JP2008299734A - Field control/monitoring device - Google Patents

Field control/monitoring device Download PDF

Info

Publication number
JP2008299734A
JP2008299734A JP2007147077A JP2007147077A JP2008299734A JP 2008299734 A JP2008299734 A JP 2008299734A JP 2007147077 A JP2007147077 A JP 2007147077A JP 2007147077 A JP2007147077 A JP 2007147077A JP 2008299734 A JP2008299734 A JP 2008299734A
Authority
JP
Japan
Prior art keywords
tag
information
control
tag information
wireless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007147077A
Other languages
Japanese (ja)
Inventor
Akihiro Kondo
晃弘 近藤
Kazuhiro Inada
和広 稲田
Tomoyuki Sunaga
朋之 須永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2007147077A priority Critical patent/JP2008299734A/en
Publication of JP2008299734A publication Critical patent/JP2008299734A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a field control/monitoring device for consolidating tagging information about operation restrictions on a plant apparatus. <P>SOLUTION: The field control/monitoring device is comprises a controller 11 of the plant apparatus, an input/output device 12 used for monitoring and control operation by an operator, a tagging device 14 having a tag 13 with a radio IC tag 31 storing work and operation restriction information of the plant apparatus, and an IC tag reader 41 for reading information in radio IC tag 31 by placing the tag 13, a tag information management device 16 for updating information in the radio IC tag 31, and a tag information management database 15 storing information of the radio IC tag 31. When the information in the radio IC tag 31 of the tag 13 arranged in the tagging device 14 is read and transmitted to the controller 11, tagging setting is carried out on the system of the controller, and control operation is restricted. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、プラント機器の操作、監視及び機器の保守、点検などに伴う作業の管理を行う現場制御・監視装置に関する。   The present invention relates to an on-site control / monitoring apparatus that manages operations associated with operation and monitoring of plant equipment and maintenance and inspection of equipment.

一般に、例えば産業プラントや発電プラントなどのプラント機器の運転は、プラント機器の監視、制御を行う制御装置を設け、運転員が中央操作室などに設置した表示装置や入力装置を備えた操作卓を用いて制御操作を行い、制御装置を介して制御指令を出力することで行う遠隔制御操作や、プラント運転用制御盤による自動制御などにより行っている。また、機器の保守、点検作業時や、異常発生時などには、中央操作室などからの遠隔制御操作に加えて、現場作業員によるプラント機器の個別直接操作を行う。従来、プラント機器の保守、点検作業時や、異常発生時などの非定常運転などのため、現場作業員がプラント機器の個別直接操作を行う場合は、プラント機器の操作制限を実施する。操作制限を行う場合は、操作制限を通知する札を現場のプラント機器の近傍に設置するとともに、中央操作室からの遠隔制御操作を制限するために、操作卓の画面を用いてシステム上の操作制限を行うための設定(札掛け設定と呼ぶ)を行っていた。   In general, for the operation of plant equipment such as industrial plants and power plants, a control device for monitoring and controlling the plant equipment is provided, and an operator console with a display device and an input device installed in a central operation room by the operator is provided. The control operation is performed using a remote control operation performed by outputting a control command via the control device, or automatic control using a plant operation control panel. In addition, in the case of equipment maintenance, inspection work, or when an abnormality occurs, in addition to remote control operation from the central operation room, individual direct operation of plant equipment is performed by field workers. Conventionally, when a field worker performs individual direct operation of plant equipment for maintenance or inspection work of plant equipment or unsteady operation such as when an abnormality occurs, operation restrictions on the plant equipment are implemented. When restricting operation, install a tag to notify the operation restriction in the vicinity of the plant equipment at the site and operate the system on the console screen to restrict remote control operations from the central operation room. There was a setting for restriction (called billing setting).

図9に従来の札掛け設定の動作例を示す。プラント機器の操作制限は、現場作業員22が当該プラント機器20の操作制限を通知する札13を現場の機器の近傍に設置すると共に、当該プラント機器20に対する中央操作室からの遠隔制御操作を制限するために、中央操作室の運転員21に連絡して現場制御・監視装置上で操作制限をするための設定操作を実施する必要があった。操作制限の設定操作は、中央操作室の入出力装置12に表示される札掛け設定画面などの画面を用いて、運転員21が対象のプラント機器の札掛け設定を入力することで行っていた。また、操作制限を行う期間や理由などの情報を人手で連絡・管理していたため、札を撤去する期限を過ぎたり、撤去可能な状態となったりした場合でも撤去されない、撤去漏れの札の認識に時間を要していた。   FIG. 9 shows an example of the conventional billing setting operation. The operation restriction of the plant equipment is such that the field worker 22 installs the tag 13 for notifying the operation restriction of the plant equipment 20 in the vicinity of the equipment on the work site and restricts the remote control operation from the central operation room to the plant equipment 20. In order to do this, it is necessary to contact the operator 21 in the central control room and perform a setting operation to limit the operation on the site control / monitoring device. The operation restriction setting operation was performed by the operator 21 inputting the billing setting of the target plant equipment using a screen such as a billing setting screen displayed on the input / output device 12 of the central operation room. . In addition, because information such as the period and reason for restricting operations was manually communicated and managed, even if the deadline for removing the tag has passed or it is possible to remove it, it will not be removed, and it will recognize the removal-missed tag It took time to.

なお、「札掛け」はプラント機器に対する直接操作を制限する場合に、操作制限を通知する札を現場に設置する運用のことであり、「札掛け設定操作」は中央操作室などからの遠隔操作を制限する場合に、現場制御・監視装置のシステム上の札掛け機能により、操作卓などの入出力装置を用いて札掛け設定を行う操作のことである。   Note that “tagging” refers to the operation of placing a tag to notify the operational restriction when restricting direct operations on plant equipment, and “tagging setting operation” is remote operation from a central control room or the like. This is an operation for setting the billing using an input / output device such as a console by the billing function on the system of the on-site control / monitoring device.

特許文献1には、プラント機器を操作、監視する操作用パソコンと無線LAN送受信装置を現場に設置することで、操作用パソコンを用いて、現場でのプラント機器の操作、監視を行うとともに、現場からの札掛け操作の設定/解除を可能とした現場監視・操作装置の例についての開示がある。
特開2003−216231号公報
In Patent Document 1, an operation personal computer for operating and monitoring plant equipment and a wireless LAN transmission / reception device are installed in the field, and the operation personal computer is used for operation and monitoring of the plant equipment on site. Discloses an example of an on-site monitoring / operating device that enables setting / cancelling of the tagging operation from the site.
JP 2003-216231 A

従来のプラント機器の運転においては、現場作業員によるプラント機器の個別直接操作と、中央制御室に設置された現場制御・監視装置の操作卓を用いた画面操作などによる遠隔操作が混在していた。そのため、プラント機器の操作制限を実施する場合には、一元的に制限できず、現場機器への札掛けとともに、現場制御・監視装置への札掛け設定操作が必要になるなど、操作制限のための手順が煩雑であるという問題があった。   In the operation of conventional plant equipment, there was a mixture of individual direct operation of plant equipment by field workers and remote operation by screen operation using the console of the on-site control / monitoring device installed in the central control room. . Therefore, when restricting the operation of plant equipment, it cannot be centrally restricted, and it is necessary to set up the tagging on site control / monitoring equipment as well as on-site equipment. There was a problem that the procedure of was complicated.

また、現場での実札掛け運用とシステム上での札掛け設定操作の二重管理が必要であった。上記特許文献1に示した現場監視・操作装置においても、現場での札掛け設定操作は可能であるが、実札掛け運用も行っており、二重管理が必要であった。その結果、現場での実札掛け運用とシステム上の札掛け設定操作の時間差や、札掛け・撤去漏れなどによる制限状況の不一致から誤操作が発生し、機器の損傷や原材料や製品の減損などに繋がる危険性があった。   In addition, double management of on-site actual billing operation and billing setting operation on the system was necessary. The on-site monitoring / operation device disclosed in Patent Document 1 can also be used for setting up bills on site, but it also uses actual bills and requires double management. As a result, erroneous operations occur due to time differences between on-site actual billing operation and billing setting operations on the system, and mismatching restrictions due to billing / removal omissions, etc., resulting in equipment damage and loss of raw materials and products. There was a risk of being connected.

本発明はかかる点に鑑みてなされたものであり、プラント機器の操作制限に関する札掛け情報の一元管理が可能な現場制御・監視装置を提供することを目的とする。   The present invention has been made in view of the above points, and an object thereof is to provide a field control / monitoring apparatus capable of centrally managing billing information related to operation restrictions on plant equipment.

本発明は、プラント機器の運転情報を収集し、制御を行う制御装置と、制御装置とネットワークを介して接続し、運転員によるプラント機器の監視や制御操作を行うための入出力装置と、プラント機器の作業及び操作制限情報を記録した無線ICタグを付加した札と、制御装置とネットワークを介して接続し、ICタグリーダを備え、札を配置することにより無線ICタグの情報を読み出し、制御装置へ伝送する札掛け装置と、札の無線ICタグの情報を更新するためのタグ情報管理装置と、札の無線ICタグの情報を保存し、制御装置とネットワークを介して接続するタグ情報管理データベースから構成する。   The present invention includes a control device that collects and controls operation information of plant equipment, an input / output device that is connected to the control device via a network, and that performs monitoring and control operations of plant equipment by an operator, and a plant Connected to a tag with a wireless IC tag recording device work and operation restriction information, and a control device via a network, provided with an IC tag reader, reads information on the wireless IC tag by placing the tag, and control device Tag information management database for storing information on tag ICs for updating tag wireless IC tags, tag information management devices for updating information on tag wireless IC tags, and tags for wireless IC tags Consists of.

また、札掛け装置は、札の無線ICタグに記録されたタグ情報を読み出すために、札の配置位置に設けたICタグリーダと、ICタグリーダで読み出したタグ情報を、制御装置へ伝送する伝送処理手段と、ICタグリーダで読み出したタグ情報を保管するタグ情報保管手段と、ICタグリーダで読み出したタグ情報をタグ情報保管手段へ保存し、データを管理するタグ情報管理処理手段から構成する。   In addition, the tagging device reads the tag information recorded on the wireless IC tag of the tag, and transmits the IC tag reader provided at the tag placement position and the tag information read by the IC tag reader to the control device. Means, tag information storage means for storing the tag information read by the IC tag reader, and tag information management processing means for storing the tag information read by the IC tag reader in the tag information storage means and managing the data.

本発明によると、従来の現場札掛け運用手順を変更することなく、現場の実札掛け運用と同時に当該プラント機器への操作制限情報を制御装置へ送信することにより、操作制限情報の一元管理化が可能になる。これにより、操作卓の画面操作によるシステム上の札掛け設定操作を省略できるとともに、現場の札掛け状態や札の撤去漏れなどを中央操作室の操作卓画面に表示することができるため、運転員が容易に確認できる。更に、プラント機器の現場操作と操作卓画面からの遠隔操作を同期させて制限、解除することが可能になるため、誤操作を防止し、安全性を向上させることができる。   According to the present invention, without restricting the conventional on-site billing operation procedure, the operation restriction information to the plant equipment is transmitted to the control device at the same time as the actual on-site billing operation, thereby centralizing management of the operation restriction information Is possible. As a result, it is possible to omit the billing setting operation on the system by operating the screen of the console, and it is possible to display the billing status at the site and leakage of the removal of the bill on the console screen of the central operation room. Can be easily confirmed. Furthermore, since the on-site operation of the plant equipment and the remote operation from the console screen can be restricted and released in synchronization, erroneous operation can be prevented and safety can be improved.

以下、本発明の一実施の形態を、図1〜図8を参照して説明する。   Hereinafter, an embodiment of the present invention will be described with reference to FIGS.

図1に、本例による現場制御・監視装置の構成例を示す。図1を参照し、本例の構成について説明する。本例による現場制御・監視装置は、プラント機器20に関する情報を収集し、制御を行う制御装置11と、制御装置11とネットワーク17を介して接続し、運転員によるプラント機器20の監視や制御操作を行うための画面を表示するモニタなどの表示装置と、キーボードやマウス、操作釦などの入力装置を備えた入出力装置12から構成する。なお、出力装置として、プラント機器の状態や異常を通知するための音声出力装置18や警報装置などを設けることもできる。本例の現場制御・監視装置は、従来と同様に、制御装置11で収集したプラント機器20の情報を入出力装置12に表示してプラント機器の監視を行うとともに、運転員が入出力装置12を用いてプラント機器の制御指令操作を行い、入力された制御指令を基に制御装置11から制御信号を出力し、プラント機器20の制御を行うことで、プラントの運用を行う。   FIG. 1 shows a configuration example of an on-site control / monitoring apparatus according to this example. The configuration of this example will be described with reference to FIG. The on-site control / monitoring device according to this example collects information about the plant equipment 20 and connects to the control equipment 11 that performs control, and the control equipment 11 via the network 17, and the operator monitors and controls the plant equipment 20. The input / output device 12 includes a display device such as a monitor that displays a screen for performing the operation and an input device such as a keyboard, a mouse, and operation buttons. As an output device, a voice output device 18 or an alarm device for notifying the state or abnormality of the plant equipment can be provided. The on-site control / monitoring apparatus of this example displays information on the plant equipment 20 collected by the control equipment 11 on the input / output device 12 to monitor the plant equipment as in the conventional case. Is used to operate the plant equipment, and a control signal is output from the control device 11 based on the input control instruction, and the plant equipment 20 is controlled to operate the plant.

本例では、更に、プラント機器20の操作制限情報を記録した無線ICタグ31を付加した札13と、現場のプラント機器の近傍に設置し、ネットワーク17を介して制御装置11と接続し、札13の無線ICタグ31の情報を読み出すICタグリーダ41を備え、読み出した操作制限情報を制御装置11へ伝送する札掛け装置14と、無線ICタグ31の情報を保存するタグ情報管理データベース15と、札13に付加された無線ICタグ31に情報を書き込み、タグ情報を更新するタグ情報管理装置16を備える。ここで、タグ情報管理データベース15とタグ情報管理装置16は、ネットワーク17を介して制御装置11に接続し、中央制御室などに設置する。タグ情報管理装置16は、無線ICタグ31を付加した札13に操作制限情報として対象機器、操作制限内容、操作制限期間などの情報を書き込むとともに、その情報をタグ情報管理データベース15に蓄積する。一方、制御装置11は、現場に設置された札掛け装置14から伝送された操作制限情報などを基に、タグ情報管理データベース15を参照してプラント機器の操作制限の状況を入出力装置12に表示し、運転員に提示する。   In this example, the tag 13 to which the wireless IC tag 31 in which the operation restriction information of the plant equipment 20 is recorded is further installed in the vicinity of the plant equipment on the site, and connected to the control device 11 via the network 17. An IC tag reader 41 that reads information on the 13 wireless IC tags 31, a tagging device 14 that transmits the read operation restriction information to the control device 11, a tag information management database 15 that stores information on the wireless IC tag 31, A tag information management device 16 is provided for writing information to the wireless IC tag 31 attached to the tag 13 and updating the tag information. Here, the tag information management database 15 and the tag information management device 16 are connected to the control device 11 via the network 17 and installed in a central control room or the like. The tag information management device 16 writes information such as the target device, operation restriction content, and operation restriction period as operation restriction information on the tag 13 to which the wireless IC tag 31 is added, and accumulates the information in the tag information management database 15. On the other hand, the control device 11 refers to the tag information management database 15 on the basis of the operation restriction information transmitted from the billing device 14 installed at the site, and informs the input / output device 12 of the operation restriction status of the plant equipment. Display and present to the operator.

次に、札掛け装置14の構成について更に説明する。図2に、札掛け装置14の構成例を示す。本例による札掛け装置14は、現場に設置し、札を配置することにより、プラント機器の操作制限情報を読み出して表示し、管理するための装置である。   Next, the configuration of the billing device 14 will be further described. FIG. 2 shows a configuration example of the billing device 14. The bill hanging device 14 according to this example is a device for reading, displaying, and managing the operation restriction information of the plant equipment by installing it on the site and arranging the bill.

本例の札掛け装置14は、札13に付加した無線ICタグ31の情報を読み込むICタグリーダ41を備え、ICタグリーダ41の無線通信手段42と無線ICタグ31の無線通信手段32との間で無線通信を行うことにより、ICタグに書き込まれた情報を読み書きする。また、札掛け装置14には、ICタグリーダ41により読み込んだタグ情報を保管するタグ情報保管手段44を設け、読み込んだタグ情報をタグ情報保管データとして保存する。ICタグリーダ41により読み込んだタグ情報は、タグ情報管理処理手段43によりタグ情報保管手段44へ保存するとともに、伝送処理手段45へ受け渡す。伝送処理手段45は、タグ情報管理処理手段43から入力されたタグ情報を制御装置11へ伝送する。更に、本例の札掛け装置14には、表示装置48と入力装置49を備え、タグ情報表示処理手段46によりタグ情報保管手段44を参照し、表示装置48へタグ情報保管データを基にした操作制限情報を表示するとともに、タグ情報編集処理手段47により入力装置49から入力された情報を基に、タグ情報保管手段44の情報を書き換えるように構成する。なお、書き換えたタグ情報は、タグ情報管理処理手段43により伝送処理手段45を介して制御装置11へ送信する。   The billing device 14 of this example includes an IC tag reader 41 that reads information of the wireless IC tag 31 added to the tag 13, and the wireless communication means 42 of the IC tag reader 41 and the wireless communication means 32 of the wireless IC tag 31. By performing wireless communication, information written in the IC tag is read and written. The tagging device 14 is provided with tag information storage means 44 for storing tag information read by the IC tag reader 41, and stores the read tag information as tag information storage data. The tag information read by the IC tag reader 41 is stored in the tag information storage unit 44 by the tag information management processing unit 43 and delivered to the transmission processing unit 45. The transmission processing unit 45 transmits the tag information input from the tag information management processing unit 43 to the control device 11. Furthermore, the tagging device 14 of this example is provided with a display device 48 and an input device 49. The tag information storage means 44 is referred to by the tag information display processing means 46, and the display device 48 is based on the tag information storage data. The operation restriction information is displayed, and the information in the tag information storage unit 44 is rewritten based on the information input from the input device 49 by the tag information editing processing unit 47. The rewritten tag information is transmitted by the tag information management processing means 43 to the control device 11 via the transmission processing means 45.

次に、本例による札掛け装置14の構造について説明する。図3は、札掛け装置14の構造例を示す説明図である。図3において、図3(A)は、札掛け装置14の正面図であり、図3(B)は、図3(A)の線分a、a´における線示断面図である。本例による札掛け装置14は、基盤板50の前面に札13を配置固定するためのホルダ51と、表示装置48、入力装置49を備え、基盤板50の背面にICタグリーダ41を備える。表示装置48は、ICタグの情報を表示することができるものであればよく、液晶ディスプレイや、電子ペーパなどがある。また、入力装置49は、表示されたICタグの情報を参照し、現場運転員が情報を修正したり、追加したりするためのものであり、キーボードやタッチパネルなどがある。   Next, the structure of the bill hanging device 14 according to this example will be described. FIG. 3 is an explanatory diagram showing a structural example of the bill hanging device 14. 3, FIG. 3 (A) is a front view of the bill hanging device 14, and FIG. 3 (B) is a sectional view taken along lines a and a ′ in FIG. 3 (A). The bill hanging device 14 according to this example includes a holder 51 for arranging and fixing the bill 13 on the front surface of the base plate 50, a display device 48, and an input device 49, and an IC tag reader 41 on the back surface of the base plate 50. The display device 48 may be any device that can display the information of the IC tag, such as a liquid crystal display or electronic paper. The input device 49 refers to information on the displayed IC tag, and is used by a field operator to correct or add information, and includes a keyboard and a touch panel.

なお、図3では、ホルダ51、表示装置48、入力装置49、ICタグリーダ41の組み合わせを3式構成した例を示しているが、札掛け装置14を設置する現場の位置や、対象とする機器などの状況に合わせた台数で構成すればよい。また、本例では、入力装置49を他の装置に合わせて複数台設けているが、札掛け装置1台に対して入力装置を1台とし、複数のホルダに配置された札の情報を1台の入力装置で書き換えるように構成することもできる。   3 shows an example in which three combinations of the holder 51, the display device 48, the input device 49, and the IC tag reader 41 are configured. However, the position of the site where the bill hanging device 14 is installed and the target device. What is necessary is just to comprise by the number according to the situation. In this example, a plurality of input devices 49 are provided in accordance with other devices. However, one input device is provided for one bill hanging device, and information on tags placed in a plurality of holders is set to 1. It can also be configured to be rewritten by a single input device.

次に、本例による現場制御・監視装置により、現場で札掛けを実施した場合の動作例について説明する。図4は、点検、修理などのために操作制限を実施するプラント機器に対し、現場で札掛けを実施した場合の中央操作室との連携について示した説明図である。   Next, a description will be given of an operation example in the case where billing is performed on site by the site control / monitoring apparatus according to this example. FIG. 4 is an explanatory diagram showing the cooperation with the central operation room when tagging is performed on site for plant equipment that performs operation restrictions for inspection, repair, and the like.

はじめに、現場運転員22は、対象となるプラント機器の操作制限内容、期間などの操作制限情報を書き込んだ無線ICタグ31を付加した札13を、現場に設置されている当該プラント機器に関する札掛け装置14のホルダに配置する。なお、本例では、札掛け装置14のホルダに札を配置する行為が「札掛け」に相当する。次に、札掛け装置14のICタグリーダ41は、無線通信手段により札13の無線ICタグ31の情報を読み取り、札掛け装置14のタグ情報保管手段44へ保存するとともに、伝送処理手段45により、ネットワーク17を経由して制御装置11へ送信する。制御装置11は、当該機器の操作制限情報をタグ情報管理データベース15へ蓄積するとともに、当該機器に札掛け状態を設定し、画面からの制御操作を禁止するなどのシステム上の制限を行う。また、当該機器に札掛けが設定されたことを入出力装置12の札掛け表示画面上に表示する。更に、札掛けが設定されたことを告知するメッセージを入出力装置の画面上に自動表示したり、音声出力装置18に札掛けが設定されたことを通知し、スピーカ19から札掛け設定されたことを音声通報したりしてもよい。   First, the site operator 22 attaches the tag 13 with the wireless IC tag 31 in which the operation restriction information such as the operation restriction contents and the period of the target plant equipment is written to the tag device related to the plant equipment installed on the site. Place in the holder of the device 14. In this example, the act of placing a bill in the holder of the bill hanging device 14 corresponds to “filing”. Next, the IC tag reader 41 of the tagging device 14 reads the information of the wireless IC tag 31 of the tag 13 by wireless communication means and stores it in the tag information storage means 44 of the tagging device 14, and also by the transmission processing means 45. The data is transmitted to the control device 11 via the network 17. The control device 11 accumulates the operation restriction information of the device in the tag information management database 15, and performs system restrictions such as setting a billing state for the device and prohibiting the control operation from the screen. Further, the fact that the billing is set for the device is displayed on the billing display screen of the input / output device 12. Further, a message notifying that the billing has been set is automatically displayed on the screen of the input / output device, or the voice output device 18 is notified that the billing has been set, and the billing is set from the speaker 19. You may make a voice report.

また、札掛け解除を行う場合には、現場運転員22が現場の札掛け装置14のホルダから札13を取り出す。これにより、札掛け装置14のICタグリーダ41は札が撤去されたことを認識し、タグ情報管理処理手段43によりタグ情報保管手段44から当該情報を削除するともに、伝送処理手段45により札掛け解除要求を制御装置11へ送信する。制御装置11は、当該機器の操作制限情報をタグ情報管理データベース15から削除するとともに、当該機器の札掛け状態を解除し、画面からの制御操作の禁止などのシステム上の制限を解除する。これにより、当該プラント機器の画面からの制御操作が可能となる。また、入出力装置12の札掛け表示画面上の当該機器の札掛け表示を解除する。更に、札掛けが解除されたことを告知するメッセージを入出力装置の画面上に自動表示したり、音声出力装置18に札掛け解除されたことを通知し、スピーカ19から札掛け解除設定があったことを音声通報したりしてもよい。   Further, when releasing the tagging, the site operator 22 takes out the tag 13 from the holder of the tagging device 14 at the site. As a result, the IC tag reader 41 of the tagging apparatus 14 recognizes that the tag has been removed, deletes the information from the tag information storage means 44 by the tag information management processing means 43, and releases the tagging by the transmission processing means 45. The request is transmitted to the control device 11. The control device 11 deletes the operation restriction information of the device from the tag information management database 15, cancels the tagging state of the device, and releases system restrictions such as prohibition of control operation from the screen. Thereby, control operation from the screen of the plant equipment becomes possible. Also, the tag display of the device on the tag display screen of the input / output device 12 is canceled. In addition, a message notifying that the tagging has been released is automatically displayed on the screen of the input / output device, or the voice output device 18 is notified that the tagging has been released, and the billing release setting is made from the speaker 19. You may be notified by voice.

これにより、現場運転員が現場で札掛け装置への札の設置または撤去を実施することにより、制御装置におけるシステム上の札掛け設定または解除を自動的に実施することができる。その結果、現場運転員から中央操作室の運転員への連絡は不要となり、中央操作室の運転員は、入出力装置の画面の表示や音声通報などにより札掛け設定や解除などの状態を認識し、確認することができる。   As a result, the on-site operator can automatically set or cancel the billing on the system in the control device by installing or removing the bill from the billing device at the site. As a result, it is no longer necessary for the operator in the field to contact the operator in the central control room, and the operator in the central control room recognizes the status of billing setting and release, etc. by displaying the screen of the input / output device and voice notification. And can be confirmed.

更に、札掛け装置14から送信された操作制限情報は、タグ情報管理データベース15に蓄積されるため、制御装置11にて札掛けの期限超過や撤去条件を満たしても現場に札が残存しているかを判定することができる。制御装置11において、札掛けの期限超過などの撤去漏れを検出した場合には、表示装置12に札の撤去漏れを通知するメッセージを出力することができる。また、制御装置11から撤去漏れの札を配置している現場の札掛け装置14に対して、ネットワーク17を介して撤去漏れの通知を送信することにより、札掛け装置14の当該札を配置している場所の表示装置48に、当該札の撤去漏れを通知するメッセージを表示することもできる。   Furthermore, since the operation restriction information transmitted from the billing device 14 is accumulated in the tag information management database 15, the bill remains on the site even if the control device 11 satisfies the billing deadline or the removal condition. Can be determined. When the control device 11 detects a removal omission such as a billing deadline exceeding, it can output a message notifying the display device 12 of the omission of the tag removal. Further, by sending a notice of removal leakage via the network 17 to the tagging device 14 on the site where the removal leakage tag is placed from the control device 11, the tag of the billing device 14 is placed. It is also possible to display a message notifying the omission of removal of the tag on the display device 48 at the place where the card is placed.

このように、本発明においては、現場運転員がいつどこのプラント機器で何をしているのかを、現場の札掛け運用により中央操作室の運転員に自動的に認識させることができるため、誤操作、誤出力を防ぎ、機器操作の安全性をより向上させることができる。   In this way, in the present invention, it is possible to automatically recognize the operator of the central operation room by the tagging operation at the site, when the plant operator is doing what with which plant equipment, Incorrect operation and output can be prevented, and the safety of device operation can be further improved.

次に、本例の無線ICタグを付加した札に書き込むタグ情報の管理方法および運用方法の例について更に説明する。図5は、本例によるタグ情報の管理方法および運用方法について示した説明図である。   Next, an example of a method for managing and operating tag information to be written on a tag to which the wireless IC tag of this example is attached will be further described. FIG. 5 is an explanatory diagram showing a tag information management method and operation method according to this example.

まず、本例におけるタグ情報の管理方法について説明する。本例では、ICタグに書き込む情報は、制御装置11とネットワーク17を介して接続するタグ情報管理装置16にて管理し、札に付加した無線ICタグへ情報を書き込む処理は、タグ情報管理装置16のタグ情報更新手段61により実施する。なお、タグ情報管理装置16は、無線ICタグの情報の読み出し/書き込み手段を備えたパーソナルコンピュータなどの計算機に、タグ情報更新やタグ情報管理データベースのデータ管理などを行う機能を実装したものである。また、タグ情報管理装置16にて管理するタグ情報は、ネットワーク17を介して接続するタグ情報管理データベース15に保管する。タグ情報管理データベース15には、タグ情報管理データ71と、タグ情報コードテーブル72と、札掛けタグ情報保管データ73から構成する。タグ情報管理データ71は、札に付加した無線ICタグへ書き込む情報を定義したもので、無線ICタグに識別番号を付与し、その識別番号をキーとして操作制限情報などのデータを定義したものである。タグ情報コードテーブル72は、タグ情報管理データ71に定義するタグ情報の内容をコード化し、そのコードとコードに対応したデータの内容を定義したテーブルである。タグ情報管理データ71には、データ項目毎に該当するコードを定義する。これは、無線ICタグに書き込むデータ量を削減するため、データをコード化して管理するためである。札掛けタグ情報保管データ73は、制御装置11が、現場の札掛け装置14から受信した札掛けされた無線ICタグの情報を、各札掛け装置の配置位置に対応して保存したものであり、実際の札掛け状態を管理するためのものである。   First, a tag information management method in this example will be described. In this example, information to be written to the IC tag is managed by the tag information management device 16 connected to the control device 11 via the network 17, and the process of writing information to the wireless IC tag added to the tag is performed by the tag information management device. This is implemented by 16 tag information updating means 61. Note that the tag information management device 16 has a function of performing tag information update, data management of a tag information management database, and the like on a computer such as a personal computer equipped with a wireless IC tag information read / write means. . Tag information managed by the tag information management device 16 is stored in a tag information management database 15 connected via the network 17. The tag information management database 15 includes tag information management data 71, a tag information code table 72, and bill tag information storage data 73. The tag information management data 71 defines information to be written to the wireless IC tag attached to the tag, and assigns an identification number to the wireless IC tag, and defines data such as operation restriction information using the identification number as a key. is there. The tag information code table 72 is a table in which the content of tag information defined in the tag information management data 71 is coded and the content of the data corresponding to the code is defined. In the tag information management data 71, a code corresponding to each data item is defined. This is because the data is coded and managed in order to reduce the amount of data written to the wireless IC tag. The tagging tag information storage data 73 is information in which the control device 11 stores the information on the tagging wireless IC tag received from the tagging device 14 in the field corresponding to the arrangement position of each tagging device. This is for managing the actual billing state.

次に、本例におけるタグ情報の運用方法について説明する。最初に、現場運転員は、対象のプラント機器に関する札13をタグ情報管理装置16に配置し、タグ情報更新手段61を用いて無線ICタグに書き込まれている情報を読み出す。読み出した情報を基に、これから行う作業の内容、操作制限期間、操作制限内容などの情報を編集し、タグ情報管理データ71の所定のタグNo.のレコードのデータを書き換える(図5の(a))。次に、タグ情報更新手段61により、更新したデータを当該札13の無線ICタグ31へ書き込む(図5の(b))。   Next, a tag information operation method in this example will be described. First, the field operator places the tag 13 related to the target plant device in the tag information management device 16 and reads the information written in the wireless IC tag using the tag information update means 61. Based on the read information, information such as the content of the work to be performed, the operation restriction period, and the operation restriction content is edited, and a predetermined tag No. in the tag information management data 71 is edited. Is rewritten ((a) of FIG. 5). Next, the tag information update unit 61 writes the updated data to the wireless IC tag 31 of the tag 13 ((b) of FIG. 5).

現場運転員は、データを更新した札13を現場へ持参し(図5の(c))、現場の札掛け装置14のホルダへ配置する。すると、札掛け装置14のICタグリーダ41がタグ情報を読み出し、タグ情報保管手段44へ保存する(図5の(d))とともに、ネットワーク17を介して制御装置11へ送信し、タグ情報管理データベース15の札掛けタグ情報保管データ73へ保存する(図5の(e))。現場の札掛け装置14の表示装置には、タグ情報保管手段44に保存された情報を表示する。現場運転員は、表示された情報を参照し、追加、変更が必要と判断した場合は、入力装置49にてタグ情報の追加、変更を行う(図5の(f))。現場にて変更された内容は、札掛け装置14のタグ情報保管手段44に保存するとともに、制御装置11へ送信し、タグ情報管理データベース15の札掛けタグ情報保管データ73へ保存する。これにより、現場で変更された情報はタグ情報管理データベース15へも反映され、情報の一元管理を行うことができる。   The site operator brings the bill 13 with the updated data to the site ((c) in FIG. 5), and places it in the holder of the tagging device 14 on the site. Then, the IC tag reader 41 of the tagging device 14 reads out the tag information and stores it in the tag information storage means 44 ((d) in FIG. 5), and transmits it to the control device 11 via the network 17 for the tag information management database. The data is stored in the 15 bill tag information storage data 73 ((e) of FIG. 5). The information stored in the tag information storage unit 44 is displayed on the display device of the tagging device 14 at the site. When the site operator refers to the displayed information and determines that addition or change is necessary, the site operator adds or changes tag information with the input device 49 ((f) in FIG. 5). The contents changed at the site are stored in the tag information storage unit 44 of the tagging device 14, transmitted to the control device 11, and stored in the tagging tag information storage data 73 of the tag information management database 15. Thereby, the information changed in the field is reflected also in the tag information management database 15, and unified management of information can be performed.

次に、タグ情報管理データベース15の各データの構成例について説明する。   Next, a configuration example of each data in the tag information management database 15 will be described.

図6に、タグ情報管理データ71のデータ構成の例を示す。タグ情報管理データ71は、札に付加した無線ICタグに付与した識別番号であるタグNo.711をキーとし、タグNo.711毎に機器名称712、作業内容713、作業期間714、作業責任者715などの作業の内容や、操作制限内容716、操作制限期間717、補足情報718などの操作制限情報を定義する。機器名称や作業内容などの情報はコード化し、タグ情報管理データ71に定義するデータとしては該当のコードを定義する。無線ICタグには、ここで定義されたデータをタグ情報として書き込む。   FIG. 6 shows an example of the data structure of the tag information management data 71. The tag information management data 71 includes a tag number, which is an identification number assigned to the wireless IC tag attached to the tag. 711 as a key and tag No. For each 711, work details such as a device name 712, work content 713, work period 714, work manager 715, and operation restriction information such as an operation restriction content 716, an operation restriction period 717, and supplementary information 718 are defined. Information such as the device name and work contents is coded, and the corresponding code is defined as the data defined in the tag information management data 71. Data defined here is written in the wireless IC tag as tag information.

図7に、タグ情報コードテーブル72のデータ構成の例を示す。本例では、タグ情報コードテーブル72を複数のテーブルに分けて定義した例を示しているが、これらのデータを1つのデータベースとして定義してもよい。図7の(A)は、プラント機器を識別するための機器コードの定義例721、図7の(B)は、作業内容を示す作業コードの定義例722、図7の(C)は、操作制限内容を示す操作制限コードの定義例723、図7の(D)は、作業責任者を示す作業責任者コードの定義例724を示している。このように、札に付加した無線ICタグに書き込む作業の情報や操作制限情報をコードとして定義し、ICタグへ書き込むタグ情報は、コードで管理する。   FIG. 7 shows an example of the data configuration of the tag information code table 72. In this example, the tag information code table 72 is defined as being divided into a plurality of tables. However, these data may be defined as one database. 7A shows an example 721 of the equipment code for identifying the plant equipment, FIG. 7B shows an example 722 of the work code indicating the work content, and FIG. 7C shows the operation. A definition example 723 of the operation restriction code indicating the restriction content and FIG. 7D show a definition example 724 of the work supervisor code indicating the work supervisor. In this way, work information and operation restriction information to be written on the wireless IC tag attached to the tag are defined as codes, and tag information to be written on the IC tag is managed by the code.

図8に、札掛けタグ情報保管データ73のデータ構成の例を示す。札掛けタグ情報保管データ73は、現場に設置された全ての札掛け装置に配置される札の情報を管理するためのデータで、札掛け装置に付与した識別番号である札掛け装置No.731と、札掛け位置732により管理する。札掛け位置732は、札掛け装置に備えたホルダの位置を示すものであり、ホルダの数に合わせて、札掛け位置を1、2、3・・・と表し、識別する。現場の札掛け装置に札が配置された場合、配置された札から読み出した情報が札掛け装置から制御装置11へ伝送され、制御装置11が該当する札掛け装置No.731、札掛け位置732にデータを保存する。ここでは、配置された札のICタグを識別するタグNo.733と、札掛け開始日時734を保存するようなデータ構成としている。タグNo.が分かれば、タグ情報管理データ71を参照することにより、当該タグに書き込まれたタグ情報が分かるため、札掛け装置から伝送する情報としては、タグNo.と札が配置されたことを検出した日時のみで識別が可能である。   FIG. 8 shows an example of the data structure of the bill tag information storage data 73. The tagging tag information storage data 73 is data for managing information on the tags placed in all the tagging devices installed at the site, and the tagging device No. which is an identification number assigned to the tagging device. 731 and the billing position 732. The bill hanging position 732 indicates the position of the holder provided in the bill hanging apparatus, and the bill hanging position is represented as 1, 2, 3,... According to the number of holders. When a tag is placed on the tagging device at the site, information read from the placed tag is transmitted from the tagging device to the control device 11, and the control device 11 receives the corresponding billing device number. 731, data is stored in the billing position 732. Here, a tag number for identifying the IC tag of the tag placed is shown. 733 and the billing start date and time 734 are stored. Tag No. If the tag information is known, the tag information written in the tag can be understood by referring to the tag information management data 71. Can be identified only by the date and time when it was detected that the tag was placed.

また、ICタグに書き込まれたタグ情報のうち、変更が可能なデータと変更できないデータを定義しておき、現場運転員により札掛け装置14の入力装置49から変更できる情報を制限することもできる。例えば、操作制限内容は変更できないが、操作制限期間や補足情報は変更できるようにした場合、現場運転員が入力装置49からデータ変更した場合、札掛け装置14は変更したデータを制御装置11へ送信し、制御装置11が札掛けタグ情報保管データ73に保存することで、情報を更新する。図8では、変更可能なデータ項目として、操作制限期間変更欄735と補足情報欄736を設け、現場で変更された情報を保存できるようにした例を示している。   Further, among the tag information written in the IC tag, data that can be changed and data that cannot be changed are defined, and information that can be changed from the input device 49 of the tagging device 14 by the field operator can be limited. . For example, if the operation restriction content cannot be changed but the operation restriction period and supplementary information can be changed, or if the field operator changes data from the input device 49, the billing device 14 sends the changed data to the control device 11. The information is updated when the control device 11 stores the information in the tagging tag information storage data 73. FIG. 8 shows an example in which an operation restriction period change column 735 and a supplemental information column 736 are provided as changeable data items so that information changed on site can be stored.

なお、本例では、現場の札掛け装置に、予めどのプラント機器の札が配置されるかを定義しておき、誤ったプラント機器の札が配置された場合、札掛け装置の表示装置に札の誤掲示を通知するメッセージを表示することで、現場運転員へ知らせることができる。産業プラントや発電プラントなどの大規模プラントでは、類似の機器が多数存在し、また、同様の機器構成の設備が複数系統並列している場合もあるため、対象の機器を容易に識別できないこともある。そのため、作業対象機器を誤って札を配置してしまうこともある。本例では、札掛け装置が配置された札のタグ情報を読み出すことができるため、札の誤掲示を検出することができ、誤操作を防止し、作業を安全に行うことができる。   In this example, the tag hanging device in the field, have defined how pre tags which plant equipment is located, if the tags wrong plant equipment is placed, ticketing display tags hanging device It is possible to notify the field operator by displaying a message notifying the erroneous posting. In large-scale plants such as industrial plants and power plants, there are many similar devices, and there are cases where multiple systems of similar equipment configurations are in parallel, so the target equipment may not be easily identified. is there. For this reason, there is a case where a tag is mistakenly placed on the work target device. In this example, the tag information of the tag on which the billing device is placed can be read, so that an erroneous posting of the tag can be detected, an erroneous operation can be prevented, and the work can be performed safely.

また、本例では、札をプラント機器毎に管理する例で説明しているが、その場合、札の数が多量となり、管理が煩雑となる。そのため、札を機器毎ではなく作業内容毎に管理することもできる。その場合、タグ情報には、予め作業内容や操作制限内容を記録しておき、実際に札を使用する前に対象機器や作業期間などの情報のみ更新するようにしてもよい。   Further, in this example, an example is described in which tags are managed for each plant device, but in that case, the number of tags becomes large and management becomes complicated. Therefore, it is possible to manage the tag for each work content, not for each device. In that case, the tag information may be recorded in advance with work contents and operation restriction contents, and only information such as the target device and work period may be updated before the tag is actually used.

本発明の一実施の形態による構成例を示す構成図である。It is a block diagram which shows the structural example by one embodiment of this invention. 本発明の一実施の形態による札掛け装置の構成例を示すブロック図である。It is a block diagram which shows the structural example of the bill hanging apparatus by one embodiment of this invention. 本発明の一実施の形態による札掛け装置の構造例を示す説明図である。It is explanatory drawing which shows the structural example of the bill hanging apparatus by one embodiment of this invention. 本発明の一実施の形態による札掛けを実施した場合の動作例を示す説明図である。It is explanatory drawing which shows the operation example at the time of implementing the bill hanging by one embodiment of this invention. 本発明の一実施の形態によるタグ情報の管理方法および運用方法例を示す説明図である。It is explanatory drawing which shows the management method and the example of an operation method of tag information by one embodiment of this invention. 本発明の一実施の形態によるタグ情報管理データのデータ構成例を示す説明図である。It is explanatory drawing which shows the data structural example of the tag information management data by one embodiment of this invention. 本発明の一実施の形態によるタグ情報コードテーブルのデータ構成例を示す説明図である。It is explanatory drawing which shows the data structural example of the tag information code table by one embodiment of this invention. 本発明の一実施の形態による札掛けタグ情報保管データのデータ構成例を示す説明図である。It is explanatory drawing which shows the data structural example of tagging tag information storage data by one embodiment of this invention. 従来の形態による札掛けを実施した場合の動作例を示す説明図である。It is explanatory drawing which shows the operation example at the time of implementing the bill hanging by the conventional form.

符号の説明Explanation of symbols

11…制御装置、12…入出力装置、13…札、14…札掛け装置、15…タグ情報管理データベース、16…タグ情報管理装置、17…ネットワーク、18…音声出力装置、19…スピーカ、20…プラント機器、21…運転員、22…現場運転員、31…無線ICタグ、32…無線通信手段、41…ICタグリーダ、42…無線通信手段、43…タグ情報管理処理手段、44…タグ情報保管手段、45…伝送処理手段、46…タグ情報表示処理手段、47…タグ情報編集処理手段、48…表示装置、49…入力装置、50…基盤板、51…ホルダ、61…タグ情報更新手段、71…タグ情報管理データ、72…タグ情報コードテーブル、73…札掛けタグ情報保管データ   DESCRIPTION OF SYMBOLS 11 ... Control apparatus, 12 ... Input / output device, 13 ... Tag, 14 ... Bill hanging device, 15 ... Tag information management database, 16 ... Tag information management device, 17 ... Network, 18 ... Audio output device, 19 ... Speaker, 20 ... plant equipment, 21 ... operator, 22 ... field operator, 31 ... wireless IC tag, 32 ... wireless communication means, 41 ... IC tag reader, 42 ... wireless communication means, 43 ... tag information management processing means, 44 ... tag information Storage means 45 ... Transmission processing means 46 ... Tag information display processing means 47 ... Tag information editing processing means 48 ... Display device 49 ... Input device 50 ... Base plate 51 ... Holder 61 ... Tag information update means 71 ... Tag information management data, 72 ... Tag information code table, 73 ... Bill tag information storage data

Claims (5)

プラント機器の運転情報を収集し、制御を行う制御装置と、
前記制御装置とネットワークを介して接続し、運転員によるプラント機器の監視や制御操作を行うための入出力装置と、
プラント機器の作業及び操作制限情報を記録した無線ICタグを付加した札と、
前記制御装置とネットワークを介して接続し、ICタグリーダを備え、前記札を配置することにより前記無線ICタグの情報を読み出し、前記制御装置へ伝送する札掛け装置と、
前記札の無線ICタグの情報を更新するためのタグ情報管理装置と、
前記札の無線ICタグの情報を保存し、前記制御装置とネットワークを介して接続するタグ情報管理データベースから構成する現場制御・監視装置。
A control device for collecting and controlling operation information of plant equipment;
An input / output device connected to the control device via a network and monitoring and controlling operations of plant equipment by an operator;
A tag to which a wireless IC tag recording work and operation restriction information of plant equipment is attached;
A billing device connected to the control device via a network, provided with an IC tag reader, reading information of the wireless IC tag by arranging the tag, and transmitting the information to the control device;
A tag information management device for updating information of the wireless IC tag of the tag;
An on-site control / monitoring device configured by a tag information management database that stores information on the wireless IC tag of the tag and is connected to the control device via a network.
請求項1記載の現場制御・監視装置において、
前記札掛け装置に配置された札の無線ICタグの情報を前記制御装置へ伝送することにより、前記制御装置のシステム上の札掛け設定を行い、制御操作を制限することを特徴とする現場制御・監視装置。
In the field control / monitoring device according to claim 1,
Field control characterized in that by setting information on the wireless IC tag of the tag placed on the billing device to the control device, billing settings on the system of the control device are performed and control operations are restricted. -Monitoring device.
請求項1記載の現場制御・監視装置において、
前記札掛け装置は、
前記札の無線ICタグに記録されたタグ情報を読み出すために、札の配置位置に設けたICタグリーダと、
前記ICタグリーダで読み出したタグ情報を、前記制御装置へ伝送する伝送処理手段と、
前記ICタグリーダで読み出したタグ情報を保管するタグ情報保管手段と、
前記ICタグリーダで読み出したタグ情報を前記タグ情報保管手段へ保存し、データを管理するタグ情報管理処理手段から構成する現場制御・監視装置。
In the field control / monitoring device according to claim 1,
The bill hanging device
In order to read tag information recorded on the wireless IC tag of the tag, an IC tag reader provided at the position of the tag,
Transmission processing means for transmitting tag information read by the IC tag reader to the control device;
Tag information storage means for storing tag information read by the IC tag reader;
An on-site control / monitoring device comprising tag information management processing means for storing tag information read by the IC tag reader in the tag information storage means and managing data.
請求項3記載の現場制御・監視装置において、
前記札掛け装置に表示装置を設け、前記ICタグリーダで読み出したタグ情報を表示するタグ情報表示処理手段により、配置された札の作業及び操作制限情報を表示することを特徴とする現場制御・監視装置。
In the field control / monitoring device according to claim 3,
Field control / monitoring characterized in that a display device is provided in the tagging device, and tag information display processing means for displaying tag information read by the IC tag reader displays work and operation restriction information on the placed tag. apparatus.
請求項3記載の現場制御・監視装置において、
前記札掛け装置に入力装置を設け、前記ICタグリーダで読み出したタグ情報を編集するタグ情報編集処理手段により、前記入力装置から入力された情報を基に配置された札の作業及び操作制限情報を追加・修正することを特徴とする現場制御・監視装置。
In the field control / monitoring device according to claim 3,
The tag device is provided with an input device, and tag information editing processing means for editing the tag information read by the IC tag reader is used to display the work and operation restriction information on the tags arranged based on the information input from the input device. Field control / monitoring device characterized by addition / modification.
JP2007147077A 2007-06-01 2007-06-01 Field control/monitoring device Pending JP2008299734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007147077A JP2008299734A (en) 2007-06-01 2007-06-01 Field control/monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007147077A JP2008299734A (en) 2007-06-01 2007-06-01 Field control/monitoring device

Publications (1)

Publication Number Publication Date
JP2008299734A true JP2008299734A (en) 2008-12-11

Family

ID=40173175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007147077A Pending JP2008299734A (en) 2007-06-01 2007-06-01 Field control/monitoring device

Country Status (1)

Country Link
JP (1) JP2008299734A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016119520A (en) * 2014-12-18 2016-06-30 四国計測工業株式会社 Plant maintenance operation support system
JP2018529868A (en) * 2015-09-15 2018-10-11 株式会社ピエンエス Dangerous equipment control method and computer program therefor
JP2020042351A (en) * 2018-09-06 2020-03-19 三浦工業株式会社 Inspection management device
CN112186763A (en) * 2020-10-13 2021-01-05 安徽海控电子科技有限公司 Intelligent power consumption management system safety control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1124729A (en) * 1997-07-08 1999-01-29 Hitachi Ltd Operation support device
JP2001051717A (en) * 1999-06-04 2001-02-23 Toshiba Corp Plant equipment monitoring device
JP2005196443A (en) * 2004-01-07 2005-07-21 Toshiba Corp Plant monitoring and control apparatus
JP2006146749A (en) * 2004-11-24 2006-06-08 Kyushu Electric Power Co Inc Facility erroneous operation prevention system of plant or the like

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1124729A (en) * 1997-07-08 1999-01-29 Hitachi Ltd Operation support device
JP2001051717A (en) * 1999-06-04 2001-02-23 Toshiba Corp Plant equipment monitoring device
JP2005196443A (en) * 2004-01-07 2005-07-21 Toshiba Corp Plant monitoring and control apparatus
JP2006146749A (en) * 2004-11-24 2006-06-08 Kyushu Electric Power Co Inc Facility erroneous operation prevention system of plant or the like

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016119520A (en) * 2014-12-18 2016-06-30 四国計測工業株式会社 Plant maintenance operation support system
JP2018529868A (en) * 2015-09-15 2018-10-11 株式会社ピエンエス Dangerous equipment control method and computer program therefor
US10613486B2 (en) 2015-09-15 2020-04-07 P&S Co., Ltd Method and computer program for controlling hazardous facility
JP2020042351A (en) * 2018-09-06 2020-03-19 三浦工業株式会社 Inspection management device
CN112186763A (en) * 2020-10-13 2021-01-05 安徽海控电子科技有限公司 Intelligent power consumption management system safety control method
CN112186763B (en) * 2020-10-13 2023-12-22 安徽海控电子科技有限公司 Safety control method for intelligent electricity management system

Similar Documents

Publication Publication Date Title
JP2008191725A (en) Plant facility management/maintenance support system
JP2008299734A (en) Field control/monitoring device
JP2008146502A5 (en)
US20120231427A1 (en) Job procedure display apparatus, method of controlling job procedure display apparatus and non-transitory, computer readable storage medium
JP5469589B2 (en) Plant equipment management maintenance support system and management maintenance method
EP2390739B1 (en) A method and apparatus for providing industrial plant information
JP5461265B2 (en) Maintenance work support system
JP2010165026A (en) State display device
JP5833069B2 (en) Parts inventory management system
JP4707689B2 (en) Valve check support system
JP2011186651A (en) Work management system, work management method, and program thereof
JP2007113220A (en) Key management system
KR20150077971A (en) A Computing System of SAMG(Severe Accident Management Guidance)
JP2013182464A (en) Graphic screen generation device and generation method
JP2007086836A (en) Existing building repair/restoration management system
JP2006249854A (en) Method and apparatus for sorting waste building material at disposal
JP5297782B2 (en) Operation prohibition tag and maintenance inspection process management system
JP2013254235A (en) Plant management system
JP2005112480A (en) Elevator control panel, substrate control system, and substrate control method
JP2007058809A (en) Management apparatus of rental equipment and material
JP4882115B2 (en) Remote notification system, electronic computer, and remote notification method
JP2010026900A (en) Facility maintenance management device
JP2012088949A (en) Electronic procedure document display system and electronic procedure document display method
JP2005202831A (en) Machine tool maintenance system
JP2021086599A (en) Management system and management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090608

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101105

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110106

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110405

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110713

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20111213