JPH0798733A - Hierarchical production plan supporting method/device - Google Patents

Hierarchical production plan supporting method/device

Info

Publication number
JPH0798733A
JPH0798733A JP31642993A JP31642993A JPH0798733A JP H0798733 A JPH0798733 A JP H0798733A JP 31642993 A JP31642993 A JP 31642993A JP 31642993 A JP31642993 A JP 31642993A JP H0798733 A JPH0798733 A JP H0798733A
Authority
JP
Japan
Prior art keywords
production
planning
plan
production plan
drafting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP31642993A
Other languages
Japanese (ja)
Inventor
Kazuhiro Obuse
和宏 小伏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to JP31642993A priority Critical patent/JPH0798733A/en
Publication of JPH0798733A publication Critical patent/JPH0798733A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To make a production plan in accordance with the real state of a production line and against the unexpected state changes. CONSTITUTION:A 1st planning means 106 makes a 1st production plan of a long period based on the production requests, and a 2nd planning means 116 makes a 2nd production plan of a short period in accordance with the state of a production line and based on the production plan made by the means 106. A plan verifying means 118 verifies the validity of the production plan made by the means 116. A limit condition/production rule generating means 119 generates the limit conditions and the production rules based on the validity of the 2nd production plan verified by the means 118. A 3rd planning means 136 makes a 3rd production plan of a shorter period and accordant better with the condition of the production line than the 2nd production plan based on the production plan made by the means 116 and also on the limit conditions and the production rules acquired by the means 119.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は生産ラインにおいて製品
を生産する順序等を決定する生産計画を立案する際に、
生産ラインに良く適応した生産計画が立案されるよう支
援する階層型生産計画支援方法及びその装置に関するも
のである。
BACKGROUND OF THE INVENTION The present invention is useful for making a production plan for determining the order of producing products in a production line.
The present invention relates to a hierarchical production plan support method and apparatus for supporting a production plan well adapted to a production line.

【0002】[0002]

【従来の技術】近年、生産計画支援装置を採用すると、
生産ラインの実情に適応した適正な生産計画を速やかに
立案できると共に、突発的な生産要求の変更や生産設備
の変動等にも対応し易いので、生産計画支援装置は化学
プラントや電気製品工場等において実用化され始めてい
る。
2. Description of the Related Art In recent years, when a production planning support device is adopted,
Since it is possible to quickly formulate an appropriate production plan that adapts to the actual conditions of the production line, and it is easy to respond to sudden changes in production requirements, changes in production equipment, etc. Has started to be put into practical use.

【0003】また、より複雑な生産工程を有する製品の
生産に対応するため、複数の生産計画支援装置が従属的
に接続された階層型生産計画支援装置が研究されてい
る。
Further, in order to cope with the production of products having more complicated production processes, a hierarchical production planning support apparatus in which a plurality of production planning support apparatuses are connected subordinately has been studied.

【0004】以下、図面に基づき従来の生産計画支援装
置の一例について説明する。
An example of a conventional production planning support device will be described below with reference to the drawings.

【0005】図2は、前者の生産計画支援装置の主要な
構成部分を示すものである。該生産計画支援装置は、販
売部門等から提出される生産要求を記憶している生産要
求記憶手段200と、生産ラインの最新の生産進捗状況
を記憶している生産状況記憶手段210と、生産装置の
処理能力や作業員の労働時間等の制約条件を記憶してい
る制約条件記憶手段220と、優先度の高いロットを先
に処理する等の生産ルールを記憶している生産ルール記
憶手段230と、生産要求記憶手段200が記憶してい
る生産要求、生産状況記憶手段210が記憶している生
産状況、制約条件記憶手段220が記憶している制約条
件、及び生産ルール記憶手段230が記憶している生産
ルールを基に生産計画を立案する立案手段240と、該
立案手段240が立案した生産計画を表示する生産計画
表示手段250とを備えている。
FIG. 2 shows the main components of the former production planning support device. The production plan support apparatus includes a production request storage unit 200 that stores a production request submitted from a sales department, a production status storage unit 210 that stores the latest production progress status of a production line, and a production apparatus. And a constraint condition storage means 220 for storing constraint conditions such as processing capacity and working hours of workers, and a production rule storage means 230 for storing production rules such as processing a lot having a high priority first. The production request stored in the production request storage unit 200, the production status stored in the production status storage unit 210, the constraint condition stored in the constraint condition storage unit 220, and the production rule storage unit 230. It is provided with a drafting means 240 for drafting a production plan based on the existing production rules, and a production plan display means 250 for displaying the production plan drafted by the drafting means 240.

【0006】以下、前記のように構成された生産計画支
援装置の動作について説明する。
The operation of the production planning support system configured as described above will be described below.

【0007】まず、生産計画の基になる生産要求を生産
要求記憶手段200に入力する。次に図示しない生産状
況収集装置等から最新の生産進捗状況を取り出し、取り
出した生産進捗状況を生産状況記憶手段210に記憶さ
せる。
First, a production request which is the basis of a production plan is input to the production request storage means 200. Next, the latest production progress status is taken out from a production status collection device or the like (not shown), and the taken production progress status is stored in the production status storage means 210.

【0008】立案手段240は、生産要求記憶手段20
0、生産状況記憶手段210、制約条件記憶手段220
及び生産ルール記憶手段230からそれぞれの情報を読
み出し、読み出した時点から内部時刻を順次進めなが
ら、それぞれの時点において使用可能な生産装置に対し
て製品ロットを割り付けていく。内部時刻が計画期間の
最後まで進むか又は処理するべき製品ロットが全て無く
なったら、立案手段240は割付を終了し、立案した生
産計画を生産計画表示手段250に出力する。
The planning means 240 is a production request storage means 20.
0, production status storage means 210, constraint condition storage means 220
Further, each piece of information is read out from the production rule storage means 230, and the product lot is allocated to the production apparatus which can be used at each time point while sequentially advancing the internal time from the time point when the information is read out. When the internal time advances to the end of the planning period or when there are no more product lots to be processed, the planning means 240 finishes the allocation and outputs the planned production plan to the production plan display means 250.

【0009】図3は後者の階層型生産計画支援装置の構
成概略を示している。該階層型生産計画支援装置は、そ
れぞれが図2に示したものと同様の構成を有する第1の
生産計画支援装置300と第2の生産計画支援装置31
0とが縦列に接続されたものである。第1の生産支援装
置300と第2の生産計画支援装置310とは、制約条
件記憶手段220に記憶されている制約条件と生産ルー
ル記憶手段230に記憶されている生産ルールとはその
一部が互いに異なっている。
FIG. 3 shows a schematic configuration of the latter hierarchical production planning support device. The hierarchical production planning support apparatus includes a first production planning support apparatus 300 and a second production planning support apparatus 31 each having a configuration similar to that shown in FIG.
0 is connected in cascade. In the first production support device 300 and the second production planning support device 310, some of the constraint conditions stored in the constraint condition storage means 220 and the production rules stored in the production rule storage means 230 are Different from each other.

【0010】以下、前記のように構成された階層型生産
計画支援装置の動作について説明する。
The operation of the hierarchical production planning support apparatus constructed as described above will be described below.

【0011】まず、第1の生産計画支援装置300は、
図2で示した生産計画支援装置と同様の手法により生産
計画を立案する。但し、第1の生産計画支援装置300
においては制約条件や生産ルールはかなり緩く設定され
ており、おおまかな生産計画が立案される。例えば、今
後1ヶ月の間に生産するべき製品はいつ頃にいくつ仕掛
からなくてはいけないかという程度である。
First, the first production planning support device 300
A production plan is created by the same method as the production plan support device shown in FIG. However, the first production planning support device 300
In, the constraints and production rules are set rather loosely, and a rough production plan is made. For example, when and how many products should be produced in the next one month.

【0012】次に、第1の生産計画支援装置300が立
案した生産計画は、第2の生産計画支援装置310の生
産要求記憶手段200に入力され、第2の生産計画支援
装置310は、図2に示した生産計画支援装置と同様の
手法により生産計画を立案する。第2の生産計画支援装
置310においては、より綿密な制約条件及び生産ルー
ルが設定されており、どのロットがどの装置によりいつ
ごろ仕掛られるかという程度まで立案される。階層型生
産計画支援装置は、生産計画支援装置を2階層に接続す
ることにより制約条件や生産ルールを細かく設定できる
ので、図2に示した生産計画支援装置よりも詳細で正確
な立案を行なうことが容易である。同様に、図2に示し
た生産計画支援装置を3階層に接続することもできる。
Next, the production plan drafted by the first production plan support apparatus 300 is input to the production request storage means 200 of the second production plan support apparatus 310, and the second production plan support apparatus 310 A production plan is drafted by the same method as the production plan support device shown in FIG. In the second production planning support device 310, more detailed constraint conditions and production rules are set, and it is planned to the extent that which lot is to be processed by which device and when. Since the hierarchical production planning support device can set the constraint conditions and the production rules in detail by connecting the production planning support device in two layers, it is necessary to make more detailed and accurate planning than the production planning support device shown in FIG. Is easy. Similarly, the production planning support device shown in FIG. 2 can be connected in three layers.

【0013】[0013]

【発明が解決しようとする課題】しかしながら、前記の
ような構成では、生産ラインの実情に正確に対応した生
産計画を立案することが難しい。例えば、現時点におい
て、一の生産装置が仕掛かり可能であり、且つ該一の生
産装置により処理されるべき第1の製品ロットがあり、
この処理には2時間を要するとする。そして、第1の製
品ロットと同一の処理条件により且つ数量的に第1の製
品ロットと同時処理が可能な第2の製品ロットが5分後
に到着する場合があるとすると、作業現場の作業員なら
ば、5分間待ってから両者を同時に処理する筈である。
2時間5分で2つの製品ロットを処理できるからであ
る。
However, with the above configuration, it is difficult to draw up a production plan that accurately corresponds to the actual conditions of the production line. For example, at the present time, one production device can be processed, and there is a first product lot to be processed by the one production device,
It takes 2 hours for this process. Then, if there is a case where a second product lot that can be simultaneously processed quantitatively with the first product lot under the same processing conditions as the first product lot arrives after 5 minutes, the worker at the work site If so, wait 5 minutes and then process both at the same time.
Two product lots can be processed in 2 hours and 5 minutes.

【0014】ところが、従来の生産計画支援装置による
と、一の生産装置により第1の製品ロットを処理し、そ
の2時間後に第2の製品ロットを処理するように立案す
る。計画内容を現場の判断と同じにしようとすると、一
度立案した第1の製品ロットを処理するという第1の計
画をキャンセルし、第1の製品ロットと第2の製品ロッ
トとを同時に処理する第2の計画を立案し直す必要があ
る。このようにすると、第1の計画と第2の計画とをそ
れぞれ立案する必要があるため、立案時間は単純に計算
して2倍かかることになる。
However, according to the conventional production planning support device, it is planned that the first product lot is processed by one production device and the second product lot is processed two hours later. If the contents of the plan are made to be the same as the judgment of the site, the first plan of processing the first product lot once planned is canceled and the first product lot and the second product lot are processed simultaneously. It is necessary to re-create the plan of 2. In this case, since the first plan and the second plan need to be drafted separately, the drafting time is simply calculated and takes twice as long.

【0015】従来の生産計画支援装置の立案時間は約3
0分程度とすると、第2の計画が立案されるまでに約1
時間を要する。立案に1時間もかかると、その間に現場
の状況が変わっている可能性がある。例えば1時間の間
に、生産装置が故障するかも知れないし、1時間後に
も、第1の製品ロットの5分後に第2の製品ロットが来
るように再び割り付けられているとは限らないので、第
2の計画が徒労に終わる可能性もある。
The planning time of the conventional production planning support device is about 3
If it takes about 0 minutes, it will take about 1 before the second plan is made.
It takes time. If planning takes an hour, the situation at the site may have changed during that time. For example, in one hour, the production equipment may break down, and even after one hour, the second product lot may not be reallocated 5 minutes after the first product lot. It is possible that the second plan will be in vain.

【0016】以上のような事情により、従来の生産計画
支援装置は、かならずしも生産ラインの実情に的確に対
応した生産計画を立案できるとは限らないと言う問題を
有している。
Due to the above-mentioned circumstances, the conventional production planning support apparatus has a problem that it is not always possible to make a production plan that accurately corresponds to the actual situation of the production line.

【0017】前記に鑑み、本発明は、生産ラインの実情
に即した、正確で、且つ突発的な状況変化に対応できる
柔軟な生産計画を立案することができる階層型生産計画
支援装置を提供することを目的とするものである。
In view of the above, the present invention provides a hierarchical production planning support apparatus capable of drafting a flexible production plan that corresponds to the actual situation of a production line, is accurate, and can cope with sudden situation changes. That is the purpose.

【0018】[0018]

【課題を解決するための手段】前記の目的を達成するた
め、本発明は生産計画支援方法を階層化し、上層の設計
計画支援工程において立案された上層の生産計画を下層
の設計計画支援工程において修正し、生産ラインの状況
により良く対応した下層の生産計画を再立案するもので
ある。
In order to achieve the above object, the present invention hierarchizes a production planning support method, and the upper layer production plan prepared in the upper layer design planning supporting step is set in the lower layer design planning supporting step. It is to revise and re-create the lower layer production plan that better corresponds to the situation of the production line.

【0019】具体的に請求項1の発明が講じた解決手段
は、階層型生産計画支援方法を、生産要求に基づき第1
の生産計画を立案する第1の立案工程と、該第1の立案
工程において立案された第1の生産計画に基づき該第1
の生産計画よりも生産ラインの状況により良く対応した
第2の生産計画を立案する第2の立案工程と、該第2の
立案工程において立案された第2の生産計画の妥当性を
検証する検証工程と、該検証工程において検証された第
2の生産計画の妥当性に基づき制約条件及び生産ルール
のうちの少なくとも1つを生成する生成工程と、前記第
2の立案工程において立案された第2の生産計画と前記
生成工程において生成された制約条件及び生産ルールの
うちの少なくとも1つとに基づき前記第2の生産計画よ
りも生産ラインの状況により良く対応した第3の生産計
画を立案する第3の立案工程とを備えている構成とする
ものである。
[0019] Specifically, the solution means taken by the invention of claim 1 is a method for supporting a hierarchical production plan according to a first requirement based on a production request.
First planning process for planning the production plan of the first and the first planning process based on the first production plan planned in the first planning process.
Second planning process for drafting a second production plan that better responds to the situation of the production line than the production plan of No. 2, and verification for verifying the validity of the second production plan drafted in the second planning process A process, a generation process for generating at least one of a constraint condition and a production rule based on the validity of the second production plan verified in the verification process, and a second process planned in the second planning process. A third production plan that better corresponds to the situation of the production line than the second production plan, based on the production plan and the at least one of the constraint condition and the production rule generated in the generation step. And a planning process.

【0020】請求項2の発明は、請求項1の構成に、前
記第3の立案工程において立案された第3の生産計画の
妥当性を検証する検証工程と、該検証工程において検証
された第3の生産計画の妥当性に基づき制約条件及び生
産ルールのうちの少なくとも1つを生成する生成工程
と、生産計画の妥当性が満足されるまで生産計画の立
案、該生産計画の妥当性の検証並びに制約条件及び生産
ルールのうちの少なくとも1つの生成をそれぞれ繰り返
し行なう工程とをさらに備えているという構成を付加す
るものである。
According to a second aspect of the present invention, in addition to the structure of the first aspect, a verification step for verifying the validity of the third production plan prepared in the third planning step, and a verification step verified in the verification step. 3. A generation process for generating at least one of a constraint condition and a production rule based on the adequacy of the production plan of No. 3, drafting the production plan until the adequacy of the production plan is satisfied, and verification of the adequacy of the production plan. And a step of repeatedly generating at least one of the constraint condition and the production rule, respectively.

【0021】請求項3の発明は、請求項1又は2の構成
に、前記第2の立案工程において立案される第2の生産
計画は、前記第1の立案工程において立案された第1の
生産計画の計画期間のうちの一部の計画期間毎に繰り返
し立案されるという構成を付加するものである。
According to a third aspect of the present invention, in the configuration of the first or second aspect, the second production plan drafted in the second drafting step is the first production drafted in the first drafting step. A configuration is added in which the plan is repeatedly drafted every part of the planning period.

【0022】請求項4の発明は、請求項1〜3の構成
に、前記第1〜第3の立案工程のうちの少なくとも1つ
は、生産計画を多段式に立案する立案工程であるという
構成を付加するものである。
According to a fourth aspect of the present invention, in the structure of the first to third aspects, at least one of the first to third planning steps is a planning step for multi-stage planning of a production plan. Is added.

【0023】請求項5の発明は、請求項1〜4の構成
に、生産ラインの最新の生産状況を記憶する記憶工程
と、該記憶工程において記憶されている生産ラインの最
新の生産状況に基づき前記第1〜第3の立案工程におい
て立案された第1〜第3の生産計画のうちの少なくとも
1つを修正する修正工程とをさらに備えているという構
成を付加するものである。
According to a fifth aspect of the present invention, based on the configuration of the first to fourth aspects, a storage process for storing the latest production status of the production line and the latest production status of the production line stored in the storage process are used. The configuration further includes a correction step of correcting at least one of the first to third production plans drafted in the first to third drafting steps.

【0024】請求項6の発明は、生産計画支援方法を階
層化し、上層の設計計画支援工程において立案された上
層の生産計画を下層の設計計画支援工程において修正
し、生産ラインの状況により良く対応し且つ上層の生産
計画よりも計画期間が短縮された下層の生産計画を再立
案するものである。
According to the invention of claim 6, the production plan support method is hierarchized, and the upper layer production plan prepared in the upper layer design plan support step is corrected in the lower layer design plan support step to better correspond to the situation of the production line. In addition, the lower-layer production plan whose planning period is shorter than that of the upper-layer production plan is re-created.

【0025】具体的に請求項6の発明が講じた解決手段
は、階層型設計計画支援方法を、生産要求に基づき第1
の生産計画を立案する第1の立案工程と、生産ラインの
最新の生産状況を記憶する記憶工程と、前記第1の立案
工程において立案された第1の生産計画を前記記憶工程
において記憶された生産ラインの最新の生産状況に基づ
き修正しつつ前記第1の生産計画の計画期間のうちの一
部の計画期間毎に繰り返し第2の生産計画を立案する第
2の立案工程と、該第2の立案工程において立案された
第2の生産計画の妥当性を検証する検証工程と、該検証
工程において検証された第2の生産計画の妥当性に基づ
き制約条件及び生産ルールのうちの少なくとも1つを生
成する生成工程と、前記第2の立案工程において立案さ
れた第2の生産計画を前記生成工程において生成された
制約条件及び生産ルールのうちの少なくとも1つに基づ
き修正して第3の生産計画を立案する第3の立案工程と
を備えている構成とするものである。
Specifically, the solution means taken by the invention of claim 6 is that the hierarchical design planning support method is the first based on the production request.
A first production process for producing a production plan of the above, a storage process for storing the latest production status of the production line, and a first production plan produced in the first production process are stored in the storage process. A second drafting step of repeatedly drafting a second production plan for every part of the planning period of the first production plan while making corrections based on the latest production status of the production line; Verification step for verifying the validity of the second production plan drafted in the planning step, and at least one of a constraint condition and a production rule based on the validity of the second production plan verified in the validation step And a second production plan created in the second planning step are modified based on at least one of the constraint condition and the production rule created in the creating step to generate a third production plan. It is an arrangement and a third planning step of planning the production schedule.

【0026】請求項7の発明は、請求項6の構成に、前
記第3の立案工程において立案された第3の生産計画を
前記記憶工程において記憶された生産ラインの最新の生
産状況に基づき修正する修正工程をさらに備えていると
いう構成を付加するものである。
According to the invention of claim 7, in the structure of claim 6, the third production plan prepared in the third planning step is modified based on the latest production status of the production line stored in the storing step. In addition, a configuration in which the correction process is further provided is added.

【0027】請求項8の発明は、請求項1の発明に用い
る階層型設計支援装置であって、具体的には、生産要求
に基づき第1の生産計画を立案する第1の立案手段と、
該第1の立案手段が立案した第1の生産計画に基づき該
第1の生産計画よりも生産ラインの状況により良く対応
した第2の生産計画を立案する第2の立案手段と、該第
2の立案手段が立案した第2の生産計画の妥当性を検証
する検証手段と、該検証手段が検証した第2の生産計画
の妥当性に基づき制約条件及び生産ルールのうちの少な
くとも1つを生成する生成手段と、前記第2の立案手段
が立案した第2の生産計画と前記生成手段が生成した制
約条件及び生産ルールのうちの少なくとも1つとに基づ
き前記第2の生産計画よりも生産ラインの状況により良
く対応した第3の生産計画を立案する第3の立案手段と
を備えている構成とするものである。
An eighth aspect of the present invention is a hierarchical design support apparatus used in the first aspect of the invention, and specifically, a first drafting means for drafting a first production plan based on a production request,
Second drafting means for drafting a second production plan that better corresponds to the situation of the production line than the first production plan based on the first production plan drafted by the first drafting means; and the second drafting means. Verification means for verifying the validity of the second production plan prepared by the planning means, and at least one of the constraint condition and the production rule based on the validity of the second production plan verified by the verification means. Based on the second production plan created by the second drafting means and at least one of the constraint condition and the production rule created by the creating means. A third planning means for planning a third production plan that better corresponds to the situation is provided.

【0028】請求項9の発明は、請求項8の構成に、前
記第3の立案手段により立案された第3の生産計画の妥
当性を検証する検証手段と、該検証手段が検証した第3
の生産計画の妥当性に基づき制約条件及び生産ルールの
うちの少なくとも1つを生成する生成手段と、生産計画
の妥当性が満足されるまで生産計画の立案、該生産計画
の妥当性の検証並びに制約条件及び生産ルールのうちの
少なくとも1つの生成をそれぞれ繰り返し行なう手段と
をさらに備えているという構成を付加するものである。
According to a ninth aspect of the present invention, in addition to the structure of the eighth aspect, a verifying means for verifying the validity of the third production plan drafted by the third drafting means, and a third means verified by the verifying means.
Means for generating at least one of a constraint condition and a production rule based on the adequacy of the production plan, a production plan is drafted until the adequacy of the production plan is satisfied, and the adequacy of the production plan is verified. The configuration further includes means for repeatedly generating at least one of the constraint condition and the production rule.

【0029】請求項10の発明は、請求項8又は9の構
成に、前記第1の立案手段と前記第2の立案手段とは同
一の手段であるという構成を付加するものである。
The present invention of claim 10 is the addition of the structure of claim 8 or 9 to the structure in which the first planning means and the second planning means are the same means.

【0030】請求項11の発明は、請求項8〜10の構
成に、前記第2の立案手段と前記第3の立案手段とは同
一の手段であるという構成を付加するものである。
According to the invention of claim 11, in addition to the structure of claims 8 to 10, the second planning means and the third planning means are the same means.

【0031】請求項11の発明は、請求項8〜10の構
成に、前記第2の立案手段が立案する第2の生産計画
は、前記第1の立案手段が立案する第1の生産計画の計
画期間のうちの一部の計画期間毎に繰り返し立案される
という構成を付加するものである。
According to an eleventh aspect of the present invention, in the structure of the eighth to tenth aspects, the second production plan drafted by the second drafting means is the first production plan drafted by the first drafting means. A configuration is added in which the planning is repeated every part of the planning period.

【0032】請求項12の発明は、請求項8〜11の構
成に、前記第2の立案手段が立案する第2の生産計画
は、前記第1の立案手段が立案する第1の生産計画の計
画期間のうちの一部の計画期間毎に繰り返し立案される
という構成を付加するものである。
According to a twelfth aspect of the present invention, in the structure of the eighth to eleventh aspects, the second production plan drafted by the second drafting means is the first production plan drafted by the first drafting means. A configuration is added in which the planning is repeated every part of the planning period.

【0033】請求項13の発明は、請求項8〜12の構
成に、前記第1〜第3の立案手段のうちの少なくとも1
つは、多段式に接続されておりそれぞれが生産計画を立
案する複数の立案手段からなるという構成を付加するも
のである。
According to a thirteenth aspect of the present invention, there is provided the structure according to the eighth to twelfth aspects, wherein at least one of the first to third planning means is provided.
One is to add a configuration in which the units are connected in a multi-stage manner and each of them comprises a plurality of planning means for planning a production plan.

【0034】請求項14の発明は、請求項8〜13の構
成に、生産ラインの最新の生産状況を記憶する記憶手段
と、該記憶手段が記憶している生産ラインの最新の生産
状況に基づき前記第1〜第3の立案手段が立案する第1
〜第3の生産計画のうちの少なくとも1つを修正する修
正手段とをさらに備えているという構成を付加するもの
である。
According to a fourteenth aspect of the present invention, based on the configuration of the eighth to thirteenth aspects, based on the storage means for storing the latest production status of the production line and the latest production status of the production line stored in the storage means. The first to be drafted by the first to third drafting means
-The structure which adds the correction means which corrects at least one of the 3rd production plans is added.

【0035】請求項15の発明は、請求項6の発明に用
いる階層型生産計画支援装置であって、具体的には、生
産要求に基づき第1の生産計画を立案する第1の立案手
段と、生産ラインの最新の生産状況を記憶する記憶手段
と、前記第1の立案手段において立案された第1の生産
計画を前記記憶工程において記憶された生産ラインの最
新の生産状況に基づき修正しつつ前記第1の生産計画の
計画期間のうちの一部の計画期間毎に繰り返し第2の生
産計画を立案する第2の立案手段と、該第2の立案手段
が立案した第2の生産計画の妥当性を検証する検証手段
と、該検証手段が検証した第2の生産計画の妥当性に基
づき制約条件及び生産ルールのうちの少なくとも1つを
生成する生成手段と、前記第2の立案手段が立案した第
2の生産計画を前記生成手段が生成した制約条件及び生
産ルールのうちの少なくとも1つに基づき修正して第3
の生産計画を立案する第3の立案手段とを備えている構
成である。
A fifteenth aspect of the present invention is a hierarchical production planning support apparatus used in the sixth aspect of the invention, and specifically, a first drafting means for drafting a first production plan based on a production request. A storage means for storing the latest production status of the production line and a first production plan prepared by the first planning means based on the latest production status of the production line stored in the storage step. A second production means for repeatedly producing a second production plan for every part of the production period of the first production plan; and a second production plan produced by the second production means. The verification means for verifying the validity, the generation means for generating at least one of the constraint condition and the production rule based on the validity of the second production plan verified by the verification means, and the second drafting means. Before the second production plan that was planned Third and modified based on at least one of the generating means has generated constraints and production rules
And a third planning means for planning the production plan.

【0036】請求項16の発明は、請求項15の構成
に、前記第3の立案手段が立案した第3の生産計画を前
記記憶手段に記憶されている生産ラインの最新の生産状
況に基づき修正する修正手段をさらに備えているという
構成を付加するものである。
According to a sixteenth aspect of the invention, in the structure of the fifteenth aspect, the third production plan prepared by the third planning means is corrected based on the latest production status of the production line stored in the storage means. The configuration in which the correction means is further provided is added.

【0037】請求項17の発明は、請求項15又は16
の構成に、前記第1の立案手段と前記第2の立案手段と
は同一の手段であるという構成を付加するものである。
The invention of claim 17 is the invention of claim 15 or 16.
In addition to the above configuration, a configuration in which the first planning means and the second planning means are the same means is added.

【0038】請求項18の発明は、請求項15〜17の
構成に、前記第2の立案手段と前記第3の立案手段とは
同一の手段であるという構成を付加するものである。
According to the eighteenth aspect of the present invention, in addition to the configurations of the fifteenth to seventeenth aspects, the second planning means and the third planning means are the same means.

【0039】[0039]

【作用】請求項1又は8の発明の構成により、第2の生
産計画は第1の生産計画よりも生産ラインの状況により
良く対応している。また、第3の生産計画は、第2の生
産計画と該第2の生産計画の妥当性を検討することによ
り生成された制約条件及び生産ルールのうちの少なくと
も1つとに基づき立案されるため、生産ラインにおいて
新たに発生した状況を取り込むことができるので、生産
ラインの状況にさらに対応している。
According to the structure of the invention of claim 1 or 8, the second production plan corresponds better to the situation of the production line than the first production plan. Further, since the third production plan is drafted based on the second production plan and at least one of the constraint condition and the production rule generated by examining the validity of the second production plan, It is possible to capture the situation newly generated in the production line, so it is possible to cope with the situation in the production line.

【0040】請求項2又は9の構成により、生産計画の
妥当性が満足されるまで生産計画の立案、該生産計画の
妥当性の検証並びに制約条件及び生産ルールのうちの1
つの生成をそれぞれ繰り返し行なうため、最終的な生産
計画は生産ラインの実情に限りなく対応している。
According to the configuration of claim 2 or 9, one of the production plan, the verification of the validity of the production plan, the constraint condition and the production rule until the validity of the production plan is satisfied.
The final production plan corresponds to the actual situation of the production line infinitely because the three generations are repeated.

【0041】請求項3又は12の構成により、第2の生
産計画は第1の生産計画の計画期間のうちの一部の計画
期間毎に繰り返し立案されるため、第2の生産計画は必
要最小限の計画期間に限って立案することができる。
According to the third or the twelfth aspect of the invention, the second production plan is repeatedly prepared for every part of the planning period of the first production plan, so that the second production plan is the minimum required. Planning can be done only during the limited planning period.

【0042】請求項4又は13の構成により、生産計画
が多段式に立案されるので、制約条件及び生産ルールを
細かく設定することができる。
According to the structure of claim 4 or 13, the production plan is prepared in a multistage manner, so that the constraint condition and the production rule can be set finely.

【0043】請求項5、7、14又は16の構成によ
り、生産計画を生産ラインの最新の生産状況に基づき修
正することができる。
According to the fifth, seventh, fourteenth or sixteenth aspect, the production plan can be revised based on the latest production status of the production line.

【0044】請求項6又は15の構成により、第2の生
産計画は、第1の生産計画を生産ラインの最新の生産状
況に基づき修正しつつ第1の生産計画の計画期間よりも
短い計画期間毎に繰り返し立案されるため、生産ライン
において新たに発生した状況を確実に取り込むことがで
きると共に必要最小限の計画期間に限って立案すること
ができる。また、第3の生産計画は、第2の生産計画と
該第2の生産計画の妥当性を検討することにより生成さ
れた制約条件及び生産ルールのうちの少なくとも1つと
に基づき立案されるため、第2の生産計画よりも生産ラ
インの実情により良く対応している。
According to the structure of claim 6 or 15, the second production plan is a planning period shorter than the planning period of the first production plan while correcting the first production plan based on the latest production status of the production line. Since the plan is repeated every time, it is possible to surely capture the situation newly generated in the production line and to make the plan only within the minimum necessary planning period. Further, since the third production plan is drafted based on the second production plan and at least one of the constraint condition and the production rule generated by examining the validity of the second production plan, It corresponds better to the actual situation of the production line than the second production plan.

【0045】請求項10又は17の構成により、第1の
立案手段と第2の立案手段とを共用することができる。
According to the structure of claim 10 or 17, it is possible to share the first planning means and the second planning means.

【0046】請求項11又は18の構成により、第2の
立案手段と第3の立案手段とを共用することができる。
According to the eleventh or eighteenth aspect, the second planning means and the third planning means can be shared.

【0047】[0047]

【実施例】以下、本発明の一実施例に係る階層型生産計
画支援装置について、図面を参照しながら説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A hierarchical production planning support apparatus according to an embodiment of the present invention will be described below with reference to the drawings.

【0048】図1は本発明の一実施例に係る階層型生産
計画支援装置を示す構成図である。該階層型生産計画支
援装置は、長期間に亘る第1の生産計画を立案する第1
立案部100と、第1立案部100が立案した生産計画
を短時間毎に読み取り、該生産計画を検証しつつ、生産
ラインの状況により良く対応した第2の生産計画を立案
する第2立案部110と、第2立案部110が立案した
第2の生産計画を現時点の生産ラインの状況と比較して
実際に処理可能な段取を指示するための第3の生産計画
を立案する第3立案部130とから構成されている。
FIG. 1 is a block diagram showing a hierarchical production planning support apparatus according to an embodiment of the present invention. The hierarchical production planning support device is a first production plan for a long-term first production plan.
The planning unit 100 and the second planning unit that reads the production plan drafted by the first drafting unit 100 at short intervals, verifies the production plan, and drafts a second production plan that better corresponds to the situation of the production line. 110, and a third plan for preparing a third production plan for instructing a setup that can be actually processed by comparing the second production plan prepared by the second planning unit 110 with the current situation of the production line. And a unit 130.

【0049】第1立案部100は、販売部門等から提出
される生産要求を記憶する第1の生産要求記憶手段10
1と、生産装置の処理能力や作業員の労働時間等の制約
条件を記憶している第1の制約条件記憶手段102と、
優先度が高いロットを先に処理する等の生産ルールを記
憶している第1の生産ルール記憶手段103と、第1の
制約条件記憶手段102が記憶している制約条件及び第
1の生産ルール記憶手段103が記憶している生産ルー
ルをそれぞれ編集する第1の条件編集手段104と、生
産ラインの最新の生産進捗状況を記憶している第1の生
産状況記憶手段107と、前記の生産要求、制約条件、
生産ルール及び生産進捗状況に基づき第1の生産計画を
立案する第1の立案手段106と、該第1の立案手段1
06を制御する第1の立案制御手段105とから構成さ
れている。
The first planning unit 100 stores the first production request storage means 10 for storing the production request submitted by the sales department or the like.
1 and a first constraint condition storage means 102 that stores constraint conditions such as the processing capacity of the production apparatus and the working hours of workers,
A first production rule storage unit 103 that stores a production rule such as processing a lot with a high priority first, and a constraint condition and a first production rule stored in the first constraint condition storage unit 102. First condition editing means 104 for respectively editing the production rules stored in the storage means 103, first production status storage means 107 for storing the latest production progress status of the production line, and the production request described above. , Constraints,
First drafting means 106 for drafting a first production plan based on the production rule and the production progress status, and the first drafting means 1
The first planning control means 105 for controlling 06.

【0050】第2の立案部110は、生産要求を記憶し
ている第2の生産要求記憶手段111と、制約条件を記
憶している第2の制約条件記憶手段112と、生産ルー
ルを記憶している第2の生産ルール記憶手段113と、
前記の制約条件及び生産ルールを編集する第2の条件編
集手段114と、生産進捗状況を記憶している第2の生
産状況記憶手段117と、前記の生産要求、制約条件、
生産ルール及び生産進捗状況に基づき第2の生産計画を
立案する第2の立案手段116と、該第2の立案手段1
16を制御する第2の立案制御手段115と、第2の生
産要求記憶手段111の内容を表示する第2の生産要求
表示手段121と、第2の生産要求表示手段121を見
ながら第2の生産要求記憶手段111の内容を編集する
立案編集手段122と、第2の立案手段116が立案し
た第2の生産計画の妥当性を検証する立案検証手段11
8とから構成されている。
The second planning unit 110 stores the second production request storage means 111 that stores the production request, the second constraint condition storage means 112 that stores the constraint condition, and the production rule. The second production rule storage means 113,
The second condition editing means 114 for editing the constraint condition and the production rule, the second production situation storage means 117 for storing the production progress situation, the production request, the constraint condition,
Second drafting means 116 for drafting a second production plan based on the production rule and the production progress status, and the second drafting means 1
The second planning control means 115 for controlling 16; the second production requirement display means 121 for displaying the contents of the second production requirement storage means 111; and the second production requirement display means 121 for the second production requirement display means 121. Planning editing means 122 for editing the contents of the production request storage means 111, and planning verification means 11 for verifying the validity of the second production plan prepared by the second planning means 116.
8 and.

【0051】第3の立案部130は、生産要求を記憶し
ている第3の生産要求記憶手段131と、生産進捗状況
を記憶している第3の生産状況記憶手段137と、前記
の生産要求及び生産進捗状況に基づき最終的な第3の生
産計画を立案する第3の立案手段136と、第3の立案
手段136に第3の生産計画の表示要求を出す表示要求
手段135と、該表示要求手段135からの表示要求が
あると第3の立案手段136が立案した第3の生産計画
を表示する第3の計画表示手段141とから構成されて
いる。
The third planning unit 130 has a third production request storage means 131 for storing the production request, a third production status storage means 137 for storing the production progress status, and the above-mentioned production request. And a third drafting means 136 for drafting a final third production plan based on the production progress status, a display requesting means 135 for issuing a display request for the third production plan to the third drafting means 136, and the display. It comprises a third plan display means 141 for displaying the third production plan prepared by the third planning means 136 when there is a display request from the request means 135.

【0052】以下、前記のように構成された階層型生産
計画支援装置の動作について説明する。
The operation of the hierarchical production planning support apparatus configured as described above will be described below.

【0053】第1立案部100において長期的な第1の
生産計画を立案する。ここでは1週間の計画期間に亘る
生産計画を立案するものとする。
The first planning unit 100 makes a long-term first production plan. Here, it is assumed that a production plan is planned over a one-week planning period.

【0054】第1生産要求記憶手段101に新たに投入
される製品の生産工程の流れ情報を入力する。現在仕掛
中の製品の流れ情報はすでに入力されているとする。第
1制約条件記憶手段102には予め生産装置の処理能力
や作業員の労働時間等の制約条件が記憶されており、第
1生産ルール記憶手段103には予め製品ロットの優先
順位の決め方等の生産ルールが記憶されている。これら
の内容は第1の条件編集手段104により編集すること
ができる。第1の立案制御手段105から立案開始命令
が出ると、第1立案手段106は、第1生産状況記憶手
段107から生産ラインにおける最新の製品ロット処理
実績と生産装置の稼働状況とを取り込んだ後、第1の制
約条件記憶手段102及び第1の生産ルール記憶手段1
03に記憶されている制約条件及び生産ルールを読み出
しながら、製品ロット指向の待ち行列法的手法により次
のような手順により第1の生産計画を立案していく。
The flow information of the production process of the product to be newly input is input to the first production request storage means 101. It is assumed that the flow information of the product currently in process has already been entered. The first constraint condition storage means 102 stores in advance constraint conditions such as the processing capacity of the production apparatus and the working hours of workers, and the first production rule storage means 103 stores in advance how to determine the priority order of product lots. The production rules are stored. These contents can be edited by the first condition editing means 104. When a planning start command is issued from the first planning control means 105, the first planning means 106 fetches the latest product lot processing record and the operating status of the production apparatus in the production line from the first production status storage means 107. , The first constraint condition storage means 102 and the first production rule storage means 1
While reading out the constraint condition and the production rule stored in 03, the first production plan is drafted by the following procedure by the product lot-oriented queuing method.

【0055】まず、第1立案手段106の内部時刻をリ
セットする。次に、現時点で処理を待っている各製品ロ
ットをそれが処理されるべき各生産装置毎に分類した
後、生産ルールに従ってその生産装置に割り当てられた
製品ロットを優先順位順に並び替える。次に、その生産
装置が処理可能な状態であれば、優先順位が第1位の製
品ロットをその生産装置に割り付ける。全生産装置につ
いてこの割り付け処理が完了したら、第1の立案手段1
06の内部時刻を1分進める。このような作業を一週間
後まで、すなわち10080分後まで繰り返す。以上の
手順により第1の生産計画が立案される。
First, the internal time of the first planning means 106 is reset. Next, each product lot currently waiting for processing is classified for each production device in which it is to be processed, and then the product lots assigned to that production device are rearranged in order of priority according to the production rules. Next, if the production device is in a processable state, the product lot having the first priority is assigned to the production device. When this allocation process is completed for all production devices, the first planning means 1
The internal time of 06 is advanced by 1 minute. Such an operation is repeated until after one week, that is, after 10080 minutes. The first production plan is created by the above procedure.

【0056】次に、第1の生産計画を第2立案部110
の第2の生産要求記憶手段111に転送する。第2の生
産要求記憶手段111の内容は、第2の生産要求表示手
段121を見ながら立案編集手段122により編集可能
であり、第1の生産計画において生産ラインの希望に沿
わない立案がなされている場合には、手動により修正す
ることができる。第2の制約条件記憶手段112及び第
2の生産ルール記憶手段113には第1の制約条件記憶
手段102及び第1の生産ルール記憶手段103よりも
詳細な制約条件及び生産ルールがそれぞれ記憶されてい
る。例えば第1の生産装置と第2の生産装置とは同一の
作業員により操作されるので、一方の生産装置の使用を
開始した直後の10分間は他方の生産装置の使用を開始
できないとか、又は或る生産装置においては、第1の処
理の後に第2の処理は引き続き処理可能であるが、第1
の処理の後に第3の処理を行なうためには20分間の切
り替え作業時間が必要である等の内容が記憶されてい
る。これらの内容は第2の条件編集手段114により編
集できる。
Next, the first production plan is set to the second planning unit 110.
To the second production request storage means 111. The contents of the second production request storage means 111 can be edited by the plan editing means 122 while looking at the second production request display means 121, and a plan that does not meet the wishes of the production line is made in the first production plan. If so, it can be corrected manually. The second constraint condition storage means 112 and the second production rule storage means 113 respectively store more detailed constraint conditions and production rules than those of the first constraint condition storage means 102 and the first production rule storage means 103. There is. For example, since the first production device and the second production device are operated by the same operator, it is impossible to start using the other production device for 10 minutes immediately after starting the use of one production device, or In some production devices, the second process can be continued after the first process,
The contents that the switching work time of 20 minutes is required for performing the third process after the process of 1 are stored. These contents can be edited by the second condition editing means 114.

【0057】第2の立案手段116は、1時間毎に自動
的に第2の立案制御手段115から発せられる立案開始
命令によって起動し、次のような手順を自動的に繰り返
し、製品ロット指向の待ち行列法的手法により第2の生
産計画を立案する。
The second drafting means 116 is automatically activated every hour by a drafting start command issued from the second drafting control means 115, and the following procedure is automatically repeated to make a product lot oriented. Develop a second production plan using a queuing method.

【0058】まず、第2の立案制御手段115から立案
開始命令が出ると、第2の立案手段116は第2の生産
状況記憶手段117から生産ラインにおける最新の製品
ロット処理実績及び生産装置の稼働状況を取り込む。第
2の立案手段116の内部時刻を第1の立案手段106
の内部時刻と一致するようにリセットした後、制約条件
及び生産ルールに従って製品ロットを生産装置に割り付
けていく。内部時刻が60分になったところで第2の生
産計画の立案が中断される。
First, when a planning start command is issued from the second planning control means 115, the second planning means 116 causes the second production status storage means 117 to output the latest product lot processing results in the production line and the operation of the production apparatus. Capture the situation. The internal time of the second planning means 116 is set to the first planning means 106.
After resetting so as to match the internal time of, the product lot is allocated to the production device according to the constraint condition and the production rule. The second production plan is interrupted when the internal time reaches 60 minutes.

【0059】この段階で、第2の生産計画は立案検証手
段118に引き渡され、立案検証手段118は第2の生
産計画の妥当性を検討する。従来の生産計画支援装置に
おいて問題となったような例えば5分間待てば同時処理
できるロット等があれば、このような事象は立案検証手
段118により検出される。検出された事象は制約条件
及びルール生成手段119により新たな制約条件又は生
産ルールとして生成され、生成された制約条件又は生産
ルールは第2の制約条件記憶手段112又は第2の生産
ルール記憶手段113に記憶されている情報と同様に取
り扱われる。新たな制約条件又は生産ルールが生成され
ると、新たな制約条件又は生産ルールが生成されたこと
が第2の立案制御手段115に伝えられる。第2の立案
制御手段115は立案開始命令を第2の立案手段116
に伝えるので、第2の立案手段116は再び立案を開始
する。この際、制約条件及びルール生成手段119が記
憶している制約条件又は生産ルールも第2の立案手段1
16に読み込まれる。
At this stage, the second production plan is handed over to the planning verification means 118, and the planning verification means 118 examines the adequacy of the second production plan. If there is a lot or the like that can be processed simultaneously by waiting for 5 minutes, which is a problem in the conventional production planning support apparatus, such a phenomenon is detected by the planning verification means 118. The detected event is generated as a new constraint condition or production rule by the constraint and rule generation means 119, and the generated constraint condition or production rule is the second constraint condition storage means 112 or the second production rule storage means 113. It is treated the same as the information stored in. When the new constraint condition or the production rule is generated, the second planning control means 115 is notified that the new constraint condition or the production rule is generated. The second planning control means 115 issues a planning start command to the second planning means 116.
The second planning unit 116 then starts planning again. At this time, the constraint condition or the production rule stored in the constraint condition and rule generation unit 119 is also the second drafting unit 1.
16 is read.

【0060】生産計画の妥当性が満たされるまで、生産
計画の立案、生産計画の妥当性の検証及び制約条件又は
生産ルールの生成をそれぞれ繰り返す。もし3回繰り返
しても生産計画の妥当性が満たされない場合には、その
時点で制約条件又は生産ルールの生成を強制的に終了す
る。制約条件や生産ルール等の妥当性が完全に満たさな
くても、3回程度繰り返して立案することにより十分に
妥当な生産計画が得られるからである。
Until the validity of the production plan is satisfied, the production plan is drafted, the validity of the production plan is verified, and the constraint condition or the production rule is generated. If the validity of the production plan is not satisfied even after repeating three times, the constraint condition or the production rule generation is forcibly terminated at that point. This is because even if the validity of the constraint conditions and the production rules are not completely satisfied, a sufficiently valid production plan can be obtained by repeating the plan about three times.

【0061】以上のようにして第2の生産計画が立案さ
れる。第2の生産計画の計画期間を60分間に限定して
いるので、生産計画の立案、生産計画の妥当性の検証及
び制約条件又は生産ルールの生成を3回繰り返しても立
案時間は数分である。この第2の生産計画は、生産ライ
ンにおいて実際に発生する事象を取り込んで立案されて
いるので、現場の実情や突発的な事柄に柔軟に対応する
ことができる。
The second production plan is formulated as described above. Since the planning period of the second production plan is limited to 60 minutes, even if the planning of the production plan, the verification of the validity of the production plan and the generation of the constraint condition or the production rule are repeated three times, the planning time is only a few minutes. is there. This second production plan is designed by taking in the events that actually occur in the production line, so that it is possible to flexibly respond to the actual situation and sudden matters at the site.

【0062】一般的には、第2の生産計画で十分である
が、生産ラインにおける或る生産装置での段取を指示を
するためには、1時間よりももっと短い時間毎に修正さ
れた生産計画が欲しい場合があるので、第3の立案部1
30を備えている。
In general, the second production plan is sufficient, but it was modified every hour shorter than one hour in order to instruct the setup on a certain production device in the production line. Since there are times when I want a production plan, the third planning department 1
Equipped with 30.

【0063】第2立案部110において立案された第2
の生産計画は第3立案部130の第3の生産要求記憶手
段131に転送される。この第3立案部130において
は、作業員は、段取指示を見たいときに表示要求を表示
要求手段135を通じて第3の立案手段136に出す。
表示要求が出ると第3の立案手段136は第3の生産状
況記憶手段137に生産ラインの最新の製品ロット処理
実績と生産装置の稼働状況とを取り込む。
The second draft made by the second drafting section 110.
Is transferred to the third production request storage means 131 of the third planning unit 130. In the third planning unit 130, the worker issues a display request to the third planning unit 136 through the display requesting unit 135 when he wants to see the setup instruction.
When the display request is issued, the third planning means 136 loads the latest production lot processing record of the production line and the operating status of the production device into the third production status storage means 137.

【0064】次に、第3の生産要求記憶手段131に格
納された第2の立案計画から、表示要求が出された装置
により処理されるべき製品ロットの情報を抜き出す。第
3の生産状況記憶手段137に格納された最新の製品ロ
ット処理実績と生産装置の稼働状況とを比較し、未到着
や後工程の生産装置が故障している等の理由により処理
不可能な製品ロットを取り除き、処理可能な製品ロット
を処理するべき順序に従って第3の計画表示手段141
に表示する。
Next, the information of the product lot to be processed by the device for which the display request is issued is extracted from the second planning plan stored in the third production request storage means 131. The latest product lot processing record stored in the third production status storage means 137 is compared with the operating status of the production apparatus, and the processing cannot be performed due to reasons such as non-arrival or failure of the production apparatus in the subsequent process. Third plan display means 141 according to the order in which product lots are removed and processable product lots are processed.
To display.

【0065】以上の一連の処理により、生産ラインの実
情に即した柔軟性を有する生産計画の立案を支援するこ
とができる。
Through the series of processes described above, it is possible to support the drafting of a production plan having flexibility according to the actual situation of the production line.

【0066】本実施例においては、第1の立案手段10
6と第2立案手段116とをそれぞれ用意したが、これ
らは1つの手段であってもよい。同様に第3の立案手段
136と、第1の立案手段106又は第2の立案手段1
16とを1つの手段としてもよい。但し、これらの場合
には、制約条件や生産ルールは、どの階層の生産計画を
立案するためのものであるかによって、その内容が異な
るので、制約条件や生産ルールを切り替える手段を用意
する必要がある。
In this embodiment, the first planning means 10
6 and the second planning means 116 are prepared respectively, but these may be one means. Similarly, the third planning means 136 and the first planning means 106 or the second planning means 1
16 and 16 may be one means. However, in these cases, the content of the constraint condition and the production rule differs depending on which layer of the production plan is to be drafted, so it is necessary to prepare a means for switching the constraint condition and the production rule. is there.

【0067】同様に第1、第2及び第3の生産状況記憶
手段107,117,137はそれぞれ1つの手段であ
ってもよいが、いずれかの立案部が立案中に第1、第2
又は第3の生産状況記憶手段107,117,137の
内容が勝手に書き換えられないような配慮が必要であ
る。
Similarly, each of the first, second and third production status storage means 107, 117 and 137 may be a single means, but one of the first and second production sections is in the process of making a plan.
Alternatively, it is necessary to consider that the contents of the third production status storage means 107, 117, 137 cannot be rewritten without permission.

【0068】第1及び第2の条件編集手段104,11
4は必要がなければ設けなくてもよい。また、立案編集
手段122は、第2立案部110に代えて、第1立案部
100又は第3立案部130にあってもよいし、第1立
案部100、第2立案部110及び第3立案部130の
うちの複数のものにあってもよい。
First and second condition editing means 104, 11
4 may not be provided if not necessary. Further, the drafting editing means 122 may be provided in the first drafting unit 100 or the third drafting unit 130 instead of the second drafting unit 110, or the first drafting unit 100, the second drafting unit 110, and the third drafting unit. It may be provided in a plurality of units 130.

【0069】また、前記実施例においては、第1の立案
手段106と第2の立案手段116とにおける立案を製
品ロット指向の待ち行列手法により行なったが、これに
代えて、山積み山崩し手法又は生産装置指向待ち行列手
法等の他の手法を用いてもよいし、異なる手法を組み合
わせてもよい。さらに、生産品種の切り替え等に合わせ
て特性が合う手法に切り替えることも考えられる。
Further, in the above-mentioned embodiment, the planning in the first planning means 106 and the second planning means 116 is carried out by the product lot-oriented queuing method. Other techniques such as the production device oriented queuing technique may be used or different techniques may be combined. Furthermore, it is also possible to switch to a method that has characteristics that match the switching of production types.

【0070】また、前記実施例においては、制約条件と
生産ルールとを区別して取り扱ったが、制約条件及び生
産ルールのうちのいずれか一方でもよいし、すべての条
件を制約条件又は生産ルールに統合することも可能であ
る。
Further, in the above-described embodiment, the constraint condition and the production rule are treated separately, but either one of the constraint condition and the production rule may be used, or all the conditions may be integrated into the constraint condition or the production rule. It is also possible to do so.

【0071】また、前記実施例においては、階層の段数
として、3層の場合を示したが、2層でも十分に効果が
期待できるし、4層以上にすることにより生産計画の精
度や柔軟性をさらに向上させることも可能である。
Further, in the above-mentioned embodiment, the case where the number of layers of the hierarchy is three layers is shown, but even two layers can be expected to have a sufficient effect, and the accuracy and flexibility of the production plan can be improved by using four layers or more. Can be further improved.

【0072】また、第1、第2及び第3の立案手段10
6,116,136の少なくとも1つを、多段式に接続
された複数の立案手段からなる多段式立案手段にする
と、精度や柔軟性の一層の向上を期待できる。例えば異
なる立案手法による複数の立案実行手段を組み合わせる
ことにより、各々の立案手法の長所を組み合わせること
ができるし、又は1段目の立案手段によりおおまかな生
産計画を立案してから、該生産計画を2段目以降の立案
手段により補完することによって、短時間で高精度の立
案が可能になる。
The first, second and third planning means 10 are also provided.
If at least one of 6, 116, 136 is a multistage planning means composed of a plurality of planning means connected in a multistage manner, further improvement in accuracy and flexibility can be expected. For example, the merits of each planning method can be combined by combining a plurality of planning execution means according to different planning methods, or a rough production plan is prepared by the first-stage planning means, and then the production plan is prepared. By supplementing with the second and subsequent planning means, highly accurate planning can be achieved in a short time.

【0073】また、前記実施例においては、第1の生産
計画の計画期間を1週間、第2の生産計画の計画期間を
1時間としたが、これに代えて、第1の生産計画の計画
期間を1か月、第2の生産計画の計画期間を1週間とし
たり、第1の生産計画の計画期間を1か月、第2の生産
計画の計画期間を1日としたりするなど、計画期間は自
由に設定できる。但し、第2の生産計画の計画期間は第
1の生産計画の生産計画と同じか又はそれよりも短いこ
とが好ましい。
Further, in the above embodiment, the planning period of the first production plan is one week and the planning period of the second production plan is one hour. Instead of this, the planning period of the first production plan is set. Planning period is one month, planning period of the second production plan is one week, planning period of the first production plan is one month, planning period of the second production plan is one day, etc. The period can be set freely. However, it is preferable that the planning period of the second production plan is the same as or shorter than the production plan of the first production plan.

【0074】さらに、第1立案部100は手動起動、第
2立案部110は自動起動の場合を示したが、いずれの
立案部も手動起動でも自動起動でもよい。
Furthermore, although the first planning unit 100 is manually activated and the second planning unit 110 is automatically activated, any of the planning units may be manually activated or automatically activated.

【0075】[0075]

【発明の効果】請求項1又は8の発明に係る階層型生産
計画支援方法又は装置によると、第2の生産計画は第1
の生産計画よりも生産ラインの状況により良く対応して
おり、第3の生産計画は、第2の生産計画と該第2の生
産計画の妥当性を検討して生成された制約条件及び生産
ルールのうちの少なくとも1つとに基づき再立案されて
おり、生産ラインにおいて新たに発生した状況を取り込
むことができるので、生産ラインの状況にさらに良く対
応している。
According to the hierarchical production planning support method or apparatus according to the invention of claim 1 or 8, the second production plan is the first production plan.
The production schedule corresponds better to the situation of the production line than the production schedule of the second production plan, and the third production plan is the second production plan and the constraint condition and the production rule generated by examining the validity of the second production plan. It has been re-planned based on at least one of the above, and it is possible to capture a newly generated situation in the production line, so that the situation of the production line is better dealt with.

【0076】このため、請求項1又は8の発明による
と、生産ラインの実情に良く対応し且つ生産ラインにお
いて発生する突発的な状況変化に柔軟に対応した生産計
画を立案することが可能になる。
Therefore, according to the invention of claim 1 or 8, it is possible to make a production plan that responds well to the actual situation of the production line and flexibly responds to sudden situational changes occurring in the production line. .

【0077】請求項2又は9の発明に係る階層型生産計
画支援方法又は装置によると、生産計画の妥当性が満足
されるまで生産計画の立案、該生産計画の妥当性の検証
並びに制約条件及び生産ルールのうちの1つの生成をそ
れぞれ繰り返し行なうため、最終的な生産計画は生産ラ
インの実情に限りなく対応しているので、生産ラインの
妥当性を限りなく満たす生産計画を立案することができ
る。
According to the hierarchical production planning support method or apparatus of the second or ninth aspect of the present invention, the production plan is drafted, the validity of the production plan is verified, and the constraint conditions are satisfied until the validity of the production plan is satisfied. Since one of the production rules is repeatedly generated, the final production plan corresponds to the actual situation of the production line as much as possible, so that a production plan that satisfies the validity of the production line as much as possible can be drafted. .

【0078】請求項3又は12の発明に係る階層型生産
計画支援方法又は装置によると、第2の生産計画は第1
の生産計画の計画期間のうちの一部の計画期間毎に繰り
返し立案されるため、第2の生産計画を必要最小限の計
画期間に限って立案できるので、生産ラインの状況変化
に良く対応した生産計画を短時間に立案することができ
る。
According to the hierarchical production planning support method or apparatus according to the invention of claim 3 or 12, the second production plan is the first production plan.
The second production plan can be drafted only for the minimum necessary planning period because it is repeatedly drafted every part of the planning period of A production plan can be planned in a short time.

【0079】請求項4又は13の発明に係る階層型生産
計画支援方法又は装置によると、生産計画が多段式に立
案されるため、制約条件及び生産ルールを細かく設定す
ることができるので、より詳細で正確な生産計画を立案
することができる。
According to the hierarchical production planning support method or apparatus according to the invention of claim 4 or 13, since the production plan is planned in a multi-stage manner, the constraint condition and the production rule can be set finely, and therefore more detailed You can make an accurate production plan.

【0080】請求項5、7、14又は16の発明に係る
階層型生産計画支援方法又は装置によると、生産計画を
生産ラインの最新の生産状況に基づき修正することがで
きるため、生産ラインにおいて新たに発生した状況を確
実に取り込むことができるので、生産ラインの状況に一
層より良く対応した生産計画を立案できる。
According to the hierarchical production planning support method or apparatus according to the invention of claim 5, 7, 14 or 16, the production plan can be revised based on the latest production status of the production line. Since it is possible to reliably capture the situation that has occurred, it is possible to make a production plan that better corresponds to the situation of the production line.

【0081】請求項6又は15の発明に係る階層型生産
計画支援方法又は装置によると、第3の生産計画は、生
産ラインにおいて新たに発生した状況を確実に取り込む
ことができると共に必要最小限の計画期間に限って立案
することができる第2の生産計画と該第2の生産計画の
妥当性を検討することにより生成された制約条件及び生
産ルールのうちの少なくとも1つとに基づき再立案され
るため、生産ラインの実情に良く対応し且つ生産ライン
において発生する突発的な状況変化にも柔軟に対応した
生産計画を短時間に立案することができる。
According to the hierarchical production planning support method or apparatus of the sixth or fifteenth aspect of the present invention, the third production planning can surely capture the situation newly generated in the production line, and has the minimum necessary amount. It is re-planned based on the second production plan that can be drafted only during the planning period and at least one of the constraint condition and the production rule generated by examining the adequacy of the second production plan. Therefore, it is possible to quickly draft a production plan that responds well to the actual situation of the production line and flexibly responds to sudden changes in the situation that occur in the production line.

【0082】請求項10、11、17又は18の発明に
係る階層型生産計画支援装置によると、立案手段を共用
できるので、階層型生産計画支援装置のコストダウンを
図ることができる。
According to the hierarchical production planning support apparatus of the tenth, eleventh, seventeenth or eighteenth aspect of the present invention, since the planning means can be shared, the cost of the hierarchical production planning support apparatus can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例に係る階層型生産計画支援装
置の構成図である。
FIG. 1 is a configuration diagram of a hierarchical production planning support apparatus according to an embodiment of the present invention.

【図2】従来の生産計画支援装置の主要部分の構成図で
ある。
FIG. 2 is a configuration diagram of a main part of a conventional production planning support device.

【図3】従来の階層型生産計画支援装置の構成概略図で
ある。
FIG. 3 is a schematic configuration diagram of a conventional hierarchical production planning support device.

【符号の説明】[Explanation of symbols]

100 第1立案部 101 第1の生産要求記憶手段 102 第1の制約条件記憶手段 103 第1の生産ルール記憶手段 104 第1の条件編集手段 105 第1の立案制御手段 106 第1の立案手段 107 第1の生産状況記憶手段 110 第2立案部 111 第2の生産要求記憶手段 112 第2の制約条件記憶手段 113 第2の生産ルール記憶手段 114 第2の条件編集手段 115 第2の立案制御手段 116 第2の立案手段 117 第2の生産状況記憶手段 118 立案検証手段 119 制約条件及びルール生成手段 121 第2の生産要求表示手段 122 立案編集手段 130 第3立案部 131 第3の生産要求記憶手段 135 表示要求手段 136 第3の立案手段 137 第3の生産状況記憶手段 141 第3の計画表示手段 100 First Planning Unit 101 First Production Request Storage Means 102 First Constraint Condition Storage Means 103 First Production Rule Storage Means 104 First Condition Editing Means 105 First Planning Control Means 106 First Planning Means 107 First production status storage means 110 Second drafting section 111 Second production request storage means 112 Second constraint condition storage means 113 Second production rule storage means 114 Second condition editing means 115 Second drafting control means 116 Second Planning Means 117 Second Production Status Storage Means 118 Planning Verification Means 119 Constraints and Rule Generation Means 121 Second Production Request Display Means 122 Planning Editing Means 130 Third Planning Department 131 Third Production Request Storage Means 135 Display Request Means 136 Third Planning Means 137 Third Production Status Storage Means 141 Third Plan Display Means

Claims (18)

【特許請求の範囲】[Claims] 【請求項1】 生産要求に基づき第1の生産計画を立案
する第1の立案工程と、該第1の立案工程において立案
された第1の生産計画に基づき該第1の生産計画よりも
生産ラインの状況により良く対応した第2の生産計画を
立案する第2の立案工程と、該第2の立案工程において
立案された第2の生産計画の妥当性を検証する検証工程
と、該検証工程において検証された第2の生産計画の妥
当性に基づき制約条件及び生産ルールのうちの少なくと
も1つを生成する生成工程と、前記第2の立案工程にお
いて立案された第2の生産計画と前記生成工程において
生成された制約条件及び生産ルールのうちの少なくとも
1つとに基づき前記第2の生産計画よりも生産ラインの
状況により良く対応した第3の生産計画を立案する第3
の立案工程とを備えていることを特徴とする階層型生産
計画支援方法。
1. A first drafting process for drafting a first production plan based on a production request, and a production more than the first production plan based on the first production plan drafted in the first drafting process. A second drafting process for drafting a second production plan that better corresponds to the situation of the line, a verification process for verifying the validity of the second production plan drafted in the second planning process, and the verification process And a generation step of generating at least one of a constraint condition and a production rule based on the validity of the second production plan verified in 1., a second production plan formulated in the second planning step, and the generation. A third production plan that better corresponds to the situation of the production line than the second production plan based on at least one of the constraint condition and the production rule generated in the process
And a planning process, the hierarchical production planning support method.
【請求項2】 前記第3の立案工程において立案された
第3の生産計画の妥当性を検証する検証工程と、該検証
工程において検証された第3の生産計画の妥当性に基づ
き制約条件及び生産ルールのうちの少なくとも1つを生
成する生成工程と、生産計画の妥当性が満足されるまで
生産計画の立案、該生産計画の妥当性の検証並びに制約
条件及び生産ルールのうちの少なくとも1つの生成をそ
れぞれ繰り返し行なう工程とをさらに備えていることを
特徴とする請求項1に記載の階層型生産計画支援方法。
2. A verification process for verifying the validity of the third production plan drafted in the third planning process, and constraint conditions based on the validity of the third production plan verified in the validation process. A generation process for generating at least one of the production rules, a production plan is drafted until the adequacy of the production plan is satisfied, the adequacy of the production plan is verified, and at least one of a constraint condition and a production rule. The hierarchical production planning support method according to claim 1, further comprising a step of repeatedly performing generation.
【請求項3】 前記第2の立案工程において立案される
第2の生産計画は、前記第1の立案工程において立案さ
れた第1の生産計画の計画期間のうちの一部の計画期間
毎に繰り返し立案されることを特徴とする請求項1又は
2に記載の階層型生産計画支援方法。
3. The second production plan drafted in the second drafting step is set for every part of the planning periods of the first production plan drafted in the first drafting step. The hierarchical production planning support method according to claim 1 or 2, wherein the method is repeatedly drafted.
【請求項4】 前記第1〜第3の立案工程のうちの少な
くとも1つは、生産計画を多段式に立案する立案工程で
あることを特徴とする請求項1〜3のいずれか1項に記
載の階層型生産計画支援方法。
4. The method according to claim 1, wherein at least one of the first to third planning steps is a planning step for planning a production plan in multiple stages. The hierarchical production planning support method described.
【請求項5】 生産ラインの最新の生産状況を記憶する
記憶工程と、該記憶工程において記憶されている生産ラ
インの最新の生産状況に基づき前記第1〜第3の立案工
程において立案された第1〜第3の生産計画のうちの少
なくとも1つを修正する修正工程とをさらに備えている
ことを特徴とする請求項1〜4のいずれか1項に記載の
階層型生産計画支援方法。
5. A storage step of storing the latest production status of the production line, and a first step made in the first to third planning steps based on the latest production status of the production line stored in the storage step. 5. The hierarchical production planning support method according to claim 1, further comprising a correction step of correcting at least one of the first to third production plans.
【請求項6】 生産要求に基づき第1の生産計画を立案
する第1の立案工程と、生産ラインの最新の生産状況を
記憶する記憶工程と、前記第1の立案工程において立案
された第1の生産計画を前記記憶工程において記憶され
た生産ラインの最新の生産状況に基づき修正しつつ前記
第1の生産計画の計画期間のうちの一部の計画期間毎に
繰り返し第2の生産計画を立案する第2の立案工程と、
該第2の立案工程において立案された第2の生産計画の
妥当性を検証する検証工程と、該検証工程において検証
された第2の生産計画の妥当性に基づき制約条件及び生
産ルールのうちの少なくとも1つを生成する生成工程
と、前記第2の立案工程において立案された第2の生産
計画を前記生成工程において生成された制約条件及び生
産ルールのうちの少なくとも1つに基づき修正して第3
の生産計画を立案する第3の立案工程とを備えているこ
とを特徴とする階層型生産計画支援方法。
6. A first planning process for formulating a first production plan based on a production request, a storage process for storing the latest production status of a production line, and a first planning process in the first planning process. While revising the production plan according to the latest production status of the production line stored in the storage step, and repeatedly preparing the second production plan for every part of the planning period of the first production plan. A second planning process
A verification process for verifying the validity of the second production plan designed in the second planning process, and a constraint condition and a production rule based on the validity of the second production plan verified in the verification process. A generation step of generating at least one, and a second production plan prepared in the second planning step, which is modified based on at least one of the constraint condition and the production rule generated in the generation step. Three
And a third drafting process for drafting a production plan of the above.
【請求項7】 前記第3の立案工程において立案された
第3の生産計画を前記記憶工程において記憶された生産
ラインの最新の生産状況に基づき修正する修正工程をさ
らに備えていることを特徴とする請求項6に記載の階層
型生産計画支援方法。
7. The method further comprises a correction step of correcting the third production plan prepared in the third planning step based on the latest production status of the production line stored in the storage step. The hierarchical production planning support method according to claim 6.
【請求項8】 生産要求に基づき第1の生産計画を立案
する第1の立案手段と、該第1の立案手段が立案した第
1の生産計画に基づき該第1の生産計画よりも生産ライ
ンの状況により良く対応した第2の生産計画を立案する
第2の立案手段と、該第2の立案手段が立案した第2の
生産計画の妥当性を検証する検証手段と、該検証手段が
検証した第2の生産計画の妥当性に基づき制約条件及び
生産ルールのうちの少なくとも1つを生成する生成手段
と、前記第2の立案手段が立案した第2の生産計画と前
記生成手段が生成した制約条件及び生産ルールのうちの
少なくとも1つとに基づき前記第2の生産計画よりも生
産ラインの状況により良く対応した第3の生産計画を立
案する第3の立案手段とを備えていることを特徴とする
階層型生産計画支援装置。
8. A first production means for producing a first production plan based on a production request, and a production line more than the first production plan based on the first production plan produced by the first production means. Second planning means for better responding to the situation of [2], verification means for verifying the adequacy of the second production plan prepared by the second planning means, and verification by the verification means. Generating means for generating at least one of the constraint condition and the production rule based on the adequacy of the second production plan, the second production plan prepared by the second planning means, and the generating means. And a third drafting means for drafting a third production plan that better corresponds to the situation of the production line than the second production plan based on at least one of the constraint condition and the production rule. Hierarchical production planning support apparatus.
【請求項9】 前記第3の立案手段により立案された第
3の生産計画の妥当性を検証する検証手段と、該検証手
段が検証した第3の生産計画の妥当性に基づき制約条件
及び生産ルールのうちの少なくとも1つを生成する生成
手段と、生産計画の妥当性が満足されるまで生産計画の
立案、該生産計画の妥当性の検証並びに制約条件及び生
産ルールのうちの少なくとも1つの生成をそれぞれ繰り
返し行なう手段とをさらに備えていることを特徴とする
請求項8に記載の階層型生産計画支援装置。
9. The verification means for verifying the validity of the third production plan prepared by the third planning means, and the constraint condition and the production based on the validity of the third production plan verified by the verification means. Generating means for generating at least one of the rules, planning of the production plan until the adequacy of the production plan is satisfied, verification of adequacy of the production plan, and generation of at least one of constraint conditions and production rules 9. The hierarchical production planning support apparatus according to claim 8, further comprising means for repeatedly performing each of the above.
【請求項10】 前記第1の立案手段と前記第2の立案
手段とは同一の手段であることを特徴とする請求項8又
は9に記載の階層型生産計画支援装置。
10. The hierarchical production planning support apparatus according to claim 8, wherein the first planning means and the second planning means are the same means.
【請求項11】 前記第2の立案手段と前記第3の立案
手段とは同一の手段であることを特徴とする請求項8〜
10のいずれか1項に記載の階層型生産計画支援装置。
11. A method according to claim 8, wherein the second planning means and the third planning means are the same means.
10. The hierarchical production planning support device described in any one of 10.
【請求項12】 前記第2の立案手段が立案する第2の
生産計画は、前記第1の立案手段が立案する第1の生産
計画の計画期間のうちの一部の計画期間毎に繰り返し立
案されることを特徴とする請求項8〜11のいずれか1
項に記載の階層型生産計画支援装置。
12. The second production plan drafted by the second drafting means is repeatedly drafted every some planning period of the planning period of the first production plan drafted by the first planning means. The method according to any one of claims 8 to 11, characterized in that
The hierarchical production planning support device described in the item.
【請求項13】 前記第1〜第3の立案手段のうちの少
なくとも1つは、生産計画を多段式に立案する立案手段
であることを特徴とする請求項8〜12のいずれか1項
に記載の階層型生産計画支援方法。
13. The method according to claim 8, wherein at least one of the first to third planning means is a planning means for planning a production plan in a multi-stage manner. The hierarchical production planning support method described.
【請求項14】 生産ラインの最新の生産状況を記憶す
る記憶手段と、該記憶手段が記憶している生産ラインの
最新の生産状況に基づき前記第1〜第3の立案手段が立
案する第1〜第3の生産計画のうちの少なくとも1つを
修正する修正手段とをさらに備えていることを特徴とす
る請求項8〜13のいずれか1項に記載の階層型生産計
画支援方法。
14. A storage means for storing the latest production status of the production line, and a first means for making a plan by the first to third planning means based on the latest production status of the production line stored in the storage means. The hierarchical production planning support method according to any one of claims 8 to 13, further comprising: a correcting unit that corrects at least one of the third production plans.
【請求項15】 生産要求に基づき第1の生産計画を立
案する第1の立案手段と、生産ラインの最新の生産状況
を記憶する記憶手段と、前記第1の立案手段において立
案された第1の生産計画を前記記憶工程において記憶さ
れた生産ラインの最新の生産状況に基づき修正しつつ前
記第1の生産計画の計画期間のうちの一部の計画期間毎
に繰り返し第2の生産計画を立案する第2の立案手段
と、該第2の立案手段が立案した第2の生産計画の妥当
性を検証する検証手段と、該検証手段が検証した第2の
生産計画の妥当性に基づき制約条件及び生産ルールのう
ちの少なくとも1つを生成する生成手段と、前記第2の
立案手段が立案した第2の生産計画を前記生成手段が生
成した制約条件及び生産ルールのうちの少なくとも1つ
に基づき修正して第3の生産計画を立案する第3の立案
手段とを備えていることを特徴とする階層型生産計画支
援装置。
15. A first drafting means for drafting a first production plan based on a production request, a storage means for storing the latest production status of the production line, and a first drafting means for the first drafting means. While revising the production plan according to the latest production status of the production line stored in the storage step, and repeatedly preparing the second production plan for every part of the planning period of the first production plan. And a verification means for verifying the validity of the second production plan prepared by the second planning means, and a constraint condition based on the validity of the second production plan verified by the verification means. And a production means for producing at least one of the production rules, and a second production plan drafted by the second drafting means based on at least one of the constraint condition and the production rule produced by the production means. Correct and third And a third drafting means for drafting the production plan.
【請求項16】 前記第3の立案手段が立案した第3の
生産計画を、前記記憶手段に記憶されている生産ライン
の最新の生産状況に基づき修正する修正手段をさらに備
えていることを特徴とする請求項15に記載の階層型生
産計画支援装置。
16. The method according to claim 16, further comprising a correcting means for correcting the third production plan prepared by the third planning means based on the latest production status of the production line stored in the storage means. 16. The hierarchical production planning support apparatus according to claim 15.
【請求項17】 前記第1の立案手段と前記第2の立案
手段とは同一の手段であることを特徴とする請求項15
又は16に記載の階層型生産計画支援装置。
17. The first drafting means and the second drafting means are the same means.
Or the hierarchical production planning support apparatus described in 16.
【請求項18】 前記第2の立案手段と前記第3の立案
手段とは同一の手段であることを特徴とする請求項15
〜17のいずれか1項に記載の階層型生産計画支援装
置。
18. The method according to claim 15, wherein the second planning means and the third planning means are the same means.
The hierarchical production planning support apparatus according to any one of items 1 to 17.
JP31642993A 1993-05-06 1993-12-16 Hierarchical production plan supporting method/device Withdrawn JPH0798733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31642993A JPH0798733A (en) 1993-05-06 1993-12-16 Hierarchical production plan supporting method/device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP5-104862 1993-05-06
JP10486293 1993-05-06
JP31642993A JPH0798733A (en) 1993-05-06 1993-12-16 Hierarchical production plan supporting method/device

Publications (1)

Publication Number Publication Date
JPH0798733A true JPH0798733A (en) 1995-04-11

Family

ID=26445236

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31642993A Withdrawn JPH0798733A (en) 1993-05-06 1993-12-16 Hierarchical production plan supporting method/device

Country Status (1)

Country Link
JP (1) JPH0798733A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000077289A (en) * 1998-08-27 2000-03-14 Fujitsu Ltd Production predicting control system
JP2007142459A (en) * 2007-02-16 2007-06-07 Fujitsu Ltd Manufacture prediction management apparatus
JP2019168763A (en) * 2018-03-22 2019-10-03 三菱電機株式会社 Operation start condition conversion device and operation start condition conversion method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000077289A (en) * 1998-08-27 2000-03-14 Fujitsu Ltd Production predicting control system
JP2007142459A (en) * 2007-02-16 2007-06-07 Fujitsu Ltd Manufacture prediction management apparatus
JP2019168763A (en) * 2018-03-22 2019-10-03 三菱電機株式会社 Operation start condition conversion device and operation start condition conversion method

Similar Documents

Publication Publication Date Title
US6438436B1 (en) Production scheduling management system, and method of managing production scheduling
KR100341145B1 (en) Method and apparatus for forming a production plan
US5664129A (en) Visual programming method
WO2013038785A1 (en) Maintenance planning system, maintenance planning system server and maintenance planning system client terminal
US9600792B2 (en) Method and apparatus for generating an engineering workflow
JPS59214964A (en) Conversational scheduling system
US20050250226A1 (en) Method for generating work-in-process schedules
JPH0798733A (en) Hierarchical production plan supporting method/device
JP3241714B2 (en) Plan type inference method and apparatus
JP2811827B2 (en) Production scheduling device
JP4804410B2 (en) Power generation plan formulation device and power generation plan formulation method
JPH0675975A (en) Production schedule method
JPH06332909A (en) Plan managing system
JP5268400B2 (en) Process management system
JPH07296062A (en) Method for supporting decision of staff arrangement
JP2000222029A (en) Management device of operation information and recording medium
JPH0748227B2 (en) Construction process planning and process management system
JPH11156679A (en) Production scheduling device and recording medium recording production scheduling program
JPH06251026A (en) Automatic production planning device
JP2000047865A (en) Arrow diagram generating device for project management system
JPH08264405A (en) Process flow generator
JPH01287739A (en) Automatic state transition table generating device
JPH04290163A (en) User-oriented production scheduling system
JP2002297849A (en) Schedule preparation support device and schedule preparation support system
JPH08147366A (en) Production planning device