JP2017084094A - Plan support device, supply chain management system, and plan support program - Google Patents

Plan support device, supply chain management system, and plan support program Download PDF

Info

Publication number
JP2017084094A
JP2017084094A JP2015211719A JP2015211719A JP2017084094A JP 2017084094 A JP2017084094 A JP 2017084094A JP 2015211719 A JP2015211719 A JP 2015211719A JP 2015211719 A JP2015211719 A JP 2015211719A JP 2017084094 A JP2017084094 A JP 2017084094A
Authority
JP
Japan
Prior art keywords
plan
period
unit
incident
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015211719A
Other languages
Japanese (ja)
Other versions
JP6174098B2 (en
Inventor
小林 秀雄
Hideo Kobayashi
秀雄 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Information Systems Corp
Original Assignee
Mitsubishi Electric Information Systems Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Information Systems Corp filed Critical Mitsubishi Electric Information Systems Corp
Priority to JP2015211719A priority Critical patent/JP6174098B2/en
Publication of JP2017084094A publication Critical patent/JP2017084094A/en
Application granted granted Critical
Publication of JP6174098B2 publication Critical patent/JP6174098B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide, when a new incident occurs, information on correspondence to the past incident which is identical or similar to the new incident from a mid-and-long term point of view.SOLUTION: In a plan support device 101, an acquisition part 120 is configured to, when occurrence of an emergency order of a product A is detected by a detection part 110 as a new incident, acquire index data indicating height of a current demand of the product A from a storage part 180, and an extraction part 130 is configured to, when the height of the demand of the product A indicated by the acquired index data matches height of a demand of a product B at occurrence of an emergency order of the product B as the past incident, extract operation data concerning the emergency order of the product B from an operation database 131, and an output part 150 is configured to output content of an operation indicated by the extracted operation data.SELECTED DRAWING: Figure 1

Description

本発明は、計画支援装置、サプライチェーン管理システム及び計画支援プログラムに関するものである。   The present invention relates to a plan support apparatus, a supply chain management system, and a plan support program.

従来、証券システム等の対象システムの特性及び状況等のリアルタイムの変動等に応じた適合的なインシデント対応情報を、既知のインシデントの情報を参照及び検索することで、自動的に取得して出力する管理システムがある(例えば、特許文献1参照)。   Conventionally, appropriate incident response information corresponding to real-time fluctuations in the characteristics and status of target systems such as securities systems is automatically obtained and output by referring to and searching for known incident information. There is a management system (see, for example, Patent Document 1).

特開2011−76161号公報JP 2011-76161 A

従来の管理システムでは、対象システムのエラー、障害等、対象システムでの所定のサービスレベルを満たしたサービスの提供を阻害するものをインシデントとして扱っている。このようなインシデントへの対応では、対象システムを復旧させれば、対象システムが正常なサービスの提供を再開できるようになるという明確な効果が得られる。   In a conventional management system, an object such as an error or failure of the target system that impedes provision of a service that satisfies a predetermined service level in the target system is handled as an incident. In response to such an incident, if the target system is restored, a clear effect is obtained that the target system can resume providing normal services.

サプライチェーンの管理システムのように、複数の価値観を持つ人及び組織等が複雑に関与するシステムでは、緊急注文、注文キャンセル等のインシデントへの対応が、プラスマイナスの波及効果を生じさせるものとなり得る。例えば、緊急注文に対して安全在庫を取り崩して販売するという対応が採られたとする。その場合、短期的には売上増というプラスの効果が期待できるが、中長期的には在庫バランスの偏り等によってサプライチェーン運用リスクが高まるというマイナスの効果が生ずるおそれがある。したがって、既知のインシデントへの対応を、短期的な観点だけでなく、中長期的な観点からも評価しなければ、その対応が参考にすべきものであるかどうか判断できない。   In a system that involves people and organizations with multiple values in a complex manner, such as a supply chain management system, responding to incidents such as urgent orders and order cancellations will have a positive and negative ripple effect. obtain. For example, suppose that an emergency order is taken to sell the safety stock after breaking it down. In that case, a positive effect of increasing sales can be expected in the short term, but in the medium and long term there may be a negative effect of increasing supply chain operational risk due to an imbalance in inventory balance. Therefore, unless the response to a known incident is evaluated not only from a short-term perspective but also from a medium- to long-term perspective, it cannot be determined whether the response should be helpful.

本発明は、新たなインシデントが発生した場合に、その新たなインシデントと中長期的な観点で同じか又は類似する過去のインシデントへの対応の情報を提供することを目的とする。   An object of the present invention is to provide information on response to a past incident that is the same as or similar to the new incident from a medium- to long-term viewpoint when a new incident occurs.

本発明の一態様に係る計画支援装置は、
単位期間ごとの数量の計画を支援する計画支援装置であって、
少なくとも1つの単位期間に対応し、対応する単位期間に必要な数量を計画するための指標値を示す指標データを予め記憶する記憶部と、
1つの単位期間に対応し、対応する単位期間以降の数量の計画に影響を及ぼすインシデントの発生を検出する検出部と、
新たなインシデントの発生が前記検出部により検出された場合、前記新たなインシデントが対応する単位期間に続く単位期間の指標値を示す指標データを前記記憶部から取得する取得部と、
過去の複数のインシデントについて、各インシデントが対応する単位期間である第1期間と前記第1期間に続く少なくとも1つの単位期間である第2期間とのそれぞれの数量の計画を調整するために実行されたオペレーションの内容と、前記第2期間の指標値とを示すオペレーションデータを蓄積するオペレーションデータベースを検索して、前記取得部により取得された指標データと指標値が一致するオペレーションデータを抽出する抽出部と、
前記抽出部により抽出されたオペレーションデータが示すオペレーションの内容を出力する出力部とを備える。
A planning support apparatus according to an aspect of the present invention includes:
A plan support device that supports the planning of a quantity for each unit period,
A storage unit corresponding to at least one unit period, and storing in advance index data indicating an index value for planning a quantity required for the corresponding unit period;
A detection unit for detecting occurrence of an incident corresponding to one unit period and affecting a plan of quantity after the corresponding unit period;
When an occurrence of a new incident is detected by the detection unit, an acquisition unit that acquires index data indicating an index value of a unit period following a unit period corresponding to the new incident from the storage unit;
For a plurality of past incidents, it is executed to adjust the plan of each quantity of a first period that is a unit period to which each incident corresponds and a second period that is at least one unit period following the first period. An extraction unit that searches an operation database that stores operation data indicating the contents of the operation and the index value of the second period, and extracts operation data that matches the index data acquired by the acquisition unit When,
An output unit that outputs the contents of the operation indicated by the operation data extracted by the extraction unit.

前記過去の複数のインシデントに対して実行されたオペレーションについて、前記第1期間の経過前に各オペレーションによって調整された前記第2期間の数量の計画である第1計画と、前記第1期間の経過後に再調整された前記第2期間の数量の計画である第2計画とを示す評価対象データを蓄積する評価対象データベースを参照し、各オペレーションを、前記第1計画と前記第2計画との比較結果に基づいて評価する評価部をさらに備え、
前記出力部は、前記抽出部により抽出されたオペレーションデータが示すオペレーションの内容とともに、該当するオペレーションの前記評価部での評価結果を出力する。
A first plan that is a plan of the quantity of the second period adjusted by each operation before the first period has elapsed for the operations executed for the plurality of past incidents, and the passage of the first period Reference is made to an evaluation target database that accumulates evaluation target data indicating a second plan that is a quantity plan of the second period that has been readjusted later, and each operation is compared with the first plan and the second plan. It further includes an evaluation unit that evaluates based on the result,
The output unit outputs the evaluation result of the corresponding operation in the evaluation unit together with the contents of the operation indicated by the operation data extracted by the extraction unit.

前記第2計画は、確定された前記第2期間の数量の計画である。   The second plan is a plan for the quantity determined in the second period.

前記評価部は、各オペレーションを、前記第1計画と前記第2計画との比較結果だけでなく、前記第1期間の数量の実績と前記第1期間の経過前に各オペレーションによって調整された前記第1期間の数量の計画との比較結果にも基づいて評価する。   The evaluation unit adjusts each operation not only by the comparison result between the first plan and the second plan, but also by the operation before the lapse of the first period and the actual quantity of the first period. Evaluation is also made based on a comparison result with the plan of the quantity in the first period.

前記新たなインシデントに対して実行されたオペレーションの内容の入力を受け、前記新たなインシデントについて、前記取得部により取得された指標データが示す指標値と、入力されたオペレーションの内容とを示すオペレーションデータを作成し、作成したオペレーションデータを前記オペレーションデータベースに登録する登録部をさらに備える。   Operation data indicating the index value indicated by the index data acquired by the acquisition unit and the content of the input operation for the new incident upon receiving the input of the content of the operation executed for the new incident And a registration unit for registering the created operation data in the operation database.

単位期間ごとに計画される数量には、サプライチェーンで扱われる製品の在庫量が含まれ、
前記記憶部に記憶されている指標データと前記オペレーションデータベースに蓄積されているオペレーションデータとが示す指標値には、前記製品の需要の高さを表す値が含まれる。
The quantity planned for each unit period includes the inventory of products handled in the supply chain,
The index value indicated by the index data stored in the storage unit and the operation data stored in the operation database includes a value indicating the level of demand for the product.

本発明の一態様に係るサプライチェーン管理システムは、
前記計画支援装置と、
前記製品の在庫量の計画を示す計画データを保管して前記計画支援装置に利用させるシステムとを備える。
A supply chain management system according to an aspect of the present invention includes:
The planning support device;
A system for storing plan data indicating a plan of the stock quantity of the product and causing the plan support apparatus to use the plan data.

本発明の一態様に係る計画支援プログラムは、
単位期間ごとの数量の計画を支援する計画支援プログラムであって、
少なくとも1つの単位期間に対応し、対応する単位期間に必要な数量を計画するための指標値を示す指標データを予め記憶する記憶部を備えるコンピュータに、
1つの単位期間に対応し、対応する単位期間以降の数量の計画に影響を及ぼすインシデントの発生を検出する処理と、
新たなインシデントの発生が検出された場合、前記新たなインシデントが対応する単位期間に続く単位期間の指標値を示す指標データを前記記憶部から取得する処理と、
過去の複数のインシデントについて、各インシデントが対応する単位期間である第1期間と前記第1期間に続く少なくとも1つの単位期間である第2期間とのそれぞれの数量の計画を調整するために実行されたオペレーションの内容と、前記第2期間の指標値とを示すオペレーションデータを蓄積するオペレーションデータベースを検索して、前記記憶部から取得された指標データと指標値が一致するオペレーションデータを抽出する処理と、
抽出されたオペレーションデータが示すオペレーションの内容を出力する処理とを実行させる。
A planning support program according to an aspect of the present invention is provided.
A planning support program that supports the planning of quantities per unit period,
In a computer provided with a storage unit corresponding to at least one unit period and storing in advance index data indicating an index value for planning a quantity required for the corresponding unit period,
A process for detecting the occurrence of an incident corresponding to one unit period and affecting the planning of the quantity after the corresponding unit period;
When the occurrence of a new incident is detected, a process of acquiring index data indicating an index value of a unit period following the unit period corresponding to the new incident from the storage unit;
For a plurality of past incidents, it is executed to adjust the plan of each quantity of a first period that is a unit period to which each incident corresponds and a second period that is at least one unit period following the first period. A process of searching an operation database for storing operation data indicating the content of the operation and the index value of the second period, and extracting operation data whose index value matches the index data acquired from the storage unit; ,
And a process for outputting the contents of the operation indicated by the extracted operation data.

本発明では、新たなインシデントが発生した場合、その新たなインシデントが対応する単位期間よりも未来に必要な数量を計画するための指標値をキーにして、過去のインシデントへの対応が検索される。このため、本発明によれば、新たなインシデントと中長期的な観点で同じか又は類似する過去のインシデントへの対応の情報を提供することができる。   In the present invention, when a new incident occurs, a response to a past incident is searched for using an index value for planning a quantity required in the future as compared with a unit period corresponding to the new incident. . For this reason, according to the present invention, it is possible to provide information on correspondence to past incidents that are the same as or similar to new incidents from a medium- to long-term viewpoint.

実施の形態1に係るサプライチェーン管理システムの構成を示すブロック図。1 is a block diagram showing a configuration of a supply chain management system according to Embodiment 1. FIG. 環境条件によってインシデントへの対応を変える例を示す表。A table showing examples of changing incident response according to environmental conditions. 短期的及び中長期的な観点からオペレーションが決定される例を示す表。A table showing examples of operations determined from short-term and medium- to long-term perspectives. 実施の形態1に係る計画支援装置のハードウェア構成例を示すブロック図。FIG. 3 is a block diagram showing an example of a hardware configuration of the plan support apparatus according to the first embodiment. 実施の形態1に係る計画支援装置の動作を示すフローチャート。5 is a flowchart showing the operation of the plan support apparatus according to the first embodiment. オペレーションデータの例を示す表。A table showing an example of operation data. 在庫量の計画が見直される例を示す図、及び、評価対象データの例を示す表。The figure which shows the example in which the plan of inventory quantity is reviewed, and the table | surface which shows the example of evaluation object data. 在庫量の計画が見直される例を示すグラフ。The graph which shows the example by which the plan of inventory quantity is reviewed. 過去のオペレーションが評価される例を示す図。The figure which shows the example by which the past operation is evaluated. 過去のオペレーションが評価される例を示す図。The figure which shows the example by which the past operation is evaluated. 過去のオペレーションの内容及び評価結果に基づいて新たなオペレーションが決定される例を示す図。The figure which shows the example in which a new operation is determined based on the content and evaluation result of the past operation.

以下、本発明の実施の形態について、図を用いて説明する。なお、各図中、同一又は相当する部分には、同一符号を付している。実施の形態の説明において、同一又は相当する部分については、その説明を適宜省略又は簡略化する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In addition, the same code | symbol is attached | subjected to the part which is the same or it corresponds in each figure. In the description of the embodiments, the description of the same or corresponding parts will be omitted or simplified as appropriate.

実施の形態1.
本実施の形態に係るシステムの構成、本実施の形態に係るシステムが備える装置の動作、本実施の形態の効果を順番に説明する。
Embodiment 1 FIG.
The configuration of the system according to the present embodiment, the operation of the apparatus provided in the system according to the present embodiment, and the effects of the present embodiment will be described in order.

***構成の説明***
図1を参照して、本実施の形態に係るシステムであるサプライチェーン管理システム100の構成を説明する。
*** Explanation of configuration ***
With reference to FIG. 1, the structure of the supply chain management system 100 which is a system based on this Embodiment is demonstrated.

サプライチェーン管理システム100は、計画支援装置101と、基幹システム102と、SC計画システム103とを備える。なお、SCは、サプライチェーンの略である。   The supply chain management system 100 includes a plan support apparatus 101, a backbone system 102, and an SC planning system 103. SC is an abbreviation for supply chain.

計画支援装置101は、単位期間ごとの数量の計画を支援する装置である。本実施の形態において、単位期間ごとに計画される数量には、サプライチェーンで扱われる製品の在庫量が含まれる。また、数量の計画サイクルとなる単位期間は、週である。即ち、計画支援装置101は、週ごとの在庫量の計画を支援する装置である。なお、単位期間ごとに計画される数量には、サプライチェーンで扱われる製品の在庫量だけでなく、当該製品の仕入れ量、生産量、販売量及び出荷量の少なくともいずれかが含まれてもよい。また、数量の計画サイクルは、週に限らず、日、月等であってもよい。また、数量は、単一の製品を対象とするだけでなく、複数の製品(例えば、1つの製品グループに含まれる製品)を対象として、カウントしてもよい。さらに、数量は、個数、ロット数といった物理的な数量に限らず、金額等であってもよい。数量が金額として計画される場合には、「金額=単価×為替レート」又は「金額=単価×数量×為替レート」として設定される。これにより、為替レートの急変等をインシデントとして考慮することができる。   The plan support apparatus 101 is an apparatus that supports the planning of quantities for each unit period. In the present embodiment, the quantity planned for each unit period includes the inventory quantity of products handled in the supply chain. In addition, a unit period that is a quantity planning cycle is a week. That is, the plan support apparatus 101 is an apparatus that supports the plan of the inventory quantity for each week. Note that the quantity planned for each unit period may include not only the inventory quantity of products handled in the supply chain but also at least one of the purchase quantity, production quantity, sales quantity, and shipment quantity of the product. . Further, the quantity planning cycle is not limited to a week, but may be a day, a month, or the like. Further, the quantity may be counted not only for a single product but also for a plurality of products (for example, products included in one product group). Furthermore, the quantity is not limited to a physical quantity such as the number and the number of lots, but may be an amount or the like. When the quantity is planned as an amount, “amount = unit price × exchange rate” or “amount = unit price × quantity × exchange rate” is set. Thereby, a sudden change in the exchange rate can be considered as an incident.

基幹システム102は、トランザクションデータ201と実績データ202とを保管して計画支援装置101に利用させるシステムであり、具体的には、ERP(Enterprise・Resource・Planning)システム等である。トランザクションデータ201としては、受注、仕入れ、工場稼働状況等に関するものがある。実績データ202としては、販売、生産、在庫等に関するものがある。販売に関する実績データ202は、サプライチェーンで扱われる製品の販売量の実績を示すデータである。生産に関する実績データ202は、当該製品の生産量の実績を示すデータである。在庫に関する実績データ202は、当該製品の在庫量の実績を示すデータである。なお、基幹システム102は、実績データ202のみを計画支援装置101に利用させてもよい。   The backbone system 102 is a system that stores the transaction data 201 and the result data 202 and causes the plan support apparatus 101 to use it, and specifically, is an ERP (Enterprise, Resource, and Planning) system. The transaction data 201 includes data related to orders, purchases, factory operating conditions, and the like. The actual data 202 includes sales, production, inventory, and the like. Sales performance data 202 is data indicating the sales volume of products handled in the supply chain. The production data 202 relating to production is data indicating the production volume of the product. The actual data 202 relating to the stock is data indicating the actual stock quantity of the product. Note that the core system 102 may cause the plan support apparatus 101 to use only the result data 202.

SC計画システム103は、計画データ301を保管して計画支援装置101に利用させるシステムである。計画データ301としては、販売、生産、在庫等に関するものがある。販売に関する計画データ301は、サプライチェーンで扱われる製品の販売量の計画を示すデータである。生産に関する計画データ301は、当該製品の生産量の計画を示すデータである。在庫に関する計画データ301は、当該製品の在庫量の計画を示すデータである。   The SC planning system 103 is a system that stores the plan data 301 and causes the plan support apparatus 101 to use it. The plan data 301 includes sales, production, inventory, and the like. The sales plan data 301 is data indicating a plan for the sales volume of products handled in the supply chain. The production plan data 301 is data indicating a production plan of the product. The plan data 301 relating to stock is data indicating a plan for the stock amount of the product.

基幹システム102では、プログラムであるインシデント検出エージェント211が動作している。同じように、SC計画システム103では、プログラムであるインシデント検出エージェント311が動作している。インシデント検出エージェント211,311は、インシデントの発生を検出する。   In the backbone system 102, an incident detection agent 211, which is a program, is operating. Similarly, in the SC planning system 103, an incident detection agent 311 that is a program is operating. Incident detection agents 211 and 311 detect the occurrence of an incident.

ここで、インシデントについて説明する。   Here, the incident will be described.

インシデントとは、在庫量の計画サイクル等、サプライチェーンの計画サイクルに関わらず、即対応が必要な事象のことである。インシデントには、以下のようなものがある。
・顧客による緊急注文:供給LT(Lead・Time)より短納期での注文、安全在庫では不足
・顧客による納期変更:供給LTより前倒し変更、大幅な後ろ倒し
・顧客による注文キャンセル:大量のキャンセル、納期直前のキャンセル
・工場又は特定ラインの操業停止:災害、重要設備故障、要員不足等
・工場又は特定ラインの生産能力低下:災害、重要設備故障、要員不足等
・品質不良発生
・計画外の生産実行
・キーパーツの欠品又は大幅な納期遅延
Incidents are events that require immediate action, regardless of the supply chain planning cycle, such as the inventory planning cycle. Incidents include the following.
・ Emergency orders by customers: Orders with shorter delivery times than supply LT (Lead / Time), shortage in safety stock ・ Changes in delivery dates by customers: Changes ahead of supply LT, significant delays ・ Order cancellations by customers: Mass cancellation, Cancellation immediately before delivery date ・ Operation stop of factory or specified line: Disaster, critical equipment failure, shortage of personnel, etc. ・ Production capacity decline of factory or specific line: Disaster, critical equipment failure, shortage of staff, etc. ・ Quality defect occurrence ・ Unplanned production Execution, missing key parts or significant delay in delivery

インシデントへの対応は、短期的な観点だけでなく、中長期的な観点からも検討して決定する必要がある。そうでなければ、前述したように、インシデントへの対応によって、短期的にはプラスの効果が得られても、中長期的にはマイナスの効果が生ずるおそれがある。中長期的にもプラスの効果を得るためには、将来必要な在庫量の計画又は計画の見直しを行い、在庫量の適正化を図ることが必要である。即ち、将来必要な在庫量の計画の範囲内で在庫を維持し、できる限り適正なレベルに近づける必要がある。将来必要な在庫量を計画するための指標としては、需要動向、工場稼働率、顧客特性、地域特性、災害リスクといった環境条件が挙げられる。   Incident response needs to be determined not only from a short-term perspective, but also from a medium- to long-term perspective. Otherwise, as described above, responding to an incident may have a positive effect in the short term, but may have a negative effect in the medium to long term. In order to obtain a positive effect in the medium to long term, it is necessary to plan the inventory required in the future or review the plan to optimize the inventory. In other words, it is necessary to maintain the inventory within the range of the planned inventory quantity required in the future and bring it closer to the appropriate level as much as possible. Indicators for planning future inventory requirements include environmental conditions such as demand trends, factory utilization, customer characteristics, regional characteristics, and disaster risk.

インシデントが発生した場合、図2に例示するように、インシデントが発生した時点における環境条件によってインシデントへの対応を変えることで、在庫の適正化が可能となり、将来のサプライチェーン運用リスクを低減することができる。具体例として、ある製品の緊急注文が発生したとする。その場合、当該製品の需要が高ければ、将来必要な当該製品の在庫量が増えることに備えて、当該製品の緊急増産を行うという対応が可能である。一方、当該製品の需要が低ければ、緊急注文には安全在庫の出荷で対応し、むしろ当該製品の減産又は減産準備を行うという対応が可能である。なお、需要は、製品のカテゴリ、地域、顧客の属性等を集計軸として集計される。   When an incident occurs, as shown in Fig. 2, by changing the response to the incident according to the environmental conditions at the time of the incident, it is possible to optimize inventory and reduce future supply chain operational risks Can do. As a specific example, it is assumed that an urgent order for a certain product has occurred. In that case, if the demand for the product is high, it is possible to cope with an emergency increase of the product in preparation for an increase in the inventory amount of the product required in the future. On the other hand, if the demand for the product is low, it is possible to respond to an urgent order by shipment of a safety stock, but rather to reduce production or prepare for production reduction. The demand is aggregated with the product category, region, customer attributes, etc. as the aggregation axis.

このように、環境条件を考慮に入れてインシデントへの対応を決定すれば、短期的にプラスの効果が得られるだけでなく、中長期的にもプラスの効果が得られる可能性が高くなる。そこで、本実施の形態では、計画支援装置101が、過去のインシデントに対して、各インシデントが発生したときの環境条件を考慮に入れて決定された対応に関する情報を、その環境条件とともに蓄積する。そして、新たなインシデントへの対応が検討される際には、計画支援装置101が、その新たなインシデントと環境条件が共通する過去のインシデントに対して決定された対応に関する情報を検索する。これにより、SC管理者が、過去のインシデントへの対応を参考にして、短期的及び中長期的にプラスの効果が得られるオペレーションを実行することが可能となる。   Thus, if the response to the incident is determined in consideration of the environmental conditions, not only a positive effect can be obtained in the short term, but also the possibility that a positive effect can be obtained in the medium to long term is increased. Therefore, in the present embodiment, the plan support apparatus 101 accumulates information regarding the correspondence determined in consideration of the environmental conditions when each incident occurs with respect to past incidents, along with the environmental conditions. Then, when a response to a new incident is considered, the plan support apparatus 101 searches for information related to a response determined for a past incident that has the same environmental conditions as the new incident. As a result, the SC manager can execute an operation that has a positive effect in the short term and the medium to long term with reference to the response to the past incident.

ここで、オペレーションについて説明する。   Here, the operation will be described.

オペレーションとは、インシデントへの対応のことであり、具体的には、指示及び計画を行うことである。オペレーションは、直接インシデントに対応する施策と、インシデント発生前の定常状態に戻すための施策とからなる。前者の施策は、インシデントの発生前から予定されている直近の生産、出荷等の優先度を考慮に入れて決定される。ただし、重要顧客又は戦略販売製品に関わるインシデントに対しては、無条件又は最優先の対応が望ましい。後者の施策は、環境条件を考慮に入れて決定される。   An operation is a response to an incident. Specifically, it is an instruction and a plan. The operation consists of a measure for directly dealing with an incident and a measure for returning to a steady state before the incident occurs. The former measure is determined taking into account the priorities of the most recent production, shipment, etc. scheduled before the occurrence of the incident. However, an unconditional or top priority response is desirable for incidents involving important customers or strategic sales products. The latter measure is determined taking into account environmental conditions.

インシデントが発生した場合、図3に例示するように、インシデントの発生前から予定されている直近の生産、出荷等の優先度によって、即ち、短期的な観点から、直接インシデントに対応する施策が決定される。また、環境条件によって、即ち、中長期的な観点から、インシデント発生前の定常状態に戻すための施策が決定される。これにより、在庫の適正化が可能となり、将来のサプライチェーン運用リスクを低減することができる。具体例として、ある製品の緊急注文が発生したとする。その場合、短期的な観点から、安全在庫を取り崩して出荷するという施策が決定される。当該製品の需要が高ければ、中長期的な観点から、当該製品の補充生産を優先的に行うという施策が決定される。なお、工場の単位期間内の生産能力を超える需要があるときは、製品を前倒しして生産し、在庫を積み上げることで対処してもよい。また、生産性、稼働率、品質等のリスク、即ち、計画通り製品を生産できないリスクへの対処として、在庫を積み上げてもよい。また、需要のブレを平準化して生産(コスト削減等の理由で)するため、結果としての在庫増減を許容してもよい。   When an incident occurs, as shown in Fig. 3, measures to deal directly with the incident are determined according to the priority of the most recent production, shipment, etc. scheduled before the incident occurs, that is, from a short-term perspective. Is done. Further, a measure for returning to the steady state before the occurrence of the incident is determined according to environmental conditions, that is, from a medium- to long-term viewpoint. This makes it possible to optimize inventory and reduce future supply chain operation risks. As a specific example, it is assumed that an urgent order for a certain product has occurred. In that case, from a short-term viewpoint, a measure of releasing safety stock and shipping is determined. If the demand for the product is high, a measure to preferentially perform supplementary production of the product is determined from a medium- to long-term viewpoint. In addition, when there is a demand exceeding the production capacity within the unit period of the factory, it may be dealt with by producing the product ahead of schedule and building up inventory. In addition, inventory may be accumulated as a countermeasure for risks such as productivity, availability, quality, etc., that is, a risk that products cannot be produced as planned. In addition, in order to produce a leveled demand fluctuation (for reasons such as cost reduction), the resulting increase or decrease in inventory may be allowed.

図1及び図4を参照して、計画支援装置101の構成を説明する。   With reference to FIG.1 and FIG.4, the structure of the plan assistance apparatus 101 is demonstrated.

図1に示すように、計画支援装置101は、検出部110と、取得部120と、抽出部130と、検索部140と、出力部150と、登録部160と、評価部170と、記憶部180とを備える。また、計画支援装置101は、インシデントデータベース111と、オペレーションデータベース131と、評価対象データベース171とを備える。なお、インシデントデータベース111と、オペレーションデータベース131と、評価対象データベース171は、計画支援装置101の外部に設けられてもよい。   As shown in FIG. 1, the planning support apparatus 101 includes a detection unit 110, an acquisition unit 120, an extraction unit 130, a search unit 140, an output unit 150, a registration unit 160, an evaluation unit 170, and a storage unit. 180. The plan support apparatus 101 also includes an incident database 111, an operation database 131, and an evaluation target database 171. The incident database 111, the operation database 131, and the evaluation target database 171 may be provided outside the planning support apparatus 101.

本実施の形態において、計画支援装置101は、コンピュータである。計画支援装置101の機能は、ソフトウェアで実現される。図4に示すように、計画支援装置101は、プロセッサ901、補助記憶装置902、メモリ903、通信装置904、入力装置905、ディスプレイ906といったハードウェアを備える。プロセッサ901は、信号線を介して他のハードウェアと接続され、これら他のハードウェアを制御する。   In the present embodiment, the plan support apparatus 101 is a computer. The function of the plan support apparatus 101 is realized by software. As illustrated in FIG. 4, the plan support apparatus 101 includes hardware such as a processor 901, an auxiliary storage device 902, a memory 903, a communication device 904, an input device 905, and a display 906. The processor 901 is connected to other hardware via a signal line, and controls these other hardware.

プロセッサ901は、プロセッシングを行うIC(Integrated・Circuit)である。プロセッサ901は、具体的には、CPU(Central・Processing・Unit)である。   The processor 901 is an IC (Integrated Circuit) that performs processing. Specifically, the processor 901 is a CPU (Central Processing Unit).

補助記憶装置902は、具体的には、ROM(Read・Only・Memory)、フラッシュメモリ、又は、HDD(Hard・Disk・Drive)である。メモリ903は、具体的には、RAM(Random・Access・Memory)である。記憶部180は、メモリ903により実現される。インシデントデータベース111、オペレーションデータベース131、及び、評価対象データベース171は、メモリ903、或いは、補助記憶装置902とメモリ903との組み合わせにより実現される。   Specifically, the auxiliary storage device 902 is a ROM (Read / Only / Memory), a flash memory, or an HDD (Hard / Disk / Drive). Specifically, the memory 903 is a RAM (Random Access Memory). The storage unit 180 is realized by the memory 903. The incident database 111, the operation database 131, and the evaluation target database 171 are realized by the memory 903 or a combination of the auxiliary storage device 902 and the memory 903.

通信装置904は、データを受信するレシーバ911と、データを送信するトランスミッタ912を含む。通信装置904は、具体的には、通信チップ又はNIC(Network・Interface・Card)である。   The communication device 904 includes a receiver 911 that receives data and a transmitter 912 that transmits data. Specifically, the communication device 904 is a communication chip or a NIC (Network, Interface, Card).

入力装置905は、具体的には、マウス、キーボード、又は、タッチパネルである。   Specifically, the input device 905 is a mouse, a keyboard, or a touch panel.

ディスプレイ906は、具体的には、LCD(Liquid・Crystal・Display)である。   The display 906 is specifically an LCD (Liquid / Crystal / Display).

補助記憶装置902には、検出部110、取得部120、抽出部130、検索部140、出力部150、登録部160、評価部170といった「部」の機能を実現するプログラムが記憶されている。このプログラムは、メモリ903にロードされ、プロセッサ901に読み込まれ、プロセッサ901によって実行される。補助記憶装置902には、OS(Operating・System)も記憶されている。OSの少なくとも一部がメモリ903にロードされ、プロセッサ901はOSを実行しながら、「部」の機能を実現するプログラムを実行する。   The auxiliary storage device 902 stores a program that realizes the function of “unit” such as the detection unit 110, the acquisition unit 120, the extraction unit 130, the search unit 140, the output unit 150, the registration unit 160, and the evaluation unit 170. This program is loaded into the memory 903, read into the processor 901, and executed by the processor 901. The auxiliary storage device 902 also stores an OS (Operating System). At least a part of the OS is loaded into the memory 903, and the processor 901 executes a program that realizes the function of “unit” while executing the OS.

計画支援装置101は、1つのプロセッサ901のみを備えていてもよいし、複数のプロセッサ901を備えていてもよい。複数のプロセッサ901が「部」の機能を実現するプログラムを連携して実行してもよい。   The plan support apparatus 101 may include only one processor 901 or may include a plurality of processors 901. A plurality of processors 901 may execute a program for realizing the function of “unit” in cooperation with each other.

「部」の処理の結果を示す情報、データ、信号値、及び、変数値は、補助記憶装置902、メモリ903、又は、プロセッサ901内のレジスタ又はキャッシュメモリに記憶される。   Information, data, signal values, and variable values indicating the results of the processing of “unit” are stored in the auxiliary storage device 902, the memory 903, or a register or cache memory in the processor 901.

「部」の機能を実現するプログラムは、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ブルーレイ(登録商標)ディスク、DVD(Digital・Versatile・Disc)等の可搬記録媒体に記憶されてもよい。   A program for realizing the function of “part” may be stored in a portable recording medium such as a magnetic disk, a flexible disk, an optical disk, a compact disk, a Blu-ray (registered trademark) disk, a DVD (Digital Versatile Disc), or the like.

***動作の説明***
図1及び図5を参照して、計画支援装置101の動作を説明する。計画支援装置101の動作は、本実施の形態に係る計画支援方法に相当する。計画支援装置101の動作は、本実施の形態に係る計画支援プログラムの処理手順に相当する。
*** Explanation of operation ***
With reference to FIG.1 and FIG.5, operation | movement of the plan assistance apparatus 101 is demonstrated. The operation of the plan support apparatus 101 corresponds to the plan support method according to the present embodiment. The operation of the plan support apparatus 101 corresponds to the processing procedure of the plan support program according to the present embodiment.

記憶部180は、指標データ181を予め記憶する。指標データ181は、少なくとも1つの単位期間に対応し、対応する単位期間に必要な数量を計画するための指標値を示すデータである。具体的には、指標データ181は、現在の環境条件を表す指標値を示すデータである。現在の環境条件は、現時点からみて直近の週よりも後の少なくとも1つの週に必要な在庫量を計画するための指標値となる。即ち、指標データ181は、次週に続く少なくとも1つの週に対応し、対応する週に必要な在庫量を計画するための指標値を示すデータである。本実施の形態において、指標データ181が示す指標値には、製品の需要の高さを表す値が含まれる。この値としては、製品のカテゴリ、地域、顧客の属性等によって別々の値が含まれることが望ましい。具体例として、製品Aの現在の需要は、3段階で評価され、需要が高い順に「1」、「2」、「3」といった数値で表される。或いは、製品Aの現在の需要は、需要動向が増加傾向であれば「1」(図2では上向きの矢印に相当)、需要動向が一定であれば「2」(図2では「−」に相当)、需要動向が減少傾向であれば「3」(図2では下向きの矢印に相当)といった数値で表される。このとき、製品Aの現在の需要が「1」、即ち、需要動向が増加傾向であれば、再来週以降に必要な製品Aの在庫量を増やすように計画すればよい。一方、製品Aの現在の需要が「3」、即ち、需要動向が減少傾向であれば、再来週以降に必要な製品Aの在庫量を減らすように計画すればよい。本実施の形態において、需要が高いことと需要動向が増加傾向であること、需要が低いことと需要動向が減少傾向であることは、それぞれ同じこととして扱うものとする。なお、指標データ181が示す指標値には、工場稼働率、顧客特性、地域特性、災害リスク等、前述したような他の環境条件を表す値が含まれていてもよい。   The storage unit 180 stores the index data 181 in advance. The index data 181 corresponds to at least one unit period, and is data indicating an index value for planning a quantity necessary for the corresponding unit period. Specifically, the index data 181 is data indicating an index value representing the current environmental condition. The current environmental conditions serve as an index value for planning the inventory quantity required for at least one week after the most recent week from the present time point. That is, the index data 181 corresponds to at least one week following the next week, and is data indicating an index value for planning an inventory amount necessary for the corresponding week. In the present embodiment, the index value indicated by the index data 181 includes a value indicating the level of product demand. As this value, it is desirable that different values are included depending on the product category, region, customer attribute, and the like. As a specific example, the current demand for the product A is evaluated in three stages, and is expressed by numerical values such as “1”, “2”, and “3” in descending order of demand. Alternatively, the current demand for the product A is “1” (corresponding to an upward arrow in FIG. 2) if the demand trend is increasing, or “2” (“−” in FIG. 2) if the demand trend is constant. Equivalent), if the demand trend is decreasing, it is represented by a numerical value such as “3” (corresponding to a downward arrow in FIG. 2). At this time, if the current demand for the product A is “1”, that is, if the demand trend is an increasing trend, it may be planned to increase the inventory amount of the product A necessary after the next week. On the other hand, if the current demand for the product A is “3”, that is, if the demand trend is decreasing, the inventory amount of the product A required after the next week may be reduced. In the present embodiment, it is assumed that the demand is high, the demand trend is increasing, the demand is low, and the demand trend is decreasing is the same. Note that the index value indicated by the index data 181 may include values representing other environmental conditions as described above, such as factory operation rate, customer characteristics, regional characteristics, disaster risk, and the like.

図5のステップS11において、検出部110は、インシデントの発生を検出する。インシデントは、1つの単位期間に対応し、対応する単位期間以降の数量の計画に影響を及ぼす事象である。具体的には、インシデントは、発生時の直後の週に対応し、対応する週以降の在庫量の計画に影響を及ぼす事象である。具体例として、製品Aの緊急注文が発生したときには、発生時の各拠点の余剰在庫を集めたり、安全在庫を取り崩したりして出荷する必要と、来週以降の製品Aの在庫量の計画を至急見直す必要とが生ずるため、その緊急注文はインシデントに該当することになる。   In step S11 of FIG. 5, the detection unit 110 detects the occurrence of an incident. An incident is an event that corresponds to one unit period and affects the planning of quantities after the corresponding unit period. Specifically, an incident is an event that corresponds to the week immediately after the occurrence and affects the planning of inventory after the corresponding week. As a specific example, when an urgent order for product A occurs, it is necessary to collect surplus inventory at each site at the time of occurrence or to release the safety stock, and to plan the inventory amount of product A from the next week onward. The urgent order falls into an incident because it needs to be reviewed.

本実施の形態では、基幹システム102で動作しているインシデント検出エージェント211と、SC計画システム103で動作しているインシデント検出エージェント311とのいずれかが、インシデントの発生を検出すると、発生したインシデントに関する情報を検出部110に送信する。検出部110は、この情報を受信することで、インシデントの発生を検出する。検出部110は、受信した情報からインシデントデータ112を作成し、作成したインシデントデータ112をインシデントデータベース111に登録する。   In the present embodiment, when any of the incident detection agent 211 operating in the backbone system 102 and the incident detection agent 311 operating in the SC planning system 103 detects the occurrence of an incident, Information is transmitted to the detection unit 110. The detection unit 110 receives this information to detect the occurrence of an incident. The detection unit 110 creates incident data 112 from the received information, and registers the created incident data 112 in the incident database 111.

図示していないが、インシデントデータ112は、各インシデントを識別するインシデントID(識別子)、各インシデントの発生日、各インシデントの種別等を示すデータである。インシデントIDは、新たなインシデントの発生が検出される度に、検出部110によって採番される。インシデントの種別としては、前述したように、緊急注文、納期変更、注文キャンセル、操業停止、生産能力低下、品質不良発生、計画外の生産実行、キーパーツの欠品又は大幅な納期遅延といったものがある。なお、前述した「短納期」、「大幅」、「大量」、「納期直前」の判定基準は、閾値によって予め定められており、インシデント検出エージェント211,311又は検出部110は、この閾値を用いてインシデントの発生の有無及びインシデントの種別を判定する。   Although not shown, the incident data 112 is data indicating an incident ID (identifier) for identifying each incident, an occurrence date of each incident, a type of each incident, and the like. The incident ID is numbered by the detection unit 110 every time the occurrence of a new incident is detected. As mentioned above, the types of incidents include emergency orders, delivery date changes, order cancellations, shutdowns, production capacity declines, quality defects, unplanned production executions, key parts shortages, or significant delivery delays. is there. It should be noted that the aforementioned criteria for “short delivery date”, “significant”, “large amount”, and “immediately before delivery date” are determined in advance by a threshold, and the incident detection agents 211 and 311 or the detection unit 110 use this threshold. Determine whether an incident has occurred and the type of incident.

図5のステップS12において、取得部120は、新たなインシデントの発生が検出部110により検出された場合、その新たなインシデントが対応する単位期間に続く単位期間の指標値を示す指標データ181を記憶部180から取得する。具体的には、取得部120は、ステップS11で発生が検出されたインシデントの発生時の環境条件、即ち、現在の環境条件を表す指標値を示す指標データ181を記憶部180から取得する。具体例として、取得部120は、製品Aの緊急注文の発生が検出部110により検出されたときには、製品Aの需要の高さを示す指標データ181を記憶部180から取得する。   In step S12 of FIG. 5, when the occurrence of a new incident is detected by the detection unit 110, the acquisition unit 120 stores index data 181 indicating an index value of a unit period following the unit period to which the new incident corresponds. Acquired from the unit 180. Specifically, the acquisition unit 120 acquires, from the storage unit 180, the index data 181 indicating the environmental condition at the time of occurrence of the incident whose occurrence is detected in step S11, that is, the index value indicating the current environmental condition. As a specific example, the acquisition unit 120 acquires index data 181 indicating the level of demand for the product A from the storage unit 180 when the occurrence of an emergency order for the product A is detected by the detection unit 110.

オペレーションデータベース131は、オペレーションデータ132を蓄積する。オペレーションデータ132は、過去の複数のインシデントについて、各インシデントが対応する単位期間である第1期間P1と第1期間P1に続く少なくとも1つの単位期間である第2期間P2とのそれぞれの数量の計画を調整するために実行されたオペレーションの内容と、第2期間P2の指標値とを示すデータである。第1期間P1は、具体的には、対応するインシデントの発生時の直後の週である。第2期間P2は、具体的には、対応するインシデントの発生時の直後の週に続く少なくとも1つの週である。本実施の形態において、オペレーションデータ132が示す指標値には、指標データ181が示す指標値と同じように、製品の需要の高さを表す値が含まれる。具体例として、オペレーションデータ132は、ある日に発生した製品Bの緊急注文について、その緊急注文に対して実行された、安全在庫を取り崩して出荷するという施策M1と、製品Bの補充生産を行うという施策M2と、緊急注文の発生当時の製品Bの需要を表す指標値とを示すデータである。施策M1は、緊急注文の発生日を含む週の次の週である第1期間P1の製品Bの在庫量の計画を調整するためのものである。施策M2は、第1期間P1に続く少なくとも1つの週である第2期間P2の製品Bの在庫量の計画を調整するためのものである。なお、オペレーションデータ132が示す指標値には、指標データ181が示す指標値と同じように、工場稼働率、顧客特性、地域特性、災害リスク等、前述したような他の環境条件を表す値が含まれていてもよい。   The operation database 131 stores operation data 132. The operation data 132 is a plan for each quantity of a plurality of past incidents, that is, a first period P1 that is a unit period corresponding to each incident and a second period P2 that is at least one unit period following the first period P1. Is the data indicating the content of the operation executed to adjust the value and the index value of the second period P2. Specifically, the first period P1 is a week immediately after the occurrence of the corresponding incident. Specifically, the second period P2 is at least one week following the week immediately after the occurrence of the corresponding incident. In the present embodiment, the index value indicated by the operation data 132 includes a value indicating the level of demand for the product, similarly to the index value indicated by the index data 181. As a specific example, the operation data 132 performs the measure M1 for the emergency order of the product B generated on a certain day and releasing the safety stock, which is executed for the emergency order, and the supplementary production of the product B. The measure M2 and the index value indicating the demand for the product B at the time of occurrence of the emergency order. The measure M1 is for adjusting the inventory plan of the product B in the first period P1, which is the week following the week including the date of occurrence of the emergency order. The measure M2 is for adjusting the inventory plan of the product B in the second period P2, which is at least one week following the first period P1. The index value indicated by the operation data 132 includes values representing other environmental conditions as described above, such as the factory operation rate, customer characteristics, regional characteristics, disaster risk, etc., similar to the index values indicated by the index data 181. It may be included.

本実施の形態では、図6に例示するように、オペレーションデータ132が、各インシデントのインシデントID、各インシデントの発生日、各インシデントの種別、各インシデントの発生時の環境条件、各インシデントに対して実行されたオペレーションの内容を示すデータになっている。環境条件としては、少なくとも需要の高さを表す指標値が示される。オペレーションの内容としては、施策の概要を表すオペレーションテキストと、施策の対象である対応システムと、施策の具体的内容を表すオペレーションログとが示される。図6の1,2行目には、「(在庫拠点別)在庫転送指示」と示し詳細は省略しているが、これは例えば、C拠点へ在庫を転送するのであれば、「A拠点からC拠点への在庫転送指示」及び「B拠点からC拠点への在庫転送指示」を示す。   In the present embodiment, as illustrated in FIG. 6, the operation data 132 includes the incident ID of each incident, the date of occurrence of each incident, the type of each incident, the environmental condition at the time of occurrence of each incident, and each incident. The data indicates the contents of the executed operation. As the environmental condition, at least an index value indicating the height of demand is shown. As the contents of the operation, an operation text that represents the outline of the measure, a response system that is the target of the measure, and an operation log that represents the specific content of the measure are shown. The first and second lines in FIG. 6 indicate “stock transfer instruction (by stock base)” and details are omitted. For example, if the stock is transferred to the C base, “Inventory transfer instruction to C base” and “Inventory transfer instruction from B base to C base” are shown.

図5のステップS13において、抽出部130は、オペレーションデータベース131を検索して、取得部120により取得された指標データ181と指標値が一致するオペレーションデータ132を抽出する。具体例として、抽出部130は、ステップS12で取得された指標データ181が示す製品Aの需要の高さと、前述した製品Bの緊急注文の発生当時における製品Bの需要の高さとが一致する場合、その製品Bの緊急注文についてのオペレーションデータ132を抽出する。なお、抽出部130は、ステップS12で取得された指標データ181が示す製品Aの需要の高さと需要の高さが一致する他のオペレーションデータ132があれば、当該他のオペレーションデータ132も抽出する。抽出部130は、製品Aと製品Bとが同じ製品カテゴリに属する場合のみ、製品Bの緊急注文についてのオペレーションデータ132を抽出してもよい。また、抽出部130は、需要の高さだけでなく、他の環境条件も一致する場合のみ、製品Bの緊急注文についてのオペレーションデータ132を抽出してもよい。   In step S <b> 13 of FIG. 5, the extraction unit 130 searches the operation database 131 and extracts operation data 132 whose index value matches the index data 181 acquired by the acquisition unit 120. As a specific example, the extraction unit 130 matches the high demand for the product A indicated by the index data 181 acquired in step S12 with the high demand for the product B at the time when the emergency order for the product B described above occurs. Then, operation data 132 for the emergency order of the product B is extracted. In addition, if there is other operation data 132 in which the height of demand of the product A indicated by the index data 181 acquired in step S12 matches the height of demand, the extraction unit 130 also extracts the other operation data 132. . The extraction unit 130 may extract the operation data 132 for the urgent order of the product B only when the product A and the product B belong to the same product category. In addition, the extraction unit 130 may extract the operation data 132 for the emergency order of the product B only when not only high demand but also other environmental conditions match.

評価対象データベース171は、評価対象データ172を蓄積する。評価対象データ172は、過去の複数のインシデントに対して実行されたオペレーションについて、第1期間P1の経過前に各オペレーションによって調整された第2期間P2の数量の計画である第1計画S1と、第1期間P1の経過後に再調整された第2期間P2の数量の計画である第2計画S2とを示すデータである。第1計画S1は、具体的には、各オペレーションによって最初に調整された第2期間P2の在庫量の計画である。第2計画S2は、具体的には、最後に調整された第2期間P2の在庫量の計画である。即ち、第2計画S2は、確定された第2期間P2の在庫量の計画である。具体例として、前述した製品Bの緊急注文に対して実行されたオペレーションについての第1計画S1は、その緊急注文の発生直後に調整された第2期間P2の製品Bの在庫量の計画である。そして、第2計画S2は、最終的に確定された第2期間P2の製品Bの在庫量の計画である。   The evaluation target database 171 stores evaluation target data 172. The evaluation target data 172 includes a first plan S1 that is a plan of the quantity of the second period P2 adjusted by each operation before the first period P1 has elapsed for the operations executed for a plurality of past incidents; It is data which shows 2nd plan S2 which is the plan of the quantity of the 2nd period P2 readjusted after progress of 1st period P1. Specifically, the first plan S1 is a plan for the inventory amount in the second period P2 that is first adjusted by each operation. Specifically, the second plan S2 is a plan for the inventory amount of the second period P2 adjusted last. That is, the second plan S2 is a plan for the stock amount in the second period P2 that has been confirmed. As a specific example, the first plan S1 for the operation executed for the emergency order of the product B described above is a plan for the inventory amount of the product B in the second period P2 adjusted immediately after the occurrence of the emergency order. . And 2nd plan S2 is a plan of the stock quantity of the product B of the 2nd period P2 finally decided.

本実施の形態では、図7に例示するように、在庫量の計画が、週ごとに調整される。具体例として、第(n−1)週に、第n週から第(n+6)週の計画が調整されたとする。この場合、第n週の計画は確定済となり、第n週には、第(n+1)週から第(n+6)週の計画が調整される。これにより、第(n+1)週の計画も確定済となり、第(n+1)週には、第(n+2)週から第(n+6)週の計画が調整される。最終的には、第(n+5)週において、第n週から第(n+6)週の計画が確定済となる。前述した製品Bの緊急注文が第(n−1)週に発生していたとすると、第1計画S1は、第(n−1)週に調整された計画であるから、第1計画S1では、第n週の計画のみが確定済となっている。第2計画S2は、第(n+5)週に調整された計画であり、第2計画S2では、第n週から第(n+6)週の計画が確定済となっている。即ち、第n週は第1期間P1に相当し、第(n+1)週から第(n+6)週は第2期間P2に相当する。   In the present embodiment, as illustrated in FIG. 7, the inventory plan is adjusted every week. As a specific example, it is assumed that the plan from the nth week to the (n + 6) th week is adjusted in the (n-1) th week. In this case, the plan for the nth week is confirmed, and the plan for the (n + 1) th week to the (n + 6) th week is adjusted in the nth week. As a result, the plan for the (n + 1) th week is also confirmed, and the plan for the (n + 2) th week to the (n + 6) th week is adjusted in the (n + 1) th week. Eventually, in the (n + 5) week, the plan from the nth week to the (n + 6) week is confirmed. Assuming that the urgent order for the product B is generated in the (n-1) week, the first plan S1 is a plan adjusted in the (n-1) week, so in the first plan S1, Only the plan for week n has been finalized. The second plan S2 is a plan adjusted in the (n + 5) week, and in the second plan S2, the plans from the nth week to the (n + 6) week are already confirmed. That is, the nth week corresponds to the first period P1, and the (n + 1) th week to the (n + 6) th week correspond to the second period P2.

評価対象データ172には、上記のように、週ごとに調整された計画が記録されるほか、週ごとの実績も記録される。   In the evaluation object data 172, as described above, the plan adjusted for each week is recorded, and the results for each week are also recorded.

図5のステップS17において、評価部170は、SC計画システム103から計画データ301を取得し、取得した計画データ301を、図7に例示するような形式に変換する。また、評価部170は、基幹システム102から実績データ202を取得し、取得した実績データ202を、図7に例示するような形式に変換する。これにより、評価部170は、評価対象データ172を作成して評価対象データベース171に登録する。   In step S17 of FIG. 5, the evaluation unit 170 acquires the plan data 301 from the SC planning system 103, and converts the acquired plan data 301 into a format illustrated in FIG. Further, the evaluation unit 170 acquires the record data 202 from the core system 102, and converts the acquired record data 202 into a format illustrated in FIG. As a result, the evaluation unit 170 creates the evaluation target data 172 and registers it in the evaluation target database 171.

評価部170は、さらに、評価対象データベース171を参照し、各オペレーションを、第1計画S1と第2計画S2との比較結果に基づいて評価する。本実施の形態において、評価部170は、各オペレーションを、第1計画S1と第2計画S2との比較結果だけでなく、第1期間P1の数量の実績と第1期間P1の経過前に各オペレーションによって調整された第1期間P1の数量の計画との比較結果にも基づいて評価する。即ち、評価部170は、インシデント発生直後の単位期間である第1期間P1については、計画に対する実績の差異を評価し、第1期間P1に続く第2期間P2については、当初計画に対する見直し計画の差異を評価する。これにより、短期的な観点からのオペレーションの効果と、中長期的な観点からのオペレーションの効果とを適切に評価することができる。   The evaluation unit 170 further refers to the evaluation target database 171 and evaluates each operation based on the comparison result between the first plan S1 and the second plan S2. In the present embodiment, the evaluation unit 170 performs each operation not only on the comparison result between the first plan S1 and the second plan S2, but also on the actual results of the quantity in the first period P1 and the passage of the first period P1. Evaluation is also made based on a comparison result with the plan of the quantity of the first period P1 adjusted by the operation. That is, the evaluation unit 170 evaluates the difference in performance with respect to the plan for the first period P1 which is a unit period immediately after the occurrence of the incident, and the second period P2 following the first period P1 Evaluate the differences. Thereby, it is possible to appropriately evaluate the effect of the operation from the short-term viewpoint and the effect of the operation from the medium- and long-term viewpoint.

図8に例示するように、インシデント発生直後の計画と定期見直し計画とが乖離している場合は、インシデント発生直後の計画に課題があると判断できる。なお、インシデント発生直後の計画と実績とが乖離している場合は、別のインシデントが発生したことが要因である可能性があり、適切な評価は困難である。そのため、本実施の形態では、評価部170が、当初計画に対する見直し計画の差異を評価している。具体的には、図9に例示するように、評価部170は、インシデント発生後の評価指標の変動をモニタリングし、期間、数量等で閾値を超える「乖離」があれば「効果」と判断する。「効果」には、プラスとマイナスとが存在する。   As illustrated in FIG. 8, when the plan immediately after the occurrence of the incident is different from the periodic review plan, it can be determined that there is a problem in the plan immediately after the occurrence of the incident. In addition, when the plan immediately after the occurrence of an incident is different from the actual result, it may be caused by the occurrence of another incident, and appropriate evaluation is difficult. Therefore, in this embodiment, the evaluation unit 170 evaluates the difference in the review plan with respect to the initial plan. Specifically, as illustrated in FIG. 9, the evaluation unit 170 monitors the change in the evaluation index after the incident occurs, and determines that it is “effect” if there is a “deviation” exceeding the threshold in terms of period, quantity, etc. . There are positive and negative effects.

このように、本実施の形態では、インシデント発生直後の当初計画の妥当性を適切に評価するために、当初計画と実績との差異ではなく、当初計画と見直し計画との差異が評価される。これは、実績は様々な理由で変動するので、当初計画と実績との「乖離」の理由が計画の問題か他の問題によるものか判断できないからである。そして、当初計画と見直し計画との「乖離」は、理由は別として、計画を見直した、即ち、当初計画には課題があり見直さざるを得なかったと判断できるからである。   As described above, in the present embodiment, in order to appropriately evaluate the validity of the initial plan immediately after the occurrence of the incident, not the difference between the initial plan and the actual results, but the difference between the initial plan and the review plan is evaluated. This is because the actual results fluctuate for various reasons, so it cannot be determined whether the reason for the “divergence” between the original plan and the actual results is due to a plan problem or other problems. The “divergence” between the initial plan and the revised plan is because, apart from the reason, it is possible to judge that the plan has been revised, that is, the initial plan has problems and must be reviewed.

図10に例示するように、評価部170は、様々な評価指標に基づいて、短期、中期、長期という時間軸でオペレーションを数値評価する。評価結果である総合スコアは、評価データ173として評価対象データベース171に登録される。評価指標の具体例としては、以下のようなものがある。
・財務:売上高/営業利益、棚卸資産
・活動指標:金額/数量、計画/実績
・管理:納期遵守率、欠品率、棚卸資産回転率、受注から納入までの供給LT
・販売:売上、在庫、仕入れ
・生産:生産高、生産LT、稼働率
・在庫:在庫量、在庫回転率
As illustrated in FIG. 10, the evaluation unit 170 numerically evaluates an operation on a time axis of short-term, medium-term, and long-term based on various evaluation indexes. The overall score that is the evaluation result is registered in the evaluation object database 171 as the evaluation data 173. Specific examples of the evaluation index include the following.
・ Financial: Sales / Operating Profit, Inventory / Activity Indicators: Amount / Quantity, Plan / Actual / Management: Delivery Date Compliance Rate, Stockout Rate, Inventory Turnover, Supply from Order to Delivery LT
・ Sales: Sales, Inventory, Purchasing ・ Production: Production, Production LT, Occupancy Rate ・ Inventory: Inventory Quantity, Inventory Turnover

顧客から感謝されたり、次回注文の確約があったりした場合も、データ化して、評価指標に含めることが望ましい。   It is also desirable to make data and include it in the evaluation index even if the customer is thankful or the next order is confirmed.

本実施の形態では、売上、利益又はコスト、過剰在庫リスク、欠品リスク、工場稼働率、企業固有評価を評価指標としている。緊急注文への対応を例とすると、売上増は、プラスの効果であり、安全在庫率低下は、マイナスの効果である。   In this embodiment, sales, profit or cost, excess inventory risk, shortage risk, factory operation rate, and company-specific evaluation are used as evaluation indexes. Taking urgent orders as an example, an increase in sales has a positive effect, and a decline in the safety stock ratio has a negative effect.

なお、ステップS17の処理は、ステップS11からステップS16までのフローとは別に、定期的に実行される。   In addition, the process of step S17 is periodically performed separately from the flow from step S11 to step S16.

図5のステップS14において、検索部140は、評価対象データベース171を検索し、抽出部130により抽出されたオペレーションデータ132と同じオペレーションに対応する評価データ173を抽出する。具体例として、検索部140は、ステップS13で抽出されたオペレーションデータ132が示すオペレーションの内容の評価結果、即ち、前述した製品Bの緊急注文に対して実行されたオペレーションがステップS17で評価された結果を示す評価データ173を抽出する。   In step S14 of FIG. 5, the search unit 140 searches the evaluation object database 171 and extracts evaluation data 173 corresponding to the same operation as the operation data 132 extracted by the extraction unit 130. As a specific example, the search unit 140 evaluates the operation result indicated by the operation data 132 extracted in step S13, that is, the operation executed for the urgent order of the product B described above in step S17. Evaluation data 173 indicating the result is extracted.

図5のステップS15において、出力部150は、抽出部130により抽出されたオペレーションデータ132が示すオペレーションの内容を出力する。本実施の形態において、出力部150は、抽出部130により抽出されたオペレーションデータ132が示すオペレーションの内容とともに、該当するオペレーションの評価部170での評価結果を出力する。   In step S15 of FIG. 5, the output unit 150 outputs the operation content indicated by the operation data 132 extracted by the extraction unit 130. In the present embodiment, the output unit 150 outputs the evaluation result of the corresponding operation in the evaluation unit 170 together with the contents of the operation indicated by the operation data 132 extracted by the extraction unit 130.

本実施の形態では、図11に例示するように、出力部150が、ステップS13で抽出されたオペレーションデータ132が示すオペレーションの内容と、ステップS14で抽出された評価データ173が示す当該オペレーションの総合スコアとをディスプレイ906の画面に表示する。SC管理者は、この画面を見ながら、ステップS11で発生が検出されたインシデントに対して実行するオペレーションを検討及び決定することができる。画面上では、各オペレーションが総合スコアの高さによってソートして表示されることが望ましい。また、画面上では、シミュレーションも実行できることが望ましい。SC管理者は、シミュレーションを行うことで、より適切なオペレーションを決定することができるようになる。   In the present embodiment, as illustrated in FIG. 11, the output unit 150 performs a total of the operations indicated by the operation data 132 extracted in step S13 and the operations indicated by the evaluation data 173 extracted in step S14. The score is displayed on the screen of the display 906. The SC administrator can examine and determine an operation to be executed for the incident whose occurrence is detected in step S11 while viewing this screen. On the screen, it is desirable that each operation is sorted and displayed according to the total score. It is also desirable that simulation can be executed on the screen. The SC administrator can determine a more appropriate operation by performing a simulation.

図5のステップS16において、登録部160は、入力装置905を介して、ステップS11で発生が検出された新たなインシデントに対して実行されたオペレーションの内容の入力を受ける。そして、登録部160は、この新たなインシデントについて、取得部120により取得された指標データ181が示す指標値と、入力されたオペレーションの内容とを示すオペレーションデータ132を作成し、作成したオペレーションデータ132をオペレーションデータベース131に登録する。   In step S16 of FIG. 5, the registration unit 160 receives input of the contents of the operation executed for the new incident whose occurrence is detected in step S11 via the input device 905. Then, the registration unit 160 creates operation data 132 indicating the index value indicated by the index data 181 acquired by the acquisition unit 120 and the contents of the input operation for the new incident, and the generated operation data 132 is generated. Is registered in the operation database 131.

***実施の形態の効果の説明***
本実施の形態では、新たなインシデントが発生した場合、その新たなインシデントが対応する単位期間よりも未来に必要な数量を計画するための指標値をキーにして、過去のインシデントへの対応が検索される。このため、本実施の形態によれば、新たなインシデントが発生した場合に、その新たなインシデントと中長期的な観点で同じか又は類似する過去のインシデントへの対応を参考にできるようになる。
*** Explanation of the effect of the embodiment ***
In this embodiment, when a new incident occurs, the response to the past incident is searched using the index value for planning the quantity required in the future as compared to the unit period to which the new incident corresponds. Is done. Therefore, according to the present embodiment, when a new incident occurs, it is possible to refer to the response to a past incident that is the same as or similar to the new incident from a medium- to long-term viewpoint.

本実施の形態では、既知のインシデントに対して、オペレーションの結果を蓄積・評価し、経営方針等から評価して最適なオペレーションの情報を優先順位をつけて出力することができる。この最適なオペレーションには、インシデントへ直接的に対応する短期的施策と、短期的施策によって生じる課題・リスクへ対応する中長期を見た施策とが含まれる。   In the present embodiment, it is possible to accumulate and evaluate the results of operations for known incidents, evaluate them based on a management policy, etc., and output information of optimum operations with priorities. This optimal operation includes short-term measures that directly respond to incidents and medium- and long-term measures that address issues and risks arising from short-term measures.

***他の構成***
計画支援装置101は、サプライチェーン管理システム100に限らず、何らかの数量の計画に関わり、その計画に影響を及ぼすインシデントが発生し得る任意のシステムに備えられていてよい。即ち、計画支援装置101は、サプライチェーンで扱われる製品の在庫量、販売量、生産量等の計画に限らず、単位期間ごとの任意の数量の計画を支援する装置であってよい。
*** Other configurations ***
The plan support apparatus 101 is not limited to the supply chain management system 100, and may be provided in any system that can be involved in some quantity of plan and an incident that affects the plan may occur. That is, the plan support apparatus 101 is not limited to the plan for the inventory quantity, the sales quantity, the production quantity, etc. of the products handled in the supply chain, but may be an apparatus that supports planning of an arbitrary quantity for each unit period.

本実施の形態では、計画支援装置101の機能がソフトウェアで実現されるが、計画支援装置101の機能は、ハードウェアで実現されてもよい。具体的には、計画支援装置101は、ハードウェアとして、プロセッサ901及びメモリ903を代替する処理回路を備えていてもよい。   In the present embodiment, the function of the plan support apparatus 101 is realized by software, but the function of the plan support apparatus 101 may be realized by hardware. Specifically, the plan support apparatus 101 may include a processing circuit that replaces the processor 901 and the memory 903 as hardware.

処理回路は、前述した「部」及び記憶部180の機能を実現する専用の電子回路である。処理回路は、具体的には、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ロジックIC、GA(Gate・Array)、ASIC(Application・Specific・Integrated・Circuit)、又は、FPGA(Field−Programmable・Gate・Array)である。   The processing circuit is a dedicated electronic circuit that realizes the functions of the “unit” and the storage unit 180 described above. Specifically, the processing circuit is a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, a logic IC, a GA (Gate / Array), an ASIC (Application / Specific / Integrated / Circuit), or FPGA (Field-Programmable / Gate / Array).

「部」及び記憶部180の機能は、1つの処理回路で実現されてもよいし、複数の処理回路に分散して実現されてもよい。   The functions of the “unit” and the storage unit 180 may be realized by one processing circuit, or may be realized by being distributed to a plurality of processing circuits.

なお、計画支援装置101の機能がソフトウェアとハードウェアとの組み合わせで実現されてもよい。即ち、計画支援装置101の一部の機能が専用のハードウェアで実現され、残りの機能がソフトウェアで実現されてもよい。   The function of the plan support apparatus 101 may be realized by a combination of software and hardware. That is, a part of the functions of the plan support apparatus 101 may be realized by dedicated hardware, and the remaining functions may be realized by software.

プロセッサ901、メモリ903、及び、処理回路を、総称して「プロセッシングサーキットリ」という。つまり、計画支援装置101の構成がどのような構成であっても、「部」及び記憶部180の機能は、プロセッシングサーキットリにより実現される。   The processor 901, the memory 903, and the processing circuit are collectively referred to as “processing circuit”. That is, regardless of the configuration of the plan support apparatus 101, the functions of the “unit” and the storage unit 180 are realized by the processing circuitry.

「部」を「工程」又は「手順」又は「処理」に読み替えてもよい。また、「部」の機能をファームウェアで実現してもよい。   “Part” may be read as “step” or “procedure” or “processing”. Further, the function of “unit” may be realized by firmware.

以上、本発明の実施の形態について説明したが、この実施の形態を部分的に実施しても構わない。具体的には、この実施の形態の説明において「部」として説明するもののうち、いずれか1つのみを採用してもよいし、いくつかの任意の組み合わせを採用してもよい。なお、本発明は、この実施の形態に限定されるものではなく、必要に応じて種々の変更が可能である。   As mentioned above, although embodiment of this invention was described, you may implement this embodiment partially. Specifically, only one of those described as “parts” in the description of this embodiment may be employed, or some arbitrary combinations may be employed. In addition, this invention is not limited to this embodiment, A various change is possible as needed.

100 サプライチェーン管理システム、101 計画支援装置、102 基幹システム、103 SC計画システム、110 検出部、111 インシデントデータベース、112 インシデントデータ、120 取得部、130 抽出部、131 オペレーションデータベース、132 オペレーションデータ、140 検索部、150 出力部、160 登録部、170 評価部、171 評価対象データベース、172 評価対象データ、173 評価データ、180 記憶部、181 指標データ、201 トランザクションデータ、202 実績データ、211 インシデント検出エージェント、301 計画データ、311 インシデント検出エージェント、901 プロセッサ、902 記憶装置、903 メモリ、905 入力装置、906 ディスプレイ、911 レシーバ、912 トランスミッタ。   100 Supply Chain Management System, 101 Planning Support Device, 102 Core System, 103 SC Planning System, 110 Detection Unit, 111 Incident Database, 112 Incident Data, 120 Acquisition Unit, 130 Extraction Unit, 131 Operation Database, 132 Operation Data, 140 Search Part, 150 output part, 160 registration part, 170 evaluation part, 171 evaluation object database, 172 evaluation object data, 173 evaluation data, 180 storage part, 181 index data, 201 transaction data, 202 actual data, 211 incident detection agent, 301 Plan data, 311 Incident detection agent, 901 processor, 902 storage device, 903 memory, 905 input device, 906 Isupurei, 911 receiver, 912 transmitter.

Claims (8)

単位期間ごとの数量の計画を支援する計画支援装置であって、
少なくとも1つの単位期間に対応し、対応する単位期間に必要な数量を計画するための指標値を示す指標データを予め記憶する記憶部と、
1つの単位期間に対応し、対応する単位期間以降の数量の計画に影響を及ぼすインシデントの発生を検出する検出部と、
新たなインシデントの発生が前記検出部により検出された場合、前記新たなインシデントが対応する単位期間に続く単位期間の指標値を示す指標データを前記記憶部から取得する取得部と、
過去の複数のインシデントについて、各インシデントが対応する単位期間である第1期間と前記第1期間に続く少なくとも1つの単位期間である第2期間とのそれぞれの数量の計画を調整するために実行されたオペレーションの内容と、前記第2期間の指標値とを示すオペレーションデータを蓄積するオペレーションデータベースを検索して、前記取得部により取得された指標データと指標値が一致するオペレーションデータを抽出する抽出部と、
前記抽出部により抽出されたオペレーションデータが示すオペレーションの内容を出力する出力部と
を備える計画支援装置。
A plan support device that supports the planning of a quantity for each unit period,
A storage unit corresponding to at least one unit period, and storing in advance index data indicating an index value for planning a quantity required for the corresponding unit period;
A detection unit for detecting occurrence of an incident corresponding to one unit period and affecting a plan of quantity after the corresponding unit period;
When an occurrence of a new incident is detected by the detection unit, an acquisition unit that acquires index data indicating an index value of a unit period following a unit period corresponding to the new incident from the storage unit;
For a plurality of past incidents, it is executed to adjust the plan of each quantity of a first period that is a unit period to which each incident corresponds and a second period that is at least one unit period following the first period. An extraction unit that searches an operation database that stores operation data indicating the contents of the operation and the index value of the second period, and extracts operation data that matches the index data acquired by the acquisition unit When,
A plan support apparatus comprising: an output unit that outputs an operation content indicated by the operation data extracted by the extraction unit.
前記過去の複数のインシデントに対して実行されたオペレーションについて、前記第1期間の経過前に各オペレーションによって調整された前記第2期間の数量の計画である第1計画と、前記第1期間の経過後に再調整された前記第2期間の数量の計画である第2計画とを示す評価対象データを蓄積する評価対象データベースを参照し、各オペレーションを、前記第1計画と前記第2計画との比較結果に基づいて評価する評価部
をさらに備え、
前記出力部は、前記抽出部により抽出されたオペレーションデータが示すオペレーションの内容とともに、該当するオペレーションの前記評価部での評価結果を出力する請求項1に記載の計画支援装置。
A first plan that is a plan of the quantity of the second period adjusted by each operation before the first period has elapsed for the operations executed for the plurality of past incidents, and the passage of the first period Reference is made to an evaluation target database that accumulates evaluation target data indicating a second plan that is a quantity plan of the second period that has been readjusted later, and each operation is compared with the first plan and the second plan. It further includes an evaluation unit that evaluates based on the result,
The planning support apparatus according to claim 1, wherein the output unit outputs an evaluation result of the corresponding operation in the evaluation unit together with an operation content indicated by the operation data extracted by the extraction unit.
前記第2計画は、確定された前記第2期間の数量の計画である請求項2に記載の計画支援装置。   The plan support apparatus according to claim 2, wherein the second plan is a plan for a quantity determined in the second period. 前記評価部は、各オペレーションを、前記第1計画と前記第2計画との比較結果だけでなく、前記第1期間の数量の実績と前記第1期間の経過前に各オペレーションによって調整された前記第1期間の数量の計画との比較結果にも基づいて評価する請求項2又は3に記載の計画支援装置。   The evaluation unit adjusts each operation not only by the comparison result between the first plan and the second plan, but also by the operation before the lapse of the first period and the actual quantity of the first period. The plan support apparatus according to claim 2 or 3, wherein the plan support apparatus performs the evaluation based on a comparison result with the plan of the quantity in the first period. 前記新たなインシデントに対して実行されたオペレーションの内容の入力を受け、前記新たなインシデントについて、前記取得部により取得された指標データが示す指標値と、入力されたオペレーションの内容とを示すオペレーションデータを作成し、作成したオペレーションデータを前記オペレーションデータベースに登録する登録部
をさらに備える請求項1から4のいずれか1項に記載の計画支援装置。
Operation data indicating the index value indicated by the index data acquired by the acquisition unit and the content of the input operation for the new incident upon receiving the input of the content of the operation executed for the new incident The planning support apparatus according to claim 1, further comprising a registration unit that creates the operation data and registers the created operation data in the operation database.
単位期間ごとに計画される数量には、サプライチェーンで扱われる製品の在庫量が含まれ、
前記記憶部に記憶されている指標データと前記オペレーションデータベースに蓄積されているオペレーションデータとが示す指標値には、前記製品の需要の高さを表す値が含まれる請求項1から5のいずれか1項に記載の計画支援装置。
The quantity planned for each unit period includes the inventory of products handled in the supply chain,
The index value indicated by the index data stored in the storage unit and the operation data stored in the operation database includes a value indicating the level of demand for the product. The planning support apparatus according to item 1.
請求項6に記載の計画支援装置と、
前記製品の在庫量の計画を示す計画データを保管して前記計画支援装置に利用させるシステムと
を備えるサプライチェーン管理システム。
The planning support apparatus according to claim 6,
A supply chain management system comprising: a system for storing plan data indicating a plan of the inventory amount of the product and causing the plan support apparatus to use the plan data.
単位期間ごとの数量の計画を支援する計画支援プログラムであって、
少なくとも1つの単位期間に対応し、対応する単位期間に必要な数量を計画するための指標値を示す指標データを予め記憶する記憶部を備えるコンピュータに、
1つの単位期間に対応し、対応する単位期間以降の数量の計画に影響を及ぼすインシデントの発生を検出する処理と、
新たなインシデントの発生が検出された場合、前記新たなインシデントが対応する単位期間に続く単位期間の指標値を示す指標データを前記記憶部から取得する処理と、
過去の複数のインシデントについて、各インシデントが対応する単位期間である第1期間と前記第1期間に続く少なくとも1つの単位期間である第2期間とのそれぞれの数量の計画を調整するために実行されたオペレーションの内容と、前記第2期間の指標値とを示すオペレーションデータを蓄積するオペレーションデータベースを検索して、前記記憶部から取得された指標データと指標値が一致するオペレーションデータを抽出する処理と、
抽出されたオペレーションデータが示すオペレーションの内容を出力する処理と
を実行させる計画支援プログラム。
A planning support program that supports the planning of quantities per unit period,
In a computer provided with a storage unit corresponding to at least one unit period and storing in advance index data indicating an index value for planning a quantity required for the corresponding unit period,
A process for detecting the occurrence of an incident corresponding to one unit period and affecting the planning of the quantity after the corresponding unit period;
When the occurrence of a new incident is detected, a process of acquiring index data indicating an index value of a unit period following the unit period corresponding to the new incident from the storage unit;
For a plurality of past incidents, it is executed to adjust the plan of each quantity of a first period that is a unit period to which each incident corresponds and a second period that is at least one unit period following the first period. A process of searching an operation database for storing operation data indicating the content of the operation and the index value of the second period, and extracting operation data whose index value matches the index data acquired from the storage unit; ,
A planning support program that executes a process of outputting the contents of the operation indicated by the extracted operation data.
JP2015211719A 2015-10-28 2015-10-28 Plan support device, supply chain management system, and plan support program Expired - Fee Related JP6174098B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015211719A JP6174098B2 (en) 2015-10-28 2015-10-28 Plan support device, supply chain management system, and plan support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015211719A JP6174098B2 (en) 2015-10-28 2015-10-28 Plan support device, supply chain management system, and plan support program

Publications (2)

Publication Number Publication Date
JP2017084094A true JP2017084094A (en) 2017-05-18
JP6174098B2 JP6174098B2 (en) 2017-08-02

Family

ID=58712067

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015211719A Expired - Fee Related JP6174098B2 (en) 2015-10-28 2015-10-28 Plan support device, supply chain management system, and plan support program

Country Status (1)

Country Link
JP (1) JP6174098B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019046287A (en) * 2017-09-05 2019-03-22 株式会社日立製作所 Planning system and planning method
JP2019086951A (en) * 2017-11-06 2019-06-06 日本電気株式会社 Supply chain management system and control method of the same

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10107111A (en) * 1996-09-27 1998-04-24 Fujitsu Ltd Manufacturing method of semiconductor device
JPH10235540A (en) * 1997-02-25 1998-09-08 Nippon Steel Corp Scheduling system for manufacturing process
JPH11296591A (en) * 1998-04-15 1999-10-29 Hitachi Ltd Method and system for investigating cause for unrealizable plan
JP2003195925A (en) * 2001-12-26 2003-07-11 Matsushita Electric Ind Co Ltd Producing operation supporting system and method for production equipment
JP2005050230A (en) * 2003-07-31 2005-02-24 Japan Nuclear Cycle Development Inst States Of Projects Facility information managing system
JP2012247964A (en) * 2011-05-27 2012-12-13 Hitachi Ltd Progress management apparatus and progress management program
JP2013092954A (en) * 2011-10-27 2013-05-16 Hitachi Ltd Management task support device, management task support method, and management task support system
JP2014081778A (en) * 2012-10-16 2014-05-08 Kobe Steel Ltd Scheduling method and scheduling program and scheduling device
JP2014197308A (en) * 2013-03-29 2014-10-16 株式会社日立製作所 Production management system, and management method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10107111A (en) * 1996-09-27 1998-04-24 Fujitsu Ltd Manufacturing method of semiconductor device
JPH10235540A (en) * 1997-02-25 1998-09-08 Nippon Steel Corp Scheduling system for manufacturing process
JPH11296591A (en) * 1998-04-15 1999-10-29 Hitachi Ltd Method and system for investigating cause for unrealizable plan
JP2003195925A (en) * 2001-12-26 2003-07-11 Matsushita Electric Ind Co Ltd Producing operation supporting system and method for production equipment
JP2005050230A (en) * 2003-07-31 2005-02-24 Japan Nuclear Cycle Development Inst States Of Projects Facility information managing system
JP2012247964A (en) * 2011-05-27 2012-12-13 Hitachi Ltd Progress management apparatus and progress management program
JP2013092954A (en) * 2011-10-27 2013-05-16 Hitachi Ltd Management task support device, management task support method, and management task support system
JP2014081778A (en) * 2012-10-16 2014-05-08 Kobe Steel Ltd Scheduling method and scheduling program and scheduling device
JP2014197308A (en) * 2013-03-29 2014-10-16 株式会社日立製作所 Production management system, and management method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019046287A (en) * 2017-09-05 2019-03-22 株式会社日立製作所 Planning system and planning method
JP2019086951A (en) * 2017-11-06 2019-06-06 日本電気株式会社 Supply chain management system and control method of the same

Also Published As

Publication number Publication date
JP6174098B2 (en) 2017-08-02

Similar Documents

Publication Publication Date Title
US10325222B2 (en) Decision tree machine learning
US20150294333A1 (en) Mobile device based inventory management and sales trends analysis in a retail environment
US20160217406A1 (en) Self-Learning Supply Chain System
US20190179927A1 (en) Enterprise data services cockpit
JP2012247964A (en) Progress management apparatus and progress management program
KR20240042593A (en) Method, Apparatus and System for managing deposit
CN111192668A (en) Medicine auditing method
JP6174098B2 (en) Plan support device, supply chain management system, and plan support program
US20130018700A1 (en) Optimizing product portfolios under customer choice
JP7114639B2 (en) Automated analysis of material-related exposures and/or prioritization of exposure strategies
US8688499B1 (en) System and method for generating business process models from mapped time sequenced operational and transaction data
KR101850753B1 (en) Apparatus and method for estimating market scale and forecast of sales based on selecting similar company
Chenneveau et al. Coronavirus and technology supply chains: How to restart and rebuild
US20210272113A1 (en) Transaction audit system
JP2015032267A (en) Demand prediction apparatus and program
Martijn et al. Determining the effects of data governance on the performance and compliance of enterprises in the logistics and retail sector
US11657063B2 (en) Behavioral analytics in information technology infrasturcture incident management systems
US20070239776A1 (en) Bonded material monitoring system and method
JP2016045819A (en) Business result management system and computer program
US20200089200A1 (en) Production management support apparatus and production management support method
US20030074270A1 (en) Computerized method and system for managing and communicating information regarding an order of goods
Lin et al. The cash flows in push and pull supply chains under supply disruptions
JP4935733B2 (en) Lending status display program, lending status display device, and lending status display method
JP2002049731A (en) Fixed property managing system
JP2014186619A (en) Cash flow management system and cash flow management method

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170627

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170705

R150 Certificate of patent or registration of utility model

Ref document number: 6174098

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees