AT211991B - Method and device for prestressing and stress relieving of reclaimable prestressed concrete rods running in the concrete body without joining - Google Patents

Method and device for prestressing and stress relieving of reclaimable prestressed concrete rods running in the concrete body without joining

Info

Publication number
AT211991B
AT211991B AT863758A AT863758A AT211991B AT 211991 B AT211991 B AT 211991B AT 863758 A AT863758 A AT 863758A AT 863758 A AT863758 A AT 863758A AT 211991 B AT211991 B AT 211991B
Authority
AT
Austria
Prior art keywords
rod
spacer
prestressed concrete
anchoring
anchoring element
Prior art date
Application number
AT863758A
Other languages
German (de)
Original Assignee
Tor Isteg Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tor Isteg Steel Corp filed Critical Tor Isteg Steel Corp
Application granted granted Critical
Publication of AT211991B publication Critical patent/AT211991B/en

Links

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren und Vorrichtung zum Vorspannen und Entspannen von verbundlos im vorzuspannenden Betonkörper verlaufenden, 
 EMI1.1 
 
Die Erfindung betrifft ein Verfahren zum Vorspannen und Entspannen von verbundlos im vorzuspan- nenden Betonkörper verlaufenden, wiedergewinnbaren Spannbetonstäben mit einem an der Staboberflä- che angreifenden Verankerungselement, das sich über ein Distanzstück gegen die Stirnseite des vorzu- spannenden Betonkörpers mittelbar abstützt, wobei Verankerungselement und Distanzstückmitgegenein-   ander gerichteten,   in verschiedener Höhe liegenden Stirnflächenteilen ausgestattet sind, die bei Ver- drehung dieser beiden Elemente gegeneinander in verschiedenen Stellungen ineinander zu liegen kom- men, so dass diese Elemente jeweils verschieden tief ineinandergreifen, sowie eine Vorrichtung zur Durch- führung dieses Verfahrens. 



   Zwischen dem eigentlichen Verankerungselement und der Stirnseite des vorzuspannenden   Beton. -   körpers werden Distanzstücke bekanntlich deshalb angeordnet, um beispielsweise bei sukzessiver Vor- spannung das zeitraubende Nachstellen des Verankerungselementes zu sparen. Bei   Spannbetonstäben,   de- ren zu verankerndes Ende mit einem Gewinde versehen ist, und bei denen das Verankerungselement als
Mutter ausgebildet wird, wäre ferner das Verdrehen dieser Mutter sehr langwierig, wenn die Spannbeton- körper grosse Länge aufweisen und das Mass der elastischen Dehnung des Spannbetonstabes dementsprechend gross ist. 



   Es ist deshalb schon vorgeschlagen worden, nach dem Vorspannen eines mit einem Verankerung- element versehenen Spannstabes ein Distanzstück zwischen das Verankerungselement und die Stirnseite des vorzuspannenden Betonkörpers einzuschieben ; diese Vorgangsweise ist jedoch in manchen Fällen nicht anwendbar, zumal dann, wenn das verankerte Stabende in der Stirnseite des vorzuspannenden Betonkör- pers versenkt angeordnet und verankert ist. Eine solche versenkte Anordnung der Stabverankerung ist bei- spielsweise bei Stahlbetonschwellen, Brückenwiderlagern, Strassendeckenabschnitten üblich und ferner auch bei vorgespannten Rammpfählen vorteilhaft, um die Verankerung unterhalb der vom Rammbären geschlagenen Pfahlkopfoberseite unterbringen zu können.

   Die Manipulation mit den Verankerungsele- menten ist in diesen Fällen naturgemäss besonders schwierig und erfordert viel Zeit, sie muss deshalb zweckmässig auf ein Mindestmass beschränkt werden. 



   Zur Erreichung dieses Zieles werden bei einem Verfahren der eingangs angegebenen Art erfindungs- gemäss die einzelnen Spannbetonstäbe mittels einer an ihrem freien Ende angreifenden Spannvorrichtung gespannt, sodann werden das Verankerungselement und das Distanzstück mit ihren gegeneinander gerich- teten Stirnflächenteilen durch Verdrehen in eine Stellung zueinander gebracht, bei welcher sie unter Ab- stützung gegen den Betonkörper eine der erfolgten Stabdehnung entsprechende Distanz ergeben, worauf die Spannvorrichtung entfernt werden kann, und schliesslich wird der Stab zu seiner Entspannung und Wiedergewinnung neuerlich mittels einer am freien Ende angreifenden Spannvorrichtung gespannt, so dass Verankerungselement und Distanzstück spannungsfrei in eine ineinandergreifende Stellung gering- ster Distanz verdreht bzw. vom Stabende entfernt werden können. 



   Bei der Einrichtung zur Durchführung des erfindungsgemässen Verfahrens sind gemäss der Erfindung das Verankerungselement und das Distanzstück mit jeweils paarweise diametral einander gegenüberlie- genden Stirnflächenteilen versehen, die in gleicher Ebene verlaufen. 

 <Desc/Clms Page number 2> 

 



   Wiederzugewinnende und damit wiederverwendbare Bewehrungsstäbe finden bekanntlich insbeson- dere bei Rammpfählen Verwendung, die zwar während des Rammens einer starken Armierung gegen Aus- knicken bedürfen, sobald sie aber im Boden stecken, nur noch auf reinen Druck beansprucht werden, so dass dann auf diese zum Vorspannen dienende Spannarmierung verzichtet werden kann.

   Diese Spannstäbe sind zum Zweck der Wiedergewinnung aus dem bereits gerammten Pfahl im Bereich der Pfahlspitze der- art verankert, dass die ansonsten unzulängliche Verankerung vom Pfahlkopf aus gelöst werden kann ; bei
Schraubverankerungen erfolgt das Lösen durch Ausdrehen des mit Gewinde versehenen Stabes aus einer ortsfesten Mutter, bei Keilverankerungen genügt ein Abwärtsbewegen der Armierungsstange, wodurch die mit der Spitze zum Pfahlkopf weisende Keile zwangsläufig aus der Verankerung gelöst werden. 



   Die Erfindung lässt sich. ungeachtet der Art der unterseitigen Verankerung solcher wiederzugewinnen- der Spannstäbe, mit Vorteil sowohl auf solche Spannstäbe anwenden, deren oberes Ende mit Keilen ver- ankert ist als auch auf solche Stäbe, die mit Gewinden versehen sind und am oberen Ende von einer Ver- ankerungsmutter gehalten werden. Bei ersteren wird das Lösen oberseitiger Keile überhaupt erst durch die   erfindungsgemässe Massnahme   ermöglicht, da es sonst nicht möglich wäre, die bereits vorgespannte Ar- mierung samt den Keilen aus dem Keilwiderlager so weit herauszuziehen, dass die Keile sichlö- sen. 



   Gerade bei wiederzugewinnenden Armierungsstäben ist aber anderseits der Vorteil von Keilveran- kerungen besonders   schätzenswert ;   diese wiederverwendbaren Stäbe sollen begreiflicherweise an ihrer
Oberfläche unbearbeitet bleiben, um eine neuerliche Verankerung an jeder beliebigen Stelle der Stab- länge vornehmen zu können. Der Wert der vorliegenden Erfindung beruht demnach nicht zuletzt auf der vorteilhaften Anwendungsmöglichkeit für solche wiederzugewinnende Spannstäbe und deren Veran- kerung. 



   Verankerungselement und Distanzstück können im Rahmen der Erfindung auf mannigfache Art ge- geneinander abgestützt ineinandergreifen, beispielsweise können diese Elemente in verschiedenen Stel- lungen mitsammen verzapft, gekuppelt, nach Art eines Bajonettverschlusses mitsammen verriegelt oder auch verschraubt sein, wobei jede Stellung jeweils eine andere Distanz zwischen Verankerungselement und freier Stirnseite des Distanzstückes bzw. Betonkörpers festlegt. 



   Nach einer bevorzugten Ausführungsform der Erfindung sind am Verankerungselement und am Di- stanzstück beispielsweise je zwei Paare   diametral gegenüberliegende,   in verschiedenen Ebenen liegende
Stirnflächenteile vorgesehen, die sich über je etwa einen Viertelkreis erstrecken, so dass die Elemente mit den jeweils vorragenden Stirnteilen ineinander gesteckt werden können oder sich wahlweise-zwecks
Erzielung einer grösseren Distanz - mit den Stirnflächen der vorragenden Teile gegeneinander ab- stützen. 



   Im letztgenannten Fall ist es angesichts der grossen Spannkraft, die als Druckkraft von den Elemen- ten zu übertragen ist, wichtig, dass sichdiejeweilshöherliegenden, vorragenden Stirnflächenteile der beiden Elemente, wenn sie aufeinander zu liegen kommen, genau decken. Zur Sicherstellung dieser
Deckung kann bei einer Endverankerung für   Spannbetonstäbe,   deren zu verankerndes Ende mit einem Ge- winde versehen ist, nach einem weiteren Erfindungsmerkmal das als Mutter ausgebildete Verankerungs- element an mindestens einem seiner   höherliegenden Stirnflächenteile   einen in Drehrichtung der Mutter wirksamen Anschlag für einen an einem ebenfalls höherliegenden Stirnflächenteil des Distanzstückes zu- geordneten Anschlag aufweisen, wobei dann diese Anschläge derart angeordnet sind,

   dass sie die Mutter mit dem Distanzstück beim Anziehen der Mutter in einer Lage verriegeln, bei der die zugeordneten höherliegenden Stirnflächen beider Elemente einander genau gegenüberliegen und sich mit richtigen
Passsitz aneinanderpressen. 



   Nach einer andern Ausführungsvariante der Erfindung kann das um die Achse des Spannbetonstabes drehbare Distanzstück am Verankerungselement über Wendel-oder Schraubflächen anliegen, wobei das
Verankerungselement in an sich bekannter Weise als ortsbewegliches Widerlager für mindestens einen, vorzugsweise zwei gegenüberliegende, am Spannbetonstab angreifende Verankerungskeile ausgebildet ist.
Um einen in bezug auf das Stabzentrum absulot symmetrischen Verlauf jener Ebene, in der die zu über- tragenden Druckkräfte verlaufen, zu sichern, kann das Verankerungselement sowie auch das um die Ach- se des Spannbetonstabes drehbare Distanzelement mit je zwei sich über je einen halben Kreisbogen er- streckenden Wandelflächen ausgestattet sein, die im Verlauf jedes Durchmessers des Elementes durchwegs gleich hoch sind.

   Verankerungselement und Distanzstück kommen dann zuverlässig derart zum Anlie- gen, dass eine in exzentrischer Ebene verlaufende Beanspruchung der Verankerungselemente, die ange- sichts der hohen zu übertragenden Kräfte gefährlich wäre, auf jeden Fall vermieden erscheint. 

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 

 <Desc/Clms Page number 4> 

 - 4wird dabei von seinem Sitz auf der Ankerplatte 10 entfernt. Bei   Aufrechterl1altung   der Spannung wird schliesslich das Distanzstück 4 auf dem voll vorgespannten Stab so lange aufgedreht. bis jene Stirnfläche, die dem Betonkörper 1 zugewendet ist, an der Ankerplatte 10 satt anliegt. Nunmehr kann die Spannvor- richtung 14 endgültig gelöst werden, und der Stab 2 ist genau in seiner richtigen Spannstellung fii xiert. 



   Ähnlich ist die Wirkungsweise der Ausführungsvariante nach Fig. 6. An Stelle des kontinuierlichen
Gewindes 17 der Ausführungsform nach Fig. 5 treten hier zwei diskontinuierlich aneinanderschliessende 
 EMI4.1 
 erstrecken sich überim Verlauf jedes Durchmessers der Elemente 3 bzw. 4 durchwegs ganz gleich hoch ; die Steigung der Wen- delflächen 18 ist so gewählt, dass sie selbsthemmend wirken,   d. h.   ein Aufdrehen unter axialem Druck ausgeschlossen ist.

   Die durch das endgültige Anspannen des Spannstabes 2 auf volle Vorspannung verur- sachte Distanzänderung zwischen dem beweglichen Widerlager 3 und der Ankerplatte 10 bzw. dem Be- tonkörper 1 kann nun durch Drehen des lockersitzenden Distanzstückes 4 um die Stabachse ausgeglichen werden, wobei infolge Anordnung zweier, in diametral gegenüberliegenden Flächenteilen absolut gleich hoher Wendelflächen gewährleistet ist, dass die Übertragungsflächen für die Druckkräfte der Vorspannung einander immer diametral gegenüberliegen und kein Kräfteverlauf in einer aussermittigen Ebene statt- finden kann. 



   Bei den zuletzt beschriebenen Keilverankerungen in einem beweglichen Widerlager kann übrigens mit Vorteil eine sogenannte doppeltwirkende Presse Verwendung finden, welche im Rückzug (beim teil- weisen Entlasten der Armierung) zwangsläufig gleich die Keile in das Widerlager hineinpresst. 



   Selbstverständlich sind im Rahmen der Erfindung neben den beschriebenen und dargestellten Aus-   fühlungsbeispielen   noch zahlreiche weitere. Varianten denkbar, ohne den Rahmen der Erfindung dabei zu verlassen ; insbesondere ist eine sehr mannigfaltige Ausgestaltung der Distanzstücke zur Erzielung des von der Erfindung angestrebten Effektes möglich. 



   PATENTANSPRÜCHE ; 
1. Verfahren zum Vorspannen und Entspannen von verbundlos im vorzuspannenden Betonkörper verlaufenden wiedergewinnbaren   Spannbetonstäben   mit einem an der Staboberfläche angreifenden Verankerungselement, das sich über ein Distanzstück gegen die Stirnseite des vorzuspannenden Betonkörpers mittelbar abstützt, wobei Verankerungselement und Distanzstück mit gegeneinander gerichteten in verschiedener Höhe liegenden Stirnflächenteilen ausgestattet sind, die bei Verdrehung dieser beiden Elemente gegeneinander in verschiedenen Stellungen ineinander zu liegen kommen, so dass diese Elemente jeweils verschieden tief ineinandergreifen, dadurch gekennzeichnet, dass die einzelnen   Spannbetonstäbe   mittels einer an ihrem freien Ende angreifenden Spannvorrichtung gespannt werden,

   dass sodann das Verankerungselement und das Distanzstück mit ihren gegeneinander gerichteten Stirnflächenteilen durch Verdrehen in eine Stellung zueinander gebracht werden, bei welcher sie unter Abstützung gegen den Betonkörper eine der erfolgten Stabdehnung entsprechende Distanz ergeben, worauf die Spannvorrichtung entfernt werden kann und dass   schliesslich.   zum Entspannen und Wiedergewinnen des Stabes der Stab neuerlich mittels einer am freien Ende angreifenden Spannvorrichtung gespannt wird, so dass Verankerungselement und Distanzstück spannungsfrei in eine ineinandergreifende Stellung geringster Distanz verdreht bzw. vom Stabende entfernt werden können.



   <Desc / Clms Page number 1>
 



  Method and device for prestressing and relieving unconnected concrete in the concrete body to be prestressed,
 EMI1.1
 
The invention relates to a method for prestressing and relieving unconnected, in the prestressed concrete body running, recoverable prestressed concrete rods with an anchoring element engaging the rod surface, which is indirectly supported via a spacer against the end face of the concrete body to be prestressed, the anchoring element and spacer also opposing - other facing end face parts lying at different heights are equipped which, when these two elements are rotated relative to one another, come to lie one inside the other in different positions, so that these elements mesh with one another to different depths, as well as a device for carrying out this method.



   Between the actual anchoring element and the face of the concrete to be prestressed. As is well known, spacers are arranged in the body in order, for example, to save the time-consuming readjustment of the anchoring element in the case of successive prestressing. In prestressed concrete rods whose end to be anchored is provided with a thread, and in which the anchoring element as
Nut is formed, the twisting of this nut would also be very tedious if the prestressed concrete bodies have a great length and the degree of elastic expansion of the prestressed concrete rod is correspondingly large.



   It has therefore already been proposed to insert a spacer between the anchoring element and the end face of the concrete body to be prestressed after a tensioning rod provided with an anchoring element has been prestressed; However, this procedure cannot be used in some cases, especially when the anchored rod end is arranged and anchored in the face of the concrete body to be prestressed. Such a recessed arrangement of the rod anchoring is common, for example, with reinforced concrete sleepers, bridge abutments, road surface sections and is also advantageous with prestressed driven piles in order to be able to accommodate the anchoring below the top of the pile head hit by the pile driver.

   The manipulation with the anchoring elements is naturally particularly difficult in these cases and requires a lot of time, it must therefore be appropriately limited to a minimum.



   To achieve this goal, according to the invention, the individual prestressed concrete rods are tensioned by means of a tensioning device acting on their free end in a method of the type specified at the beginning, then the anchoring element and the spacer with their facing parts facing each other are brought into a position relative to one another by turning, at which, with support against the concrete body, they produce a distance corresponding to the rod expansion, whereupon the tensioning device can be removed, and finally the rod is tensioned again by means of a tensioning device acting at the free end, so that the anchoring element and spacer Can be rotated stress-free into an interlocking position of the smallest distance or removed from the rod end.



   In the device for carrying out the method according to the invention, according to the invention, the anchoring element and the spacer are provided with face parts which are diametrically opposed to one another in pairs and which run in the same plane.

 <Desc / Clms Page number 2>

 



   Reinforcing bars that can be recovered and thus re-used are known to be used in particular in driven piles, which require strong reinforcement against buckling during driving, but as soon as they are stuck in the ground, they are only subjected to pure pressure, so that they are then used for prestressing serving reinforcement can be dispensed with.

   For the purpose of recovery from the pile that has already been driven, these tie rods are anchored in the region of the pile tip in such a way that the otherwise inadequate anchoring can be released from the pile head; at
Screw anchors are loosened by unscrewing the threaded rod from a stationary nut; in the case of wedge anchors, it is sufficient to move the reinforcing rod downwards, which inevitably detaches the wedges pointing towards the pile head from the anchoring.



   The invention can. Regardless of the type of anchoring on the underside of such recoverable tie rods, use it with advantage both on those tie rods whose upper end is anchored with wedges and on those rods which are provided with threads and held at the upper end by an anchoring nut will. In the case of the former, the loosening of the top wedges is only made possible by the measure according to the invention, since otherwise it would not be possible to pull the already prestressed reinforcement together with the wedges out of the wedge abutment so far that the wedges come loose.



   On the other hand, however, the advantage of wedge anchors is particularly valuable when it comes to rebars that are to be recovered; these reusable sticks should understandably be attached to your
Surface remain unprocessed in order to be able to re-anchor at any point along the length of the rod. The value of the present invention is therefore based not least on the advantageous application possibility for such tie rods to be recovered and their anchoring.



   Within the scope of the invention, anchoring element and spacer can interlock in a variety of ways supported against one another, for example these elements can be pegged, coupled, locked together in the manner of a bayonet joint or screwed together in different positions, with each position having a different distance between Fixes anchoring element and free face of the spacer or concrete body.



   According to a preferred embodiment of the invention, on the anchoring element and on the spacer there are, for example, two pairs of diametrically opposed pairs lying in different planes
End face parts are provided which each extend over approximately a quarter circle, so that the elements with the respectively protruding end parts can be plugged into one another or alternatively for the purpose
Achieving a greater distance - support each other with the end faces of the protruding parts.



   In the last-mentioned case, in view of the great tension force that is to be transmitted by the elements as a compressive force, it is important that the respectively higher, protruding end face parts of the two elements coincide exactly when they come to rest on one another. To ensure this
In the case of end anchoring for prestressed concrete rods whose end to be anchored is provided with a thread, cover can, according to a further feature of the invention, be the anchoring element designed as a nut on at least one of its higher end face parts, an effective stop in the direction of rotation of the nut for a stop which is also higher Have end face part of the spacer assigned stop, these stops then being arranged in such a way

   that they lock the nut with the spacer when tightening the nut in a position in which the associated higher end faces of both elements are exactly opposite each other and with correct
Press fit together.



   According to another embodiment of the invention, the spacer rotatable about the axis of the prestressed concrete rod can rest on the anchoring element via helical or screw surfaces
Anchoring element is formed in a manner known per se as a movable abutment for at least one, preferably two opposite, anchoring wedges engaging the prestressed concrete rod.
In order to ensure an absolutely symmetrical course of the plane in which the compressive forces to be transmitted run in relation to the rod center, the anchoring element as well as the spacer element rotatable around the axis of the prestressed concrete rod can each have two each over half a circular arc Extensive wall surfaces must be equipped, which are consistently the same height in the course of each diameter of the element.

   The anchoring element and spacer then come into contact reliably in such a way that stress on the anchoring elements running in an eccentric plane, which would be dangerous in view of the high forces to be transmitted, appears to be avoided in any case.

 <Desc / Clms Page number 3>

 
 EMI3.1
 

 <Desc / Clms Page number 4>

 - 4 is removed from its seat on the anchor plate 10. When the tension is maintained, the spacer 4 is finally unscrewed on the fully pre-tensioned rod. until that end face which faces the concrete body 1 rests snugly on the anchor plate 10. The tensioning device 14 can now be finally released, and the rod 2 is fixed precisely in its correct tensioning position.



   The mode of operation of the variant embodiment according to FIG. 6 is similar. Instead of the continuous one
Thread 17 of the embodiment according to FIG. 5 occurs here two discontinuously adjoining one another
 EMI4.1
 extend over the course of each diameter of the elements 3 and 4 consistently at exactly the same height; the slope of the helical surfaces 18 is chosen so that they have a self-locking effect, d. H. unscrewing under axial pressure is excluded.

   The change in distance between the movable abutment 3 and the anchor plate 10 or the concrete body 1 caused by the final tensioning of the tie rod 2 to full pre-tension can now be compensated for by rotating the loosely seated spacer 4 around the rod axis, whereby due to the arrangement of two, In diametrically opposite surface parts of helical surfaces of the same height, it is ensured that the transfer surfaces for the compressive forces of the preload are always diametrically opposed to each other and that no force distribution can take place in an eccentric plane.



   In the case of the wedge anchoring described last in a movable abutment, a so-called double-acting press can be used with advantage, which inevitably presses the wedges into the abutment when the armoring is partially relieved.



   Of course, in addition to the exemplary embodiments described and illustrated, numerous other examples are within the scope of the invention. Variants are conceivable without departing from the scope of the invention; In particular, a very varied configuration of the spacers is possible in order to achieve the effect sought by the invention.



   PATENT CLAIMS;
1. A method for pre-stressing and relieving tensioning and relieving of unconnected re-stressed concrete rods running in the concrete body to be prestressed, with an anchoring element engaging the rod surface, which is indirectly supported via a spacer against the end face of the concrete body to be prestressed, the anchoring element and spacer being equipped with mutually opposing end face parts at different heights which come to lie one inside the other in different positions when these two elements are rotated, so that these elements mesh with one another to different depths, characterized in that the individual prestressed concrete rods are tensioned by means of a tensioning device engaging at their free end,

   that then the anchoring element and the spacer with their oppositely directed end face parts are brought into a position to each other by twisting, in which they result in a distance corresponding to the rod expansion, supported against the concrete body, whereupon the clamping device can be removed and that finally. to relax and regain the rod, the rod is again tensioned by means of a tensioning device acting on the free end, so that the anchoring element and spacer can be rotated tension-free into an interlocking position of the smallest distance or removed from the rod end.

 

Claims (1)

2. Einrichtung zur Durchführung des Verfahrens nach Anspruch l, dadurch gekennzeichnet, dass das Verankerungselement (3) und das Distanzstück (4) mit jeweils paarweise diametral einander gegenüberliegenden Stirnflächenteilen (6, 7, 7') versehen sind, die in gleicher Ebene verlaufen (Fig. l - 4). 2. Device for carrying out the method according to claim l, characterized in that the anchoring element (3) and the spacer (4) are provided with each pair of diametrically opposite end face parts (6, 7, 7 ') which run in the same plane ( Fig. 1 - 4). 3. Einrichtung nach Anspruch 2, dadurch gekennzeichnet, dass bei jedem der beiden Elemente (3,4) jeweils zwei Paare diametral gegenüberliegende, in verschiedenen Ebenen liegende Stirnflächenteile (6, 7, 7') vorgesehen sind, die sich über je etwa einen Viertelkreis erstrecken (Fig. l-4). 3. Device according to claim 2, characterized in that for each of the two elements (3, 4) there are two pairs of diametrically opposite end face parts (6, 7, 7 ') lying in different planes, each of which extends over approximately a quarter circle extend (Fig. l-4). 4. Einrichtung nach Anspruch 3 für Spannbetonstäbe, deren zu verankerndes Ende mit einem Gewinde versehen ist, dadurch gekennzeichnet, dass das als Mutter ausgebildete Verankerungselement (3) an mindestens einem der höherliegenden Stirnflächenteile (6) einen in Drehrichtung der Mutter wirksamen Anschlag (12) für einen an einem ebenfalls höherliegenden Stirnflächenteil (7') des Distanzstückes (4) zugeordneten Anschlag (13) aufweist, wobei diese Anschläge (12, 13) derart angeordnet sind, dass sie die Mutter (3) mit dem Distanzstück (4) bei Drehung ersterer in Anzugsrichtung in einer Stellung verriegeln, bei welcher die zugeordneten höherliegenden Stirnflächenteile (6,7') beider Elemente (3, 4) einander genau gegenüberliegen (Fig. l - 4). <Desc/Clms Page number 5> 4. Device according to claim 3 for prestressed concrete rods whose end to be anchored is provided with a thread, characterized in that the anchoring element (3) designed as a nut has a stop (12) effective in the direction of rotation of the nut on at least one of the higher end face parts (6) for a stop (13) assigned to a likewise higher end face part (7 ') of the spacer (4), these stops (12, 13) being arranged in such a way that they the nut (3) with the spacer (4) upon rotation Lock the former in the tightening direction in a position in which the associated higher end face parts (6, 7 ') of both elements (3, 4) are exactly opposite one another (FIGS. 1-4). <Desc / Clms Page number 5> 5. Einrichtung nach Anspruch 4. dadurch gekennzeichnet, dass der Anschlag aus einer radial verlaufenden, an einem in Anzugsdrehrichtung nachgeordneten Rand eines jeweils höherliegenden Stirnflächenteiles (6, 7') angeordneten Anschlagleiste (13) bzw. einer dieser Leiste (13) zugeordneten Nut (12) besteht (Fig. 1 - 4). 5. Device according to claim 4, characterized in that the stop consists of a radially extending stop strip (13) or a groove (13) assigned to this strip (13) on a downstream edge of a respective higher end face part (6, 7 ') in the tightening direction of rotation. 12) (Figs. 1 - 4). 6. Einrichtung nach Anspruch 5, dadurch gekennzeichnet, dass die Höhe des Anschlages (13) bzw. die Tiefe der Nut (12) etwas grösserist als eine Gewindeganghöhe der Verankerungsmutter (3). 6. Device according to claim 5, characterized in that the height of the stop (13) or the depth of the groove (12) is somewhat greater than a thread pitch of the anchoring nut (3). 7. Verfahren zum Vorspannen eines mit einer Einrichtung nach einem der Ansprüche 4 bis 6 ausgestatteten Spannbetonstabes, dadurch gekennzeichnet, dass vor dem Spannen des Stabes (2) Verankerungmutter (3) und Distanzstück (4) ineinandergreifend auf das zu verankernde Stabende aufgebracht werden (Fig. 1), sodann vorgespannt wird (Fig. 2) und dass schliesslich die Verankerungsmutter (3) auf dem noch in der Spannvorrichtung (14) festgehaltenen Ende des vorgespannten Stabes (2) so lange in Anzugsrichtung gedreht wird, bis sie vorerst das Distanzstück (4) in ihrer Drehung mitnimmt und dann bei weiterer Drehung ihre höheren Stirnflächenteile (6) an den höheren, genau gegenüberliegenden Stirnflächenteilen (7') des Distanzstückes (4) satt anliegen. 7. A method for prestressing a pre-stressed concrete rod equipped with a device according to one of claims 4 to 6, characterized in that before the rod (2) is tensioned, anchoring nut (3) and spacer (4) are applied to the rod end to be anchored in an interlocking manner (Fig . 1), is then pre-tensioned (Fig. 2) and that finally the anchoring nut (3) on the end of the pre-tensioned rod (2) still held in the tensioning device (14) is rotated in the tightening direction until it first removes the spacer ( 4) entrains in its rotation and then with further rotation its higher end face parts (6) lie snugly against the higher, exactly opposite end face parts (7 ') of the spacer (4). 8. Einrichtung zur Durchführung des Verfahrens nach Anspruch l, dadurch gekennzeichnet, dass das um die Achse des Spannbetonstabes (2) drehbare Distanzstück (4) am Verankerungselement (3) über Wendel- oder Schraubflächen (17, 18) anliegt und dass das Verankerungselement (3) in an sich bekannter Weise als ortsbewegliches Widerlager für mindestens einen, vorzugsweise zwei gegenüberliegende, am Spannbetonstab (2) angreifende Verankerungskeile (15) ausgebildet ist (Fig. 5,6). 8. Device for performing the method according to claim l, characterized in that the spacer (4) rotatable about the axis of the prestressed concrete rod (2) rests on the anchoring element (3) via helical or screw surfaces (17, 18) and that the anchoring element ( 3) is designed in a manner known per se as a movable abutment for at least one, preferably two opposite, anchoring wedges (15) engaging the prestressed concrete rod (2) (FIGS. 5, 6). 9. Einrichtung nach Anspruch 8, dadurch gekennzeichnet, dass das Verankerungselement (3) sowie das um die Achse des Spannbetonstabes (2) drehbare Distanzstück (4) mit je zwei sich über je einen halben Kreisbogen erstreckenden. Wendelflächen (18) ausgestattet sind, die im Verlauf jedes Durchmessers des Elementes durchwegs gleich hoch sind (Fig. 6). 9. Device according to claim 8, characterized in that the anchoring element (3) and the spacer (4) rotatable around the axis of the prestressed concrete rod (2), each with two each extending over half a circular arc. Helical surfaces (18) are equipped, which are consistently the same height in the course of each diameter of the element (Fig. 6). 10. Verfahren zum Vorspannen eines mit einer Einrichtung nach Anspruch 8 oder 9 ausgestatteten Spannbetonstabes, dadurch gekennzeichnet, dass der Spannbetonstab (2) vorerst durch eine an ihm angreifende Spannvorrichtung (14) gespannt wird, dass anschliessend dessen Spannung unter Einbringung der Keile (15) etwas nachgelassen wird, wobei die Keile vom Stab (2) mitgenommen und in dem beweglichen Widerlager (Verankerungselement (3)) verkeilt werden, dass sodann die Spannvorrichtung am Widerlager (3) angesetzt und dasselbe mit dem Distanzstück (4), den Keilen (15) und dem Stab (2) hochgezogen und der Stab auf volle Höhe gespannt wird und dass schliesslich das Distanzstück (4) auf dem noch in der Spannvorrichtung (14) festgehaltenen Ende des vorgespannten Stabes (2) so lange in Anzugsrichtung gedreht wird, bis sowohl einerseits seine Stirnflächenteile (17 bzw. 10. A method for prestressing a prestressed concrete rod equipped with a device according to claim 8 or 9, characterized in that the prestressed concrete rod (2) is initially tensioned by a clamping device (14) which acts on it, and then its tensioning with the introduction of the wedges (15) is slackened somewhat, with the wedges being carried along by the rod (2) and wedged in the movable abutment (anchoring element (3)), so that the clamping device is then attached to the abutment (3) and the same with the spacer (4), the wedges (15 ) and the rod (2) is pulled up and the rod is tensioned to its full height and that finally the spacer (4) on the end of the pre-tensioned rod (2) still held in the tensioning device (14) is rotated in the tightening direction until both on the one hand its end face parts (17 resp. 18) am beweglichen Widerlager (3) als auch anderseits seine freie, dem Betonkörper zugewendete Stirnfläche am Betonkörper, vorzugsweise mittelbar, satt anliegen. 18) on the movable abutment (3) and on the other hand, its free end face facing the concrete body, preferably indirectly, lie snugly on the concrete body. 11. Verfahren zum Entspannen eines mit einer Endverankerung nach Anspruch 8 oder 9 ausgestatteten Spannbetonstabes, dadurch gekennzeichnet, dass der vorgespannte Spannbetonstab (2) durch eine an ihm angreifende Spannvorrichtung (14) nur ein geringes Mass noch weiter angespannt wird, so dass sich der Pressdruck auf das bewegliche Widerlager (3) verringert, dass sodann das Distanzstück (4) in jene Stellung gedreht wird, in der es mit dem Widerlager (3) am weitesten ineinandergreift, und dass schliesslich - bei Aufrechterhaltung der vollen Spannung des in der Spannvorrichtung festgehaltenen Stabes - das bewegliche Widerlager in Richtung zum Betonkörper hin bewegt und aus der Keilverankerung gelöst wird. 11. A method for relaxing a prestressed concrete rod equipped with an end anchorage according to claim 8 or 9, characterized in that the prestressed prestressed concrete rod (2) is only further tightened to a small extent by a clamping device (14) acting on it, so that the pressure is increased on the movable abutment (3) that then the spacer (4) is rotated into that position in which it meshes with the abutment (3) the most, and that finally - while maintaining the full tension of the rod held in the clamping device - The movable abutment is moved towards the concrete body and is released from the wedge anchorage.
AT863758A 1958-05-19 1958-12-15 Method and device for prestressing and stress relieving of reclaimable prestressed concrete rods running in the concrete body without joining AT211991B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
LU211991X 1958-05-19

Publications (1)

Publication Number Publication Date
AT211991B true AT211991B (en) 1960-11-25

Family

ID=19732363

Family Applications (1)

Application Number Title Priority Date Filing Date
AT863758A AT211991B (en) 1958-05-19 1958-12-15 Method and device for prestressing and stress relieving of reclaimable prestressed concrete rods running in the concrete body without joining

Country Status (1)

Country Link
AT (1) AT211991B (en)

Similar Documents

Publication Publication Date Title
DE102007004226B3 (en) Anchor system of a concrete wall formwork
DE3131078C1 (en) Anchoring or connecting body for steel bars having surface profilings in the form of ribs
DE1194552B (en) Draw bolt socket for connection to roll-formed prestressing bars with a circular core cross-section
DE2537649C3 (en) Device for anchoring a tie rod for prestressed concrete
AT211991B (en) Method and device for prestressing and stress relieving of reclaimable prestressed concrete rods running in the concrete body without joining
DE2927953A1 (en) MOUNTAIN ANCHOR
DE1683121C3 (en) Spiral staircase
DE3034740C2 (en)
DE1184060B (en) Thread anchoring of prestressed concrete rods and procedures for prestressing rods with this end anchorage
AT386037B (en) Arrangement for fastening uprights on building structures
AT224575B (en) Heald frame
AT215912B (en) Driven pile
AT249962B (en) Prestressed concrete process with subsequent bond and anchor head for this process
DE1917370A1 (en) Arrangement for the protection of tendon anchorages
DE975861C (en) Clamping head made of concrete for bundles of bars, especially of prestressed concrete components
AT333106B (en) DEVICE FOR FASTENING PANEL PLATES OF TUBE OR DRUM MILLS
AT387412B (en) Device for fastening rails on plastic sleepers
DE1077854B (en) Reinforcing bar for concrete, especially for prestressed concrete
AT203190B (en) Anchoring the reinforcement of concrete
DE1917370C (en) Device for protecting tendon anchorages against corrosion
DE1808293A1 (en) Device for anchoring tendons in components made of prestressed concrete
AT224882B (en) Formwork anchor
AT263321B (en) Anchoring for concrete formwork
AT310416B (en) Formwork anchor with lost inner anchor rod
AT204986B (en) Double wedge anchors, especially for pit and tunnel construction