AR059630A1 - Sistema y metodo de planificacion de pozo - Google Patents

Sistema y metodo de planificacion de pozo

Info

Publication number
AR059630A1
AR059630A1 ARP070100785A AR059630A1 AR 059630 A1 AR059630 A1 AR 059630A1 AR P070100785 A ARP070100785 A AR P070100785A AR 059630 A1 AR059630 A1 AR 059630A1
Authority
AR
Argentina
Prior art keywords
well
trajectory
planned
properties
extracted
Prior art date
Application number
Other languages
English (en)
Original Assignee
Logined Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Logined Bv filed Critical Logined Bv
Publication of AR059630A1 publication Critical patent/AR059630A1/es

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

Un método para realizar operaciones de extraccion de petroleo para un campo de petroleo que tiene una formacion subterránea con un deposito subterráneo incluido en ella, el campo de petroleo está provisto de por lo menos un sitio de pozos con equipos de campo de petroleo para extraer fluidos del deposito subterráneo, que implica recolectar datos referidos a la trayectoria y propiedades de la tierra asociados con un pozo planificado para una aplicacion geocientífica para obtener un modelo geocientífico, invocar un sistema de planificacion de pozos integrado con la aplicacion geocientífica, extraer la trayectoria y propiedades de la tierra del modelo geocientífico para obtener una trayectoria extraída y propiedades extraídas de la tierra, determinar por lo menos un parámetro para el pozo planificado en base a la trayectoria extraída y las propiedades extraídas de la tierra, y visualizar por lo menos el parámetro individual asociado con el pozo planificado dentro de un contexto geologico de la aplicacion geocientífica para permitir el refinamiento del pozo planificado para la eficaz extraccion de fluidos del deposito subterráneo.
ARP070100785 2006-02-27 2007-02-26 Sistema y metodo de planificacion de pozo AR059630A1 (es)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US77714306P 2006-02-27 2006-02-27
US11/708,861 US8812334B2 (en) 2006-02-27 2007-02-21 Well planning system and method

Publications (1)

Publication Number Publication Date
AR059630A1 true AR059630A1 (es) 2008-04-16

Family

ID=38335683

Family Applications (1)

Application Number Title Priority Date Filing Date
ARP070100785 AR059630A1 (es) 2006-02-27 2007-02-26 Sistema y metodo de planificacion de pozo

Country Status (9)

Country Link
US (1) US8812334B2 (es)
AR (1) AR059630A1 (es)
AU (1) AU2007221158B2 (es)
CA (3) CA2643834C (es)
EA (1) EA013660B1 (es)
MX (1) MX2008010963A (es)
NO (1) NO20084076L (es)
TW (1) TWI382122B (es)
WO (1) WO2007100703A2 (es)

Families Citing this family (131)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0708449B1 (pt) 2006-03-02 2019-01-22 Exxonmobil Upstream Res Co métodos para produção de hidrocarbonetos
US7992642B2 (en) * 2007-05-23 2011-08-09 Schlumberger Technology Corporation Polished bore receptacle
US20100191516A1 (en) * 2007-09-07 2010-07-29 Benish Timothy G Well Performance Modeling In A Collaborative Well Planning Environment
US8892221B2 (en) * 2007-09-18 2014-11-18 Groundswell Technologies, Inc. Integrated resource monitoring system with interactive logic control for well water extraction
US20090076873A1 (en) * 2007-09-19 2009-03-19 General Electric Company Method and system to improve engineered system decisions and transfer risk
EP2223126B1 (en) * 2007-12-07 2018-08-01 Landmark Graphics Corporation, A Halliburton Company Systems and methods for utilizing cell based flow simulation results to calculate streamline trajectories
US9026417B2 (en) 2007-12-13 2015-05-05 Exxonmobil Upstream Research Company Iterative reservoir surveillance
US9638830B2 (en) 2007-12-14 2017-05-02 Westerngeco L.L.C. Optimizing drilling operations using petrotechnical data
US7894991B2 (en) * 2008-02-01 2011-02-22 Schlumberger Technology Corp. Statistical determination of historical oilfield data
US8073665B2 (en) * 2008-03-07 2011-12-06 Schlumberger Technology Corporation Analyzing an oilfield network for oilfield production
US8185311B2 (en) * 2008-04-22 2012-05-22 Schlumberger Technology Corporation Multiuser oilfield domain analysis and data management
US8884964B2 (en) 2008-04-22 2014-11-11 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2D and 3D visual environment
US8499829B2 (en) * 2008-08-22 2013-08-06 Schlumberger Technology Corporation Oilfield application framework
US8892407B2 (en) * 2008-10-01 2014-11-18 Exxonmobil Upstream Research Company Robust well trajectory planning
US8306842B2 (en) * 2008-10-16 2012-11-06 Schlumberger Technology Corporation Project planning and management
AU2009311619B2 (en) * 2008-11-06 2015-10-01 Exxonmobil Upstream Research Company System and method for planning a drilling operation
AU2009314461B2 (en) * 2008-11-14 2015-11-05 Exxonmobil Upstream Research Company Forming a model of a subsurface region
US20100193254A1 (en) * 2009-01-30 2010-08-05 Halliburton Energy Services, Inc. Matrix Drill Bit with Dual Surface Compositions and Methods of Manufacture
US20110093309A1 (en) * 2009-08-24 2011-04-21 Infosys Technologies Limited System and method for predictive categorization of risk
GB2515411B (en) * 2009-10-09 2015-06-10 Senergy Holdings Ltd Well simulation
BR112012012817A2 (pt) 2009-11-30 2020-08-11 Exxonmobil Upstream Research Company método de newton adaptativo para simulação de reservatório
US8818779B2 (en) * 2009-12-21 2014-08-26 Baker Hughes Incorporated System and methods for real-time wellbore stability service
US20110155463A1 (en) * 2009-12-31 2011-06-30 Sergey Khromov System and apparatus for directing a survey of a well
EP2531694B1 (en) 2010-02-03 2018-06-06 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
EP2534605B1 (en) 2010-02-12 2020-06-17 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
US8731872B2 (en) * 2010-03-08 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
US9367564B2 (en) 2010-03-12 2016-06-14 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
US8731887B2 (en) 2010-04-12 2014-05-20 Exxonmobile Upstream Research Company System and method for obtaining a model of data describing a physical structure
US8727017B2 (en) 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
US8731873B2 (en) 2010-04-26 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
CA2801382C (en) 2010-06-29 2018-12-18 Exxonmobil Upstream Research Company Method and system for parallel simulation models
WO2012015521A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Method and system for reservoir modeling
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US9123161B2 (en) 2010-08-04 2015-09-01 Exxonmobil Upstream Research Company System and method for summarizing data on an unstructured grid
US8731875B2 (en) 2010-08-13 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
US9593558B2 (en) 2010-08-24 2017-03-14 Exxonmobil Upstream Research Company System and method for planning a well path
US9058446B2 (en) 2010-09-20 2015-06-16 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
US20120182205A1 (en) * 2011-01-18 2012-07-19 Schlumberger Technology Corporation Context driven heads-up display for efficient window interaction
WO2012102784A1 (en) 2011-01-26 2012-08-02 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3d earth model
WO2012106347A1 (en) * 2011-02-01 2012-08-09 Halliburton Energy Services, Inc. Drilling optimization
US20120203525A1 (en) * 2011-02-08 2012-08-09 Adrian Rodriguez Herrera Three-dimensional modeling of parameters for oilfield drilling
US20120203591A1 (en) * 2011-02-08 2012-08-09 General Electric Company Systems, methods, and apparatus for determining pipeline asset integrity
AU2011360212B2 (en) 2011-02-21 2017-02-02 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3D earth model
AU2011360239B2 (en) * 2011-02-23 2014-10-23 Landmark Graphics Corporation Method and systems of determining viable hydraulic fracture scenarios
US8854373B2 (en) 2011-03-10 2014-10-07 Baker Hughes Incorporated Graph to analyze drilling parameters
CA2915625C (en) 2011-03-11 2021-08-03 Schlumberger Canada Limited Method of calibrating fracture geometry to microseismic events
US9618652B2 (en) * 2011-11-04 2017-04-11 Schlumberger Technology Corporation Method of calibrating fracture geometry to microseismic events
WO2012175115A1 (en) * 2011-06-21 2012-12-27 Baker Hughes Incorporated Computer-based method for real-time three-dimensional geological model calculation and reservoir navigation
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
US20140151035A1 (en) * 2011-07-28 2014-06-05 Schlumberger Technology Corporation System and method for performing wellbore fracture operations
EP2756382A4 (en) 2011-09-15 2015-07-29 Exxonmobil Upstream Res Co MATRIX AND VECTOR OPERATIONS OPTIMIZED IN LIMITED INSTRUCTION ALGORITHMS THAT COMPLETE EOS CALCULATIONS
RU2567067C1 (ru) * 2011-10-11 2015-10-27 Шлюмберже Текнолоджи Б.В. Система и способ выполнения операции интенсификации
US10422208B2 (en) 2011-11-04 2019-09-24 Schlumberger Technology Corporation Stacked height growth fracture modeling
CA2854371C (en) * 2011-11-04 2019-12-24 Schlumberger Canada Limited Modeling of interaction of hydraulic fractures in complex fracture networks
EP2842025A4 (en) * 2012-04-25 2015-11-25 Halliburton Energy Services Inc SYSTEMS AND METHODS FOR ANONYMOUSING AND INTERPRETING INDUSTRIAL ACTIVITIES SUCH AS APPLIED TO DRILLING APPARATUS
WO2013169429A1 (en) 2012-05-08 2013-11-14 Exxonmobile Upstream Research Company Canvas control for 3d data volume processing
EP2875204B1 (en) * 2012-07-20 2020-09-02 Merlin Technology Inc. Inground operations, system, communications and associated apparatus
CA2880956C (en) 2012-08-23 2020-04-21 Landmark Graphics Corporation Well planning workflow system, method and computer-program product
MX2015002141A (es) * 2012-08-24 2015-05-11 Schlumberger Technology Bv Sistema y metodo para realizar operaciones de estimulacion.
US10036829B2 (en) 2012-09-28 2018-07-31 Exxonmobil Upstream Research Company Fault removal in geological models
US20140149174A1 (en) * 2012-11-26 2014-05-29 International Business Machines Corporation Financial Risk Analytics for Service Contracts
US20140214476A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Data initialization for a subterranean operation
US20140209317A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Mobile workflow orchestration and job execution for hydrocarbon recovery operations
CN105143598A (zh) * 2013-02-27 2015-12-09 兰德马克绘图国际公司 用于预测钻井事故的方法和系统
US10048396B2 (en) 2013-03-14 2018-08-14 Exxonmobil Upstream Research Company Method for region delineation and optimal rendering transform of seismic attributes
US9896923B2 (en) * 2013-05-28 2018-02-20 Schlumberger Technology Corporation Synchronizing pulses in heterogeneous fracturing placement
EP3008281A2 (en) 2013-06-10 2016-04-20 Exxonmobil Upstream Research Company Interactively planning a well site
US8996396B2 (en) * 2013-06-26 2015-03-31 Hunt Advanced Drilling Technologies, LLC System and method for defining a drilling path based on cost
RU2637255C2 (ru) * 2013-07-02 2017-12-01 Шлюмбергер Текнолоджи Б.В. Способ проверки геометрии трещины для микросейсмических событий
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
WO2015047406A1 (en) * 2013-09-30 2015-04-02 Landmark Graphics Corporation Method and analysis for holistic casing design for planning and real-time
BR112016004897B1 (pt) 2013-10-08 2021-06-22 Halliburton Energy Services, Inc Método de sondagem de poço implementado por computador, e, sistema de gerenciamento e planejamento de sondagem de poço
AU2013402484B2 (en) 2013-10-08 2017-06-15 Halliburton Energy Services, Inc. Integrated well survey management and planning tool
US20150185363A1 (en) * 2013-12-26 2015-07-02 Baker Hughes Incorporated Data visualization in borehole systems
WO2015112233A1 (en) * 2014-01-24 2015-07-30 Landmark Graphics Corporation Determining appraisal locations in a reservoir system
US9638032B2 (en) * 2014-02-28 2017-05-02 Halliburton Energy Services, Inc. Interactive wellbore design management
CA2940810C (en) * 2014-02-28 2023-05-23 Schlumberger Canada Limited Automatic method for three-dimensional structural interpretation of borehole images acquired in high-angle and horizontal wells
US9934481B2 (en) * 2014-03-13 2018-04-03 Schlumberger Technology Corporation Planning drilling operations using models and rig market databases
CN103953854B (zh) * 2014-04-02 2017-07-28 中国石油大学(北京) 含蜡原油管道运行参数确定方法及装置
CA2939993C (en) * 2014-04-09 2019-07-09 Landmark Graphics Corporation Parameter measurement refinement in oil exploration operations
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
US10450841B2 (en) * 2014-05-16 2019-10-22 Apache Corporation Methods for statistical prediction of well production and reserves
AU2015298233B2 (en) 2014-07-30 2018-02-22 Exxonmobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
US10861110B2 (en) * 2014-08-04 2020-12-08 Schlumberger Technology Corporation Collaborative system and method for performing wellsite tasks
CA2956139C (en) * 2014-08-29 2021-10-19 Landmark Graphics Corporation Directional driller quality reporting system and method
US10331288B2 (en) * 2014-10-02 2019-06-25 Schlumberger Technology Corporation Method and system for generating oilfield objects
US10221659B2 (en) * 2014-10-08 2019-03-05 Chevron U.S.A. Inc. Automated well placement for reservoir evaluation
EP3213126A1 (en) 2014-10-31 2017-09-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
US10036233B2 (en) * 2015-01-21 2018-07-31 Baker Hughes, A Ge Company, Llc Method and system for automatically adjusting one or more operational parameters in a borehole
EP3265647B1 (en) * 2015-03-06 2021-02-24 Hartford Steam Boiler Inspection and Insurance Company Risk assessment for drilling and well completion operations
US11319780B2 (en) 2015-04-03 2022-05-03 Schlumberger Technology Corporation Wellsite system services
WO2016168617A1 (en) * 2015-04-17 2016-10-20 Schlumberger Technology Corporation Well plan system
CN106156389A (zh) 2015-04-17 2016-11-23 普拉德研究及开发股份有限公司 用于自动执行的井规划
WO2016172038A1 (en) * 2015-04-19 2016-10-27 Schlumberger Technology Corporation Wellsite report system
WO2016168957A1 (en) 2015-04-19 2016-10-27 Prad Research And Development Limited Automated trajectory and anti-collision for well planning
US10513920B2 (en) * 2015-06-19 2019-12-24 Weatherford Technology Holdings, Llc Real-time stuck pipe warning system for downhole operations
US20180209249A1 (en) * 2015-07-21 2018-07-26 Schlumberger Technology Corporation Well Placement Plan Optimization
WO2017070025A1 (en) * 2015-10-18 2017-04-27 Schlumberger Technology Corporation Rig operations information system
US20170138181A1 (en) * 2015-11-16 2017-05-18 Sure Shot Wireline Inc. Method and system for logging a well
US10883346B2 (en) * 2015-12-18 2021-01-05 Schlumberger Technology Corporation Method of performing a perforation using selective stress logging
US10210638B2 (en) * 2016-04-14 2019-02-19 Schlumberger Technology Corporation Visualization integration of graphical logging content
CA3026105A1 (en) * 2016-06-02 2017-12-07 Ge Oil & Gas Esp, Inc. System and method for well lifecycle planning visualization
WO2017206182A1 (en) * 2016-06-03 2017-12-07 Schlumberger Technology Corporation Detecting events in well reports
RU2637464C1 (ru) * 2016-06-30 2017-12-04 ФЕДЕРАЛЬНОЕ ГОСУДАРСТВЕННОЕ КАЗЕННОЕ ВОЕННОЕ ОБРАЗОВАТЕЛЬНОЕ УЧРЕЖДЕНИЕ ВЫСШЕГО ОБРАЗОВАНИЯ "Военная академия Ракетных войск стратегического назначения имени Петра Великого" МИНИСТЕРСТВА ОБОРОНЫ РОССИЙСКОЙ ФЕДЕРАЦИИ Устройство моделирования сценариев развития ситуации
US10794134B2 (en) * 2016-08-04 2020-10-06 Baker Hughes, A Ge Company, Llc Estimation of optimum tripping schedules
US10872183B2 (en) * 2016-10-21 2020-12-22 Baker Hughes, A Ge Company, Llc Geomechanical risk and hazard assessment and mitigation
US11423493B2 (en) * 2016-12-09 2022-08-23 Schlumberger Technology Corporation Combinatorial solver and logic solver planner
TWI626622B (zh) * 2017-07-04 2018-06-11 System and method for stereoscopic imaging of underground rock formation characteristics
EP3659101A4 (en) 2017-07-27 2020-12-09 Hartford Steam Boiler Inspection and Insurance Company EQUIPMENT-BASED RISK MANAGEMENT USING AN ASSET-SPECIFIC ENERGY DATA THROUGH DYNAMICALLY ADJUSTABLE SENSOR-CONTROLLED FEEDBACK LOOPS
WO2019147689A1 (en) 2018-01-23 2019-08-01 Baker Hughes, A Ge Company, Llc Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods
CN112262250A (zh) 2018-03-09 2021-01-22 斯伦贝谢技术有限公司 集成井施工系统操作
CN108920183B (zh) * 2018-05-31 2022-11-18 创新先进技术有限公司 一种业务决策方法、装置及设备
WO2020010122A1 (en) * 2018-07-03 2020-01-09 Baker Hughes, A Ge Company, Llc Drilling productive wells
CN109063285B (zh) * 2018-07-18 2022-12-02 南昌大学 一种土坡钻孔布置方案设计方法
RU2687668C1 (ru) * 2018-10-16 2019-05-15 Общество с ограниченной ответственностью "Геонавигационные технологии" Способ и система комбинированного сопровождения процесса бурения скважины
US10808517B2 (en) 2018-12-17 2020-10-20 Baker Hughes Holdings Llc Earth-boring systems and methods for controlling earth-boring systems
US11242746B2 (en) 2019-01-16 2022-02-08 Schlumberger Technology Corporation Well planning using geomechanics nudge
US11639646B2 (en) 2019-02-13 2023-05-02 Landmark Graphics Corporation Planning a well configuration using geomechanical parameters
CN110145286B (zh) * 2019-05-22 2021-10-01 西南石油大学 一种低渗透油藏或气藏完井工程的设计方法
RU2720859C1 (ru) * 2019-05-29 2020-05-13 Общество с ограниченной ответственностью "Газпром добыча Кузнецк" Способ выбора конструкции горизонтальной метаноугольной скважины
US11200093B2 (en) * 2019-07-15 2021-12-14 Baker Hughes Oilfield Operations Llc Management of a geomechanical workflow of a geomechanics application in a computer system
US11282011B2 (en) * 2020-04-01 2022-03-22 Chevron U.S.A. Inc. Task management interface for well operations
RU2745152C1 (ru) * 2020-06-17 2021-03-22 Общество с ограниченной ответственностью «Геонавигационные технологии» Способ объединения модели геологической проводки скважины с оперативной петрофизической интерпретацией данных гис в режиме реального времени и система, реализующая способ
CN111734391B (zh) * 2020-07-30 2023-03-21 国兴汇金(深圳)科技有限公司 油气井井深与温度的在线校准方法、系统及存储介质
CN112819198B (zh) * 2020-12-31 2023-11-14 中国石油大学(北京) 一种基于成本分析模型的工厂化钻井优化配置方法和系统
US11680480B2 (en) 2021-05-25 2023-06-20 Saudi Arabian Oil Company Multi-layer gas reservoir field development system and method
US20230058683A1 (en) * 2021-08-17 2023-02-23 Landmark Graphics Corporation Well construction optimization techniques
AU2021467706A1 (en) 2021-10-08 2024-03-14 Halliburton Energy Services, Inc. Alkali-silica reaction for expanding cement in a wellbore

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5139094A (en) 1991-02-01 1992-08-18 Anadrill, Inc. Directional drilling methods and apparatus
AU692620B2 (en) 1994-12-08 1998-06-11 Noranda Inc. Method for real time location of deep boreholes while drilling
US5899958A (en) 1995-09-11 1999-05-04 Halliburton Energy Services, Inc. Logging while drilling borehole imaging and dipmeter device
US6612382B2 (en) 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
US5992519A (en) 1997-09-29 1999-11-30 Schlumberger Technology Corporation Real time monitoring and control of downhole reservoirs
GB9904101D0 (en) 1998-06-09 1999-04-14 Geco As Subsurface structure identification method
US6313837B1 (en) 1998-09-29 2001-11-06 Schlumberger Technology Corporation Modeling at more than one level of resolution
US6266619B1 (en) 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6853921B2 (en) 1999-07-20 2005-02-08 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US8224783B1 (en) * 2000-09-26 2012-07-17 Conocophillips Company Information management system
US7003439B2 (en) 2001-01-30 2006-02-21 Schlumberger Technology Corporation Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
US7248259B2 (en) 2001-12-12 2007-07-24 Technoguide As Three dimensional geological model construction
US7523024B2 (en) 2002-05-17 2009-04-21 Schlumberger Technology Corporation Modeling geologic objects in faulted formations
US20040050590A1 (en) 2002-09-16 2004-03-18 Pirovolou Dimitrios K. Downhole closed loop control of drilling trajectory
MXPA05005466A (es) 2002-11-23 2006-02-22 Schlumberger Technology Corp Metodo y sistema para simulaciones integradas de redes de instalaciones en depositos y en superficie.
CA2527864C (en) 2003-04-30 2016-05-24 Landmark Graphics Corporation Stochastically generating facility and well schedules
US7539625B2 (en) * 2004-03-17 2009-05-26 Schlumberger Technology Corporation Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
US7698148B2 (en) 2003-09-12 2010-04-13 Raytheon Company Web-based risk management tool and method
US20050209886A1 (en) 2004-02-05 2005-09-22 Corkern Robert S System and method for tracking patient flow
US7832500B2 (en) 2004-03-01 2010-11-16 Schlumberger Technology Corporation Wellbore drilling method
US7653563B2 (en) 2004-03-17 2010-01-26 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US7546884B2 (en) 2004-03-17 2009-06-16 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements
US7630914B2 (en) * 2004-03-17 2009-12-08 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US7258175B2 (en) 2004-03-17 2007-08-21 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic drill bit selection based on earth properties and wellbore geometry
US7155239B2 (en) 2004-05-28 2006-12-26 Symbol Technologies, Inc. Method and system for radio map filtering via adaptive clustering

Also Published As

Publication number Publication date
CA2894737A1 (en) 2007-09-07
AU2007221158B2 (en) 2010-12-16
CA2643834C (en) 2015-10-13
TWI382122B (zh) 2013-01-11
CA2838468A1 (en) 2007-09-07
US20070199721A1 (en) 2007-08-30
WO2007100703A3 (en) 2007-11-08
AU2007221158A1 (en) 2007-09-07
TW200802149A (en) 2008-01-01
NO20084076L (no) 2008-11-27
EA200870303A1 (ru) 2009-02-27
MX2008010963A (es) 2009-01-07
CA2643834A1 (en) 2007-09-07
WO2007100703A2 (en) 2007-09-07
EA013660B1 (ru) 2010-06-30
US8812334B2 (en) 2014-08-19

Similar Documents

Publication Publication Date Title
AR059630A1 (es) Sistema y metodo de planificacion de pozo
MX2017000147A (es) Identificacion de pozo de inyeccion usandoo particulas de rastreador.
MY179810A (en) Zero equivalent circulating density drilling method
AR097859A1 (es) Fluidos de perforación de yacimientos que comprenden nanoparticulados para consolidar formaciones subterráneas durante una perforación
AR104396A1 (es) Posicionamiento lateral y diseño de completamiento para un desempeño mejorado de pozo de reservorios no convencionales
Diakhate et al. Refracturing on horizontal wells in the Eagle Ford Shale in South Texas-one operator's perspective
PL418239A1 (pl) Modelowanie oddziaływań szczelin hydraulicznych w złożonych sieciach szczelin
Fisher Data confirm safety of well fracturing
AR099996A1 (es) Polifosfacenos lineales solubles en agua en fluidos a base de agua para utilizar en pozos o líneas de tuberías
AR085699A1 (es) Metodo y sistema de perforacion de laterales en formaciones de lutita
RU2016102557A (ru) Устранение вызванного асфальтенами закупоривания стволов скважин и эксплуатационных трубопроводов
GB2554209A (en) Providing communication between wellbores through directional hydraulic fracturing
Long et al. Conceptual model of the uppermost principal aquifer systems in the Williston and Powder River structural basins, United States and Canada
Closas Norias, boreholes and the role of the state during the groundwater'silent revolution'in La Mancha, Spain
Cheon et al. Theoretical background and design of hydraulic fracturing in oil and gas production
WO2015049125A3 (de) Verfahren zur förderung von erdöl aus einer unterirdischen erdöllagerstätte unter einsatz einer bohrung, die gleichzeitig als injektions- und produktionsbohrung dient
CL2019000287A1 (es) Fluidos y métodos
Cao et al. Re-Fracturing and Water Flooding Western Canada Tight Oil Reservoir Horizontal Wells
RU2011125853A (ru) Способ ранней идентификации естественной трещиноватости пластов
Jacobs A Multidisciplinary Approach to Site Characterization and Remediation of Contamination From Oilfield-Produced Waters, East Poplar Oil Field, Fort Peck Indian Reservation, Roosevelt County, Montana
Al-Senafy et al. Simulation of potential dewatering system for managing high water table
Grossi Fracking probe expands in Central Valley
Wilson A critical view of the current state of reservoir modeling of shale assets
Sadeak et al. Sustainable Groundwater Management by Geological Modeling and Recharge Estimation to Optimize Sudden Stress on the Geologically Complex Aquifer System in the South-Eastern Hilly Region of Bangladesh
Liu et al. Identification and characterization of individual fractures in 3D networks of microtomography-a first step towards multi-scale analysis of reservoir fractures

Legal Events

Date Code Title Description
FC Refusal