US20110315397A1 - Producing hydrocarbon material from a layer of oil sand - Google Patents
Producing hydrocarbon material from a layer of oil sand Download PDFInfo
- Publication number
- US20110315397A1 US20110315397A1 US13/166,396 US201113166396A US2011315397A1 US 20110315397 A1 US20110315397 A1 US 20110315397A1 US 201113166396 A US201113166396 A US 201113166396A US 2011315397 A1 US2011315397 A1 US 2011315397A1
- Authority
- US
- United States
- Prior art keywords
- borehole
- cavity
- refill
- production
- fluid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/29—Obtaining a slurry of minerals, e.g. by using nozzles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/24—Methods of underground mining; Layouts therefor for oil-bearing deposits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/08—Filling-up hydraulically or pneumatically
Definitions
- the present invention relates to a method of producing hydrocarbon material from a layer of oil sand located in an earth formation.
- oil sand Hydrocarbons from oil sand layers can in principle be recovered by mining. As some oil sands layers occur at relatively shallow depths, typically between 0 to 200 meters, it is common practice to produce oil from these layers by surface mining whereby the overburden layer is removed using draglines and/or shovels and trucks. The produced oil sand is transported to one or more processing facilities for separation of hydrocarbon fluid from the sand slurries. However, for oil sands layers at greater depths, removal of the overburden is costly and has a significant impact on the environment. Therefore alternative methods for producing oil sands have been proposed.
- a slurry of fluid and oil sands is formed in the cavity as a result of the fluid jetting operation.
- Slurry is withdrawn through the borehole, and a stable cavern is formed containing caved oil sands, water, and possibly injected air.
- the cavern is used as a primary fractionator, in which bitumen rises to the top and sand sinks to the bottom.
- a second horizontal borehole is provided above the first borehole, to an upper part of the cavity, to withdraw water and oil. Once the bitumen is removed, thickened tailings recovered from the portion of the oil sands slurry that was sent to surface for processing are placed back via the second borehole in the upper part of the cavern.
- FIG. 6 of this publication discloses two horizontal boreholes, one above the other.
- the lower borehole is a production well, through which a hydraulic mining bit is operated to create a mined volume that enlarges upwardly, until it reaches the level of an upper sand injection well, at which point mining is stopped and sand is injected from the upper well.
- the sand injection well can also be used to create a small mined volume at its toe, above and separate from the mined volume at the toe of the production well.
- the upper mined volume can then be filled with sand slurry and pressurized, to assist the hydraulic mining process being applied from below.
- the lower production and upper sand slurry injection well can also be operated simultaneously, wherein the sand slurry injection well sticks out into the cavity and sprays a stream of tailings slurry into the cavity.
- Refilling from below is advantageous for a controlled refill operation.
- the distance along the extension direction can be 20 m or more, preferably 50 m or more, such as 100 m or more. It is likely that the cavity at least partially collapses over such distances, so that refill from above is hampered or impossible.
- Refilling from above moreover requires a casing/lining to extend into the cavity for a significant distance, but there is no proper support. Reference is made in this regard to FIG. 8 of WO 2008/064305, showing such an undesirable operation.
- the production borehole can be a combined injection and discharge borehole.
- An injection borehole is a borehole through which the fluid jetting means is operated during normal operation.
- a discharge borehole is a borehole through which a slurry comprising oil sand is transported to surface during normal operation.
- a combined injection and discharge borehole serves for both functions.
- Such a combined borehole is for example disclosed in the above-referenced paper by Tannant et al., or in WO 2008/064305, both incorporated herein by reference.
- the production borehole is a discharge borehole
- the borehole arrangement further includes an injection borehole separate from the discharge borehole.
- the injection borehole suitably also has an injection borehole section extending in an injection borehole direction deviating less than 45 degrees from the extension direction.
- the discharge borehole section extends below the injection borehole section.
- pressure in the cavity is lower than the bubble point pressure in the pristine oil sands layer before the cavity is created therein, in particular 50% or less of the pristine pressure, more in particular 20% or less.
- Oil sands layers can have gas present, e.g. methane. The gas can e.g. be adsorbed or dissolved. Lowering the pressure below the pressure at which gas can be released from pores in the sand matrix (which pressure is referred to as bubble point pressure) can lead to damage to the sand matrix, and to the loss of strength of the oil sands, at the walls of the cavity. Removal of material by a hydraulic jet becomes much easier, and the disintegrated oil sand will sink to the bottom of the cavity.
- fluid is also injected into the cavity via the discharge borehole.
- a particular purpose of this is for stirring or mobilizing the slurry and breaking of any larger lumps of material in the area of the cavity from which the slurry is withdrawn via the discharge borehole.
- no injection or discharge borehole in fluid communication with the cavity is operated, which borehole is a vertical or near-vertical borehole.
- Near-vertical means that the average angle between the vertical and the borehole from surface to cavity is less than 45 degrees.
- the discharge borehole is provided with a liner of a length adapted to be changed
- the injection borehole is provided with injection tubular of a length adapted to be changed, and wherein both the lengths of the liner and of the injection tubular are changed in correspondence with the extension of the cavity.
- the tubular can for example be a fluid injection tubular or a liner.
- the length of such a tubular can be changed by a shortening device.
- the step of shortening the liner can comprise operating a cutting device to cut the liner.
- the liner can also be shortened by the action of a fluid jet, or by any other means, e.g. by milling, explosives, or a laser. Shortening can be done by removing coarse discrete pieces of the liner, such as at suitable time intervals, or by producing small chips of the liner material.
- the liner is suitably made from a suitable material for shortening.
- the liner can be made of metals softer than steel, e.g. aluminium.
- the liner is made of a non-metal material, and in particular the liner can be made of a plastics material, such as a material comprising 50 wt % or more of a polymer.
- the discharge borehole is provided with a pump for pumping the slurry via the discharge borehole to the processing facility, preferably the pump is sealed relative to an inner surface of the liner.
- the pump can be axially movable through the discharge borehole, and moved in correspondence with changing the length of the liner.
- the pump can e.g. be driven by electricity, but also by a stream of fluid pumped through a conduit extending through the discharge borehole. In the latter case, at least a portion of said stream of fluid is suitably injected into the slurry of fluid and oil sands present in the cavity, e.g. for stirring.
- the stream of refill material can comprise tailings that are separated in and transported from the processing facility to the cavity.
- the refill borehole section is arranged near or at the lower end of the cavity or just below, e.g. 0-10 m below. There it is nearly unaffected by a (partial) collapse of the cavity.
- inserting a stream of refill material into the cavity comprises providing the refill borehole section with a casing.
- the casing protects against collapse of the borehole. After extending the cavity for a selected length, the casing is perforated within that length, and refill material is pumped through the perforations.
- FIG. 1 schematically shows an example of a production unit for use in an embodiment of the method of the invention
- FIG. 2 schematically shows a detail of the production unit of FIG. 1 ;
- FIG. 3 schematically shows another example of a production unit for use in an embodiment of the method of the invention
- FIG. 4 schematically shows a top view at surface of a production field using embodiments of the present invention.
- FIG. 5 schematically shows another example of a production unit for use in an embodiment of the method of the invention.
- an earth formation 1 containing an oil sands layer 2 located between an overburden layer 4 above the oil sands layer 2 and an underburden layer, shown as a layer of rock material 6 , such as limestone, below the oil sands layer 2 .
- Earth formation below the oil sands layer is referred to as underburden.
- the oil sands layer 2 has respective upper and lower boundaries 20 , 22 extending generally horizontally in this example.
- An overburden can for example be between 50 and 1000 m thick, in particular between 100 and 800 m.
- the layer of oil sands extends in an extension direction 21 , in particular a non-vertical extension direction, in this example horizontally between an overburden and an underburden.
- the layer of oil sands has a thickness defining a thickness direction 21 a , which is in this example vertical.
- the extension direction 21 is different from, often perpendicular to, the thickness direction, and is in this example in the horizontal plane.
- the layer extends more in the extension direction than its thickness, typically for more than twice its thickness, such as for more that 5 or 10 times its thickness, or even more. It will typically extend for less than 10000 times its thickness.
- the thickness can for example be between 1 m and 500 m, in particular between 5 m and 200 m, such as between 10 and 100 m, and may vary along the extension direction. It will be understood that the layer can extend along a flat or curved plane.
- An injection borehole 8 is provided, which in this example is a deviated borehole extending from an injection station 10 at the earth surface 11 to a cavity 12 formed in the layer of oil sands 2 .
- the cavity has an upper portion 12 a containing gas (e.g. CO2, methane, air, and/or H2S) and a lower portion 12 b containing a mixture (referred to hereinafter as “slurry”) 13 of fluid (preferably water) and oil sands particles comprising hydrocarbon material and sand, which may partly or fully separate in the slurry.
- a deviated discharge borehole 14 which is also referred to as production borehole, extends from a production station 15 at the earth surface to the cavity 12 whereby the production station 15 is horizontally spaced from the injection station 10 and debouches into the lower cavity portion 12 b at some distance above the bottom of the cavity.
- the injection borehole 8 and the discharge borehole 14 each have an upper section 16 , 16 a extending downwardly, such as substantially vertically from surface, and a non-vertical lower section 18 , 18 a .
- the expression lower borehole section is used for a borehole section that is further away from surface along the borehole trajectory than an upper borehole section.
- the lower borehole section 18 of the discharge borehole extends in a discharge borehole direction, below the injection borehole section 18 a of the injection borehole 8 , extending in an injection borehole direction.
- Each of the injection and discharge borehole directions is a selected direction within the layer 2 , in this example an azimuthal direction from the cavity 12 .
- the intersection between the lower borehole section 18 a of the injection borehole 8 and the cavity 12 defines a front surface 23 of the cavity 12 .
- Each of these selected directions suitably is a direction within the layer.
- the lower sections of the injection and discharge boreholes each deviate less than 45 degrees from the extension direction 21 , wherein the angle is preferably counted in a vertical plane through the extension direction.
- These borehole sections preferably extend substantially parallel to the upper boundary 20 and/or lower boundary 22 of the oil sands layer 2 .
- the selected direction substantially coincides with the extension direction, so that the cavity is extended within the layer, substantially parallel with its upper and/or lower boundary, for more than the layer thickness, such as for between 2 and 5000 times the layer thickness.
- substantially parallel herein accounts for the precision with which deviated boreholes can be drilled in an underground layer.
- the lower sections 18 , 18 a extend substantially horizontally.
- the expression “direction” is used herein to refer to a direction without specifying the sense of direction, unless otherwise indicated.
- the extension direction may deviate somewhat from the horizontal plane due to geological circumstances, as can the directions of the lower sections 18 , 18 a in the practice of directional drilling. It is desired to arrange the lower sections such that they extend for a substantial length within the oil sands layer, such as for between 50 and 5000 m, in particular between 100 and 2000 m.
- the injection and discharge borehole sections preferably deviate less than 30 degrees from the extension direction, more preferably less than 15 degrees. It can alternatively be said that the injection and discharge borehole sections preferably are substantially horizontal borehole sections.
- a substantially horizontal borehole section deviates 30 degrees or less from the horizontal plane, more preferably 15 degrees or less.
- the selected direction can be at least 45 degrees away from the thickness direction, in particular at least 45 degrees away from the vertical. All angles specified herein are to be understood as absolute (positive) values, unless otherwise specified. It will be understood that when the cavity is extended along the injection and/or discharge borehole directions that deviate by a certain angle from the extension direction, the cavity is at the same time extended in the extension direction.
- the expression “extending below” in relation to two borehole sections is used to refer to the situation that one borehole section extends at a greater vertical depth than the other.
- the two borehole sections extend substantially along the same trajectory in a vertical projection onto the earth's surface, which can for example mean that the horizontal deviation in such projection is 50 m or less, preferably 10 m or less, more preferably 5 m or less, such as 2 m or less.
- the vertical distance between the discharge borehole section and the injection borehole section thereabove is suitably in the range of 1-100 m, preferably between 2 and 50 m, such as between 5 and 30 m.
- the upper borehole sections 16 , 16 a are each provided with a conventional casing (or liner) 24 , 24 a
- the lower borehole sections 18 , 18 a are each provided with a liner 26 , 26 a , e.g. of plastics material, for example glass fibre reinforced plastic.
- the liner 26 extends a minimal distance into the cavity 12 .
- a jet pump 28 is positioned in the liner 26 in a manner that the jet pump 28 is sealed relative to the inner surface of the liner 26 and is axially movable through liner 26 .
- a fluid conduit 30 for driving the jet pump 28 extends from the production station 15 through the casing 24 and the liner 26 to the jet pump 28 .
- the jet pump 28 When driven by fluid, such as water, pumped through the fluid conduit 30 , the jet pump 28 is arranged to pump the slurry 13 of fluid and particles from the lower cavity portion 12 b , via the annular space 27 between the fluid conduit 30 on one hand and the liner 26 and casing 24 on the other hand, to the production station 15 .
- the jet pump 28 is thereto provided with one or more flow channels 32 ( FIG. 2 ) allowing the slurry to flow in axial direction through the jet pump 28 .
- the fluid conduit 30 extends further from the jet pump 28 through liner 26 to the cavity 12 .
- a lower end part 34 of the fluid conduit 30 is provided with a shortening device, in this embodiment cutter 36 , for shortening the liner 26 , one or more nozzles 38 for initially forming the cavity 12 and/or for stirring the slurry present in the cavity 12 , and a bit or mill 39 for crushing lumps of rock material that may be present in the cavity 12 .
- Conduit 30 can be rotatable.
- the discharge borehole can also be set up for operation in ‘reverse circulation’, where driving fluid for the jet pump is pumped from surface via the annulus, and slurry is pumped via an inner tubular like reference numeral 30 .
- Liner 26 and jet-pump 28 are suitably designed to withstand the pressure of driving fluid, e.g. a plastic liner of sufficient strength can be used.
- An advantage of this reverse circulation operation is that there is no wear of the slurry in the annulus. Also the slurry travelling inside a slowly rotating production pipe will not be able to settle down.
- An injection string 40 for injecting fluid into the cavity 12 extends from the injection station 10 via the injection borehole 8 into the cavity 12 , the injection string 40 having a lower end provided with fluid jetting means in the form of fluid jetting head 41 comprising jetting nozzles 42 , the fluid jetting head being located in the upper portion 12 a of cavity 12 .
- An annular seal 43 (e.g. such as used in a rotating head) is arranged in an upper part of the first injection borehole 8 to seal the annular space formed between the injection string 40 and the wall or casing of the first injection borehole 8 .
- the injection string 40 can also be provided with a shortening device (not shown) for shortening the liner 26 a extending into the cavity 12 , which can be similar to the shortening device 36 of the conduit 30 .
- Injection string 40 can be rotatable.
- a refill borehole 108 which in this example is also a deviated borehole extending from a refill station 110 at the earth's surface 11 to the lower end of the cavity 12 .
- the refill borehole 108 has an upper section 116 extending downwardly, such as substantially vertically, and a lower section 118 .
- the lower borehole section 118 extends below lower non-vertical section 116 of the discharge borehole 14 , such as between 1 and 20 m below the lower section in particular between 2 and 10 m, preferably substantially parallel therewith.
- the lower borehole section preferably extends substantially along the lower boundary 22 , such as within 5 meters from the boundary, preferably within 1 m from the boundary.
- the refill borehole 108 on this embodiment is provided with casing 124 , preferably a steel casing, and with an injection string 148 for refill material, which can be rotatable.
- the injection string is optional; the injection borehole could alternatively be arranged without such string, so that the injection slurry is passed through the casing.
- the refill borehole section preferably deviates less than 30 degrees from the extension direction, more preferably less than 15 degrees. It can alternatively be said that the refill borehole section preferably is a substantially horizontal borehole section.
- FIG. 1 shows the invention with several of the components at a stage of normal operation after some time of operation.
- the cavity 12 is being extended by operating the fluid jetting means using nozzles 42 via the injection borehole to jet a stream of fluid against a wall of the cavity, in particular the front surface 23 , starting from an initial cavity 12 ′ in an azimuthal direction, along the parallel lower borehole sections 18 and 18 a .
- the initial cavity 12 ′ that was created in the layer of oil sands 2 is indicated with a dashed line.
- the jetting fluid is a low solids fluid, i.e. it contains substantially no solids, such as less than 10 wt % or less than 1 wt % of solids. Water is a suitable jetting fluid.
- the water can contain one or more additives such as a surfactant, but this is not required.
- Reference to water herein is to a fluid that contains at least 80 wt %, preferably at least 90 wt % of pure water.
- the temperature of the jetting fluid (water) can be selected or modified such as by heating. For example, water at a temperature of 25° C. or above, or 40° C. or above, can be used.
- the front surface 23 of the cavity has been moving in the extension direction, with the sense of direction generally uphole, defined by the injection borehole's sense of direction towards surface.
- the lower borehole sections 18 , 18 a have become shorter compared to an initial length indicated at 18 ′ and 18 a ′.
- the liners 26 and 26 a have been shortened at the side of the cavity 12 in correspondence with shortening of the lower borehole sections 18 , 18 a .
- the fluid conduit 30 with the jet pump 28 connected thereto has been pulled upward through discharge borehole 14 over a distance about equal to the reduction in length of liner 26 , and likewise the injection string 40 has been retracted, so that the nozzles stay in sufficient proximity to the front wall 23 so that the fluid jetting is effective to extend the cavity.
- the nozzles are at a distance of between 0.5 m and 15 m from the wall against which the fluid jet is exerted.
- the injection borehole 8 and the discharge borehole 14 , and the refill borehole are drilled into the oil sands layer 2 using one or more conventional drilling rigs, and completed as needed, such as with the casings 24 , 24 a and liners 26 , 26 a .
- the injection station 10 and the production station 15 are installed at their respective positions as indicated in FIG. 1 .
- the initial cavity is created.
- the fluid conduit 30 with the jet pump 28 connected thereto is lowered through the discharge borehole 14 until end part 34 of the fluid conduit 30 extends just beyond the far end of the liner 26 .
- Water at high pressure is then pumped from the production station 15 into the fluid conduit 30 so that the pumped water is jetted through the nozzles 38 to impact the formation at the end of the liner 26 with great force.
- the discharge borehole is operated in reverse circulation as discussed above.
- the fluid conduit 30 is simultaneously rotated about its longitudinal axis to induce the bit or mill 39 to crush the rock formation.
- the oil sands layer 2 is gradually excavated so that the cavity 12 ′ and the slurry 13 of water and oil sand particles are initially formed.
- the jet pump 28 is operated to pump the slurry 13 from the cavity 12 ′ via the flow channels 32 of the jet pump 28 and via the annular space 27 between the fluid conduit 30 and the liner 26 /casing 24 , to the production station 15 .
- the initial cavity 12 ′ is created by fluid jetting via the injection borehole, optionally using equipment and operation similar to what was described above for the discharge borehole.
- the cavity 12 ′ is initiated by underreaming, via injection borehole 8 or discharge borehole 14 , or even from a separate borehole (not shown) such as from a vertical borehole above the cavity.
- the injection string 40 is operated via the first injection borehole 8 .
- Fluid preferably water
- Fluid is pumped at high pressure, such as between 10 and 500 bar, in particular between 100 and 200 bar from the injection station 10 into the injection string 40 .
- the pumped water is jetted through the jetting nozzles 42 and impacts the wall of the cavity 12 with great force.
- the oil sands layer 2 is further excavated and the slurry 13 of water and oil sand particles is continuously formed in the cavity 12 .
- the size of the cavity increases as jetting of water through the nozzles 42 continues.
- pumping of the slurry of fluid and particles from the cavity 12 to the production station 15 can be enhanced by maintaining a suitable elevated pressure in the cavity 12 .
- the pressure can be adjusted by influx and/or outflux of gas, taking into account gas that is released from the matrix below the bubble point.
- the pressure in cavity 12 is kept lower than the pressure in the pristine oil sands layer 2 before the cavity 12 , 12 ′ is created therein, such as at or below 90%, or at or below 80%, of the hydrostatic pressure in the pristine oil sand layer.
- the pressure can be 5 bar below the bubble point pressure, or lower. At lower pressure, the gas contained in the oil sands layer can be released, and the sands matrix loses strength and is jetted away into a slurry relatively easily.
- a portion of the water pumped through fluid conduit 30 is injected/jetted into the lower cavity portion 12 b through nozzles 38 in order to achieve some stirring of the slurry 13 in the cavity 12 , simultaneously with fluid jetting via the injection borehole.
- Jetting of water through nozzles 42 is continued so as to extend the cavity 12 in the azimuthal direction of the lower borehole section 18 whereby the front surface 23 of the cavity moves in said azimuthal direction.
- a portion 117 of the liner 26 ( FIG. 2 ) gradually becomes protruding into the cavity 12 .
- the cutter 36 is operated to cut the protruding liner portion 117 at time intervals selected in accordance with the speed of movement of the front surface 23 in the azimuthal direction.
- the fluid conduit 30 is moved upwardly in correspondence with shortening of the liner 26 whereby the jet pump 28 slides along the inner surface of the liner 26 .
- the fluid conduit 30 is rotated to induce bit 39 to crush rock particles that may be present in the cavity 12 .
- the portion of the liner 26 a of the injection borehole section 18 a protruding into the cavity can be shortened using a cutter (not shown).
- the liner 26 and/or 26 a can be shortened in another way, such as by using a fluid jet.
- the amount of fluid flowing through the injection nozzles 42 can typically be in the range of 50-50001/min, in particular between 100 and 1000 l/min, such as between 200 and 800 l/min.
- the amount of fluid flowing through the nozzles 38 can be in the same range as the amount of water injection through the injection borehole.
- An aqueous slurry that is formed and produced during operation can have a density of between 1100 and 1600 kg/m3.
- the pristine oil sand may for example contain between 1 and 50 wt % of hydrocarbons, based on total oil sand including hydrocarbons, in particular between 2 and 30 wt %, such as between 5 and 20 wt %.
- the width of the cavity in the horizontal plane perpendicular to the direction of the injection borehole 8 depends on the precise orientation and operation of the nozzles, and is typically in the range of 1-50 m, such as between 10 and 40 m.
- the jetting nozzles can be arranged to jet in a fixed direction against a front, side, rear, upper, and/or lower wall of the cavity, or can be movable such as rotatable.
- the growth of the cavity in the extension direction can for example be in the range of between 10 cm/day to 10 m/day, so for example the liners need to be shortened by approximately 1 m/day.
- the hydrocarbon material from the oil sand layer can be produced in a continuous process, by simultaneous operation of the injection and discharge borehole sections, and over an extended length, such as for 20 m or more, 50 m or more, 100 m or more, even 500 m or more, and for extended periods of time, such as for a day or more, a week or more, a month or more, even a year or more.
- each additional injection borehole can be substantially similar to injection borehole 8 as described above, with a non-vertical lower section extending substantially above the non-vertical lower section 18 a , the injection borehole 8 thus extending below additional injection boreholes. This may be useful when the vertical thickness of the oil sands layer 2 is 30 m or more, or 50 m or more.
- tailings are produced to surface, which are separated from hydrocarbon material and water, and it is typically desired to reinject tailings for disposal, and to avoid or reduce subsidence.
- the refill borehole is provided.
- the slurry 13 of water and oil sand is transported from the production station 15 to a separation plant (not shown) for separating hydrocarbon material and tailings from the slurry.
- the hydrocarbon material is recovered as product and optionally subject to further transport, purification, separation, treatment and/or processing to further products.
- the production station 15 and the separation plant can be integrated in a single unit.
- the production station and optionally the separation plant form part of a production facility.
- at least part of the tailings is used to refill the cavity 12 .
- the tailings can comprise solids like sand and/or clay.
- tailings are pumped into the rear portion of cavity 12 (such as beginning at the initial cavity 12 ′) via the injection string 148 .
- a cement plug 150 is provided, and then perforations 154 are created in the casing at the desired locations, through which tailings are pumped into the cavity.
- the rear portion of cavity 12 is gradually filled with the body of tailings 149 .
- any reference to “the cavity” is meant to include the upper cavity portion 12 a , the lower cavity portion 12 b , the initial cavity 12 ′, and the rear portion filled with refill material such as tailings or tailings.
- FIG. 3 showing schematically an alternative example of operating the present invention.
- the operation is started as described above with reference to FIGS. 1 and 2 .
- the extension of a cavity in the extension direction 21 is stopped at a certain moment, such as when a certain horizontal length of the cavity is reached, or when the constitution of the oil sands layer changes.
- the tubulars 30 , 40 are retracted a certain distance in the injection and discharge (production) boreholes, such as by 1 to 100 m, preferably 5-50 m, e.g. 20 m, before a further cavity is created.
- the liners 26 , 26 a can e.g. be cut off and abandoned.
- FIG. 3 shows a first cavity 12 a that is fully produced and refilled with tailings 149 ; a second cavity 12 b created and produced after the first cavity 12 a , and being refilled with tailings 149 ; and a third cavity 12 c in production, substantially as described with reference to FIGS. 1 and 2 .
- FIG. 5 shows schematically an embodiment in which a production borehole in the form of a combined injection and discharge borehole 514 is arranged above a refill borehole 108 .
- the lower section 518 of the combined injection and discharge borehole 514 extends substantially horizontally above the lower section 118 of the refill borehole 108 .
- fluid driving the jetting head 41 is pumped through tubing 530 , and oil sand slurry that is obtained in the cavity 12 is produced via the annulus 527 between the liner/casing 526 and the tubing 530 , as indicated by the arrows.
- Refill material is injected via perforations 154 substantially as discussed with reference to FIG. 1 .
- Parts having the same reference number as parts in FIG. 1 are substantially similar in form and operation. Other parts shown in FIG. 1 can be installed as well, e.g. a jet pump in the production well, and have not been shown for clarity.
- an assembly comprising a cooperating production borehole and refill borehole, injection, production, refill station and one or more cavities created along these boreholes is referred to as a production unit.
- a production field comprises one or more production units.
- An injection, production and/or refill station can include a drilling rig.
- FIG. 4 there is schematically shown a top view at surface of a layout of a production field 201 for recovering hydrocarbons from an underground oil sands layer.
- the Figure shows a plurality of production units 210 , 212 , 214 , 216 , 218 , 220 , 222 , 224 , 226 , 228 , 230 , 232 , 234 , 236 , 238 , 240 , 242 , 244 , 246 , 248 in four field sections 251 , 252 , 253 , 254 on either side of a backbone 260 .
- Each production unit can be substantially similar to and operated as described hereinbefore with reference to FIGS. 1-3 , and has an injection borehole above a discharge borehole above a refill borehole, overlapping in the top view.
- the production units are in different stages of operation.
- the solid lines, e.g. 270 indicate a section of a production unit that is producing hydrocarbons (slurry) to a separation plant 275
- the dashed lines, e.g. 280 indicate an area that has already been produced and is abandoned, or refilled.
- Units 218 , 228 , 230 and 240 were the first units to produce and have already stopped production.
- Units 210 , 220 , 238 and 246 just started production. Remaining units are in an intermediate stage.
- boreholes for a future production unit are being drilled.
- the area 285 that is generally defined by the dashed lines can be referred to as reclaimed area of the production field, and the area 288 generally defined by solid lines can be referred to as producing area of the production field 201 . It shall be clear that only one, two or three of the field sections 251 - 254 may be arranged, or may be developed at different periods in time, and that more or less production units than shown can be provided in a field section.
- the backbone provides for transport of fluids (slurry, tailings) between the production units and the separation plant 275 via suitable pipelines/conduits. It concentrates the surface equipment in a relatively narrow surface area or streak, for easy accessibility and minimum surface impact. This area is moreover typically not or only modestly affected by subsidence.
- the backbone can be between 0.1 and 50 km long, preferably between 0.5 and 20 km, and may grow in the lifetime of a field, which is suitably developed starting with production units close to the separation plant 275 .
- the lateral spacing between production units can be between 10 m and 500 m, preferably between 20 m and 100 m. They can in particular be arranged such that the cavities along adjacent production units join or overlap, or remain separate.
- Each production unit may have a length of between 50 and 5000 m, in particular between 100 and 2000 m. Areas where it is not desired or possible to produce oil sand can be avoided in the layout.
- hydrocarbon fluid is produced from the oil sands layer without removing the overburden layer.
- the cavities are refilled with tailings from the produced slurries of water and oil tailings after cleaning at the separation plant.
- a binding material like cement is mixed into the tailings.
- the discharge borehole is provided with a single pump (jet pump 28 ) for pumping the slurry of fluid and oil sand particles via the discharge borehole to the production station at surface.
- a single pump may not suffice to pump the slurry to surface at an efficient flow rate.
- one or more additional pumps can be applied in the discharge borehole.
- the upper section of the discharge borehole can be provided with a single-stage or multi-stage centrifugal pump driven by a hydraulic or electric motor, to pump the slurry to surface.
- Such additional pump can be positioned, for example, in the lower end part of the casing provided in the discharge borehole, just above the liner.
- an additional jet pump or gas lift can be applied.
- various boreholes extend from surface locations mutually spaced in horizontal direction.
- the boreholes can extend as deviated boreholes from a fewer or a single surface location, or as branch boreholes of a multilateral borehole.
- Such arrangement can be attractive in applications whereby the surface area is difficult accessible, for example if the oil sands layer is located below a body of water or a swamp area.
Abstract
A method of producing hydrocarbon material from a layer of oil sand in an earth formation, the layer having a thickness and extending in an extension direction for more than its thickness comprises creating production borehole having a production borehole section extending in a production borehole direction, and a refill borehole having a refill borehole section extending in a refill borehole direction, wherein both the production and refill borehole directions deviate less than 45 degrees from the extension direction; creating a cavity in the layer of oil sand, the cavity being in fluid communication with the production borehole section; extending the cavity by operating fluid jetting means against a wall of the cavity; withdrawing the slurry from the cavity via the production borehole to a processing facility; and injecting refill material into the cavity via the refill borehole section, wherein the refill borehole section extends below the production borehole section.
Description
- This application claims the benefit of European Application No. 10167160.0 filed Jun. 24, 2010 which is incorporated herein by reference.
- The present invention relates to a method of producing hydrocarbon material from a layer of oil sand located in an earth formation.
- In the industry of hydrocarbon production from subterranean reservoirs, it is conventional practice that oil or gas is produced from wellbores by virtue of the high fluid pressures existing downhole. In case of high viscosity oil, downhole pumps can be applied to pump the oil to surface, or other methods can be applied to increase the oil production rate such as steam injection or CO2 injection into the formation. However, the conventional methods are not adequate for the production of heavy hydrocarbon material present in rock formations, when the material is not flowing up a well. Examples are bituminous oil or tar or kerogen occurring in sands, standstone, or shale based reservoirs in Canada or elsewhere, e.g. tar sands or Limestone/Dolomite based and calcareous shale based reservoirs such as found in the Canadian Athabasca or Grosmont regions. Such a reservoir will herein be referred to as oil sand. Hydrocarbons from oil sand layers can in principle be recovered by mining. As some oil sands layers occur at relatively shallow depths, typically between 0 to 200 meters, it is common practice to produce oil from these layers by surface mining whereby the overburden layer is removed using draglines and/or shovels and trucks. The produced oil sand is transported to one or more processing facilities for separation of hydrocarbon fluid from the sand slurries. However, for oil sands layers at greater depths, removal of the overburden is costly and has a significant impact on the environment. Therefore alternative methods for producing oil sands have been proposed.
- One such alternative method is disclosed in a technical paper published in CIM magazine by the Canadian Institute of Mining & Metallurgy, 2001, Vol. 94, Nr. 1054, pages 63-66, entitled “Hydraulic underground mining of oil sands—the next big step”, by D. D. Tannant et al. This publication discloses a method of producing hydrocarbon fluid from an oil sands layer located in an earth formation, wherein a first horizontal borehole is drilled into the oil sands layer and a fluid jetting device is operated through the borehole to excavate the oil sands layer and thereby form a cavity in the oil sands layer. A slurry of fluid and oil sands is formed in the cavity as a result of the fluid jetting operation. Slurry is withdrawn through the borehole, and a stable cavern is formed containing caved oil sands, water, and possibly injected air. The cavern is used as a primary fractionator, in which bitumen rises to the top and sand sinks to the bottom. A second horizontal borehole is provided above the first borehole, to an upper part of the cavity, to withdraw water and oil. Once the bitumen is removed, thickened tailings recovered from the portion of the oil sands slurry that was sent to surface for processing are placed back via the second borehole in the upper part of the cavern.
- Another method is disclosed in WO 2008/064305, in which horizontal boreholes extending from a main access tunnel are used to recover oil sands. FIG. 6 of this publication discloses two horizontal boreholes, one above the other. The lower borehole is a production well, through which a hydraulic mining bit is operated to create a mined volume that enlarges upwardly, until it reaches the level of an upper sand injection well, at which point mining is stopped and sand is injected from the upper well. Initially the sand injection well can also be used to create a small mined volume at its toe, above and separate from the mined volume at the toe of the production well. The upper mined volume can then be filled with sand slurry and pressurized, to assist the hydraulic mining process being applied from below. In a variant of the known method the lower production and upper sand slurry injection well can also be operated simultaneously, wherein the sand slurry injection well sticks out into the cavity and sprays a stream of tailings slurry into the cavity.
- International patent publications No. WO 2010/000729 and WO 2010/000736 disclose methods of producing hydrocarbon fluid from a layer of oil sand, wherein a plurality of vertical injection/refill boreholes and a discharge borehole having a substantially horizontal borehole section are operated.
- However, there is still a need for an improved method of producing hydrocarbon material from an oil sands layer combined with reinjection of refill material.
- In accordance with the invention there is provided a method of producing hydrocarbon material from a layer of oil sand located in an earth formation, the layer of oil sand having a thickness and extending in an extension direction for more than its thickness, the method comprising:
-
- creating a borehole arrangement in the earth formation, including a production borehole having a production borehole section extending in a production borehole direction, and a refill borehole having a refill borehole section extending in a refill borehole direction, wherein both the production and the refill borehole directions are deviating less than 45 degrees from the extension direction;
- creating a cavity in the layer of oil sand, the cavity being in fluid communication with the production borehole section;
- extending the cavity by operating fluid jetting means to jet a stream of fluid against a wall of the cavity, to obtain a slurry comprising fluid, hydrocarbon material, and sand;
- withdrawing the slurry from the cavity via the production borehole to a processing facility for processing the slurry; and
- injecting refill material into the cavity via the refill borehole section, wherein the refill borehole section extends below the production borehole section.
- Refilling from below is advantageous for a controlled refill operation. When oil sand production and refill operations are carried out simultaneously, it will be preferred to maintain a certain distance between the area of the cavity from which oil sand is produced, and the area of refill. E.g., the distance along the extension direction can be 20 m or more, preferably 50 m or more, such as 100 m or more. It is likely that the cavity at least partially collapses over such distances, so that refill from above is hampered or impossible. Refilling from above moreover requires a casing/lining to extend into the cavity for a significant distance, but there is no proper support. Reference is made in this regard to FIG. 8 of WO 2008/064305, showing such an undesirable operation. Also in the case of discontinuous operation, wherein refill material is injected after a certain cavity was produced, there is a risk of (partial) collapse of the cavity. Providing the refill borehole below the production borehole protects the refill borehole against a potential collapse of the cavity, and refill can still take place. Refill material can be pumped with excess pressure in to the cavity in a controlled way from below.
- In one embodiment of the invention, the production borehole can be a combined injection and discharge borehole. An injection borehole is a borehole through which the fluid jetting means is operated during normal operation. A discharge borehole is a borehole through which a slurry comprising oil sand is transported to surface during normal operation. A combined injection and discharge borehole serves for both functions. Such a combined borehole is for example disclosed in the above-referenced paper by Tannant et al., or in WO 2008/064305, both incorporated herein by reference.
- In another embodiment, the production borehole is a discharge borehole, and the borehole arrangement further includes an injection borehole separate from the discharge borehole. The injection borehole suitably also has an injection borehole section extending in an injection borehole direction deviating less than 45 degrees from the extension direction. Preferably the discharge borehole section extends below the injection borehole section. In this manner, hydrocarbon-containing slurry that is formed in a lower part of the cavity by the erosive action of the fluid jetting means and under the influence of gravity, can be effectively removed via the discharge borehole arranged below the fluid injection borehole, i.e. in a lower part of the cavity.
- Preferably pressure in the cavity, while the fluid jetting means is operated, is lower than the bubble point pressure in the pristine oil sands layer before the cavity is created therein, in particular 50% or less of the pristine pressure, more in particular 20% or less. Oil sands layers can have gas present, e.g. methane. The gas can e.g. be adsorbed or dissolved. Lowering the pressure below the pressure at which gas can be released from pores in the sand matrix (which pressure is referred to as bubble point pressure) can lead to damage to the sand matrix, and to the loss of strength of the oil sands, at the walls of the cavity. Removal of material by a hydraulic jet becomes much easier, and the disintegrated oil sand will sink to the bottom of the cavity.
- In one embodiment, fluid is also injected into the cavity via the discharge borehole. A particular purpose of this is for stirring or mobilizing the slurry and breaking of any larger lumps of material in the area of the cavity from which the slurry is withdrawn via the discharge borehole.
- In one embodiment, no injection or discharge borehole in fluid communication with the cavity is operated, which borehole is a vertical or near-vertical borehole. Near-vertical means that the average angle between the vertical and the borehole from surface to cavity is less than 45 degrees. The present invention allows to excavate a layer of oil sands using deviated boreholes, with horizontal or near-horizontal borehole sections in the oil sands layer for extended distances, and thus without the need for a multitude of vertical or near-vertical wells.
- Suitably the discharge borehole is provided with a liner of a length adapted to be changed, and the injection borehole is provided with injection tubular of a length adapted to be changed, and wherein both the lengths of the liner and of the injection tubular are changed in correspondence with the extension of the cavity. The tubular can for example be a fluid injection tubular or a liner.
- The length of such a tubular can be changed by a shortening device. For example, the step of shortening the liner can comprise operating a cutting device to cut the liner. The liner can also be shortened by the action of a fluid jet, or by any other means, e.g. by milling, explosives, or a laser. Shortening can be done by removing coarse discrete pieces of the liner, such as at suitable time intervals, or by producing small chips of the liner material. To this end the liner is suitably made from a suitable material for shortening. The liner can be made of metals softer than steel, e.g. aluminium. Preferably the liner is made of a non-metal material, and in particular the liner can be made of a plastics material, such as a material comprising 50 wt % or more of a polymer.
- In one embodiment the discharge borehole is provided with a pump for pumping the slurry via the discharge borehole to the processing facility, preferably the pump is sealed relative to an inner surface of the liner. The pump can be axially movable through the discharge borehole, and moved in correspondence with changing the length of the liner. The pump can e.g. be driven by electricity, but also by a stream of fluid pumped through a conduit extending through the discharge borehole. In the latter case, at least a portion of said stream of fluid is suitably injected into the slurry of fluid and oil sands present in the cavity, e.g. for stirring.
- The stream of refill material can comprise tailings that are separated in and transported from the processing facility to the cavity.
- Preferably the refill borehole section is arranged near or at the lower end of the cavity or just below, e.g. 0-10 m below. There it is nearly unaffected by a (partial) collapse of the cavity.
- In a preferred option inserting a stream of refill material into the cavity comprises providing the refill borehole section with a casing. The casing protects against collapse of the borehole. After extending the cavity for a selected length, the casing is perforated within that length, and refill material is pumped through the perforations.
- The invention will be described hereinafter in more detail, and by way of example, with reference to the accompanying drawings in which:
-
FIG. 1 schematically shows an example of a production unit for use in an embodiment of the method of the invention; -
FIG. 2 schematically shows a detail of the production unit ofFIG. 1 ; -
FIG. 3 schematically shows another example of a production unit for use in an embodiment of the method of the invention; -
FIG. 4 schematically shows a top view at surface of a production field using embodiments of the present invention; and -
FIG. 5 schematically shows another example of a production unit for use in an embodiment of the method of the invention; and - In the Figures, like reference numerals relate to like or similar components.
- Referring to
FIGS. 1 and 2 there is shown anearth formation 1 containing anoil sands layer 2 located between an overburden layer 4 above theoil sands layer 2 and an underburden layer, shown as a layer of rock material 6, such as limestone, below theoil sands layer 2. Earth formation below the oil sands layer is referred to as underburden. Theoil sands layer 2 has respective upper andlower boundaries extension direction 21, in particular a non-vertical extension direction, in this example horizontally between an overburden and an underburden. The layer of oil sands has a thickness defining athickness direction 21 a, which is in this example vertical. Theextension direction 21 is different from, often perpendicular to, the thickness direction, and is in this example in the horizontal plane. The layer extends more in the extension direction than its thickness, typically for more than twice its thickness, such as for more that 5 or 10 times its thickness, or even more. It will typically extend for less than 10000 times its thickness. - The thickness can for example be between 1 m and 500 m, in particular between 5 m and 200 m, such as between 10 and 100 m, and may vary along the extension direction. It will be understood that the layer can extend along a flat or curved plane.
- An
injection borehole 8 is provided, which in this example is a deviated borehole extending from aninjection station 10 at theearth surface 11 to acavity 12 formed in the layer ofoil sands 2. The cavity has anupper portion 12 a containing gas (e.g. CO2, methane, air, and/or H2S) and alower portion 12 b containing a mixture (referred to hereinafter as “slurry”) 13 of fluid (preferably water) and oil sands particles comprising hydrocarbon material and sand, which may partly or fully separate in the slurry. - A deviated
discharge borehole 14, which is also referred to as production borehole, extends from aproduction station 15 at the earth surface to thecavity 12 whereby theproduction station 15 is horizontally spaced from theinjection station 10 and debouches into thelower cavity portion 12 b at some distance above the bottom of the cavity. - The
injection borehole 8 and thedischarge borehole 14 each have anupper section lower section lower borehole section 18 of the discharge borehole extends in a discharge borehole direction, below theinjection borehole section 18 a of theinjection borehole 8, extending in an injection borehole direction. Each of the injection and discharge borehole directions is a selected direction within thelayer 2, in this example an azimuthal direction from thecavity 12. The intersection between thelower borehole section 18 a of theinjection borehole 8 and thecavity 12 defines afront surface 23 of thecavity 12. - Each of these selected directions suitably is a direction within the layer. The lower sections of the injection and discharge boreholes each deviate less than 45 degrees from the
extension direction 21, wherein the angle is preferably counted in a vertical plane through the extension direction. These borehole sections preferably extend substantially parallel to theupper boundary 20 and/orlower boundary 22 of theoil sands layer 2. Suitably the selected direction substantially coincides with the extension direction, so that the cavity is extended within the layer, substantially parallel with its upper and/or lower boundary, for more than the layer thickness, such as for between 2 and 5000 times the layer thickness. The expression “substantially parallel” herein accounts for the precision with which deviated boreholes can be drilled in an underground layer. In the present example thelower sections lower sections - The expression “extending below” in relation to two borehole sections is used to refer to the situation that one borehole section extends at a greater vertical depth than the other. Preferably the two borehole sections extend substantially along the same trajectory in a vertical projection onto the earth's surface, which can for example mean that the horizontal deviation in such projection is 50 m or less, preferably 10 m or less, more preferably 5 m or less, such as 2 m or less.
- The vertical distance between the discharge borehole section and the injection borehole section thereabove is suitably in the range of 1-100 m, preferably between 2 and 50 m, such as between 5 and 30 m.
- The
upper borehole sections lower borehole sections liner liner 26 extends a minimal distance into thecavity 12. Furthermore in this example, ajet pump 28 is positioned in theliner 26 in a manner that thejet pump 28 is sealed relative to the inner surface of theliner 26 and is axially movable throughliner 26. Afluid conduit 30 for driving thejet pump 28 extends from theproduction station 15 through thecasing 24 and theliner 26 to thejet pump 28. When driven by fluid, such as water, pumped through thefluid conduit 30, thejet pump 28 is arranged to pump theslurry 13 of fluid and particles from thelower cavity portion 12 b, via theannular space 27 between thefluid conduit 30 on one hand and theliner 26 andcasing 24 on the other hand, to theproduction station 15. Thejet pump 28 is thereto provided with one or more flow channels 32 (FIG. 2 ) allowing the slurry to flow in axial direction through thejet pump 28. Thefluid conduit 30 extends further from thejet pump 28 throughliner 26 to thecavity 12. Alower end part 34 of thefluid conduit 30 is provided with a shortening device, in thisembodiment cutter 36, for shortening theliner 26, one ormore nozzles 38 for initially forming thecavity 12 and/or for stirring the slurry present in thecavity 12, and a bit ormill 39 for crushing lumps of rock material that may be present in thecavity 12.Conduit 30 can be rotatable. - Alternatively, the discharge borehole can also be set up for operation in ‘reverse circulation’, where driving fluid for the jet pump is pumped from surface via the annulus, and slurry is pumped via an inner tubular like
reference numeral 30.Liner 26 and jet-pump 28 are suitably designed to withstand the pressure of driving fluid, e.g. a plastic liner of sufficient strength can be used. An advantage of this reverse circulation operation is that there is no wear of the slurry in the annulus. Also the slurry travelling inside a slowly rotating production pipe will not be able to settle down. - An
injection string 40 for injecting fluid into thecavity 12 extends from theinjection station 10 via theinjection borehole 8 into thecavity 12, theinjection string 40 having a lower end provided with fluid jetting means in the form offluid jetting head 41 comprising jettingnozzles 42, the fluid jetting head being located in theupper portion 12 a ofcavity 12. An annular seal 43 (e.g. such as used in a rotating head) is arranged in an upper part of thefirst injection borehole 8 to seal the annular space formed between theinjection string 40 and the wall or casing of thefirst injection borehole 8. Theinjection string 40 can also be provided with a shortening device (not shown) for shortening theliner 26 a extending into thecavity 12, which can be similar to theshortening device 36 of theconduit 30.Injection string 40 can be rotatable. - In accordance with the invention there is further provided a
refill borehole 108 which in this example is also a deviated borehole extending from arefill station 110 at the earth'ssurface 11 to the lower end of thecavity 12. Therefill borehole 108 has anupper section 116 extending downwardly, such as substantially vertically, and alower section 118. Thelower borehole section 118 extends below lowernon-vertical section 116 of thedischarge borehole 14, such as between 1 and 20 m below the lower section in particular between 2 and 10 m, preferably substantially parallel therewith. The lower borehole section preferably extends substantially along thelower boundary 22, such as within 5 meters from the boundary, preferably within 1 m from the boundary. Therefill borehole 108 on this embodiment is provided withcasing 124, preferably a steel casing, and with aninjection string 148 for refill material, which can be rotatable. The injection string is optional; the injection borehole could alternatively be arranged without such string, so that the injection slurry is passed through the casing. The refill borehole section preferably deviates less than 30 degrees from the extension direction, more preferably less than 15 degrees. It can alternatively be said that the refill borehole section preferably is a substantially horizontal borehole section. -
FIG. 1 shows the invention with several of the components at a stage of normal operation after some time of operation. Thecavity 12 is being extended by operating the fluid jetting means usingnozzles 42 via the injection borehole to jet a stream of fluid against a wall of the cavity, in particular thefront surface 23, starting from aninitial cavity 12′ in an azimuthal direction, along the parallellower borehole sections initial cavity 12′ that was created in the layer ofoil sands 2 is indicated with a dashed line. Suitably the jetting fluid is a low solids fluid, i.e. it contains substantially no solids, such as less than 10 wt % or less than 1 wt % of solids. Water is a suitable jetting fluid. The water can contain one or more additives such as a surfactant, but this is not required. Reference to water herein is to a fluid that contains at least 80 wt %, preferably at least 90 wt % of pure water. The temperature of the jetting fluid (water) can be selected or modified such as by heating. For example, water at a temperature of 25° C. or above, or 40° C. or above, can be used. - Thus the
front surface 23 of the cavity has been moving in the extension direction, with the sense of direction generally uphole, defined by the injection borehole's sense of direction towards surface. As a result, thelower borehole sections liners cavity 12 in correspondence with shortening of thelower borehole sections fluid conduit 30 with thejet pump 28 connected thereto has been pulled upward throughdischarge borehole 14 over a distance about equal to the reduction in length ofliner 26, and likewise theinjection string 40 has been retracted, so that the nozzles stay in sufficient proximity to thefront wall 23 so that the fluid jetting is effective to extend the cavity. Suitably, the nozzles are at a distance of between 0.5 m and 15 m from the wall against which the fluid jet is exerted. - During normal operation of the system of
FIGS. 1-2 , theinjection borehole 8 and thedischarge borehole 14, and the refill borehole are drilled into theoil sands layer 2 using one or more conventional drilling rigs, and completed as needed, such as with thecasings liners injection station 10 and theproduction station 15 are installed at their respective positions as indicated inFIG. 1 . In a next step, the initial cavity is created. Thefluid conduit 30 with thejet pump 28 connected thereto is lowered through thedischarge borehole 14 untilend part 34 of thefluid conduit 30 extends just beyond the far end of theliner 26. Water at high pressure is then pumped from theproduction station 15 into thefluid conduit 30 so that the pumped water is jetted through thenozzles 38 to impact the formation at the end of theliner 26 with great force. Alternatively, the discharge borehole is operated in reverse circulation as discussed above. If desired, thefluid conduit 30 is simultaneously rotated about its longitudinal axis to induce the bit ormill 39 to crush the rock formation. As a result theoil sands layer 2 is gradually excavated so that thecavity 12′ and theslurry 13 of water and oil sand particles are initially formed. Furthermore, by virtue of pumping of water throughfluid conduit 30, thejet pump 28 is operated to pump theslurry 13 from thecavity 12′ via theflow channels 32 of thejet pump 28 and via theannular space 27 between thefluid conduit 30 and theliner 26/casing 24, to theproduction station 15. - Alternatively or in addition, the
initial cavity 12′ is created by fluid jetting via the injection borehole, optionally using equipment and operation similar to what was described above for the discharge borehole. - In an alternative embodiment, the
cavity 12′ is initiated by underreaming, viainjection borehole 8 or dischargeborehole 14, or even from a separate borehole (not shown) such as from a vertical borehole above the cavity. - Once the
cavity 12 is sufficiently large so that fluid communication between thecavity 12 and theinjection borehole 8 is established, in particular so that bothboreholes cavity 12, theinjection string 40 is operated via thefirst injection borehole 8. Fluid, preferably water, is pumped at high pressure, such as between 10 and 500 bar, in particular between 100 and 200 bar from theinjection station 10 into theinjection string 40. The pumped water is jetted through the jettingnozzles 42 and impacts the wall of thecavity 12 with great force. As a result, theoil sands layer 2 is further excavated and theslurry 13 of water and oil sand particles is continuously formed in thecavity 12. The size of the cavity increases as jetting of water through thenozzles 42 continues. Water is pumped at a suitable pressure fromproduction station 15 into thefluid conduit 30 to operate thejet pump 28. Thereby, thejet pump 28 withdraws the slurry of fluid and particles from thelower cavity portion 12 b, via the annular space between thefluid conduit 30 and theliner 26 orcasing 24, and theflow channels 32 of thejet pump 28, to theproduction station 15. Arrows 115 (FIG. 2 ) indicate the direction of flow of water pumped throughfluid conduit 30, andarrows 116 indicate the direction of flow of the slurry of water and oil sand through said annular space andchannels 32. Note that in case of reverse circulation, below thepump arrows - If desired, pumping of the slurry of fluid and particles from the
cavity 12 to theproduction station 15 can be enhanced by maintaining a suitable elevated pressure in thecavity 12. The pressure can be adjusted by influx and/or outflux of gas, taking into account gas that is released from the matrix below the bubble point. Preferably however the pressure incavity 12 is kept lower than the pressure in the pristineoil sands layer 2 before thecavity - Furthermore, a portion of the water pumped through
fluid conduit 30 is injected/jetted into thelower cavity portion 12 b throughnozzles 38 in order to achieve some stirring of theslurry 13 in thecavity 12, simultaneously with fluid jetting via the injection borehole. - Jetting of water through
nozzles 42 is continued so as to extend thecavity 12 in the azimuthal direction of thelower borehole section 18 whereby thefront surface 23 of the cavity moves in said azimuthal direction. As a result, aportion 117 of the liner 26 (FIG. 2 ) gradually becomes protruding into thecavity 12. In order to reduce the length of, or completely remove, the protrudingliner portion 117, thecutter 36 is operated to cut the protrudingliner portion 117 at time intervals selected in accordance with the speed of movement of thefront surface 23 in the azimuthal direction. Thefluid conduit 30 is moved upwardly in correspondence with shortening of theliner 26 whereby thejet pump 28 slides along the inner surface of theliner 26. If desired, thefluid conduit 30 is rotated to inducebit 39 to crush rock particles that may be present in thecavity 12. Likewise, the portion of theliner 26 a of theinjection borehole section 18 a protruding into the cavity can be shortened using a cutter (not shown). Alternatively, theliner 26 and/or 26 a can be shortened in another way, such as by using a fluid jet. - The amount of fluid flowing through the
injection nozzles 42 can typically be in the range of 50-50001/min, in particular between 100 and 1000 l/min, such as between 200 and 800 l/min. The amount of fluid flowing through thenozzles 38 can be in the same range as the amount of water injection through the injection borehole. An aqueous slurry that is formed and produced during operation can have a density of between 1100 and 1600 kg/m3. The pristine oil sand may for example contain between 1 and 50 wt % of hydrocarbons, based on total oil sand including hydrocarbons, in particular between 2 and 30 wt %, such as between 5 and 20 wt %. The width of the cavity in the horizontal plane perpendicular to the direction of theinjection borehole 8 depends on the precise orientation and operation of the nozzles, and is typically in the range of 1-50 m, such as between 10 and 40 m. The jetting nozzles can be arranged to jet in a fixed direction against a front, side, rear, upper, and/or lower wall of the cavity, or can be movable such as rotatable. The growth of the cavity in the extension direction can for example be in the range of between 10 cm/day to 10 m/day, so for example the liners need to be shortened by approximately 1 m/day. - In this way, the hydrocarbon material from the oil sand layer can be produced in a continuous process, by simultaneous operation of the injection and discharge borehole sections, and over an extended length, such as for 20 m or more, 50 m or more, 100 m or more, even 500 m or more, and for extended periods of time, such as for a day or more, a week or more, a month or more, even a year or more.
- It will be understood that for very thick layers of oil sands, more than one injection borehole can be arranged at various heights. Each additional injection borehole can be substantially similar to
injection borehole 8 as described above, with a non-vertical lower section extending substantially above the non-verticallower section 18 a, theinjection borehole 8 thus extending below additional injection boreholes. This may be useful when the vertical thickness of theoil sands layer 2 is 30 m or more, or 50 m or more. - If the operation is conducted as described hereinbefore, the earth's surface may subside above the cavity as a result. On the other hand, tailings are produced to surface, which are separated from hydrocarbon material and water, and it is typically desired to reinject tailings for disposal, and to avoid or reduce subsidence.
- To this end the refill borehole is provided. In a preferred operation, the
slurry 13 of water and oil sand is transported from theproduction station 15 to a separation plant (not shown) for separating hydrocarbon material and tailings from the slurry. The hydrocarbon material is recovered as product and optionally subject to further transport, purification, separation, treatment and/or processing to further products. Alternatively theproduction station 15 and the separation plant can be integrated in a single unit. The production station and optionally the separation plant form part of a production facility. Suitably, at least part of the tailings is used to refill thecavity 12. The tailings can comprise solids like sand and/or clay. It can be desired to re-use part or all of the sand produced to surface for other purposes than reinjection, and to reinject only or predominantly other tailings like for example clay. For refilling, tailings are pumped into the rear portion of cavity 12 (such as beginning at theinitial cavity 12′) via theinjection string 148. Suitably, first acement plug 150 is provided, and thenperforations 154 are created in the casing at the desired locations, through which tailings are pumped into the cavity. In this manner, the rear portion ofcavity 12 is gradually filled with the body oftailings 149. In the context of the present description, any reference to “the cavity” is meant to include theupper cavity portion 12 a, thelower cavity portion 12 b, theinitial cavity 12′, and the rear portion filled with refill material such as tailings or tailings. - Reference is now made to
FIG. 3 , showing schematically an alternative example of operating the present invention. In this example, the operation is started as described above with reference toFIGS. 1 and 2 . The extension of a cavity in theextension direction 21 is stopped at a certain moment, such as when a certain horizontal length of the cavity is reached, or when the constitution of the oil sands layer changes. Thetubulars liners way pillars 170 are created between cavities to prevent or minimize subsidence, and/or to avoid producing areas that do not contain sufficient hydrocarbons or are otherwise not interesting to produce.FIG. 3 shows afirst cavity 12 a that is fully produced and refilled withtailings 149; asecond cavity 12 b created and produced after thefirst cavity 12 a, and being refilled withtailings 149; and athird cavity 12 c in production, substantially as described with reference toFIGS. 1 and 2 . -
FIG. 5 shows schematically an embodiment in which a production borehole in the form of a combined injection anddischarge borehole 514 is arranged above arefill borehole 108. Thelower section 518 of the combined injection anddischarge borehole 514 extends substantially horizontally above thelower section 118 of therefill borehole 108. During operation, fluid driving the jettinghead 41 is pumped throughtubing 530, and oil sand slurry that is obtained in thecavity 12 is produced via theannulus 527 between the liner/casing 526 and thetubing 530, as indicated by the arrows. Refill material is injected viaperforations 154 substantially as discussed with reference toFIG. 1 . Parts having the same reference number as parts inFIG. 1 are substantially similar in form and operation. Other parts shown inFIG. 1 can be installed as well, e.g. a jet pump in the production well, and have not been shown for clarity. - In the context of the present description, an assembly comprising a cooperating production borehole and refill borehole, injection, production, refill station and one or more cavities created along these boreholes is referred to as a production unit. A production field comprises one or more production units. An injection, production and/or refill station can include a drilling rig.
- Referring to
FIG. 4 , there is schematically shown a top view at surface of a layout of aproduction field 201 for recovering hydrocarbons from an underground oil sands layer. The Figure shows a plurality ofproduction units field sections backbone 260. Each production unit can be substantially similar to and operated as described hereinbefore with reference toFIGS. 1-3 , and has an injection borehole above a discharge borehole above a refill borehole, overlapping in the top view. - The production units are in different stages of operation. The solid lines, e.g. 270, indicate a section of a production unit that is producing hydrocarbons (slurry) to a
separation plant 275, whereas the dashed lines, e.g. 280, indicate an area that has already been produced and is abandoned, or refilled.Units Units area 285 that is generally defined by the dashed lines can be referred to as reclaimed area of the production field, and thearea 288 generally defined by solid lines can be referred to as producing area of theproduction field 201. It shall be clear that only one, two or three of the field sections 251-254 may be arranged, or may be developed at different periods in time, and that more or less production units than shown can be provided in a field section. - The backbone provides for transport of fluids (slurry, tailings) between the production units and the
separation plant 275 via suitable pipelines/conduits. It concentrates the surface equipment in a relatively narrow surface area or streak, for easy accessibility and minimum surface impact. This area is moreover typically not or only modestly affected by subsidence. - The backbone can be between 0.1 and 50 km long, preferably between 0.5 and 20 km, and may grow in the lifetime of a field, which is suitably developed starting with production units close to the
separation plant 275. The lateral spacing between production units can be between 10 m and 500 m, preferably between 20 m and 100 m. They can in particular be arranged such that the cavities along adjacent production units join or overlap, or remain separate. Each production unit may have a length of between 50 and 5000 m, in particular between 100 and 2000 m. Areas where it is not desired or possible to produce oil sand can be avoided in the layout. - With the method described above it is achieved that hydrocarbon fluid is produced from the oil sands layer without removing the overburden layer. Moreover, by refilling the cavities with tailings it is achieved that any subsidence of the overburden layer is reduced to a minimum. In a preferred embodiment, the cavities are refilled with tailings from the produced slurries of water and oil tailings after cleaning at the separation plant. Suitably a binding material like cement is mixed into the tailings.
- In the examples described above, the discharge borehole is provided with a single pump (jet pump 28) for pumping the slurry of fluid and oil sand particles via the discharge borehole to the production station at surface. However, depending on the depth of the cavity and/or other operational parameters, a single pump may not suffice to pump the slurry to surface at an efficient flow rate. In that case, one or more additional pumps can be applied in the discharge borehole. For example, the upper section of the discharge borehole can be provided with a single-stage or multi-stage centrifugal pump driven by a hydraulic or electric motor, to pump the slurry to surface. Such additional pump can be positioned, for example, in the lower end part of the casing provided in the discharge borehole, just above the liner. Alternatively or in addition, an additional jet pump or gas lift can be applied.
- In the examples described above, various boreholes extend from surface locations mutually spaced in horizontal direction. In an alternative arrangement, the boreholes can extend as deviated boreholes from a fewer or a single surface location, or as branch boreholes of a multilateral borehole. Such arrangement can be attractive in applications whereby the surface area is difficult accessible, for example if the oil sands layer is located below a body of water or a swamp area.
Claims (15)
1. A method of producing hydrocarbon material from a layer of oil sand located in an earth formation, the layer of oil sand having a thickness and extending in an extension direction for more than its thickness, the method comprising:
a) creating a borehole arrangement in the earth formation, including a production borehole having a production borehole section extending in a production borehole direction, and a refill borehole having a refill borehole section extending in a refill borehole direction, wherein both the production and the refill borehole directions are deviating less than 45 degrees from the extension direction;
b) creating a cavity in the layer of oil sand, the cavity being in fluid communication with the production borehole section;
c) extending the cavity by operating fluid jetting means to jet a stream of fluid against a wall of the cavity, to obtain a slurry comprising fluid, hydrocarbon material, and sand;
withdrawing the slurry from the cavity via the production borehole to a processing facility for processing the slurry; and
d) injecting refill material into the cavity via the refill borehole section,
wherein the refill borehole section extends below the production borehole section.
2. The method of claim 1 , wherein the production borehole is a combined injection and discharge borehole.
3. The method of claim 1 wherein the production borehole is a discharge borehole, and wherein the borehole arrangement further includes an injection borehole having an injection borehole section extending in an injection borehole direction deviating less than 45 degrees from the extension direction, preferably wherein the discharge borehole section extends below the injection borehole section.
4. The method according to claim 1 wherein the pressure in the cavity, while the fluid jetting means is operated, is lower than the pressure in the pristine oil sand layer before creating the cavity therein, preferably lower than the bubble point pressure.
5. The method according to claim 1 wherein fluid is also injected into the cavity via the discharge borehole.
6. The method of claim 1 wherein no borehole in fluid communication with the cavity is arranged, which borehole is a vertical or near-vertical borehole.
7. The method of any one of claims 1 -6, wherein the production borehole is provided with a tubular of a length adapted to be changed, and wherein the length of the tubular is changed in correspondence with the extension of the cavity in the extension direction.
8. The method of claim 1 wherein the production borehole is provided with a pump for pumping the slurry via the discharge borehole to the processing facility and wherein the pump is sealed relative to an inner surface of the liner.
9. The method of claim 8 , wherein the pump is axially movable through the production borehole, and wherein the method further comprises axially moving the pump through the production borehole in correspondence with changing the length of the liner.
10. The method of claim 8 wherein the pump is driven by a stream of fluid pumped through a conduit extending through the production borehole, and wherein at least a portion of said stream of fluid is injected into the slurry of fluid and oil sand present in the cavity.
11. The method of claim 1 wherein at least one of the production borehole section and the refill borehole section extends substantially horizontal, preferably wherein both extend substantially horizontal.
12. The method of claim 1 wherein the refill material comprises tailings.
13. The method of claim 12 , wherein the refill material is transported from the processing facility to the cavity.
14. The method according to claim 1 wherein operating the fluid jetting means and inserting refill material are carried out simultaneously.
15. The method of claim 1 wherein inserting refill material into the cavity comprises, after extending the cavity for a selected length, perforating the casing within that length, and pumping refill material from the refill well through the perforations.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10167160.0 | 2010-06-24 | ||
EP10167160A EP2400112A1 (en) | 2010-06-24 | 2010-06-24 | Producing hydrocarbon material from a layer of oil sand |
Publications (1)
Publication Number | Publication Date |
---|---|
US20110315397A1 true US20110315397A1 (en) | 2011-12-29 |
Family
ID=42566210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/166,396 Abandoned US20110315397A1 (en) | 2010-06-24 | 2011-06-22 | Producing hydrocarbon material from a layer of oil sand |
Country Status (3)
Country | Link |
---|---|
US (1) | US20110315397A1 (en) |
EP (1) | EP2400112A1 (en) |
CA (1) | CA2744109A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110213602A1 (en) * | 2008-11-20 | 2011-09-01 | Dasari Ganeswara R | Sand and Fluid Production and Injection Modeling Methods |
US8584749B2 (en) | 2010-12-17 | 2013-11-19 | Exxonmobil Upstream Research Company | Systems and methods for dual reinjection |
US20170058646A1 (en) * | 2015-08-25 | 2017-03-02 | Shell Oil Company | Deepwater extended reach hardrock completions |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130106166A1 (en) * | 2011-10-27 | 2013-05-02 | PCS Phosphate Company, Inc. | Horizontal Borehole Mining System and Method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4353417A (en) * | 1980-11-28 | 1982-10-12 | Texaco Inc. | Method for producing a well in an unconsolidated formation |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2682396A (en) * | 1948-09-17 | 1954-06-29 | Potash Company | Method for mining soluble ores |
US3302720A (en) * | 1957-06-17 | 1967-02-07 | Orpha B Brandon | Energy wave fractureing of formations |
CA989729A (en) * | 1973-01-15 | 1976-05-25 | Akzona Incorporated | Bedded underground salt deposit solution mining system |
CA1023397A (en) * | 1975-01-29 | 1977-12-27 | World Oil Mining Ltd. | Hydraulic mining method |
US4035023A (en) * | 1975-07-15 | 1977-07-12 | Freeport Minerals Company | Apparatus and process for hydraulic mining |
US4289354A (en) * | 1979-02-23 | 1981-09-15 | Edwin G. Higgins, Jr. | Borehole mining of solid mineral resources |
US6688702B1 (en) * | 2002-12-16 | 2004-02-10 | Grigori A. Abramov | Borehole mining method |
CA2668774A1 (en) | 2006-11-22 | 2008-05-29 | Osum Oil Sands Corp. | Recovery of bitumen by hydraulic excavation |
US20110120704A1 (en) | 2008-07-02 | 2011-05-26 | Bruno Best | Producing hydrocarbon fluid from a layer of oil sand |
WO2010000736A1 (en) | 2008-07-02 | 2010-01-07 | Shell Internationale Research Maatschappij B.V. | Method of producing hydrocarbon fluid from a layer of oil sand |
-
2010
- 2010-06-24 EP EP10167160A patent/EP2400112A1/en not_active Withdrawn
-
2011
- 2011-06-22 CA CA2744109A patent/CA2744109A1/en not_active Abandoned
- 2011-06-22 US US13/166,396 patent/US20110315397A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4353417A (en) * | 1980-11-28 | 1982-10-12 | Texaco Inc. | Method for producing a well in an unconsolidated formation |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110213602A1 (en) * | 2008-11-20 | 2011-09-01 | Dasari Ganeswara R | Sand and Fluid Production and Injection Modeling Methods |
US8666717B2 (en) | 2008-11-20 | 2014-03-04 | Exxonmobil Upstream Resarch Company | Sand and fluid production and injection modeling methods |
US8584749B2 (en) | 2010-12-17 | 2013-11-19 | Exxonmobil Upstream Research Company | Systems and methods for dual reinjection |
US20170058646A1 (en) * | 2015-08-25 | 2017-03-02 | Shell Oil Company | Deepwater extended reach hardrock completions |
Also Published As
Publication number | Publication date |
---|---|
EP2400112A1 (en) | 2011-12-28 |
CA2744109A1 (en) | 2011-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8313152B2 (en) | Recovery of bitumen by hydraulic excavation | |
US8287050B2 (en) | Method of increasing reservoir permeability | |
RU2287666C2 (en) | Method for controlling usage of accompanying products from underground zones | |
US4189184A (en) | Rotary drilling and extracting process | |
US4452491A (en) | Recovery of hydrocarbons from deep underground deposits of tar sands | |
EP2321497B1 (en) | Traveling undercut solution mining systems and methods | |
CA2752461C (en) | Enhanced permeability subterranean fluid recovery system and methods | |
US20130043031A1 (en) | Manifold string for selectivity controlling flowing fluid streams of varying velocities in wells from a single main bore | |
US20140117739A1 (en) | Mining Method for Gassy and Low Permeability Coal Seams | |
US20110315379A1 (en) | Producing hydrocarbon material from a layer of oil sand | |
US7493951B1 (en) | Under-balanced directional drilling system | |
US3439953A (en) | Apparatus for and method of mining a subterranean ore deposit | |
US20110120704A1 (en) | Producing hydrocarbon fluid from a layer of oil sand | |
US20110315397A1 (en) | Producing hydrocarbon material from a layer of oil sand | |
CN112253070A (en) | Method for eliminating outburst by sectional seam-making and coal-washing of horizontal well in linkage mode of top and bottom of thick coal seam | |
US5249844A (en) | Borehole mining process for recovery for petroleum from unconsolidated heavy oil formations | |
US20110114311A1 (en) | Method of producing hydrocarbon fluid from a layer of oil sand | |
US20130106166A1 (en) | Horizontal Borehole Mining System and Method | |
US20130127231A1 (en) | Hydraulic Mining System for Tabular Orebodies Utilising Directional Drilling | |
CN113605874B (en) | Method for extracting coal bed gas of broken soft coal bed top and bottom double-layer horizontal well | |
CA1067819A (en) | Mining and extracting process and apparatus | |
US11732567B2 (en) | Apparatus and methods for hydrocarbon recovery | |
RU2754232C1 (en) | Method for constructing an underground tunnel reservoir in a rock salt reservoir of limited capacity | |
CN117090570A (en) | Comprehensive coal seam gas mining method and system based on well drilling type soft coal construction | |
RU2180699C1 (en) | Method of tapping of producing formation of fluid mineral |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SHELL OIL COMPANY, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BEST, BRUNO;REEL/FRAME:026771/0301 Effective date: 20110719 |
|
STCB | Information on status: application discontinuation |