AT164228B - System for coupling an electrical network with a second network with a different frequency or number of phases - Google Patents

System for coupling an electrical network with a second network with a different frequency or number of phases

Info

Publication number
AT164228B
AT164228B AT164228DA AT164228B AT 164228 B AT164228 B AT 164228B AT 164228D A AT164228D A AT 164228DA AT 164228 B AT164228 B AT 164228B
Authority
AT
Austria
Prior art keywords
network
phase
turbine
coupling
pump
Prior art date
Application number
Other languages
German (de)
Inventor
Eduard Dipl Ing Dr Techn Senn
Original Assignee
Eduard Dipl Ing Dr Techn Senn
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eduard Dipl Ing Dr Techn Senn filed Critical Eduard Dipl Ing Dr Techn Senn
Application granted granted Critical
Publication of AT164228B publication Critical patent/AT164228B/en

Links

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Anlage zur Kupplung eines elektrischen Netzes mit einem zweiten Netz anderer Frequenz bzw. Phasenzahl 
In der Elektrowirtschaft besteht häufig das Bedürfnis, Netze verschiedener Art miteinander zu verbinden, um von einem Netz in das andere Energie zu liefern, z. B. um einen Überbedarf eines Netzes aus dem anderen decken oder die bei plötzlicher Entlastung eines Netzes vorhandene Überschuss-Energie im anderen Netz unterbringen zu können und dadurch Wasser-oder Brennstoffverluste zu vermeiden. Ein wichtiger Fall ist das Problem, aus einem mit 50 Perioden betriebenem Drehstromnetz ein mit   16 2/3   Perioden betriebenes Einphasenbahnnetz zu speisen. 



  Die naheliegendste Lösung dieses Problems ist die Verwendung eines Umformeraggregats, wobei z. B. aus dem Drehstromnetz ein Drehstrommotor betrieben wird, der seinerseits wiederum einen Einphasengenerator antreibt. Bei dieser Anordnung ist jedoch ein konstantes Verhältnis der Frequenz in beiden Netzen unbedingte Voraussetzung, was in der heutigen Praxis die grössten Schwierigkeiten bereitet. Als Ausweg wurde daher für diesen Zweck auch ein Asynchron-Motor mit Hintermaschine benützt, durch welche die Drehzahl reguliert werden kann. 



  Auch Drehstromkollektormotoren können Verwendung finden. Beide Anordnungen sind aber teuer und für grössere Leistungen aus konstruktiven Gründen schwer auszuführen. 



   Will man bestehende Anlagen umbauen, so bereitet der Anbau eines Drehstrommotors an ein Turbinen-Einphasengenerator-Aggregat auch dadurch grosse Schwierigkeiten, weil die Verlängerung der Welle nur mit grossen Kosten durchführbar ist. 



   Den Gegenstand der Erfindung bildet eine Anlage zur Kupplung eines durch ein Wasserturbinenaggregat gespeisten elektrischen Netzes mit einem zweiten elektrischen Netz anderer Frequenz bzw. Phasenzahl, die auch bei bestehenden Werken dieser Art mit relativ geringen Kosten herstellbar ist und besonders bei Speicherwerken bedeutende Vorteile bietet. Erfindungsgemäss wird durch ein vom zweiten Netz gespeistes an sich bekanntes Motor-Pumpenaggregat der Turbine Wasser zugeführt. 



   In der Zeichnung sind zwei Ausführungsbeispiele der Erfindung in Fig. 1 im Schaltschema dargestellt. Fig. 2 zeigt ein Rohranschlussstück. 



   Eine Gruppe von zwei Turbinen T und T' wird über die Druckleitung D von einem Speicher S aus gespeist. Die damit gekuppelten Generatoren G und G'arbeiten auf ein Einphasenbahnnetz. Von einem Drehstromnetz aus, das mit dem Einphasennetz gekuppelt werden soll, wird ein Drehstromsynchronmotor SM gespeist, der eine Pumpe P antreibt, die Wasser vom Unterwasserkanal U über ein Anschlussstück A vor der Abzweigung der Druckleitung zuführt. 



   Soll also infolge Überlastung des Bahnnetzes oder zum Zwecke der Schonung des Speicherinhaltes Energie aus dem z. B. aus Laufwerken gespeisten Drehstromnetz entnommen werden, so wird das Drehstrom-Pumpenaggregat   SM-P   in Betrieb gesetzt und so die Turbinen mindestens teilweise durch im Kreislauf geführtes Wasser gespeist. 



   Bei geeigneter Ausbildung des Anschlussrohrstückes   A   als Dreieckleitung gemäss Fig. 3 besteht auch keine Schwierigkeit, bei völliger Abschaltung der Turbinen T und T'den Speicher S durch die Druckleitung aus dem Unterwasser aufzufüllen, wenn, wie dies meistens der Fall ist, dauernd genügend Unterwasser, z. B. aus einem Fluss oder See zur Verfügung steht. Es besteht auch die Möglichkeit, z. B. nur eine Turbine aus der Pumpe zu speisen und die andere Hälfte des Druckwassers in den Speicher zu fördern. Alle diese Möglichkeiten hängen natürlich von der Leistungsfähigkeit des Motorpumpenaggregates ab. 



   Auch mit einer solchen Anlage können daher, wie bei der eingangs erwähnten Kupplung beider Netze mit rein elektrischen Maschinen, auftretende Mehrbelastungen im Einphasennetz aus dem Drehstromnetz gedeckt werden. Darüber hinaus bietet aber diese Anordnung folgende Vorteile : a) Die Anlage kann ohne jede konstruktive Änderung an den Turbinen-Aggregaten gebaut werden. b) Die sehr unruhige Belastung des Bahnnetzes kann durch eine vollkommen gleichmässige Leistungsentnahme aus dem Drehstromnetz aufgebracht werden, da Überlasten des Bahnspeichers aus dem Speicher gedeckt werden könne, während eine Unterlast zu einer Auffüllung des Speichers führt. 

 <Desc/Clms Page number 2> 

 c) Überschussenergie im Drehstromnetz, z.

   B. in der Nacht oder bei Lastabwurf im Drehstromnetz kann jederzeit gespeichert und daher in Mangelzeiten, wo die Energie höher zu bewerten ist, wieder entnommen werden. Dies ist besonders wichtig, wenn das Drehstromnetz aus Laufwerken gespeist ist. 



   Als Nachteil einer solchen hydraulischen Kupplungsanlage gegenüber rein elektrischer Kupplung muss die Verringerung des Wirkungsgrades durch die zwischen Motor und Generator liegende Pumpe und Turbine in Betracht gezogen werden. 



  Gegenüber der Anordnung eines Asynchronmotors mit Hintermaschine hat diese Anordnung 
 EMI2.1 
 einen grösseren Wirkungsgrad. 



   Bedenkt man aber den Umstand, dass eine ungleichmässige Belastung des Drehstromnetzes durch die Bahnmaschinen weitere Verluste mit sich bringt, so wird der verringerte Wirkungsgrad zweifellos durch die Vorteile der gleichmässigen Belastung des Drehstromnetzes und die äusserst wertvolle Speichermöglichkeit der Drehstrom- Überschussenergie aufgewogen, wobei die leichte Umbaumöglichkeit bei bereits bestehenden Anlagen schliesslich den Ausschlag gibt. 



   Das Motorpumpen-Aggregat SM-P kann sehr einfach zu einem Reserve-Aggregat ausgebaut werden, indem an der anderen Seite eine weitere Turbine T"angebaut wird. Man kann in diesem Falle, z. B. bei abnormal kleinem Leistungsbedarf im Einphasenbahnnetz die Pumpe P ab-und die Turbine   TU anschalten   und den Synchronmotor SM als Drehstromgenerator auf das Drehstromnetz arbeiten lassen. 



   Natürlich besteht auch die Möglichkeit, den Synchronmotor mit einer Turbine eines im Kraftwerk eventuell vorhandenen Drehstrom-Aggregates kuppelbar zu machen, so dass bei Ausfall des Generators dieses Aggregates der Synchronmotor als Ersatzgenerator auf das Drehstromnetz arbeiten kann. 



   PATENTANSPRÜCHE : 
1. Anlage zur Kupplung eines durch ein Wasserturbinenaggregat gespeisten elektrischen Netzes mit einem zweiten elektrischen Netz anderer Frequenz bzw. Phasenzahl, gekennzeichnet durch ein vom zweiten Netz gespeistes, an sich bekanntes Motor-Pumpen-Aggregat   (SM-P),   das der Turbine (T) Wasser zuführt.



   <Desc / Clms Page number 1>
 



  System for coupling an electrical network with a second network with a different frequency or number of phases
In the electrical industry, there is often a need to connect networks of different types with one another in order to supply energy from one network to the other, e.g. B. to cover an excess demand of one network from the other or to be able to accommodate the excess energy present in the other network when the load on one network is suddenly discharged and thereby avoid water or fuel losses. An important case is the problem of feeding a single-phase railway network operated with 16 2/3 periods from a three-phase network operated with 50 periods.



  The most obvious solution to this problem is the use of a converter unit, where z. B. from the three-phase network a three-phase motor is operated, which in turn drives a single-phase generator. With this arrangement, however, a constant frequency ratio in both networks is an absolute prerequisite, which in today's practice causes the greatest difficulties. As a way out, an asynchronous motor with a rear machine was used for this purpose, through which the speed can be regulated.



  Three-phase collector motors can also be used. Both arrangements, however, are expensive and difficult to implement for greater performance for structural reasons.



   If you want to convert existing systems, the addition of a three-phase motor to a turbine single-phase generator unit also creates great difficulties because the extension of the shaft can only be carried out at great expense.



   The subject of the invention is a system for coupling an electrical network fed by a water turbine unit with a second electrical network of a different frequency or number of phases, which can also be produced at relatively low cost in existing plants of this type and offers significant advantages especially in storage plants. According to the invention, water is supplied to the turbine by a known motor-pump unit, which is fed by the second network.



   In the drawing, two exemplary embodiments of the invention are shown in FIG. 1 in the circuit diagram. Fig. 2 shows a pipe connector.



   A group of two turbines T and T 'is fed from an accumulator S via the pressure line D. The generators G and G 'coupled to it work on a single-phase railway network. From a three-phase network that is to be coupled to the single-phase network, a three-phase synchronous motor SM is fed, which drives a pump P, which supplies water from the underwater canal U via a connector A before the junction of the pressure line.



   So if due to overloading of the rail network or for the purpose of conserving the storage contents of the energy from the z. B. are taken from drives fed three-phase network, the three-phase pump unit SM-P is put into operation and so the turbines at least partially fed by circulating water.



   With a suitable design of the connecting pipe section A as a triangular line according to FIG. 3, there is also no difficulty in filling the reservoir S through the pressure line from the underwater when the turbines T and T 'are completely switched off, if, as is usually the case, there is always sufficient underwater, z. B. from a river or lake is available. There is also the possibility of z. B. to feed only a turbine from the pump and to promote the other half of the pressurized water in the memory. Of course, all these options depend on the performance of the motor-pump unit.



   With such a system, as with the coupling of both networks with purely electrical machines mentioned at the beginning, additional loads occurring in the single-phase network can therefore be covered from the three-phase network. In addition, however, this arrangement offers the following advantages: a) The system can be built without any structural changes to the turbine units. b) The very unsteady load on the rail network can be applied by a completely uniform power take-off from the three-phase network, since overloads of the rail storage can be covered by the storage, while an underload leads to a filling of the storage.

 <Desc / Clms Page number 2>

 c) Excess energy in the three-phase network, e.g.

   B. at night or with load shedding in the three-phase network can be stored at any time and therefore withdrawn again in times of shortage, where the energy is to be assessed higher. This is particularly important if the three-phase network is powered by drives.



   A disadvantage of such a hydraulic clutch system compared to a purely electric clutch must be the reduction in the efficiency due to the pump and turbine located between the motor and generator.



  Compared to the arrangement of an asynchronous motor with rear machine, this arrangement has
 EMI2.1
 greater efficiency.



   However, if you consider the fact that an uneven load on the three-phase network by the railway machines results in further losses, the reduced efficiency is undoubtedly offset by the advantages of the even load on the three-phase network and the extremely valuable storage option for the three-phase excess energy, with the possibility of easy conversion In the case of existing systems, it ultimately makes the difference.



   The motor-pump unit SM-P can very easily be expanded into a reserve unit by adding a further turbine T "to the other side. In this case, for example if the power requirement in the single-phase rail network is abnormally low, the pump P off and on the turbine TU and let the synchronous motor SM work as a three-phase generator on the three-phase network.



   Of course, there is also the option of coupling the synchronous motor to a turbine of a three-phase unit that may be present in the power station, so that if the generator of this unit fails, the synchronous motor can work as a backup generator on the three-phase network.



   PATENT CLAIMS:
1. System for coupling an electrical network fed by a water turbine unit with a second electrical network with a different frequency or number of phases, characterized by a known motor-pump unit (SM-P) fed by the second network, which the turbine (T ) Supplies water.

 

Claims (1)

2. Anlage nach Anspruch 1, dadurch gekennzeichnet, dass bei Hochdruckspeicherwerken in der Hochdruckleitung ein Dreieck-Rohrstück (A) angeordnet ist, das nach Wahl eine wirbelfreie Strömung sowohl vom Unterwasser (U) über die Pumpe (P) zum Generator (G) als auch vom Unterwasser (U) über die Pumpe (P) in den Speicher (S) ermöglicht. 2. System according to claim 1, characterized in that a triangular piece of pipe (A) is arranged in the high-pressure storage plants in the high-pressure line, the choice of an eddy-free flow both from the underwater (U) via the pump (P) to the generator (G) as also from underwater (U) via the pump (P) into the storage tank (S). 3. Anlage nach Anspruch 1, dadurch gekennzeichnet, dass der Synchronmotor (SM) des Pumpenaggregates mit einer Turbine (T") kuppelbar ist, derart, dass unter Ausschaltung der Pumpe der Motor (SM) als Generator zur Speisung des zweiten Netzes von dieser Turbine aus verwendbar ist. 3. System according to claim 1, characterized in that the synchronous motor (SM) of the pump unit with a turbine (T ") can be coupled, in such a way that, with the pump switched off, the motor (SM) acts as a generator for feeding the second network from this turbine is usable.
AT164228D 1947-10-14 1947-10-14 System for coupling an electrical network with a second network with a different frequency or number of phases AT164228B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT164228T 1947-10-14

Publications (1)

Publication Number Publication Date
AT164228B true AT164228B (en) 1949-10-25

Family

ID=3652949

Family Applications (1)

Application Number Title Priority Date Filing Date
AT164228D AT164228B (en) 1947-10-14 1947-10-14 System for coupling an electrical network with a second network with a different frequency or number of phases

Country Status (1)

Country Link
AT (1) AT164228B (en)

Similar Documents

Publication Publication Date Title
EP1735890B1 (en) Electric installation for coupling a power supply system and a central direct current branch and method for operating an installation of this type
WO2019185267A1 (en) Method for operating a pumped storage power plant
EP2815480A2 (en) Electric unit for a pump-storage power plant
DE2722990A1 (en) Wind driven electricity generating station - has flywheel and hydraulic circuit to balance energy input with demand
AT164228B (en) System for coupling an electrical network with a second network with a different frequency or number of phases
DE102011106877A1 (en) Asynchronous-photovoltaic generator
EP3766154B1 (en) Electrical power supply network and operation thereof
DE10220738A1 (en) Energy supply system for island grids
WO2019166202A1 (en) Combined power plant and method for operation
DE394589C (en) Steam turbine system for driving electrical generators
DE676515C (en) Multi-stage steam power plant with intermediate superheater and a memory that absorbs the excess exhaust steam from the high-pressure machine
DE383762C (en) Method for operating a machine system which has an electrical part that can be used as a generator and a motor and a hydraulic part that is operatively connected to this and can be used as a turbine or pump
DE102017211151A1 (en) The fuel cell system
US1716039A (en) Rolling mill
DE432167C (en) Process for the operation of electrical systems whose electricity-generating machines are driven by wind power
DE224294C (en) Buffer arrangement in single or multi-phase AC systems
CH537516A (en) Process for generating electrical energy and installation for carrying out the process
DE385836C (en) Arrangement for the electric drive of ship propellers by asynchronous AC motors
DE692583C (en) Frequency converter group for generating a constant medium frequency
AT127306B (en) Machine set for peak power plants.
DE971427C (en) Power plant circuit for supplying two networks with different operating conditions
AT98115B (en) Machine set with voltage that can be regulated within wide limits.
AT119321B (en) Arrangement for alternating current to direct current conversion.
DE924574C (en) Switching arrangement for power generation systems with synchronous generators
DE2126547C3 (en) Device for operating a non-self-starting machine set with an electrical machine connected to a single-phase network