JP2002157301A - System for preparing construction schedule and its recording medium - Google Patents

System for preparing construction schedule and its recording medium

Info

Publication number
JP2002157301A
JP2002157301A JP2000354618A JP2000354618A JP2002157301A JP 2002157301 A JP2002157301 A JP 2002157301A JP 2000354618 A JP2000354618 A JP 2000354618A JP 2000354618 A JP2000354618 A JP 2000354618A JP 2002157301 A JP2002157301 A JP 2002157301A
Authority
JP
Japan
Prior art keywords
screen
construction process
house
construction
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000354618A
Other languages
Japanese (ja)
Inventor
Shinichi Sakiyama
真一 崎山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2000354618A priority Critical patent/JP2002157301A/en
Publication of JP2002157301A publication Critical patent/JP2002157301A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a system for preparing a construction schedule whose operability and expressive power are made satisfactory by using a personal computer and its recording medium. SOLUTION: In this system for preparing a construction schedule, the attribute information of an individual house and the result information of a construction schedule accumulated in a recording medium of a host computer 40 is distributed through a telephone line to personal computers 10 and 11 so that schedule can be prepared on the screens of the personal computers 10 and 11. This construction schedule preparing system comprises a step for selecting the pertinent house, month, and schedule divisions on the screens of the personal computers 10 and 11, a step for displaying the attribute information of the pertinent house, and for preparing a construction schedule, a step for selecting a group in charge of the construction schedule of the pertinent house, and a step for changing and confirming the attribute information of the pertinent house.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、分散して建築され
る建築邸の工事工程計画の作成システム及びその記録媒
体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for creating a construction process plan of a building house constructed in a distributed manner and a recording medium therefor.

【0002】[0002]

【従来の技術】従来、特開平7−229294号公報に
作業現場の工事進捗を管理する建築現場作業管理システ
ムが記載されている。上記公報記載では、建築現場に設
置され、電話回線に接続される情報リーダ装置を有する
端末機と、建築現場に用意され、作業情報に対応した情
報コードが付与された情報コード媒体と、管理部所に設
置され、電話回線を通じて前記端末機と接続されるとと
もに、前記作業情報をデーターベースに保持するホスト
コンピュータとを備え、建築現場の作業者が作業進捗状
況を前記情報コード媒体の中から選択し、その選択した
作業項目に付された情報コードを前記情報リーダ装置に
よって読み取らせ、電話回線を通じて前記ホストコンピ
ュータに送出することにより、この送られてきた作業情
報に基づいて前記ホストコンピュータにより建築現場の
作業進捗状況を管理するようになされている。
2. Description of the Related Art Conventionally, a construction site work management system for managing the progress of construction work at a work site is described in Japanese Patent Application Laid-Open No. 7-229294. In the above publication, a terminal having an information reader device installed at a building site and connected to a telephone line, an information code medium prepared at the building site and provided with an information code corresponding to work information, and a management unit And a host computer connected to the terminal through a telephone line and holding the work information in a database, and a construction site worker selects a work progress status from the information code medium. Then, the information code attached to the selected work item is read by the information reader device and transmitted to the host computer via a telephone line. The work progress is managed.

【0003】[0003]

【発明が解決しようとする課題】上記公報記載の様に、
現場作業者全員にバーコード付個人カードを配布し、ま
た個別の建築邸にはバーコードブックとバーコードリー
ダ付電話端末機を設置し、作業者の入退邸の情報や作業
進捗状況を入力することで、リアルタイムに現場の進捗
状況を把握できるようになされている。
As described in the above publication,
A personal card with a barcode is distributed to all site workers, and a barcode book and a telephone terminal with a barcode reader are installed in individual building houses, and information on worker entry / exit and work progress is input. By doing so, it is possible to grasp the progress of the site in real time.

【0004】しかしながら、計画表示がバーチャート式
に表示し、直接表示画面で計画の修正ができないといっ
た問題があった。更に、従来の工事工程表では、画面よ
りおおきく一覧表示でき、画面表示では、工程表の一部
しかみることができず、複数の画面で表示しなければな
らず、計画入力、画面参照において操作性、画面表示の
表現力に劣っているといった問題があった。
[0004] However, there has been a problem that the plan display is displayed in the form of a bar chart, and the plan cannot be corrected on the direct display screen. Furthermore, in the conventional construction process schedule, a large list can be displayed from the screen, and in the screen display, only a part of the process schedule can be seen, and it must be displayed on multiple screens. However, there is a problem that the display performance is poor.

【0005】本発明は、上記のこのような問題点に着眼
してなされたものであり、その目的は、パソコンを用い
て操作性、表現力のよい工事工程計画の作成システム及
びその記録媒体を提供するものである。
The present invention has been made in view of the above-mentioned problems, and an object of the present invention is to provide a system for creating a construction process plan having good operability and expressiveness using a personal computer, and a recording medium therefor. To provide.

【0006】[0006]

【課題を解決するための手段】請求項1記載の本発明の
工事工程計画の作成システムは、ホストコンピュータの
記録媒体に蓄積した個別邸の属性情報、工事工程の実績
情報とを電話回線を通じてパソコンに配信され、該パソ
コンの画面で工程計画を作成する工事工程計画の作成シ
ステムであって、前記工事工程の作成システムは、前記
パソコン画面上に該当する邸、月、工程区分を選択する
ステップと、該当する邸の属性情報を表示し、工事工程
を作成するステップと、該当する邸の工事工程を担当す
るグループを選択するステップと、該当する邸の属性情
報を変更し、確認するステップとからなるものである。
According to a first aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein personal property information and construction process result information stored in a recording medium of a host computer are transmitted to a personal computer through a telephone line. A construction process plan creation system for creating a process plan on the screen of the personal computer, wherein the construction process creation system includes a step of selecting a house, a month, and a process category on the personal computer screen. , Displaying the attribute information of the house, creating a construction process, selecting a group in charge of the construction process of the house, and changing and confirming the attribute information of the house. It becomes.

【0007】請求項2記載の本発明の工事工程計画の作
成システムは、前記該当する邸、月、工程区分を選択す
るステップの計画開始画面において、該当する邸が事業
所全体、担当グループ、担当外注業者単位で選択され、
計画作成が主要工事管理日で選択され、作成区分が全体
工程、据付前工程、据付後工程で選択できるものであ
る。
According to a second aspect of the present invention, in the construction process planning system according to the present invention, on the plan start screen of the step of selecting the pertinent house, month, and process division, the pertinent house is the entire office, the responsible group, and the responsible person. Selected on a subcontractor basis,
The plan creation is selected on the main construction management date, and the creation category can be selected for the whole process, pre-installation process, and post-installation process.

【0008】請求項3記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面の工程表示画面において、計画と実績がバーチャ
ート式に対比して表示され、該画面上で直接計画値を変
更できるものである。
According to a third aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein a plan and an actual result are displayed on a process display screen of a main screen of the step of creating the construction process in comparison with a bar chart system. The plan values can be changed directly on the screen.

【0009】請求項4記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面の工程表示画面が、水平、垂直に画面内の情報が
スクロールし工程表が一覧表示できるものである。
According to a fourth aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein a process display screen of a main screen of the step of creating the construction process includes a horizontal and vertical scrolling of information in the screen and a list of process schedules. It can be displayed.

【0010】請求項5記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面において、表示するパソコン画面を邸情報表示画
面と工程表示画面とに左右に分割し、左右の画面がマウ
ス操作で拡大縮小できるようになされているものであ
る。
According to a fifth aspect of the present invention, a construction process plan creating system according to the present invention divides a personal computer screen to be displayed into a house information display screen and a process display screen on the main screen of the step of creating the construction process. The left and right screens can be enlarged or reduced by mouse operation.

【0011】請求項6記載の本発明の工事工程計画の作
成システムは、前記該当する邸の工事工程を担当するグ
ループを選択するステップのグループ選択画面が設けら
れ、該グループ選択画面が、前記工程表示画面を開いた
状態で表示できるものである。
According to a sixth aspect of the present invention, there is provided the construction process planning system according to the present invention, wherein a group selection screen for selecting a group in charge of the construction process of the pertinent house is provided. It can be displayed with the display screen open.

【0012】請求項7記載の本発明の工事工程計画の作
成システムは、前記工事工程の作成システムがそのコン
ピュータプログラムを記録した記録媒体を用いて作成さ
れているものである。
According to a seventh aspect of the present invention, there is provided a construction process creation system according to the present invention, wherein the construction process creation system is created using a recording medium on which a computer program is recorded.

【0013】[0013]

【作用】請求項1記載の本発明の工事工程計画の作成シ
ステムは、前記工事工程の作成システムは、前記パソコ
ン画面上に該当する邸、月、工程区分を選択するステッ
プと、該当する邸の属性情報を表示し、工事工程を作成
するステップと、該当する邸の工事工程を担当するグル
ープを選択するステップと、該当する邸の属性情報を変
更し、確認するステップとからなるので、パソコン画面
上で手書きの工事工程表と同様に見やすく、容易に工事
工程計画を作成することができる。
According to a first aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein the construction process creating system includes a step of selecting a corresponding house, month, and process category on the personal computer screen; Displaying attribute information and creating a construction process, selecting a group responsible for the construction process of the house, and changing and confirming the attribute information of the house. Like the handwritten construction schedule, it is easy to see and the construction schedule can be easily created.

【0014】請求項2記載の本発明の工事工程計画の作
成システムは、前記該当する邸、月、工程区分を選択す
るステップの計画開始画面において、該当する邸が事業
所全体単位、担当グループ単位、担当外注業者単位で選
択され、計画作成が主要工事管理日で選択され、作成区
分が全体工程、据付前工程、据付後工程で選択できるの
で、該当する邸を全体、グループ単位、業者単位に分類
して表示でき、更に、現場管理の分かれる建築職種の工
事工程を外部工事、建物本体工事、内部造作工事等に整
理して画面表示でき、使い勝手のよい表示画面とするこ
とができる。
According to a second aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein, in the planning start screen of the step of selecting the corresponding house, month, and process division, the corresponding house is a unit of the whole office and a unit of the responsible group. Outsourcing is selected on a contractor basis basis, planning is selected on the main construction management date, and the preparation category can be selected for the overall process, pre-installation process, and post-installation process. The work can be classified and displayed, and furthermore, the construction process of the architects whose site management is divided can be arranged and displayed on an external work, a building body work, an internal construction work, etc., and the display screen can be used easily.

【0015】請求項3記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面の工程表示画面において、計画と実績がバーチャ
ート式に対比して表示され、該画面上で直接計画値を変
更できるので、工程表示画面のバーチャートを見ながら
計画の修正をマウスの操作で容易に行うことができ、使
い勝手のよい表示画面とすることができる。
According to a third aspect of the present invention, in the construction process planning system according to the present invention, a plan and an actual result are displayed on a process display screen of a main screen of the step of creating the construction process in comparison with a bar chart system. Since the plan value can be changed directly on the screen, the plan can be easily corrected by operating the mouse while looking at the bar chart on the process display screen, and the display screen can be used easily.

【0016】請求項4記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面の工程表示画面が、水平、垂直に画面内の情報が
スクロールし工程表が一覧表示できるので、表示画面を
スクロールすることにより、手書きサイズの大きな一覧
表示と同様な表示ができ、見やすい表示画面とすること
ができる。
According to a fourth aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein a process display screen of a main screen of the step of creating the construction process includes a horizontal and vertical scrolling of information in the screen and a list of process schedules. Since the display can be performed, by scrolling the display screen, a display similar to a list display with a large handwritten size can be performed, and the display screen can be easily viewed.

【0017】請求項5記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面において、表示するパソコン画面を邸情報表示画
面と工程表示画面とに左右に分割し、左右の画面がマウ
ス操作で拡大縮小できるようになされているので、参照
しない画面を小さくし、見たい画面を大きくして画面表
示を自在に変えて、見やすい画面表示とすることができ
る。
According to a fifth aspect of the present invention, in the construction process planning system according to the present invention, a personal computer screen to be displayed is divided into a house information display screen and a process display screen on the main screen of the step of creating the construction process. Since the left and right screens can be enlarged or reduced by a mouse operation, the screen not to be referred to can be made smaller, the screen to be viewed can be enlarged, and the screen display can be freely changed, so that the screen display can be easily viewed.

【0018】請求項6記載の本発明の工事工程計画の作
成システムは、前記該当する邸の工事工程を担当するグ
ループを選択するステップのグループ選択画面が設けら
れ、該グループ選択画面が、前記工程表示画面を開いた
状態で表示できるので、工事工程の計画修正をバーチャ
ートを見ながら変更でき、操作性の良い表示画面とする
ことができる。
According to a sixth aspect of the present invention, there is provided the construction process planning system according to the present invention, wherein a group selection screen for selecting a group in charge of the construction process of the pertinent house is provided. Since the display can be displayed with the display screen open, the plan correction of the construction process can be changed while looking at the bar chart, and a display screen with good operability can be obtained.

【0019】請求項7記載の本発明の工事工程計画の作
成システムは、前記工事工程の作成システムがそのコン
ピュータプログラムを記録した記録媒体を用いて作成さ
れているので、邸情報の保存、回線を経由しての受信、
送信を行うことができ、利便性の良い工事工程計画の作
成システム及び記録媒体とすることができる。
In the construction process planning system according to the present invention, since the construction process creation system is created using a recording medium on which the computer program is recorded, the house information can be stored and the line can be saved. Receiving via
Transmission can be performed, and a convenient construction process plan creation system and recording medium can be provided.

【0020】[0020]

【発明の実施の形態】以下に本発明の実施の形態を図面
を参照して説明する。図1(イ)は、本発明の工事工程
計画の作成システムのネットワークを示す説明図、図1
(ロ)は、本発明の工事工程計画の作成システムのハー
ドウエアを示す説明図、図2は、本発明の該当する邸、
月、工程区分を選択するステップの計画開始画面を示す
平面図、図3は、本発明の工事工程を作成するステップ
のメイン画面を示す平面図、図4は、本発明の該当する
邸の工事工程を担当するグループを選択するステップの
グループ選択画面を示す平面図、図5は、本発明の邸情
報変更確認画面を示す平面図、図6は、本発明の日程情
報の変更確認画面を示す平面図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1A is an explanatory diagram showing a network of a construction process plan creation system according to the present invention.
(B) is an explanatory view showing the hardware of the construction process plan creation system of the present invention, and FIG.
FIG. 3 is a plan view showing a plan start screen of a step for selecting a month and a process category, FIG. 3 is a plan view showing a main screen of a step for creating a construction process of the present invention, and FIG. FIG. 5 is a plan view showing a group selection screen of a step of selecting a group in charge of the process, FIG. 5 is a plan view showing a house information change confirmation screen of the present invention, and FIG. 6 is a schedule information change confirmation screen of the present invention. It is a top view.

【0021】図1(イ)に示す様に、本発明の工事工程
計画の作成システムは、ホストコンピュータ40の記録
媒体に蓄積した個別邸の属性情報、工事工程の実績情報
が、電話回線13を通じて、本発明の工事工程計画を作
成するパソコン10、11に配信するようになされてい
る。
As shown in FIG. 1A, the construction process planning system according to the present invention uses the telephone line 13 to transmit the attribute information of the individual house and the performance information of the construction process stored in the recording medium of the host computer 40 through the telephone line 13. The present invention is delivered to the personal computers 10 and 11 for creating the construction process plan of the present invention.

【0022】前記工事工程の作成システムは、前記パソ
コン10、11の画面上で作成できるようになされてい
る。本システムは、パソコンの一般的オペレーティング
システムのウィンドウ上で稼動するように開発されたプ
ログラムからなっている。
The construction process creation system can be created on the screens of the personal computers 10 and 11. The system consists of a program developed to run on the windows of a typical operating system of a personal computer.

【0023】図1(ロ)に示す様に、パソコン10のハ
ードウエアの構成は、本体の制御部101、表示部10
2、入力操作部103、記録媒体104、送受信部10
5等からなり、本システムのプログラムが稼動し、演算
処理、送受信、記録保存できるようになされている。
As shown in FIG. 1B, the hardware configuration of the personal computer 10 includes a control unit 101 and a display unit 10 of the main unit.
2, input operation unit 103, recording medium 104, transmission / reception unit 10
5 and the like, and the program of the present system is operated so that arithmetic processing, transmission / reception, recording and storage can be performed.

【0024】パソコン10は、システム全体の運用管理
をモニターできるようになされている。パソコン11
は、事業所、外注業者事務所等に分散配置されて電話回
線で接続されネットが形成されている。
The personal computer 10 can monitor the operation and management of the entire system. PC 11
Are distributed in offices, subcontractor offices, etc., and connected by telephone lines to form a net.

【0025】該パソコン10、11の画面では、受信し
た前記個別邸の属性情報と工事工程の実績情報とを表示
できるようになされ、更に、工事工程の計画情報を直接
入力し、表示して工程計画を作成できるようになされて
いる。入力方法については後述する。
On the screens of the personal computers 10 and 11, the received attribute information of the individual house and the actual information of the construction process can be displayed, and the plan information of the construction process is directly inputted and displayed. You have been able to create a plan. The input method will be described later.

【0026】パソコン10、11の画面は、該当する
邸、月、工程区分を選択するステップと、該当する邸の
属性情報を表示し、工事工程を作成するステップと、該
当する邸の工事工程を担当するグループを選択するステ
ップと、該当する邸の属性情報を変更し、確認するステ
ップとから画面構成されている。
The screens of the personal computers 10 and 11 display a step of selecting a pertinent house, a month, and a process category, a step of displaying attribute information of the pertinent house, and a step of creating a construction process. The screen is composed of a step of selecting a group to be in charge and a step of changing and confirming attribute information of a corresponding house.

【0027】ホストコンピュータ40は、別個独立した
工程進捗管理システムのサーバーを形成し、分散した個
別邸の建築現場に設置された電話端末機より現場の工事
工程の進捗の実績情報が蓄積され、実績情報は電話回線
を通じてリアルタイムに受信できるようになされてい
る。
The host computer 40 forms a server of a separate and independent process progress management system, and accumulates information on the progress of the on-site construction process from telephone terminals installed at the construction sites of the individual residences dispersed, The information can be received in real time through a telephone line.

【0028】ホストコンピュータ40には、併せて、個
別建築邸の属性情報が蓄積保存されている。本システム
を形成するパソコン10、11は、ホストコンピュータ
40から前記建築邸の属性情報、工事工程の実績情報を
決められた間隔で受信し、パソコン10、11の属性情
報、工事工程の実績情報が更新されている。
The host computer 40 also accumulates and stores attribute information of the individual building. The personal computers 10 and 11 forming the present system receive the attribute information of the architectural house and the performance information of the construction process at predetermined intervals from the host computer 40, and the attribute information of the personal computers 10 and 11 and the performance information of the construction process are received. Has been updated.

【0029】このようにして、ホストコンピュータ40
とパソコン10、11の情報の同期がとられ、常に最新
の情報が共有されている。
Thus, the host computer 40
And the personal computers 10 and 11 are synchronized, and the latest information is always shared.

【0030】図2に示す様に、本発明の工事工程計画の
作成システムは、前記該当する邸、月、工程区分を選択
するステップの計画開始画面14が設けられている。
As shown in FIG. 2, the construction process planning system according to the present invention is provided with a planning start screen 14 for selecting the relevant house, month, and process category.

【0031】計画開始画面14には、選択エリア141
が設けられ、該当する邸が事業所全体、担当グループに
相当する課、担当する業者等の単位で選択できるように
なされている。
The planning start screen 14 includes a selection area 141
Is provided so that the house can be selected in units of the entire business establishment, the section corresponding to the group in charge, the contractor in charge, and the like.

【0032】計画開始画面14の選択エリア142で
は、計画作成が年、月で選択できるようになされてい
る。
In the selection area 142 of the plan start screen 14, a plan can be selected by year and month.

【0033】選択エリア143では、作成基準を主要工
事管理日である据付日、社内検査日、納期等をキーにし
て選択できるようになさている。
In the selection area 143, the creation standard can be selected using the installation date, in-house inspection date, delivery date, etc., which are the main construction management dates, as keys.

【0034】選択エリア144は、工事工程の表示の作
成区分を大きな工程節目に分けて選択きるようになされ
ている。
The selection area 144 is designed so that a section for creating a display of a construction process can be selected by dividing it into large process steps.

【0035】即ち、全体工程、主に据付前の工事工程を
表示する据付前、主に本体工事を表示する据付後工程、
に区分できるようになされている。
That is, before the installation, which indicates the entire process, mainly the construction process before the installation, the post-installation process, which mainly indicates the main body construction,
It has been made to be divided into.

【0036】このようにして多岐にわたる工事工程を工
事工程の管理単位別に分類して表示できるようになされ
ている。
As described above, various construction processes can be classified and displayed according to the management unit of the construction process.

【0037】図3に示す様に、発明の工事工程計画の作
成システムは、前記工事工程を作成するステップのメイ
ン画面15で実行できるようになされている。
As shown in FIG. 3, the construction process planning system of the present invention can be executed on the main screen 15 of the step of creating the construction process.

【0038】メイン画面15は、画面上部には、表示処
理を実行選択できるメニューバー151が設けられ、印
刷処理、邸の並べ替え、作業終了等の処理を実行できる
ようになされている。
The main screen 15 is provided with a menu bar 151 at the upper part of the screen, from which a display process can be selected. The menu bar 151 can execute processes such as a print process, a rearrangement of houses, and an end of work.

【0039】メニューバー151の下に職種の選択ボタ
ンが配列されたツールバー152が設けられ、該当する
職種が表示選択できるようになされている。
Below the menu bar 151, there is provided a toolbar 152 in which occupation type selection buttons are arranged, so that the corresponding occupation type can be displayed and selected.

【0040】職種選択ボタンは、解体工事、基礎工事、
据付工事、木工工事、クロス工事等を解体、基礎、据
付、木工、クロスと略称表示した選択ボタンで任意に選
択できるようになされている。
The job type selection buttons are used for demolition work, foundation work,
Installation work, woodwork, cross work, etc., can be arbitrarily selected with selection buttons abbreviated as demolition, foundation, installation, woodwork, and cloth.

【0041】画面中央部は、左右に画面分割されて、邸
情報画面153と、工程表示画面154とが設けられて
いる。
The screen center is divided into left and right screens, and a house information screen 153 and a process display screen 154 are provided.

【0042】邸情報画面153は、画面左側に表示さ
れ、該当邸の主要な属性情報、関連する工事情報が複数
邸表示できるようになされている。
The house information screen 153 is displayed on the left side of the screen, and the main attribute information of the house and related construction information can be displayed in a plurality of houses.

【0043】工程表示画面154は、上部に曜日を横表
示したカレンダーが設けられ、カレンダーに沿って、略
号表示された工事工程がバーチャート式に表示されてい
る。
The process display screen 154 is provided with a calendar in which the day of the week is displayed horizontally at the top, and the construction process indicated by the symbol is displayed in a bar chart manner along the calendar.

【0044】バーチャート表示は、上段に計画値を下段
に実績値が表示できるようになされ、計画と実績が対比
して見られるように表示されている。
The bar chart is displayed so that the planned value is displayed in the upper part and the actual value is displayed in the lower part, so that the plan and the actual value can be compared with each other.

【0045】表示は、職種工事名称を略号化した記号を
行表示できるようし、たとえば、大工工事は、Dの文字
を日単位に行配列して表示している。
In the display, symbols abbreviations of the occupation type construction names can be displayed in rows. For example, in the case of carpentry construction, the letter D is displayed in a line arrangement on a day basis.

【0046】又、投入人員が複数の際にはD3(3名の
大工さん)のように人数表示されている。
When there are a plurality of input personnel, the number is displayed as D3 (three carpenters).

【0047】バーチャートの計画表示は、計画を直接修
正できるようになされている。計画の修正作業は、計画
表示の端をカーソルヒットし、マウスのドラッグ操作で
移動しながら修正できるようになされている。
The plan display of the bar chart allows the plan to be directly modified. In the plan modification work, the end of the plan display is hit by a cursor, and the plan can be modified while being moved by a mouse drag operation.

【0048】工程表示画面154は、水平、垂直に画面
内の情報がスクロールし工程表が一覧表示できるように
なされている。画面スクロールは、縦方向、横方向に移
動でき限られた画面で全体の工程情報を確認表示できる
ようになされている。
The process display screen 154 is arranged so that information in the screen can be scrolled horizontally and vertically to display a list of process charts. Screen scrolling is performed so that the entire process information can be confirmed and displayed on a limited screen that can be moved vertically and horizontally.

【0049】工程表示画面154と邸情報画面153と
は、左右に画面分割できるようになされ、左右の工程表
示画面154、邸情報画面153がマウス操作で拡大縮
小できるようになされている。
The process display screen 154 and the house information screen 153 can be divided into left and right screens, and the left and right process display screens 154 and the house information screen 153 can be enlarged or reduced by mouse operation.

【0050】そのため使用中の画面を拡大して表示で
き、使用中の画面を最大に表示して使いやすくなされて
いる。
Therefore, the screen in use can be enlarged and displayed, and the screen in use is displayed at the maximum, thereby facilitating use.

【0051】図4に示す様に、本発明の工事工程計画の
作成システムは、前記該当する邸の工事工程を担当する
グループを選択するステップのグループ選択画面16が
設けられている。
As shown in FIG. 4, the construction process planning system of the present invention is provided with a group selection screen 16 for selecting a group in charge of the construction process of the house.

【0052】図4に示す様に、グループ選択画面16
は、該当邸を担当する職方グループの選択変更ができる
ようになされている。該当工程の着工から完工日が16
1で表示され、162で日数が表示できるようになされ
ている。
As shown in FIG. 4, the group selection screen 16
Is designed so that the selection of the group of staff in charge of the house can be changed. Completion date is 16 from the start of the process
1 is displayed, and the number of days is displayed at 162.

【0053】グループ表示エリア163では、計画立案
中の職種に関係あるグループが一覧表示できるようにな
されている。
In the group display area 163, a list of groups related to the job type for which planning is being made can be displayed.

【0054】又、各グループの計画邸に対する所要工数
が工数表示できるようになされている。所要工数は、邸
属性情報、業者能力実績等から別途記録保存された計算
値情報から算定表示できるようになされている。
The required man-hours for each group's planned house can be displayed. The required man-hours can be calculated and displayed from calculated value information separately recorded and stored based on house attribute information, actual performance of the contractor, and the like.

【0055】図4に示す様に、グループ選択画面16
は、前記メイン画面15の工程表示画面154を開いた
状態で表示できるようになされている。そのため、工程
表示画面154の計画値修正をバーチャートを見ながら
変更でき、操作性の良い画面構成になされている。
As shown in FIG. 4, the group selection screen 16
Can be displayed with the process display screen 154 of the main screen 15 opened. For this reason, the planned value correction on the process display screen 154 can be changed while looking at the bar chart, and the screen configuration has good operability.

【0056】図5は、邸情報に変更確認ができるように
なされている。邸情報の変更確認画面17は、メイン画
面15の邸情報画面153をダブルクリック操作で表示
できるようになされている。邸情報の変更確認画面17
は、邸の属性情報の修正できるようになされている。
FIG. 5 shows that change of house information can be confirmed. The house information change confirmation screen 17 can be displayed by double-clicking the house information screen 153 of the main screen 15. House information change confirmation screen 17
Has been made so that the attribute information of the house can be modified.

【0057】図6は、日程、業者情報が入力、確認でき
るようになされ、顧客からの指定日等、その他特別工事
に日程を入力できるようになされている。
In FIG. 6, the schedule and the trader information can be input and confirmed, and the schedule can be input for other special works such as the date designated by the customer.

【0058】本発明の工事工程計画の作成システムは、
前記工事工程の作成システムがそのコンピュータプログ
ラムを記録した記録媒体を用いて作成されている。
The system for creating a construction process plan according to the present invention comprises:
The construction system creation system is created using a recording medium on which the computer program is recorded.

【0059】前記記録媒体に記録したコンピュータプロ
グラムによって、邸情報の保存、回線を経由しての邸属
性情報、工事工程情報の更新情報の受信、送信を行うこ
とができ、利便性の良い工事工程計画の作成システム及
び記録媒体とすることができる。
The computer program recorded on the recording medium can store house information, receive and transmit house attribute information and update information of construction process information via a line, and provide a convenient construction process. It can be a plan creation system and a recording medium.

【0060】[0060]

【発明の効果】請求項1記載の本発明の工事工程計画の
作成システムは、前記工事工程の作成システムは、前記
パソコン画面上に該当する邸、月、工程区分を選択する
ステップと、該当する邸の属性情報を表示し、工事工程
を作成するステップと、該当する邸の工事工程を担当す
るグループを選択するステップと、該当する邸の属性情
報を変更し、確認するステップとからなるので、パソコ
ン画面上で手書きの工事工程表を同様な見やすく、操作
の容易な工事工程計画を作成することができる。
According to the first aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein the construction process creation system includes a step of selecting a corresponding house, month, and process category on the personal computer screen. It consists of a step of displaying attribute information of the house and creating a construction process, a step of selecting a group in charge of the construction process of the house, and a step of changing and confirming the attribute information of the house. A handwritten construction schedule can be easily viewed on a personal computer screen, and a construction schedule that is easy to operate can be created.

【0061】請求項2記載の本発明の工事工程計画の作
成システムは、前記該当する邸、月、工程区分を選択す
るステップの計画開始画面において、該当する邸を事業
所全体単位、担当グループ単位、担当外注業者単位で選
択するようにし、計画作成表示基準を主要工事項目で選
択し、作成区分を全体工程、据付前工程、据付後工程で
選択できるので、該当する邸を全体、グループ単位、業
者単位に分類して表示でき、更に、現場管理の分かれる
建築職種の工事工程を外部工事、建物本体工事、内部造
作工事等に整理して画面表示でき、使い勝手のよい表示
画面とすることができる。
According to a second aspect of the present invention, in the construction process planning system according to the present invention, in the planning start screen of the step of selecting the pertinent house, month, and process division, the pertinent house is set as a whole office unit and a responsible group unit. , Select the contractor in charge of each subcontractor, select the plan creation display standard in the main construction items, and select the creation category in the overall process, pre-installation process, post-installation process. It can be classified and displayed on a contractor basis, and furthermore, the construction process of construction work divided into site management can be arranged and displayed on external construction, building body construction, internal construction work etc., making it a convenient display screen .

【0062】請求項3記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップの工程
表示画面において、計画と実績をバーチャート式に対比
して表示し、該画面上で直接計画値を変更できるので、
工程表示画面を見ながら計画の修正をマウスの操作で容
易に行うことができ、使い勝手のよい表示画面とするこ
とができる。
According to a third aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein a plan and actual results are displayed in a bar chart type on a process display screen of the step of creating the construction process, and the screen is displayed on the screen. Since you can change the plan value directly,
The plan can be easily modified by operating the mouse while looking at the process display screen, and the display screen can be used easily.

【0063】請求項4記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップの工程
表示画面が、水平、垂直に画面内の情報がスクロールし
工程表が一覧表示できるので、表示画面をスクロールす
ることにより、手書きサイズの大きな一覧表示と同様な
表示ができ、見やすい表示画面とすることができる。
According to the construction process planning system of the present invention, since the process display screen of the step of creating the construction process can horizontally and vertically scroll information in the screen and display a list of process schedules. By scrolling the display screen, a display similar to a list display with a large handwritten size can be performed, and the display screen can be easily viewed.

【0064】請求項5記載の本発明の工事工程計画の作
成システムは、前記工事工程を作成するステップにおい
て、表示するパソコン画面を邸情報表示画面と工程表示
画面とに左右に分割し、左右の画面がマウスの操作で拡
大縮小できるようになされているので、参照しない画面
を小さくし、見たい画面を大きくして画面表示を自在に
変えて、見やすい画面表示とすることができる。
According to a fifth aspect of the present invention, in the construction process creation system according to the present invention, in the step of creating the construction process, the personal computer screen to be displayed is divided into a house information display screen and a process display screen, and the left and right screens are displayed. Since the screen can be enlarged or reduced by operating the mouse, it is possible to reduce the screen not to be referred to, enlarge the screen to be viewed, and freely change the screen display to provide an easy-to-view screen display.

【0065】請求項6記載の本発明の工事工程計画の作
成システムは、前記該当する邸の工事工程を担当するグ
ループを選択するステップのグループ選択画面におい
て、工程計画を担当するグループを選択、表示する画面
が、前記工程表示画面を開いた状態で表示できるので、
工事工程の計画修正をバーチャートを見ながら変更で
き、操作性の良い表示画面とすることができる。
According to a sixth aspect of the present invention, there is provided a construction process planning system according to the present invention, wherein a group in charge of a process plan is selected and displayed on a group selection screen of a step of selecting a group in charge of the construction process of the corresponding house. Screen can be displayed with the process display screen open,
The plan modification of the construction process can be changed while looking at the bar chart, and a display screen with good operability can be provided.

【0066】請求項7記載の本発明の工事工程計画の作
成システムは、前記工事工程の作成システムが記録媒体
を用いて作成しているので、邸情報の保存、回線を経由
しての受信、送信を行うことができる利便性の良い工事
工程計画の作成システム及び記録媒体とすることができ
る。
According to the construction process creation system of the present invention, since the construction process creation system uses a recording medium, it stores house information, receives via a line, It is possible to provide a convenient construction process plan creation system and recording medium capable of performing transmission.

【0067】[0067]

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1(イ)は、本発明の工事工程計画の作成シ
ステムのネットワークを示す説明図、図1(ロ)は、本
発明の工事工程計画の作成システムのハードウエアを示
す説明図である。
FIG. 1A is an explanatory diagram showing a network of a construction process plan creating system according to the present invention, and FIG. 1B is an explanatory diagram showing hardware of a construction process plan creating system according to the present invention. It is.

【図2】本発明の該当する邸、月、工程区分を選択する
ステップの計画開始画面を示す平面図である。
FIG. 2 is a plan view showing a planning start screen of a step of selecting a house, a month, and a process category to which the present invention pertains.

【図3】本発明の工事工程を作成するステップのメイン
画面を示す平面図である。
FIG. 3 is a plan view showing a main screen of a step of creating a construction process according to the present invention.

【図4】本発明の該当する邸の工事工程を担当するグル
ープを選択するステップのグループ選択画面を示す平面
図である。
FIG. 4 is a plan view showing a group selection screen of a step of selecting a group in charge of a construction process of a corresponding house according to the present invention.

【図5】本発明の邸の属性情報を変更し、確認するステ
ップの邸属性情報の変更確認画面を示す平面図である。
FIG. 5 is a plan view showing a house attribute information change confirmation screen in a step of changing and confirming house attribute information of the present invention.

【図6】本発明の本発明の邸の属性情報を変更し、確認
するステップの日程情報の変更確認画面を示す平面図で
ある。
FIG. 6 is a plan view showing a schedule information change confirmation screen of a step of changing and confirming attribute information of a house according to the present invention.

【符号の説明】[Explanation of symbols]

10 パソコン端末 101 制御部 102 表示部 103 入力操作部 104 記録媒体 105 送受信部 11 パソコン端末 12 電話回線 14 計画開始画面 141 選択エリア 142 選択エリア 143 選択エリア 144 選択エリア 15 メイン画面 151 メニュバー 152 ツールバー 153 邸情報画面 154 工程表示画面 16 グループ選択画面 17 邸情報変更確認画面 18 工事情報変更確認画面 40 ホストコンピュータ DESCRIPTION OF SYMBOLS 10 Personal computer terminal 101 Control part 102 Display part 103 Input operation part 104 Recording medium 105 Transmission / reception part 11 Personal computer terminal 12 Telephone line 14 Plan start screen 141 Selection area 142 Selection area 143 Selection area 144 Selection area 15 Main screen 151 Menu bar 152 Tool bar 153 House Information screen 154 Process display screen 16 Group selection screen 17 House information change confirmation screen 18 Construction information change confirmation screen 40 Host computer

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 ホストコンピュータの記録媒体に蓄積し
た個別邸の属性情報、工事工程の実績情報とを電話回線
を通じてパソコンに配信され、該パソコンの画面で工程
計画を作成する工事工程計画の作成システムであって、 前記工事工程の作成システムは、前記パソコン画面上に
該当する邸、月、工程区分を選択するステップと、 該当する邸の属性情報を表示し、工事工程を作成するス
テップと、 該当する邸の工事工程を担当するグループを選択するス
テップと、 該当する邸の属性情報を変更し、確認するステップとか
らなることを特徴とする工事工程計画の作成システム。
1. A construction process plan creation system for distributing attribute information of individual houses and actual information of construction process stored in a recording medium of a host computer to a personal computer through a telephone line, and creating a process plan on a screen of the personal computer. And a step of selecting a corresponding house, month, and process category on the personal computer screen, displaying attribute information of the corresponding house, and creating a construction process. A step of selecting a group in charge of the construction process of the house to be changed, and a step of changing and confirming attribute information of the house to be constructed.
【請求項2】 前記該当する邸、月、工程区分を選択す
るステップの計画開始画面において、該当する邸が事業
所全体、担当グループ、担当外注業者単位で選択され、
計画作成が主要工事管理日で選択され、作成区分が全体
工程、据付前工程、据付後工程で選択できることを特徴
とする請求項1記載の工事工程計画の作成システム。
2. On the planning start screen of the step of selecting the pertinent house, month, and process category, the pertinent house is selected for the whole office, the group in charge, and the subcontractor in charge,
2. The construction process plan creation system according to claim 1, wherein the creation of the plan is selected on the main construction management date, and the creation category can be selected from the entire process, the pre-installation process, and the post-installation process.
【請求項3】 前記工事工程を作成するステップのメイ
ン画面の工程表示画面において、計画と実績がバーチャ
ート式に対比して表示され、該画面上で直接計画値を変
更できることを特徴とする請求項1記載の工事工程計画
の作成システム。
3. A plan display and an actual result are displayed in comparison with a bar chart type on a process display screen of a main screen of a step of creating the construction process, and a plan value can be directly changed on the screen. Item 1. A construction process planning system according to item 1.
【請求項4】 前記工事工程を作成するステップのメイ
ン画面の工程表示画面が、水平、垂直に画面内の情報が
スクロールし工程表が一覧表示できることを特徴とする
請求項1記載の工事工程計画の作成システム。
4. The construction process plan according to claim 1, wherein a process display screen of a main screen of the step of creating the construction process is capable of horizontally and vertically scrolling information in the screen and displaying a list of process schedules. Creation system.
【請求項5】 前記工事工程を作成するステップのメイ
ン画面において、表示するパソコン画面を邸情報表示画
面と工程表示画面とに左右に分割し、左右の画面がマウ
ス操作で拡大縮小できるようになされていることを特徴
とする請求項1記載の工事工程計画の作成システム。
5. In the main screen of the step of creating the construction process, a personal computer screen to be displayed is divided into a house information display screen and a process display screen, and the left and right screens can be enlarged and reduced by mouse operation. 2. The construction process plan creation system according to claim 1, wherein:
【請求項6】 前記該当する邸の工事工程を担当するグ
ループを選択するステップのグループ選択画面が設けら
れ、該グループ選択画面が、前記工程表示画面を開いた
状態で表示できることを特徴とする請求項1記載の工事
工程計画の作成システム。
6. A group selection screen for a step of selecting a group in charge of a construction process of the corresponding house, wherein the group selection screen can be displayed with the process display screen opened. Item 1. A construction process planning system according to item 1.
【請求項7】 前記工事工程の作成システムがそのコン
ピュータプログラムを記録した記録媒体を用いて作成さ
れていることを特徴とする工事工程計画の作成システム
及びその記録媒体。
7. A construction process plan creation system and a recording medium, wherein the construction process creation system is created using a recording medium on which the computer program is recorded.
JP2000354618A 2000-11-21 2000-11-21 System for preparing construction schedule and its recording medium Pending JP2002157301A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000354618A JP2002157301A (en) 2000-11-21 2000-11-21 System for preparing construction schedule and its recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000354618A JP2002157301A (en) 2000-11-21 2000-11-21 System for preparing construction schedule and its recording medium

Publications (1)

Publication Number Publication Date
JP2002157301A true JP2002157301A (en) 2002-05-31

Family

ID=18827172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000354618A Pending JP2002157301A (en) 2000-11-21 2000-11-21 System for preparing construction schedule and its recording medium

Country Status (1)

Country Link
JP (1) JP2002157301A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010097532A (en) * 2008-10-20 2010-04-30 Asahi Kasei Homes Co Craftsman rotation management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010097532A (en) * 2008-10-20 2010-04-30 Asahi Kasei Homes Co Craftsman rotation management system

Similar Documents

Publication Publication Date Title
US6678671B1 (en) System for linking a resource management system with an event of a project in a project management system and a method therefor
US5970466A (en) Graphical computer system and method for appointment scheduling
US7672861B2 (en) Systems, program products, and methods of human resource planning and development
US6289317B1 (en) Task-based classification and analysis system
US8234137B2 (en) One view integrated project management system
US20100268705A1 (en) Database and data access layer
US20040001103A1 (en) Modeling business objects
US20020191035A1 (en) Computerized customizable scheduler
US20060206490A1 (en) Computerized legal case management system incorporating reconciliation feature
AU2011202260A1 (en) A project management method and system
US7752065B2 (en) Digital percent complete process
US20080168113A1 (en) Time blocks and customizable time blocks
US8688596B2 (en) Project activity reporting
US20100017246A1 (en) Software user interface for specification of project task dependencies and deadlines
US20050182698A1 (en) Report generation and distribution system and method for a time and attendance recording system
CA2323268A1 (en) A system for linking a booking of a resource with events of a project and a method therefor
US20140129466A1 (en) Method and system for selecting labour resources
JP2021086281A (en) Work timetable creating system
US20150213397A1 (en) Construction computer software related method and apparatus
JP2002157301A (en) System for preparing construction schedule and its recording medium
US20170255605A1 (en) Annotations and Issue Tracking for Graphical Data
JP3488265B2 (en) Business operation system
JP2007257364A (en) Electronic organization chart processing system, electronic organization chart processing method, and program
US20220051170A1 (en) System and Method for Labor Scheduling and Jobsite Management
JP2002230245A (en) Progress information managing device

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060201

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060323

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060510