JP5155976B2 - Work support system and work support method - Google Patents

Work support system and work support method Download PDF

Info

Publication number
JP5155976B2
JP5155976B2 JP2009224877A JP2009224877A JP5155976B2 JP 5155976 B2 JP5155976 B2 JP 5155976B2 JP 2009224877 A JP2009224877 A JP 2009224877A JP 2009224877 A JP2009224877 A JP 2009224877A JP 5155976 B2 JP5155976 B2 JP 5155976B2
Authority
JP
Japan
Prior art keywords
work
information
sheet
instruction
tag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009224877A
Other languages
Japanese (ja)
Other versions
JP2011076229A (en
Inventor
米満 新村
聡 大石
將弘 渡邊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2009224877A priority Critical patent/JP5155976B2/en
Publication of JP2011076229A publication Critical patent/JP2011076229A/en
Application granted granted Critical
Publication of JP5155976B2 publication Critical patent/JP5155976B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)

Description

本発明は、作業対象物品の組み立ての指示画面情報と製造部品表情報とを連動させる作業支援システムおよび作業支援方法に関する。   The present invention relates to a work support system and a work support method that link instruction screen information for assembling work target articles and manufacturing parts table information.

組み立て製造業において、1人または数人の作業員が部品の取り付けから組み立て、加工、検査までの全工程(1人が多工程)を担当するセル生産方式がある。セル生産方式は、部品や工具などを配置したセルと呼ばれるセル作業台で作業を行う。セル生産方式の大きなメリットとして、部品箱の入れ替えやセルでの作業員の作業順序を変えるだけで、生産品目(製品バリエーションなど)を容易に変更できることで、多品種少量生産への対応に優れている。また、生産量の調整も、セル内人数の調整やセル数の増減によって対応しやすいことが特徴である。   In the assembly manufacturing industry, there is a cell production system in which one or several workers are in charge of all the processes (from one person to multiple processes) from component mounting to assembly, processing, and inspection. In the cell production method, work is performed on a cell work table called a cell in which parts and tools are arranged. A major advantage of the cell production method is that it can easily change production items (product variations, etc.) simply by replacing parts boxes and changing the work order of workers in the cell. Yes. In addition, the production volume can be easily adjusted by adjusting the number of people in the cell or by increasing or decreasing the number of cells.

セル生産方式では、セル作業台に設置されたデータ表示部に、作業手順情報を表示する技術が開示されている(例えば、特許文献1参照)。データ表示部の画面には、作業手順に関する文書、画像、および使用部品の表示データが表示される。   In the cell production method, a technique for displaying work procedure information on a data display unit installed on a cell work table is disclosed (for example, see Patent Document 1). On the screen of the data display section, documents relating to work procedures, images, and display data of used parts are displayed.

特開2001-242928号公報Japanese Patent Laid-Open No. 2001-242928

セル生産方式では、作業手順の順序の良し悪しにより作業効率が大幅に変化することが知られている。このため、管理者などが作業分析を実施して、頻繁に作業手順を変更する必要がでてくる。   In the cell production method, it is known that the work efficiency changes greatly depending on the order of work procedures. For this reason, it is necessary for an administrator or the like to perform work analysis and frequently change work procedures.

従来、現場での作業内容の見直しにより、作業工程の作業手順を変更するタイミングと、製造BOM(Bills Of Materials)(以下、製造部品表、または、M−BOMという。)を修正する場合、バッチ処理などにより所定時間毎に修正したため、製造BOMの修正タイミングとが必ずしも一致せず、迅速な作業手順の変更ができない問題があった。具体的には、制御用のプリント基板の場合、部品用の組図を含めて約1万点にもおよぶため、所定時間毎にバッチ処理で製造部品表を修正していた。一方、セル作業台の表示部に表示される作業手順情報は、比較的すみやかに修正できる。このため、作業手順情報の修正時間と、製造部品表の修正時間とに乖離が生じ、生産効率を向上するのに問題があった。   Conventionally, when the work procedure of the work process is changed by reviewing the work content at the work site and the manufacturing BOM (Bills Of Materials) (hereinafter referred to as the manufacturing parts table or M-BOM) is modified, Since correction was made every predetermined time by processing or the like, there was a problem that the correction timing of the manufacturing BOM did not always match and the work procedure could not be changed quickly. Specifically, in the case of a printed circuit board for control, there are about 10,000 points including assembly drawings for parts, so the manufacturing parts list is corrected by batch processing every predetermined time. On the other hand, the work procedure information displayed on the display unit of the cell work table can be corrected relatively quickly. For this reason, there is a difference between the correction time of the work procedure information and the correction time of the manufacturing parts table, and there is a problem in improving the production efficiency.

本発明は、前記の課題を解決するための発明であって、作業対象物品の組み立ての作業手順情報である指示画面情報と、製造部品表情報とを連動させることにより作業効率を向上できる作業支援システムおよび作業支援方法を提供することを目的とする。   The present invention is an invention for solving the above-described problems, and is work support that can improve work efficiency by linking instruction screen information that is work procedure information for assembling work target articles and manufacturing parts table information. It is an object to provide a system and a work support method.

前記目的を達成するため、本発明の作業支援システムは、作業者の作業手順を管理する管理サーバ(例えば、データベースサーバ30)と、作業場所に設置され管理サーバからの作業手順に従い表示部(例えば、表示装置25)に作業指示を表示する作業端末(例えば、セル作業端末20)とを備えており、作業手順の順序の入換えと連動して、作業手順に必要な製造部品表の更新を行う。   In order to achieve the object, the work support system of the present invention includes a management server (for example, the database server 30) that manages the work procedure of the worker, and a display unit (for example, according to the work procedure from the management server that is installed in the work place). And a work terminal (for example, cell work terminal 20) that displays work instructions on the display device 25), and updates the manufacturing parts list necessary for the work procedure in conjunction with the change of the order of the work procedure. Do.

管理サーバの記憶部に、作業端末の表示部に表示する作業手順を識別するシートIDと画面情報とが関連付けられた指図情報(例えば、指図情報32)と、シートIDと該シートIDの作業手順に必要な部品表とが関連付けられたシート単位部品表を含み、作業手順の順序にシート単位部品表が構成された製造部品表情報(例えば、製造部品表情報33)とを有している。   Instruction information (for example, instruction information 32) in which the sheet ID for identifying the work procedure to be displayed on the display unit of the work terminal and the screen information are associated with the storage unit of the management server, and the work procedure of the sheet ID and the sheet ID. And manufacturing part table information (for example, manufacturing part table information 33) in which the sheet unit part table is configured in the order of the work procedure.

管理サーバの処理部は、作業手順の順序の入換え指令を受理すると、指図情報のシートIDに関連付けられた単位ごとに順序の入換えを行い、製造部品表情報のシート単位部品表ごとに順序の入換えを行うことを特徴とする。   When the processing unit of the management server receives the order change instruction for the work procedure, the processing part changes the order for each unit associated with the sheet ID of the instruction information, and changes the order for each sheet unit part table of the manufacturing parts table information. It is characterized by exchanging.

本発明によれば、作業対象物品の組立の作業手順情報である指示画面情報と、製造部品表情報とを連動させることにより作業効率を向上できる。   According to the present invention, work efficiency can be improved by linking instruction screen information, which is work procedure information for assembling work target articles, and manufacturing parts table information.

本実施形態に係る作業表示画面と製造部品表との関係を示す説明図である。It is explanatory drawing which shows the relationship between the work display screen and manufacturing parts table | surface which concern on this embodiment. 作業支援システムを示す全体構成図である。It is a whole lineblock diagram showing a work support system. 部品ボックスユニットのICタグ読み取り機能を示すブロック図である。It is a block diagram which shows the IC tag reading function of a component box unit. 作業エリアのセル作業台の一例を示す外観斜視図である。It is an external appearance perspective view which shows an example of the cell work table of a work area. 表示装置の表示画面例を示す説明図である。It is explanatory drawing which shows the example of a display screen of a display apparatus. 表示装置の他の表示画面例を示す説明図である。It is explanatory drawing which shows the other example of a display screen of a display apparatus. 指図情報の例を示す説明図である。It is explanatory drawing which shows the example of instruction information. 製造部品表情報の例を示す説明図である。It is explanatory drawing which shows the example of manufacture parts table information. 作業指示画面の入換えからセル作業端末での作業の処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the work in a cell work terminal after replacement of a work instruction screen. 表示装置の作業進捗状況の表示画面例を示す説明図である。It is explanatory drawing which shows the example of a display screen of the work progress condition of a display apparatus.

以下、本発明の実施形態について図面を参照して詳細に説明する。
図1は、本実施形態に係る作業表示画面と製造部品表との関係を示す説明図である。図1(a)は、表示装置25(図4参照)に表示される作業手順の表示画面と、製造部品表80(M−BOM)との関係を模式的に示している。表示装置25には、作業手順に添って、順に、シート#1、シート#2、シート#3、・・・・の内容が表示される。本実施形態では、シートIDの内容と関連付けて、製造部品表80と連動して構成されている。製造部品表80は、シート#2の部品表(シート#2のシート単位部品表)、シート#3の部品表(シート#3のシート単位部品表)、シート#4の部品表(シート#4のシート単位部品表)、・・・のように、シートIDごとの部品表(シート単位部品表)から構成されている。なお、製造部品表80にシート#1の部品表がないのは、シート#1は、例えば、作業手順のガイダンスなど、実際に組み付ける部品対象がない場合を示している。IDはIDentificationの略である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is an explanatory diagram showing a relationship between a work display screen and a manufacturing parts table according to the present embodiment. FIG. 1A schematically shows a relationship between a work procedure display screen displayed on the display device 25 (see FIG. 4) and the manufacturing parts table 80 (M-BOM). The display device 25 displays the contents of sheet # 1, sheet # 2, sheet # 3,... In order according to the work procedure. In the present embodiment, it is configured in association with the manufacturing parts table 80 in association with the content of the sheet ID. The manufactured parts table 80 includes a parts table for sheet # 2 (a sheet unit parts table for sheet # 2), a parts table for sheet # 3 (a sheet unit parts table for sheet # 3), and a parts table for sheet # 4 (sheet # 4). The sheet unit parts table),... Are configured from a part table for each sheet ID (sheet unit part table). It should be noted that the fact that there is no part list for sheet # 1 in the manufactured parts list 80 indicates that sheet # 1 has no part object to be actually assembled, such as guidance for work procedures. ID is an abbreviation for IDentification.

図1(b)は、表示装置25に表示する作業手順の変更が生じた場合の処理手順を示す。例えば、シート#3とシート#4とが入換えが必要となると、作業手順は、シート#1、シート#2、シート#4、シート#3、シート#5、シート#6の順になる。この場合に、本実施形態では、作業手順の入換えと連動して、製造部品表80の修正が必要になった箇所だけ、入換えの修正をする。これにより、作業工程の作業手順を変更するタイミングと、M−BOMの修正タイミングが連動し、迅速に作業手順の修正をすることができる。   FIG. 1B shows a processing procedure when the work procedure displayed on the display device 25 is changed. For example, when the sheet # 3 and the sheet # 4 need to be switched, the work procedure is in the order of the sheet # 1, the sheet # 2, the sheet # 4, the sheet # 3, the sheet # 5, and the sheet # 6. In this case, in the present embodiment, in conjunction with the replacement of the work procedure, the replacement is corrected only at the portion where the manufacturing parts table 80 needs to be corrected. Thereby, the timing which changes the work procedure of a work process, and the correction timing of M-BOM interlock | cooperate, and a work procedure can be corrected rapidly.

また、セル作業台71(図4参照)に配膳される部品73(図4参照)などは、製造部品表80を基にピッキングリストが作成されるため、すでに作成されていたピッキングリストも、自動的に入換えすることが可能となる。以下、具体的に作業支援システムSの構成について、図2を参照して説明する。   In addition, since the picking list is created based on the manufacturing parts table 80 for the parts 73 (see FIG. 4) arranged on the cell work table 71 (see FIG. 4), the picking list already created is automatically It is possible to replace them automatically. Hereinafter, the configuration of the work support system S will be specifically described with reference to FIG.

図2は、作業支援システムを示す全体構成図である。作業支援システムSは、指図管理端末10と、セル作業端末20(作業端末)と、データベースサーバ30(管理サーバ)とを備えている。指図管理端末10と、セル作業端末20と、データベースサーバ30とは、LAN(Local Area Network)などのネットワーク40で接続されている。   FIG. 2 is an overall configuration diagram showing the work support system. The work support system S includes an instruction management terminal 10, a cell work terminal 20 (work terminal), and a database server 30 (management server). The instruction management terminal 10, the cell work terminal 20, and the database server 30 are connected by a network 40 such as a LAN (Local Area Network).

指図管理端末10は、作業が必要になった際に、指図50を発行・管理する端末であり、データベースサーバ30の記憶部31に、指図内容および組付指示情報を登録する。なお、組付指示情報とは、製品・半製品を組み立てていく(組み付けていく)上で必要な部品および手順の情報をいう。ここでは、組付指示情報として、電子回路基板74(図4参照)(作業対象物品)に部品を取付ける組立工程を一例としている。   The instruction management terminal 10 is a terminal that issues and manages an instruction 50 when work is required, and registers instruction contents and assembly instruction information in the storage unit 31 of the database server 30. The assembly instruction information is information on parts and procedures necessary for assembling (assembling) a product or semi-finished product. Here, as an example of the assembly instruction information, an assembly process of attaching components to the electronic circuit board 74 (see FIG. 4) (work object) is taken as an example.

指図管理端末10は、処理部11、入力装置13、表示装置14、ICタグリーダライタ15、およびプリンタ16を備え、処理部11には、指図50を管理する指図管理部111と、製造部品表80(図1参照)を管理するBOM管理部112とを有する。   The instruction management terminal 10 includes a processing unit 11, an input device 13, a display device 14, an IC tag reader / writer 15, and a printer 16. The processing unit 11 includes an instruction management unit 111 that manages the instruction 50, and a manufacturing parts table 80. And a BOM management unit 112 for managing (see FIG. 1).

指図管理部111は、指図出力要求を受理すると、指図50をリライタブルのプリンタ16にて出力する。また、ICタグリーダライタ15は、指図管理部111の指示により、作業内容を特定する情報を作業特定用ICタグ51(第1のICタグ)に書き込む。また、指図管理部111は、指図50のシート入換えの指令を受理すると、指図情報32の入換え(更新)を行う。   Upon receiving the instruction output request, the instruction management unit 111 outputs the instruction 50 by the rewritable printer 16. Further, the IC tag reader / writer 15 writes information for specifying the work content in the work specifying IC tag 51 (first IC tag) in accordance with an instruction from the instruction management unit 111. Also, the instruction management unit 111 replaces (updates) the instruction information 32 upon receiving a sheet replacement instruction for the instruction 50.

作業内容を特定する情報とは、例えば、指図50の指図ID、製造する製品・半製品の品名または型番、製作員数である。また、作業対象物品の作業内容を特定する情報の詳細情報として、作業員が、電子回路基板74(図4参照)に部品73(図4参照)を取付ける際の組付情報が記載されており、具体的には、部品73の種別、員数、および部品の取付け順序である。   The information specifying the work content is, for example, the instruction ID of the instruction 50, the product name or model number of the product / semi-product to be manufactured, and the number of production personnel. In addition, as detailed information of information specifying the work content of the work target article, assembly information when the worker attaches the component 73 (see FIG. 4) to the electronic circuit board 74 (see FIG. 4) is described. Specifically, the type of the component 73, the number of components, and the mounting order of the components.

BOM管理部112は、指図管理部111から、指図50のシート入換え要求を受理すると、製造部品表情報33の入換えを行う。また、BOM管理部112は、部品配膳の指令を受理すると、ピッキングリストの出力を行う。さらに、セル作業台71(図4参照)に配膳された部品73の配置が適正化否かを判定することもできる。   When the BOM management unit 112 receives a sheet replacement request for the instruction 50 from the instruction management unit 111, the BOM management unit 112 replaces the manufactured parts table information 33. In addition, when the BOM management unit 112 receives a component layout command, the BOM management unit 112 outputs a picking list. Further, it can be determined whether or not the arrangement of the parts 73 arranged on the cell work table 71 (see FIG. 4) is appropriate.

指図50は、作業者が該当する組立工程が記載された書類である。具体的には、電子回路基板74に取り付ける部品には、各種の部品73があり、1枚の電子回路基板74に部品73を取り付けて作成するための工程のルートが記載されている。例えば、CPU工程、CPU周辺部品工程、電源工程、I/Oインターフェース工程がある。作業者は、指図50により作業工程のルートを判断することができる。作業特定用ICタグ51は、RFID(Radio Frequency IDentification)などの非接触の無線用ICタグを使用し、指図50の書類に添付される。   The instruction 50 is a document in which an assembly process corresponding to the worker is described. Specifically, the components to be attached to the electronic circuit board 74 include various parts 73, and a process route for attaching and creating the part 73 to one electronic circuit board 74 is described. For example, there are a CPU process, a CPU peripheral component process, a power supply process, and an I / O interface process. The operator can determine the route of the work process based on the instruction 50. The work identification IC tag 51 uses a non-contact wireless IC tag such as RFID (Radio Frequency IDentification) and is attached to the document of the instruction 50.

セル作業端末20は、投入口を有する作業管理ボックス21と、作業管理ボックス21の側面に付設され作業特定用ICタグ51を読み取るICタグリーダライタ22(第1のICタグ読取装置)と、作業に必要な部品を格納している部品ボックスユニット23と、部品ボックスユニット23に付設されたループアンテナ234を介してシート特定用ICタグ61(第2のICタグ)を読み取るユニット制御部24と、作業指示を表示する表示装置25(表示部)と、表示装置25の指示に対する作業完了指令をするためのスイッチ26と、セル作業端末20を統括する制御部27とを備えている。   The cell work terminal 20 includes a work management box 21 having a slot, an IC tag reader / writer 22 (first IC tag reader) attached to a side surface of the work management box 21 for reading the work identification IC tag 51, and for work. A component box unit 23 storing necessary components, a unit controller 24 that reads a sheet specifying IC tag 61 (second IC tag) via a loop antenna 234 attached to the component box unit 23, and a work A display device 25 (display unit) for displaying an instruction, a switch 26 for issuing a work completion command in response to the instruction from the display device 25, and a control unit 27 for controlling the cell work terminal 20 are provided.

シート特定用ICタグ61には、表示装置25に表示されるシートIDの情報が記憶されており、指図情報32(図7参照)により、部品品番、画面ID(画面情報)などと関連付けられている。   The sheet identification IC tag 61 stores information on the sheet ID displayed on the display device 25, and is associated with the part number, screen ID (screen information), and the like by the instruction information 32 (see FIG. 7). Yes.

作業管理ボックス21は、指図50を、作業の開始時に投入するボックスである。また、作業者は、作業が終了すると、指図50を作業管理ボックス21から取り出し、電子回路基板74に取り出した指図50を添付して、次の工程に配送する。   The work management box 21 is a box into which the instruction 50 is input at the start of work. Further, when the work is completed, the worker takes out the instruction 50 from the work management box 21, attaches the taken instruction 50 to the electronic circuit board 74, and delivers it to the next step.

ICタグリーダライタ22は、作業管理ボックス21に指図50が投入された際、作業特定用ICタグ51との通信を確認すると、指図50に添付されている作業特定用ICタグ51の情報を読み取り、制御部27を介してデータベースサーバ30に、作業特定用ICタグ51との通信開始情報と、作業内容を特定する情報とを送信する。通信開始情報には、作業管理ボックス21のID、通信開始時刻がある。作業内容を特定する情報には、例えば、指図50の指図ID、製造する製品・半製品の品番、製作員数がある。また、ICタグリーダライタ22は、作業管理ボックス21から、指図50が取り出された際、作業特定用ICタグ51との通信の断絶を確認すると、制御部27を介してデータベースサーバ30に、作業特定用ICタグ51との通信終了情報と、作業内容を特定する情報とを送信する。通信終了情報には、作業管理ボックス21のID、通信終了時刻がある。作業内容を特定する情報には、例えば、指図50の指図ID、製造する製品・半製品の品番、製作員数がある。   When the IC tag reader / writer 22 confirms communication with the work identification IC tag 51 when the instruction 50 is inserted into the work management box 21, the IC tag reader / writer 22 reads the information of the work identification IC tag 51 attached to the instruction 50, Communication start information with the work specifying IC tag 51 and information for specifying the work content are transmitted to the database server 30 via the control unit 27. The communication start information includes the ID of the work management box 21 and the communication start time. The information specifying the work content includes, for example, the instruction ID of the instruction 50, the product number of the manufactured product / semi-finished product, and the number of production personnel. When the IC tag reader / writer 22 confirms the disconnection of communication with the work specifying IC tag 51 when the instruction 50 is taken out from the work management box 21, the IC tag reader / writer 22 sends the work specifying to the database server 30 via the control unit 27. The communication end information with the IC tag 51 for use and the information specifying the work content are transmitted. The communication end information includes the ID of the work management box 21 and the communication end time. The information specifying the work content includes, for example, the instruction ID of the instruction 50, the product number of the manufactured product / semi-finished product, and the number of production personnel.

なお、ICタグリーダライタ22は、周期的にIDの読取動作をしているとき、作業特定用ICタグ51と最初に通信の開始を検知したときを通信開始時刻とし、作業特定用ICタグ51と最初に通信の断絶を検知したときを通信終了時刻とするとよい。また、作業管理ボックス21には、複数のICタグを投入してもよい。他のICタグとしては、例えば、作業者を特定する情報が書き込まれた作業者特定用ICタグ52がある。ICタグリーダライタ22は、作業者特定用ICタグ52が投入された際、作業者特定用ICタグ52の情報を読み取り、制御部27を介してデータベースサーバ30に、作業者特定用ICタグ52との通信開始情報と、作業者を特定する情報とを送信する。通信開始情報には、例えば、作業管理ボックス21のID、通信開始時刻がある。また、ICタグリーダライタ22は、作業管理ボックス21から、作業者特定用ICタグ52が取り出された際、作業者特定用ICタグ52との通信の断絶を確認すると、データベースサーバ30に、作業者特定用ICタグ52との通信終了情報と、作業者を特定する情報とを送信する。通信終了情報には、例えば、作業管理ボックス21のID、通信終了時刻がある。   When the IC tag reader / writer 22 periodically performs the ID reading operation, the IC tag reader / writer 22 sets the communication start time as the first time when the start of communication with the work specifying IC tag 51 is detected. The time when communication disconnection is first detected may be the communication end time. A plurality of IC tags may be inserted into the work management box 21. As another IC tag, for example, there is an operator identifying IC tag 52 in which information for identifying the worker is written. When the worker specifying IC tag 52 is inserted, the IC tag reader / writer 22 reads the information of the worker specifying IC tag 52 and sends it to the database server 30 via the control unit 27 and the worker specifying IC tag 52. Communication start information and information for identifying the worker are transmitted. The communication start information includes, for example, the ID of the work management box 21 and the communication start time. When the IC tag reader / writer 22 confirms the disconnection of communication with the worker specifying IC tag 52 when the worker specifying IC tag 52 is taken out of the work management box 21, the IC tag reader / writer 22 notifies the database server 30 of the worker. Information on the end of communication with the identification IC tag 52 and information for identifying the worker are transmitted. The communication end information includes, for example, the ID of the work management box 21 and the communication end time.

部品ボックスユニット23は、ランプ233およびループアンテナ234が設置された部品ボックス台231と、部品が格納される部品ボックス232(部品箱)とを有する。ランプ233は、組み付け作業時に部品の格納場所を知らせる報知ランプである。ループアンテナ234を利用したICタグ読み取り機能は、図3を参照して説明する。なお、本実施形態では、複数の部品ボックスユニット23を横一例に配置しているが、これに限定されるものではない。セル作業台71(図4参照)にあわせて上下2段にして配置してもよい。また、図2において、部品ボックス232は、ループアンテナ234を表示するために透明にしているが透明である必要はない。   The component box unit 23 includes a component box base 231 on which a lamp 233 and a loop antenna 234 are installed, and a component box 232 (component box) in which components are stored. The lamp 233 is a notification lamp that informs the storage location of parts during assembly work. The IC tag reading function using the loop antenna 234 will be described with reference to FIG. In the present embodiment, the plurality of component box units 23 are arranged in a horizontal example, but the present invention is not limited to this. You may arrange | position in two steps of upper and lower sides according to the cell work table 71 (refer FIG. 4). In FIG. 2, the component box 232 is transparent for displaying the loop antenna 234, but does not need to be transparent.

図3は、部品ボックスユニットのICタグ読み取り機能を示すブロック図である。部品ボックスユニット23に設置された複数のループアンテナ234は、ユニット制御部24に接続されている。ユニット制御部24には、アンテナ切替器241と、ICタグリーダライタ242(第2のICタグ読取装置)が備えられている。アンテナ切替器241が、所定時間毎にループアンテナ234を切り替えることで、部品ボックス232内のシート特定用ICタグ61を、ICタグリーダライタ242で読み取ることができる。   FIG. 3 is a block diagram showing an IC tag reading function of the component box unit. A plurality of loop antennas 234 installed in the component box unit 23 are connected to the unit controller 24. The unit controller 24 includes an antenna switch 241 and an IC tag reader / writer 242 (second IC tag reader). The antenna switch 241 switches the loop antenna 234 every predetermined time, so that the IC tag reader / writer 242 can read the sheet specifying IC tag 61 in the component box 232.

このため、部品ボックスユニット23に配膳された部品内容が適宜変更になった際にも、部品ボックスユニット23の識別情報(部品ボックス位置情報)と、現在配膳されているシートを特定するための識別情報(例えば、シートID)とを対応させることができる。具体的には、図2の実施形態においては、左から部品ボックスユニット23のBOX位置情報を、LB01、LB02、・・・、LB10とすると、各BOX位置情報とシートIDとを対応させることができる。   For this reason, even when the contents of the components arranged in the component box unit 23 are appropriately changed, the identification information (component box position information) of the component box unit 23 and the identification for specifying the sheet currently arranged Information (for example, sheet ID) can be associated. Specifically, in the embodiment of FIG. 2, if the BOX position information of the component box unit 23 is LB01, LB02,..., LB10 from the left, each BOX position information and the sheet ID can be associated with each other. it can.

なお、部品ボックスユニット23のBOX位置情報は、ICタグリーダライタ242内の記憶部に、ループアンテナ234およびランプ233を含む部品ボックス台231の固有の識別情報として有しているとよい。また、図3において、各部品ボックスユニット23にループアンテナ234のみを設置し、ユニット制御部24を設けた構成としたが、これに限定されるものではない。部品ボックスユニット23毎にループアンテナ234を含むICタグリーダライタを設けてもよい。   The BOX position information of the component box unit 23 may be stored in the storage unit in the IC tag reader / writer 242 as unique identification information of the component box base 231 including the loop antenna 234 and the lamp 233. In FIG. 3, only the loop antenna 234 is installed in each component box unit 23 and the unit control unit 24 is provided. However, the present invention is not limited to this. An IC tag reader / writer including a loop antenna 234 may be provided for each component box unit 23.

図2に戻り、データベースサーバ30は、指図50の指図情報32(図7参照)、製造部品表情報33(図8参照)を記憶部31に記憶し、指図情報32と製造部品表情報33との対応を管理するサーバである。また、データベースサーバ30は、指図50に基づく作業実績情報を記憶し、作業実績情報を分析するサーバであり、指図管理端末10、セル作業端末20からの情報を記憶する。   Returning to FIG. 2, the database server 30 stores the instruction information 32 (see FIG. 7) and the manufacturing parts table information 33 (see FIG. 8) of the instruction 50 in the storage unit 31, and the instruction information 32, the manufacturing parts table information 33, It is a server that manages the correspondence of. The database server 30 is a server that stores work performance information based on the instruction 50 and analyzes the work performance information, and stores information from the instruction management terminal 10 and the cell work terminal 20.

また、データベースサーバ30は、作業時には、セル作業端末20からの情報、すなわち、通信開始情報、作業内容を特定する情報、通信終了情報を受信すると、記憶部31に記憶する。受信した情報には、年月日を含む時刻情報(タイムスタンプ)が付加されて記憶される。記憶部31に記憶される時刻情報には、通信開始情報に含まれる通信開始時刻、通信終了情報に含まれる通信終了時刻、および受信された情報に付加される時刻情報(タイムスタンプ)がある。受信した情報に付加される時刻情報(タイムスタンプ)は、通信開始時刻および通信終了時刻のバックアップとして利用してもよい。また、ICタグリーダライタ22から送付された情報に、時刻情報が含まれていない場合は、受信した情報に付加される時刻情報(タイムスタンプ)が、受信した情報の管理に利用される。データベースサーバ30の演算処理部(図示せず)は、記憶部31の情報から、例えば、指図別の作業時間を演算し、演算結果を記憶部31に記憶する。   When the database server 30 receives information from the cell work terminal 20, that is, communication start information, information for specifying work contents, and communication end information, the database server 30 stores the information in the storage unit 31. The received information is stored with time information (time stamp) including date. The time information stored in the storage unit 31 includes a communication start time included in the communication start information, a communication end time included in the communication end information, and time information (time stamp) added to the received information. The time information (time stamp) added to the received information may be used as a backup of the communication start time and communication end time. If the time information is not included in the information sent from the IC tag reader / writer 22, the time information (time stamp) added to the received information is used for managing the received information. An arithmetic processing unit (not shown) of the database server 30 calculates, for example, a work time for each instruction from the information in the storage unit 31 and stores the calculation result in the storage unit 31.

なお、データベースサーバ30の管理者端末(図示せず)から、指図50の発行状態などの作業内の作業計画および製造工程内の作業実績について、データベースサーバ30の記憶部31を検索することにより、監視、分析することができる。   By searching the storage unit 31 of the database server 30 for the work plan in the work such as the issuing state of the instruction 50 and the work results in the manufacturing process from the administrator terminal (not shown) of the database server 30, Can be monitored and analyzed.

図4は、作業エリアのセル作業台の一例を示す外観斜視図である。セル作業台71の下部には、セル作業端末20の作業管理ボックス21が設置されており、作業管理ボックス21にICタグリーダライタ22が付設されている。作業管理ボックス21は、作業者が、指図50を作業開始時に投入、作業終了時に取出しが容易なように、図面前方に傾斜している。これにより、作業者は、作業管理ボックス21内の指図50の有無も目視確認が容易になる。なお、作業管理ボックス21の投入口は、略垂直で上方向にあることが好ましい。これにより、作業管理ボックス21の設置面積を最小化することができる。   FIG. 4 is an external perspective view showing an example of a cell work table in the work area. A work management box 21 of the cell work terminal 20 is installed below the cell work table 71, and an IC tag reader / writer 22 is attached to the work management box 21. The work management box 21 is inclined forward of the drawing so that the operator can easily input the instruction 50 at the start of the work and take out the instruction 50 at the end of the work. Thereby, the worker can easily visually check the presence / absence of the instruction 50 in the work management box 21. In addition, it is preferable that the insertion port of the work management box 21 is substantially vertical and upward. Thereby, the installation area of the work management box 21 can be minimized.

セル作業台71の上部(上面)は、電子回路基板74の組立作業エリアであり、また、作業者の前方には、複数の部品ボックスユニット23が設置されている。表示装置25は、作業補助台72の上部に設置されており、作業特定用ICタグ51の情報が表示される。組み付け作業時には、作業者は、表示装置25に表示された情報に従い、電子回路基板74の組み付け作業を行う。   The upper part (upper surface) of the cell work table 71 is an assembly work area of the electronic circuit board 74, and a plurality of component box units 23 are installed in front of the worker. The display device 25 is installed on the upper part of the work auxiliary table 72 and displays information on the work specifying IC tag 51. During the assembling work, the worker performs the assembling work of the electronic circuit board 74 according to the information displayed on the display device 25.

部品ボックスユニット23のランプ233のパネル部分には、BOX位置情報(例えば、LB01、LB02)を記載しているとよい。これにより、作業者には、表示装置25に表示された部品ボックスユニット番号の情報と、実際のボックス(BOX)の位置情報とが一致しているか否かの目視確認が容易になる。   The BOX position information (for example, LB01, LB02) may be described in the panel portion of the lamp 233 of the component box unit 23. Thereby, it is easy for the operator to visually check whether or not the information of the component box unit number displayed on the display device 25 matches the position information of the actual box (BOX).

ピッキングリストに基づき部品を供給する配膳員は、シートIDの順番に、図4の図面の左側の部品ボックス232から右方向に部品を配膳してゆく。このとき、部品ボックス232には、供給される部品とともに、シートIDが記憶されているシート特定用ICタグ61を入れる。これにより、BOX位置情報とシートIDとが関連付けられる。   The distributor who supplies the parts based on the picking list arranges the parts in the right direction from the part box 232 on the left side of the drawing of FIG. 4 in the order of the sheet ID. At this time, the sheet identification IC tag 61 in which the sheet ID is stored is put in the component box 232 together with the components to be supplied. Thereby, the BOX position information and the sheet ID are associated with each other.

作業者は、表示装置25に表示された作業手順に従って、部品ボックス232から、部品73を取出し、電子回路基板74に組み付け作業を行う。複数の部品ボックス232には、シートIDごとに部品が配膳されているので、所定のシートIDの作業が済むと、該当する部品ボックス232が空になる。これにより、作業者は、組み付ける部品が確実に組み付けているか否かを判断することができる。なお、図4に示す状態は、図面左から2つの部品ボックス232は、すでに部品の組み付けが完了しており、空の状態を示している。   The worker takes out the component 73 from the component box 232 according to the operation procedure displayed on the display device 25 and performs the assembly operation on the electronic circuit board 74. Since components are arranged for each sheet ID in the plurality of component boxes 232, the corresponding component box 232 becomes empty after the work of a predetermined sheet ID is completed. Thereby, the operator can determine whether or not the parts to be assembled are securely assembled. In the state shown in FIG. 4, the two component boxes 232 from the left of the drawing have already been assembled and the components are empty.

図5は、表示装置の表示画面例を示す説明図である。適宜図4を参照する。図5に示す表示画面は、作業者が指図50を作業管理ボックス21に投入した際に表示される画面である。表示部251には、セル作業台71での組付指示内容の作業ガイダンスが示されており、シートIDがB0001のときである。セル作業台71のスイッチ26を押下すると、次のシートIDの画面が表示される。   FIG. 5 is an explanatory diagram illustrating a display screen example of the display device. Reference is made to FIG. 4 as appropriate. The display screen shown in FIG. 5 is a screen that is displayed when the operator inputs the instruction 50 into the work management box 21. The display unit 251 shows work guidance for the contents of the assembly instruction on the cell work table 71, and is when the sheet ID is B0001. When the switch 26 of the cell work table 71 is pressed, the next sheet ID screen is displayed.

表示部251に表示される項目は、指図ID2511、指図内容2512(製造する製品・半製品の型番、品名、および員数を含む。)、組付指示情報2513、工程ID2514、作業着手日時・作業終了日時2515、作業者ID2516、完成員数2517を含む。組付指示情報2513には、作業者の組み付け手順(シートID)、作業内容、部品ボックスユニット番号2518の表示欄がある。例えば、手順(シートID)がB0001は「作業ガイダンス」、手順がB0002は「Parts001取付」、手順がB0003は「Parts002取付」である。部品ボックスユニット番号2518の欄には、BOX位置情報である「LB01」、「LB02」(図4参照)が表示される。なお、組付指示情報2513に表示する内容には、作業内容とともに、部品品番を表示してもよい。   Items displayed on the display unit 251 include an instruction ID 2511, instruction contents 2512 (including the model number, product name, and number of products and semi-finished products to be manufactured), assembly instruction information 2513, process ID 2514, work start date / time, and work end. Date and time 2515, worker ID 2516, and number of completed workers 2517 are included. The assembly instruction information 2513 includes display fields for an operator's assembly procedure (sheet ID), work content, and component box unit number 2518. For example, the procedure (sheet ID) B0001 is “work guidance”, the procedure B0002 is “Parts 001 attachment”, and the procedure B0003 is “Parts 002 attachment”. In the column of the component box unit number 2518, “LB01” and “LB02” (see FIG. 4) which are BOX position information are displayed. The contents displayed in the assembly instruction information 2513 may display the part number together with the work contents.

表示装置25の入力部252には、メニューボタン253があり、シート移動を選択すると、カーソルボタン254を利用して、必要がある場合には、これから作業開始する作業手順の画面に移動することができる。   The input unit 252 of the display device 25 has a menu button 253. When the sheet movement is selected, the cursor button 254 can be used to move to a work procedure screen to start work from now on if necessary. it can.

図6は、表示装置の他の表示画面例を示す説明図である。図6に示す表示画面には、コネクタを挿入する際の具体例を示す。表示部251(図5参照)には、取付部品欄2521、全体図欄2522、詳細欄2523、部品情報欄2524、作業経過時間欄2525、手順番号欄2526、中断ボタン2527を有している。   FIG. 6 is an explanatory diagram illustrating another display screen example of the display device. The display screen shown in FIG. 6 shows a specific example when a connector is inserted. The display unit 251 (see FIG. 5) includes an attachment part field 2521, an overall view field 2522, a detail field 2523, a part information field 2524, an operation elapsed time field 2525, a procedure number field 2526, and an interruption button 2527.

作業者は、取付部品欄2521のコネクタを、全体図欄2522および詳細欄2523から取り付け位置を確認することができる。また、作業経過時間欄2525の目標時間に対し、現在、どの程度時間が経過しているか確認することができる。作業を中断するときは、中断ボタン2527を押下すると時間経過は中断することができるが、作業時間中の中断時間として、データベースサーバ30に記録される。   The operator can confirm the attachment position of the connector in the attachment part column 2521 from the general view column 2522 and the detail column 2523. Further, it can be confirmed how much time has elapsed with respect to the target time in the work elapsed time column 2525. When the operation is interrupted, the elapsed time can be interrupted by pressing the interrupt button 2527, but is recorded in the database server 30 as the interruption time during the operation time.

図7は、指図情報の例を示す説明図である。指図情報32には、製品名(品名)、指図ID、工程ID、シートID、作業内容、セル作業の位置を示す作業場位置情報、セル作業台でのボックス(BOX)の位置を示すBOX位置情報(部品ボックス位置情報)、部品品番、表示画面に表示する際の画面ID、作業者IDなどが登録されている。具体的には、シートIDがB0001の場合は作業ガイダンスであり、シートIDがB0002の場合はParts001の取付作業である。Parts001の取付作業には、複数の部品(例えば、部品P101、P102)が使用される。また、図示はしていないが、各部品の必要な員数などは、リンクされた情報で関連付けられている。なお、作業者IDは、作業者が作業者特定用ICタグ52(図2参照)を、作業管理ボックス21に投入した場合に登録される。   FIG. 7 is an explanatory diagram illustrating an example of instruction information. The instruction information 32 includes a product name (item name), an instruction ID, a process ID, a sheet ID, work contents, work place position information indicating the position of the cell work, and BOX position information indicating the position of the box (BOX) on the cell work table. (Part box position information), a part number, a screen ID for displaying on the display screen, a worker ID, and the like are registered. Specifically, when the sheet ID is B0001, it is work guidance, and when the sheet ID is B0002, it is an attachment work of Parts 001. A plurality of parts (for example, parts P101 and P102) are used for the attachment work of Parts 001. Further, although not shown, the necessary number of parts and the like are associated with linked information. The worker ID is registered when the worker inserts the worker specifying IC tag 52 (see FIG. 2) into the work management box 21.

図7において、作業場位置情報とBOX位置情報とを区別しているが、これに限定されるものではない。例えば、作業場位置情報とBOX位置情報とをひとつにまとめてBOX位置情報としてもよい。この場合には、BOX位置情報は、例えばLS001LB01として固有の識別情報として管理し、セル作業端末20の制御部27において、部品ボックス232内のシート特定用ID61に記憶されているシートIDと、作業場位置情報を含むBOX位置情報とを関連付けて、データベースサーバ30に送信され、データベースサーバ30は、受信したシートIDおよびBOX位置情報が指図情報32に含まれているか否かを判定する(図9、ステップS8参照)。   In FIG. 7, the workplace position information and the BOX position information are distinguished, but the present invention is not limited to this. For example, the work location position information and the BOX position information may be combined into a single BOX position information. In this case, the BOX position information is managed as unique identification information, for example, LS001LB01, and the control unit 27 of the cell work terminal 20 stores the sheet ID stored in the sheet specifying ID 61 in the component box 232 and the work place. The BOX position information including the position information is transmitted to the database server 30 in association with it, and the database server 30 determines whether or not the received sheet ID and BOX position information are included in the instruction information 32 (FIG. 9, (See step S8).

図8は、製造部品表情報の例を示す説明図である。製造部品表情報33には、製品名(品名)、指図ID、工程ID、シートID、作業内容、作業場位置情報、BOX位置情報、部品品番、倉庫内の部品位置を示す部品位置情報、配膳員ID、配膳員がピッキングする際のピッキングIDなどが登録されている。   FIG. 8 is an explanatory diagram showing an example of the manufactured parts table information. The manufacturing parts table information 33 includes a product name (article name), an instruction ID, a process ID, a sheet ID, work contents, work site position information, BOX position information, a part part number, part position information indicating a part position in a warehouse, and a staff member. An ID, a picking ID when the staff member picks, and the like are registered.

製造部品表情報33は、指図情報32、倉庫内管理情報などに基づいて作成される。指図情報32のシートIDの順序の入換えが生じた際には、BOM管理部112(図2参照)が、製造部品表情報33のシートIDに関連付けられた行単位で入換えを行う。   The production parts table information 33 is created based on the instruction information 32, the management information in the warehouse, and the like. When the order of the sheet IDs in the instruction information 32 is changed, the BOM management unit 112 (see FIG. 2) performs the replacement in units of rows associated with the sheet IDs in the manufacturing parts table information 33.

次に、表示装置25に表示する作業手順の変更が生じた場合の処理について説明する。
図9は、作業指示画面の入換えからセル作業端末での作業の処理の流れを示すフローチャートである。適宜図2を参照する。管理者が作業手順の変更の必要性があるときは、指図管理端末10の入力装置13から指図のシート入換え指令をする。指図管理部111は、シート入換え指令を判定し(ステップS1)、指図のシート入換え指令の場合には(ステップS1,Yes)、指図情報32の入換えを行い(ステップS2)、BOM管理部112にシートの入換え指令の通知をする。次に、シートの入換え指令の通知を受理したBOM管理部112は、製造部品表情報33の入換えをする(ステップS3)。具体的には、図8に示す製造部品表情報33のシートIDで関連付けられた行単位で入換えを行う。これにより、改めて製造部品表情報33を作成するのではなく、行単位の入換えの処理時間で済むことになる。なお、ステップS1において、指図のシート入換え指令でない場合(ステップS1,No)、ステップS1に戻り、入力装置13からの入力指示を待つ。
Next, processing when the work procedure displayed on the display device 25 is changed will be described.
FIG. 9 is a flowchart showing the flow of work processing at the cell work terminal after the work instruction screen is replaced. Reference is made to FIG. 2 as appropriate. When the administrator needs to change the work procedure, the instruction sheet replacement command is issued from the input device 13 of the instruction management terminal 10. The instruction management unit 111 determines a sheet replacement instruction (step S1), and in the case of an instruction sheet replacement instruction (step S1, Yes), the instruction information 32 is replaced (step S2), and BOM management is performed. The unit 112 is notified of a sheet replacement command. Next, the BOM management unit 112 that has received the notification of the sheet replacement command replaces the manufactured parts table information 33 (step S3). Specifically, the replacement is performed in units of rows associated with the sheet ID of the manufacturing parts table information 33 shown in FIG. As a result, the manufacturing parts table information 33 is not created again, but the replacement processing time for each row is sufficient. If it is not an instruction sheet replacement command in step S1 (step S1, No), the process returns to step S1 and waits for an input instruction from the input device 13.

ステップS3において、既に、製造部品表情報33に基づいてピッキングリストが作成されている場合には、BOM管理部112は、製造部品表情報33のシートIDで関連付けられた行単位で入換えに伴い、自動的にピッキングリストもシートIDの入換え順に入換えられる。   In step S3, if a picking list has already been created based on the manufactured parts table information 33, the BOM management unit 112 performs replacement in units of rows associated with the sheet ID of the manufactured parts table information 33. The picking list is automatically changed in the order of changing the sheet ID.

BOM管理部112は、部品の配膳指令を判定し(ステップS4)、部品の配膳指令の場合(ステップS4,Yes)、ピッキングリストの出力を行う(ステップS5)。このピッキングリスト出力の際、ピッキングタグであるシート特定用ICタグ61(図2参照)に、ピッキングID、シートIDを記憶する。そして、BOM管理部112は、配膳員が所有する携帯端末などに、ピッキング指令および配膳指令を通知する。なお、ステップS4において、部品の配膳指令でない場合(ステップS4,No)、ステップS4に戻り、入力装置13からの入力指示を待つ。   The BOM management unit 112 determines a component layout command (step S4), and if the component layout command is selected (step S4, Yes), outputs a picking list (step S5). When outputting the picking list, the picking ID and the sheet ID are stored in the sheet specifying IC tag 61 (see FIG. 2) which is a picking tag. Then, the BOM management unit 112 notifies the picking command and the serving command to the mobile terminal owned by the serving staff. In step S4, if it is not a component layout command (step S4, No), the process returns to step S4 and waits for an input instruction from the input device 13.

通知を受けた配膳員は、倉庫からピッキングリストに基づき、部品をピッキングし、指定された作業場位置、BOX位置の部品ボックス232に部品を供給(配膳)する(ステップS6)。このとき、シート特定用ICタグ61も該当する部品ボックス232に入れる。なお、配膳員は、複数の空の部品ボックス232を台車に載せて倉庫に行き、部品ボックス232ごとに、所定のシート特定用ICタグ61を入れ、そして、ピッキングリストに基づき、ピッキングした部品を該当する部品ボックス232に入れてもよい。この場合には、配膳員は、指定された作業場位置において、部品ボックス232ごと交換するとよい。   Upon receiving the notification, the dispatcher picks parts from the warehouse based on the picking list, and supplies (distributes) the parts to the parts box 232 at the designated work place position and BOX position (step S6). At this time, the sheet specifying IC tag 61 is also placed in the corresponding component box 232. The staff member puts a plurality of empty parts boxes 232 on the cart, goes to the warehouse, puts a predetermined sheet identifying IC tag 61 for each parts box 232, and picks the picked parts based on the picking list. You may put in the corresponding component box 232. In this case, the staff member may replace the parts box 232 at the designated work site position.

一方、データベースサーバ30は、セル作業端末20からの情報を受理すると、作業管理ボックス21の指図50の投入の検知であるか否かを判定する(ステップS7)。指図50の投入の検知であると(ステップS7,Yes)、データベースサーバ30は、投入指令に含まれる作業場位置情報、BOX位置情報、シートIDが、指図情報32と一致しているかの部品配置の適正を判定する(ステップS8)。部品配置が適正であるとき(ステップS8,Yes)、ステップS9に進む。部品配置が適正でないとき(ステップS8,No)、部品配置が適正でない旨の警告を、指図管理端末10の表示装置14およびセル作業端末20の表示装置25に送信し(ステップS11)、ステップS8に戻る。作業者は、表示装置25に部品配置が適正でない旨の警告が表示された場合、部品位置の確認を行う作業が発生する。   On the other hand, when the database server 30 receives the information from the cell work terminal 20, it determines whether or not it is the detection of the insertion of the instruction 50 in the work management box 21 (step S7). If it is detected that the instruction 50 has been input (step S7, Yes), the database server 30 determines whether or not the work place position information, the BOX position information, and the sheet ID included in the input command match the instruction information 32. Appropriateness is determined (step S8). When the component arrangement is appropriate (step S8, Yes), the process proceeds to step S9. When the component arrangement is not appropriate (No at Step S8), a warning that the component arrangement is not appropriate is transmitted to the display device 14 of the instruction management terminal 10 and the display device 25 of the cell work terminal 20 (Step S11), and Step S8. Return to. When the warning that the component arrangement is not appropriate is displayed on the display device 25, the worker performs an operation of confirming the position of the component.

なお、ステップS7において、投入の検知でない場合は(ステップS7,No)、ステップS7に戻る。ステップS8において、部品配置が適正でないとき(ステップS8,No)、ステップS11において、配膳員の携帯端末に警告を通知してもよい。   In step S7, when the input is not detected (No in step S7), the process returns to step S7. In step S8, when the component arrangement is not appropriate (step S8, No), a warning may be sent to the mobile terminal of the staff member in step S11.

そして、ステップS9において、データベースサーバ30は、作業手順を順次、表示装置25に表示する。データベースサーバ30は、セル作業端末20からの情報を受理すると、作業管理ボックス21の指図50の取出しの検知であるか否かを判定し(ステップS10)、取出しの検知のとき(ステップS10,Yes)、一連の作業が終了する。なお、取出しの検知でないとき(ステップS10,No)、ステップS10に戻る。   In step S9, the database server 30 sequentially displays the work procedure on the display device 25. Upon receiving the information from the cell work terminal 20, the database server 30 determines whether or not it is the detection of the removal of the instruction 50 in the work management box 21 (step S10), and when the removal is detected (step S10, Yes). ), A series of work ends. When it is not detection of removal (No at Step S10), the process returns to Step S10.

図10は、表示装置の作業進捗状況の表示画面例を示す説明図である。図10において、図5と同一構成品には同一符号を付しており、説明を省略する。組付指示情報2513には、手順、作業内容、および詳細作業時刻2519を有している。作業着手日時・作業終了日時2515には、指図50が作業管理ボックス21(図2参照)に投入された時刻、および作業管理ボックス21から取り出された時刻が表示される。完成員数2517には、製作員数のうち何枚完成したかが表示され、組付指示情報2513の手順が全て終了した際に、制御部27(図2参照)が完成員数を表示する。   FIG. 10 is an explanatory diagram illustrating a display screen example of the work progress status of the display device. In FIG. 10, the same components as those in FIG. The assembly instruction information 2513 includes a procedure, work content, and detailed work time 2519. In the work start date / time / work end date / time 2515, the time when the instruction 50 is input into the work management box 21 (see FIG. 2) and the time when the instruction 50 is taken out from the work management box 21 are displayed. The number of completed members 2517 displays how many of the production members have been completed, and when the procedure of the assembly instruction information 2513 is completed, the control unit 27 (see FIG. 2) displays the number of completed members.

詳細作業時刻2519には、各手順の終了時刻が表示され、制御部27が、スイッチ26(図2参照)が押下された時刻を表示する。このように、作業者は、表示装置25(図2参照)の表示画面の作業内容の指示に従い、確認しながら作業を進めることができる。具体的には、手順番号B0003の場合、セル作業端末20の制御部27は、手順番号B0003に該当するBOX位置情報のランプ233(図2参照)が点灯し、作業者は、取り出すべき部品の部品ボックス232を容易に判別することができる。なお、図10に示す表示画面は、メニューボタン253から選択することができる。   The detailed work time 2519 displays the end time of each procedure, and the control unit 27 displays the time when the switch 26 (see FIG. 2) is pressed. In this way, the worker can proceed with the work while confirming according to the work content instruction on the display screen of the display device 25 (see FIG. 2). Specifically, in the case of the procedure number B0003, the control unit 27 of the cell work terminal 20 turns on the lamp 233 (see FIG. 2) of the BOX position information corresponding to the procedure number B0003, and the operator selects the part to be removed. The component box 232 can be easily identified. Note that the display screen shown in FIG. 10 can be selected from the menu button 253.

本実施形態では、指図管理端末10の処理部11が指図管理部111およびBOM管理部112を有するとして説明したがこれに限定されるものではない。データベースサーバ30(管理サーバ)の処理部(図示せず)が指図管理部111およびBOM管理部112を有していてもよい。この場合には、指図管理端末10の入力装置13からの指令により、データベースサーバ30の処理部が、指図情報32および製造部品表情報33の登録/更新/削除などの処理を行う。   In the present embodiment, the processing unit 11 of the instruction management terminal 10 has been described as including the instruction management unit 111 and the BOM management unit 112, but the present invention is not limited to this. A processing unit (not shown) of the database server 30 (management server) may include an instruction management unit 111 and a BOM management unit 112. In this case, according to a command from the input device 13 of the instruction management terminal 10, the processing unit of the database server 30 performs processing such as registration / update / deletion of the instruction information 32 and the manufacturing parts table information 33.

本実施形態では、作業支援システムSの管理サーバ(例えば、データベースサーバ30)の記憶部31には、指図情報32が記憶されており、指図情報32には、シートIDと関連付けられて部品ボックス位置情報が登録されている。   In the present embodiment, the instruction information 32 is stored in the storage unit 31 of the management server (for example, the database server 30) of the work support system S, and the instruction information 32 is associated with the sheet ID and the component box position. Information is registered.

作業端末(セル作業端末20)は、作業対象物品(例えば、電子回路基板74)の作業内容を特定する情報が書き込まれた第1のICタグ(例えば、作業特定用ICタグ51)を読み取る第1のICタグ読取装置(例えば、ICタグリーダライタ22)と、作業者が取り出す部品(例えば、部品73)の部品箱(例えば、部品ボックス232)を識別するランプ(例えば、ランプ233)と、部品箱に入れられたシート単位部品表を識別するシートIDが書き込まれた第2のICタグ(例えば、シート特定用ICタグ61)を読み取る第2のICタグ読取装置(例えば、ICタグリーダライタ242)と、を有する。   The work terminal (cell work terminal 20) reads the first IC tag (for example, work identification IC tag 51) in which information for identifying the work content of the work target article (for example, the electronic circuit board 74) is written. 1 IC tag reader (for example, IC tag reader / writer 22), a lamp (for example, lamp 233) for identifying a component box (for example, component box 232) of a component (for example, component 73) taken out by an operator, and a component A second IC tag reader (for example, an IC tag reader / writer 242) that reads a second IC tag (for example, a sheet specifying IC tag 61) in which a sheet ID for identifying a sheet unit parts table placed in the box is written. And having.

作業端末は、第1のICタグ読取装置が第1のICタグを読み取ると、その読み取った情報を管理サーバに送信し(例えば、ステップS7)、第2のICタグ読取装置が第2のICタグを読み取ると、シートIDとランプに割り付けられた部品ボックス位置情報とを関連付けて、管理サーバに送信する。   When the first IC tag reader reads the first IC tag, the work terminal transmits the read information to the management server (for example, step S7), and the second IC tag reader reads the second IC tag. When the tag is read, the sheet ID and the component box position information assigned to the lamp are associated with each other and transmitted to the management server.

管理サーバは、受信した第2のICタグの部品ボックス位置情報およびシートIDと、記憶部に登録されている指図情報のうち受信した第1のICタグの部品ボックス位置情報およびシートIDとが一致するか否かを判定し(例えば、ステップS8)、判定が一致しない場合、作業端末に部品の配置が適切でない旨の警告をし(例えば、ステップS11)、作業端末は、判定が一致する場合、管理サーバの記憶部に登録されている指図情報の作業手順を受信して、表示部(例えば、表示装置25)に受信した作業手順を含む画面情報を表示し、作業手順に基づいて、作業手順ごとの部品ボックス位置情報に該当するランプを点灯させる(例えば、ステップS9)ことができる。   The management server matches the received component box position information and sheet ID of the second IC tag with the received component box position information and sheet ID of the first IC tag out of the instruction information registered in the storage unit. If the determination does not match (for example, step S8), the work terminal is warned that the parts are not properly arranged (for example, step S11), and the work terminal determines that the determination matches. The work procedure of the instruction information registered in the storage unit of the management server is received, the screen information including the received work procedure is displayed on the display unit (for example, the display device 25), and the work is performed based on the work procedure. The lamp corresponding to the component box position information for each procedure can be turned on (for example, step S9).

本実施形態によれば、下記の特徴を有する。
(1)作業対象物品の組み立ての作業手順情報である指示画面情報(例えば、指図情報32のシートIDに関連付けられた情報)と、製造部品表情報(例えば、製造部品表情報33)とを連動させることにより作業効率を向上できる。具体的には、製造部品表情報33は、シートIDごとの部品情報を含んで構成されている。このため、表示装置25の指示画面情報の作業手順の入換えが必要になった際には、指図管理部111が指図情報32のシートIDの行の入換えを行うとともに、BOM管理部112は、製造部品表情報33のシートIDに関連付けられた製造部品表の入換えを行うことができる。
According to this embodiment, it has the following characteristics.
(1) Linkage of instruction screen information (for example, information associated with the sheet ID of the instruction information 32) and manufacturing parts table information (for example, manufacturing parts table information 33), which is work procedure information for assembling the work target article By doing so, the work efficiency can be improved. Specifically, the manufactured parts table information 33 includes part information for each sheet ID. For this reason, when the work procedure of the instruction screen information on the display device 25 needs to be changed, the instruction management unit 111 changes the sheet ID row of the instruction information 32, and the BOM management unit 112 The manufacturing parts table associated with the sheet ID of the manufacturing parts table information 33 can be replaced.

(2)ピッキングリストは、シートIDの部品表ごと順番に出力され、ピッキングされた部品群は、セル作業台71に配置された部品ボックス232に、シートIDごとに関連付けられて順番に配膳される。データベースサーバ30(管理サーバ)は、セル作業端末20から送信された配膳されたシートID、作業場位置情報、部品ボックス232のボックス位置情報(BOX位置情報)を有する情報が、指図情報32と一致するか否かを判定し、配膳された部品が適正に配置されているかを判定することができる。 (2) The picking list is output in order for each part table of the sheet ID, and the picked parts group is allocated to the parts box 232 arranged on the cell work table 71 in association with each sheet ID in order. . In the database server 30 (management server), the information including the arranged sheet ID, the work place position information, and the box position information (BOX position information) of the component box 232 transmitted from the cell work terminal 20 matches the instruction information 32. It is possible to determine whether or not the arranged parts are properly arranged.

(3)セル作業端末20は、表示装置25に作業手順情報を提示すると共に、その各作業手順情報である指示画面情報に関連付けられているBOX位置情報に対応したランプ233を点灯させることができる。これにより、作業者は、容易に作業に必要な部品の取出しができる。また、作業者または作業管理者は、既に作業が終了している部品ボックス232内の部品の有無により部品の組み付け忘れなどの作業不良を確認することができる。 (3) The cell work terminal 20 can present the work procedure information on the display device 25 and can turn on the lamp 233 corresponding to the BOX position information associated with the instruction screen information that is each work procedure information. . Thereby, the worker can easily take out the parts necessary for the work. In addition, the worker or the work manager can confirm a work defect such as forgetting to assemble a component depending on the presence or absence of a component in the component box 232 that has already been completed.

10 指図管理端末
11 処理部
13 入力装置
14 表示装置
20 セル作業端末(作業端末)
21 作業管理ボックス
22 ICタグリーダライタ(第1のICタグ読取装置)
23 部品ボックスユニット
24 ユニット制御部
25 表示装置(表示部)
26 作業スイッチ
27 制御部
30 データベースサーバ(管理サーバ)
31 記憶部
32 指図情報
33 製造部品表情報
40 ネットワーク
50 指図
51 作業特定用ICタグ(第1のICタグ)
52 作業者特定用ICタグ
61 シート特定用ICタグ(第2のICタグ)
73 部品
74 電子回路基板(作業対象物品)
80 製造部品表
111 指図管理部
112 BOM管理部
231 部品ボックス台
232 部品ボックス(部品箱)
233 ランプ
234 ループアンテナ
241 アンテナ切替器
242 ICタグリーダライタ(第2のICタグ読取装置)
S 作業支援システム
DESCRIPTION OF SYMBOLS 10 Instruction management terminal 11 Processing part 13 Input apparatus 14 Display apparatus 20 Cell work terminal (work terminal)
21 Work management box 22 IC tag reader / writer (first IC tag reader)
23 parts box unit 24 unit control unit 25 display device (display unit)
26 work switch 27 control unit 30 database server (management server)
31 Storage Unit 32 Instruction Information 33 Manufacturing Parts Table Information 40 Network 50 Instruction 51 Work Identification IC Tag (First IC Tag)
52 IC tag for worker identification 61 IC tag for sheet identification (second IC tag)
73 Parts 74 Electronic circuit board (work object)
80 Manufacturing Parts List 111 Instruction Management Department 112 BOM Management Department 231 Parts Box Stand 232 Parts Box (Parts Box)
233 Lamp 234 Loop antenna 241 Antenna switch 242 IC tag reader / writer (second IC tag reader)
S Work support system

Claims (6)

作業者の作業手順を管理する管理サーバと、作業場所に設置され前記管理サーバからの前記作業手順に従い表示部に作業指示を表示する作業端末とを備え、前記作業手順の順序の入換えと連動して、前記作業手順に必要な製造部品表の更新を行う作業支援システムであって、
前記管理サーバは、
前記作業端末の表示部に表示する作業手順を識別するシートIDと画面情報とが関連付けられた指図情報と、
前記シートIDと該シートIDの前記作業手順に必要な部品表とが関連付けられたシート単位部品表を含み、前記作業手順の順序に前記シート単位部品表が構成された製造部品表情報とを記憶部に有し、
前記作業手順の順序の入換え指令を受理すると、
前記指図情報の前記シートIDに関連付けられた単位ごとに順序の入換えを行い、
前記製造部品表情報の前記シート単位部品表ごとに順序の入換えを行う
ことを特徴とする作業支援システム。
A management server that manages a work procedure of a worker; and a work terminal that is installed at a work place and displays a work instruction on a display unit in accordance with the work procedure from the management server, and is linked to a change in the order of the work procedures. A work support system for updating a manufacturing parts list necessary for the work procedure,
The management server
Instruction information in which a sheet ID for identifying a work procedure to be displayed on the display unit of the work terminal and screen information are associated;
The sheet ID and the parts list necessary for the work procedure of the sheet ID are associated with each other, and the manufacturing parts table information in which the sheet unit parts list is configured in the order of the work procedure is stored. Have
When receiving the order change instruction of the work procedure,
The order is changed for each unit associated with the sheet ID of the instruction information,
The work support system, wherein the order is changed for each sheet unit parts table of the manufacturing parts table information.
前記管理サーバは、
ピッキングリストの出力指令を受理すると、前記製造部品表情報に基づいて前記シート単位部品表ごとにピッキングリストを出力する
ことを特徴とする請求項1に記載の作業支援システム。
The management server
2. The work support system according to claim 1, wherein when the picking list output command is received, the picking list is output for each of the sheet unit parts table based on the manufacturing parts table information.
前記指図情報には、前記シートIDと関連付けられて部品ボックス位置情報が登録されており、
前記作業端末は、
作業対象物品の作業内容を特定する情報が書き込まれた第1のICタグを読み取る第1のICタグ読取装置と、
作業者が取り出す部品の部品箱を識別するランプと、
前記部品箱に入れられた前記シート単位部品表を識別するシートIDが書き込まれた第2のICタグを読み取る第2のICタグ読取装置と、を有し、
前記第1のICタグ読取装置が第1のICタグを読み取ると、その読み取った情報を前記管理サーバに送信し、
前記第2のICタグ読取装置が第2のICタグを読み取ると、前記シートIDと前記ランプに割り付けられた部品ボックス位置情報とを関連付けて、前記管理サーバに送信し、
前記管理サーバは、
受信した第2のICタグの部品ボックス位置情報およびシートIDと、前記記憶部に登録されている前記指図情報のうち受信した第1のICタグの部品ボックス位置情報およびシートIDとが一致するか否かを判定し、
前記判定が一致しない場合、前記作業端末に部品の配置が適切でない旨の警告をし、
前記作業端末は、前記判定が一致する場合、
前記管理サーバの記憶部に登録されている前記指図情報の作業手順を受信して、前記表示部に前記受信した作業手順を含む前記画面情報を表示し、
前記作業手順に基づいて、前記作業手順ごとの部品ボックス位置情報に該当する前記ランプを点灯させる
ことを特徴とする請求項1に記載の作業支援システム。
In the instruction information, component box position information is registered in association with the sheet ID,
The work terminal is
A first IC tag reading device that reads a first IC tag in which information specifying work content of a work target article is written;
A lamp for identifying a parts box of parts to be taken out by an operator;
A second IC tag reader for reading a second IC tag in which a sheet ID for identifying the sheet unit parts table placed in the parts box is written;
When the first IC tag reader reads the first IC tag, the read information is transmitted to the management server,
When the second IC tag reader reads the second IC tag, the sheet ID and the component box position information assigned to the lamp are associated with each other and transmitted to the management server,
The management server
Whether the received component box position information and sheet ID of the second IC tag match the received component box position information and sheet ID of the first IC tag among the instruction information registered in the storage unit. Determine whether or not
If the determinations do not match, warn the work terminal that the parts are not properly placed,
The work terminal, if the determination matches,
Receiving the work procedure of the instruction information registered in the storage unit of the management server, and displaying the screen information including the received work procedure on the display unit;
The work support system according to claim 1, wherein the lamp corresponding to the component box position information for each work procedure is turned on based on the work procedure.
前記作業端末は、前記第1のICタグ読取装置が前記第1のICタグとの通信ができた場合に前記管理サーバに情報を送信し、前記第1のICタグとの通信が断絶した場合に前記管理サーバに情報を送信し、
前記管理サーバは、前記通信ができた場合に送信される情報に含まれる時刻を、通信開始時刻として登録するとともに、前記通信が断絶した場合に送信される情報に含まれる時刻を、通信終了時刻として登録する
ことを特徴とする請求項3に記載の作業支援システム。
The work terminal transmits information to the management server when the first IC tag reader can communicate with the first IC tag, and communication with the first IC tag is interrupted. Send information to the management server,
The management server registers the time included in the information transmitted when the communication is possible as the communication start time, and sets the time included in the information transmitted when the communication is interrupted as the communication end time. The work support system according to claim 3, wherein the work support system is registered as.
作業者の作業手順を管理する管理サーバと、作業場所に設置され前記管理サーバからの前記作業手順に従い表示部に作業指示を表示する作業端末とを備える作業支援システムにおいて、前記作業手順の順序の入換えと連動して、前記作業手順に必要な製造部品表の更新を行う作業支援方法であって、
前記管理サーバは、
前記作業端末の表示部に表示する作業手順を識別するシートIDと画面情報とが関連付けられた指図情報と、
前記シートIDと該シートIDの前記作業手順に必要な部品表とが関連付けられたシート単位部品表を含み、前記作業手順の順序に前記シート単位部品表が構成された製造部品表情報とが記憶部に記憶されており、
前記作業手順の順序の入換え指令を受理すると、
前記指図情報の前記シートIDに関連付けられた単位ごとに順序の入換えを行い、
前記製造部品表情報の前記シート単位部品表ごとに順序の入換えを行う
ことを特徴とする作業支援方法。
A work support system comprising: a management server that manages a work procedure of a worker; and a work terminal that is installed at a work place and displays a work instruction on a display unit according to the work procedure from the management server. A work support method for updating the manufacturing parts list necessary for the work procedure in conjunction with replacement,
The management server
Instruction information in which a sheet ID for identifying a work procedure to be displayed on the display unit of the work terminal and screen information are associated;
The sheet ID and the part ID necessary for the work procedure of the sheet ID are related to each other, and the manufacturing parts table information in which the sheet unit parts list is configured in the order of the work procedure is stored. Is stored in the department,
When receiving the order change instruction of the work procedure,
The order is changed for each unit associated with the sheet ID of the instruction information,
The work support method according to claim 1, wherein the order is changed for each sheet unit parts table of the manufacturing parts table information.
前記管理サーバは、
ピッキングリストの出力指令を受理すると、前記製造部品表情報に基づいて前記シート単位部品表ごとにピッキングリストを出力する
ことを特徴とする請求項5に記載の作業支援方法。
The management server
6. The work support method according to claim 5, wherein when a picking list output command is received, a picking list is output for each sheet-based parts table based on the manufacturing parts table information.
JP2009224877A 2009-09-29 2009-09-29 Work support system and work support method Active JP5155976B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009224877A JP5155976B2 (en) 2009-09-29 2009-09-29 Work support system and work support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009224877A JP5155976B2 (en) 2009-09-29 2009-09-29 Work support system and work support method

Publications (2)

Publication Number Publication Date
JP2011076229A JP2011076229A (en) 2011-04-14
JP5155976B2 true JP5155976B2 (en) 2013-03-06

Family

ID=44020172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009224877A Active JP5155976B2 (en) 2009-09-29 2009-09-29 Work support system and work support method

Country Status (1)

Country Link
JP (1) JP5155976B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015194021A1 (en) * 2014-06-19 2015-12-23 株式会社日立製作所 Work procedure management method and system
JP7022007B2 (en) * 2018-05-16 2022-02-17 株式会社日立製作所 Standard working time estimation method, standard working time estimation device and program
WO2019243795A1 (en) * 2018-06-19 2019-12-26 Bae Systems Plc Workbench system
EP3584655A1 (en) * 2018-06-19 2019-12-25 BAE SYSTEMS plc Workbench system
EP3810374B1 (en) 2018-06-19 2022-06-01 BAE SYSTEMS plc Workbench system
CN109542037A (en) * 2018-12-25 2019-03-29 南京熊猫电子股份有限公司 A kind of manual work intellectualized production system and production control method
JP7110138B2 (en) * 2019-03-11 2022-08-01 株式会社日立製作所 Work order system and method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001265756A (en) * 2000-03-17 2001-09-28 Pfu Ltd Work manual preparing device and program recording medium
JP2002259500A (en) * 2001-03-06 2002-09-13 Omron Corp Preparation apparatus for instruction document and support system for work
JP2002341921A (en) * 2001-05-15 2002-11-29 Toshiba Corp Manufacturing data management system and its managing method
JP2004246762A (en) * 2003-02-17 2004-09-02 Olympus Corp Working manual preparation support system
JP5139650B2 (en) * 2006-06-26 2013-02-06 株式会社日立製作所 Work results collection system and work results collection method
JP4299847B2 (en) * 2006-08-03 2009-07-22 株式会社日立製作所 Work management apparatus, work management system, and work management method
JP5196991B2 (en) * 2007-12-27 2013-05-15 キヤノンItソリューションズ株式会社 Manufacturing process management apparatus, manufacturing process management method, and computer program

Also Published As

Publication number Publication date
JP2011076229A (en) 2011-04-14

Similar Documents

Publication Publication Date Title
JP5155976B2 (en) Work support system and work support method
JP2007328665A (en) Work result collection system
JP2008280140A (en) Electronic inventory tag system
KR20220091257A (en) Method and system for inventory management using detachable to shelf inventory management device
JP2008040640A (en) Work management apparatus, work management system, work management method, and picking carriage
JP6060171B2 (en) Tape feeder parts verification system
JP4056139B2 (en) Article management method, article management apparatus, and picking work apparatus in a picking work place
JP2011048631A (en) Electronic shelf label system
JP5139650B2 (en) Work results collection system and work results collection method
JP4922837B2 (en) Work management system and work management method
JP4593165B2 (en) Product identification device and product management system
JP2007193525A (en) Traceability information collection method, traceability information collection system, purchase part information input terminal and product information input terminal
US11048241B2 (en) Production schedule creating method and production schedule creating apparatus
JP2010170195A (en) Part serving system and part serving method using part serving dolly
JP6320025B2 (en) Demand management system and demand management method
JP5467988B2 (en) Parts arrangement and assembly system
CA3212251A1 (en) Systems and methods for inventory management
JP7050593B2 (en) Devices, systems and methods for updating the status of goods
JP4997200B2 (en) Work support system and work support method
JP4234342B2 (en) Component mounting operation support system and method for component mounting apparatus
JPH1166157A (en) Production process control system
JP2006213464A (en) Sorting system
JP4975346B2 (en) Article sorting system
JP3867517B2 (en) Work equipment and work equipment control method
JP7162930B1 (en) Loan management system, management server, and management terminal

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121127

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121207

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151214

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5155976

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150