Prior art keywords
control
excess
power
unit
time zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012214571A
Other languages
Japanese (ja)
Other versions
JP6036102B2 (en
Inventor
Daisuke Nogami
大輔 野上
Noriyuki Kawai
詔之 河合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2012214571A priority Critical patent/JP6036102B2/en
Publication of JP2014072911A publication Critical patent/JP2014072911A/en
Application granted granted Critical
Publication of JP6036102B2 publication Critical patent/JP6036102B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a controller capable of performing control that allows for incentives.SOLUTION: A controller 30 for controlling equipment including air-conditioning machines in a building that pays penalty if failed in suppression control targetting at a frist power amount while gains an incentive if succeeded in the suppression control targetting at a second power amount which is lower than the first power amount. The controller 30 includes: a storage part 35 for storing power amount; a reception part 36b for receiving a time zone requested for performing suppression control targetting at the second power amount; an electric energy suppression control part 36c; an excessive control part 36d for performing an excessive control in a prescribed time zone just before the requested time zone; and an acquisition part 36a for acquiring an excessive amount from the first power amount of total usage power amount in each requested time zone of the equipment in the excessive control.

Description

本発明は、制御装置に関する。   The present invention relates to a control device.

従来、デマンド時限毎の総使用電力量が、電力会社との間で定めた契約電力量を超えないように、デマンド制御を行う制御装置が存在する。例えば、特許文献1(特開平7−143670号公報)に開示の制御装置では、デマンド時限終了時での使用電力量を予測しその使用電力量が契約電力量を超えないように複数の空調機の設定温度を均等に変更しながら、ユーザの快適性を確保するデマンド制御が開示されている。   Conventionally, there is a control device that performs demand control so that the total power consumption for each demand time limit does not exceed the contract power amount determined with the power company. For example, in the control device disclosed in Patent Document 1 (Japanese Patent Application Laid-Open No. 7-143670), a plurality of air conditioners are predicted so that the power consumption at the end of the demand time period is predicted and the power consumption does not exceed the contract power consumption. Demand control for ensuring user comfort while uniformly changing the set temperature is disclosed.

近年、各建物等における使用電力量をより減少させようとする動きがある。このため、電力会社は、上記で説明した通常の契約電力量よりも少ない目標電力量を定め、所定の時間帯において使用電力量を目標電力量に抑える建物等にインセンティブを与える制度を提案している。   In recent years, there is a movement to further reduce the amount of power used in each building. For this reason, the electric power company proposes a system that provides incentives for buildings, etc., that set a target power amount that is smaller than the normal contracted power amount described above, and that keeps the amount of power used at the target power amount in a predetermined time zone. Yes.

しかし、特許文献1に開示の制御装置では、ユーザの快適性を加味してデマンド制御を行っているもののインセンティブまで加味した制御は考えられていない。   However, in the control device disclosed in Patent Document 1, although demand control is performed in consideration of user comfort, control that considers even incentives is not considered.

そこで、本発明の課題は、インセンティブを加味した制御を実行できる制御装置を提供することにある。   Then, the subject of this invention is providing the control apparatus which can perform the control which considered the incentive.

本発明の第1観点に係る制御装置は、第1電力量を目標とする電力抑制を行えないとペナルティを払う一方、第1電力量よりも低い第2電力量を目標とする電力抑制を行うとインセンティブが入る建物、における空調機を含む設備機器、を制御する制御装置を前提とする。そして、本発明の第1観点に係る制御装置は、記憶部と、受付部と、電力量抑制制御部と、超過制御部と、取得部とを備える。記憶部は、第1電力量及び第2電力量を記憶する。受付部は、第2電力抑制制御を行う要求時間帯を受け付ける。第2電力抑制制御は、設備機器のデマンド時限毎の総使用電力量を第2電力量以下にする制御である。超過制御部は、超過制御を、要求時間帯の直前の所定時間帯において実行する。超過制御は、設備機器のデマンド時限毎の総使用電力量を第1電力量よりも超過させる制御である。取得部は、超過制御における、設備機器のデマンド時限毎の総使用電力量の第1電力量からの超過分の情報を取得する。   The control device according to the first aspect of the present invention pays a penalty that power suppression targeting the first power amount cannot be performed, while performing power suppression targeting a second power amount lower than the first power amount. And a control device that controls facility equipment including an air conditioner in a building where an incentive enters. And the control apparatus which concerns on the 1st viewpoint of this invention is provided with a memory | storage part, a reception part, an electric energy suppression control part, an excess control part, and an acquisition part. The storage unit stores the first electric energy and the second electric energy. The reception unit receives a request time zone for performing the second power suppression control. 2nd electric power suppression control is control which makes the total electric energy used for every demand time limit of an installation apparatus below 2nd electric energy. The excess control unit executes the excess control in a predetermined time zone immediately before the request time zone. The excess control is control that causes the total power consumption for each demand time limit of the equipment to exceed the first power consumption. An acquisition part acquires the information of the excess from the 1st electric energy of the total electric energy used for every demand time limit of equipment in the excess control.

ここで、従来、建物では、デマンド時限毎の総使用電力量が第1電力量よりも超過しないように制御している。これは、第1電力量を超えるとペナルティを払う必要があるからである。ここで、例えば、ペナルティとは、料金的なデメリットである。そして、近年、第2電力量を目標とする電力抑制を行うとインセンティブが入るシステムが提案されている。ここで、例えば、インセンティブとは、料金的なメリットである。   Here, conventionally, in buildings, control is performed so that the total power consumption for each demand period does not exceed the first power consumption. This is because it is necessary to pay a penalty if the first electric energy is exceeded. Here, for example, the penalty is a fee demerit. In recent years, a system has been proposed in which an incentive is provided when power suppression is performed with the second power amount as a target. Here, for example, the incentive is a merit in charge.

そこで、本発明では、第2電力抑制制御を行うことでインセンティブが入ることを加味して、第2電力抑制制御を行う要求時間帯の直前の所定時間帯において、超過制御を行っている。すなわち、例えば、超過制御を実行することによって生じたペナルティが、第2電力抑制制御を実行したことによって入るインセンティブより少ない場合、超過制御を実行することによってペナルティが生じたとしても、第2電力抑制制御を実行したことによってインセンティブが入って料金的な不利が生じなくなるので、第2電力抑制制御を実行できる場合は、超過制御を実行しようとするものである。よって、超過制御の実行中は、ユーザの快適性をより確保でき、さらに、第2電力抑制制御を実行する直前の所定時間帯に超過制御を実行することで、第2電力抑制制御におけるユーザの快適性の低下を抑制できている。このように、本発明では、インセンティブを加味した制御を実行できるようになっている。   Therefore, in the present invention, excess control is performed in a predetermined time zone immediately before the request time zone in which the second power suppression control is performed in consideration of the incentive by performing the second power suppression control. That is, for example, when the penalty caused by executing the excess control is less than the incentive entered by executing the second power suppression control, even if the penalty occurs due to executing the excess control, the second power suppression Since an incentive is entered due to the execution of the control and no fee-related disadvantage occurs, when the second power suppression control can be executed, the excess control is executed. Therefore, during execution of the excess control, the user's comfort can be further ensured, and further, the excess control is executed in a predetermined time zone immediately before the execution of the second power suppression control. Reduces comfort. As described above, in the present invention, it is possible to execute control in consideration of incentives.

本発明の第2観点に係る制御装置は、本発明の第1観点に係る制御装置であって、超過制御部は、要求時間帯の直後の所定時間帯に、さらに設備機器の前記超過制御を実行する。   A control device according to a second aspect of the present invention is the control device according to the first aspect of the present invention, wherein the excess control unit further performs the excess control of the equipment in a predetermined time zone immediately after the request time zone. Run.

本発明では、第2電力抑制制御を実行したことによる要求時間帯におけるユーザの不快を、極力早く戻すことができる。   In the present invention, the user's discomfort in the required time zone due to the execution of the second power suppression control can be restored as soon as possible.

本発明の第3観点に係る制御装置は、本発明の第1観点に係る制御装置であって、電力量抑制制御部は、要求時間帯以前において、第1電力抑制制御をさらに実行し、超過制御部は、要求時間帯の直前の所定時間帯において、設備機器の第1電力抑制制御の実行を電力量抑制制御部に終了させて超過制御を実行し、さらに更新部を備える。第1電力抑制制御は、設備機器のデマンド時限毎の総使用電力量を第1電力量以下にする制御である。更新部は、超過制御以後において、第1電力抑制制御における設備機器のデマンド時限毎の総使用電力量の上限値を、第1電力量に超過分を加えた値へと更新する。   The control device according to the third aspect of the present invention is the control device according to the first aspect of the present invention, wherein the power amount suppression control unit further executes the first power suppression control before the request time period, and exceeds it. The control unit causes the power amount suppression control unit to terminate the execution of the first power suppression control of the facility device in a predetermined time period immediately before the request time period, and further includes an update unit. 1st electric power suppression control is control which makes the total electric energy used for every demand time limit of an installation apparatus or less the 1st electric energy. After the excess control, the updating unit updates the upper limit value of the total power consumption for each demand time period of the facility device in the first power suppression control to a value obtained by adding the excess amount to the first power amount.

ここで、デマンド時限毎の総使用電力量が第1電力量を超える超過制御を行うと、一般に、翌月から1年間、電力抑制の目標となる第1電力量が更新され、基本料金も値上げされることになる。そして、第1電力抑制制御は、この更新された電力量に基づいて実行されることになる。しかし、本発明では、第2電力抑制制御を実行することによりインセンティブが入るので、基本料金が値上げされる超過制御を行って、更新された電力量に基づいて第1電力抑制制御が実行されたとしても、料金的な不利が生じないようにすることが可能になっている。   Here, when the excess control in which the total power consumption for each demand time limit exceeds the first power amount, generally, the first power amount that is the target of power suppression is updated for one year from the following month, and the basic charge is also raised. Will be. And 1st electric power suppression control is performed based on this updated electric energy. However, in the present invention, since the incentive is entered by executing the second power suppression control, the excess control in which the basic charge is increased is performed, and the first power suppression control is executed based on the updated power amount. Even so, it is possible to prevent a fee penalty.

本発明の第4観点に係る制御装置は、本発明の第1観点〜第3観点のいずれかに係る制御装置であって、記憶部は、インセンティブに関する情報及びペナルティに関する情報をさらに記憶し、導出部と、出力部とをさらに備える。導出部は、インセンティブに関する情報及びペナルティに関する情報に基づいて、超過分―金銭状況関係を導出する。超過分―金銭状況関係とは、所定の超過分に対する金銭状況の関係である。出力部は、超過分―金銭状況関係を出力する。   A control device according to a fourth aspect of the present invention is the control device according to any one of the first to third aspects of the present invention, wherein the storage unit further stores and derives information on incentives and information on penalties. And an output unit. The deriving unit derives the excess-monetary status relationship based on the information on the incentive and the information on the penalty. The excess-monetary status relationship is the relationship of the monetary status to a predetermined excess. The output unit outputs the excess-money situation relationship.

本発明では、超過分―金銭状況関係が出力されることによって、ユーザが、ある超過分を選択した場合の金銭状況、つまり、どのくらいの電力量を超過させたら、どの程度料金的にプラス又はマイナスになるのか、を把握することができる。尚、ここでのユーザとは、例えば、建物を管理する管理室に位置する管理者を想定している。   In the present invention, by outputting the excess-money situation relationship, the monetary situation when the user selects a certain excess, that is, how much power is exceeded, how much plus or minus is charged. You can grasp what will become. In addition, the user here assumes the administrator located in the management room which manages a building, for example.

本発明の第5観点に係る制御装置は、本発明の第4観点に係る制御装置であって、超過分をユーザが入力する入力部、をさらに備える。   The control apparatus which concerns on the 5th viewpoint of this invention is a control apparatus which concerns on the 4th viewpoint of this invention, Comprising: The input part which a user inputs an excess is further provided.

本発明では、超過分―金銭状況関係を見て、超過分をユーザが選択して入力することができる。すなわち、金銭面と快適性とのバランスをユーザ自身が決定できる。   In the present invention, the user can select and input the excess amount by looking at the relationship between the excess amount and the money situation. That is, the user can determine the balance between the financial aspect and comfort.

本発明の第6観点に係る制御装置は、本発明の第1観点〜第5観点のいずれかに係る制御装置であって、超過制御部は、超過制御において、空調機の躯体蓄熱制御を行う。   The control apparatus which concerns on the 6th viewpoint of this invention is a control apparatus which concerns on either of the 1st viewpoint of this invention-5th viewpoint, Comprising: An excess control part performs the housing | casing heat storage control of an air conditioner in excess control. .

本発明では、超過制御において、予め躯体に蓄熱しておくことにより、第2電力抑制制御実行中の空調環境に関するユーザの不快を低減できる。   In the present invention, in excess control, the user's discomfort related to the air-conditioning environment during execution of the second power suppression control can be reduced by storing heat in the housing in advance.

本発明の第7観点に係る制御装置は、本発明の第1観点〜第6観点のいずれかに係る制御装置であって、超過制御部は、超過制御において、空調機のサーモオフ制御を解除する又は設定温度制御を行う。   A control device according to a seventh aspect of the present invention is the control device according to any one of the first to sixth aspects of the present invention, wherein the excess control unit cancels the thermo-off control of the air conditioner in the excess control. Or set temperature control is performed.

本発明では、超過制御において、設定温度に達したとしてもサーモオフしないように制御すれば、空調機の対象空間(例えば、室内)に蓄熱できる。また、本発明では、超過制御において、冷房運転時においては設定温度を下げ暖房運転時においては設定温度を上げる設定温度制御を行えば、サーモオフ制御の解除と同様に、空調機の対象空間に蓄熱できる。よって、第2電力抑制制御実行中の空調環境に関するユーザの不快を低減できる。   In the present invention, in the excess control, heat can be stored in the target space (for example, the room) of the air conditioner by controlling so as not to be turned off even if the set temperature is reached. Further, in the present invention, in the excess control, if the set temperature control is performed to lower the set temperature during the cooling operation and raise the set temperature during the heating operation, the heat storage is performed in the target space of the air conditioner, similar to the release of the thermo-off control. it can. Therefore, user discomfort regarding the air-conditioning environment during execution of the second power suppression control can be reduced.

本発明の第1観点に係る制御装置では、インセンティブを加味した制御を実行できる。   In the control device according to the first aspect of the present invention, control in consideration of incentives can be executed.

本発明の第2観点に係る制御装置では、要求時間帯におけるユーザの不快を、極力早く戻すことができる。   In the control device according to the second aspect of the present invention, the user's discomfort in the requested time zone can be returned as soon as possible.

本発明の第3観点に係る制御装置では、料金的な不利が生じないようにすることが可能になっている。   In the control device according to the third aspect of the present invention, it is possible to prevent a fee disadvantage.

本発明の第4観点に係る制御装置では、ユーザが、ある超過分を選択した場合の金銭状況を把握することができる。   In the control device according to the fourth aspect of the present invention, it is possible to grasp the monetary situation when the user selects a certain excess.

本発明の第5観点に係る制御装置では、金銭状況を見ながら、ユーザが、超過分を選択して入力することができる。   In the control device according to the fifth aspect of the present invention, the user can select and input the excess amount while looking at the money situation.

本発明の第6観点及び第7観点に係る制御装置では、第2電力抑制制御実行中の空調環境に関するユーザの不快を低減できる。   In the control device according to the sixth aspect and the seventh aspect of the present invention, it is possible to reduce user discomfort related to the air-conditioning environment during execution of the second power suppression control.

本発明の一実施形態に係る制御装置を備える設備機器制御システム全体の概略構成図。The schematic block diagram of the whole equipment control system provided with the control apparatus which concerns on one Embodiment of this invention. 管理装置の概略構成図。The schematic block diagram of a management apparatus. 制御装置の概略構成図。The schematic block diagram of a control apparatus. 制御装置における処理の流れを示すフローチャート。The flowchart which shows the flow of the process in a control apparatus. 建物における電力量の推移の一部を示すグラフ。The graph which shows a part of transition of the electric energy in a building. 変形例Aに係る制御装置における処理の流れを示すフローチャート。The flowchart which shows the flow of a process in the control apparatus which concerns on the modification A. 変形例Aに係る建物における電力量の推移の一部を示すグラフ。The graph which shows a part of transition of the electric energy in the building concerning the modification A. 変形例Bに係る制御装置の概略構成図。The schematic block diagram of the control apparatus which concerns on the modification B. 変形例Bに係る制御装置における処理の流れを示すフローチャート。The flowchart which shows the flow of a process in the control apparatus which concerns on the modification B. 変形例Bに係る建物における電力量の推移の一部を示すグラフ。The graph which shows a part of transition of the electric energy in the building concerning the modification B.

以下、図面を参照して、本発明の一実施形態に係る制御装置を備える設備機器制御システム100について説明する。   Hereinafter, an equipment control system 100 including a control device according to an embodiment of the present invention will be described with reference to the drawings.

(1)設備機器制御システムの全体構成
図1は、本発明の一実施形態に係る制御装置30を備える設備機器制御システム100全体の概略構成図である。設備機器制御システム100は、ビル等の建物内の各部屋等の空調等を行うために、各部屋に設置される空調機40を含む設備機器(空調機40以外には、照明機器50や換気装置60等)の制御を制御装置30を介して行うための設備機器制御システムである。具体的には、設備機器制御システム100は、図1に示すように、電力会社1に配置される管理装置10と、設備機器と共に建物A,Bにそれぞれ配置される制御装置30と、を備える。管理装置10と、制御装置30とは、インターネット80aを介して接続されており、双方向の通信が可能である。また、制御装置30と設備機器とは、専用の通信線80bを介して接続されており、双方向の通信が可能である。尚、ここでは、建物Aに配置される制御装置30と、建物Bに配置される制御装置30とは、同様の構成を有するため、分けて説明することなく、単に、制御装置30ということにする。また、物件A,Bには、空調機40及び制御装置30の他に、空調機40、照明機器50、換気装置60等に電力を供給する電源6、電源6から空調機40、照明機器50、換気装置60等に供給される電力量を計測する電力メーター7が設置されている。
(1) Overall Configuration of Facility Equipment Control System FIG. 1 is a schematic configuration diagram of an entire equipment control system 100 including a control device 30 according to an embodiment of the present invention. The facility equipment control system 100 is a facility equipment including an air conditioner 40 installed in each room in order to perform air conditioning of each room in the building or the like (in addition to the air conditioner 40, the lighting equipment 50 and the ventilation). It is an equipment control system for performing control of the device 60 and the like via the control device 30. Specifically, as shown in FIG. 1, the facility equipment control system 100 includes a management device 10 disposed in the electric power company 1 and a control device 30 disposed in each of the buildings A and B together with the facility equipment. . The management device 10 and the control device 30 are connected via the Internet 80a, and bidirectional communication is possible. Further, the control device 30 and the equipment are connected via a dedicated communication line 80b, and bidirectional communication is possible. Here, since the control device 30 arranged in the building A and the control device 30 arranged in the building B have the same configuration, they are simply referred to as the control device 30 without being described separately. To do. Further, in the properties A and B, in addition to the air conditioner 40 and the control device 30, the power supply 6 that supplies power to the air conditioner 40, the lighting device 50, the ventilation device 60, and the like, and the power supply 6 to the air conditioner 40 and the lighting device 50. A power meter 7 for measuring the amount of power supplied to the ventilation device 60 and the like is installed.

設備機器制御システム100では、建物A,Bは、電力会社1から電力を供給している。また、電力会社1と、建物A,Bとは、電力会社1で定める条件に基づいた第1契約及び第2契約を結んでいる。第1契約とは、第1電力量を目標とする電力抑制に関するデマンド契約である。より具体的には、空調機40、照明機器50、換気装置60等の建物A,Bに設置される設備機器のデマンド時限(本実施形態では、30分)毎の総使用電力量が、電力会社1と建物A,Bとの間で定める一定の第1電力量を超えない限りは、一定の基本料金に抑えることができるといった契約である。このため、第1契約では、建物A,Bにおいて設備機器の第1電力量を目標とする電力抑制を行えないと、建物A,Bが電力会社1に対してペナルティを払う義務が生じる。尚、ペナルティについては、後述する。一方、第2契約とは、第1電力量よりも低い第2電力量を目標とする電力抑制に関するデマンド契約である。具体的には、空調機40、照明機器50、換気装置60等の建物A,Bに設置される設備機器のデマンド時限毎の使用電力量が、所定時間帯において一定の第2電力量を超えないことを目標とする契約であり、建物A,Bにおいて設備機器の第2電力量を目標とする電力抑制を行うと、電力会社1から建物A,Bに対してインセンティブが支払われることになる。尚、建物A,Bの第1契約及び第2契約の契約相手は、電力会社1に限られるものではなく、アグリゲータ等の第三者機関であってもよい。また、ここでは、一例として建物A,Bを挙げているが、建物の数は2つに限られるものではなく、1つであっても、3つ以上であってもよい。   In the equipment control system 100, the buildings A and B supply power from the power company 1. In addition, the electric power company 1 and the buildings A and B have a first contract and a second contract based on conditions defined by the electric power company 1. The first contract is a demand contract related to power suppression targeting the first power amount. More specifically, the total power consumption for each demand time period (30 minutes in this embodiment) of the equipment installed in the buildings A and B such as the air conditioner 40, the lighting device 50, and the ventilation device 60 is the power. As long as it does not exceed a certain first power amount determined between the company 1 and the buildings A and B, it is a contract that can be suppressed to a certain basic charge. For this reason, in the first contract, the buildings A and B are obliged to pay a penalty to the power company 1 if the power suppression for the first power amount of the equipment in the buildings A and B cannot be performed. The penalty will be described later. On the other hand, the second contract is a demand contract related to power suppression targeting a second power amount lower than the first power amount. Specifically, the amount of power used for each demand period of equipment installed in the buildings A and B such as the air conditioner 40, the lighting device 50, and the ventilation device 60 exceeds a certain second power amount in a predetermined time period. It is a contract that aims to be absent, and if power suppression is performed with buildings A and B aiming at the second power amount of equipment, an incentive is paid from the power company 1 to the buildings A and B. . In addition, the contract partner of the first contract and the second contract of the buildings A and B is not limited to the power company 1, and may be a third party organization such as an aggregator. Moreover, although the buildings A and B are mentioned here as an example, the number of buildings is not limited to two, and may be one or three or more.

以下、簡単に設備機器に含まれる空調機40の構成について説明し、その後、設備機器制御システム100を構成する各部の構成や制御装置30によって実行される各種の制御について説明する。   Hereinafter, the configuration of the air conditioner 40 included in the facility equipment will be briefly described, and then the configuration of each part constituting the facility device control system 100 and various controls executed by the control device 30 will be described.

(2)空調機の構成
空調機40は、同じ建物A,B内に配置される制御装置30の制御対象となる機器であり、主として、図1に示すように、部屋の外部に設置される室外機41と、部屋の天井や壁に設置される室内機42と、室外機41と室内機42とを接続する冷媒連絡配管(図示せず)と、を有している。尚、空調機40は、いわゆるペア式の空調機であっても、マルチ式の空調機であっても構わない。室外機41には、圧縮機、室外熱交換器、室外ファン等の機器が収容されており、室内機42には、室内熱交換器、室内ファン等の機器が収容されている。そして、空調機40では、室外機41と室内機42と冷媒連絡配管との間で冷媒を循環させることによって、設置される部屋の空調(冷暖房)を行っている。
(2) Configuration of air conditioner The air conditioner 40 is a device to be controlled by the control device 30 arranged in the same buildings A and B, and is mainly installed outside the room as shown in FIG. The outdoor unit 41, an indoor unit 42 installed on the ceiling or wall of the room, and a refrigerant communication pipe (not shown) for connecting the outdoor unit 41 and the indoor unit 42 are provided. The air conditioner 40 may be a so-called pair type air conditioner or a multi-type air conditioner. The outdoor unit 41 accommodates devices such as a compressor, an outdoor heat exchanger, and an outdoor fan, and the indoor unit 42 accommodates devices such as an indoor heat exchanger and an indoor fan. And in the air conditioner 40, the refrigerant | coolant is circulated among the outdoor unit 41, the indoor unit 42, and refrigerant | coolant communication piping, and the air-conditioning (cooling / heating) of the room installed is performed.

空調機40の制御部(図示せず)は、室外機41が有する室外制御部(図示せず)と、室内機42が有する室内制御部(図示せず)とから構成されている。室外制御部と室内制御部とは、専用の通信線(図示せず)を介して接続されており、双方向の通信が可能となっている。また、空調機40の制御部は、上述したように、制御装置30と、専用の通信線80bを介して接続されており、制御装置30からの制御指令に基づいて、室外機41や室内機42の各種機器の動作を制御している。ここで、制御指令とは、室内機42の運転/停止指令、運転モードの変更指令等である。また、室外機41や室内機42の各種機器の動作の制御とは、圧縮機、室外ファン及び室内ファンの回転数の調整、室外機41及び/又は室内機42に収容される膨張弁の開度の調整等である。   The control unit (not shown) of the air conditioner 40 includes an outdoor control unit (not shown) included in the outdoor unit 41 and an indoor control unit (not shown) included in the indoor unit 42. The outdoor control unit and the indoor control unit are connected via a dedicated communication line (not shown), and bidirectional communication is possible. Further, as described above, the control unit of the air conditioner 40 is connected to the control device 30 via the dedicated communication line 80b. Based on a control command from the control device 30, the outdoor unit 41 and the indoor unit are connected. 42 controls the operation of various devices. Here, the control command is an operation / stop command for the indoor unit 42, an operation mode change command, or the like. Control of the operation of various devices such as the outdoor unit 41 and the indoor unit 42 includes adjustment of the rotation speed of the compressor, the outdoor fan and the indoor fan, and opening of the expansion valve accommodated in the outdoor unit 41 and / or the indoor unit 42. Adjustment of the degree.

また、空調機40の制御部は、制御装置30からの制御指令に応じて、空調機40の運転データを制御装置30に送信している。運転データとは、例えば、室外機41の運転モード、室内機42の起動/停止状態、設定温度、暖房/除湿等の運転モード、室外温度、室外湿度、室内温度、室内湿度、室外ファンの回転数、圧縮機の回転数、所定位置における冷媒温度、所定位置における冷媒圧力、室内ファンの回転数、室外機41及び/又は室内機42に収容される膨張弁の開度等が挙げられる。   Further, the control unit of the air conditioner 40 transmits operation data of the air conditioner 40 to the control device 30 in response to a control command from the control device 30. The operation data includes, for example, the operation mode of the outdoor unit 41, the start / stop state of the indoor unit 42, the set temperature, the operation mode such as heating / dehumidification, the outdoor temperature, the outdoor humidity, the indoor temperature, the indoor humidity, and the rotation of the outdoor fan. Number, the number of rotations of the compressor, the refrigerant temperature at a predetermined position, the refrigerant pressure at a predetermined position, the number of rotations of the indoor fan, the opening degree of the expansion valve accommodated in the outdoor unit 41 and / or the indoor unit 42, and the like.

(3)管理装置の構成
図2は、管理装置10の概略構成図である。管理装置10は、図1に示すように、電力会社1に配置されており、図2に示すように、主として、通信部11と、表示部12と、入力部13と、記憶部14と、制御部15とを有している。
(3) Configuration of Management Device FIG. 2 is a schematic configuration diagram of the management device 10. As shown in FIG. 1, the management device 10 is arranged in the electric power company 1. As shown in FIG. 2, the management device 10 mainly includes a communication unit 11, a display unit 12, an input unit 13, a storage unit 14, And a control unit 15.

通信部11は、管理装置10をインターネット80aに接続可能にするネットワークインターフェースである。   The communication unit 11 is a network interface that enables the management apparatus 10 to be connected to the Internet 80a.

表示部12は、主として、ディスプレイから構成されている。   The display unit 12 is mainly composed of a display.

入力部13は、主として、操作ボタン、キーボード、マウス等から構成されており、管理者等の入力を受け付ける。管理者等が入力部13への入力操作を行うことにより、制御部15によって内部処理が実行される。   The input unit 13 mainly includes operation buttons, a keyboard, a mouse, and the like, and receives input from an administrator or the like. When an administrator or the like performs an input operation on the input unit 13, internal processing is executed by the control unit 15.

記憶部14は、主として、ハードディスクから構成されている。記憶部14には、建物A,Bに関する情報や、建物A,Bとの契約に関する情報、第2契約に基づく電力抑制を建物A,Bに対して要求する要求時間帯の情報等が記憶されている。ここで、建物A,Bとの契約に関する情報とは、どのタイプの契約を結んでいるかということや、第1電力量や第2電力量に関する情報である。また、要求時間帯は、建物A,Bに対して第2電力抑制制御を行うように要求する時間帯であり、予め、入力部13を介し管理者等によって入力される。ここで、要求時間帯は、特に消費される電力量が大きくなる時期や時間帯、例えば、夏季の昼間(13時〜16時)等に設定されることが多い。   The storage unit 14 is mainly composed of a hard disk. The storage unit 14 stores information related to the buildings A and B, information related to the contracts with the buildings A and B, information on request time zones for requesting the buildings A and B to suppress power based on the second contract, and the like. ing. Here, the information related to the contract with the buildings A and B is information regarding which type of contract is made, and the first power amount and the second power amount. The requested time zone is a time zone for requesting the buildings A and B to perform the second power suppression control, and is input in advance by the administrator or the like via the input unit 13. Here, the required time zone is often set at a time or a time zone in which the amount of consumed electric power is particularly large, for example, summer daytime (13:00 to 16:00).

制御部15は、主として、CPU、ROMおよびRAMから構成されている。制御部15は、上述の記憶部14に記憶されているプログラムを読み出して実行することにより、制御装置30に対して要求時間帯等の情報を送信する送信部等として機能する。尚、上記では、要求時間帯は、予め管理者等によって入力されると述べたが、必ずしもそうである必要はなく、制御部15が、過去の建物A,Bにおける消費電力量を参照することによって要求時間帯を決定/更新する要求時間帯決定部として機能してもよい。   The control unit 15 mainly includes a CPU, a ROM, and a RAM. The control unit 15 functions as a transmission unit that transmits information such as a requested time zone to the control device 30 by reading and executing the program stored in the storage unit 14 described above. In the above description, it has been described that the requested time zone is input in advance by an administrator or the like, but this is not necessarily the case, and the control unit 15 refers to the power consumption in the past buildings A and B. May function as a request time zone determination unit that determines / updates the request time zone.

(4)制御装置の構成
図3は、制御装置30の概略構成図である。
(4) Configuration of Control Device FIG. 3 is a schematic configuration diagram of the control device 30.

制御装置30は、建物A,Bの管理室等に配置され、電力会社1に配置される管理装置10から情報(具体的には、要求時間帯の情報)を受け取って又は電力会社1との契約に基づいて独自に設備機器の制御を実行する制御装置である。具体的には、制御装置30は、図3に示すように、主として、通信部31と、表示部32と、入力部33と、タイマー部34と、記憶部35と、制御部36と、を有している。   The control device 30 is arranged in a management room or the like of the buildings A and B and receives information (specifically, information on a requested time zone) from the management device 10 arranged in the electric power company 1 or with the electric power company 1. It is a control device that independently executes control of equipment based on a contract. Specifically, as shown in FIG. 3, the control device 30 mainly includes a communication unit 31, a display unit 32, an input unit 33, a timer unit 34, a storage unit 35, and a control unit 36. Have.

(4―1)通信部
通信部31は、制御装置30をインターネット80aに接続可能にするネットワークインターフェースであり、制御装置30を専用の通信線80bに接続可能にするネットワークインターフェースである。これにより、建物A,Bにおける制御装置30と管理装置10との間で双方向の通信が可能になり、制御装置30と空調機40との間で双方向の通信が可能になっている。
(4-1) Communication Unit The communication unit 31 is a network interface that allows the control device 30 to be connected to the Internet 80a, and is a network interface that enables the control device 30 to be connected to a dedicated communication line 80b. Thereby, bidirectional communication is possible between the control device 30 and the management device 10 in the buildings A and B, and bidirectional communication is possible between the control device 30 and the air conditioner 40.

(4−2)表示部
表示部32は、主として、ディスプレイから構成されている。表示部32には、空調機40の運転状況、照明機器50の運転状況、換気装置60の運転状況等を示す画面が表示される。尚、設備機器の運転状況に関しては、後の「運転状況記憶領域35a」の箇所で説明する。
(4-2) Display Unit The display unit 32 mainly includes a display. The display unit 32 displays a screen showing the operating status of the air conditioner 40, the operating status of the lighting device 50, the operating status of the ventilation device 60, and the like. The operation status of the equipment will be described later in the “operation status storage area 35a”.

また、表示部32には、デマンド時限毎の現在の使用電力量、第1契約で定められた第1電力量、第2契約で定められた第2電力量も表示され、さらには、後述する第2電力抑制制御実行中のときは、実行中である旨を表示したり第2電力抑制制御の終了時までの残り時間を表示したりする。さらに、表示部32には、後述する超過制御における第1電力量からの超過分も表示されるようになっている。これについては、後の「超過分―金銭状況記憶領域35e」の箇所でも説明する。   The display unit 32 also displays the current power consumption for each demand period, the first power amount determined in the first contract, and the second power amount determined in the second contract, and will be described later. When the second power suppression control is being executed, a message indicating that the second power suppression control is being executed is displayed, or the remaining time until the end of the second power suppression control is displayed. Furthermore, the display unit 32 also displays an excess amount from the first power amount in the excess control described later. This will be described later in the “excess amount-money status storage area 35e”.

(4−3)入力部
入力部33は、主として、キーボードやマウス等から構成されており、ユーザ(建物A,Bの管理室に位置する管理者等を想定)からの入力を受け付ける。制御装置30では、管理者等によって入力部33への入力操作が行われたり、別途のコンピュータとの通信による入力操作が行われたりすることで、制御部36によって内部処理が実行される。尚、入力部33は、操作ボタン及び上記ディスプレイを覆うタッチパネルから構成されていてもよい。
(4-3) Input unit The input unit 33 mainly includes a keyboard, a mouse, and the like, and receives input from a user (assuming an administrator or the like located in the management room of the buildings A and B). In the control device 30, an internal process is executed by the control unit 36 when an input operation to the input unit 33 is performed by an administrator or the like, or an input operation is performed through communication with a separate computer. The input unit 33 may include an operation button and a touch panel that covers the display.

(4−4)タイマー部
タイマー部34は、電力会社1の管理装置10と略同期する時計を有し、時刻、日、月、年、曜日、所定時刻を基準とした経過時間等の時間的要素を計測する。
(4-4) Timer unit The timer unit 34 has a clock that is substantially synchronized with the management device 10 of the electric power company 1, and includes time, day, month, year, day of the week, and elapsed time based on a predetermined time. Measure elements.

(4−5)記憶部
記憶部35は、主として、ハードディスクから構成され、運転状況記憶領域35aと、契約情報記憶領域35bと、要求時間帯記憶領域35cと、超過分―金銭状況記憶領域35dと、超過分記憶領域35eと、を有している。
(4-5) Storage Unit The storage unit 35 is mainly composed of a hard disk, and includes an operation status storage area 35a, a contract information storage area 35b, a requested time zone storage area 35c, and an excess-money status storage area 35d. And an excess storage area 35e.

(4−5−1)運転状況記憶領域
運転状況記憶領域35aは、後述する取得部36aによって取得された、空調機40、照明機器50、換気装置60等の建物A,Bに設置される設備機器の状況や電力メーター7によって計測される電力量等の設備機器の運転状況が記憶されている。空調機40の運転状況としては、空調機40の運転/停止の状態、設定温度、運転モード(冷房モード/暖房モード等)、稼働時間、室外機41及び室内機42の各種機器の状態値(ファンの回転数、圧縮機の回転数、冷媒温度、冷媒圧力等)、室外温度、室内温度、吸込温度等が含まれ、照明機器50の運転状況としては、照度等、換気装置60の運転状況としては、換気風量等が含まれる。
(4-5-1) Operation Status Storage Area The operation status storage area 35a is equipment installed in the buildings A and B such as the air conditioner 40, the lighting device 50, and the ventilation device 60, which are acquired by the acquisition unit 36a described later. The operation status of equipment such as the status of the equipment and the amount of power measured by the power meter 7 is stored. The operation status of the air conditioner 40 includes the operation / stop state of the air conditioner 40, the set temperature, the operation mode (cooling mode / heating mode, etc.), the operating time, and the state values of various devices such as the outdoor unit 41 and the indoor unit 42 ( Fan rotation speed, compressor rotation speed, refrigerant temperature, refrigerant pressure, etc.), outdoor temperature, indoor temperature, suction temperature, and the like. As such, ventilation airflow and the like are included.

(4−5−2)契約情報記憶領域35b
契約情報記憶領域35bには、電力会社1と建物A,Bとの間で定められた第1契約及び第2契約に関する情報が記憶されている。第1契約及び第2契約に関する情報とは、具体的には、第1電力量、第2電力量、第1電力量を目標とする電力抑制を実行できなかった場合のペナルティに関する情報、第2電力量を目標とする電力抑制を実行した場合のインセンティブに関する情報等である。ここで、ペナルティに関する情報とは、例えば、ペナルティが第1電力量を超えると1kWh当たり100円で計算されるという情報である。このペナルティは、予め電力会社1と建物A,Bとの間で定められた基本料金に上乗せされ、1年間その料金が継続されることになる。一方、インセンティブに関する情報とは、例えば、インセンティブが、抑制制御1回当たり300円で計算されるという情報である。すなわち、要求時間帯に第2電力抑制制御を実行できれば、300円が、電力会社1から建物A,Bに対して支払われることになる。
(4-5-2) Contract information storage area 35b
The contract information storage area 35b stores information on the first contract and the second contract defined between the electric power company 1 and the buildings A and B. Specifically, the information on the first contract and the second contract is information on the penalty when the power suppression targeting the first electric energy, the second electric energy, and the first electric energy cannot be executed, the second This is information related to incentives when power suppression targeting power consumption is executed. Here, the information on the penalty is, for example, information that is calculated at 100 yen per kWh when the penalty exceeds the first power amount. This penalty is added to a basic charge determined in advance between the electric power company 1 and the buildings A and B, and the charge is continued for one year. On the other hand, the information regarding the incentive is information that the incentive is calculated at 300 yen per suppression control, for example. That is, if the second power suppression control can be executed in the required time zone, 300 yen is paid from the power company 1 to the buildings A and B.

(4−5−3)要求時間帯記憶領域
要求時間帯記憶領域35cには、管理装置10から受信した要求時間帯が記憶されている。要求時間帯とは、上述したように、電力会社1から、建物A,Bにおける設備機器の第2電力抑制制御を行うように要求される時間帯である。
(4-5-3) Request time zone storage area The request time zone storage area 35c stores the request time zone received from the management apparatus 10. A request | requirement time slot | zone is a time slot | zone requested | required from the electric power company 1 to perform the 2nd electric power suppression control of the installation equipment in the buildings A and B as mentioned above.

(4−5−4)超過分―金銭状況記憶領域
超過分―金銭状況記憶領域35dには、超過分―金銭状況関係を示すテーブルが記憶されている。ここで、超過分とは、超過制御における設備機器に関するデマンド時限毎の総使用電力量の第1電力量からの超過分を意味し、入力部33を介して管理者等によって入力される。また、超過分―金銭状況関係とは、超過制御における設備機器に関するデマンド時限毎の総使用電力量の第1電力量からの超過分がどの程度であれば、どの程度料金的にプラスになる又はマイナスになるかを示すものである。この超過分―金銭状況関係を示すテーブルは、表示部32を介してユーザが視認可能となる。そして、所定の超過分とこれに対応する金銭状況との複数の組み合わせのうちいずれかを、管理者等が入力部33を介して選択できるようになっている。すなわち、本実施形態では、超過制御における設備機器に関するデマンド時限毎の総使用電力量の第1電力量からの超過分を、金銭面とのバランスを見ながら管理者等が入力部33を介して入力可能になっている。
(4-5-4) Excess-monetary status storage area The excess-monetary status storage area 35d stores a table indicating the excess-monetary status relationship. Here, the excess means an excess from the first power amount of the total power consumption for each demand time period related to the equipment device in the excess control, and is input by the administrator or the like via the input unit 33. In addition, the excess-money status relationship means how much the amount of excess from the first power consumption of the total power consumption for each demand time period related to equipment in excess control will be positive in terms of charge or It shows whether it becomes negative. The table showing the excess-monetary status relationship is visible to the user via the display unit 32. Then, the administrator or the like can select one of a plurality of combinations of the predetermined excess and the corresponding monetary status via the input unit 33. That is, in the present embodiment, the administrator or the like via the input unit 33 while checking the balance from the first power amount of the total power consumption for each demand time period regarding the equipment in the excess control while looking at the balance with the financial aspect. Input is enabled.

(4−5−5)超過分記憶領域
超過分記憶領域35eには、入力部33を介して管理者等によって選択されることにより取得部36aが取得した上記の超過分が記憶されている。
(4-5-5) Excess Storage Area The excess storage area 35e stores the above-described excess acquired by the acquisition unit 36a by being selected by the administrator or the like via the input unit 33.

(4−6)制御部36
制御部36は、主として、CPU、ROM及びRAMから構成されている。制御部36は、上述の記憶部35に記憶されているプログラムを読み出して実行することにより、主として、取得部36a、受付部36b、電力量抑制制御部36c、超過制御部36d、導出部36e、出力部36f等として機能する。
(4-6) Control unit 36
The control unit 36 mainly includes a CPU, a ROM, and a RAM. The control unit 36 mainly reads out and executes the program stored in the above-described storage unit 35, so that the acquisition unit 36a, the reception unit 36b, the power amount suppression control unit 36c, the excess control unit 36d, the derivation unit 36e, It functions as the output unit 36f and the like.

(4−6−1)取得部
取得部36aは、所定の時間間隔(本実施形態では、5分間隔)で、空調機40等の設備機器の状況や電力メーター7によって計測される電力量を、設備機器の運転状況として取得する。また、取得部36aは、入力部33を介して入力された情報を取得する。そして、取得部36aは、当該設備機器の運転状況、入力部33を介して入力された情報、別途のコンピュータから通信によって得た情報等を、所定の記憶領域に格納する。
(4-6-1) Acquisition Unit The acquisition unit 36a determines the status of the equipment such as the air conditioner 40 and the amount of power measured by the power meter 7 at a predetermined time interval (in this embodiment, every 5 minutes). , Get the operating status of equipment. The acquisition unit 36 a acquires information input via the input unit 33. And the acquisition part 36a stores the operating condition of the said equipment, the information input via the input part 33, the information obtained by communication from another computer, etc. in a predetermined storage area.

(4−6−2)受付部
受付部36bは、電力会社1の管理装置10から送信される要求時間帯を受け付ける。そして、受け付けた要求時間帯を、上述の要求時間帯記憶領域35cに格納する。要求時間帯は、例えば、前日に、電力会社1の管理装置10から送信されるものとする。
(4-6-2) Reception Unit The reception unit 36b receives a request time zone transmitted from the management device 10 of the power company 1. Then, the received request time zone is stored in the request time zone storage area 35c described above. For example, the request time zone is transmitted from the management device 10 of the power company 1 on the previous day.

(4−6−3)電力量抑制制御部
電力量抑制制御部36cは、要求時間帯において、空調機40を含む設備機器の第2電力抑制制御を実行する。具体的には、電力量抑制制御部36cは、まず、運転状況記憶領域35aに記憶されている設備機器の運転状況及び第2電力量に基づいて、建物A,Bにおける空調機40、照明機器50、換気装置60等のそれぞれの要求時間帯におけるデマンド時限毎の目標総使用電力量を要求時間帯よりも前の時点で決定している。そして、この決定した目標総使用電力量以下になるように、空調機40、照明機器50、換気装置60等のそれぞれのデマンド時限毎の総使用電力量を制御している。ここで、設備機器のデマンド時限毎の総使用電力量を目標総使用電力量以下にする制御方法としては、空調機40に関して言えば、例えば、室外機41に含まれる圧縮機の能力を抑制することであり、換気装置であれば、換気風量を小さくする等、照明機器であれば、照度を低くする等である。
(4-6-3) Power amount suppression control unit The power amount suppression control unit 36c executes the second power suppression control of the equipment including the air conditioner 40 in the required time zone. Specifically, the power amount suppression control unit 36c first determines the air conditioner 40 and the lighting device in the buildings A and B based on the operation state of the equipment and the second power amount stored in the operation state storage area 35a. 50, the ventilation device 60, etc., the target total power consumption for each demand time period in each required time zone is determined at a time point before the required time zone. Then, the total power consumption for each demand time period of the air conditioner 40, the lighting device 50, the ventilation device 60, and the like is controlled so as to be equal to or less than the determined target total power consumption. Here, as a control method for setting the total power consumption for each demand time limit of the equipment to be equal to or less than the target total power consumption, for example, regarding the air conditioner 40, the capacity of the compressor included in the outdoor unit 41 is suppressed. In the case of a ventilator, the ventilation air volume is reduced, and in the case of lighting equipment, the illuminance is reduced.

また、電力量抑制制御部36cは、要求時間帯以外の時間帯には、空調機40を含む設備機器の第1電力抑制制御を実行する。具体的には、まず、電力量抑制制御部36cは、運転状況記憶領域35aに記憶されている設備機器の運転状況及び第1電力量に基づいて、デマンド時限毎に、空調機40、照明機器50、換気装置60等のそれぞれのデマンド時限の終了時点での目標総使用電力量を決定する。そして、この決定したデマンド時限の終了時点での目標総使用電力量以下になるように、空調機40、照明機器50、換気装置60等のそれぞれのデマンド時限毎の総使用電力量を制御している。   Moreover, the electric energy suppression control part 36c performs the 1st electric power suppression control of the installation apparatus containing the air conditioner 40 in time slots other than a request | requirement time slot | zone. Specifically, first, the power amount suppression control unit 36c, based on the operation state of the equipment and the first power amount stored in the operation state storage area 35a, for each demand time period, the air conditioner 40, the lighting device 50, the target total power consumption at the end of each demand time period of the ventilator 60, etc. is determined. Then, the total power consumption for each demand time period of the air conditioner 40, the lighting device 50, the ventilation device 60, etc. is controlled so as to be equal to or less than the target total power consumption at the end of the determined demand time period. Yes.

(4−6−4)超過制御部
超過制御部36dは、要求時間帯の直前の所定時間帯において、設備機器の超過制御を実行する。超過制御とは、設備機器のデマンド時限毎の総使用電力量を第1電力量よりも超過させる制御である。より具体的には、設備機器のデマンド時限毎の総使用電力量を第1電力量よりも上述した超過分だけ超過させる制御である。
(4-6-4) Excess Control Unit The excess control unit 36d performs excess control of the equipment in a predetermined time zone immediately before the request time zone. Excess control is control in which the total power consumption for each demand time period of the facility device exceeds the first power amount. More specifically, it is control that causes the total power consumption for each demand time limit of the equipment to exceed the first power amount by the excess amount described above.

さらに具体的には、超過制御部36dは、超過制御では、設備機器に含まれる空調機40のデマンド時限毎の総使用電力量を、第1電力抑制制御の実行中におけるデマンド時限毎の目標総使用電力量よりも上述した超過分だけ超過させる。すなわち、上記では、超過制御は、設備機器のデマンド時限毎の総使用電力量を第1電力量よりも超過分だけ超過させる制御であると述べたが、実際は、設備機器に含まれる空調機40のデマンド時限毎の総使用電力量を第1電力量よりも超過分だけ超過させる制御であるということである。尚、超過制御部36dは、超過制御の実行中、空調機40のサーモオフ制御を強制的に解除している。具体的には、超過制御部36dは、空調機40の制御部に対して、超過制御を実行する指令を出すと共に超過制御の実行中にサーモオフを強制的に解除する指令を出している。   More specifically, in the excess control, the excess control unit 36d calculates the total power consumption for each demand time period of the air conditioner 40 included in the facility device as the target total for each demand time period during the execution of the first power suppression control. Exceed the amount of power used by the excess amount described above. That is, in the above description, the excess control is described as control that causes the total power consumption for each demand time period of the equipment to exceed the first power quantity by an excess, but actually, the air conditioner 40 included in the equipment is used. That is, the total power consumption for each demand period is controlled to exceed the first power amount by an excess amount. The excess control unit 36d forcibly releases the thermo-off control of the air conditioner 40 during the execution of the excess control. Specifically, the excess control unit 36d issues a command to execute the excess control to the control unit of the air conditioner 40 and issues a command to forcibly cancel the thermo-off during the execution of the excess control.

(4−6−5)導出部
導出部36eは、上述した超過分―金銭状況関係を示すテーブルを導出する。具体的には、導出部36eは、契約情報記憶領域35bに記憶されているペナルティに関する情報及び第1電力量に基づいて、超過分に対応するペナルティを導出する。ここで、導出部36eは、第1電力量からの超過分α(kW)×経過時間t(h)×100(円/kWh)を、建物A,Bが電力会社1に対して支払うペナルティとして導出する。そして、導出部36eは、このペナルティと、インセンティブに関する情報から得られるインセンティブと、契約情報記憶領域35bに記憶されている第1電力量と、に基づいて、超過分―金銭状況の関係を示すテーブルを導出する。そして、このテーブルは、上述の超過分―金銭状況記憶領域35dに格納されることになる。
(4-6-5) Deriving Unit The deriving unit 36e derives a table indicating the above-described excess amount-money situation relationship. Specifically, the deriving unit 36e derives a penalty corresponding to the excess based on the information on the penalty stored in the contract information storage area 35b and the first power amount. Here, the deriving unit 36e uses the excess α (kW) from the first power amount × elapsed time t (h) × 100 (yen / kWh) as a penalty that the buildings A and B pay to the power company 1. To derive. Then, the derivation unit 36e is a table showing the relationship between excess amount and monetary status based on the penalty, the incentive obtained from the information on the incentive, and the first electric energy stored in the contract information storage area 35b. Is derived. This table is stored in the above-excess-money status storage area 35d.

(4−6−6)出力部
出力部36fは、導出部36eによって導出された超過分―金銭状況関係を示すテーブルを、表示部32に表示させる。これにより、超過分―金銭状況関係を示すテーブルを、管理者等が視認可能となる。また、出力部36fは、運転状況記憶領域35aに記憶されている設備機器の運転状況等も適宜、表示部32に表示させる。
(4-6-6) Output unit The output unit 36f causes the display unit 32 to display a table indicating the excess-monetary status relationship derived by the deriving unit 36e. As a result, the manager or the like can visually recognize the table indicating the excess amount-money situation relationship. The output unit 36f also causes the display unit 32 to appropriately display the operation status of the equipment stored in the operation status storage area 35a.

(5)制御装置における処理の流れ
図4は、制御装置30における処理を示すフローチャートである。また、図5は、建物A,Bにおける電力量の推移の一部を示すグラフである。以下、図4及び図5を用いて制御装置30における処理の流れを説明する。
(5) Processing Flow in Control Device FIG. 4 is a flowchart showing processing in the control device 30. FIG. 5 is a graph showing a part of the transition of electric energy in buildings A and B. Hereinafter, the flow of processing in the control device 30 will be described with reference to FIGS. 4 and 5.

尚、図4には示していないが、予め、建物A,Bの管理者等によって、超過制御におけるデマンド時限毎の総使用電力量の第1電力量からの超過分が、入力部33を介して管理者等により決定されているものとする。また、受付部36bが、予め、前日に、第2電力抑制制御を行う要求時間帯を受け付けているものとする。また、取得部36aは、定期的に(具体的には、所定時間間隔(例えば、5分間隔)で)、設備機器の運転状況を取得しているものとする。   Although not shown in FIG. 4, an excess of the total power consumption for each demand period in the excess control from the first power amount is previously input via the input unit 33 by the manager of the buildings A and B or the like. It is assumed that it has been determined by the administrator. In addition, it is assumed that the reception unit 36b has received a request time zone for performing the second power suppression control on the previous day in advance. Moreover, the acquisition part 36a shall acquire the driving | running state of an installation apparatus regularly (specifically at predetermined time intervals (for example, every 5 minutes)).

まず、図4に示すように、ステップS101では、電力量抑制制御部36cが、設備機器の第1電力抑制制御を実行する。すなわち、電力量抑制制御部36cは、設備機器のデマンド時限毎の総使用電力量が、電力会社1との第1契約に基づく第1電力量以下になるように制御する(図5の超過制御より前の第1電力抑制制御を参照)。具体的には、上述したように、設備機器を構成する各機器(空調機40、照明機器50、換気装置60等)のデマンド時限毎の総使用電力量が、第1電力量や設備機器の運転状況に基づく個々のデマンド時限毎の目標総使用電力量以下になるように制御している。   First, as shown in FIG. 4, in step S101, the power amount suppression control unit 36c executes the first power suppression control of the equipment. In other words, the power amount suppression control unit 36c performs control so that the total power consumption for each demand time period of the equipment is equal to or less than the first power amount based on the first contract with the power company 1 (excess control in FIG. 5). (See earlier first power suppression control). Specifically, as described above, the total power consumption for each demand period of each device (air conditioner 40, lighting device 50, ventilation device 60, etc.) constituting the facility device is equal to the first power amount or the facility device. Control is performed so that it is less than or equal to the target total power consumption for each demand period based on operating conditions.

ステップS102では、超過制御部36dが、要求時間帯の所定時間前であるか否かを判定する。具体的には、超過制御部36dは、要求時間帯記憶領域35cに記憶されている要求時間帯と、タイマー部34によって計測される時刻とに基づいて、要求時間帯の所定時間前であるか否かを判定している。ここで、所定時間とは、予め所定の記憶領域に記憶される任意の時間であり、例えば、1時間である。尚、所定時間は、運転状況記憶領域35aに記憶されている設備機器の運転状況やその運転状況に基づく要求時間帯における予測状況(予測消費電力量)等に基づいて随時変更されてもよい。要求時間帯の所定時間前であると判定する場合は、ステップS103に進んで、超過制御部36dが、電力量抑制制御部36cに第1電力抑制制御の実行を終了させて、超過制御を実行する(図5の超過制御を参照)。超過制御では、設備機器のデマンド時限毎の総使用電力量を第1電力量よりも超過させる。より具体的には、設備機器のデマンド時限毎の総使用電力量を、第1電力量と超過分とを加算した値以下となるように制御する。さらに具体的には、上述したように、超過制御では、設備機器に含まれる空調機40のデマンド時限毎の総使用電力量を、第1電力抑制制御の実行中におけるデマンド時限毎の目標総使用電力量と超過分とを加算した値以下となるように制御する。他方、ステップS102において、要求時間帯の所定時間前になっていないと判定する場合は、超過制御部36dは、電力量抑制制御部36cに、ステップS101の処理を繰り返すように指示する。つまり、本実施形態では、要求時間帯の所定時間前になるまでは、第1電力抑制制御を実行しており、要求時間帯の所定時間前になると、第1電力抑制制御を終了して超過制御を実行している。   In step S102, the excess control unit 36d determines whether or not it is a predetermined time before the requested time zone. Specifically, whether the excess control unit 36d is a predetermined time before the request time zone based on the request time zone stored in the request time zone storage area 35c and the time measured by the timer unit 34. It is determined whether or not. Here, the predetermined time is an arbitrary time stored in a predetermined storage area in advance, for example, one hour. Note that the predetermined time may be changed as needed based on the operating status of the equipment stored in the operating status storage area 35a, the predicted status (predicted power consumption) in the required time zone based on the operating status, and the like. If it is determined that it is a predetermined time before the requested time zone, the process proceeds to step S103, and the excess control unit 36d causes the power amount suppression control unit 36c to end the execution of the first power suppression control and executes the excess control. (See the excess control in FIG. 5). In the excess control, the total power consumption for each demand time limit of the equipment is made to exceed the first power consumption. More specifically, the total power consumption for each demand time limit of the equipment is controlled to be equal to or less than the value obtained by adding the first power amount and the excess amount. More specifically, as described above, in the excess control, the total power consumption for each demand time period of the air conditioner 40 included in the equipment is calculated as the target total use for each demand time period during the execution of the first power suppression control. Control is performed so as to be equal to or less than the sum of the electric energy and the excess. On the other hand, when it is determined in step S102 that the predetermined time before the requested time zone has not been reached, the excess control unit 36d instructs the power amount suppression control unit 36c to repeat the process of step S101. In other words, in the present embodiment, the first power suppression control is executed until a predetermined time before the request time zone, and when the predetermined time before the request time zone is reached, the first power suppression control is terminated and exceeded. Control is being executed.

ステップS104では、電力量抑制制御部36cが、要求時間帯の開始時刻になったか否かを判定する。具体的には、電力量抑制制御部36cは、要求時間帯記憶領域35cに記憶されている要求時間帯と、タイマー部34によって計測される時刻とに基づいて、要求時間帯の開始時刻か否かを判定している。そして、要求時間帯の開始時刻になったと判定する場合は、ステップS105において、超過制御部36dに設備機器の超過制御の実行を終了させて、さらに、ステップS106において、設備機器の第2電力抑制制御を実行する(図5の第2電力抑制制御を参照)。すなわち、ステップS106では、電力量抑制制御部36cは、設備機器のデマンド時限毎の総使用電力量が、電力会社1との第2契約に基づく第2電力量以下になるように制御する。より具体的には、上述したように、設備機器を構成する各機器(空調機40、照明機器50、換気装置60等)のデマンド時限毎の総使用電力量が、第2電力量や設備機器の運転状況に基づく個々のデマンド時限毎の目標総使用電力量以下になるように制御している。他方、ステップS104において、要求時間帯の開始時刻になっていないと判定する場合は、電力量抑制制御部36cは、超過制御部36dに、超過制御を継続して実行するように指示する(ステップS103の処理を実行する)。つまり、本実施形態では、要求時間帯の所定時間前から要求時間帯の開始時刻までは、超過制御を実行しており、要求時間帯の開始時刻になると、超過制御を終了して第2電力抑制制御を実行している。   In step S104, the power amount suppression control unit 36c determines whether or not the start time of the requested time zone has come. Specifically, the power amount suppression control unit 36c determines whether or not the requested time zone start time is based on the requested time zone stored in the requested time zone storage area 35c and the time measured by the timer unit 34. Judging. If it is determined that the start time of the requested time zone has been reached, in step S105, the excess control unit 36d terminates the execution of the excess control of the facility device, and in step S106, the second power suppression of the facility device is performed. The control is executed (see the second power suppression control in FIG. 5). That is, in step S106, the power amount suppression control unit 36c performs control so that the total power consumption for each demand time period of the equipment is equal to or less than the second power amount based on the second contract with the power company 1. More specifically, as described above, the total power consumption for each demand period of each device (air conditioner 40, lighting device 50, ventilation device 60, etc.) constituting the facility device is the second power amount or the facility device. It is controlled so that it is less than or equal to the target total power consumption for each demand time period based on the driving situation. On the other hand, if it is determined in step S104 that the start time of the requested time zone has not been reached, the power amount suppression control unit 36c instructs the excess control unit 36d to continue the excess control (step S104). The process of S103 is executed). That is, in the present embodiment, excess control is executed from a predetermined time before the request time zone to the start time of the request time zone. When the start time of the request time zone is reached, the excess control is terminated and the second power Suppression control is being executed.

ステップS107では、電力量抑制制御部36cが、要求時間帯の終了時刻になったか否かを判定する。具体的には、電力量抑制制御部36cは、要求時間帯記憶領域35cに記憶されている要求時間帯と、タイマー部34によって計測される時刻とに基づいて、要求時間帯の終了時刻か否かを判定している。そして、要求時間帯の終了時刻になったと判定する場合は、ステップS108において、第2電力抑制制御を終了して、ステップS101に戻って第1電力抑制制御を実行する(図5の要求時間帯以後の第1電力抑制制御を参照)。他方、ステップS107において、要求時間帯の終了時刻になっていないと判定する場合は、ステップS106の処理を繰り返す。すなわち、第2電力抑制制御を継続して実行する。   In step S107, the power amount suppression control unit 36c determines whether or not the end time of the requested time period has come. Specifically, the power amount suppression control unit 36c determines whether or not the end time of the requested time zone based on the requested time zone stored in the requested time zone storage area 35c and the time measured by the timer unit 34. Judging. If it is determined that the end time of the requested time zone has been reached, the second power suppression control is terminated in step S108, and the process returns to step S101 to execute the first power suppression control (the requested time zone in FIG. 5). Refer to the subsequent first power suppression control). On the other hand, when it is determined in step S107 that the end time of the requested time zone has not been reached, the process of step S106 is repeated. That is, the second power suppression control is continuously executed.

(6)特徴
(6−1)
本実施形態の設備機器制御システム100では、建物A,Bは、第1電力量を目標とする電力抑制を行えないとペナルティを払い、第1電力量よりも低い第2電力量を目標とする電力抑制を行うとインセンティブが入ることを前提としている。具体的には、建物A,Bは、電力会社1との間で、第1電力量を目標とする電力抑制に関する第1契約及び第2電力量を目標とする電力抑制に関する第2契約を結んでいる。第1契約は、電力抑制を行えないと、建物A,Bが、電力会社1に対してペナルティを払うといった契約である。第2契約は、電力抑制を行うと建物A,Bに電力会社1からインセンティブが入るといった契約である。
(6) Features (6-1)
In the equipment control system 100 of the present embodiment, the buildings A and B pay a penalty if the power suppression targeted for the first power amount cannot be performed, and target the second power amount lower than the first power amount. It is assumed that incentives will be provided when power is suppressed. Specifically, buildings A and B have signed a first contract with power company 1 regarding power suppression targeting the first power amount and a second contract regarding power suppression targeting the second power amount. It is out. The first contract is a contract in which the buildings A and B pay a penalty to the power company 1 if the power control cannot be performed. The second contract is a contract in which an incentive from the power company 1 is entered into the buildings A and B when power is suppressed.

そして、建物A,Bでは、前提として、制御装置30が、第1契約に基づいて設備機器の第1電力抑制制御を実行している。但し、建物A,Bが電力会社1と第2契約を結んでいることによって、例外的に、要求時間帯になると設備機器の第2電力抑制制御を実行している。そして、この第2電力抑制制御を実行することによって建物A,Bには電力会社1からインセンティブが入るので、それを加味して、さらに例外的に、要求時間帯の直前の所定時間帯(すなわち、要求時間帯の所定時間前から要求時間帯の開始時刻までの時間帯)に、設備機器の超過制御を実行している。さらに、本実施形態では、超過制御における、設備機器のデマンド時限毎の総使用電力量の第1電力量からの超過分を、管理者等が入力部33を介して入力可能になっている。尚、本実施形態では、超過制御では、空調機40のデマンド時限毎の目標総使用電力量が超過分だけ増加されることになる。これにより、例えば、管理者等が超過分として0より大きい数字を入力すれば、超過制御の実行中、空調環境に関するユーザの快適性が確保されることになる。   And in the buildings A and B, as a premise, the control device 30 executes the first power suppression control of the facility equipment based on the first contract. However, since the buildings A and B have a second contract with the power company 1, exceptionally, the second power suppression control of the equipment is executed when the requested time zone is reached. Then, by executing this second power suppression control, incentives are entered from the power company 1 into the buildings A and B. Therefore, in addition, in exceptional cases, a predetermined time zone immediately before the request time zone (ie, The equipment equipment excess control is executed during a predetermined time before the request time zone to the start time of the request time zone. Furthermore, in this embodiment, an administrator or the like can input an excess from the first power amount of the total power consumption for each demand time period of the equipment device in the excess control via the input unit 33. In the present embodiment, in the excess control, the target total power consumption for each demand period of the air conditioner 40 is increased by the excess amount. Thus, for example, if the administrator or the like inputs a number greater than 0 as the excess, the user's comfort regarding the air-conditioning environment is ensured during the execution of the excess control.

また、本実施形態では、超過制御を、第2電力抑制制御の実行時間帯(要求時間帯)の直前の所定時間帯に実行することから、第2電力抑制制御の実行中、空調環境に関するユーザの快適性の低下を極力抑制できている。   In the present embodiment, the excess control is executed in a predetermined time zone immediately before the execution time zone (request time zone) of the second power suppression control. Therefore, during execution of the second power suppression control, the user regarding the air conditioning environment It is possible to suppress the decrease in comfort as much as possible.

以上のように、本実施形態では、近年提案されている、インセンティブが与えられる制度に対応した制御、すなわち、インセンティブを加味した制御を実行できている。   As described above, in the present embodiment, it is possible to execute control corresponding to a system that has been proposed in recent years, that is, a system that takes incentives into consideration.

(6−2)
本実施形態では、導出部36eが、記憶部35の契約情報記憶領域35bに記憶されているインセンティブに関する情報及びペナルティに関する情報に基づいて、所定の超過分に対する金銭状況の関係である超過分―金銭状況関係を導出している。そして、この導出された超過分―金銭状況関係は、記憶部35の超過分―金銭状況記憶領域35dに記憶されて、出力部36fによって、表示部32に表示されるようになっている。
(6-2)
In the present embodiment, the derivation unit 36e is based on the information on the incentive and the information on the penalty stored in the contract information storage area 35b of the storage unit 35. Situational relationships are derived. The derived excess-money status relationship is stored in the excess-money status storage area 35d of the storage unit 35 and displayed on the display unit 32 by the output unit 36f.

以上のように、本実施形態では、管理者等が、所定の超過分とこれに対応する金銭状況とを表示部32を介して視認可能となっている。すなわち、管理者等は、超過制御において設備機器のデマンド時限毎の総使用電力量を第1電力量からどのくらい超過させれば、つまり、超過分をどのくらいにすれば、料金的にどの程度のプラスになるのか或いはマイナスになるのかを把握できるようになっている。よって、管理者等は、超過分と金銭状況との関係を見て、超過制御における設備機器に関するデマンド時限毎の総使用電力量の第1電力量からの超過分を決定できる。このように、本実施形態では、管理者等は、快適性と料金面とのバランスを自身で決定できるようになっている。   As described above, in the present embodiment, the administrator or the like can visually recognize the predetermined excess and the corresponding monetary status via the display unit 32. In other words, the administrator, etc., in the excess control, how much the total power consumption per demand time period of the equipment is exceeded from the first power amount, that is, how much the excess amount is, how much plus It is possible to grasp whether it will be negative or negative. Therefore, the administrator or the like can determine the excess from the first power amount of the total power consumption for each demand time period related to the equipment in the excess control by looking at the relationship between the excess amount and the money situation. As described above, in this embodiment, the administrator or the like can determine the balance between the comfort and the price.

(6−3)
本実施形態では、超過制御部36dは、超過制御において、空調機40のサーモオフ制御を解除する。
(6-3)
In the present embodiment, the excess control unit 36d cancels the thermo-off control of the air conditioner 40 in the excess control.

このように、超過制御中において、設定温度に達したとしてもサーモオフしないようにすることで、その間、空調機40の空調によって空調対象空間としての部屋に蓄熱し続けることができる。よって、超過制御の終了後に実行される第2電力抑制制御の実行中、空調環境に関するユーザの不快感を低減できる。   As described above, during the excess control, even if the set temperature is reached, the thermo-off is not performed, so that heat can be continuously stored in the room as the air-conditioning target space by the air-conditioning of the air conditioner 40. Therefore, the user's discomfort regarding the air-conditioning environment can be reduced during the execution of the second power suppression control executed after the end of the excess control.

(7)変形例
以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、上記の実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。
(7) Modifications The embodiment of the present invention has been described with reference to the drawings. However, the specific configuration is not limited to the above-described embodiment, and can be changed without departing from the gist of the invention. .

(7−1)変形例A
上記実施形態では、要求時間帯が終了した後は、設備機器の第1電力抑制制御を実行すると説明したが、これに限られるものではなく、制御装置30を、要求時間帯後に設備機器の超過制御を実行するように構成してもよい。
(7-1) Modification A
In the above-described embodiment, it has been described that the first power suppression control of the facility device is executed after the request time period ends. However, the present invention is not limited to this. You may comprise so that control may be performed.

以下、本変形例に係る制御装置30における具体的な処理の流れを、以下、図6及び図7を用いて説明する。尚、図6は、本変形例Aに係る制御装置30における処理の流れを示すフローチャートである。図7は、本変形例Aに係る建物A,Bにおける電力量の推移の一部を示すグラフである。ここで、図6のステップS111〜ステップS118は、上記実施形態と同様の処理であるため、説明を省略し、上記実施形態と異なる、ステップS119〜ステップS121についてのみ説明する。   Hereinafter, a specific processing flow in the control device 30 according to the present modification will be described with reference to FIGS. 6 and 7. FIG. 6 is a flowchart showing the flow of processing in the control device 30 according to Modification A. FIG. 7 is a graph showing a part of the transition of the electric energy in the buildings A and B according to the modified example A. Here, since steps S111 to S118 in FIG. 6 are the same processing as in the above embodiment, description thereof will be omitted, and only steps S119 to S121 that are different from the above embodiment will be described.

ステップS119では、電力量抑制制御部36cは、超過制御部36dに設備機器の超過制御を実行するように指示する。すなわち、本変形例では、要求時間帯の直後に、設備機器の超過制御を実行する。   In step S119, the power amount suppression control unit 36c instructs the excess control unit 36d to execute excess control of the equipment. That is, in this modification, the excess control of the equipment is executed immediately after the request time period.

そして、ステップS120では、超過制御部36dは、要求時間帯の終了時刻から所定時間を経過したか否かを判定する。具体的には、超過制御部36dが、要求時間帯記憶領域35cに記憶されている要求時間帯と、タイマー部34によって計測される時刻とに基づいて、要求時間帯の終了時刻から所定時間を経過したか否かを判定している。ここで、所定時間とは、予め所定の記憶領域に記憶される任意の時間であり、例えば、1時間である。尚、所定時間は、運転状況記憶領域35aに記憶されている設備機器の運転状況やその運転状況に基づく要求時間帯における予測状況(予測消費電力量)等に基づいて随時変更されてもよい。そして、所定時間を経過したと判定する場合は、ステップS121へ移行して、超過制御部36dは設備機器の超過制御を終了し、さらに、電力量抑制制御部36cに、設備機器の第1電力抑制制御を実行するように指示する(ステップS111)。他方、所定時間を経過していないと判定する場合は、設備機器の超過制御を継続して実行する。このように、本変形例では、図7にも示すように、要求時間帯の直前の所定時間帯だけでなく、要求時間帯の直後の所定時間帯(すなわち、要求時間帯の終了時刻から所定時間を経過するまでの間)に、設備機器の超過制御を実行している。   In step S120, the excess control unit 36d determines whether or not a predetermined time has elapsed from the end time of the requested time period. Specifically, the excess control unit 36d sets a predetermined time from the end time of the request time zone based on the request time zone stored in the request time zone storage area 35c and the time measured by the timer unit 34. It is determined whether or not it has passed. Here, the predetermined time is an arbitrary time stored in a predetermined storage area in advance, for example, one hour. Note that the predetermined time may be changed as needed based on the operating status of the equipment stored in the operating status storage area 35a, the predicted status (predicted power consumption) in the required time zone based on the operating status, and the like. And when determining with having passed predetermined time, it transfers to step S121, the excess control part 36d complete | finishes the excess control of an installation apparatus, and also the electric energy suppression control part 36c is the 1st electric power of an installation apparatus. An instruction is given to execute the suppression control (step S111). On the other hand, when it is determined that the predetermined time has not elapsed, the excess control of the equipment is continuously executed. In this way, in this modification, as shown in FIG. 7, not only the predetermined time zone immediately before the request time zone, but also the predetermined time zone immediately after the request time zone (that is, the predetermined time zone from the end time of the request time zone). Excessive control of equipment is executed until the time elapses).

これにより、第2電力抑制制御を実行したことによる要求時間帯における空調環境に関するユーザの不快感を極力早く取り戻すことができる。   Thereby, the user's discomfort regarding the air-conditioning environment in the required time zone due to the execution of the second power suppression control can be recovered as soon as possible.

(7−2)変形例B
上記実施形態では、要求時間帯の直前の所定時間帯のみ超過制御を実行すると説明し、上記変形例Aでは、要求時間帯の直前/直後の所定時間帯のみ超過制御を実行すると説明したが、これに限られるものではない。例えば、図9に示す処理を行うように図8のような構成を有する制御装置130であってもよい。以下、図8〜図10に基づいて、本変形例に係る制御装置130の構成や処理の流れについて説明する。尚、制御装置130の制御装置30と異なる点は、制御部36が更新部36g(図8を参照)としてさらに機能する点であるので、構成については、この点についてのみ説明する。また、処理の流れについては、図9のステップS131〜ステップS134までは、上記実施形態のステップS101〜104と同様であり、図9のステップS136〜ステップS139は、上記実施形態のステップS105〜ステップS108と同様であるため、これらの説明については省略し、ステップS135についてのみ説明することにする。
(7-2) Modification B
In the above embodiment, it is described that the excess control is executed only in a predetermined time zone immediately before the request time zone, and in the modification A, the excess control is executed only in the predetermined time zone immediately before / after the request time zone. It is not limited to this. For example, the control device 130 having the configuration shown in FIG. 8 may be used so as to perform the processing shown in FIG. Hereinafter, based on FIGS. 8-10, the structure of the control apparatus 130 which concerns on this modification, and the flow of a process are demonstrated. The difference of the control device 130 from the control device 30 is that the control unit 36 further functions as the update unit 36g (see FIG. 8), and therefore, only the configuration will be described. Further, regarding the flow of processing, steps S131 to S134 in FIG. 9 are the same as steps S101 to S104 in the above embodiment, and steps S136 to S139 in FIG. 9 are steps S105 to S139 in the above embodiment. Since this is the same as S108, description thereof will be omitted, and only step S135 will be described.

<構成>
更新部36gは、要求時間帯以後において、第1電力抑制制御における設備機器のデマンド時限毎の総使用電力量の上限値を、第1電力量に超過分を加えた値へと更新する。よって、要求時間帯以後の第1電力抑制制御では、設備機器のデマンド時限毎の総使用電力量を、第1電力量に超過分を加えた値以下になるように制御することになる。
<Configuration>
The update unit 36g updates the upper limit value of the total power consumption for each demand time period of the facility device in the first power suppression control to a value obtained by adding the excess amount to the first power amount after the requested time period. Therefore, in the first power suppression control after the request time zone, the total power consumption for each demand time period of the equipment is controlled to be equal to or less than the value obtained by adding the excess amount to the first power amount.

<処理の流れ>
ステップS135では、更新部36gが、設備機器のデマンド時限毎の総使用電力量の上限値を、第1電力量から、第1電力量に超過分を加えた値へと更新する。よって、ステップS131では、この更新された値を目標として設備機器の電力抑制が実行される、すなわち、超過制御以後の第1電力抑制制御では、この更新された値以下となるように、電力量抑制制御部36cが設備機器のデマンド時限毎の総使用電力量を制御することになる(図10を参照)。尚、第1電力抑制制御の方法については、上記実施形態と同様である。ここで、更新部36gによる、デマンド時限毎の総使用電力量の上限値の更新は、超過制御を開始した直後であってもよいし、超過制御の終了以後であってもよい。すなわち、この更新は、超過制御以後に行われるものであればよい。
<Process flow>
In step S135, the update unit 36g updates the upper limit value of the total power consumption for each demand time period of the facility device from the first power amount to a value obtained by adding the excess amount to the first power amount. Therefore, in step S131, the power suppression of the equipment is executed with the updated value as a target. That is, in the first power suppression control after the excess control, the power amount is set to be equal to or less than the updated value. The suppression control unit 36c controls the total power consumption for each demand time period of the equipment (see FIG. 10). In addition, about the method of 1st electric power suppression control, it is the same as that of the said embodiment. Here, the update of the upper limit value of the total power consumption for each demand time period by the update unit 36g may be performed immediately after the start of excess control or after the end of excess control. That is, this update may be performed after the excess control.

ここで、一般に、デマンド時限毎の総使用電力量が第1電力量を超えると、その超えた値を目標として第1電力抑制制御が実行されて基本料金が値上げされることが多い。よって、上記実施形態のように、あくまでも最初に電力会社1と設定した第1電力量を目標とした第1電力抑制制御を実行することを前提としない場合は、本変形例のように、よりユーザの快適性を考慮して、要求時間帯以外の時間帯には、第1電力量に超過分を加えた値を目標とした第1電力抑制制御を実行してもよい。   Here, generally, when the total power consumption for each demand period exceeds the first power amount, the first power suppression control is executed with the exceeded value as a target, and the basic charge is often raised. Therefore, as in the above-described embodiment, when it is not premised that the first power suppression control targeting the first power amount that is initially set as the power company 1 is performed, In consideration of the user's comfort, the first power suppression control may be executed in a time zone other than the requested time zone, with the target being a value obtained by adding an excess amount to the first power amount.

この場合であっても、第2電力抑制制御を実行することにより建物A,Bにはインセンティブが入るので、基本料金が値上げされる超過制御を行って、更新された電力量に基づいて第1電力抑制制御が実行されたとしても、料金的な不利が生じないようにすることが可能になっている。   Even in this case, since the incentive is given to the buildings A and B by executing the second power suppression control, the excess control for raising the basic charge is performed, and the first power based on the updated power amount is performed. Even if the power suppression control is executed, it is possible to prevent a penalty from being caused.

(7−3)変形例C
上記実施形態の超過制御では、超過制御部36dは、さらに、空調機40の躯体蓄熱制御を実行してもよい。具体的には、超過制御部36dは、空調機40の制御部に対して、超過制御を実行する指令を送信すると共に、躯体蓄熱制御を実行する指令を送信してもよい。ここで、躯体蓄熱制御とは、躯体に蓄熱させる制御である。躯体蓄熱制御としては、例えば、空調機40を構成する室内機のフラップの向きを水平吹きにさせて躯体に熱を溜め込む、すなわち、建物躯体を蓄熱媒体として使用することが考えられる。
(7-3) Modification C
In the excess control of the above embodiment, the excess control unit 36d may further execute the housing heat storage control of the air conditioner 40. Specifically, the excess control unit 36d may transmit a command for executing excess control and a command for executing enclosure heat storage control to the control unit of the air conditioner 40. Here, the frame heat storage control is control for storing heat in the frame. As the housing heat storage control, for example, it is conceivable that the direction of the flaps of the indoor units constituting the air conditioner 40 is blown horizontally to accumulate heat in the housing, that is, the building housing is used as a heat storage medium.

このように、第2電力抑制制御が実行される要求時間帯の直前の所定時間帯に、超過制御部において躯体に蓄熱されることで、第2電力抑制制御の実行中(要求時間帯)における空調環境に関するユーザの不快感を低減できる。また、建物躯体を蓄熱媒体としているので、蓄熱装置等を別途設ける必要がなく、コストも抑制できる。   In this way, during the second power suppression control is being performed (requested time zone) by storing heat in the enclosure in the excess control unit in a predetermined time zone immediately before the requested time zone in which the second power suppression control is executed. User discomfort regarding the air-conditioning environment can be reduced. Moreover, since the building frame is used as a heat storage medium, it is not necessary to separately provide a heat storage device and the cost can be suppressed.

(7−4)変形例D
上記実施形態では、導出部36eによって導出された超過分―金銭状況関係が、出力部36fによって表示部32に表示されると説明したが、出力部36fによって出力される方法は、表示部32に表示される方法のみに限られない。例えば、超過分―金銭状況関係は、紙媒体に印刷されるようにしてもよいし、メールで建物A,Bにおける管理者等が所有するコンピュータに送信されるようにしてもよい。この場合であっても、入力部33を介して超過制御におけるデマンド時限毎の総使用電力量の第1電力量からの超過分を管理者等によって入力できるように、制御装置30を構成しておけば、上記実施形態と同様の作用効果を得ることができる。
(7-4) Modification D
In the above-described embodiment, it has been described that the excess-monetary situation relationship derived by the deriving unit 36e is displayed on the display unit 32 by the output unit 36f. However, the method output by the output unit 36f is displayed on the display unit 32. It is not limited to the displayed method. For example, the excess-monetary status relationship may be printed on a paper medium, or may be sent by e-mail to a computer owned by an administrator or the like in buildings A and B. Even in this case, the control device 30 is configured so that an administrator or the like can input the excess from the first power amount of the total power consumption for each demand time limit in the excess control via the input unit 33. If this is the case, the same effects as those of the above-described embodiment can be obtained.

(7−5)変形例E
上記実施形態では、インセンティブに関する情報として、第2電力抑制制御を1回実行すると300円になる情報といった例を挙げて説明したが、これに限られるものではなく、1kWh当たり何円といった単位当たりの料金設定がされる情報であってもよい。この場合、導出部36eは、このインセンティブに関する情報や要求時間帯(具体的には、要求時間帯の開始時刻から終了時刻までの時間)から、インセンティブを導出することになる。
(7-5) Modification E
In the above-described embodiment, as an example of information related to incentives, an example has been described in which the second power suppression control is executed once for 300 yen. However, the present invention is not limited to this, and is not limited to this. Information for which a fee is set may be used. In this case, the deriving unit 36e derives the incentive from the information related to the incentive and the requested time zone (specifically, the time from the start time to the end time of the requested time zone).

(7−6)変形例F
上記実施形態では、管理者等によって入力部33を介して入力された超過分の情報を取得部36aが取得すると説明したが、これに限られるものではない。
(7-6) Modification F
In the above-described embodiment, it has been described that the acquisition unit 36a acquires the excess information input via the input unit 33 by the administrator or the like, but is not limited thereto.

例えば、上記実施形態の制御装置の制御部に、算出部(図示せず)の機能を加えてもよい。具体的には、算出部は、運転状況記憶領域に記憶される設備機器の状況及び設備機器の状況の履歴から、要求時間帯の直前の所定時間帯、すなわち、超過制御における超過分を算出する。   For example, you may add the function of a calculation part (not shown) to the control part of the control apparatus of the said embodiment. Specifically, the calculation unit calculates a predetermined time zone immediately before the requested time zone, that is, an excess amount in the excess control, from the equipment device status and the history of the equipment status stored in the operation status storage area. .

そして、算出部によって算出された超過分の情報を、上記の取得部が取得する。   Then, the acquisition unit acquires the excess information calculated by the calculation unit.

このように、本変形例では、過去の履歴やリアルタイムの設備機器の状況に基づいて、超過分を決定できるので、ユーザの快適性に貢献する超過制御を実行できる。   Thus, in this modification, since an excess can be determined based on the past history and the situation of real-time equipment, excess control that contributes to the user's comfort can be executed.

(7−7)変形例G
上記実施形態の超過制御では、空調機40のサーモオフ制御を解除すると説明したが、これに代えて、空調機40(室内機42)の設定温度制御を行ってもよい。
(7-7) Modification G
In the excess control of the above-described embodiment, it has been described that the thermo-off control of the air conditioner 40 is cancelled. However, instead of this, the set temperature control of the air conditioner 40 (indoor unit 42) may be performed.

設定温度制御とは、冷房運転時においては空調機40(室内機42)の設定温度を下げ暖房運転時においては空調機40(室内機42)の設定温度を上げる制御である。すなわち、サーモオフしないようにする制御である。   The set temperature control is control for decreasing the set temperature of the air conditioner 40 (indoor unit 42) during the cooling operation and increasing the set temperature of the air conditioner 40 (indoor unit 42) during the heating operation. That is, it is control to prevent the thermo-off.

このように、超過制御中において、空調機40の設定温度制御を行うことによって、その間、空調機40の空調によって空調対象空間としての部屋に蓄熱し続けることができる。よって、上記実施形態と同様に、超過制御の終了後に実行される第2電力抑制制御の実行中、空調環境に関するユーザの不快感を低減できる。   Thus, by performing the set temperature control of the air conditioner 40 during the excess control, heat can be continuously stored in the room as the air-conditioning target space by the air conditioning of the air conditioner 40. Therefore, similarly to the above-described embodiment, the user's discomfort regarding the air-conditioning environment can be reduced during the execution of the second power suppression control executed after the end of the excess control.

本発明は、電力会社との間で第1電力量を目標とする電力抑制に関する第1契約及び第1目標電力よりも低い第2電力量を目標とする電力抑制に関する第2契約を結ぶことによって、第2契約での電力抑制を行うとインセンティブが入る一方、第1契約での電力抑制を行えないとペナルティを払う建物における空調機を含む設備機器、を制御する制御装置に種々適用できる。   The present invention concludes a first contract with a power company regarding power suppression targeting a first power amount and a second contract regarding power suppression targeting a second power amount lower than the first target power. In addition, when the power suppression in the second contract is performed, an incentive is entered. On the other hand, the present invention can be variously applied to a control device that controls equipment including an air conditioner in a building that pays a penalty if the power suppression in the first contract cannot be performed.

1 電力会社
10 管理装置
30,130 制御装置
33 入力部
35 記憶部
36a 取得部
36b 受付部
36c 電力量抑制制御部
36d 超過制御部
36e 導出部
36f 出力部
36g 更新部
100 設備機器制御システム
DESCRIPTION OF SYMBOLS 1 Electric power company 10 Management apparatus 30,130 Control apparatus 33 Input part 35 Storage part 36a Acquisition part 36b Reception part 36c Electric energy control part 36d Excess control part 36e Derivation part 36f Output part 36g Update part 100 Equipment apparatus control system

特開平7−143670号公報JP-A-7-143670

Claims (7)

第1電力量を目標とする電力抑制を行えないとペナルティを払う一方、前記第1電力量よりも低い第2電力量を目標とする電力抑制を行うとインセンティブが入る建物(A,B)、における空調機(40)を含む設備機器、を制御する制御装置(30,130)であって、
前記第1電力量及び前記第2電力量を記憶する記憶部(35)と、
前記設備機器のデマンド時限毎の総使用電力量を前記第2電力量以下にする第2電力抑制制御を行う要求時間帯、を受け付ける受付部(36b)と、
前記要求時間帯において前記設備機器の前記第2電力抑制制御を実行する電力量抑制制御部(36c)と、
前記設備機器のデマンド時限毎の総使用電力量を前記第1電力量よりも超過させる超過制御、を前記要求時間帯の直前の所定時間帯において実行する超過制御部(36d)と、
前記超過制御における、前記設備機器のデマンド時限毎の総使用電力量の前記第1電力量からの超過分の情報を取得する取得部(36a)と、
を備える、制御装置(30,130)。
Buildings (A, B) that receive incentives when power suppression is performed with the target of the second power amount lower than the first power amount, while paying a penalty if the power suppression targeting the first power amount cannot be performed. A control device (30, 130) for controlling equipment including an air conditioner (40) in
A storage unit (35) for storing the first electric energy and the second electric energy;
A reception unit (36b) that receives a request time zone for performing second power suppression control for setting the total power consumption for each demand time period of the facility equipment to be equal to or less than the second power consumption;
A power amount suppression control unit (36c) that executes the second power suppression control of the equipment in the required time zone;
An excess control unit (36d) that executes excess control for exceeding the first power consumption over the total power consumption for each demand time period of the facility device in a predetermined time zone immediately before the request time zone;
In the excess control, an acquisition unit (36a) for acquiring excess information from the first power amount of the total power consumption for each demand time period of the facility device;
A control device (30, 130).
前記超過制御部は、前記要求時間帯の直後の所定時間帯に、さらに前記設備機器の前記超過制御を実行する、
請求項1に記載の制御装置。
The excess control unit further performs the excess control of the equipment in a predetermined time zone immediately after the request time zone;
The control device according to claim 1.
前記電力量抑制制御部は、前記要求時間帯以前において、前記設備機器のデマンド時限毎の総使用電力量を前記第1電力量以下にする第1電力抑制制御、をさらに実行し、
前記超過制御部は、前記要求時間帯の直前の所定時間帯において、前記設備機器の前記第1電力抑制制御の実行を前記電力量抑制制御部に終了させて前記超過制御を実行し、
前記超過制御以後において、前記第1電力抑制制御における前記設備機器のデマンド時限毎の総使用電力量の上限値を、前記第1電力量に前記超過分を加えた値へと更新する更新部(36g)、をさらに備える、
請求項1に記載の制御装置。
The power amount suppression control unit further executes a first power suppression control that sets a total power consumption for each demand time period of the facility device to be equal to or less than the first power amount before the request time zone,
The excess control unit executes the excess control by causing the power amount suppression control unit to terminate the execution of the first power suppression control of the facility device in a predetermined time zone immediately before the request time zone,
After the excess control, an updating unit that updates the upper limit value of the total power consumption for each demand time period of the facility device in the first power suppression control to a value obtained by adding the excess to the first power amount ( 36g),
The control device according to claim 1.
前記記憶部は、前記インセンティブに関する情報及び前記ペナルティに関する情報をさらに記憶し、
前記インセンティブに関する情報及び前記ペナルティに関する情報に基づいて、所定の前記超過分に対する金銭状況の関係である超過分―金銭状況関係を導出する導出部(36e)と、
前記超過分―金銭状況関係を出力する出力部(36f)と、
をさらに備える、
請求項1〜3のいずれか1項に記載の制御装置。
The storage unit further stores information on the incentive and information on the penalty,
A deriving unit (36e) for deriving an excess-monetary status relationship that is a relationship of a monetary status with respect to the predetermined excess based on the information on the incentive and the information on the penalty;
An output unit (36f) for outputting the excess-money situation relationship;
Further comprising
The control device according to claim 1.
前記超過分をユーザが入力する入力部(33)、をさらに備える、
請求項4に記載の制御装置。
An input unit (33) for a user to input the excess,
The control device according to claim 4.
前記超過制御部は、前記超過制御において、前記空調機の躯体蓄熱制御を行う、
請求項1〜5のいずれか1項に記載の制御装置。
The excess control unit performs enclosure heat storage control of the air conditioner in the excess control.
The control apparatus of any one of Claims 1-5.
前記超過制御部は、前記超過制御において、前記空調機のサーモオフ制御を解除する又は設定温度制御を行う、
請求項1〜6のいずれか1項に記載の制御装置。
The excess control unit cancels the thermo-off control of the air conditioner or performs set temperature control in the excess control.
The control apparatus of any one of Claims 1-6.
JP2012214571A 2012-09-27 2012-09-27 Control device Expired - Fee Related JP6036102B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012214571A JP6036102B2 (en) 2012-09-27 2012-09-27 Control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012214571A JP6036102B2 (en) 2012-09-27 2012-09-27 Control device

Publications (2)

Publication Number Publication Date
JP2014072911A true JP2014072911A (en) 2014-04-21
JP6036102B2 JP6036102B2 (en) 2016-11-30

Family

ID=50747668

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012214571A Expired - Fee Related JP6036102B2 (en) 2012-09-27 2012-09-27 Control device

Country Status (1)

Country Link
JP (1) JP6036102B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016158433A (en) * 2015-02-25 2016-09-01 京セラ株式会社 Power control apparatus, control method for power control apparatus, and power control system
JP2016205740A (en) * 2015-04-24 2016-12-08 京セラ株式会社 Energy management method, energy management device and energy management system
JPWO2016147454A1 (en) * 2015-03-13 2017-12-28 日本電気株式会社 Display device, power generation device, management device, control device, status display method of power generation device, and program
CN108649556A (en) * 2018-04-16 2018-10-12 东南大学 A kind of electric network emergency scene random optimization dispatching method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000078748A (en) * 1998-09-02 2000-03-14 Mitsubishi Electric Corp Power dsm system
JP2003274555A (en) * 2002-03-18 2003-09-26 Daikin Ind Ltd Method and apparatus for demand control
US20050005621A1 (en) * 2003-07-10 2005-01-13 Jayadev Tumkur S. Strategic-response control system for regulating air conditioners for economic operation
JP2005198423A (en) * 2004-01-07 2005-07-21 Toshiba Corp Energy management system, energy management method, and energy management program
JP2012037222A (en) * 2010-07-16 2012-02-23 Daikin Industries Ltd Energy controller

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000078748A (en) * 1998-09-02 2000-03-14 Mitsubishi Electric Corp Power dsm system
JP2003274555A (en) * 2002-03-18 2003-09-26 Daikin Ind Ltd Method and apparatus for demand control
US20050005621A1 (en) * 2003-07-10 2005-01-13 Jayadev Tumkur S. Strategic-response control system for regulating air conditioners for economic operation
JP2005198423A (en) * 2004-01-07 2005-07-21 Toshiba Corp Energy management system, energy management method, and energy management program
JP2012037222A (en) * 2010-07-16 2012-02-23 Daikin Industries Ltd Energy controller

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016158433A (en) * 2015-02-25 2016-09-01 京セラ株式会社 Power control apparatus, control method for power control apparatus, and power control system
JPWO2016147454A1 (en) * 2015-03-13 2017-12-28 日本電気株式会社 Display device, power generation device, management device, control device, status display method of power generation device, and program
JP2016205740A (en) * 2015-04-24 2016-12-08 京セラ株式会社 Energy management method, energy management device and energy management system
CN108649556A (en) * 2018-04-16 2018-10-12 东南大学 A kind of electric network emergency scene random optimization dispatching method
CN108649556B (en) * 2018-04-16 2021-06-01 东南大学 Random optimization scheduling method for power grid emergency scene

Also Published As

Publication number Publication date
JP6036102B2 (en) 2016-11-30

Similar Documents

Publication Publication Date Title
JP6562664B2 (en) Energy control system
JP2014236605A (en) Management system of air-conditioner
US7172132B2 (en) Balanced utility load management
JP6225419B2 (en) Air conditioner control device
JP2011036084A (en) Consumer energy management system
JP6036102B2 (en) Control device
JP2013250038A (en) Refrigeration device management system
JP2014185832A (en) Air conditioning system, air conditioning control device, and air conditioning system control method
JP6937261B2 (en) Air conditioning control device, air conditioning control method and computer program
US10530154B2 (en) Control apparatus
JP2013174418A (en) Control device for heat pump apparatus
JP5936714B2 (en) System controller, facility management system, demand control method and program
US20150005969A1 (en) Energy control device
JP2008249154A (en) Centralized control device, centralized control program and centralized control system
JP5136403B2 (en) Equipment control system
JP5621720B2 (en) Energy control device
WO2016152669A1 (en) Demand-response control result display device
JP2011158117A (en) Air conditioner system
JP2017011905A (en) Schedule creation device
JP2004118366A (en) Energy saving control system, energy saving control method and presentation acceptance device
JP5491987B2 (en) Air conditioning controller
JP2013002680A (en) Equipment control device
JP6443947B2 (en) Demand control system
JP5131185B2 (en) Equipment control system
JP5287798B2 (en) Energy management system and control device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150513

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160212

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160315

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160426

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161004

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20161017

R151 Written notification of patent or utility model registration

Ref document number: 6036102

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees