JP2008115554A - Mining work information collecting system and collecting method - Google Patents

Mining work information collecting system and collecting method Download PDF

Info

Publication number
JP2008115554A
JP2008115554A JP2006297725A JP2006297725A JP2008115554A JP 2008115554 A JP2008115554 A JP 2008115554A JP 2006297725 A JP2006297725 A JP 2006297725A JP 2006297725 A JP2006297725 A JP 2006297725A JP 2008115554 A JP2008115554 A JP 2008115554A
Authority
JP
Japan
Prior art keywords
mining
information
transport
ore
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006297725A
Other languages
Japanese (ja)
Other versions
JP4678360B2 (en
Inventor
Kenji Kondo
憲二 近藤
Masahiro Kuga
正浩 空閑
Naoyuki Fukada
直之 深田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Materials Corp
NEC Corp
Original Assignee
Mitsubishi Materials Corp
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Materials Corp, NEC Corp filed Critical Mitsubishi Materials Corp
Priority to JP2006297725A priority Critical patent/JP4678360B2/en
Publication of JP2008115554A publication Critical patent/JP2008115554A/en
Application granted granted Critical
Publication of JP4678360B2 publication Critical patent/JP4678360B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To construct a system for efficiently collecting information from a mining place of a mine where a fixed communication infrastructure is difficult to construct. <P>SOLUTION: Mining heavy equipment 10 located at the mining place P1 is composed of a mining information acquiring means 11 and a mining information transmitting means 12 for transmitting mining information by radio. Transporting heavy equipment 20 for loading therein ores mined in the mining place and transporting the same to a processing site P2, is composed of a transporting information acquiring means 21, a mining information receiving means 22 for receiving the mining information transmitted from the mining information transmitting means, a mining work information accumulating means 23 for accumulating therein the acquired transporting information and the received mining information as mining work information, and a mining work information transmitting means 24 for transmitting the mining work information by radio. Then the transmitted mining work information is received by an information collecting device 30 arranged inside or outside the processing site. In this manner, the mining work information is transferred by way of the transporting heavy equipment reciprocatively moving between the mining place and the processing site where the fixed communication infrastructure can be constructed. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は採鉱作業情報収集システムに関し、特に固定的な通信インフラ無しで情報を収集できる採鉱作業情報収集システム及び収集方法に関する。   The present invention relates to a mining work information collection system, and more particularly to a mining work information collection system and a collection method capable of collecting information without a fixed communication infrastructure.

採鉱作業に関連する情報を収集する公知技術としては、例えば特許文献1に開示された採鉱方法がある。この採鉱方法では、採鉱場所に配置された穿孔機が発破用の孔を穿孔した後、孔に火薬を装填して発破し、砕かれた鉱石を積込ショベルでダンプトラックに積み込む作業が行われる。これらの作業に際して、穿孔機、積込ショベルはそれぞれ基地局との間で通信を行い、鉱石の品位等の分布マップを作成しながら採鉱作業が行われる。   As a known technique for collecting information related to the mining operation, for example, there is a mining method disclosed in Patent Document 1. In this mining method, after a drilling machine located at the mining site drills a hole for blasting, the hole is loaded with explosives and blasted, and the crushed ore is loaded onto a dump truck with a loading shovel. . During these operations, the drilling machine and the loading excavator communicate with the base station, and the mining operation is performed while creating a distribution map of ore quality and the like.

一方、鉱山における定型作業として、鉱石等の産出物を採鉱場所から処理場まで運搬するという業務がある。本業務の作業管理を行うためには、採鉱位置、採鉱機器(採鉱用重機)、運搬機器(運搬用重機)、運搬開始時刻、運搬終了時刻、処理機器等の各種情報を収集する必要がある。   On the other hand, as a routine work in a mine, there is a task of transporting products such as ore from a mining site to a treatment plant. In order to perform work management of this work, it is necessary to collect various information such as mining position, mining equipment (mining equipment), transport equipment (transport heavy equipment), transport start time, transport end time, processing equipment, etc. .

このような各種情報を収集するために、採鉱作業を実施する重機から情報を蓄積する装置に各種情報を伝達する必要があり、通常、無線通信システムが用いられる。しかしながら、各種情報を蓄積する装置のある処理場の事務所は、通常、採鉱場所から遠く離れており、採鉱場所から発信した無線電波が直接届く距離には無いことが多い。また、距離以外に地形の影響で採鉱場所からの無線電波が届かないケースも多い。携帯電話網等の大規模な広域インフラを活用すれば直接の通信も可能と思われるが、大規模な自主設備の投資もしくは通信料の負担が必要となるため、現実的には採用困難である。   In order to collect such various types of information, it is necessary to transmit various types of information from a heavy machine that performs mining operations to a device that accumulates information, and a wireless communication system is usually used. However, the office of a treatment plant with a device for storing various information is usually far away from the mining site, and is often not within a range where radio waves transmitted from the mining site can reach directly. In addition to the distance, there are many cases where radio waves from the mining site do not reach due to the influence of topography. Direct communication may be possible if a large-scale wide-area infrastructure such as a cellular phone network is used, but it is difficult to adopt in practice because it requires investment of large-scale independent facilities or communication charges. .

鉱山の重機がデータ通信を行う際には、無線LAN(802.11b、802.11g)が広範囲に使用されている。しかしながら、無線LANを使って採鉱場所から処理場の事務所にデータを送信するには採鉱場所と事務所がそれぞれ無線LANに接続できる状態におかれている必要があり、全ての採鉱場所付近に無線LANのアクセスポイントを設置する必要がある。つまり、採鉱場所と処理場の事務所が遠く離れている場合には、アドホックモードによる通信は期待できず、インフラストラクチャモードが必須となる。   When mine heavy equipment performs data communication, wireless LAN (802.11b, 802.11g) is widely used. However, in order to transmit data from a mining site to an office of a treatment plant using a wireless LAN, the mining site and the office must be in a state where they can be connected to a wireless LAN. It is necessary to install a wireless LAN access point. In other words, when the mining site and the office of the treatment plant are far apart, communication in the ad hoc mode cannot be expected, and the infrastructure mode is essential.

しかしながら、採鉱場所は日々変化し、カバーすべきエリアが変動する上に、鉱山の形状自体も採鉱により変化するため、固定的な無線LANのアクセスポイントを適切に配置し続けることは事実上難しい。   However, since the mining site changes from day to day, the area to be covered varies, and the shape of the mine itself also changes due to mining, it is practically difficult to keep fixed wireless LAN access points properly arranged.

特開2000−204872号公報JP 2000-204872 A

以上のように、これまでの採鉱情報収集方法の問題点は、採鉱場所と処理場の事務所との通信を確保する適切な方法が無いということにある。その理由は、採鉱場所付近が固定的な通信インフラの設置に適しないためである。   As described above, the problem with the mining information collection method so far is that there is no appropriate method for ensuring communication between the mining site and the office of the treatment plant. The reason is that the vicinity of the mining site is not suitable for installation of a fixed communication infrastructure.

そこで、本発明の目的は、採鉱場所における固定的な通信インフラ無しで採鉱作業情報を収集できる採鉱作業情報収集システムを提供することにある。   Therefore, an object of the present invention is to provide a mining work information collection system that can collect mining work information without a fixed communication infrastructure at a mining site.

本発明による採鉱作業情報収集システムは、採鉱場所に配置され採鉱に関する採鉱情報を取得する採鉱情報取得手段と、前記採鉱場所に配置され前記採鉱情報取得手段で取得された前記採鉱情報を無線にて送信する採鉱情報送信手段と、前記採鉱場所で採鉱された鉱石を積み込んで前記採鉱場所から離れた処理場へ運搬する運搬用機器に備えられ運搬に関する運搬情報を取得する運搬情報取得手段と、前記運搬用機器に備えられ前記採鉱情報送信手段から送信された前記採鉱情報を受信する採鉱情報受信手段と、前記運搬用機器に備えられ前記運搬情報取得手段で取得された前記運搬情報及び前記採鉱情報受信手段で受信された前記採鉱情報とを採鉱作業情報として蓄積する蓄積手段と、前記運搬用機器に備えられ前記蓄積手段に蓄積されている前記採鉱作業情報を無線にて送信する採鉱作業情報送信手段とを含み、該採鉱作業情報送信手段から送信された前記採鉱作業情報を前記処理場内または処理場外に配置された情報収集装置で受信するようにしたことを特徴とする。   The mining work information collection system according to the present invention wirelessly receives the mining information acquisition means arranged at a mining site and acquires mining information related to mining, and the mining information arranged at the mining site and acquired by the mining information acquisition means. Mining information transmitting means for transmitting, transport information acquiring means for acquiring transport information relating to transport provided in a transporting device for loading ore mined at the mining site and transporting it to a treatment plant remote from the mining site, Mining information receiving means for receiving the mining information transmitted from the mining information transmitting means provided in the transporting equipment, and the transporting information and the mining information acquired in the transporting information acquiring means provided in the transporting equipment. Accumulating means for accumulating the mining information received by the receiving means as mining work information, and being stored in the accumulating means provided in the transporting device. And receiving the mining work information transmitted from the mining work information transmitting means by an information collecting device arranged inside or outside the processing site. It was made to do.

本発明による採鉱作業情報収集システムにおいては、前記採鉱情報取得手段及び採鉱情報送信手段は前記採鉱場所で採鉱を行う採鉱用機器に備えられ、該採鉱用機器から前記運搬用機器への鉱石の積込作業の際に前記採鉱情報送信手段から前記採鉱情報受信手段へ前記採鉱情報が送信される。   In the mining work information collection system according to the present invention, the mining information acquisition means and the mining information transmission means are provided in a mining device that performs mining at the mining site, and the ore stacking from the mining device to the transporting device is performed. The mining information is transmitted from the mining information transmitting means to the mining information receiving means at the time of loading work.

本発明による採鉱作業情報収集システムにおいてはまた、前記採鉱情報取得手段は前記採鉱情報として少なくとも採鉱位置、採鉱時刻、採鉱担当者名、採鉱重機ID、採鉱量を取得する一方、前記運搬情報取得手段は前記運搬情報として少なくとも運搬開始/終了位置、運搬開始/終了時刻、運搬担当者名、運搬重機ID、運搬量を取得する。   In the mining work information collection system according to the present invention, the mining information acquisition means acquires at least a mining position, a mining time, a mining person name, a mining heavy equipment ID, and a mining amount as the mining information, while the transport information acquisition means. Acquires at least a transport start / end position, a transport start / end time, a transporter name, a transport heavy machine ID, and a transport amount as the transport information.

本発明による採鉱作業情報収集システムにおいてはさらに、前記運搬情報取得手段は、前記鉱石の積込作業に際して前記運搬開始位置、運搬開始時刻、運搬担当者名、運搬重機ID、運搬量を取得し、前記処理場において前記運搬終了位置、運搬終了時刻に加えてさらに運搬先情報を追加取得し、前記採鉱情報送信手段は前記処理場での鉱石の積み下ろしに際して前記蓄積手段に蓄積されている前記採鉱作業情報に前記追加取得した運搬情報を合わせてトータル採鉱作業情報として送信する。   In the mining work information collection system according to the present invention, the transport information acquisition means further acquires the transport start position, transport start time, transporter name, transport heavy machine ID, transport amount when loading the ore, In addition to the transport end position and the transport end time, further acquisition of transport destination information is obtained at the treatment plant, and the mining information transmitting means accumulates the ore at the processing plant when the ore is stored in the storage means. The additional acquired transport information is combined with the information and transmitted as total mining work information.

本発明による採鉱作業情報収集システムにおいては、前記採鉱情報取得手段は前記採鉱位置、採鉱時刻を取得するためにGPSを含み、前記運搬情報取得手段も前記運搬開始/終了位置、運搬開始/終了時刻を取得するために別のGPSを含むようにしても良い。   In the mining work information collection system according to the present invention, the mining information acquisition means includes a GPS for acquiring the mining position and mining time, and the transport information acquisition means also includes the transport start / end position and transport start / end time. Another GPS may be included in order to obtain

本発明による採鉱作業情報収集システムにおいてはさらに、前記採鉱場所から離れた処理場を複数設定すると共に、各処理場には異なるIDを付与された少なくとも1つの無線アクセスポイントを鉱石の積み下ろし場所に設定し、これら複数の無線アクセスポイントと前記情報収集装置との間を有線または無線ネットワークで接続し、前記運搬用機器は、鉱石の積み下ろし場所における前記無線アクセスポイントのIDを認識しこれを前記運搬情報取得手段にて前記搬送先情報として取得し、当該無線アクセスポイント経由で前記情報収集装置へ前記トータル採鉱作業情報を送信するようにしても良い。   In the mining work information collecting system according to the present invention, a plurality of treatment plants apart from the mining site are set, and at least one wireless access point assigned with a different ID is set as an ore loading / unloading site. The plurality of wireless access points and the information collecting device are connected by a wired or wireless network, and the transportation device recognizes the ID of the wireless access point at the place where the ore is loaded and unloaded. It may be acquired as the transport destination information by an acquisition means, and the total mining work information may be transmitted to the information collection device via the wireless access point.

本発明によればまた、採鉱場所に配置された採鉱用機器において採鉱に関する採鉱情報を取得する第1のステップと、前記第1のステップで取得された前記採鉱情報を無線にて送信する第2のステップと、前記採鉱場所で採鉱された鉱石を積み込んで前記採鉱場所から離れた処理場へ運搬する運搬用機器において運搬に関する運搬情報を取得する第3のステップと、前記運搬用機器において前記第2のステップで送信された前記採鉱情報を受信する第4のステップと、前記運搬用機器において前記第3のステップで取得された前記運搬情報及び前記第4のステップで受信された前記採鉱情報とを採鉱作業情報として蓄積手段に蓄積する第5のステップと、前記運搬用機器において前記蓄積手段に蓄積されている前記採鉱作業情報を前記処理場で無線にて送信する第6のステップとを含み、該第6のステップで送信された前記採鉱作業情報を前記処理場内または処理場外に配置された情報収集装置で受信するようにしたことを特徴とする採鉱作業情報収集方法が提供される。   According to the present invention, the first step of acquiring mining information related to mining in the mining equipment arranged at the mining site, and the second step of wirelessly transmitting the mining information acquired in the first step. A third step of acquiring transport information relating to transport in a transporting device that loads ore mined at the mining site and transports the ore to a treatment plant remote from the mining site; and A fourth step of receiving the mining information transmitted in step 2, the transport information acquired in the third step in the transport device, and the mining information received in the fourth step; And storing the mining work information stored in the storage means in the transporting device as the mining work information in the storage means. And a sixth step of transmitting by radio, wherein the mining work information transmitted in the sixth step is received by an information collecting device arranged inside or outside the processing site. A method for collecting mining work information is provided.

本採鉱作業情報収集方法においては、前記採鉱情報は少なくとも採鉱位置、採鉱時刻、採鉱担当者名、採鉱重機ID、採鉱量を含む一方、前記運搬情報は少なくとも運搬開始/終了位置、運搬開始/終了時刻、運搬担当者名、運搬重機ID、運搬量を含み、前記採鉱用機器から前記運搬用機器への鉱石の積込作業の際に前記第2のステップを実行することが望ましい。   In the mining operation information collection method, the mining information includes at least a mining position, a mining time, a mining person name, a mining heavy equipment ID, and a mining amount, while the transport information includes at least a transport start / end position and a transport start / end. It is preferable that the second step is executed at the time of loading the ore from the mining equipment to the transport equipment, including time, transport personnel name, transport heavy equipment ID, and transport amount.

本採鉱作業情報収集方法においてはまた、前記鉱石の積込作業に際して前記運搬開始位置、運搬開始時刻、運搬担当者名、運搬重機ID、運搬量を取得し、前記処理場において前記運搬終了位置、運搬終了時刻に加えてさらに運搬先情報を追加取得し、前記処理場での鉱石の積み下ろしに際して前記蓄積手段に蓄積されている前記採鉱作業情報に前記追加取得した運搬情報を合わせてトータル採鉱作業情報として送信するようにしても良い。   In the mining operation information collection method, the transport start position, the transport start time, the transporter name, the transport heavy equipment ID, the transport amount are acquired at the time of the ore loading operation, and the transport end position at the treatment plant, In addition to the transport end time, additional acquisition of transport destination information is performed, and the total mining work information is combined with the transport information acquired in addition to the mining work information stored in the storage means when the ore is loaded and unloaded at the treatment plant. You may make it transmit as.

本発明によれば、採鉱場所における固定的な通信インフラ無しで採鉱作業情報を収集できる。その理由は、運搬用機器に採鉱作業情報の運搬機能を持たせたからである。   According to the present invention, mining work information can be collected without a fixed communication infrastructure at the mining site. The reason is that the carrying device has a carrying function for mining work information.

次に、本発明の実施形態について図面を参照して詳細に説明する。   Next, embodiments of the present invention will be described in detail with reference to the drawings.

図1は、本発明を、鉱石等の採鉱場所、特に露天掘りによる採鉱場所における採鉱作業情報を、採鉱場所から離れた場所にある鉱石等の処理場内あるいは処理場外にある事務所において収集するシステムに適用した実施形態を示す。   FIG. 1 shows a system in which the present invention collects mining work information at a mining site such as ore, especially at a mining site by open-pit mining, in an ore processing plant located outside the mining site or in an office outside the processing plant. The applied embodiment is shown.

採鉱場所P1においては、ショベルカーのような採鉱用重機(採鉱用機器)10、ダンプカーのような運搬用重機(運搬用機器)20が採鉱作業、運搬作業をそれぞれ実施する。便宜上、採鉱用重機10、運搬用重機20はそれぞれ1台のみ図示しているが、これらは1台とは限らない。また、採鉱場所P1で採鉱された鉱石は運搬用重機20により処理場P2に運搬されるが、処理場も1個所とは限らない。   In the mining place P1, a mining heavy machine (mining equipment) 10 such as a shovel car and a transport heavy machine (transporting equipment) 20 such as a dump truck respectively perform the mining work and the transport work. For convenience, only one mining heavy machine 10 and one transport heavy machine 20 are shown, but these are not necessarily one. Further, the ore mined at the mining site P1 is transported to the processing plant P2 by the transport heavy machine 20, but the processing plant is not limited to one.

採鉱用重機10は、少なくとも採鉱位置、採鉱時刻、採鉱担当者名、採鉱重機ID(Identification Data)、採鉱量を含む採鉱情報を取得する採鉱情報取得手段11、及び取得した採鉱情報を無線にて送信する採鉱情報送信手段12を備えている。採鉱位置は、後述するGPS(Global Positioning System)等の手段により得ることができ、採鉱時刻はGPSのほか、計時機能により得ることもできる。また、採鉱担当者名及び採鉱重機IDは、例えば採鉱用重機10の運転者により運転席に設けられた入力部から入力され、採鉱量は採鉱用重機10に備えられた計測機器により得られる。採鉱担当者名及び採鉱重機IDは採鉱情報取得手段11内のメモリに保存されており、採鉱位置、採鉱時刻等の情報もこのメモリに一時的に保存されても良い。   The mining heavy machine 10 wirelessly transmits at least a mining position, a mining time, a mining person's name, a mining heavy machine ID (Identification Data), mining information acquisition means 11 for acquiring mining information including a mining amount, and the acquired mining information. Mining information transmission means 12 for transmission is provided. The mining position can be obtained by means such as GPS (Global Positioning System) described later, and the mining time can be obtained by a time measuring function in addition to GPS. The name of the mining person in charge and the mining heavy equipment ID are input from, for example, an input unit provided in the driver's seat by the driver of the mining heavy equipment 10, and the amount of mining is obtained by a measuring device provided in the mining heavy equipment 10. The name of the mining person in charge and the mining heavy equipment ID are stored in the memory in the mining information acquisition means 11, and information such as the mining position and the mining time may be temporarily stored in this memory.

運搬用重機20は、少なくとも運搬開始/終了位置、運搬開始/終了時刻、運搬担当者名、運搬重機ID、運搬量を含む運搬情報を取得する運搬情報取得手段21、採鉱用重機10における採鉱情報送信手段12からの採鉱情報を受信する採鉱情報受信手段22、採鉱情報受信手段22からの採鉱情報及び運搬情報取得手段21からの運搬情報を蓄積する採鉱作業情報蓄積手段23のほか、無線による採鉱作業情報送信手段24を備えている。ここでは、運搬開始というのは運搬用重機20への鉱石の積込開始を意味し、運搬終了というのは処理場において鉱石の積み下ろし開始を意味するものとする。運搬開始/終了位置もGPS等の手段により得ることができ、運搬開始/終了時刻はGPSや計時機能等により得ることができる。運搬担当者名及び運搬重機IDは、例えば運搬用重機20の運転者により運転席に設けられた入力部から入力され、運搬量は運搬用重機20に備えられた計測機器により得られる。運搬担当者名及び運搬重機IDは運搬情報取得手段21内のメモリに保存されており、運搬開始/終了位置、運搬開始/終了時刻等の情報もこのメモリに一時的に保存されても良い。   The transport heavy machine 20 includes at least a transport start / end position, a transport start / end time, a transporter name, a transport heavy machine ID, a transport information acquisition unit 21 that acquires transport information including a transport amount, and mining information in the mining heavy machine 10. Mining information receiving means 22 for receiving mining information from the transmitting means 12, mining work information accumulating means 23 for accumulating mining information from the mining information receiving means 22 and transport information from the transport information acquiring means 21, and wireless mining Work information transmission means 24 is provided. Here, the start of transportation means the start of loading of ore into the heavy equipment 20 for transportation, and the end of transportation means the start of unloading of ore at the treatment plant. The transport start / end position can also be obtained by means such as GPS, and the transport start / end time can be obtained by GPS, a time measuring function, or the like. The name of the person in charge of transport and the ID of the transport heavy machine are input, for example, from the input unit provided in the driver's seat by the driver of the transport heavy machine 20, and the transport amount is obtained by a measuring device provided in the transport heavy machine 20. The name of the person in charge of transport and the ID of the transport heavy machine are stored in the memory in the transport information acquisition means 21, and information such as the transport start / end position and the transport start / end time may be temporarily stored in this memory.

採鉱場所P1において、採鉱用重機10は採鉱作業を開始すると採鉱情報の取得を開始し、運搬用重機20も運搬作業を開始すると運搬情報の取得を開始する。取得された採鉱情報は、例えば運搬用重機20による運搬開始時に採鉱情報送信手段12から送信され、採鉱情報受信手段22によって受信される。運搬開始時には運搬用重機20は採鉱用重機10の近傍にあるので、確実な無線通信が可能である。このようにして収集された採鉱情報/運搬情報はまとめて採鉱作業情報として採鉱作業情報蓄積手段23に蓄積される。   At the mining site P1, the mining heavy machine 10 starts to acquire mining information when the mining work is started, and the transport heavy machine 20 also starts to acquire transport information when the transporting heavy machine 20 also starts the transport work. The acquired mining information is transmitted from the mining information transmitting means 12 at the start of transportation by the heavy equipment for transportation 20 and received by the mining information receiving means 22, for example. Since the transport heavy machine 20 is in the vicinity of the mining heavy machine 10 at the start of transport, reliable wireless communication is possible. The mining information / transport information collected in this way is collectively stored in the mining work information storage means 23 as mining work information.

採鉱用重機10からの鉱石の積込みを終了した運搬用重機20は、蓄積された採鉱作業情報を保持した状態で採鉱場所P1を離れ、鉱石の処理場P2まで鉱石を運搬する。処理場P2に示されている運搬用重機は採鉱場所P1から移動してきた運搬用重機であるが、便宜上、同じ構成要素の参照番号にはダッシュを付けている。処理場P2内あるいは処理場P2外には採鉱作業を管理する事務所(もしくは出張所)があり、この事務所は情報収集装置30を備えるほか、後述するように情報収集装置30への無線通信を実現する無線ネットワークインフラが構築されている。処理場P2まで移動した運搬用重機20’は、運搬情報取得手段21’により運搬終了位置、運搬終了時刻、処理場を示す運搬先情報等の運搬情報を追加で取得した後、採鉱場所P1で収集した採鉱作業情報と処理場P2にて追加取得した運搬情報とを合わせたトータル採鉱作業情報を、採鉱作業情報送信手段24’を用いて情報収集装置30に送信する。情報収集装置30は、採鉱作業情報受信手段31で受信したトータル採鉱作業情報をメモリ32に蓄積する。   The transport heavy machine 20 that has finished loading the ore from the mining heavy machine 10 leaves the mining site P1 while retaining the accumulated mining work information, and transports the ore to the ore processing plant P2. Although the heavy transport equipment shown in the treatment plant P2 is a heavy transport equipment that has moved from the mining site P1, for convenience, reference numerals of the same components are indicated by dashes. There is an office (or a branch office) that manages mining operations inside or outside of the processing plant P2, and this office has an information collecting device 30 as well as wireless communication to the information collecting device 30 as described later. A wireless network infrastructure has been established. The transport heavy machine 20 ′ that has moved to the processing site P2 additionally acquires transport information such as a transport end position, a transport end time, and transport destination information indicating the processing site by the transport information acquisition means 21 ′, and then at the mining site P1. Total mining work information, which is a combination of the collected mining work information and the transport information additionally acquired at the treatment plant P2, is transmitted to the information collecting device 30 using the mining work information transmitting means 24 ′. The information collecting device 30 stores the total mining work information received by the mining work information receiving means 31 in the memory 32.

以上のような手順を繰り返し実施することで、採鉱作業情報は情報収集装置30により作業の進捗に合わせる形で収集、蓄積され、短スパンの作業内容の管理や作業内容の見直しに活用することが可能となる。例えば、事務所内あるいはそこから離れた場所にあってオンラインで結ばれている管理センターでは、メモリ32に蓄積されているトータル採鉱作業情報を用いて採鉱作業の管理や運搬作業の管理、及び作業従事者への作業指示を行うことができる。   By repeating the above procedures, mining work information is collected and accumulated by the information collection device 30 in accordance with the progress of work, and can be used for management of short-span work contents and review of work contents. It becomes possible. For example, in a management center that is connected in the office or at a location remote from the office, management of the mining work and management of the transport work and work engagement using the total mining work information stored in the memory 32 A work instruction can be given to a person.

[実施例]
次に、図2を参照して、本発明の具体的な実施例について説明する。図2においても、便宜上、採鉱用重機110、運搬用重機120はそれぞれ1台のみ図示しているが、これらは1台とは限らず、処理場も1個所とは限らない。
[Example]
Next, a specific embodiment of the present invention will be described with reference to FIG. Also in FIG. 2, for convenience, only one mining heavy machine 110 and one transporting heavy machine 120 are shown, but these are not limited to one, and the processing site is not limited to one.

図2に示すように、採鉱場所P1にある採鉱用重機110は、図1に示された採鉱情報取得手段11として、採鉱位置と採鉱時刻を取得するためのGPS111−1を含む採鉱情報取得手段111を備えており、図1に示された採鉱情報送信手段12として無線通信機112を備えている。運搬用重機120も同様に、図1に示された運搬情報取得手段21として、運搬開始/終了位置と運搬開始/終了時刻を取得するためのGPS121−1を含む運搬情報取得手段121を備えており、図1に示されている採鉱情報受信手段22及び採鉱作業情報送信手段24として無線通信機122を備えている。運搬用重機120はまた、図1に示されている採鉱作業情報蓄積手段23としてメモリ123を備えている。   As shown in FIG. 2, the mining heavy machine 110 in the mining place P1 is a mining information acquisition unit including a GPS 111-1 for acquiring the mining position and the mining time as the mining information acquisition unit 11 shown in FIG. 111 and a wireless communication device 112 as the mining information transmission means 12 shown in FIG. Similarly, the transport heavy machine 120 includes a transport information acquisition unit 121 including a GPS 121-1 for acquiring a transport start / end position and a transport start / end time as the transport information acquisition unit 21 shown in FIG. The mining information receiving means 22 and the mining work information transmitting means 24 shown in FIG. The transporting heavy machine 120 is also provided with a memory 123 as the mining work information storage means 23 shown in FIG.

運搬用重機120は、採鉱用重機110に近接した状態で鉱石の積込作業を開始し、運搬開始位置、運搬開始時刻、運搬担当者名、運搬重機IDを取得するとともに、運搬量等の運搬情報の取得を開始する。取得した運搬情報はメモリ123に蓄積される。積込作業開始は運搬用重機120にて手動もしくは自動で認識され、もっとも近傍にある採鉱用重機を鉱石の積込みを実施している採鉱用重機として認識し、該当する採鉱用重機に採鉱情報の送信を要求する。この送信要求には採鉱用重機のIDが付されることは言うまでも無いが、手動の場合には、運搬用重機120の運転者により採鉱用重機が認識され、その採鉱重機IDが入力される。一方、自動認識の場合、下記のような方法が採用される。   The transport heavy machine 120 starts the ore loading operation in the state of being close to the mining heavy machine 110, acquires the transport start position, the transport start time, the name of the person in charge of transport, the transport heavy machine ID, and transports the transport amount and the like. Start acquiring information. The acquired transportation information is stored in the memory 123. The loading operation start is recognized manually or automatically by the transporting heavy machine 120, the nearest mining heavy machine is recognized as the mining heavy machine that is loading the ore, and the mining information is sent to the corresponding mining heavy machine. Request transmission. It goes without saying that the ID of the mining heavy equipment is attached to this transmission request, but in the case of manual operation, the mining heavy equipment is recognized by the operator of the transporting heavy equipment 120 and the mining heavy equipment ID is input. The On the other hand, in the case of automatic recognition, the following method is adopted.

鉱石の積込作業開始時に運搬用重機120の運転手が運転席のあらかじめ定められたボタンを押す。この時点で運搬用重機120の無線通信機122が周りにいる(通信範囲内にいる)全ての採鉱用重機に運搬用重機120からの電波の受信電界強度を申告するようメッセージを送信する。本メッセージを受信した各採鉱用重機の無線通信機は、自身のIDを付加して受信電界強度を示す信号を返信する。運搬用重機120の無線通信機122は一定時間回答を待ち、受信した複数の電界強度を示すメッセージの中からもっとも強い受信電界強度を申告してきた採鉱用重機のIDを積込作業の相手先として認識する。なお、採鉱用重機からの受信電界強度に加えて、運搬用重機120にて返信メッセージを受信した際の受信電界強度も考慮に入れるようにしても良い。つまり、採鉱用重機からの受信電界強度と返信メッセージを受信した際の受信電界強度との平均値に基づいて積込作業の相手先を認識するようにしても良い。   At the start of the ore loading operation, the driver of the transporting heavy machine 120 presses a predetermined button on the driver's seat. At this time, a message is transmitted so as to report the received electric field strength of the radio wave from the transport heavy machine 120 to all mining heavy machines around which the radio communication device 122 of the transport heavy machine 120 is located (within the communication range). The radio communication device of each mining heavy machine that has received this message adds its own ID and returns a signal indicating the received electric field strength. The wireless communication device 122 of the transporting heavy machine 120 waits for an answer for a certain period of time, and uses the ID of the mining heavy equipment that has declared the strongest received electric field strength among the received messages indicating the multiple electric field strengths as the destination of the loading operation. recognize. In addition to the received electric field strength from the mining heavy equipment, the received electric field strength when the return message is received by the heavy transport equipment 120 may be taken into consideration. That is, you may make it recognize the other party of loading work based on the average value of the received electric field strength from the mining heavy equipment and the received electric field strength when the reply message is received.

なお、上記の受信電界強度を利用した自動認識方式に代えて、GPSの位置情報による計算を利用した自動認識方式を採用しても良い。例えば、上記と同様の方法で、通信範囲内にある全ての採鉱用重機に位置情報の返信をもとめ、受信した位置情報の中で最近接のものを積込作業の相手先として認識する。   Instead of the automatic recognition method using the received electric field intensity, an automatic recognition method using calculation based on GPS position information may be adopted. For example, by using the same method as described above, the position information is returned to all mining heavy machines within the communication range, and the closest received position information is recognized as a loading work partner.

採鉱情報としては、GPS111−1により取得した採鉱位置、採鉱時刻のほか、採鉱担当者名、採鉱重機ID、採鉱量等が採鉱情報取得手段111内のメモリに保存されており、採鉱情報の送信を要求された採鉱用重機110がこの採鉱情報を、無線通信機112により採鉱情報の送信を要求した運搬用重機120に送信する。運搬用重機120から送信される送信要求には、自己のIDを含むほか、前述したように送信を要求する採鉱用重機110のIDを含む。また、採鉱用重機110から送信される採鉱情報にも自己のIDが付されるほか、送信を要求した採鉱用重機110のIDが付されることは言うまでも無い。   As the mining information, in addition to the mining position and mining time acquired by the GPS 111-1, the name of the person in charge of mining, the mining heavy equipment ID, the mining amount, etc. are stored in the memory in the mining information acquisition means 111, and transmission of the mining information is performed. The mining heavy equipment 110 requested to transmit the mining information to the transporting heavy equipment 120 that has requested transmission of the mining information by the wireless communication device 112. The transmission request transmitted from the transporting heavy machine 120 includes its own ID, as well as the ID of the mining heavy machine 110 that requests transmission as described above. It goes without saying that the mining information transmitted from the mining heavy equipment 110 is also given the ID of the mining heavy equipment 110 that requested transmission, in addition to its own ID.

採鉱用重機110からの採鉱情報を受信した運搬用重機120は、受信した採鉱情報をメモリ123に蓄積する。メモリ123には、前述したように、自身が取得した運搬情報として運搬開始位置、運搬開始時刻、運搬担当者名、運搬重機IDが蓄積されており、その他の運搬情報として運搬量が取得され、これもメモリ123に蓄積される。   The transporting heavy machine 120 that has received the mining information from the mining heavy machine 110 accumulates the received mining information in the memory 123. As described above, in the memory 123, the transportation start position, the transportation start time, the name of the person in charge of transportation, the heavy equipment ID are stored as the transportation information acquired by itself, and the transportation amount is acquired as other transportation information, This is also stored in the memory 123.

積込作業が終了すると採鉱情報、運搬情報の取得も完了しており、運搬用重機120は鉱石運搬のために移動を開始する。その後、鉱石の処理場P2に到着した運搬用重機120’は鉱石を積み下ろす。鉱石の積み下ろしを開始する時点で、運搬用重機120’の運搬情報取得手段121は運搬情報を追加取得する。追加取得する運搬情報は、GPS121−1により取得した運搬終了位置、運搬終了時刻、積み下ろし先の無線アクセスポイントのID等である。   When the loading operation is completed, the acquisition of mining information and transport information is also completed, and the transport heavy machine 120 starts moving to transport the ore. Thereafter, the heavy equipment for transportation 120 ′ arriving at the ore treatment plant P <b> 2 loads ore. At the point of time when loading or unloading of the ore is started, the transport information acquisition means 121 of the transport heavy machine 120 ′ additionally acquires transport information. The additionally acquired transportation information includes the transportation end position, the transportation end time, the ID of the wireless access point at the loading / unloading position, etc. acquired by the GPS 121-1.

ここで、図3を参照して積み下ろし先の無線アクセスポイントについて説明する。図3では、処理場として複数の処理場1、処理場2(図2の処理場P2とする)、処理場3が示され、各処理場の鉱石積み下ろし場所に1つの無線アクセスポイントが設定されている。無線アクセスポイントは1つの処理場に複数個所あっても良いが、各無線アクセスポイントには異なるIDが付与される。図3では、処理場1の無線アクセスポイントにID「101」が、処理場2の無線アクセスポイントにID「102」が、処理場3の無線アクセスポイントにID「103」がそれぞれ付与されている。各無線アクセスポイントは、処理場外にある事務所内の情報収集装置130に有線ネットワークを介して接続されているが、有線ネットワークに代えて無線ネットワーク構成とされても良い。   Here, the loading and unloading wireless access point will be described with reference to FIG. In FIG. 3, a plurality of treatment plants 1, a treatment plant 2 (referred to as a treatment plant P2 in FIG. 2), and a treatment plant 3 are shown as treatment plants, and one wireless access point is set at the ore loading / unloading location of each treatment plant. ing. There may be a plurality of wireless access points in one processing place, but a different ID is assigned to each wireless access point. In FIG. 3, ID “101” is assigned to the wireless access point of the processing place 1, ID “102” is assigned to the wireless access point of the processing place 2, and ID “103” is assigned to the wireless access point of the processing place 3. . Each wireless access point is connected to the information collecting apparatus 130 in the office outside the processing site via a wired network, but may be configured as a wireless network instead of the wired network.

運搬用重機120’の無線通信機123’は、前述した採鉱用重機の自動認識と同様の方法で、積み下ろし先の無線アクセスポイントのIDを自動認識する。この認識も、前述したように、運搬用重機120’の運転者により手動で指定されても良いし、各無線アクセスポイントからの位置情報とGPSによる自己の位置情報とに基づいてもっとも近接した無線アクセスポイントを自動認識するようにしても良い。認識された無線アクセスポイントのIDは運搬情報取得手段121’において運搬先情報として取得される。   The wireless communication device 123 ′ of the transport heavy machine 120 ′ automatically recognizes the ID of the loading and unloading wireless access point in the same manner as the automatic recognition of the mining heavy equipment described above. As described above, this recognition may also be manually designated by the driver of the transporting heavy machine 120 ', or the closest wireless based on the positional information from each wireless access point and its own positional information by GPS. The access point may be automatically recognized. The ID of the recognized wireless access point is acquired as the transport destination information in the transport information acquiring means 121 '.

いずれにしても、処理場P2での鉱石の積み下ろし開始時に、運搬用重機120’は、採鉱場所P1で収集した採鉱作業情報に、処理場P2で追加取得した運搬情報を加えたトータル採鉱作業情報を処理場P2の無線アクセスポイント(ID「102」)を経由して情報収集装置130に送信する。鉱石の積み下ろし開始は運搬用重機120’にて手動もしくは自動で認識される。積み下ろし作業が行われる処理場P2と情報収集装置130の間には有線または無線による固定的なネットワークが構成されており、情報の通信が可能となっている。   In any case, at the start of unloading of the ore at the treatment plant P2, the transporting heavy machine 120 ′ adds the transportation information additionally acquired at the treatment plant P2 to the mining operation information collected at the mining site P1. Is transmitted to the information collecting apparatus 130 via the wireless access point (ID “102”) of the processing place P2. The start of unloading of the ore is recognized manually or automatically by the transporting heavy machine 120 '. A fixed wired or wireless network is configured between the processing site P2 where the loading and unloading work is performed and the information collecting apparatus 130, and information communication is possible.

このような形で鉱石の積み下ろしが行われる度に、該当する鉱石の採鉱作業情報、処理場に関する情報が収集される。これらの採鉱作業情報、処理場に関する情報を、事務所内あるいは事務所から離れオンラインで結ばれている管理センターで管理することにより、採鉱作業の管理及び見直しを短い時間スパンで実現することが可能となる。   Every time ore is loaded and unloaded in this way, information on the mining work and information on the treatment plant is collected. Management and review of mining operations can be realized in a short time span by managing these mining operation information and information on treatment plants in the office or at a management center that is connected online away from the office. Become.

本発明は、鉱山における採鉱作業情報の収集、管理といった用途に適用できる。   The present invention can be applied to uses such as collection and management of mining work information in a mine.

図1は、本発明による採鉱作業情報収集システムの実施形態を示す構成図である。FIG. 1 is a configuration diagram showing an embodiment of a mining work information collection system according to the present invention. 図2は、本発明による採鉱作業情報収集システムの具体的な実施例を示す構成図である。FIG. 2 is a block diagram showing a specific embodiment of the mining work information collection system according to the present invention. 図3は、運搬用重機と鉱石の処理場及び情報収集装置との関係を説明するための図である。FIG. 3 is a diagram for explaining the relationship between the heavy transport equipment, the ore processing plant, and the information collection device.

符号の説明Explanation of symbols

P1 採鉱場所
P2 処理場
10、110 採鉱用重機
20、20’、120、120’ 運搬用重機
30、130 情報収集装置
P1 Mining site P2 Processing plant 10,110 Heavy machinery for mining 20,20 ', 120,120' Heavy machinery for transportation 30,130 Information collecting device

Claims (9)

採鉱場所に配置され採鉱に関する採鉱情報を取得する採鉱情報取得手段と、
前記採鉱場所に配置され前記採鉱情報取得手段で取得された前記採鉱情報を無線にて送信する採鉱情報送信手段と、
前記採鉱場所で採鉱された鉱石を積み込んで前記採鉱場所から離れた処理場へ運搬する運搬用機器に備えられ運搬に関する運搬情報を取得する運搬情報取得手段と、
前記運搬用機器に備えられ前記採鉱情報送信手段から送信された前記採鉱情報を受信する採鉱情報受信手段と、
前記運搬用機器に備えられ前記運搬情報取得手段で取得された前記運搬情報及び前記採鉱情報受信手段で受信された前記採鉱情報とを採鉱作業情報として蓄積する蓄積手段と、
前記運搬用機器に備えられ前記蓄積手段に蓄積されている前記採鉱作業情報を無線にて送信する採鉱作業情報送信手段とを含み、
該採鉱作業情報送信手段から送信された前記採鉱作業情報を前記処理場内または処理場外に配置された情報収集装置で受信するようにしたことを特徴とする採鉱作業情報収集システム。
Mining information acquisition means arranged at the mining site to acquire mining information about mining,
Mining information transmitting means for wirelessly transmitting the mining information arranged at the mining place and acquired by the mining information acquiring means;
A transport information acquisition means for acquiring transport information related to transport provided in a transport device for loading ore mined at the mining site and transporting the ore to a treatment plant remote from the mining site;
Mining information receiving means for receiving the mining information transmitted from the mining information transmitting means provided in the transporting device;
An accumulating means for accumulating as the mining work information the transport information provided in the transport equipment and acquired by the transport information acquiring means and the mining information received by the mining information receiving means;
Including a mining work information transmitting means for wirelessly transmitting the mining work information stored in the storage means provided in the transporting equipment,
A mining work information collecting system, wherein the mining work information transmitted from the mining work information transmitting means is received by an information collecting device arranged inside or outside the processing site.
前記採鉱情報取得手段及び採鉱情報送信手段は前記採鉱場所で採鉱を行う採鉱用機器に備えられ、
該採鉱用機器から前記運搬用機器への鉱石の積込作業の際に前記採鉱情報送信手段から前記採鉱情報受信手段へ前記採鉱情報が送信されることを特徴とする請求項1に記載の採鉱作業情報収集システム。
The mining information acquisition means and the mining information transmission means are provided in mining equipment for mining at the mining site,
2. The mining information according to claim 1, wherein the mining information is transmitted from the mining information transmitting unit to the mining information receiving unit when loading ore from the mining device to the transporting device. Work information collection system.
前記採鉱情報取得手段は前記採鉱情報として少なくとも採鉱位置、採鉱時刻、採鉱担当者名、採鉱重機ID、採鉱量を取得する一方、前記運搬情報取得手段は前記運搬情報として少なくとも運搬開始/終了位置、運搬開始/終了時刻、運搬担当者名、運搬重機ID、運搬量を取得することを特徴とする請求項2に記載の採鉱作業情報収集システム。   The mining information acquisition means acquires at least a mining position, mining time, mining person name, mining heavy equipment ID, and mining amount as the mining information, while the transport information acquisition means at least a transport start / end position as the transport information, 3. The mining work information collection system according to claim 2, wherein the transportation start / end time, the name of the person in charge of transportation, the heavy equipment ID, and the transportation amount are acquired. 前記運搬情報取得手段は、前記鉱石の積込作業に際して前記運搬開始位置、運搬開始時刻、運搬担当者名、運搬重機ID、運搬量を取得し、前記処理場において前記運搬終了位置、運搬終了時刻に加えてさらに運搬先情報を追加取得し、
前記採鉱情報送信手段は前記処理場での鉱石の積み下ろしに際して前記蓄積手段に蓄積されている前記採鉱作業情報に前記追加取得した運搬情報を合わせてトータル採鉱作業情報として送信することを特徴とする請求項2または3に記載の採鉱作業情報収集システム。
The transport information acquisition means acquires the transport start position, transport start time, transport personnel name, transport heavy machine ID, transport amount during the loading operation of the ore, and the transport end position, transport end time at the treatment plant. In addition to obtaining additional shipping destination information,
The mining information transmitting means transmits the additional acquired transport information together with the mining work information stored in the accumulating means when the ore is loaded and unloaded at the treatment plant, and transmits the information as total mining work information. Item 4. The mining operation information collection system according to item 2 or 3.
前記採鉱情報取得手段は前記採鉱位置、採鉱時刻を取得するためにGPSを含み、前記運搬情報取得手段も前記運搬開始/終了位置、運搬開始/終了時刻を取得するために別のGPSを含むことを特徴とする請求項2〜4のいずれかに記載の採鉱作業情報収集システム。   The mining information acquisition means includes a GPS for acquiring the mining position and mining time, and the transport information acquisition means also includes another GPS for acquiring the transport start / end position and transport start / end time. The mining work information collection system according to any one of claims 2 to 4. 前記採鉱場所から離れた処理場が複数設定されると共に、各処理場には異なるIDを付与された少なくとも1つの無線アクセスポイントが鉱石の積み下ろし場所に設定され、
これら複数の無線アクセスポイントと前記情報収集装置との間が有線または無線ネットワークで接続され、
前記運搬用機器は、鉱石の積み下ろし場所における前記無線アクセスポイントのIDを認識しこれを前記運搬情報取得手段にて前記搬送先情報として取得し、当該無線アクセスポイント経由で前記情報収集装置へ前記トータル採鉱作業情報を送信することを特徴とする請求項4に記載の採鉱作業情報収集システム。
A plurality of treatment plants away from the mining site are set, and at least one wireless access point assigned with a different ID is set as an ore loading / unloading site,
The plurality of wireless access points and the information collection device are connected by a wired or wireless network,
The transport device recognizes the ID of the wireless access point at the ore loading / unloading location, acquires the ID as the transport destination information by the transport information acquisition means, and transmits the total to the information collection device via the wireless access point. The mining work information collection system according to claim 4, wherein the mining work information is transmitted.
採鉱場所に配置された採鉱用機器において採鉱に関する採鉱情報を取得する第1のステップと、
前記第1のステップで取得された前記採鉱情報を無線にて送信する第2のステップと、
前記採鉱場所で採鉱された鉱石を積み込んで前記採鉱場所から離れた処理場へ運搬する運搬用機器において運搬に関する運搬情報を取得する第3のステップと、
前記運搬用機器において前記第2のステップで送信された前記採鉱情報を受信する第4のステップと、
前記運搬用機器において前記第3のステップで取得された前記運搬情報及び前記第4のステップで受信された前記採鉱情報とを採鉱作業情報として蓄積手段に蓄積する第5のステップと、
前記運搬用機器において前記蓄積手段に蓄積されている前記採鉱作業情報を前記処理場で無線にて送信する第6のステップとを含み、
該第6のステップで送信された前記採鉱作業情報を前記処理場内または処理場外に配置された情報収集装置で受信するようにしたことを特徴とする採鉱作業情報収集方法。
A first step of obtaining mining information relating to mining at a mining device located at the mining site;
A second step of wirelessly transmitting the mining information acquired in the first step;
A third step of acquiring transport information relating to transport in a transporting device that loads ore mined at the mining site and transports the ore to a treatment plant remote from the mining site;
A fourth step of receiving the mining information transmitted in the second step in the transporting device;
A fifth step of accumulating in the accumulating means the mining information received in the fourth step and the mining information received in the fourth step in the transporting device;
A sixth step of wirelessly transmitting the mining work information stored in the storage means in the transporting equipment at the processing site,
The mining work information collecting method, wherein the mining work information transmitted in the sixth step is received by an information collecting device arranged inside or outside the treatment plant.
前記採鉱情報は少なくとも採鉱位置、採鉱時刻、採鉱担当者名、採鉱重機ID、採鉱量を含む一方、前記運搬情報は少なくとも運搬開始/終了位置、運搬開始/終了時刻、運搬担当者名、運搬重機ID、運搬量を含み、
前記採鉱用機器から前記運搬用機器への鉱石の積込作業の際に前記第2のステップが実行されることを特徴とする請求項7に記載の採鉱作業情報収集方法。
The mining information includes at least mining position, mining time, mining person name, mining heavy equipment ID, and mining amount, while the transportation information includes at least transport start / end position, transport start / end time, transport person name, transport heavy equipment. Including ID, transport amount,
The mining work information collecting method according to claim 7, wherein the second step is executed when ore is loaded from the mining equipment to the transport equipment.
前記鉱石の積込作業に際して前記運搬開始位置、運搬開始時刻、運搬担当者名、運搬重機ID、運搬量を取得し、前記処理場において前記運搬終了位置、運搬終了時刻に加えてさらに運搬先情報を追加取得し、
前記処理場での鉱石の積み下ろしに際して前記蓄積手段に蓄積されている前記採鉱作業情報に前記追加取得した運搬情報を合わせてトータル採鉱作業情報として送信することを特徴とする請求項8に記載の採鉱作業情報収集方法。
Acquire the transport start position, transport start time, transport personnel name, transport heavy machine ID, transport amount at the time of loading the ore, and further transport destination information in addition to the transport end position and transport end time at the treatment plant Get additional
The mining according to claim 8, wherein when the ore is unloaded at the treatment plant, the additional acquired transport information is combined with the mining work information stored in the storage means and transmitted as total mining work information. Work information collection method.
JP2006297725A 2006-11-01 2006-11-01 Mining work information collection system and collection method Active JP4678360B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006297725A JP4678360B2 (en) 2006-11-01 2006-11-01 Mining work information collection system and collection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006297725A JP4678360B2 (en) 2006-11-01 2006-11-01 Mining work information collection system and collection method

Publications (2)

Publication Number Publication Date
JP2008115554A true JP2008115554A (en) 2008-05-22
JP4678360B2 JP4678360B2 (en) 2011-04-27

Family

ID=39501724

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006297725A Active JP4678360B2 (en) 2006-11-01 2006-11-01 Mining work information collection system and collection method

Country Status (1)

Country Link
JP (1) JP4678360B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011139186A (en) * 2009-12-28 2011-07-14 Hitachi Ltd Wireless data transport apparatus and wireless data transport system
JP2013221309A (en) * 2012-04-16 2013-10-28 Hitachi Constr Mach Co Ltd Operation management system
JP2021038607A (en) * 2019-09-05 2021-03-11 株式会社小松製作所 Measurement system and measurement method
CN113610451A (en) * 2021-06-22 2021-11-05 陕西同力重工股份有限公司 Method, device and system for managing surface mine vehicles by using electronic fence

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000204872A (en) * 1999-01-11 2000-07-25 Mitsubishi Materials Corp Mining method
JP2006148290A (en) * 2004-11-17 2006-06-08 Komatsu Ltd Vehicle information collection system and method of collecting vehicle information

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000204872A (en) * 1999-01-11 2000-07-25 Mitsubishi Materials Corp Mining method
JP2006148290A (en) * 2004-11-17 2006-06-08 Komatsu Ltd Vehicle information collection system and method of collecting vehicle information

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011139186A (en) * 2009-12-28 2011-07-14 Hitachi Ltd Wireless data transport apparatus and wireless data transport system
US8649730B2 (en) 2009-12-28 2014-02-11 Hitachi, Ltd. Wireless data transport apparatus and wireless data transport system
JP2013221309A (en) * 2012-04-16 2013-10-28 Hitachi Constr Mach Co Ltd Operation management system
JP2021038607A (en) * 2019-09-05 2021-03-11 株式会社小松製作所 Measurement system and measurement method
WO2021044914A1 (en) * 2019-09-05 2021-03-11 株式会社小松製作所 Measurement system and measurement method
CN113610451A (en) * 2021-06-22 2021-11-05 陕西同力重工股份有限公司 Method, device and system for managing surface mine vehicles by using electronic fence
CN113610451B (en) * 2021-06-22 2023-10-20 陕西同力重工股份有限公司 Method, device and system for managing surface mine vehicles by using electronic fence

Also Published As

Publication number Publication date
JP4678360B2 (en) 2011-04-27

Similar Documents

Publication Publication Date Title
JP5973676B2 (en) Construction management system
JP6199449B2 (en) Construction management system
JP2007204176A (en) Warehouse management device
JP4678360B2 (en) Mining work information collection system and collection method
CN108699812B (en) Construction machine, portable information terminal for acquiring work data from construction machine, information communication system for construction machine, and program installed on portable information terminal
US7949612B2 (en) Method and load input device for optimizing log truck productivity
JP2010244247A (en) Delivery results collection system and vehicle allocation plan preparation method
JP5520448B2 (en) Container transport truck operation management system
CN109308595A (en) A kind of turnover box tracking system, method and device and terminal and storage medium based on walking robot
JP6149894B2 (en) Position information processing apparatus and program, position information processing system, and position information processing method
JP2011139186A (en) Wireless data transport apparatus and wireless data transport system
JP2018188312A (en) Physical distribution base management device, physical distribution base management system, physical distribution base management method and program
JP3904967B2 (en) Chassis management system, chassis management server, computer-readable recording medium storing program, and program
US20160292619A1 (en) System for Tracking Hauling Operations
JP2007153545A (en) Container management system
KR102059514B1 (en) Mine Navigation System and Method Based on Beacon
JP6701872B2 (en) Temperature control system and slave
JP4272202B2 (en) Computer-readable recording medium and program recording tractor mounting system and program
CN113703403B (en) Tool car management system, method and storage medium
JP2004131225A (en) Refuse disposal station control system
JP2010196315A (en) Method for measuring cycle time in tunnel construction
JP4563148B2 (en) Vehicle information collection system and vehicle information collection method
JP2020061092A (en) Scrap collection vehicle allocation plan support system and method
JP2004231387A (en) Industrial waste proper treatment monitoring system
EP4210358A1 (en) A connected system for tracking of tagged objects

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100901

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101029

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20101115

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20101115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110105

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110118

R150 Certificate of patent or registration of utility model

Ref document number: 4678360

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140210

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250