JP3903471B2 - Complete processing system with date and time - Google Patents

Complete processing system with date and time Download PDF

Info

Publication number
JP3903471B2
JP3903471B2 JP2004128903A JP2004128903A JP3903471B2 JP 3903471 B2 JP3903471 B2 JP 3903471B2 JP 2004128903 A JP2004128903 A JP 2004128903A JP 2004128903 A JP2004128903 A JP 2004128903A JP 3903471 B2 JP3903471 B2 JP 3903471B2
Authority
JP
Japan
Prior art keywords
account
date
time
balance
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004128903A
Other languages
Japanese (ja)
Other versions
JP2004272926A (en
Inventor
正 小松
Original Assignee
株式会社八十二銀行
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社八十二銀行 filed Critical 株式会社八十二銀行
Priority to JP2004128903A priority Critical patent/JP3903471B2/en
Publication of JP2004272926A publication Critical patent/JP2004272926A/en
Application granted granted Critical
Publication of JP3903471B2 publication Critical patent/JP3903471B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

本発明は、先日時付完結処理システム及び方法に係り、特に、金融機関での口座に対する自動振替や振込等をオンライン稼働中に並行して処理する先日時付完結処理システムに関する。
なお、この出願は、特願2000−112455号の分割出願である特願2003−112455号の分割出願である。
The present invention relates to a complete processing system and method with the time the other day, in particular, about the complete processing system with at the time the other day to be processed in parallel the automatic transfer and the transfer or the like during online operation for the account of a financial institution.
This application is a divisional application of Japanese Patent Application No. 2003-112455, which is a divisional application of Japanese Patent Application No. 2000-112455.

従来より、公共料金の口座振替処理は、自動現金預入支払機(ATM)や自動支払機(CD)及びオンラインシステムが停止し、口座残高が確定した後に、バッチ処理で実行されていた。例えば、特許文献1には、電気、ガス、水道等の料金を指定振替日(勘定日)の前夜から翌朝までの時間を利用して、口座からの出金処理(引落処理)を行う手法が開示されている。特許文献2にも、口座振替をバッチ処理にて行う手法が開示されている。また、他の従来例としては、特許文献3がある。
特開昭59−77573号公報 特開平7−93439号公報 特開平8−129501号
Conventionally, the bill transfer process for public charges has been executed in a batch process after the automatic cash deposit / payment machine (ATM), the automatic payment machine (CD) and the online system are stopped and the account balance is determined. For example, Patent Document 1 discloses a method of performing a withdrawal process (withdrawal process) from an account using the time from the night before the designated transfer date (account date) to the next morning for charges such as electricity, gas, and water. It is disclosed. Patent Document 2 also discloses a method of performing account transfer by batch processing. Moreover, there exists patent document 3 as another prior art example.
JP 59-77573 A JP-A-7-93439 JP-A-8-129501

しかしながら、バッチ処理による口座振替処理では、オンラインシステムを停止させた状態で口座振替処理を行わなければならないため、ATMやインターネットバンキングなどを24時間連続稼働させることが難しい、という不都合があった。   However, the account transfer process by the batch process has a disadvantage that it is difficult to continuously operate ATM, Internet banking, etc. for 24 hours because the account transfer process must be performed with the online system stopped.

また、上記従来例では、口座残高が確定した前夜から振替当日のオンライン稼働時間前までの限られた時間内に全ての口座振替処理を行わなければならず、口座振替処理のデータ量の増加やオンライン稼働時間の延長に対応するためにはコンピュータ(CPU)などの機器を増強しなければならない、という不都合があった。   In addition, in the above conventional example, all account transfer processing must be performed within a limited time from the night before the account balance is confirmed to the online operation time on the transfer day, which increases the amount of data in the account transfer processing, In order to cope with the extension of the online operation time, there has been a disadvantage that equipment such as a computer (CPU) has to be increased.

さらに、上記従来例では、振替当日の前夜から開始して、振替当日の早朝までにバッチ処理を完了しなければならないため、データ量によっては、振替当日のオンライン稼働開始が遅れてしまう恐れもあった。   Furthermore, in the above conventional example, since the batch processing must be completed by the early morning of the transfer day, starting from the night before the transfer day, depending on the amount of data, the start of online operation on the transfer day may be delayed. It was.

<発明の目的>
本発明は、係る従来例の有する不都合を改善し、特に、ATM等の端末を用いた入出金等のオンライン処理と並列して口座振替や融資返済等の種々の取引を処理することのできる先日時付完結処理システムを提供することを、その目的とする。
すなわち、本発明は、従来バッチ処理として行っていた口座振替処理等をオンライン処理中に並行して処理を行うことを、その目的としている。
<Object of invention>
The present invention relates to improved the disadvantage of the prior example, in particular, capable of processing various transactions such mouth seat transfers or loan repayment in parallel with the online processing of the depositing and dispensing or the like using the terminal such as ATM to provide a complete processing system with at the time the other day, and an object of the present invention.
That is, the present invention is to make a parallel process during on-line processing of a conventional batch processing debit process was performed as such, it is an object of it.

本発明では、先日付の口座処理をその勘定日となる前に実行し、勘定日別の口座情報(例えば、残高)を保有する。そして、先日付が当日時(その時刻)となった瞬間に参照すべき口座情報が変化する。先日付での口座情報を生成しておき、そして、先日付の日時に至るまでに口座残高の異動(変動)や利率や契約内容の変更があった場合には、その変更を先日付での残高に反映させる。これにより、日時(時刻)が変更した時点で、変更した日時を勘定日時とする口座処理も完了している。
すなわち、本発明では、現在の口座情報に基づいて、その後に口座処理が無い場合の先日付での残高を仮想的に生成しておき、その先日付の残高に基づいて先日付の口座処理を実行しておくことで、従来バッチ処理で行っていた口座処理をオンライン処理中に並行して処理する。これは、現在処理する口座処理を、先日付の日時が到来するまでの最終の口座処理と仮定し、当該先日付の残高等を予め計算する処理である。その後、先日付の勘定日が至る前に別の口座処理があった場合には、再度その口座処理が最終の口座処理であると仮定し、先日付の残高等を算出する。この先日付の残高等は、口座の名義人にとって、当該先日付の日時(時刻)とならなければ使用できない残高である。
In the present invention, to run before it becomes the account processing dated at the time the other day and their account Date and Time, owned by a different account information at the time the account date (for example, balance). Then, the account information to be referred to the moment that with time the other day has become the time of the day (that time) is changed. Leave generate the account information in with the time the other day, and, when there is a change (variation) and changes in interest rates and contract details of the account balance in up to the date and time dated at the time the other day, at the time the other day the change It will be reflected in the balance. Thereby, when the date and time (time) is changed , the account processing using the changed date and time as the account date and time is also completed.
That is, in the present invention, based on the current account information, then advance to generate a balance in recent with time if the account processing is not virtually, dated during other day on the basis of the balance of the other day with time By executing the account processing, the account processing that has been conventionally performed in batch processing is processed in parallel during online processing. In this process, the account process to be processed is assumed to be the final account process until the date and time with the previous date and time arrives. Thereafter, if another account process is performed before the account date with the previous date and time arrives, the account process is assumed to be the final account process, and the balance with the previous date and time is calculated. Balance of with the time of this the other day, for the holder of the account, a balance can not be used if not the date and time dated at the time the other day (time).

本発明の前提となる先日時付完結処理の原理は、現時点での情報に基づいて、その後の変化が無いとした場合の、将来の口座情報を生成しておく点にある。その後に口座処理が無い場合や、自動定期化サービスにて普通預金口座から定期預金へ入金する契約に変更が無い場合や、小切手の資金化について不渡の連絡が無い場合を想定して、その前提での先日付の口座情報を予め算出しておく。先日付の処理であるため、口座名義人がその先日付の残高を直接に用いて取引をすることができず、従って、先日付処理については取消を行うことができる。このため、自動定期化サービスにて普通預金の出金及び定期預金への入金を先日付で行った後に、契約の変更等が連絡された場合には、先日付での当該口座処理を取り消し、変更された契約に基づいて再実行することができる。 The principle of the pre-date and time completion process, which is a premise of the present invention, is that future account information is generated based on information at the present time when there is no subsequent change. Assuming that there is no account processing after that, that there is no change in the contract for depositing from a savings account to a fixed deposit with the automatic periodic service, or that there is no non-delivery notification about the financing of the check The account information of the previous date is calculated in advance. Because it is a few days ago with the process, it is impossible to account holder to the transaction by using directly to the balance as of the time the other day, therefore, about the other day with a time of processing it is possible to perform the cancellation. For this reason, if a change in contract is notified after withdrawal of ordinary deposits and deposits into time deposits with the date and time using the automatic periodic service, the relevant account processing with the date and time will be processed. Can be canceled and re-executed based on the changed contract.

このように、現在の状態から変化がないと仮定した場合の先日付での口座情報を予め算出しておき、状態に変化があった場合には、再度先日付での口座情報の算出を行うと、先日付の日時(時刻)を迎える前後にはなんら処理を行う必要がない。このため、オンライン処理の終了後にバッチ処理にて口座処理を行う必要がなくなる。従って、本発明の先日付での口座処理は、その口座処理が完了した段階で、完結している。 In this way, the account information with the previous date and time when it is assumed that there is no change from the current state is calculated in advance, and if there is a change in the state, the account information with the previous date and time is calculated again. When you do, need not name to perform any treatment before and after to greet the date and time of the postdated (time). For this reason, there is no need to perform the account processing in the batch processing after the end of the online process. Therefore, the account processing with the date and time of the present invention is completed when the account processing is completed.

現在の状態からの変化には、続く口座処理が無いという前提のみならず、先日付で契約する定期預金や口座に元加する利息の利率が現在に判明していて、その後に変更がないという前提(変更が有った場合には、再度口座処理を実行する)などが含まれる。このため、先日付処理を行うことのできる対象は数多い。通常の普通預金口座や当座預金口座に対する種々の口座処理や、ある条件に応じたオプションの行使や、先物取引を口座で決済する場合に、期日時刻での額が定まっている場合の差額の算出及び決済や、住宅ローンの特別な増額返済のための普通預金口座からの出金の予約などについても、先日時付完結処理としてオンライン処理中に実行することができる。 The change from the current state, not only the assumption that subsequent account processing is not, have interest rates of interest to MotoKa in time deposits and account to contract with at the time the other day is found to the current, there is no subsequent change (If there is a change, the account processing is executed again). For this reason, there are many objects that can be processed with date and time . A variety of account processing and for a normal savings account and a checking account, option exercise or in response to certain conditions, in the case to settle the futures traded on the account, the calculation of the difference if you are definite that the amount of the due date time In addition, payment and reservation for withdrawal from a savings account for special repayment of a mortgage can also be executed during online processing as completion processing with a date and time .

本発明は、各口座に対する各種入出金等の口座処理の取引種類と、当該口座処理の取引日時となる対象勘定日時と、入金額又は出金額である取引金額とを有する口座処理要求を演算する演算手段と、この演算手段によって演算された口座処理の結果を口座情報として記録するファイルとを備えている。
そして、前記ファイルが前記口座情報として、前記演算された口座処理要求の対象勘定日時、取引種類及び取引金額を、口座処理要求の取引日時である勘定日時別で当該口座処理毎に記録する取引明細情報と、前記口座毎に口座処理のあった勘定日時の残高を勘定日時毎に記録する勘定日時別の残高明細情報とを備えている。
前記口座処理要求は、当該口座処理要求の対象となる口座への振込若しくは自動現金預入支払機等による入金要求又は口座振替若しくは自動現金預入支払機等による出金要求である。
前記残高明細情報が、口座処理要求を演算する口座について、少なくとも演算日時と同日時付の残高又は過去で直近の残高を有している。
本発明では、前記演算手段は、勘定日時別口座処理部と、勘定日時別口座情報格納部とを備えている。
勘定日別口座処理部は、まず、前記残高明細情報に記録された前記残高のうち、対象勘定日時と同日時付の残高が記録されている場合には当該残高を対象勘定日時の残高として特定し、対象勘定日時と同日時付の残高が記録されていない場合には当該対象勘定日時より過去で直近の残高を対象勘定日時の残高として特定する。そして、前記特定された対象勘定日時の残高と前記取引金額とを加減算し、当該演算した口座処理要求の取引種類及び取引金額を、当該口座処理要求の取引日時である対象勘定日時を勘定日時として前記取引明細情報に記録する。
また、勘定日時別口座情報格納部は、当該勘定日時別口座処理部が加減算した処理後の残高を、前記対象勘定日時の残高として前記残高明細情報に記録することで、前記対象勘定日時が先日時である場合には、前記対象勘定日時の残高を当該先日時の残高として前記残高明細情報に記録する、という構成を採っている。これにより上記課題を解決しようとするものである。
ここで、「勘定日以後」は、勘定日を含み、「勘定日より未来」は、勘定日を含まない。「更新」は、ファイルに格納されていた演算日と同日付又は先日付の残高の上書きを意味する。「格納」は、主に、同日付又は先日付でのある日時の最初の口座処理で、新しくその勘定日の残高を記録する場合に用い、さらに、データの記録一般にも用いる。
「口座処理」は、例えば、金融機関の個人向けの普通口座を例とすると、給与振込等の口座への振込(入金)や、公共料金の自動引落のような口座からの振替(出金)や、融資の返済や家賃の引落などの自動引落(出金)などである。また、法人等を例とすると、「口座処理」は、各種支払の振込予約や、給与支払のための引落や、口座引落で集金した家賃の入金などである。これら種々の内容の口座処理を扱うようにしても良いし、例えば振込などは別の演算手段にて扱い、公共料金の振替のみを本発明による先日時付完結処理システムで扱うようにしても良い。
また、証券取引用の口座を例とすると、「口座処理」は、株取引に要した資金の決済や、金融商品の自動的な購入などが該当する。このように、「口座処理」には、まず、商取引の決済手法の種々の態様が含まれる。この決済の対象は単一の通貨のみならず、例えば先日付での為替レートを予め取引者間で定めておくことができれば、外為取引に応用することもできる。さらに、決済の対象は、通貨を扱う口座のみならず、例えば商品やサービスの販売時に付加するポイント値(マイレージポイント)でも良い。
さらに「口座処理」には、その口座の属性を設定又は変更する処理を含めるようにしても良い。例えば、定期の自動更新に応じた自動融資極度額の変更や、長期ローンでの変動金利と固定金利とのスワップの予約等を含めるようにしても良い。また、ATMやCDや金融機関の店舗の窓口端末による現金の入金や出金は即時の口座処理であり、演算日時と定日時が一致する。
The present invention calculates an account processing request having a transaction type of account processing such as various deposits and withdrawals for each account, a target account date and time that is the transaction date and time of the account processing, and a transaction amount that is a deposit or withdrawal amount. A calculation means and a file for recording the account processing result calculated by the calculation means as account information are provided.
The file records the account information for the account processing request, the transaction type and the transaction amount as the account information, for each account processing by account date and time that is the transaction date and time of the account processing request. Information and balance detailed information for each account date and time for recording the account date and time balance for which account processing has been performed for each account.
The account processing request is a transfer request to an account subject to the account processing request or a deposit request by an automatic cash deposit payment machine or a withdrawal request by an account transfer or an automatic cash deposit payment machine.
The balance detail information has at least a balance with the same date and time as the calculation date or the latest balance in the past for the account for calculating the account processing request.
In the present invention, the calculation means includes an account processing unit by account date and time and an account information storage unit by account date and time.
The account processing unit by account date first identifies the balance as the balance of the target account date and time when a balance with the same date and time as the target account date and time is recorded among the balances recorded in the balance detail information If the balance with the same date and time as the target account date and time is not recorded, the balance closest to the target account date and time in the past is specified as the balance of the target account date and time. Then, the balance of the identified target account date and time and the transaction amount are added and subtracted, and the calculated transaction type and transaction amount of the account processing request are set as the account date and time as the target account date and time of the account processing request. Record in the transaction details information.
Further, the account information storage unit by account date and time records the balance after the addition and subtraction by the account processing unit by account date and time as the balance of the target account date and time in the balance detailed information so that the target account date and time When it is a date and time, the balance of the target account date and time is recorded in the balance detail information as the balance of the destination date and time. Thus, the above problem is to be solved.
Here, the "account date when after" includes the account date, "the future from the time of account date" does not include the time accounts date. "Update" means overwriting at the time of the calculation date that had been stored in a file and the balance of or with the other day with the time of day. "Storage" is, primarily, in the first account processing of a certain date and time in or with the time the other day with the time of day, used in the case of recording the balance at the time of the newly the account date, further, also used to record the general data.
“Account processing” is, for example, an ordinary account for individuals at a financial institution. Transfer (payment) to an account such as salary transfer, or transfer from an account (withdrawal) such as automatic withdrawal of public charges And automatic withdrawals (withdrawals) such as loan repayment and rent withdrawal. Further, taking a corporation or the like as an example, “account processing” includes reservations for various payments, withdrawals for salary payments, and payment of rent collected by account withdrawal. You may make it handle the account processing of these various contents, for example, you may handle transfer etc. by another calculating means, and may handle only the transfer of a utility bill with the date and time completion processing system by this invention. .
Taking an account for securities trading as an example, “account processing” corresponds to settlement of funds required for stock trading, automatic purchase of financial products, and the like. As described above, the “account processing” first includes various modes of settlement methods for commercial transactions. This settlement is not limited to a single currency, but can be applied to forex trading if, for example, an exchange rate with a date and time can be determined in advance between traders. Furthermore, the settlement target may be not only an account that handles currency, but also a point value (mileage point) that is added at the time of sale of goods or services, for example.
Further, “account processing” may include processing for setting or changing the attribute of the account. For example, it may be possible to include a change in the maximum amount of an automatic loan according to a periodic automatic renewal, a reservation for a swap between a variable interest rate and a fixed interest rate in a long-term loan, and the like. In addition, deposit and withdrawal of cash by the window terminal of the store of ATM and CD and financial institutions is the account processing of immediate, computation time and intuition constant date and time to match.

上記ファイルには、預金・融資等の取引履歴や、現在の残高や、口座に定義された自動融資可能額(貸越極度)などの口座に関する情報が格納されている。「口座情報」というときには、残高情報を含む。残高情報は、口座処理要求が決済可能であるか又は決済不能であるかを判定するための数値であり、例えば、定期預金等を担保とする自動融資が無い場合には実際の残高で、定期預金等を担保とする自動融資が付随する場合には、自動融資可能額(貸越極度)の極度額と実際の残高とを加算した額を出金可能額としても良い。定期預金等を担保とする自動融資を行う場合には、口座情報として担保明細等の属性情報を持つようにすると良い。 The file stores information related to an account such as a transaction history such as deposit / loan, current balance, and automatic lending possible amount (overdraft extreme) defined in the account. “Account information” includes balance information. The balance information is a numerical value for determining whether the account processing request can be settled or cannot be settled. For example, when there is no automatic loan secured as a fixed deposit, In the case where an automatic loan secured by a deposit or the like is accompanied, an amount obtained by adding the extreme amount of the automatic loan available amount (overdraft extreme) and the actual balance may be used as the possible withdrawal amount. When performing automatic financing with a fixed deposit as collateral, it is preferable to have attribute information such as collateral details as account information.

演算手段は、例えば、口座処理要求として入金があった場合には、現在の残高を読み出して、入金額を加算し、ファイルを更新する。   For example, when there is a deposit as an account processing request, the calculation means reads the current balance, adds the deposit amount, and updates the file.

本発明では、勘定日別口座処理部が、演算を行う演算日時と同日時付又は先日付となる勘定日での口座処理を当該勘定日の直近の口座情報に基づいて処理する。そして、勘定日別口座情報格納部は、勘定日別口座処理部の処理結果を当該口座処理の勘定日での口座情報として前記ファイルに格納する。 In the present invention, it accounts Daily account processing unit processes based on the account processing when account date to be attached during operation time and or with the same time the other day to perform an operation on the most recent account information during the account date. Then, another account information storage unit when account date, the processing result of another account processing unit when accounts date stored in the file as the account information when account date of the account processing.

「勘定日」は、取引を行う日時である。「勘定日時として」日と、午前午後の時間指定や、また、秒単位の取引を扱うようにしても良い。秒単位の取引を扱う場合、「勘定日時」のデータ型には時分秒まで含まれることとなる。 "When the account date" is a line cormorant date and time of the transaction. And the date "as the account date and time", the time specified and in the morning the afternoon, also, may be dealing with transactions in seconds. When dealing with a transaction in seconds, it is the data type of the "time of account date" that Do and be included until the hour, minute, and second.

この「勘定日」は、例えば、口座処理が振替であれば振替日である。融資の返済であれば「約定返済日」が勘定日であると考える。給与振込であれば振込日が勘定日に相当する。本明細書では、これら種々の口座処理要求に指定される取引実行日を「勘定日」と呼ぶ。「演算日時」は演算を行う「当日」であり、「現在」ともいう。 This "when the account date", for example, account processing is at the transfer date if the transfer. If the repayment of the loan "when the contract repayment date" is considered to be the time of account date. When the transfer date if the payroll is equivalent to the time of account date. In the present specification, when the transaction execution date to be specified for these various accounts processing request is referred to as a "time of account date". "Calculation date" is "during the day" to perform the operation, also referred to as "current".

本発明では、演算日時に対して先日付となる勘定日での口座処理要求を、演算日時の段階で処理する。その処理結果を、演算日時に対して先日時付となる勘定日での口座情報として格納する。従って、口座情報は、口座処理要求がなされた勘定日別に生成され、管理される。例えば、演算日時の残高と、先日付での処理を行った将来の残高(仮想残高)との情報がファイルに格納される。この将来の残高は、今までに行った口座処理の後、口座処理がないままその勘定日が到来しときの、その勘定日の残高である。このため、例えば勘定日を日単位とすると、日が変更したときに、その日変更の前後でなんら処理を行うことなく、当該勘定日に行うべき口座処理を完了した状態で、新たに迎えた日(時刻)での残高が確定する。 In the present invention, the account processing request when the account date to be attached at the time the other day for the operation date and time, the processing at the stage of the operation date and time. The processing result is stored as account information at the time the account date to be attached at the time the other day for the operation date and time. Thus, account information, account processing request is generated separately during account date been made and managed. For example, information about the balance at the calculation date and the future balance (virtual balance) that has been processed with the date and time is stored in the file. The future of the balance, after the account processing performed up to now, when the time is come that account date remains no account processing is the balance at the time of the account date. Thus, for example, the time accounts date and day time unit, when the day time is changed, without performing any processing before and after the change when the day, while completing the account processing to be performed on the accounts day, new the balance of when greeted day (time) is determined.

例えば、先日付である勘定日が、演算日時の翌営業日であったとする。そして、翌営業日を勘定日とする振替等の口座処理要求をその翌営業日の前の時刻に演算する。演算した結果、現在の残高と、翌営業日の残高とが個別にファイルに格納される。その後、当該口座に対して残高の変動(異動)をもたらす処理が行われなかったとすると、本日から翌営業日時へ変更した段階で、引落(出金)が確定し、新たな残高に基づいた処理が可能となる。従って、翌営業日時が到来した瞬間に、口座振替後の新たな残高に基づいた処理を行うことができる。 For example, the accounts date is with at the time the other day, and was at the time the next business day of the operation date and time. Then, to calculate the account processing requests for transfer or the like for the account date at the time when the next business day prior to the time at the time of the next business day. The calculated result, the current balance, and the balance at the time of the next business day is stored in individual files. Then, when the processing result in a change in the balance (changes) with respect to the account has not been performed, at a stage when you change the time of day from today to the next business date and time, direct debit (withdrawal) is confirmed, based on the new balance Can be processed. Therefore , the processing based on the new balance after the account transfer can be performed at the moment when the next business date and time arrives .

ここで、午前午後や、時分秒ではなく、時分を例として説明する。例えば、午後1:30を勘定日時とする振込があるとする。本発明では、例えば午前11:00頃の演算日時で、将来の時間である午後1:30の口座処理要求を処理する。すると、午後1:30前の時刻(システムが秒単位であれば、午後1:29分59秒まで)で参照する残高と、午後1:30以後に参照する残高の2つの口座情報がファイルに格納される。このため、午後1:30前後になんら処理を行うことなく、午後1:30の取引を先日時付にて完結させることができる。これをオンライン・リアルタイムで行うには、午後1:30に行うべき処理が大量にある場合には、ハードウエア資源への負荷が瞬間的に大きくなりすぎる。一方、この例では、口座情報を勘定日時別に有するという思想により、実際の演算日時はいつでも良い。 Here , the description will be made by taking the hour and minute as an example instead of morning and afternoon or hour and minute . For example, it is assumed that there is a transfer with 1:30 pm as the account date . In the present invention, for example, an account processing request at 1:30 pm, which is a future time, is processed at a calculation date and time around 11:00 am. Then, two account information of the balance that is referenced at the time before 1:30 pm (if the system is in seconds, until 1:29 pm 59 seconds) and the balance that is referenced after 1:30 pm are stored in the file. Stored. For this reason, the transaction at 1:30 pm can be completed with the previous date and time without performing any processing around 1:30 pm. To do this online and in real time, if there is a large amount of processing to be performed at 1:30 pm, the load on hardware resources will be too high momentarily. On the other hand, in this example , the actual calculation date and time may be any time due to the idea of having account information for each account date and time .

一般的に、勘定日を日単位として、公共料金等の振替をバッチ処理で行うのは、勘定日を時分単位と考えた場合の上記午後1:30の大量処理に相当する。すなわち、前日に口座残高が確定した後、振替日(勘定日)の朝までに振替を実行するには、その間の現実の時間内で全ての処理を完結させなければならない。そして、バッチ処理の場合には、この処理時間を「0」とすることはできない。一方、勘定日時を日単位として考えると、日付変更の瞬間(前後)には、口座情報に対してなんら処理を行う必要がない。このように、本発明による先日時付完結処理システムでは、口座処理の負荷を時間的に分散している。 In general, as the daily the time account Date, to carry out the transfer, such as a public utility charges in batch processing is equivalent to the mass treatment of the 1:30 pm in the case of thought and hour and minute units of account date. That is, after the account balance is confirmed on the previous day, in order to execute the transfer by the morning of the transfer date (account date), all processes must be completed within the actual time period. In the case of batch processing, this processing time cannot be set to “0”. On the other hand, when the account date is considered as a daily unit, there is no need to perform any processing on the account information at the moment of date change (before and after) . As of this, in the complete processing system with at the time the other day in accordance with the present invention are temporally distribute the load of account processing.

本発明の実施形態では、先日付の勘定日での口座処理要求を処理した後、現在の残高が変更され、先日付での処理が実行できない状態となり、反対に、先日付で未成立の処理が実行できる状態となると、先日付処理の取消や、未成立であった口座処理の再実行(再カット)を行うなど、種々の局面に対応するための技術が開示される。 In an embodiment of the present invention, after processing the account processing request when the account date dated at the time the other day, the current balance is changed, a state that processing can not be executed in the other day with the time, on the contrary, dated at the time the other day When an unestablished process is ready to be executed, a technique for dealing with various aspects is disclosed, such as canceling a process with a date and time or re-executing (recutting) an account process that has not been established. .

そして、本発明の好ましい実施形態では、先日時付の残高を格納した後、別の新たな口座処理要求を処理したことで、先日付の残高が変動した場合に、先日付ですでに成立していた口座処理を取り消し、または、未成立であった出金予定(残不足明細に格納された口座処理)を再カットすると良い。 Then, in the preferred embodiment of the present invention, after storing the balances with time recently it was processing another new account processing request, when the balance with time other day varies, already with the time other day The account processing that has been established may be canceled or the withdrawal schedule that has not been established (account processing stored in the remaining shortage details) may be recut.

本発明は以上のように構成され機能するので、これによると、勘定日時別口座処理部が、演算日時を勘定日時とする口座情報か、この勘定日時の時刻に最も近い過去の残高に基づいて、振込(入金)や振替(出金、引落)等の口座処理要求を実行し、勘定日時別口座情報格納部が、勘定日時別の残高を使用した口座処理後の残高を、当該口座処理の勘定日時での残高として前記ファイルに格納するため、勘定日時別の残高等の口座情報がファイルに格納される。
そして、勘定日時別口座処理部が、新たな口座処理をその勘定日時又は過去で直近の残高に基づいて処理するため、ある勘定日時を経過した時刻では、経過後の勘定時日の残高に基づいて口座処理を行う。
従って、勘定時刻の前後になんら口座に対する処理を行うことなく、事前に、振込や振替や利息入金等の処理を完結することができる。
従って、日付変更前後などに大量の口座に対する種々の処理を一時期にまとめて処理する必要がなく、例えば、公共料金の振替等を夜間バッチ処理にて行う必要がなく、先日付時での口座処理を前もって平準化した状態で日中に、すなわち、通常のオンライン処理中に処理することができる。
このように、すなわち、ATM等の端末を用いた入出金等のオンライン処理と並列して口座振替や利息の入金等の種々の取引を処理することができ、従って、24時間連続サービスを演算手段の処理能力を増強せずに実施することができ、また、24時間サービスを行わない場合であっても、演算手段をバッチ処理のために深夜運用する必要性がなくなるため、管理が容易となる。
このように、バッチ処理を不要とすることができるため、振替や利息入金等の口座処理要求が大量に存在しても、演算手段の処理能力を増強せずに大量の口座に対する同種の口座処理を日中に完了させることができる、という従来にない優れた先日付完結処理システムを提供することができる。
Since the present invention is configured and functions as described above, according to this, the account processing unit by account date and time is based on the account information having the calculation date and time as the account date or the past balance closest to the time of this account date and time. , Execute account processing requests such as transfer (payment) and transfer (withdrawal, withdrawal), etc., the account information storage unit by account date and time, the balance after account processing using the balance by account date and time of the account processing Since the balance at the account date is stored in the file, account information such as the balance by account date is stored in the file.
Then, since the account processing unit by account date / time processes new account processing based on the account date / time or the latest balance in the past, at the time when a certain account date / time has passed, Account processing.
Accordingly, it is possible to complete processing such as transfer, transfer, and interest payment in advance without performing any processing on the account before and after the account time.
Therefore, it is not necessary to process various processes for a large number of accounts all at once before and after the date change, for example, there is no need to transfer public charges by night batch processing, and account processing at the previous date. Can be processed during the day, ie, during normal online processing, in a leveled state in advance.
In this way, it is possible to process various transactions such as account transfers and interest deposits in parallel with online processing such as deposits and withdrawals using terminals such as ATMs. Can be implemented without increasing the processing capacity of the system, and even when the service is not performed for 24 hours, it is not necessary to operate the computing means late at night for batch processing, thus facilitating management. .
In this way, since batch processing can be eliminated, even if there are a large number of account processing requests such as transfers and interest deposits, the same kind of account processing for a large number of accounts without increasing the processing capacity of the calculation means Can be completed in the daytime, and it is possible to provide an unprecedented superior date completion processing system.

<第1実施形態>
以下、本発明の実施の形態を図面を参照して説明する。
図1は、本発明の第一の実施形態の構成を示すブロック図である。図1に示す例では、第1実施形態による先日時付完結処理システムは、勘定日時の取引等の口座処理要求を受信する受信手段4と、この受信手段4にて受信した口座処理要求を演算する演算手段2と、この演算手段2によって演算される処理結果を口座情報として記録するファイル6とを備えている。そして、演算手段2が、当該演算を行う演算日時に対して同日時又は先日時となる勘定日時での口座処理を当該勘定日時の口座情報(残高)又は直近の口座情報(残高)に基づいて処理する勘定日時別口座処理部8と、この勘定日時別口座処理部8の処理結果を当該口座処理の勘定日時での口座情報として前記ファイルに格納する勘定日時別口座情報格納部10とを備えている。
受信手段4は、ATMや、公共料金等の引落データが格納された外部持込媒体や、融資や自動定期化サービス等の情報等を格納した内部各種マスタなどから直接又は間接に口座処理要求を受信する。また、インターネットや専用ネットワーク等を介して顧客のコンピュータから口座処理要求を受信するようにしても良い。
<First Embodiment>
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a block diagram showing the configuration of the first embodiment of the present invention. In the example shown in FIG. 1, the completion processing system with a predecessor date according to the first embodiment computes an account processing request received by the receiving unit 4 and a receiving unit 4 that receives an account processing request such as an account date transaction. And a file 6 for recording a processing result calculated by the calculation means 2 as account information. Then, the calculation means 2 performs the account processing at the account date and time that is the same date or the previous date and time with respect to the calculation date and time for performing the calculation based on the account information (balance) or the latest account information (balance) at the account date and time. and account date and time-account processing unit 8 for processing the accounts date and time-account information storage unit 10 for storing the account information to the file 6 of the processing result of the account date and time-account processing unit 8 with account date and time of the account processing I have.
The receiving means 4 directly or indirectly receives an account processing request from an external carry-in medium storing withdrawal data such as ATMs, utility charges, etc., and various internal masters storing information such as loans and automatic periodic services. Receive. Further, an account processing request may be received from a customer's computer via the Internet or a dedicated network.

演算手段は、1台又は複数台のコンピュータである。演算手段2が有する種々の手段や各部、各機能は、所定のプログラムを実行するコンピュータのCPUによって実現できる。図1に示す例では、先日時付完結処理に必要な種々の機能のうち、原理的に重要な部分を抽出している。すなわち、演算手段2は、勘定日時別口座処理部8と、勘定日時別口座情報格納部10とを備えている。勘定日時別口座処理部8は、口座処理要求を受信した時刻を含む日時勘定日時とする口座処理要求を、当該勘定日時の口座情報(残高)に基づいて処理する。例えば、ATM等の操作により現金出金を行う場合、当日の口座情報を読み出して、その残高に基づいて現金出金を行う。また、勘定日時別口座処理部8は、口座処理要求を受信した日時に対して先日時付となる勘定日時の口座処理を、先日時付の口座情報に基づいて処理する。先日時付の口座情報が無い場合には、当該当該受信した日時より過去で直近の口座情報に基づいて先日時付となる勘定日時の口座情報を生成する。例えば、演算日の口座残高と同一額の残高を先日時付である翌営業日の残高とする。口座処理要求は、当該処理要求の対象となる口座へ口座振込等による先日時での入金要求又は口座振替等による先日時での出金要求である。 The computing means 2 is one or a plurality of computers. The various means, each part, and each function that the computing means 2 has can be realized by a CPU of a computer that executes a predetermined program. In the example shown in FIG. 1, in principle, an important part is extracted from various functions necessary for the completion process with the previous date and time. In other words, calculation means 2 is provided with a counting time by the account processing unit 8, and accounts date and time-account information storage unit 10. The account processing unit 8 by account date and time processes an account processing request having the date and time including the time when the account processing request is received based on the account information (balance) of the account date and time . For example, in the case of a cash withdrawal by the operation of the ATM or the like, and reads out the account information at the time of the day, perform a cash withdrawal on the basis of the balance. Also, it accounts by date and time account processing unit 8, an account processing account date becomes attached at the other day against time which has received the account processing request, to processing on the basis of the account information with the time of day. If there is no account information dated at the time the other day, to generate the account information of the account date and time to be with at the time the other day on the basis of the most recent account information in the past than the date and time of the the received. For example, the balance of the account balance and the same amount of calculation date and the next business day when the balance is with at the time the other day. The account processing request is a deposit request at a previous date and time by account transfer or the like, or a withdrawal request at a previous date and time by account transfer or the like to the account that is the target of the processing request.

勘定日時別口座情報格納部10は、勘定日時別に処理される口座処理の処理結果を、当該口座処理の勘定日時での口座情報としてファイル6に格納する。これにより、勘定日時別の口座情報が生成される。この勘定日時別口座情報は、勘定日時別口座処理部8によってアクセスされる。 It accounts by date and time account information storage unit 10, the processing result of the account processing separately processed accounts date and time stored in the file 6 as account information in the account date and time of the account processing. As a result, account information for each account date is generated. The account date and time-account information is accessed by the account date and time-account processing unit 8.

図2は、口座処理の例を示す説明図である。ここで、図2(A)及び(B)では、説明のために、勘定日時ではなく、勘定日とする。図2(A)に示すように、10日の残高が30,000の場合に、勘定日を11日とする20,000の出金(例えば、振替)要求を10日に処理する場合、この20,000の出金は先日付での処理となる。この場合、11日を勘定日とする処理を初めて行うのであれば、まず、11日の残高を30,000とする。そして、11日を勘定日とする20,000の出金要求を処理し、11日の残高を10,000とする。この先日付の出金を行ったのち、当該口座に他の口座処理が無い場合には、11日になった時に、残高10,000が確定する。このため、出金処理は、10日に先日付で処理した時点で完結している。 FIG. 2 is an explanatory diagram illustrating an example of account processing. Here, in FIGS. 2A and 2B, for the purpose of explanation, the account date is used instead of the account date. As shown in FIG. 2 (A), when the balance of 10 days is 30,000, when processing a withdrawal request (for example, transfer) of 20,000 with an account date of 11 days, 20,000 withdrawals will be processed on the previous date. In this case, if the process for setting the 11th date as the account date is performed for the first time, the balance on the 11th is first set to 30,000. Then, 20,000 withdrawal requests with the 11th as the account date are processed, and the balance on the 11th is set to 10,000. After the withdrawal of this date, if there is no other account processing in the account, the balance 10,000 is fixed when the 11th is reached. For this reason, the withdrawal process is completed at the time of processing on the previous date on the 10th.

図2(B)は、口座処理を入金(例えば、振込)とする例を示す図である。10日の残高を30,000とするときに、勘定日を11日とする40,000の入金要求を、10日に処理する。11日の残高は、10日の時点で70,000と算出される。出金の場合と同様に、10日での先日付の入金要求を処理した時点で完結している。その後、10日にATMで現金の出金要求(払戻要求)があった場合、出金可能額は30,000であり、70,000ではない。そして、11日の午前0時に残高照会を行うとすると、11日の0時を迎えた段階では、残高は70,000である。   FIG. 2B is a diagram illustrating an example in which the account process is a deposit (for example, transfer). When the balance on the 10th is 30,000, a deposit request of 40,000 with an account date of 11th is processed on the 10th. The balance on the 11th is calculated as 70,000 on the 10th. Similar to the case of withdrawal, it is completed when the deposit request for the previous date in 10 days is processed. After that, if there is a cash withdrawal request (refund request) at ATM on the 10th, the possible withdrawal amount is 30,000, not 70,000. If the balance is inquired at midnight on the 11th, the balance is 70,000 at the time when the midnight of the 11th is reached.

図2(A)及び(B)に示す例では、勘定日としたが、本発明では、時刻(または、一定時間)毎に残高明細を持つ。図2(C)に示す例では、10日の9:00時点の残高が30,000であるとする。そして、勘定日時を13:00とする50,000の入金処理を9:30頃に受信したとする。この処理は、先日時での処理となる。勘定日時別口座処理部8は、13:00での残高を30,000とする
続いて10日9:30頃を演算日時とし、勘定日時を10日13:00とする50,000入金することで、先日時付である13:00での残高を、当日時である10日9:30頃現在に、80,000として、9:00の残高30,000とは別に記録する。
図2(B)に示す「勘定日」の場合と同様に、「勘定日時」では、例えば10日の12:59に出金可能な額は30,000であり、13:00に出金可能な額は80,000である。このとき、13:00の入金自体は、9:30に完結している。その後、17:00を勘定日時とする60,000の出金要求があった場合、直近の残高である13:00の残高を用いて口座処理を行い、17:00の残高を20,000とする。
このように、取引の期間の単位を日付とする勘定日の場合と、日時とする勘定日時の場合とは、残高の期間が異なるだけで、必要な情報処理は共通している。従って、勘定日を使用した情報処理に関する原出願及びその原出願の開示は、その日付を時刻と読み替えるのみで、勘定日時を使用した情報処理の開示である。原出願の「日」と「日時」の情報処理場の同一性からして、例えば、原出願の10日、11日、12日とあるのを、10時、11時、12時と読み替えることで、先日時付の開示となっている。
In the example shown in FIG. 2 (A) and (B), but the account date, in the present invention, time (or a predetermined time) with value statement for each. In the example shown in FIG. 2C, it is assumed that the balance at 9:00 on the 10th is 30,000. Then, it is assumed that a payment process of 50,000 with a date and time of 13:00 is received around 9:30. This process is a process of dated at the time the other day. The account processing unit 8 by date and time sets the balance at 13:00 to 30,000 .
Followed by the around 10 9:30 and the operation date and time, the account date and time by 50,000 payment to 10 13:00, the balance at 13 o'clock is with at the time the other day, it is the time of day As of about 9:30 on the 10th, it is recorded as 80,000 separately from the balance of 30,000 at 9:00 .
As in the case of “account date” shown in FIG. 2B, in “account date”, for example, the amount that can be withdrawn at 12:59 on the 10th is 30,000 and can be withdrawn at 13:00 The amount is 80,000. At this time, the 13:00 deposit itself is completed at 9:30. After that, when there is a withdrawal request of 60,000 with the date and time as 17:00, account processing is performed using the balance of 13:00 which is the latest balance, and the balance of 17:00 is set to 20,000. To do.
In this way, the account date with the transaction period unit as the date and the account date with the date and time as the date and time only differ in the balance period, and the necessary information processing is common. Accordingly, the original application related to information processing using the account date and the disclosure of the original application are disclosure of information processing using the account date and time only by replacing the date with time. Based on the identity of the “date” and “date and time” information processing fields of the original application, for example, the 10th, 11th, and 12th days of the original application should be read as 10:00, 11:00, and 12:00. Therefore, it is disclosed with date and time.

先日時付完結処理では、口座残高に不足があるような場合や、当日の取引等によって口座残高が不足となった場合に、先日時付取引の取消を行うことができる。バッチ処理の場合、一旦成立した口座処理要求の取消を行うことは難しいが、勘定日時先日時付とする口座処理の場合には、この取消を行いやすい。また、未成立であった口座処理や、取消により未成立となった口座処理がある場合に、何らかの入金がある場合には、当該口座処理について再実行(再カット)を行うようにしても良い。本実施形態では、最後の口座処理要求を実行した処理結果(残高等)に基づいて、先日時付での口座処理を実行するため、口座残高の異動に応じて、先日時付で決済不能であった口座処理を再カットすることができる。また、特許文献1(特開昭59−77573号公報)に開示されているように、未成立であった口座処理について当日に入金があった時に再カットするようにしても良い。 In the completion process with the previous date and time, the transaction with the previous date and time can be canceled when the account balance is insufficient or when the account balance becomes insufficient due to the transaction on the day . In the case of batch processing, it is difficult to cancel the account processing request once established, but in the case of account processing with the account date and time attached , this cancellation is easy to perform. Further, when there is an account process that has not been established or an account process that has not been established due to cancellation, if there is any payment, the account process may be re-executed (recut). . In this embodiment, since the account processing with the date and time is executed based on the processing result (balance etc.) that executed the last account processing request, it is impossible to settle with the date and time according to the transfer of the account balance. The account processing that was there can be recut. Further, as disclosed in Patent Document 1 (Japanese Patent Application Laid-Open No. 59-77573), an account process that has not been established may be recut when there is a deposit on that day.

再度図1を参照すると、本実施形態では、勘定日時別口座処理部8は、前記演算日時から勘定日時までの間に前記演算日時に直近(勘定日時と同時を含む)の勘定日時での口座情報に基づいて出金要求を処理し、先日時の残高を更新したことで、先日時での口座処理要求が決済不能となる場合には当該先日時での口座処理を取り消す先日時付取消機能12を備えている。そして、勘定日時別口座情報格納部10が、この先日時付取消機能12によって取り消された口座処理要求を当該口座処理要求の勘定日時での口座情報として更新する先日時残高更新機能16を備えている。 Referring to FIG. 1 again , in the present embodiment, the account processing unit 8 by account date and time is an account at the account date and time closest to the calculation date and time (including the account date and time) between the calculation date and time. to process the withdrawal request on the basis of the information, that you update the balance of the time the other day, with the time the other day to cancel the account processing in with the earlier date if the account processing request dated at the time the other day becomes impossible settlement A cancel function 12 is provided. The account information storage unit 10 by account date and time includes a destination date and time balance update function 16 that updates the account processing request canceled by the date and time cancellation function 12 as account information at the account date and time of the account processing request. Yes.

先日時取消機能12は、先日時付で決済可能であった口座処理について、先日時付よりも前の日(例えば、現在)に出金等を行った結果、決済不能となる口座処理を取り消す。すなわち、最新の口座処理要求を実行した結果、先日時付で決済不能な口座処理がある場合には、最新の口座処理要求の実行結果(口座情報)に基づいて当該口座処理を取り消す。取り消された口座処理の取引の結果は、未成立であり、当該先日時付勘定日時までの入金を待機し、勘定日時の満了時点まで入金がない場合には、当該口座処理は決済不能で確定する。先日時残高更新機能16は、口座処理の取消による額を、当該先日時付勘定日時の残高へ加算する。 Cancel function 12 with the time the other day, about the settlement possible was the account processing dated at the time the other day, when the day earlier than with the time the other day (for example, current) result of the withdrawal, etc., account processing to be a settlement impossible Cancel. That is, as a result of executing the latest account processing request, if there is an account processing that cannot be settled with the date and time, the account processing is canceled based on the execution result (account information) of the latest account processing request. The results of the transactions of the canceled account processing, Ri not met der, waiting for a payment of up to the account date and time of the other day with the time, when there is no payment until the expiration time of the account date and time, the account processing is non-settlement Confirm with. The future date / time balance update function 16 adds the amount due to the cancellation of the account processing to the balance of the account date / time with the previous date / time .

勘定日時別口座処理部8は、最新の口座処理の処理結果に応じて先日時付で未成立の口座処理が決済可能となる場合に当該未成立であった口座処理を再実行する先日時付再カット機能13を備える。 The account processing unit 8 by account date and time includes a date and time to re-execute the account processing that has not been established when the account processing that has not been established and can be settled according to the processing result of the latest account processing . Ru equipped with a re-cut function 13.

一般的に、公共料金の引落等は振替日当日のみに引落を行う。このため、その振替日(勘定日時)に残高に不足があり決済不能であると、公共料金の支払いができず、来月に再度口座振替処理を行うこととなる。一方、自動的に積立を行う契約などでは、積立をする振替日(勘定日時)のみならず、次回の振替日の直前の時刻まで残高がある場合には積立を行う。この場合、勘定日時は1か月間となる。勘定日時の初日の日時勘定日時と呼び、振替日直前など再カットを行う期限を再カット期限と呼ぶ。 In general, withdrawing utility bills, etc. are made only on the day of transfer. For this reason, if there is a shortage in balance on the transfer date ( account date and time ) and settlement is not possible, the utility charge cannot be paid, and the account transfer process will be performed again next month. On the other hand, automatically in such contracts to fund, transfer date of the funded not (account date and time) only, when there is a balance to the time just before the next date of transfer to fund. In this case, the account date is one month. Called the account date and time the date and time of the first day of the account date and time is referred to as a re-cut deadline a deadline to carry out just before, and so on re-cut at the time of transfer date.

一定期間の勘定日時を有する口座処理では、例えば、10勘定日時の初日としている場合、10には残高が不足し、一方、11には先日時付での入金があるため決済可能であるとすると、10で未成立とした後に、11勘定日時として口座処理を行う。その後、10に入金がある場合には、11の口座処理ではなく、10の口座処理とすることが好ましい。例えば、融資の返済等で11勘定日時とすると延滞金が発生するような局面も想定されるため、先日時付で成立している口座処理を、より前の勘定日時へ前倒することが望ましい。 In account processing with the account date and time for a certain period of time, for example, if you are the first day of the account date and time 10:00, a lack of balance in the 10 o'clock, on the other hand, possible settlement because there is a deposit of dated at the time the other day in the 11 o'clock When it is, after the non-established was at 10, and account for as account date 11 o'clock. Then, if there is a deposit in at 10, not the account processing at 11, preferably in the account processing 10:00. For example, because the arrears are also contemplated aspects, such as occurs when the account date and time the 11 o'clock in the repayment of the loan, the account processing that has been established in with the time the other day, that before Taosuru to earlier accounts date and time Is desirable.

この前倒を行う例では、図1に示す勘定日時別口座処理部8が、口座処理要求を実行した後に、当該実行対象の勘定日時以後の日時を勘定日時とする口座処理要求のうち決済済の口座処理要求を取り消すと共に、当該取り消した口座処理要求を前記実行対象の勘定日時での口座処理要求として再実行する先日時前倒制御機能14を備えている。この先日時前倒制御機能14により、再カット期限(一定期間の勘定日時)を有する口座処理を、口座残高の異動があった時に、決済可能なより前の勘定日時での取引とすることができる。 In this example, the account processing unit 8 according to account date and time shown in FIG. 1 executes the account processing request and then settles the account processing request with the date and time after the account date and time to be executed as the account date and time. And an earlier date and time control function 14 for re-executing the canceled account processing request as an account processing request at the execution date and time of the account. With this advance date / time advance control function 14, account processing having a recutting deadline ( account date / time for a certain period) can be made a transaction with an earlier account date / time that can be settled when the account balance changes. .

図3は、図1に示す構成での口座情報の推移の一例を示す説明図である。図3中、口座処理は、取引の内容を示し、残高(口座情報)は、処理の結果である。演算日は、口座処理要求を実行する日である。勘定日は、取引を行うべき日で、自振通番は、自動振込や自動振替等の自振を個別に識別するための番号である。
ここでは、上述のように、図3中、10日、11日、12日とあるのを、全て一律に10時、11時、12時と読み替えて勘定日時の情報処理を説明する。すなわち、図3中、演算日を演算日時とし、勘定日を勘定日時とし、数字の10、11及び12を、それぞれ、10時、11時、12時とし、残高(口座情報)の10日、11日及び12日を、10時、11時及び12時と読み替える。この点、図6も同様である。
また、取引は、口座からの出金や、口座への入金などであり、取引種類にその具体的な取引内容が格納される。取引金額は自振等の金額であり、取引の結果は、その口座処理(取引)が成立したか否かを記録するものである。
FIG. 3 is an explanatory diagram showing an example of transition of account information in the configuration shown in FIG. In FIG. 3, the account process indicates the content of the transaction, and the balance (account information) is the result of the process . The calculation date is the date when the account processing request is executed. Account day, the day to conduct transactions, self-oscillation serial number is, Ru number der to identify the self-oscillation such as an automatic transfer and automatic transfer individually.
Here, as described above, the information processing of the account date and time will be described by replacing all the 10th, 11th, and 12th days in FIG. 3 with 10 o'clock, 11 o'clock, and 12 o'clock. That is, in FIG. 3, the calculation date is the calculation date and time, the account date is the account date and time, the numbers 10, 11 and 12 are respectively 10 o'clock, 11 o'clock and 12 o'clock, and the balance (account information) is 10 days, The 11th and 12th days are read as 10 o'clock, 11 o'clock and 12 o'clock. This also applies to FIG.
In addition, the transaction, withdrawal or from the account, and the like payment to the account, the specific transaction contents are stored in the transaction type. The transaction amount is an amount such as self-vibration, and the transaction result records whether or not the account processing (transaction) is established.

まず、10の残高が30,000であるとする。10に、先日時付である11勘定日時とする電気料引落(自振番号001)が行われるとする。この場合、勘定日時別口座処理部8は、まず、11勘定日時の直近の勘定日時である10の残高に基づいて、11の残高を30,000とする。出金10,000は決済可能であるため、電気料引落による出金を成立させる。勘定日時別口座情報格納部10は、この11の残高を20,000とする。このとき、10の残高にはなんら変更がない。 First, assume that the balance at 10:00 is 30,000. At 10, the electric charge withdrawal to account date and time 11:00 is attached at the other day (self oscillation number 001) is performed. In this case, account date and time-account processing unit 8, first, based on the balance of 10:00 is the most recent accounts date account date 11 o'clock, and 30,000 balance of 11:00. Since the withdrawal 10,000 can be settled, the withdrawal by the deduction of electricity charges is established. The account information storage unit 10 by date and time sets the balance at 11:00 to 20,000. At this time, there is no change in the balance at 10:00.

続いて、10に、12勘定日時として振込による50,000の入金があるとする。勘定日時別口座処理部8は、直近の勘定日時である11の残高を12の残高として展開し、さらに50,000を加算する。この結果、12の残高は70,000となる。さらに、10時現在にATMによる現金出金(支払)があるとする。10の残高は30,000であるため、25,000は出金可能であり、取引は成立する。10の残高は5,000となる。勘定日時別口座情報格納部10は、10の残高が更新されたため、この25,000の出金を11及び12の残高へ反映させる。すると、11の残高が−5,000となる。 Subsequently, and at 10, there are 50,000 payment by bank transfer the 12 o'clock as accounts date and time. The account processing unit 8 by account date and time expands the balance at 11:00, which is the latest account date and time , as a balance at 12:00, and further adds 50,000. As a result, the balance of 12 o'clock will be 70,000. In addition, it is assumed that there is a cash withdrawal by ATM at 10 current (payment). Since the balance at 10:00 is 30,000, 25,000 can be withdrawn and the transaction is completed. The balance at 10:00 is 5,000. It accounts by date and time account information storage unit 10, since the balance of 10:00 is updated to reflect the withdrawal of 25,000 to 11 o'clock and 12 o'clock balance. Then, the balance of 11 o'clock is -5,000.

先日時付取消機能12は、11の残高がマイナス(出金可能額よりも口座処理による出金額が大きい)となったため、すでに成立している電気料引落による出金処理(自振番号001)を取り消す。この取消により、電気料引落は未成立となる。取消金額は10,000であるため、11の残高は5,000となり、残高不足での出金という状態が解消された。12の残高は55,000となる。 Since the balance at 11:00 is negative (the withdrawal amount by account processing is larger than the amount that can be withdrawn), the withdrawal processing with date and time 12 has already made withdrawal processing (self-assigned number 001) ) Is canceled. As a result of this cancellation, the deduction of electricity charges is not yet established. For cancellation amount is 10,000, the balance of 11 o'clock has been eliminated state that the withdrawal of 5,000, and the lack of balance. The balance of the 12 o'clock will be 55,000.

勘定日時を11(実際の勘定日時の期間は契約による)とし、再カット期限を有する口座振替で行う場合、11での決済が不能であると、12に決済を行う場合がある。例えば、図3に示す例では、11では決済不能であるため、11勘定日時とする融資返済は未成立となる。この例では、再カット期限内である12勘定日時とする決済が可能であるため、12勘定日時として口座振替を行う。約定返済日が11の融資返済を12に返済すると、延滞となる。ここでは、延滞に伴う再処理の手数料を10円として説明する(原出願では、一日分の延滞利息を10円として説明した)。融資返済は成立し、12の残高は14,990となる。 Account date and time 11 o'clock (the period of the actual account date and time contracts) and, if carried out in the account transfer with a re-cut deadline, and it is impossible to settle at 11 o'clock, there is a case of carrying out the settlement to 12 o'clock. For example, in the example shown in FIG. 3, because it is the non payment at 11, loan repayment to account date 11 o'clock becomes not met. In this example, for settlement to the 12 o'clock is in the re-cut deadline and account date and time it is possible, carry out the account transfer the 12 o'clock as accounts date and time. When the time repayment date to repay the loan repayment of 11 o'clock to 12 o'clock, it becomes overdue. Here, the reprocessing fee associated with arrears is described as 10 yen (in the original application, the arrears interest for one day was described as 10 yen ). Loan repayment is met, the balance of 12 o'clock will be 14,990.

10に、11勘定日時とする振込による入金があると、まず、11の残高が65,000となる。これにより、12勘定日時として成立していた融資返済処理は、11にて決済可能となる。先日時前倒制御機能14は、12にて成立していた融資返済を取り消し、11勘定日時として再カットする。12の残高は、一旦40,010の取り消しにより増加する。続いて、11での再カットの残高が反映されて、75,000となる。この前倒制御により、先日時付の入金に応じて、延滞利息が発生する12での取引を取り消すことができる。また、11勘定日時とする電気料引落が未成立であったため、先日時付再カット機能13は、当該電気料10,000を再カットする。10に実行した口座処理はこれが最終であり、このまま11を迎える。11になると、10の残高5,000ではなく、11の残高15,000にアクセスする。この15,000の残高は、振込による入金と、融資の返済と、電気料の引落とが完了した残高である。このように、本実施形態では、バッチ処理と同様の結果をオンライン処理時間中に実行することができる。また、バッチ処理を行わずに24時間連続してオンライン処理を稼働することができる。 At 10, and there is a payment by transfer to the account date and time 11:00, First, the balance of 11 o'clock is 65,000. As a result, the loan repayment process that has been established the 12 o'clock as the account date and time is made possible settlement at 11 o'clock. The other day at the time before倒制control function 14, cancel the loan repayment, which has been established at 12 o'clock, and re-cut as account date and time of 11:00. The balance at 12:00 will increase once the cancellation of 40,010. Then, the balance of the re-cut at 11 o'clock is reflected, and 75,000. By this advance control, it is possible to cancel the transaction at 12:00 when the arrears interest occurs according to the deposit with the date and time . In addition, since the electricity charge withdrawal with the date and time as 11:00 has not been established, the re-cut function 13 with the previous date and time re-cuts the electricity charge 10,000. Account processing executed in 10:00 This is the final, welcome as it is 11 o'clock. When becomes 11:00 instead balance 5,000 10:00, it accesses the balance 15,000 11 o'clock. The balance of 15,000 is a balance in which the deposit by transfer, the repayment of the loan, and the deduction of the electricity charge are completed. As described above, in the present embodiment, the same result as the batch processing can be executed during the online processing time. Moreover, it is possible to operate online processing continuously for 24 hours without performing batch processing.

図1乃至図3に示すように、先日時付の取引をオンライン処理中に行い、勘定日時別の残高を持ち、ATM等による取引は当日の残高に基づいて処理を行うことにより、振替や振込等の事前にほぼ取引の内容が判明している口座処理を勘定日時よりも前の日時にて完結させることができる。これにより、振替等のバッチ処理を無くし、24時間365日の連続稼働が可能となる。また、24時間稼働としない場合であっても、夜間や早朝のバッチ処理が不要となるため、口座処理の運用コストを低下させ、且つ、夜間の短時間でのCPUの処理能力を増加させるための投資を不要とする。また、顧客サービスという点からも、日付が変化した時には新たな残高に基づいて直ちに取引を開始することができるため、インターネットを介した取引等を24時間連続してシームレスに行うことができる。 As shown in FIGS. 1 to 3, carried out the transaction as of the time the other day during the online process, have the accounts by date and time of the balance, transaction by ATM or the like by performing the processing on the basis of the balance of the day, transfer or transfer It is possible to complete the account processing for which the contents of the transaction are almost known in advance, such as the date and time before the account date and time . This eliminates batch processing such as transfer and enables continuous operation for 24 hours 365 days. Further, even when the operation is not performed for 24 hours, batch processing at night or early morning becomes unnecessary, so that the operation cost of account processing is reduced and the processing capacity of the CPU in a short time at night is increased. No need to invest. Also, from the viewpoint of customer service, since the transaction can be started immediately on the basis of the new balance when the date changes, it is possible to seamlessly perform transactions via the Internet continuously for 24 hours.

図4は、第1実施形態のハードウエア資源の構成例を示すブロック図である。図4に示す例では、先日時付完結処理システムは、通信制御装置28と、この通信制御装置28等から入力される要求指令に従って口座処理をオンライン処理及びバッチ処理で行うCPU20と、このCPU20の主記憶21と、図1に示す口座情報7や融資マスタDB等を記憶するファイル記憶部22と、CPUによって実行される各種プログラムを記憶するプログラム記憶部23と、CPU20による口座処理や各種契約の登録等の実行結果をログとして記憶するログ記憶部24と、外部から持ち込まれる持ち込み媒体26を読み取る媒体読取部25と、顧客に発送する帳票等を印刷する印刷部27とを備えている。 FIG. 4 is a block diagram illustrating a configuration example of hardware resources according to the first embodiment. In the example shown in FIG. 4, the pre-date and time completion processing system includes a communication control device 28, a CPU 20 that performs account processing by online processing and batch processing in accordance with a request command input from the communication control device 28, and the like. Main memory 21, file storage unit 22 for storing account information 7 and loan master DB shown in FIG. 1, program storage unit 23 for storing various programs executed by CPU, account processing by CPU 20 and various contracts A log storage unit 24 that stores execution results of registration and the like as a log, a medium reading unit 25 that reads a carry-in medium 26 brought in from the outside, and a printing unit 27 that prints a form and the like to be sent to a customer.

図4に示す構成では、受信手段4は、通信制御装置28と、所定のプログラムを実行するCPU20と、媒体読取部25によって実現される。通信制御装置28は、内部(行内)ネットワーク30と、対外ネットワーク31と接続されている。各ネットワーク30,31は、物理的、論理的に多数のネットワークを含むようにしても良い。通信制御装置は、内部ネットワーク30を介して、顧客とのオンライン取引に用いられるCD/ATM33と、営業店内に配置され営業店の担当者によって操作される営業店端末34と、顧客からの電話による取引を遂行するためのテレフォンバンキングセンタ32と接続されている。
また、通信制御装置28は、対外ネットワーク31を介して他の金融機関との為替等の通信を制御する全銀センタ35や、その他の外部センタ36や、ファームバンキングを行う顧客のパーソナルコンピュータ等の顧客PC37や、携帯電話等の顧客携帯端末38と接続されている。
In the configuration illustrated in FIG. 4, the reception unit 4 is realized by the communication control device 28, the CPU 20 that executes a predetermined program, and the medium reading unit 25. The communication control device 28 is connected to an internal (in-row) network 30 and an external network 31. Each of the networks 30 and 31 may include a large number of networks physically and logically. The communication control device is connected to the CD / ATM 33 used for online transactions with the customer via the internal network 30, the branch terminal 34 arranged in the branch and operated by the person in charge of the branch, and the telephone from the customer It is connected to a telephone banking center 32 for performing a transaction.
Further, the communication control device 28 is a Zengin Center 35 that controls communications such as exchanges with other financial institutions via the external network 31, other external centers 36, personal computers of customers who perform farm banking, etc. It is connected to a customer PC 37 and a customer portable terminal 38 such as a cellular phone.

各端末33,34,37,38や、センタ32,35,36等から、通信制御装置28を介してCPU20に入金や出金の要求が入力される。全銀センタ35は、全国銀行データ通信システムのセンタである。個人情報センタや、他行コンピュータセンタと接続されている。振込、送金等の為替取引を行う要求指令(電文)が送受信される。
外部センタ36は、金融機関の業態別に構築された各種のネットワーク(地方銀行のACS,都市銀行のBANCS,全国キャッシュサービスのMICS等)のセンタや、ファームバンキング(FB)やエレクトロニックバンキング(EB)や、テレフォンバンキングに必要なデータの送受信を行うためのセンタ(例えば、ANSER)や、販売店のPOSシステムやクレジットカード決済用の端末との通信を行うためのセンタ(例えば、CAFISやDCS)である。この外部センタからは、通知、照会、資金移動など、金融機関窓口で可能な種々の取引を行う要求指令(電文)が入力される。
通信制御装置28は、それぞれのプロトコルに従って要求指令を受信し、CPU20に入力する。CPU20は、各端末からそれぞれの形態で入力される要求指令を予め定められた形式の口座処理要求に変換して、口座処理を行うプログラムに引き渡す。
また、公共料金の振替等(外部自振)は、持ち込み媒体26にて持ち込まれる。CPU20は、媒体読取部25によって読み取られた外部自振原データと他のデータベース(DB)を用いて口座処理要求を生成する。
Deposit / withdrawal requests are input to the CPU 20 from the terminals 33, 34, 37, 38, the centers 32, 35, 36, etc. via the communication control device 28. The Zengin Center 35 is a national bank data communication system center. It is connected to the personal information center and other computer centers. Request commands (messages) for exchange transactions such as transfer and remittance are transmitted and received.
The external center 36 is a center of various networks (ACS of regional banks, BANS of city banks, MICS of national cash service, etc.), farm banking (FB), electronic banking (EB), etc. A center (for example, ANSER) for transmitting and receiving data necessary for telephone banking, and a center (for example, CAFIS and DCS) for communicating with a POS system at a store and a credit card payment terminal. . From this external center, request commands (telegrams) for performing various transactions that can be made at a financial institution window such as notification, inquiry, and fund transfer are input.
The communication control device 28 receives a request command according to each protocol and inputs it to the CPU 20. The CPU 20 converts a request command input in each form from each terminal into an account processing request in a predetermined format, and delivers it to a program that performs account processing.
In addition, the transfer of public utility charges (external self-vibration) is brought into the carry-in medium 26. The CPU 20 generates an account processing request using the external self-vibration original data read by the medium reading unit 25 and another database (DB).

CPU20は、勘定日時別の口座処理を行うための指令や、勘定日時別の口座情報を格納するための指令や、融資契約を融資マスタDBに登録するための指令等の先日時付完結処理用プログラムを実行することで、図1に示す勘定日時別口座処理部8や、勘定日時別口座情報格納部10として動作する。これらのプログラムは、プログラム記憶部23に格納される。また、基本的な入出力を行うオペレーティングシステムや、データベースの管理やログによる復帰や、トランザクションの管理などを行うプログラム群についても、このプログラム記憶部23に格納されている。 CPU20 is, the command and for performing a different account processing accounts date and time, instruction and for storing a different account information account date and time, for complete processing with the time the other day of instruction or the like for registering the loan agreement to finance the master DB By executing the program, it operates as the account processing unit 8 by account date and time and the account information storage unit 10 by account date and time shown in FIG. These programs are stored in the program storage unit 23. In addition, an operating system that performs basic input / output, a program group that performs database management, log recovery, transaction management, and the like are also stored in the program storage unit 23.

このような先日時付完結処理用プログラムは、CPU(演算手段)20を動作させる指令を備える。例えば、演算日に対して先日時付となる勘定日時での出金を当該口座へ要求する出金要求(口座処理要求の一種)をCPU20にて受信した場合に、当該出金処理の勘定日時である対象勘定日時の口座情報と当該対象勘定日時より未来の勘定日時について予め処理された口座情報とを、前記ファイル6に格納された口座情報に基づいて展開させる勘定日時別口座情報展開指令を備えている。 Such a program for completion processing with date and time includes a command for operating the CPU (calculation means) 20. For example, when the CPU 20 receives a withdrawal request (a type of account processing request) requesting the account to be withdrawn at an account date and time with a date prior to the calculation date , the account date and time of the withdrawal process preprocessed and account information, stored account information expanded to account date and time-account information deployment command based on report to the file 6 for account information and account future date than the target account date target account date is It has.

先日時付完結処理用プログラムは、さらに、勘定日時別口座情報展開指令に応じて主記憶21に展開された勘定日時別の口座情報に基づいて、当該口座から出金可能な残高貸越極度額がある際には、残高と貸越極度額とを加算した残高を出金可能額ともいうを特定させると共に、当該出金可能額に応じて当該出金要求を処理させる勘定日時別口座処理指令を備えている。そして、この勘定日時別口座処理指令は、当該出金要求について決済が可能である場合には当該処理結果を当該先日時付となる勘定日時の口座情報として前記ファイル6に格納させると共に、当該出金要求について決済不能である場合には当該出金要求を当該勘定日時での出金予定として前記口座情報に格納させる勘定日時別口座情報格納指令を備えている。 Program completion process with time recently further based on the expanded accounts by date and time of the account information in the main memory 21 in accordance with the account date and time-account information inflation instruction, dispensing possible balance from the account (overdraft maximum amount when there is, also referred to as balance and overdraft maximum amount and can withdraw the balance obtained by adding the amount) with to identify, the out KimuKaname account date and time-dependent account to process a determined process in accordance with the dispensing amount available Has a directive. Then, the accounts by date and time account processing instruction, together with if possible settlement for the payment request to store the processing result to the file 6 as account information for accounts date becomes attached at the other day, leaving the If the gold required is impossible settlement is the withdrawal request includes the account date and time-account information storage command to be stored in the account information as withdrawal schedule in the account date.

また、先日時付完結処理システムにて実現すべき各手段、各部又は各機能や、フローチャートの各工程に応じた指令を備えることで、CPU20は種々の機能を有する演算手段2として動作する。先日時付完結処理用プログラムは、磁気テープ(MT)等の記録媒体に格納されて搬送され、媒体読取部25によって読み取られる。記録媒体に格納されていた先日時付完結処理用プログラムは、媒体読取部25にて読み取られた後、プログラム記憶部23に格納される。また、他のホスト装置から通信回線を経由してプログラム記憶部23にプログラムを提供することもできる。 In addition, the CPU 20 operates as the computing unit 2 having various functions by providing each unit, each unit or each function to be realized in the completion processing system with a date and time, and a command corresponding to each step of the flowchart. The pre-date and time completion processing program is stored in a recording medium such as a magnetic tape (MT), conveyed, and read by the medium reading unit 25. The completion date-and- time processing program stored in the recording medium is read by the medium reading unit 25 and then stored in the program storage unit 23. In addition, a program can be provided to the program storage unit 23 from another host device via a communication line.

プログラムについて、CPU(演算手段)20を「動作させる指令」というときには、各指令のみでCPUを動作させる指令と、プログラム記憶部23に予め格納されているオペレーティングシステム等の他のプログラムに依存して当該CPU20を動作させる指令とのいずれかまたは双方を含む。例えば、図4に示す例では、勘定日時別口座情報格納指令は、主記憶21にて生成した勘定日時別の口座情報をオペレーティングシステムに引き渡す指令のみでもよい。このように、当該先日時付完結処理用プログラムを記憶する記録媒体であって、当該プログラムをユーザへ搬送する用途の記録媒体には、例えば「オペレーティングシステムに格納対象の主記憶上のエリア名を引き渡す指令」のみが格納される場合がある。これは、動作させようとするコンピュータのオペレーティングシステム等との関係で定まる。この点、通信回線を介してプログラム(指令)を提供する場合も同様である。 Regarding the program, when the “command for operating the CPU (calculation means) 20” is referred to, it depends on the command for operating the CPU only with each command and another program such as an operating system stored in the program storage unit 23 in advance. Either or both of the commands for operating the CPU 20 are included. For example, in the example shown in FIG. 4, the account information storage instruction by account date it can be only a command to deliver the generated account time-specific account information in the main memory 21 to the operating system. As described above, a recording medium for storing the program for completion processing with date and time, and a recording medium for transferring the program to the user may include, for example, “the name of the area on the main storage to be stored in the operating system. Only the “handover command” may be stored. This is determined by the relationship with the operating system of the computer to be operated. This also applies to the case where a program (command) is provided via a communication line.

次に、口座処理の処理工程を図5乃至図8を参照して説明する。図5は、図1及び図4に示す構成での口座処理の一例を示すフローチャートである。処理を行う口座処理要求の勘定日時を「対象勘定日時」と呼ぶ。対象勘定日時は、演算日と同日であるか、または、演算日の翌営業日時以後先日時付である。 Next, the account process will be described with reference to FIGS. FIG. 5 is a flowchart illustrating an example of account processing in the configuration illustrated in FIGS. 1 and 4. The account date and time of the account processing request for processing is called “target account date ”. Target account date and time, whether it is the time of the calculation date during the same day, or, it is the next business day when after dated at the time the other day at the time of the calculation date.

また、図3に示す例では、通常の残高を口座情報としていたが、図5乃至図7で示す例では、担保となる定期が有る場合に、その定期預金の額に応じた貸越極度内にて口座に自動融資する例を説明する。担保定期が付されている口座では、残高と貸越極度額を加算した出金可能額で口座処理の決済が可能であるか否かを判定する。 In the example shown in FIG. 3, the normal balance is account information, but in the examples shown in FIGS. 5 to 7, when there is a fixed period, it is within the overdraft limit corresponding to the amount of the fixed deposit. An example of automatically lending to an account will be described. In the account of collateral periodically it is attached, determines whether or not the settlement of account processing is possible in the withdrawal amount available by adding the balance and overdraft poles of the amount.

図5に示す例では、演算手段2は、口座処理要求を受信すると(ステップS1)、まず対象勘定日時の口座情報が有るか否かを確認し(ステップS2)、口座情報が無い場合には、対象勘定日時の口座情報(仮想残高)を当該対象勘定日時より過去で直近の口座情報に基づいて生成する(ステップS3,残高展開工程)。そして、当該口座処理要求の対象勘定日時の口座情報と、先日時の口座情報とを主記憶21に展開する(ステップS4,勘定日時別口座情報展開工程)。続いて、対象勘定日時の口座情報に基づいて、当該口座処理要求を処理し(ステップS5)、当該対象勘定日時の口座情報を更新する(ステップS6,対象勘定日時処理工程)。そして、対象勘定日時処理工程にて算出した対象勘定日時の口座情報に基づいて、前記先日時の口座情報を更新する(ステップS7,勘定日時別口座情報更新工程)。さらに、更新した各先日時の出金可能額に基づいて、先日時付取消再カットの必要性の有無を判定する(ステップS8)。先日時付取消又は先日時付再カットを行う場合には、当該勘定日時の口座処理の取消や再カットや前倒制御を行う。これらの各工程により、図3に示す口座処理が行われる。 In the example shown in FIG. 5, when the calculation means 2 receives an account processing request (step S1), it first checks whether there is account information for the target account date and time (step S2). generated based account information of the target account time (virtual balance) in the immediate vicinity of the account information in the past than the target account time (step S3, the balance expanding step). Then, the account information of the target account date and time of the account processing request and the account information of the previous date and time are expanded in the main memory 21 (step S4, account information expansion step by account date and time ). Subsequently, the account processing request is processed based on the account information of the target account date (step S5), and the account information of the target account date is updated (step S6, target account date processing step). Then, based on the calculated account information of the target account time at target accounts date process, updates the account information at the time the other day (step S7, accounts by date and time account information updating process). Further, it is determined whether or not there is a need for cancellation / recutting with the previous date / time based on the updated withdrawal possible amount at each previous date / time (step S8). In the case of performing cancellation with a previous date or re-cutting with a previous date and time, cancel or re-cut the account processing for that date and time , or perform advance control. The account process shown in FIG. 3 is performed by these steps.

また、ステップS7及びS8にて、先日時の出金可能額に基づいて、当該出金要求について決済が可能である場合には、当該処理結果を当該先日時付の口座情報として前記ファイルに格納する。一方、出金要求について当該勘定日時の出金可能額では決済不能である場合には当該出金要求を当該先日時での出金予定として前記口座情報に格納する(勘定日時別口座情報格納工程)。 Further, in step S7 and S8, when the withdrawal request can be settled based on the withdrawal possible amount at the previous date and time, the processing result is stored in the file 6 as the account information with the previous date and time. Store. On the other hand, if it is impossible to settle the withdrawal request with the amount that can be withdrawn at the relevant account date and time , the withdrawal request is stored in the account information as a withdrawal schedule at the relevant date and time (account information storage step by account date and time). ).

図6(A)は口座処理の決済の可否と先日時付処理の対応を保持するチェックテーブルの一例を示す説明図である。口座処理の入出金があり、口座残高に異動があると、残高不足で未成立であった口座処理が決済可能となる場合や、口座残高の異動により残不足となり決済不能となる場合がある。決済可能な場合には、勘定日時を前倒する前倒再カット処理や、先日時付再カット処理を行う。一方、決済不能である場合には、先日時付取消を行い、口座処理を未成立とする。未成立の口座処理は、入金待ちとなる。勘定日時の時刻が経過するまで又は所定の入金待ち終了時刻に至ったときに決済不能である場合には、カードローンによる自動融資を行うようにしても良い。このカードローンによる自動融資は、担保定期による貸越極度内の自動融資と異なり、ローンの対象とする口座処理が限定され、且つ、勘定日時の満了直前に入金が無い場合に自動融資するものである。 FIG. 6A is an explanatory diagram showing an example of a check table that holds the correspondence between the availability of settlement of account processing and the processing with date and time . If there is a deposit / withdrawal for account processing and there is a change in the account balance, account processing that has not been completed due to a shortage of balance may be settled, or due to a change in account balance, there may be a shortage and settlement may be impossible. If the settlement possible, carry out and before倒再cut processing that defeat before the account date and time, the re-cut processing with at the time the other day. On the other hand, if the settlement is impossible, the date and time cancellation is performed, and the account processing is not established. Unestablished account processing waits for payment. If payment is not possible until the time of the account date / time has elapsed or when a predetermined payment waiting end time has been reached, an automatic loan by card loan may be performed. This automatic loan by card loan is different from the automatic loan within the overdraft limit by the collateral period, and the automatic loan is provided when the account processing for the loan is limited and there is no payment immediately before the expiration of the account date. .

図6(B)は取消再カット判定用のチェックテーブルを示す図である。図5に示すステップS7にて、各先日時での口座情報の更新が完了すると、図6(B)に示すような取消再カット判定用テーブルが生成される。図6(B)に示す例では、2勘定日時として未成立の口座処理(出金予定)が存在し、その出金予定の取引金額は出金可能額以下であるため、再カットが可能となる。また、3勘定日時にて、出金可能額がマイナスとなっているため、その3勘定日時とする出金処理の内一つ又は幾つかを取り消す必要がある。図5のステップS8では、このような先日時付取消及び先日時付再カットの判定を行う。 FIG. 6B is a diagram showing a check table for cancel / recut determination. In step S7 shown in FIG. 5, when updating of the account information is completed at the time of each other day, cancellation recut determination table as shown in FIG. 6 (B) is generated. In the example shown in FIG. 6 (B), for the 2 o'clock account processing not met (withdrawal planned) is present as account date, transaction amount of the withdrawal will is less withdrawal Amounts, re-cut It becomes possible. Further, at 3 o'clock account date, because the withdrawal amount available is in the negative, it is necessary to cancel the inner one or several dispensing process to account time o'clock that 3. In step S8 in FIG. 5, it is determined such with at recent cancellation and re-cut with at the other day.

図7は、図5に示す処理にて起動される取消再カット処理の一例を示すフローチャートである。図5のステップS8にて取消再カット処理が起動されると、ステップS7での勘定日時別口座情報から、図6(B)に示すチェックテーブルを生成する(ステップS11)。ファイル6中の口座情報に出金予定が格納されている場合に、当該出金予定の勘定日時での出金可能額を増加させる入金等の入金要求を受信したときには、まず、出金予定の取引金額よりも出金可能額が大きい先日時があるか否かを判定する(ステップS12)。該当する先日時がある場合には、当該先日時を勘定日時とする出金予定の出金要求先日時付再カットする(ステップS13,先日時付再カット処理工程)。続いて、この先日時付再カットの処理結果に基づいて各勘定日時の残高を更新する(ステップS14)。そして、未だ再カット可能な取引が残存している可能性があるため、取消再カット処理を再度起動する(ステップS15)。 FIG. 7 is a flowchart showing an example of the cancel / recut process activated by the process shown in FIG. When the cancel / recut process is started in step S8 of FIG. 5, the check table shown in FIG. 6B is generated from the account information classified by account date and time in step S7 (step S11). If the withdrawal plan to account information in the file 6 is stored, when receiving a payment request for payment or the like to increase the withdrawal amount available in the account date and time of the withdrawal will, first, withdrawal will It is determined whether or not there is a previous date and time when the possible withdrawal amount is larger than the transaction amount (step S12). If there is a time other day applicable, re-cut with at the other day the withdrawal request payment plan to account date and time when the other day (step S13, re-cut processing step with the time other day). Subsequently, the balance of each account date and time is updated based on the processing result of this recut with date and time (step S14). Since there is a possibility that a transaction that can be recut still remains, the cancel / recut process is started again (step S15).

先日時付再カットすべき口座処理要求が無い場合には、図6(B)に示すチェックテーブルを参照して出金可能額がマイナスとなっている勘定日時の有無を探索する。すなわち、先日時付勘定日時の出金可能額を減少させる出金要求が処理された場合に、当該出金要求の処理結果によって前記先日時付出金要求が決済不能となるか否かを判定する(ステップS16,先日時付処理確認工程)。該当する出金可能額がマイナスの先日時又は決済不能となる口座処理が無い場合には処理を終了する。一方、先日時付処理確認工程S16にて決済不能の出金処理が発見された場合には、当該発見した先日時付を勘定日時とする出金処理を決済不能として取り消す(ステップS17,先日時付取消処理工程)。そして、この先日時付取消工程にて取り消された出金処理を当該勘定日時での出金予定として前記口座情報に格納する(ステップS18,出金予定格納工程)。続いて、出金可能額がマイナスとなっている可能性があるため、取消再カット処理を再度起動する。 If there is no account processing request to be recut with a date and time , the presence / absence of an account date and time when the possible withdrawal amount is negative is searched with reference to the check table shown in FIG. That is, when the output KimuKaname seek to reduce the withdrawal amount available accounts date dated during other day has been processed, or withdrawal request dated during the recently by the process result of the withdrawal request is disabled settlement not (Step S16, process confirmation step with date / time ). If the corresponding withdrawal possible amount is a negative date and time or there is no account processing that makes settlement impossible, the processing ends. On the other hand, when the dispensing processing of non settlement at the other day during with processing confirmation step S16 is was discovered, revoke the you and discovered the account date with time recently dispensing process as non settlement (step S17, previously Cancellation process with date and time ). Then, the withdrawal process canceled in the previous date and time cancellation process is stored in the account information as a withdrawal schedule at the account date and time (step S18, withdrawal schedule storage process). Subsequently, since the possible withdrawal amount may be negative, the cancel / recut process is started again.

上述したように第1実施形態によると、先日時付となる勘定日時の口座処理を事前に完結させ、さらに口座の異動に応じて先日時付取消や先日時付再カットを行うため、日付変更前後にバッチ処理等による振替等を行う必要がなくなり、日付変更前後であっても連続したオンライン処理を行うことができる。 As described above, according to the first embodiment, the account processing for the account date and time with the date and time is completed in advance, and the date change is performed in order to cancel the date and time and recut with the date and time according to the account transfer. There is no need to perform transfer by batch processing before and after, and continuous online processing can be performed even before and after date change.

<第2実施形態>
以下、第2実施形態、第1実施例及び第2実施例では、勘定日時毎の残高を用いる情報処理の内容を説明するために、勘定日を例とする情報処理の例を開示する。
図8は、本発明の第2実施形態の構成例を示すブロック図である。第2実施形態では、翌営業日を勘定日とする口座処理要求の結果を、当日の口座残高で計算する。すなわち、先日付を翌営業日のみに限定し、翌営業日以降の日付を勘定日とする口座処理は未成立としておくか、または口座処理要求として入力しない。このような仕組みによっても、オンラインの24時間連続稼働を低コストで実現することができる。
Second Embodiment
Hereinafter, in the second embodiment, the first example, and the second example, an example of information processing using an account date as an example will be disclosed in order to explain the contents of information processing using a balance for each account date.
FIG. 8 is a block diagram showing a configuration example of the second embodiment of the present invention. In the second embodiment, the result of the account processing request with the next business day as the account date is calculated with the account balance on that day. That is, the account processing with the previous date limited to the next business day and the date after the next business day as the account date is not established or is not input as an account processing request. Even with such a mechanism, online 24-hour continuous operation can be realized at low cost.

図8(A)に示す例では、演算手段2が、当該演算を行う演算日に対して翌営業日となる勘定日での口座処理を演算日の口座残高に基づいて処理する翌営業日口座処理部40と、この翌営業日口座処理部40によって算出された翌営業日の口座残高を当該翌営業日口座処理部40による処理後、翌営業日を迎えるまでに他の口座処理要求を受信しない場合の前記翌営業日の口座残高として前記ファイルに格納する翌営業日口座残高格納部42とを備えている。   In the example shown in FIG. 8 (A), the next business day account in which the calculation means 2 processes the account processing on the account date that becomes the next business day with respect to the calculation date on which the calculation is performed based on the account balance on the calculation date. After the next business day account processing unit 40 processes the account balance of the next business day calculated by the processing unit 40 and the next business day account processing unit 40, another account processing request is received until the next business day is reached. And a next business day account balance storage unit 42 for storing in the file as the account balance of the next business day when not.

翌営業日の口座残高(出金可能額)は、翌営業日口座処理部40による処理後、翌営業日を迎えるまでに他の口座処理要求を受信しない場合の、翌営業日の口座残高である。翌営業日口座処理部40が当該口座について新たに口座処理を実行した場合には、その処理後、翌営業日を迎えるまでに他の口座処理要求を受信しない場合の前記翌営業日の口座残高をファイル7に格納する。動作原理は上述した第1実施形態と同様である。   The account balance of the next business day (the amount that can be withdrawn) is the account balance of the next business day when another account processing request is not received by the next business day after processing by the next business day account processing unit 40. is there. When the next business day account processing unit 40 newly executes account processing for the account, the account balance of the next business day when no other account processing request is received by the next business day after the processing. Is stored in the file 7. The operation principle is the same as that of the first embodiment described above.

図8に示す翌営業日残高格納部40は、図1に示す勘定日別口座処理部8と同様に、当該翌営業日の口座残高が格納されていた場合には前記翌営業日口座処理部40によって処理された新たな処理結果に応じて当該翌営業日の口座残高を更新する翌営業日口座残高更新機能44を備える。これにより、当日の口座処理結果を翌営業日の口座処理結果へ反映させる。   The next business day balance storage unit 40 shown in FIG. 8 is similar to the account processing unit 8 for each business day shown in FIG. A next business day account balance update function 44 is provided for updating the account balance of the next business day according to the new processing result processed by 40. Thereby, the account processing result of the day is reflected in the account processing result of the next business day.

図8(B)は第2実施形態での口座情報の推移例を示す説明図である。まず、当日の残高が50,000とする。ここで、先日付の出金30,000があると、当日残高を翌営業日の残高とし、出金処理を行い、翌営業日の残高を20,000とする。続いて、当日の入金があると、当日の残高を参照して、当日の残高を増加させる。翌営業日口座残高更新機能44は、この増加分を翌営業日残高へ反映させる。そして、翌営業日への入金があると、翌営業日の残高を50,000へ増加させる。   FIG. 8B is an explanatory diagram showing a transition example of account information in the second embodiment. First, assume that the balance on the day is 50,000. Here, if there is a withdrawal of 30,000 on the previous date, the balance on the current day is set as the balance on the next business day, the withdrawal process is performed, and the balance on the next business day is set to 20,000. Subsequently, when there is payment on the day, the balance on the day is increased with reference to the balance on the day. The next business day account balance update function 44 reflects this increase in the next business day balance. Then, if there is payment for the next business day, the balance of the next business day is increased to 50,000.

上述したように第2実施形態によると、翌営業日を先日付として事前に口座処理を実行し、当日の残高と翌営業日の残高とを別途有するため、日付変更時になんら処理を行うことなく振替や振込等の処理を実行することができ、これにより、口座振替等のバッチ処理を無くすことができる。   As described above, according to the second embodiment, account processing is executed in advance with the next business day as the previous date, and the balance of the current day and the balance of the next business day are separately provided. Therefore, no processing is performed when the date is changed. Processing such as transfer and transfer can be executed, and thus batch processing such as account transfer can be eliminated.

<第1実施例>
以下、本発明の実施例を図面を参照して説明する。第1実施例では、外部から持ち込まれる自振データと、内部から発生する自振データと、通常のオンライン処理とを並列して処理するのに好適な構成を開示する。また、口座情報として、取引の内容を示す取引明細セグメントと、残高を勘定日別に保持する残高明細セグメントとを用いて口座処理を行う例を開示する。
<First embodiment>
Embodiments of the present invention will be described below with reference to the drawings. The first embodiment discloses a configuration suitable for processing self-vibration data brought in from outside, self-vibration data generated from the inside, and normal online processing in parallel. Moreover, the example which performs account processing using the transaction detailed segment which shows the content of transaction, and the balance detailed segment which hold | maintains a balance according to an account date as account information is disclosed.

図9は、第1実施例の構成例を示すブロック図である。基本的な構成は、図1や図4に示す構成と同様である。図9に示す例では、外部自振と内部自振を口座処理要求として演算手段で実行するために一般的に必要となるデータベース(DB)等が付加されている。図9に示す例では、先日時付完結処理システムは、外部自振に関連して、媒体26や顧客端末37,38等から、公共料金の自動振替等の出金や給与振込等の入金等の外部自振原データ101を読み出すと共に、当該自動振替の受託及び自振契約内容等を管理する外部自振関連DB102に格納されたデータを、当該外部自振原データ101に付加する外部自振データ生成手段100を備えている。外部自振データ生成手段100は、外部自振関連DB102に格納されている委託者(振替等の委託者)に関する情報や、自振契約者(振替を口座で行う口座の名義人)に関する情報を使用して、外部自振データを生成する。 FIG. 9 is a block diagram showing a configuration example of the first embodiment. The basic configuration is the same as the configuration shown in FIGS. In the example shown in FIG. 9, a database (DB) or the like that is generally required to execute external self-vibration and internal self-vibration as account processing requests by the calculation means is added. In the example shown in FIG. 9, the completion processing system with date and time is related to external self-vibration, such as automatic payment of public utility charges, payments such as salary transfer, etc. from the medium 26, customer terminals 37, 38, etc. External self-vibration source data 101 and external self-vibration that adds data stored in the external self-vibration related DB 102 for managing the automatic transfer contract and self-vibration contract contents to the external self-vibration source data 101 Data generation means 100 is provided. The external self-vibration data generation means 100 stores information on the consignor (consignor for transfers, etc.) stored in the external self-vibration related DB 102 and information on the self-vibration contractor (the account holder who performs the transfer with the account). Use to generate external self-vibration data.

また、本実施例による先日時付完結処理システムは、内部自振に関連して、自動積立や融資返済等の特約による処理及び定期の自動更新等の期日毎の処理を管理する内部自振管理DB111から処理対象日となる先日付の勘定日を有する口座処理要求を抽出する内部自振データ抽出手段110を備えている。外部自振データと、内部自振データとは、それぞれ自振入力ファイル生成手段120に入力される。 In addition, the completion processing system with date and time according to the present embodiment is related to internal self-vibration. Internal self-vibration management that manages processing by special provisions such as automatic funding and loan repayment and periodic processing such as periodic automatic renewal An internal self-vibration data extracting unit 110 is provided that extracts an account processing request having a date of a future date as a processing target date from the DB 111. The external self-vibration data and the internal self-vibration data are input to the self-vibration input file generation unit 120, respectively.

本実施例による先日時付完結処理システムは、さらに、各自振データでの口座処理の対象となる口座情報を管理する預金マスタDB160と、前記融資内容等を管理する各種内部マスタDB112とを備えている。各種内部マスタDB112は、例えば、口座処理による融資の返済結果などの内部自振の処理結果に関する情報が格納されるマスタDBである。 The pre-date and time completion processing system according to the present embodiment further includes a deposit master DB 160 that manages account information that is subject to account processing in each self- vibration data, and various internal master DBs 112 that manage the loan contents and the like. Yes. Various internal master DB112 is master DB in which the information regarding the processing result of internal self-vibration, such as the repayment result of the loan by account processing, is stored, for example.

預金マスタDB160は、上述した実施形態での口座情報7を有するファイル6である。この預金マスタDB160は、本実施例では、勘定日での口座処理の取引明細を当該口座処理の勘定日毎に記録する取引明細セグメントと、この取引明細セグメントに記録された口座処理の演算結果の一部を成す残高明細を前記口座処理の勘定日毎に記録する残高明細セグメントとを備えている。また、担保定期等自動融資の貸越極度額を定める担保定期預金の額等を記憶する担保明細セグメントを備えるようにしても良い。   The deposit master DB 160 is a file 6 having the account information 7 in the above-described embodiment. In this embodiment, the deposit master DB 160 is configured to record the transaction details of the account processing on the account date for each account date of the account processing, and one of the calculation results of the account processing recorded in the transaction details segment. A balance statement segment for recording a balance statement for each account date for each account processing date. Moreover, you may make it provide the collateral | detail detail segment which memorize | stores the amount etc. of the collateral term deposit which determines the overdraft extreme amount of automatic loans, such as a collateral term.

本実施例による先日時付完結処理システムは、また、内部自振データ抽出手段110によって抽出された内部自振データと前記外部自振データ生成手段100によって読み出された外部自振データとをそれぞれ編集すると共に1又は複数の口座処理要求からなるセンターカット電文を蓄積した自振入力ファイルを生成する自振入力ファイル生成手段120を備えている。自振入力ファイル生成手段120は、各自振データを編集して、口座処理要求を生成し、さらに、必要に応じて複数の口座処理要求を一つの電文へブロッキングし、電文の並べ替え等を行う。 The completion processing system with date and time according to the present embodiment also uses the internal self-vibration data extracted by the internal self-vibration data extraction unit 110 and the external self-vibration data read by the external self-vibration data generation unit 100, respectively. Self-vibration input file generation means 120 is provided that generates a self-input file that is edited and stores a center cut message including one or more account processing requests. The self-vibration input file generation unit 120 edits each self-vibration data to generate an account processing request, and further blocks a plurality of account processing requests to one message as necessary, and rearranges the messages. Do.

先日時付完結処理システムは、さらに、CD/ATM33や店頭端末等との口座処理要求に応答する演算手段140と、この演算手段140へ前記自振入力ファイル生成手段120によって生成されたセンターカット電文を入力するセンターカット電文入力手段130とを備えている。 The completion processing system with a date and time further includes a calculation means 140 that responds to an account processing request with a CD / ATM 33 or a storefront terminal, and a center cut message generated by the self-vibration input file generation means 120 to the calculation means 140. And a center cut message input means 130 for inputting.

演算手段140は、例えば図1に示す演算手段2とほぼ同様の機能を有する。図9に示す例では、演算手段140は、前記センターカット電文入力手段130から入力されるセンターカット電文の口座処理要求を当該勘定日に直近の勘定日となる残高明細セグメントに記録された残高明細に基づいて処理する勘定日別口座処理部150と、この勘定日別口座処理部150によって処理された処理結果を当該口座処理要求の勘定日での残高明細として残高明細セグメントに記録させる勘定日別残高格納部142と、前記勘定日別口座処理部150によって処理された処理結果を当該口座処理要求の取引内容に応じて先日付での処理結果として前記外部自振原データ101又は各種内部マスタ112に格納する処理結果格納部144とを備えている。勘定日別残高格納部142は、新たに格納した残高明細に基づいて当該残高明細以後の先日付の残高明細セグメントを更新する勘定日別残高更新処理機能を備える。   The calculating means 140 has substantially the same function as the calculating means 2 shown in FIG. In the example shown in FIG. 9, the calculation means 140 has the balance details recorded in the balance detail segment that is the closest account date to the account date of the center cut message input from the center cut message input means 130. Account processing unit 150 according to account date to be processed based on the account date, and the processing result processed by the account processing unit 150 according to account date is recorded in the balance details segment as the balance details at the account date of the account processing request The processing result processed by the balance storage unit 142 and the account processing unit 150 by account date is used as the processing result at the previous date according to the transaction contents of the account processing request, and the external self-vibration original data 101 or various internal masters 112. And a processing result storage unit 144 for storing the data. The balance storage unit 142 by account date has a balance update process by account date that updates the balance detail segment of the future date after the balance statement based on the newly stored balance statement.

また、演算手段140は、ATM等からの口座処理要求を実行するオンライン応答処理部146を備えている。オンライン応答処理部146は、演算日と同日付(当日)の入出金指令に応答する。   The computing unit 140 includes an online response processing unit 146 that executes an account processing request from an ATM or the like. The online response processing unit 146 responds to a deposit / withdrawal command on the same date (the same day) as the calculation date.

勘定日別口座処理部150と、勘定日別残高格納部142は、それぞれ図1に示した構成とほぼ同一の機能を果たす。処理結果格納部144は、口座処理の取引の結果を外部自振原データや各種内部マスタへ更新する。処理結果格納部144は、先日付での取引の結果を格納するため、当該口座処理が先日付取消や先日付再カットされた場合には、新たな取引の結果を外部自振原データや各種内部マスタへ逐次格納する。例えば、外部自振の場合には処理不能の場合にのみ逐次外部自振原データに取引の結果が未成立であると格納する。このような構成では、先日付である勘定日が満了したときに、外部自振原データ101や各種内部マスタへの取引の結果の記録は既に完結している。 The account processing unit for each account date 150 and the balance storage unit for each account date 142 perform substantially the same functions as those shown in FIG. The processing result storage unit 144 updates the account processing transaction result to the external self-vibration original data and various internal masters. The processing result storage unit 144 stores the result of the transaction at the previous date. Therefore, when the account processing is canceled or re-cut at the previous date, the new transaction result is stored in the external self-vibration original data or various kinds of data. Store sequentially to the internal master. For example, only the sequential external self Fuhara data to the transaction result to the case of non processing if the external self oscillation is store When it is not met. In such a configuration, when the account date, which is the previous date, has expired, the recording of the transaction results to the external self-vibration original data 101 and various internal masters has already been completed.

通信制御装置28や各ネットワーク30,31等は、図4に示す構成と同様である。   The communication control device 28 and the networks 30 and 31 are the same as those shown in FIG.

図9に示す例では、外部自振データと内部自振データをそれぞれ生成又は抽出しておき、自振入力ファイル生成手段120が、これらの自振データから自振入力ファイルを生成する。この自振入力ファイルのデータ構造を予め定められた書式としておくことで、外部自振と内部自振とを並行又は連続して実行することができる。   In the example shown in FIG. 9, external self-vibration data and internal self-vibration data are generated or extracted, respectively, and the self-vibration input file generation unit 120 generates a self-vibration input file from these self-vibration data. By setting the data structure of the self-vibration input file in a predetermined format, the external self-vibration and the internal self-vibration can be executed in parallel or continuously.

また、勘定日別口座処理部150が、前記口座処理要求の種別に応じて各DBを参照して口座処理内容を算出するセンターカット時参照機能151を備えるようにしても良い。この場合、定期の利率や融資の延滞金の額やカードローン自動融資額などを、口座処理時に確定し、処理する。センターカット時参照機能151により、最新の情報に基づいた先日付処理が可能となり、また、口座処理要求の書式や、口座処理要求の実行プログラムや、自振入力ファイル生成手段の構成を簡略化することができる。   Further, the account processing unit 150 by account date may be provided with a center cut reference function 151 for calculating account processing contents by referring to each DB according to the type of the account processing request. In this case, the periodic interest rate, the amount of the arrears of the loan, the automatic loan amount of the card loan, etc. are determined and processed at the time of account processing. The center cut reference function 151 enables future date processing based on the latest information, and simplifies the structure of the account processing request format, the account processing request execution program, and the self-vibration input file generation means. be able to.

図10は、図9に示す構成で使用するデータベースの種類を示す説明図である。自振のタイプとして、勘定日をキーとして口座処理要求を読み出すタイプと、勘定日の特定時刻をキーとして実行するタイプとがある。通常の外部自振や内部自振は、勘定日をキーとする口座処理である。外部からの持ち込み媒体による口座振替や、顧客PC34等の操作に応じた振込や振替は、自振原データファイルに格納される。融資の約定返済日を勘定日とする口座振替での返済や、自動的な定期化サービスなどによる定期預金への入金などは、内部の各種DBへの登録データに基づいて口座処理要求が抽出される。   FIG. 10 is an explanatory diagram showing the types of databases used in the configuration shown in FIG. There are two types of self-vibration: a type in which an account processing request is read out using the account date as a key, and a type that is executed using a specific time on the account date as a key. Normal external vibration and internal vibration are account processes using the account date as a key. Account transfers using externally brought-in media and transfers and transfers according to operations of the customer PC 34 and the like are stored in the self-transfer original data file. Account repayment requests are extracted based on the registration data in various internal DBs for repayment by direct debit with the scheduled repayment date of the loan and payment to time deposits by automatic periodic services, etc. The

融資の返済や、積立や、自動定期化サービスなどは、特約管理DBへ蓄積された情報に基づいて内部自振データが抽出される。定期の期間が満了したときに自動継続するための口座処理などについては、期日管理DBに蓄積された情報に基づいて内部自振データが抽出される。   In the case of loan repayment, accumulation, automatic periodic service, etc., internal self-vibration data is extracted based on information accumulated in the special contract management DB. For account processing for automatic continuation when the regular period expires, internal self-vibration data is extracted based on information stored in the due date management DB.

勘定日の特定時刻をキーとする自振としては、例えば手形小切手の資金化や、カードローンの自動融資などがある。また、自動定期化サービスを実行するために、先日付で普通預金口座からの出金と定期預金口座への入金を処理した後に、当該勘定日の満了前に金額の変更等が行われることもある。この場合、営業店の端末のオペレーションにより、既に実行した関連する口座処理の取消と、新たな契約での口座処理の実行を行う。このような勘定日又はその直前での変更による口座処理要求は、追い上げ分DBに登録される。   Examples of self-vibration using a specific time on the account date as a key include funding of a bill check and automatic loan of a card loan. In addition, in order to execute the automatic periodic service, the amount of money may be changed before the account date expires after processing withdrawals from the savings account and depositing to the time deposit account on the previous date. is there. In this case, the operation of the terminal of the branch office cancels the related account processing that has already been executed and executes the account processing under the new contract. The account processing request due to such a billing date or a change immediately before is registered in the catch-up DB.

本実施例では、取引の内容に応じて各種のデータやデータベースを使い分けているが、図9に示すように、これらを一定の形式の口座処理要求に編集した後に、演算手段140へ入力する。   In the present embodiment, various types of data and databases are properly used according to the contents of the transaction. However, as shown in FIG. 9, these are edited into a certain form of account processing request and then input to the computing means 140.

図11は、図9に示す自振入力ファイル生成手段及び演算手段の詳細構成を示すブロック図である。自振入力ファイル生成手段120は、演算日時よりも先日時となる多数の口座処理要求のうち入金要求を出金要求に先立って処理させる入金要求優先部121を備えている。この入金要求処理優先部121を備える例では、図5に示す処理との関係では、勘定日よりも先日付となる口座処理要求が多数ある場合には前記出金可能額増加処理要求を前記口座残高減少処理要求に先立って処理させる設定をする処理順序設定工程を備える。   FIG. 11 is a block diagram showing a detailed configuration of the self-vibration input file generation unit and the calculation unit shown in FIG. The self-vibration input file generation unit 120 includes a deposit request priority unit 121 that processes a deposit request prior to a withdrawal request among a number of account processing requests that precede the calculation date. In the example provided with the deposit request process priority unit 121, in the relationship with the process shown in FIG. 5, when there are a large number of account process requests that are ahead of the account date, the withdrawal possible amount increase process request is sent to the account. A processing order setting step for performing processing prior to the balance reduction processing request;

入金要求優先部121によって入金要求が先に処理されると、取消が生じる可能性が低くなる。このため、例えば給与振込を行う場合には、各口座への先日付での振込処理を先に行う。そして、振込を行った総額を振出人の口座から引き落とす先日付処理を行う。同様に、先日付処理では、振込についても振込側口座の出金と、被振込側の口座への入金を同時に完了させる必要がない。すなわち、振込による入金を先日付で行い、その後振込側口座での出金が不能となっても、当該振込の勘定日が到来するまでの間に、入金処理の取消を行うことができる。   If the deposit request is first processed by the deposit request priority unit 121, the possibility of cancellation becomes low. For this reason, for example, when payroll transfer is performed, the transfer process to each account on the previous date is performed first. Then, a future date process is performed in which the total amount transferred is withdrawn from the account of the payer. Similarly, in the future date processing, it is not necessary to complete the withdrawal of the transfer side account and the payment to the account on the transfer side for the transfer. That is, even if the deposit by transfer is performed on the previous date, and the withdrawal on the transfer side account becomes impossible after that, the deposit process can be canceled until the transfer date arrives.

また、自振入力ファイル生成手段120は、複数のセンターカット電文を当該口座処理要求の種別に応じて予め定められた順序に並べ替える種別ソート部122を備えると良い。この場合、例えば入金要求を出金要求に優先し、ある種類の口座処理の完了後に行うべき他の種類の口座処理について、その順序を適正にしてセンターカット電文入力手段130へ入力することができる。 The self-vibration input file generation unit 120 may include a type sorting unit 122 that rearranges a plurality of center cut messages in a predetermined order according to the type of the account processing request. In this case, for example, priority is given to incoming KimuKaname determined the dispensing request, another type of account processing to be performed after the completion of a certain type of account processing, entering to the center cut message input means 130 in the appropriate the order Can do.

さらに、センターカット電文入力手段130は、複数のセンターカット電文をランダムに並べ替えるランダムソート部123を備えるようにしても良い。これは、預金マスタDBへのアクセスが特定の領域に集中することによるスループットの低下の防止を図り、また、残高が不足している状態が数ヶ月連続する場合に、引落不能となる口座処理の種類を一定としないように作用する。   Furthermore, the center cut message input means 130 may include a random sort unit 123 that rearranges a plurality of center cut messages at random. This is intended to prevent throughput degradation due to access to the deposit master DB being concentrated in a specific area, and account processing that cannot be withdrawn when the balance is insufficient for several months. Acts so that the type is not constant.

図11に示す例では、図9に示す勘定日別口座処理部150が、前記勘定日別残高格納部142による残高明細セグメントの更新によって出金可能額に異動があった場合には、当該異動のあった勘定日及び当該勘定日より未来の勘定日の一又は複数の口座処理について、前記勘定日までその後に出金可能額の異動がないとした前提で、前記一又は複数の口座処理を取消又は再カットする取消再カット処理機能152を備えている。これにより、残高が先日付にて仮想的に不足する場合であっても、先日時付完結処理を良好に行う。 In the example shown in FIG. 11, when the account date-specific account processing unit 150 shown in FIG. 9 changes in the possible withdrawal amount due to the update of the balance detail segment by the account date-specific balance storage unit 142, With regard to one or more account processes that have a certain account date and an account date that is later than the account date, the one or more account processes are performed on the assumption that there is no change in the amount that can be withdrawn until the account date. A cancel / recut processing function 152 for canceling or recutting is provided. Thereby, even if the balance is virtually insufficient at the previous date, the completion process with the previous date and time is satisfactorily performed.

また、勘定日別口座処理部150は、前記先日付となる複数の勘定日のうち現在に近い勘定日の口座処理要求を実行した後に当該実行した口座処理要求の勘定日よりも未来の勘定日にて成立している口座処理を取消対象に設定する前倒用取消制御機能153を備える。これにより、最適な勘定日での口座処理を行う。   Further, the account processing unit 150 according to account date executes an account processing request that is closer to the present date among the plurality of account dates that are the future dates, and an account date that is later than the account date of the account processing request that has been executed. Is provided with a forward cancellation control function 153 for setting the account processing established in step 1 to be canceled. As a result, account processing is performed with an optimal account date.

図12(A)は、図9に示す構成に再カット管理DBを付加した構成例を示す図である。再カット管理DBは、図10に示すように、時刻をトリガとして実行する自振データを管理するデータベースである。図12に示す例では、先日時付完結処理システムは、勘定日の予め定められた時刻以後に処理する口座処理を管理する再カット管理DB112と、この再カット管理DB112に管理される口座処理要求のうち勘定日が当日である口座処理要求を口座処理要求の種別に応じて予め定められた時刻以後に抽出し、当該抽出した口座処理要求を前記自振入力ファイル生成手段120へ入力する時刻依存処理抽出部113とを備えている。 FIG. 12A is a diagram illustrating a configuration example in which a recut management DB is added to the configuration illustrated in FIG. 9. As shown in FIG. 10, the recut management DB is a database that manages self-vibration data that is executed with time as a trigger. In the example shown in FIG. 12, the pre-date and time completion processing system includes a recut management DB 112 that manages account processing to be processed after a predetermined time on the account date, and an account processing request that is managed by the recut management DB 112. Of the account processing request whose account date is the current day is extracted after a predetermined time according to the type of the account processing request, and the extracted account processing request is input to the self-vibration input file generation means 120 And a process extraction unit 113.

時刻依存処理抽出部113は、例えば、未成立の口座処理が有る場合に、入金される可能性が低くなったか、又は無くなった段階でカードローンによる自動融資を行う場合などに用いる。この例では、預金マスタDB160が、勘定日での取引が不能である場合に当該不能となった取引明細と当該取引を行う期限となる再カット期限とを格納する残不足明細セグメントを備える。そして、再カット管理DB112が、当該残不足明細セグメントを有し且つカードローンの実行等の未入金時処理が設定されている口座に対する未入金時処理を口座処理要求として記憶する。このため、時刻依存処理抽出部113は、手動コマンドの入力や、所定時刻となった時に、未入金時処理を行う口座処理要求を再カット管理DBから抽出する。   The time-dependent process extraction unit 113 is used, for example, when there is an unsettled account process and when an automatic loan is made with a card loan when the possibility of deposit is low or no longer exists. In this example, the deposit master DB 160 includes a remaining shortage detail segment that stores a transaction detail that has become impossible when a transaction on the account date is impossible and a recut deadline that is a time limit for performing the transaction. Then, the recut management DB 112 stores the non-payment process for the account having the remaining shortage detail segment and the non-payment process such as card loan execution as an account process request. For this reason, the time-dependent process extraction unit 113 extracts an account process request for performing a non-payment process from the recut management DB when a manual command is input or a predetermined time comes.

手形や小切手等については、不渡通知がないことを条件として出金可能な残高に組み込むことが行われている。この場合、預金マスタDB160の残高明細セグメントが、図12(B)に示すように、勘定日を資金化日とする口座処理要求に応じて、当該資金化日の資金化を予定する未資金化残データと、出金可能な残高を示す実残データとを備える。そして、再カット管理DB112は、未資金化残データを残高明細セグメントに有する口座に対する不渡連絡時刻後の資金化処理を口座処理要求として記憶している。   Bills, checks, etc. are incorporated into the balance that can be withdrawn on the condition that there is no non-delivery notice. In this case, as shown in FIG. 12 (B), the balance detail segment of the deposit master DB 160 is unfunded to be funded on the funding date in response to an account processing request with the funding date as the funding date. Remaining data and actual remaining data indicating the balance that can be withdrawn are provided. The recut management DB 112 stores the funding process after the non-delivery contact time for an account having unfunded remaining data in the balance detail segment as an account process request.

図12(B)を参照すると、10日を資金化日とする小切手による入金100,000が既に先日付のセンターカットで残高明細に反映されているとする。この100,000をそのまま実際の残高である実残に加算してしまうと、現金出金後に不渡連絡を受信する可能性に対応できなくなる。このため、資金化日である10日には、100,000を未資金化残として残高明細に格納する。一方、先日付である11日については、不渡連絡を待たずに実残に組み込んでいる。これは、11日は先日付であるため、仮に資金化が不能となった場合に資金化処理を取り消せば良く、また、11日を勘定日とする残高は、10日に現金出金することもできず、さらに、一般的には不渡通知を受信せず、正常に資金化できる可能性が高く、その場合、先日付の出金などが未成立とならない可能性が高まることによる。実際、10日の不渡連絡の受信前に先日付での振替で250,000の出金が有る場合には、50,000の残高とし、未成立の口座処理による取消や再カット処理の発生を防止することができる。   Referring to FIG. 12 (B), it is assumed that the deposit 100,000 by the check having the funding date of 10th has already been reflected in the balance details by the center cut of the previous date. If this 100,000 is added as it is to the actual balance, which is the actual balance, it becomes impossible to cope with the possibility of receiving a non-delivery notice after the withdrawal of cash. For this reason, on the 10th, which is the funding date, 100,000 is stored in the balance statement as an unfunded balance. On the other hand, the previous date, 11th, is incorporated into the actual balance without waiting for non-delivery. This is because the 11th is the previous date, so if funding becomes impossible, the funding process should be canceled, and the balance with the 11th as the account date should be withdrawn in cash on the 10th. In addition, generally, it is highly likely that the non-delivery notice will not be received and the funds can be normally funded, and in that case, the possibility that the withdrawal of the other day will not be established is increased. In fact, if there are 250,000 withdrawals due to a transfer on the previous date before receiving the 10-day non-delivery notification, the balance will be 50,000, and cancellation or recut processing due to unsettled account processing will occur. Can be prevented.

資金化日である10日の11:30までに不渡連絡がなかった場合には、再カット管理DBから読み出した資金化処理を実行し、未資金化残を実残に組み込む。一方、不渡連絡を受けた場合には、資金化を行わず、また、11日を勘定日とする残高についても100,000減少させる。この場合、250,000の出金については、11日を勘定日とする出金可能額がマイナスとなることで、取り消される。   If there is no non-delivery notification by 11:30 on the 10th, which is the funding date, the funding process read from the recut management DB is executed, and the unfunded balance is incorporated into the actual balance. On the other hand, when a non-delivery notice is received, no funding is performed, and the balance with the account date of 11th is also reduced by 100,000. In this case, the withdrawal of 250,000 is canceled when the possible withdrawal amount with the 11th as the account date is negative.

図13及び図14は、図9に示す構成で使用する取引明細セグメント等の例を示す説明図である。図13及び図14に示す例では、預金マスタDB160(ファイル6)が前記口座情報7として、前記演算手段140の演算処理日に対して同日付又は先日付となる勘定日での口座処理の取引明細を記録する取引明細セグメントと、この取引明細セグメントに記録された口座処理の演算結果の一部を成す残高明細を前記口座処理の勘定日毎に記録する残高明細セグメントと、前記勘定日での取引が決済不能である場合に当該決済不能となる取引明細とを格納する残不足明細セグメントとを備えている。また、担保定期等など自動融資の貸越極度を算出するための取引種別と担保金額とを記録する担保明細セグメントを備えている。   13 and 14 are explanatory diagrams showing examples of transaction detail segments used in the configuration shown in FIG. In the example shown in FIG. 13 and FIG. 14, transaction of account processing on the account date on which the deposit master DB 160 (file 6) has the same date as the account processing 7 or the same date as the calculation processing date of the calculation means 140. A transaction detail segment for recording details, a balance detail segment for recording the balance details that form part of the results of the account processing recorded in the transaction details segment for each account processing account date, and transactions on the account date And a remaining shortage detail segment for storing a transaction detail that cannot be settled when the settlement is impossible. In addition, a collateral detail segment is provided for recording the transaction type and collateral amount for calculating the overdraft extreme of automatic loans such as collateral period.

残不足明細セグメントは、勘定日データと、残不足となった口座処理要求の内容を記録した残不足取引明細データと、当該取引が不能であった場合に口座処理要求を再実行する実行期限を示す再カット期限データとを備えている。   The remaining shortage details segment includes the account date data, the remaining shortage transaction details data that records the details of the account processing request that has become shortage, and the execution deadline for re-executing the account processing request when the transaction is impossible. Re-cut time limit data shown.

残高明細セグメントは、演算手段140によって当日又は先日付の勘定日毎の残高の確定に用いられると共に、口座処理要求の処理結果に応じて各勘定日毎に更新される。そして、当該更新後に先日付取引が決済不能な残高となるか否かに応じて演算手段140による先日付の口座処理要求の取消処理の起動判定に用いられる。   The balance detail segment is used by the calculation means 140 to determine the balance for each account date of the current day or the previous date, and is updated for each account date according to the processing result of the account processing request. Then, after the update, the calculation unit 140 is used to determine whether or not to cancel the cancellation process for the account processing request for the previous date depending on whether or not the future date transaction becomes a balance that cannot be settled.

また、残不足明細セグメントは、演算手段140によって勘定日の口座残高を増加させる口座処理要求が実行された後で、当該演算手段140による演算日が再カット期限データによる実行期限を経過していない場合に参照され、当該増加した残高が前記残不足取引明細データでの取引額より大きい場合に演算手段による再カット処理を起動させる。   In addition, after the account processing request for increasing the account balance of the account date is executed by the calculation means 140, the calculation date by the calculation means 140 has not passed the execution deadline due to the recut deadline data for the remaining shortage detail segment When the increased balance is larger than the transaction amount in the remaining shortage transaction details data, the recut processing by the calculation means is activated.

この取引明細、残高明細及び残不足明細による口座の推移データがあると、日付変更処理や取消再カット処理が容易となる。このデータ構造での口座の推移データを、ここでは先日時付完結処理用データと呼ぶ。 If there is account transition data based on the transaction details, balance details, and remaining shortage details, date change processing and cancellation / recut processing are facilitated. The account transition data in this data structure is referred to herein as pre- date and time completion processing data.

図13及び図14を参照すると、繰り越した担保金額が50,000(図13のセル0J)で、この場合の貸越極度は9割の45,000(図14の0L)となる。繰越残高は50,000であり、その合計額が出金可能額95,000である。出金可能額は、残高明細セグメント自体に含めず、口座処理時に算出するようにしても良い。ここでは、理解を容易とするために、融資返済についての延滞利息を含めずに説明する。   Referring to FIGS. 13 and 14, the collateral amount carried forward is 50,000 (cell 0J in FIG. 13), and the overdraft extreme in this case is 90% 45,000 (0L in FIG. 14). The balance carried forward is 50,000, and the total amount is a possible withdrawal amount of 95,000. The withdrawal possible amount may be calculated at the time of account processing without being included in the balance detail segment itself. Here, in order to facilitate understanding, the explanation will be made without including late interest on loan repayment.

まず、1日に、勘定日を2日とする融資返済のための出金108,000(図13の1E)を口座処理として実行する。この場合、出金可能額よりも出金金額が大きいため、決済不能となる。勘定日別口座処理部150は、残不足明細に当該取引金額と再カット期限とを記録する。取引の結果は極度超で未成立である。続いて、自動定期化サービスによる担保定期の入金10,000(2E)があるとする。出金可能額は95,000であるからこの口座処理は成立し、担保が60,000となる(2J)。担保金額が増額したため、極度の増額(3D)があり、極度額は2日を勘定日として54,000となる。この場合、1日の貸越極度に変更はない。   First, the withdrawal 108,000 (1E in FIG. 13) for loan repayment with the account date being 2 days is executed as account processing. In this case, the amount of money to be withdrawn is larger than the amount of money that can be withdrawn, making settlement impossible. The account processing unit 150 by date records the transaction amount and the recut deadline in the remaining shortage details. The result of the transaction is extremely high and unsettled. Next, suppose that there is 10,000 (2E) collateral regular deposit by the automatic regularization service. Since the possible withdrawal amount is 95,000, this account processing is established, and the collateral becomes 60,000 (2J). Since the collateral amount has increased, there is an extreme increase (3D), and the extreme amount is 54,000 with 2 days as the account date. In this case, there is no change in the daily overdraft extreme.

1日に、3日を勘定日とする振込による入金150,000があると、融資返済を3日にて決済可能となるため、先日付再カットを行う(5C)。続いて、ATMによる現金出金70,000があるとする。1日の出金可能額は95,000であるため、口座処理は成立し、1日の残高は−20,000(図14の7K)となる。この1日の残高が更新されたため、勘定日別残高格納部142は、2日及び3日の残高明細セグメントを更新する。いずれの勘定日も出金可能額がマイナスとなっていないため、取消処理は行わない。   If there is a deposit of 150,000 by transfer on the 1st as the account date on the 1st, the loan repayment can be settled on the 3rd, so the previous date is recut (5C). Next, assume that there is a cash withdrawal 70,000 by ATM. Since the daily allowance is 95,000, account processing is established, and the daily balance is -20,000 (7K in FIG. 14). Since the balance for this day has been updated, the balance by account date storage unit 142 updates the balance detail segments for the 2nd and 3rd days. Since the amount that can be withdrawn is not negative on any account date, the cancellation process is not performed.

さらに、2日を勘定日とする振込による入金130,000があったとする。2日の残高が更新され、出金可能額は154,000(図14の8P)となる。すると、3日を勘定日として成立していた融資返済を、2日にて決済することができる。このため、3日を勘定日とする前倒取消と、2日を勘定日とする前倒再カットを行う。   Furthermore, suppose that there was 130,000 deposits by transfer with the account date as the second day. The balance on the 2nd is updated, and the possible withdrawal amount is 154,000 (8P in FIG. 14). Then, the loan repayment that was established on the third day can be settled on the second day. For this reason, the advance cancellation with the 3rd account date and the forward recut with the 2nd account date are performed.

この状態で、1日を演算日とする全ての口座処理が終了し、2日を迎える。1日の最終残高は−20,000であり、この残高と、2日に先日付で入金された金額とに基づいて、融資返済担保定期入金が完結し、残高は−8,000となる。   In this state, all account processing with 1st as the calculation date ends, and the 2nd is reached. The final balance on the 1st is -20,000, and based on this balance and the amount deposited on the previous day on the 2nd, the regular payment for loan repayment is completed, and the balance becomes -8,000.

2日に3日を勘定日とするクレジット振替があるとすると、3日の出金可能額は196,000であるため、この取引は成立する。続いて、2日に、当日勘定のATMによる現金出金40,000があるとする。2日の出金可能額は46,000(10P)であるためこの取引は成立し、2日の残高は−48,000となる。この2日の残高を3日に反映すると、出金可能額が−4,000(12S)となる。出金可能額がマイナスであるため、3日を勘定日とする出金の口座処理の取消を行う。3日の出金はクレジット振替(11D)であるため、この出金を取り消す(13C)。   If there is a credit transfer with the third day as the account date on the second day, the amount of money that can be paid on the third day is 196,000, so this transaction is completed. Next, on the second day, suppose that there is a cash withdrawal of 40,000 by ATM of the same day account. Since the amount of money that can be raised on 2nd day is 46,000 (10P), this transaction is concluded, and the balance on the 2nd is -48,000. If the balance of the two days is reflected on the third day, the possible withdrawal amount is -4,000 (12S). Since the amount that can be withdrawn is negative, the withdrawal account processing with the third day as the account date is cancelled. Since the third sunrise is a credit transfer (11D), the withdrawal is canceled (13C).

この状態で3日を迎えたとする。3日を勘定日とする入金は完結しているが、クレジット振替が未成立で残っている。3日になんら口座処理が無いとすると、カードローン自動融資対象先を再カット管理DBから抽出し、実行する。カードローン自動融資を例えば出金可能額を0円とする最少額の貸出とすると、センターカット時参照機能151により、口座処理の実行時に自動融資額を算出し、4,000とする。これを入金し、クレジット振替が成立する。センターカット時参照機能151を用いると、再カット管理DBには自動融資額を格納しておく必要がなくなる。   Suppose that three days have passed in this state. Although the payment on the third day is completed, the credit transfer remains unsettled. If there is no account processing on the 3rd, the card loan automatic loan target is extracted from the recut management DB and executed. If the automatic loan of the card loan is, for example, the minimum loan with a possible withdrawal amount of 0 yen, the automatic loan amount is calculated at the time of account processing by the center cut reference function 151 and is set to 4,000. This is deposited and credit transfer is established. When the center cut reference function 151 is used, it is not necessary to store the automatic loan amount in the recut management DB.

上述したように本実施例によると、図13及び図14に示すように、種々の口座処理が幾つかの勘定日について予め予測できない順序で実行されたとしても、図9等に示す構成により、勘定日別の残高セグメントを用いて管理することで、個々の口座処理を厳格に実行することができる。また、顧客からの取引照会や異動照会については、取引明細中の当日までに成立し、確定した取引のみを対象とすると、先日付の取引や取り消した取引は顧客に通知されない。すなわち、取引明細セグメントを用いることで、取り消した取引が通帳記帳され、また、ファームバンキング(FB)の会計情報サービスで連絡されることを防止できる。   As described above, according to the present embodiment, as shown in FIGS. 13 and 14, even if various account processes are executed in an order that cannot be predicted in advance for several account dates, the configuration shown in FIG. By using the balance segment for each account date, individual account processing can be executed strictly. Further, regarding transaction inquiries and transfer inquiries from customers, if they are established only by the day in the transaction details and only confirmed transactions are targeted, the customers are not notified of transactions of the previous date or canceled transactions. That is, by using the transaction detail segment, it is possible to prevent the canceled transaction from being recorded in the passbook and being contacted by the accounting information service of the farm banking (FB).

<第2実施例>
第2実施例では、オペコードテーブルを用いてオンラインによる口座処理と自振用の口座処理を並列処理する手法を説明する。
<Second embodiment>
In the second embodiment, a technique for performing parallel processing of online account processing and self-propagation account processing using an operation code table will be described.

図15は第2実施例による先日時付完結処理システムの構成例を示すブロック図である。図15に示す例では、先日時付完結処理システムは、公共料金の自動振替等の外部自振と自動積立等の内部自振とを予め定められた自振データへ編集すると共に、当該自振の種別に応じたオペコードを含む自振入力データを口座処理要求として生成する自振入力ファイル生成手段120と、CD/ATM33の端末との口座処理要求に応答する演算手段140と、この演算手段140へ前記自振入力ファイル生成手段120によって生成された自振入力データを入力するセンターカット電文入力手段130とを備えている。 FIG. 15 is a block diagram showing an example of the configuration of a pre-date and time completion processing system according to the second embodiment. In the example shown in FIG. 15, the completion processing system with date and time edits external self-vibration such as automatic transfer of public utility charges and internal self-vibration such as automatic accumulation into predetermined self-vibration data, and Self-input input file generation means 120 for generating self-input data including an operation code corresponding to the type of the account as an account processing request, arithmetic means 140 for responding to an account processing request with the terminal of the CD / ATM 33, and this arithmetic means 140 And a center cut message input means 130 for inputting the self-vibration input data generated by the self-vibration input file generation means 120.

本実施例による先日時付完結処理システムは、さらに、オンラインの口座処理要求及び自振データによる口座処理要求の全部又は一部を処理するサブプログラムデータを複数記憶したプログラム記憶手段170と、前記口座処理要求の実行時に使用するサブプログラム名及びサブプログラムの実行順序が前記口座処理要求の種別を示すオペコード別に格納されたオペコードテーブルを記憶したオペコードテーブル記憶手段171とを備えている。
オペコードは、例えば数値列で、普通預金入金や、定期入金の取消など、口座処理要求の種別を表すコードである。本実施例では、このオペコードと、勘定日や取引金額の組み合わせが、口座処理要求である。
The completion processing system with a date and time according to the present embodiment further includes a program storage means 170 for storing a plurality of subprogram data for processing all or part of online account processing requests and account processing requests based on self-vibration data, and the account And an operation code table storage unit 171 for storing an operation code table in which a subprogram name used in execution of a processing request and an execution order of the subprograms are stored for each operation code indicating the type of the account processing request.
The operation code is, for example, a numerical string, and is a code representing the type of account processing request, such as depositing ordinary deposits or canceling regular deposits. In this embodiment, the combination of this opcode, account date, and transaction amount is an account processing request.

そして、サブプログラムがそれぞれ、前記オンラインの口座処理要求及び前記自振入力データによる口座処理要求に共通した処理を実行させる共通指令と、当該サブプログラムの起動形態に応じた当該サブプログラムの戻り又は他のサブプログラムの起動を行う処理を実行させる戻り/起動指令とを備えている。   Then, each subprogram executes a common command for executing the processing common to the online account processing request and the account processing request based on the self-vibration input data, and the return or other of the subprogram according to the activation form of the subprogram. And a return / startup command for executing processing for starting the subprogram.

さらに、プログラム記憶手段170が、前記サブプログラムの実行中に起動され当該口座処理後に当該口座に対する口座処理がないと仮定した場合の先日付となる勘定日での口座状態を生成するために取消又は再カットする口座処理を特定する取消再カットメインプログラムを記憶している。 Further, the program storage means 170 is canceled during the execution of the subprogram to generate an account status at an account date that is a future date when it is assumed that there is no account processing for the account after the account processing. A cancel / recut main program for specifying an account process to be recut is stored.

図16はオペコードテーブルの一例を示す説明図である。オペコードテーブルは、口座処理の業務別に定義すると良い。例えば、普通預金口座から出金し、定期預金に入金する場合、定期預金への入金を起動処理、普通預金の出金を受動処理と考える。起動処理と受動処理とは双方が成立するか、又は双方が中止するかのいずれかであり、一方のみ成立させることのないように処理する。起動処理としては、公共料金の引落等の外部自振や、融資や、定期や、定積に関する口座処理がある。これらの起動処理と連動して処理される受動処理の例としては、普通預金や、当座預金や、情報登録等の口座処理がある。図16に示す例では、口座処理を受動処理と起動処理とに分け、さらにそれぞれの業務毎にオペコードテーブルを作成している。   FIG. 16 is an explanatory diagram showing an example of an operation code table. The opcode table should be defined for each account processing task. For example, when withdrawing from a savings account and depositing into a time deposit, the deposit into the time deposit is considered as an activation process, and the withdrawal from the ordinary deposit is considered as a passive process. The activation process and the passive process are either established or both are stopped, and processing is performed so that only one of them is not established. As activation processing, there are external self-vibration such as deduction of public utility charges, financing, periodic processing, and account processing related to fixed volume. Examples of passive processing processed in conjunction with the activation processing include account processing such as savings, checking, and information registration. In the example shown in FIG. 16, account processing is divided into passive processing and activation processing, and an opcode table is created for each business.

図17は、オペコードテーブルの内容の一例を示す説明図である。図17は、普通預金のオペコードテーブルである。普通預金出金のオペコードが、「01001」であるとする。オペコードテーブルには、このオペコードの動作環境指定が記述されている。例えば、普通預金の出金は、土曜日にも動作し、先日付処理を行うセンター一括も行う。一方、動作のための個別の承認処理は不要である。好ましい実施例では、ある口座処理要求の取消を行うための口座処理要求を、元の口座処理要求のオペコードに一定数を加えることとするとよい。例えば、取消のために500を加算することとすると、普通預金出金のオペコードが01001で有る場合に、普通預金出金の取消オペコードは01501となる。   FIG. 17 is an explanatory diagram showing an example of the contents of the operation code table. FIG. 17 is an opcode table for ordinary deposits. It is assumed that the operation code of the ordinary deposit withdrawal is “01001”. The operation code specification of the operation environment of this operation code is described in the operation code table. For example, withdrawals of ordinary deposits also operate on Saturdays and perform central batch processing for future dates. On the other hand, separate approval processing for operation is not necessary. In a preferred embodiment, an account processing request for canceling an account processing request may be a certain number added to the original account processing request opcode. For example, if 500 is added for cancellation, if the operation code for savings deposit is 01001, the cancellation opcode for savings deposit becomes 01501.

オペコードテーブルは、各オペコードで指定される口座処理要求が予め定められた動作環境以外で動作することを防止する。例えば、何らかの不具合でセンター一括処理で行わないオペコードがセンター一括処理として入力された場合であっても、このオペコードテーブルの動作環境指定を参照することで、演算手段140はエラー出力することができる。   The operation code table prevents an account processing request designated by each operation code from operating in a non-predetermined operating environment. For example, even if an operation code that is not performed in the center batch process is input as the center batch process due to some trouble, the calculation means 140 can output an error by referring to the operation environment designation in the operation code table.

普通預金の出金(オペコード01001)を例として考えると、ATMからオンライン処理として実行される場合と、外部自振や定期入金等の先日付処理で実行される場合とでは処理内容の詳細が一致しない場合がある。一方、普通預金の出金であれば、どの起動形態でも共通している処理も存在する。また、勘定日及び勘定日以後の残高を展開する処理などは、普通預金の入金及び出金で共通する処理となる。これらの口座処理とプログラムの関係を、本実施例では、図17に示すオペコード別のプログラムリストで調整する。   Considering the withdrawal of ordinary deposit (opcode 01001) as an example, the details of the processing are the same when executed as online processing from ATM and when executed in earlier date processing such as external self-vibration and periodic deposits. May not. On the other hand, there is a process that is common to all types of startups as long as it is withdrawing from ordinary deposits. Further, the process of expanding the account date and the balance after the account date is a process common to deposit and withdrawal of the ordinary deposit. In this embodiment, the relationship between these account processes and programs is adjusted by a program list for each operation code shown in FIG.

プログラムの起動形態としては、B:営業店端末34やATM33等の端末からその口座処理要求(オペコード)が初回に入力された場合と、C:同様の端末から連続して同一の口座処理要求が入力される場合と、D:定期の入金に対する普通預金の出金など、受動処理として単一のトランザクションの一部として起動される「被連動」の場合と、E:先日付処理にて普通預金の入金等の残高に異動があった場合の取消や再カット等を行うために、入金等のトランザクションとは異なる他のトランザクションとして起動される「被派生」とがある。   As a program activation mode, B: when the account processing request (opcode) is input for the first time from a terminal such as the branch terminal 34 or ATM 33, and C: the same account processing request is continuously issued from the same terminal. When entered: D: “accounted” started as part of a single transaction as passive processing, such as withdrawal of savings deposit for regular deposits, E: savings deposit at earlier date processing In order to cancel, recut, etc. when there is a change in the balance of the deposit, etc., there is a “derived” that is activated as another transaction different from the transaction such as deposit.

前記演算手段140は、口座処理要求が入力された時に当該口座処理要求のオペコードに基づいて前記オペコードテーブルを特定する機能と、特定されたオペコードテーブルにて指定される順序で前記サブプログラムを単一のトランザクションとして実行する機能とを備えている。例えば、図16に示す例では、オペコード01001で特定される口座処理要求がセンター一括にて起動された場合には、サブプログラム10,11,12をこの順で一つのトランザクションとして実行する。   The calculation means 140 has a function of specifying the operation code table based on an operation code of the account processing request when an account processing request is input, and the subprograms in the order specified in the specified operation code table. And a function to execute as a transaction. For example, in the example shown in FIG. 16, when the account processing request specified by the operation code 01001 is activated in the center, the subprograms 10, 11, and 12 are executed as one transaction in this order.

本実施例では、2種類のトランザクションの起動手法を使い分けている。一つは連動取引(連鎖トランザクション)であり、もう一つは派生取引(非連鎖トランザクション)である。連動取引は、例えば、自動定期化を行うために、普通預金口座から出金して、定期預金口座に入金する場合、普通預金口座からの出金を行うトランザクションと定期預金口座に入金するトランザクションとを連動(chain)させ、一つのトランザクションとして処理する手法である。すなわち、連動取引は、1トランザクションである。連動取引は、一般的に、連動回数に制限が有るほか、1トランザクションとして実行するため、連動すべき取引数が多数になる場合には、オンライン取引の応答時間を一定時間以内とすることができなくなる。 In this embodiment, two types of transaction starting methods are used properly. One is a linked transaction (chain transaction), and the other is a derivative transaction (unchained transaction). Linked transactions include, for example, when performing withdrawals from a savings account and depositing into a fixed deposit account to perform automatic recurring transactions, a transaction for withdrawing from a savings account and a transaction for depositing into a fixed deposit account Is a method of processing as a single transaction. That is, the linked transaction is one transaction. Linked transactions generally have a limited number of links, and are executed as one transaction, so if there are a large number of transactions to be linked, the response time of online transactions can be within a certain time. Disappear.

派生取引は、一つのトランザクションを完了させ、そのトランザクションとは別の他のトランザクションを派生させるものである。派生取引(非連鎖トランザクション)には取扱困難な部分もあるが、本実施例によると、一つの入金処理に対して数百の先日付再カット処理が行われることも想定でき、このように同一口座に対する口座処理の数が多数となる場合には、連動取引にて先日付取消及び先日付再カットを処理するには限界がある。 A derivative transaction completes one transaction and derives another transaction different from the transaction. Derived transactions (unchained transactions) are difficult to handle, but according to this embodiment, it can be assumed that several hundreds of re-cuts will be performed for one deposit process. When there are a large number of account processes for the same account, there is a limit to processing the future date cancellation and the future date recut in the linked transaction.

このため、図15に示す例では、演算手段140が、各トランザクションのサブプログラムの実行と並列して、当該サブプログラムにて起動指示される他のサブプログラムを同一又は他のトランザクションとして実行する機能と、オペコードテーブルにて特定された単一のトランザクションの正常終了後に当該サブプログラムでの指令に応じて前記取消再カットメインプログラムを他のトランザクションとして実行する機能とを備えている。 For this reason, in the example shown in FIG. 15, the calculation unit 140 executes the other subprograms instructed to start by the subprogram as the same or other transactions in parallel with the execution of the subprogram of each transaction. And a function for executing the cancel / recut main program as another transaction in response to a command in the subprogram after the normal end of the single transaction specified in the opcode table.

同一のトランザクションとして他のサブプログラムを起動するのは、連動取引である。他のトランザクションとして他のサブプログラムを起動するのは、派生取引である。例えば、ATMを用いて普通預金口座からの出金により定期預金の作成や振込を行う場合には、普通預金口座の出金処理と連動して定期預金への入金や振込を行う。一方、ATMから入金があったときに、先日付の取引の再カットや前倒制御を行うのは、派生取引で行う。ATMから入金があると、入金処理をするためのサブプログラム群が一つのトランザクションとして動作し、最後に取消再カットメインプログラムを派生取引として起動する。派生取引を起動した入金処理のトランザクションは終了し、当日の残高を印字等して処理を終了する。この残高の印字等と並行して、取消再カットメインプログラムが被派生のサブプログラムとして実行される。入金により先日付再カットすべき口座処理が発見されると、その口座処理の再カット処理を再度派生取引として起動する。当該再カット処理が完了すると、他に再カット可能な口座処理が無いかどうかを確認するため、さらに、取消再カットメインプログラムが派生取引として起動される。取消再カットメインプログラムは、取り消すべき口座処理や、再カット可能な口座処理が無くなるまで、繰り返し派生により起動される。
口座残高の異動があった場合には、この再カットメインプログラムを動作させることで、その口座処理より後に口座処理がなかったと仮定した場合の先日付の口座処理を整理し、完結させることができる。
It is a linked transaction that activates another subprogram as the same transaction. It is a derivative transaction that starts another subprogram as another transaction. For example, when creating or transferring a time deposit by withdrawal from a savings account using ATM, the depositing or transferring to the time deposit is performed in conjunction with the withdrawal processing of the savings account. On the other hand, when there is a deposit from the ATM, it is a derivative transaction that re-cuts or advances the transaction of the previous date. When there is a deposit from ATM, a subprogram group for deposit processing operates as one transaction, and finally, the cancel / recut main program is started as a derivative transaction. The deposit processing transaction that started the derivative transaction ends, and the processing ends after printing the balance of the day. In parallel with the printing of the balance, the cancel / recut main program is executed as a derived subprogram. When an account process to be recut at a later date is found by deposit, the recut process of the account process is activated again as a derivative transaction. When the recut process is completed, a cancel / recut main program is started as a derivative transaction in order to confirm whether there is any other account process that can be recut. The cancel / recut main program is activated by repeated derivation until there is no account processing to be canceled or recutable account processing.
If there is a change in the account balance, this recut main program can be run to organize and complete the account processing for the future date assuming that there was no account processing after that account processing. .

本実施例では、内部自振及び外部自振を行うためにセンターカット電文に含まれる口座処理要求は、図16に示す起動処理である。起動処理が演算手段140にて実行されると、その実行中に対応する受動処理を連動にて起動する。例えば、融資の返済のための口座処理実行中に、当該融資返済の対象となる普通預金の出金処理を連動で起動する。受動処理の終了時には、取消再カットメインプログラムが派生にて起動される。取消再カットメインプログラムは、取り消すべき口座処理又は再カットすべき口座処理を探索する。探索対象の口座処理は、起動処理である。取消再カットメインプログラムは、例えば定積入金の取消を派生にて起動する。この定積入金は、対応する受動処理を連動で起動する。そして、受動処理は、再度取消再カットメインプログラムを派生で起動する。 In the present embodiment, the account processing request included in the center cut message for performing internal self-vibration and external self-vibration is the activation process shown in FIG. When the activation process is executed by the calculation means 140, the corresponding passive process is activated in conjunction with the activation process. For example, during the execution of account processing for loan repayment, the withdrawal process for the ordinary deposit subject to loan repayment is started in conjunction. At the end of the passive process, the cancel / recut main program is activated as a derivative. The cancel / recut main program searches for an account process to be canceled or an account process to be recut. The account process to be searched is an activation process. The cancellation / recut main program activates, for example, cancellation of fixed deposits. This fixed deposit is activated in conjunction with the corresponding passive process. Then, the passive process starts the cancel / recut main program by derivation again.

以下、具体的な処理例を説明する。図18は、残高明細更新処理(サブプログラム)の一例を示すフローチャートである。この残高明細更新は、種々の口座処理要求にて用いるため、一つのサブプログラムとしている。まず、残高明細更新要求を受信する。この残高明細更新処理は、例えば、口座処理要求が成立して口座残高に異動が生じた場合に起動される。続いて、ファイル6又は預金マスタDB160から、残高明細セグメントを読み出す(ステップA2)。そして、勘定日の古い順に残高明細を展開する(ステップA3)。口座処理要求の勘定日の残高明細が有るか否かを確認する(ステップA4)。当該勘定日の残高明細が無い場合には、勘定日当日分の残高明細エリアを作成する(ステップA5)。続いて、勘定日当日以降の各種残高を更新する(ステップA6)。さらに、更新した残高明細セグメントを預金マスタDB160へ更新する。そして、起動形態に応じて業務メイン等に戻る処理を行う。 Hereinafter, a specific processing example will be described. FIG. 18 is a flowchart illustrating an example of the balance details update process (subprogram). Since this balance detail update is used for various account processing requests, it is a single subprogram. First, a balance detail update request is received. This balance detail update process is activated, for example, when an account process request is established and the account balance is changed. Subsequently, the balance details segment is read from the file 6 or the deposit master DB 160 (step A2). Then, the balance details are expanded in order of old account date (step A3). It is confirmed whether or not there is a balance statement of the account date for the account processing request (step A4). If there is no balance details for the account date, a balance details area for the account date is created (step A5). Subsequently, various balances after the account date are updated (step A6). Further, the updated balance detail segment is updated to the deposit master DB 160. Then, processing for returning to the main business is performed in accordance with the activation mode.

図19は、通常入金処理の一例を示すフローチャートである。まず、営業店端末や、ATMや、例えば振込を行うトランザクションなどから、入金要求を受信する(ステップA11)。続いて、この入金要求のフォーマットや、入金対象の口座の有無や状態を確認し(ステップA12)、異常があればエラー処理を行う。正常であれば、入金の取引明細を作成する(ステップA14)。続いて、図19に示す残高明細更新処理を実行する(ステップA15)。残高明細の更新が正常に完了すると、入金の取引ログを出力する(ステップA16)。この取引ログは、種々の帳票の印刷や、また、管理用のデータベースの構築(ディレード処理)等に用いられる。そして、金融機関側の会計を管理する日計を更新する(ステップA17)。さらに、未成立の取引の有無をチェックする(ステップA18)。例えば、残不足明細の有無をチェックする。未成立の取引がある場合には、取消再カットメインを派生取引として起動する(ステップA19)。取消再カットメインの処理完了を待たずに、通常入金処理は完了する。
残高明細の更新処理A15や、日計の更新A17等は、種々の口座処理で共通するため、オペコードテーブルのプログラムリストを用いて同一のプログラムを各種の口座処理に流用すると良い。
FIG. 19 is a flowchart illustrating an example of a normal deposit process. First, the office terminal and, ATM or, for example, from such a transaction to perform the transfer, to receive a payment request (step A11). Subsequently, the format of this deposit request , the presence / absence and status of the account to be deposited are confirmed (step A12), and if there is an abnormality, error processing is performed. If it is normal, a deposit transaction statement is created (step A14). Subsequently, the balance details update process shown in FIG. 19 is executed (step A15). When the balance details are updated normally, a deposit transaction log is output (step A16). This transaction log is used for printing various forms and for constructing a management database (delay processing). Then, the daily balance for managing the accounting of the financial institution is updated (step A17). Further, the presence / absence of an unsettled transaction is checked (step A18). For example, the presence or absence of remaining shortage details is checked. If there is an unsettled transaction, the cancel / recut main is activated as a derivative transaction (step A19). The normal deposit process is completed without waiting for the cancellation / recut main process to be completed.
Since the balance statement update process A15, daily balance update A17, and the like are common to various account processes, the same program may be used for various account processes using the program list of the operation code table.

図20は、通常出金処理の処理例を示すフローチャートである。ATMや、口座振替を行う口座処理要求などから出金要求を受信すると(ステップA20)、フォーマット及び口座のチェックを行う(ステップA21)。口座が取引停止等の場合には、それに応じたエラー処理を行う(ステップA22)。フォーマット等が正常であれば、口座処理要求の残高明細にから出金可能額を算出し、出金要求額と出金可能額を比較する(ステップA23)。出金要求額に対して出金可能額が不足で有れば、残高なしとしてエラー処理を行う(ステップA24)。図19に示す例と同様に、取引明細の作成(ステップA25)や、残高明細更新処理の起動及び戻り(ステップA26)や、取引ログの出力(ステップA27)や、日計の更新(ステップA28)を行う。 FIG. 20 is a flowchart illustrating an example of a normal withdrawal process. When a withdrawal request is received from an ATM or an account processing request for performing an account transfer (step A20), the format and the account are checked (step A21). If the account is in a transaction stop, etc., error processing is performed accordingly (step A22). If the format or the like is normal, a possible withdrawal amount is calculated from the balance details of the account processing request, and the requested withdrawal amount is compared with the possible withdrawal amount (step A23). If the amount that can be withdrawn is insufficient with respect to the withdrawal request amount, error processing is performed with no balance (step A24). Similarly to the example shown in FIG. 19, creation of transaction details (step A25), activation and return of balance details update processing (step A26), output of transaction logs (step A27), and daily total update (step A28) )I do.

続いて、更新した勘定日毎の残高明細に基づいて、出金可能額がマイナスとなっている勘定日の有無をチェックする(ステップA29)。出金可能額がマイナスとなっている勘定日があれば、取消再カットメインを派生取引として起動し(ステップA30)、取消再カットメインの処理の終了を待たずに通常出金処理は終了する。一方、マイナスの出金可能額が無い場合にも、通常出金処理は終了する。 Subsequently, based on the updated balance details for each account date, the presence / absence of an account date having a negative withdrawal amount is checked (step A29). If there is an account date for which the possible withdrawal amount is negative, the cancel / recut main is activated as a derivative transaction (step A30), and the normal withdrawal process ends without waiting for the cancellation / recut main process to end. . On the other hand, when there is no negative withdrawal possible amount, the normal withdrawal process is ended.

図21は、第2実施例での取消再カットメイン処理の一例を示すフローチャートである。図21に示す取消再カットメイン処理では、繰り返し図21に示す処理を行うことで、どのような取引の組み合わせとなっても、口座処理の取消又は再カットを確実に行うようにしている。この取消再カットメインプログラムは、次の指令を備える。 FIG. 21 is a flowchart showing an example of the cancel / recut main process in the second embodiment. In the cancellation / recut main process shown in FIG. 21, the process shown in FIG. 21 is repeatedly performed to reliably cancel or recut the account process for any combination of transactions. The cancel / recut main program includes the following commands.

他のトランザクションから起動された時に前記口座情報に基づいて各勘定日別の出金可能額を算出する日付チェックテーブル作成指令(ステップB2)。
前記日付チェックテーブル作成指令にて作成された日付チェックテーブルに基づいて各勘定日別の取消必要額を算出する取消必要額算出指令(ステップB3)。
日付チェックテーブルは、例えば図22に示すテーブルである。
A date check table creation command for calculating a possible withdrawal amount for each account date based on the account information when activated from another transaction (step B2).
Required cancellation amount calculation command (step B3) for calculating the required cancellation amount for each account date based on the date check table created by the date check table creation command.
The date check table is, for example, a table shown in FIG.

勘定日の初日より未来で再カット期限内に決済された口座処理がある場合には、当該口座処理の取消処理(ステップC1)を起動すると共に当該取消処理の完了後に取消再カットメインプログラムを再度起動させる前倒取消指令(ステップB4,B5)。 If there is an account process settled within the recut deadline in the future from the first day of the account date, the cancellation process (step C1) of the account process is started and the cancellation / recut main program is again executed after the cancellation process is completed. An advance cancellation command to be activated (steps B4 and B5).

取消再カットメインの再度の起動は、取消処理が派生として起動された場合の戻りの指示として取消処理を構成するサブプログラムに記述するようにしてもよい。このステップB1,B2,B3,B5,C1を繰り返すことで、前倒をすべき口座処理は全て一旦残不足明細に格納される。これにより、より前の勘定日での決済が後半の処理(C3等)で図られている。一旦残不足明細としたが、再度同一の勘定日で先日付再カットされることも多々あるが、口座処理時に何らかのデータを参照して再処理を行うものもあり、また、貸越極度の変更なども起こるため、取消再カットメインでは、取りあえず勘定日の初日より未来の再カット期限内に決済された口座処理を全て取り消す。 The reactivation of the cancel / recut main may be described in a subprogram constituting the cancel process as a return instruction when the cancel process is activated as a derivative. By repeating these steps B1, B2, B3, B5, and C1, all account processes to be advanced are temporarily stored in the remaining shortage details. Thereby, the settlement on the earlier account date is achieved by the latter half of the processing (C3 etc.). Once the remaining shortage item is specified, it is often recut again on the same account date, but there are also cases where reprocessing is performed by referring to some data during account processing, and changes in overdraft extremes, etc. In the cancellation / recutting main, all account processing settled within the future recutting period is canceled from the first day of the account date for the time being.

取消再カットメインプログラムは、前倒取消指令による取消処理の起動が成されない場合で、且つ前記日付チェックテーブル上に取消必要額が格納されている場合に、当該取消必要額が格納された勘定日の出金取引である口座処理を取消対象として特定する取消対象特定指令(ステップB6,B7)を備えている。 The cancellation / recut main program is used when the cancellation process is not activated by the advance cancellation command and the cancellation required amount is stored on the date check table, the account sunrise storing the cancellation required amount is stored. A cancel target specifying command (steps B6 and B7) for specifying an account process that is a gold transaction as a cancel target is provided.

また、取消再カットメインプログラムは、この取消対象取消指令に応じて特定された口座処理の取消処理C2を起動すると共に、当該取消処理の完了後に取消再カットメインプログラムを再度起動させる取消処理起動指令(ステップB8)を備えている。
このステップB1,B2,B3,B4,B6,B7,B8,C2は、出金可能額がプラスとなるまで繰り返される。出金可能額がプラスとなると、他の勘定日についても必要な取消を行い、さらに他の勘定日について再カット可能なものがあるか否かを確認するために、ステップB9を実行する。
取消対象特定指令B7にて、他の口座処理と比較して優先度の低い口座処理から取消対象に特定するようにしても良い。例えば、延滞の付く口座処理の優先度を高くする場合には、延滞の付かない口座処理から順次取消対象の口座処理に特定する。
Also, cancellation recut main program, as well as start the cancellation process C2 account processing specified in accordance with the cancellation target cancel command, cancellation processing start command for starting the cancellation recut main program after completion of the cancellation process again (Step B8).
Steps B1, B2, B3, B4, B6, B7, B8, and C2 are repeated until the possible withdrawal amount becomes positive. When the possible withdrawal amount is positive, necessary cancellation is performed for other account dates, and step B9 is executed to check whether there are any other account dates that can be recut.
In the cancellation target specifying command B7, the cancellation processing may be specified from the account processing having a lower priority than the other account processing. For example, when the priority of account processing with arrears is increased, the account processing to be canceled is sequentially specified from the account processing without arrears.

取消再カットメインプログラムは、さらに次の指令を備えている。
前記取消対象特定指令B7による取消対象の特定が成されない場合、すなわち、出金可能額のマイナスが全ての勘定日について無くなった場合には、未成立又は取消処理により未成立となった口座処理の一覧を生成すると共に、決済可能な口座処理を最先の勘定日から順次特定する決済可否判定指令B9。
The cancel / recut main program further includes the following commands.
If the cancellation target is not specified by the cancellation target specification command B7, that is, if the minus of the withdrawal possible amount disappears for all the account dates, the account processing that has not been established or has not been established due to the cancellation processing. A settlement enable / disable determination command B9 that generates a list and sequentially identifies account processes that can be settled from the earliest account date.

この決済可否判定指令B9に応じて決済可能と判定された口座処理がある場合に、当該口座処理について再カット処理を起動すると共に当該再カット処理の完了後に決済可否判定指令を起動させる再カット処理起動指令B10。
前倒制御では、C1にて取り消された口座処理がこのB10にてより前の勘定日で決済できるかどうかを判定する。例えば、入金処理により取消再カットメインが起動される場合には、図19のステップA18にて成立未成立にかかわらず残不足明細がある場合には、図21のステップB4で前倒可能性がある口座処理であるかどうかを判定し、前倒可能で有れば取消処理を行う(ステップC1)。そして、ステップB9にてより前の勘定日(入金された勘定日)での再カットが可能であるか否かを判定する。
When there is an account process that is determined to be settled according to the settlement enable / disable determination command B9, a recut process that activates a recut process for the account process and activates a settlement enable / disable determination command after completion of the recut process. Start command B10.
In the advance control, it is determined whether or not the account processing canceled at C1 can be settled on the previous account date at B10. For example, when cancellation / recut main is activated by deposit processing, there is a possibility that the item will be advanced in step B4 in FIG. 21 if there is a remaining shortage in spite of not being established in step A18 in FIG. It is determined whether or not it is a certain account process, and if it can be advanced, a cancellation process is performed (step C1). Then, in step B9, it is determined whether or not recutting is possible on an earlier account date (account date on which payment is made).

前記決済可否判定指令に応じて決済可能と判定された口座処理が無い場合処理を完了させる処理完了指令B11。処理の完了は、例えば業務メインへの処理の戻しである。   A process completion instruction B11 for completing the process when there is no account process that is determined to be settled according to the settlement enable / disable determination instruction. The completion of the process is, for example, a return of the process to the business main.

図21に示す再カット処理は、演算手段の機能である。すなわち、ある実施例では、演算手段は、前記口座処理要求として当該処理対象の口座の残高を増加させる口座残高増加要求を処理すると共に当該処理結果に応じて当該口座残高増加要求の勘定日より未来の勘定日にて定義されている残高明細セグメントを更新する口座処理部と、口座残高増加要求の実行後に前記再カット期限を超過しておらず且つ取引が未成立の前記残不足明細セグメントを読み出す残不足明細読み出し部と、口座処理部によって更新された勘定日別の残高明細セグメントに基づいて前記残不足明細読み出し部によって読み出された残不足取引明細データの再カットが可能であるか否かを判定する再カット可否判定部と、この再カット可否判定部によって再カット可能と判定された残不足取引明細データを再処理する再カット処理部とを備えると良い。   The recut process shown in FIG. 21 is a function of the calculation means. In other words, in one embodiment, the computing means processes an account balance increase request for increasing the balance of the account to be processed as the account processing request, and the future from the account date of the account balance increase request according to the processing result. An account processing unit that updates the balance detail segment defined on the account date, and reads the remaining shortage detail segment that has not exceeded the recut deadline and the transaction has not been completed after executing the account balance increase request Whether or not it is possible to recut the remaining shortage and detailed transaction details data read out by the remaining shortage and shortage details reading unit based on the balance details segment for each account date updated by the account processing unit. A re-cutability determination unit that determines whether the recut is possible, and a re-processing that reprocesses the remaining shortage transaction details data determined to be recut by the recutability determination unit. It may comprise a preparative process unit.

図23は、受動処理、受動処理及び取消再カットメインプログラムの構成例を示す説明図である。まず、演算手段140にてオペコードxx1の受動処理E1が実行されたとする。この受動処理では、口座残高の異動を生じさせるため、その処理の終了時点で取消再カットメインを派生処理E3として起動する(E2)。取消再カットメインプログラムE4は、図21に示す処理に従って、取消対象又は再カット対象を特定し、取消対象又は再カット対象の起動処理(オペコードxx2)を派生処理E7にて起動する(E6)。派生起動された起動処理は、図17に示すようなオペコードテーブル中の、被派生(E)によるプログラムリストに従って、起動処理を行う。この起動処理中に、普通預金関連の処理等の受動処理を連動E11にて依頼する(E8)。連動依頼された受動処理(オペコードxx3)E12は、普通預金の出金や出金の取消等を行い、処理終了時に取消再カットメインを派生にて起動する(E13)。すなわち、この受動処理E12は、受動処理E1と同様の動作をする。受動処理E12は、派生起動E13ののち、連動処理に戻る(E14)。 FIG. 23 is an explanatory diagram illustrating a configuration example of the passive process, the passive process, and the cancel / recut main program. First, it is assumed that the passive processing E1 of the operation code xx1 is executed by the calculation means 140. In this passive process, in order to cause a change in the account balance, the cancel / recut main is activated as the derivation process E3 at the end of the process (E2). The cancellation / recut main program E4 specifies the cancellation target or the recut target according to the process shown in FIG. 21, and starts the cancellation process or the recut target activation process (opcode xx2) in the derivation process E7 (E6). The activation process that is derived and activated performs the activation process according to the program list by the derived (E) in the operation code table as shown in FIG. During this activation process, a passive process such as a process related to savings is requested by the interlocking E11 (E8). The passive processing (opcode xx3) E12 requested to be linked performs withdrawal of the ordinary deposit, withdrawal of withdrawal, and the like, and activates the cancellation recut main at the end of the processing (E13). That is, the passive process E12 performs the same operation as the passive process E1. The passive process E12 returns to the interlocking process after the derivative activation E13 (E14).

起動処理E8では、受動処理の正常終了に従って、その後の処理を進め、処理を終了する(E10)。E15の派生による取消再カットメインプログラムの実行開始は、この起動処理E8の終了後となるように、派生処理を管理するとよい。 In the startup process E8, the subsequent process is advanced in accordance with the normal end of the passive process, and the process ends (E10). The derivation process may be managed so that the start of the execution of the cancel / recut main program by the derivation of E15 is after the end of the activation process E8.

この受動処理、起動処理及び取消再カットメインプログラムの関係を、具体的に説明する。符号D1で示す普通預金の出金が先日付で行われたとする。残高に異動があるため、派生E3にて取消再カットメインプログラムが起動される。普通預金出金D1は、この派生による取消再カットメインプログラムの動作完了を待たずに処理を完了する。一方、派生された取消再カットメインプログラムは、普通預金出金処理D1が正常終了した後に実行を開始する。ここでは、普通預金の出金によって、その先日付の勘定日にて残不足となり、既に成立していた定期入金を取消対象としたとする(D2,図21に示す例では、B7)。この場合、派生処理E7として、起動処理である定期入金取消を起動する(B8)。定期入金取消処理中に、対応する普通預金の出金取消処理(受動処理)を連動E11で依頼する。受動処理である普通預金出金取消は、定期入金取消額と同額の普通預金の出金を取り消す(D4)。この取消処理D4は口座の異動を伴うため、取消再カットメインプログラムを発生E15にて起動する。普通預金出金取消と、定期入金取消がコミットすると、連動取引は完了する。 The relationship between the passive process, the startup process, and the cancel / recut main program will be described in detail. It is assumed that the withdrawal of the ordinary deposit indicated by the symbol D1 is performed on the previous date. Since there is a change in the balance, the cancel / recut main program is started in derivation E3. The ordinary deposit withdrawal D1 completes the processing without waiting for the completion of the operation of the cancellation / recut main program by this derivation. On the other hand, the derived cancellation / recut main program starts executing after the normal deposit / withdrawal process D1 ends normally. Here, it is assumed that due to withdrawal of the ordinary deposit, there is a shortage on the account date of the future date, and the periodic deposit that has already been established is subject to cancellation (D2, B7 in the example shown in FIG. 21). In this case, as the derivation process E7, the periodic deposit cancellation which is an activation process is activated (B8). During the periodic deposit cancellation process, a request for withdrawal cancellation process (passive process) of the corresponding ordinary deposit is made by the interlock E11. Withdrawal of ordinary deposits, which is a passive process, cancels withdrawals of ordinary deposits of the same amount as the periodic deposit withdrawal amount (D4). Since this cancellation process D4 involves a change of account, a cancellation / recut main program is started at generation E15. When the withdrawal of savings deposit and the cancellation of periodic deposit are committed, the linked transaction is completed.

ある取引を取り消した結果、未成立であった他の取引を再カットできることがある。例えば、5,000の残不足で、30,000の定期入金を取り消した結果、未成立であった10,000の公共料金振替が再カット可能となることがある。ステップD5にて、このように未成立の取引のうち、先日付再カット(振替)可能な取引を発見したとする。同様に、派生E7により外部自振を起動し、外部自振D6は連動で普通預金出金を依頼し、連動取引を行う。普通預金出金D7により残高の異動が生じるため、再度取消再カットメインプログラムが起動する(D8)。取消対象及び再カット対象がなければ、ここで普通預金出金D1によって開始した先日付取引の取消再カット処理が完了する。 As a result of canceling a transaction, it may be possible to recut other transactions that have not been completed. For example, it may be possible to recut 10,000 utility bill transfers that have not been established as a result of canceling 30,000 periodic deposits due to a shortage of 5,000. In step D5, it is assumed that a transaction that can be recut (transferred) from the previous date is found among transactions that have not yet been completed. Similarly, the external self-vibration is activated by the derivation E7, and the external self-vibration D6 requests the ordinary deposit withdrawn and performs the linked transaction. Since the balance changes due to the ordinary deposit withdrawal D7, the cancellation / recut main program is started again (D8). If there is no cancellation object and no recut object, the cancellation recut process of the future date transaction started by the ordinary deposit withdrawal D1 is completed here.

このように第2実施例では、連動取引と派生取引とを使い分けることで、先日時付完結処理を他のオンライン処理による口座処理に遅れを生じさせない状態でオンライン処理と並行して処理することができる。例えば、派生取引等に他のトランザクションによるプロセスに対する優先度の設定等を行わなくとも、派生取引の同時最大数等の規制により、オンラインの応答時間に影響を与えずに、口座振替等の従来バッチ処理で行っていた口座処理をオンライン処理中に処理することができる。 As described above, in the second embodiment, by using the linked transaction and the derivative transaction properly, it is possible to process the completion process with the previous date and time in parallel with the online process without causing a delay in the account process by other online process. it can. For example, even if you do not set priorities for processes by other transactions for derivative transactions, etc., conventional batches such as account transfers without affecting online response time due to restrictions on the maximum number of derivative transactions, etc. Account processing that has been performed in the processing can be processed during online processing.

図24は、第2実施例による1日のプログラム実行例を示す説明図である。7:00から内部自振、外部自振のセンターカット(C/C)を開始し、順次外部自振や手形交換などを実行する。また、再カット管理DBによる他店券資金化C/Cを11:30に、カードローン自動融資C/Cを16:00過ぎに実行している。続いて、契約に変更のあった口座処理を再実行する追い上げC/Cや、マスタデータ等の再編処理などを行い、24:00にはバッチ処理によって行っていた全てのセンターカット(口座処理)を先日付にて完了させ、日付変更を行うことができる。   FIG. 24 is an explanatory diagram showing an example of a daily program execution according to the second embodiment. From 7:00, center cut (C / C) of internal vibration and external vibration is started, and external vibration and bill exchange are sequentially executed. Further, the other-store ticket funding C / C by the recut management DB is executed at 11:30, and the card loan automatic loan C / C is executed after 16:00. Subsequently, the C / C for re-execution of account processing whose contract has been changed, reorganization processing of master data, etc. are performed. At 24:00, all center cuts (account processing) performed by batch processing are performed. Can be completed at a later date to change the date.

本発明の第一の実施形態の構成を示すブロック図である。It is a block diagram which shows the structure of 1st embodiment of this invention. 図1に示す構成での処理例を示す説明図であり、図2(A)は出金処理の一例を示す図で、図2(B)は入金処理の一例を示す図で、図2(C)は先時間での処理例を示す図である。FIG. 2A is an explanatory diagram showing an example of processing in the configuration shown in FIG. 1, FIG. 2A is a diagram showing an example of a withdrawal process, FIG. 2B is a diagram showing an example of a deposit process, and FIG. C) is a diagram showing an example of processing in the previous time. 図1に示す構成での口座情報の推移の一例を示す説明図である。It is explanatory drawing which shows an example of transition of the account information in the structure shown in FIG. 本実施形態のハードウエア資源の構成例を示すブロック図である。It is a block diagram which shows the structural example of the hardware resource of this embodiment. 図1及び図4に示す構成での口座処理の一例を示すフローチャートである。It is a flowchart which shows an example of the account process in the structure shown in FIG.1 and FIG.4. 本実施形態での口座処理による残高の異動と先日付処理の関係を示す説明図であり、図6(A)は決済の可否と先日付処理の対応を示す図で、図6(B)は取消再カット判定用のテーブルを示す図である。It is explanatory drawing which shows the relationship between the balance transfer by account processing in this embodiment, and a future date process, FIG. 6 (A) is a figure which shows the response | compatibility of the decision | availability of a payment, and a future date process, FIG. It is a figure which shows the table for cancellation recut determination. 図6に示す処理にて起動される取消再カット処理の一例を示すフローチャートである。It is a flowchart which shows an example of the cancellation recut process started by the process shown in FIG. 本発明の第2実施形態の構成例を示すブロック図である。It is a block diagram which shows the structural example of 2nd Embodiment of this invention. 本発明の第1実施例の構成例を示すブロック図である。It is a block diagram which shows the structural example of 1st Example of this invention. 図9に示す構成で使用するデータベースの種類を示す説明図である。It is explanatory drawing which shows the kind of database used with the structure shown in FIG. 図9に示す演算手段等の詳細構成を示すブロック図である。FIG. 10 is a block diagram illustrating a detailed configuration of a calculation unit and the like illustrated in FIG. 9. 再カット管理DBを用いた処理例を示す説明図であり、図12(A)は図9に示す構成に付加する部分を示す図で、図12(B)は未資金化残がある場合の処理例を示す図である。It is explanatory drawing which shows the process example using recut management DB, FIG. 12 (A) is a figure which shows the part added to the structure shown in FIG. 9, and FIG. It is a figure which shows the process example. 図9に示す構成で使用する取引明細セグメント等の例を示す説明図である。It is explanatory drawing which shows the example of the transaction details segment etc. which are used with the structure shown in FIG. 図13に示す取引明細セグメント等に応じた残高明細セグメントの例を示す説明図である。It is explanatory drawing which shows the example of the balance details segment according to the transaction detail segment etc. which are shown in FIG. 本発明の第2実施例の構成例を示すブロック図である。It is a block diagram which shows the structural example of 2nd Example of this invention. 第2実施例で使用するオペコードテーブルの一例を示す説明図である。It is explanatory drawing which shows an example of the opcode table used in 2nd Example. 図16に示す普通預金オペコードテーブルの一例を示す説明図である。It is explanatory drawing which shows an example of the ordinary deposit opcode table shown in FIG. 第2実施例での残高明細更新処理の一例を示すフローチャートである。It is a flowchart which shows an example of the balance details update process in 2nd Example. 第2実施例での通常入金処理の一例を示すフローチャートである。It is a flowchart which shows an example of the normal payment process in 2nd Example. 第2実施例での通常出金処理の一例を示すフローチャートである。It is a flowchart which shows an example of the normal payment process in 2nd Example. 第2実施例での取消再カットメイン処理の一例を示すフローチャートである。It is a flowchart which shows an example of the cancellation recut main process in 2nd Example. 図19に示す処理で使用する日付チェックテーブルの一例を示す説明図である。It is explanatory drawing which shows an example of the date check table used by the process shown in FIG. 第2実施例での定期預金入金取消処理の一例を示すフローチャートである。It is a flowchart which shows an example of the time deposit receipt cancellation process in 2nd Example. 第2実施例による1日のプログラム実行例を示す説明図である。It is explanatory drawing which shows the example of a 1-day program execution by 2nd Example.

符号の説明Explanation of symbols

2 演算手段
4 受信手段
6 ファイル
7 口座情報
8 勘定日別口座処理部
10 勘定日別口座情報格納部
12 先日時取消機能
13 先日時再カット機能
16 先日時残高更新機能
Second computing means 4 receiving unit 6 File 7 account information 8 separate account information storage unit 12 undo function equipped at the other day when another account processing unit 10 accounts date when accounts Date
13 Date / time recut function 16 Date / time balance update function

Claims (3)

各口座に対する各種入出金等の口座処理の取引種類と、当該口座処理の取引日時となる対象勘定日時と、入金額又は出金額である取引金額とを有する口座処理要求を演算する演算手段と、この演算手段によって演算された口座処理の結果を口座情報として記録するファイルとを備え、
前記ファイルが前記口座情報として、
前記演算された口座処理要求の対象勘定日時、取引種類及び取引金額を、口座処理要求の取引日時である勘定日時別で当該口座処理毎に記録する取引明細情報と、
前記口座毎に口座処理のあった勘定日時の残高を勘定日時毎に記録する勘定日時別の残高明細情報とを備え、
前記口座処理要求は、当該口座処理要求の対象となる口座への振込若しくは自動現金預入支払機等による入金要求又は口座振替若しくは自動現金預入支払機等による出金要求であり、
前記残高明細情報が、口座処理要求を演算する口座について、少なくとも演算日時と同日時付の残高又は過去で直近の残高を有し、
前記演算手段は、
前記残高明細情報に記録された前記残高のうち、対象勘定日時と同日時付の残高が記録されている場合には当該残高を対象勘定日時の残高として特定し、対象勘定日時と同日時付の残高が記録されていない場合には当該対象勘定日時より過去で直近の残高を対象勘定日時の残高として特定し、
前記特定された対象勘定日時の残高と前記取引金額とを加減算し、
当該演算した口座処理要求の取引種類及び取引金額を、当該口座処理要求の取引日時である対象勘定日時を勘定日時として前記取引明細情報に記録する勘定日時別口座処理部を備えると共に、
当該勘定日時別口座処理部が加減算した処理後の残高を、前記対象勘定日時の残高として前記残高明細情報に記録することで、前記対象勘定日時が先日時である場合には、前記対象勘定日時の残高を当該先日時の残高として前記残高明細情報に記録する勘定日時別口座情報格納部とを備えたことを特徴とする先日時付完結処理システム。
Calculation means for calculating an account processing request having a transaction type of account processing such as various deposits and withdrawals for each account, a target account date and time that is the transaction date and time of the account processing, and a transaction amount that is a deposit or withdrawal amount; A file for recording the account processing result calculated by the calculation means as account information,
The file is the account information,
Transaction details information for each account processing that records the calculated account processing request target account date and time, transaction type and transaction amount by account date and time that is the transaction date and time of the account processing request,
Balance details information for each account date and time to record the balance of the account date and time account processing for each account for each account date and time,
The account processing request is a transfer request to an account subject to the account processing request or a deposit request by an automatic cash deposit payment machine or a withdrawal request by an account transfer or an automatic cash deposit payment machine,
The balance statement information has at least the balance with the same date and time as the calculation date or the latest balance in the past for the account for calculating the account processing request,
The computing means is
Among the balances recorded in the balance details information, if a balance with the same date and time as the target account date is recorded, the balance is specified as the balance of the target account date and time, If the balance is not recorded, the balance closest to the target account date is specified as the balance of the target account date,
Add / subtract the balance of the identified target account date and time and the transaction amount,
A transaction type and transaction amount of the calculated account processing request are provided, and an account processing unit for each account date and time is recorded in the transaction details information as a target account date and time that is a transaction date and time of the account processing request.
By recording the balance after the addition and subtraction by the account processing unit according to the account date and time in the balance detail information as the balance of the target account date and time, when the target account date and time is the previous date and time, the target account date and time A date and time completion processing system comprising: an account information storage unit for each account date and time that records the current balance as a balance of the date and time in the balance detail information.
前記残高明細情報が、口座処理要求を演算する口座について、演算日より未来で先日時付の残高を既に有する場合、
前記勘定日時別口座処理部は、前記演算日時と同日時付又は先日時付の勘定日時を対象勘定日時とする別の新たな口座処理要求に対して、前記対象勘定日時の残高を特定する処理、加減算する処理及び取引明細情報に記録する処理とを実行し、
前記勘定日時別口座情報格納部は、
前記勘定日時別口座処理部によって前記別の新たな口座処理要求が実行された後に、
前記別の新たな口座処理要求の口座処理によって当該加減算された残高を、前記同日時付又は先日時付である対象勘定日時の残高として前記残高明細情報に記録し、
当該別の新たな口座処理に対応して、前記取引金額を、前記残高明細情報に記録された先日時付の勘定日時のうち、当該対象勘定日時より未来である先日時付の残高に対して加減算することで、先日時付の残高を更新することを特徴とする請求項1記載の先日時付完結処理システム。
When the balance statement information already has a balance with a date ahead in the future from the calculation date for the account for calculating the account processing request,
The account processing unit according to the account date and time is a process for specifying the balance of the target account date and time in response to another new account processing request with the account date and time with the same date and time as the calculation date or time as the target account date and time. , Execute the process of adding and subtracting and the process of recording in the transaction details information,
The account information storage unit by account date and time,
After the another new account processing request is executed by the account processing unit by account date and time,
The balance added and subtracted by the account processing of the other new account processing request is recorded in the balance description information as the balance of the target account date and time with the same date and time,
Corresponding to the other new account processing, the transaction amount is calculated with respect to the balance with the date and time ahead of the target account date and time among the date and time with the date and time recorded in the balance detail information. The completion processing system with the previous date and time according to claim 1, wherein the balance with the previous date and time is updated by addition and subtraction.
前記ファイルは、対象勘定日時を先日時付とする出金処理で当該対象勘定日時の残高より取引金額が大きく決済不能であった場合、当該出金処理が未成立であることを記録する取引の結果を有し、
前記勘定日時別口座処理部は、
新たな入金処理によって残高が更新された際に、当該新たな入金処理によって残高が増加した先日時付について、前記取引の結果が未成立の出金処理を読み出して、当該読み出した未成立の出金処理の対象勘定日時に対応する残高と取引金額とを比較し、比較の結果、当該取引金額が前記残高以下で決済可能である場合には、当該未成立であった出金処理を再実行することによって、先日時付再カットを行い、
新たな出金処理によって残高が更新された際に、当該残高が更新された先日時付について、残高がマイナスとなった先日時付の有無を確認し、残高がマイナスとなった先日時付がある場合には、当該残高がマイナスとなった先日時付を対象勘定日時とした出金処理を前記取引明細情報から読み出し、当該読み出した出金処理に対して未成立であることを前記取引の結果に記録し、前記未成立とした出金処理の取引金額を当該対象勘定日時の残高に加算することによって、先日時付取消を行うことを特徴とする請求項2記載の先日時付完結処理システム。
If the transaction amount is larger than the balance of the target account date and time and cannot be settled in the withdrawal process with the target account date and time as the target date and time, the file records that the withdrawal process has not been completed. Have results,
The account processing unit by account date and time,
When the balance is updated by a new deposit process, the withdrawal process in which the result of the transaction is not established is read for the date and time when the balance has increased by the new deposit process, and the read unestablished Compare the balance corresponding to the target account date and time of the transaction with the transaction amount, and if the transaction amount can be settled below the balance as a result of the comparison, re-execute the unsettled withdrawal process By doing a re-cut with the date and time ahead,
When the balance is updated by a new withdrawal process, the date and time when the balance is updated is checked for the date and time when the balance has become negative. If there is, the withdrawal process with the target date and time as the target date and time when the balance has become negative is read from the transaction details information, and it is determined that the transaction has not been established for the readout process. 3. A date-and-time completion process according to claim 2, wherein the date-and-time cancellation is recorded by adding the transaction amount of the withdrawal process recorded in the result to the balance of the target account date and time. system.
JP2004128903A 2004-04-23 2004-04-23 Complete processing system with date and time Expired - Lifetime JP3903471B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004128903A JP3903471B2 (en) 2004-04-23 2004-04-23 Complete processing system with date and time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004128903A JP3903471B2 (en) 2004-04-23 2004-04-23 Complete processing system with date and time

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2003112455A Division JP3941946B2 (en) 2003-04-17 2003-04-17 A recording medium recording a program for completion processing of a previous date and a program for canceling / recutting main processing

Publications (2)

Publication Number Publication Date
JP2004272926A JP2004272926A (en) 2004-09-30
JP3903471B2 true JP3903471B2 (en) 2007-04-11

Family

ID=33128546

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004128903A Expired - Lifetime JP3903471B2 (en) 2004-04-23 2004-04-23 Complete processing system with date and time

Country Status (1)

Country Link
JP (1) JP3903471B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5519834B1 (en) * 2013-06-18 2014-06-11 ソフトバンクモバイル株式会社 Credit system and program
JP2017182284A (en) * 2016-03-29 2017-10-05 Profit Cube 株式会社 Loan examination support device and system, and program
JP7084737B2 (en) * 2018-02-09 2022-06-15 株式会社オービック Deposit amount appropriation device, deposit amount appropriation method and deposit amount appropriation program

Also Published As

Publication number Publication date
JP2004272926A (en) 2004-09-30

Similar Documents

Publication Publication Date Title
US20140114821A1 (en) Apparatus for consolidating financial transaction information
WO2009029331A1 (en) Methods and systems for executing a plurality of money transfers having a fluctuating parameter
JP4540002B2 (en) Inter-account settlement processing apparatus using electronic record receivable and inter-account settlement processing method
WO1992004679A1 (en) Transaction processor
CN112785262B (en) Mobile loan management method, mobile loan management system, mobile loan management server, and mobile loan management storage medium
JP2001243400A (en) Account managing system using related account
JP2000339391A (en) Funds centralized control system, computer used in the same, its operating method and medium for recording program to control computer
KR20210119263A (en) Method of managing card sales data of affiliate store using electronic device and electronic device thereof
JP3903471B2 (en) Complete processing system with date and time
JP2001266025A (en) Method and system for price settlement management
JP3471728B2 (en) Future date completion processing system and method
JP2001142987A (en) Substitutive payment work system
JP3941946B2 (en) A recording medium recording a program for completion processing of a previous date and a program for canceling / recutting main processing
JP3611110B2 (en) System, method and program for completion process of the previous date, program for cancel / recut main process used therefor, resource optimization system, program and program for cancel / reexecute main process used therefor
JP2003288490A (en) Automatic processing system, aggregation server and automatic processing method
JP2003168004A (en) Method for processing payment, method for processing financing certification and financial institution system
JP2007317092A (en) Credit payment management system, application server, program, and computer readable recording medium
JP2003331121A5 (en)
AU2021101189A4 (en) Method and Apparatus for Immediate Credit
JP2003122932A (en) Account transfer method, search method for account transfer information, and account transfer system
JP2004038614A (en) Paying and receiving substitution processing method, computer program, and recording medium
JP2003099607A (en) Deposit account information providing method and deposit account information providing program
JP2002149962A (en) Method and system for management of money deposit and withdrawal using portable terminal unit
JP3235060B2 (en) Automatic transfer device and automatic transfer method
JP3257058B2 (en) Data update system

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061228

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061228

R150 Certificate of patent or registration of utility model

Ref document number: 3903471

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100119

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term