EP1971727B1 - Construction of buildings - Google Patents

Construction of buildings Download PDF

Info

Publication number
EP1971727B1
EP1971727B1 EP06821548A EP06821548A EP1971727B1 EP 1971727 B1 EP1971727 B1 EP 1971727B1 EP 06821548 A EP06821548 A EP 06821548A EP 06821548 A EP06821548 A EP 06821548A EP 1971727 B1 EP1971727 B1 EP 1971727B1
Authority
EP
European Patent Office
Prior art keywords
structural
pod
floor
walls
pods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP06821548A
Other languages
German (de)
French (fr)
Other versions
EP1971727A1 (en
Inventor
John Joseph Fleming
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Biomedy Ltd
Original Assignee
Biomedy Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Biomedy Ltd filed Critical Biomedy Ltd
Publication of EP1971727A1 publication Critical patent/EP1971727A1/en
Application granted granted Critical
Publication of EP1971727B1 publication Critical patent/EP1971727B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/3483Elements not integrated in a skeleton the supporting structure consisting of metal

Definitions

  • the invention relates to construction of buildings.
  • US4,107,886 describes a construction method in which building modules are formed into a building by placing a layer of modules with one side wall of each module adjacent but spaced apart from one side wall of a different module. Concrete is poured into the space between the side walls to form a supporting column which is reinforced by bar girders extending out from the side walls. For multi-storey construction, a shoulder or saddle is formed on top of the supporting column for supporting modules to be placed directly above. While this method appears to speed up building construction, there is still considerable on-site work required.
  • US4,050,215 describes a modular construction method for a multi-storey building.
  • U-shaped reinforced concrete modules are placed one atop the other to build up the building height, and at the top level there is a layer of modules having both floors and ceilings. These modules are used to provide the building frame and the remaining construction work is then performed.
  • EP0544609 describes a modular construction method, but gives very little detail about how this is achieved. It appears that a concrete mould is made and the module is then unmoulded.
  • US4833841 describes a prefabricated transportable building module.
  • the invention is directed towards providing for greater efficiency in construction of multi-storey buildings, both in terms of labour required and/or materials required. Another object is to provide a more consistent achievement of building quality. A still further object is to achieve better control of a project, with better predictability of dates for completion of activities. Another object is to reduce the extent of time and materials handling on site. A further object is to reduce construction materials waste.
  • the structural walls are secured by bolting to the top flanges of the floor edge structural members.
  • the trusses each comprise at least two horizontal structural members interconnected by vertical studs.
  • the structural members and studs of the vertical trusses are of box-section steel.
  • each ceiling truss comprises a horizontal bearing plate overlying a wall plate of a structural wall.
  • the bearing plate overlies a vertical stud of the structural wall.
  • the walls comprise non-combustible board cladding on both sides, with insulation such as mineral wool between the claddings.
  • the building pod further comprises a balcony secured to the structural floor.
  • the method comprises the steps of moving the platform from one work position to the next with successive steps being performed to erect the walls and the ceiling.
  • the platform is moved on rollers.
  • the pod is lifted for transport by lifting it from lifting points on the floor.
  • lifting rods are secured to the floor frame and extend to a height greater than the walls, and the pod is lifted by engagement of lifting tackle with the lifting rods.
  • the rods extend upwardly from edge members of the structural floor frame and through the structural walls.
  • the rods engage in sockets between flanges of floor edge structural members.
  • the platform is coated with oil to allow easy separation of the floor concrete from the platform.
  • the structural ceiling is manufactured by placing a number of vertical trusses horizontally across a jig, securing internal cladding to the trusses, and lifting and flipping over the ceiling so that it spans the structural walls.
  • the pods are placed with structural walls aligned so that vertical load is transferred down through the pod structural walls.
  • the method comprises the further step of erecting a stair or elevator core on site over the podium structure, and some pods are placed to butt against the core.
  • the method comprises the further step of embedding a metal plate in a wall of the core, and the floor of a pod butts against said embedded plate.
  • an interface structural member is mounted between the floor and the embedded core plate.
  • the interface structural member has a vertical flange welded to the core plate and a horizontal flange welded to the pod floor.
  • a building is constructed in a method 1 by constructing in a factory a number of modules (or "pods"), transporting them to the site, placing them one atop the other and side-by-side to provide the rooms, and then erecting external cladding and a roof.
  • the pods are complete, with no need for internal work to be performed. Moreover, they provide the building structure, and so there is no need for any structural work to be done on site other than providing a ground-level floor. The extent of work done on site is considerably reduced in comparison with conventional construction methods.
  • FIG. 2 and 3 an individual pod 30 is shown.
  • the main components are a structural floor 31, structural walls 32, and a structural ceiling 33.
  • the floor 31 comprises C-section edge frame structural members 35, poured concrete 36 with enmeshed re-bars 37 moulded in situ within the frame, and bolt fasteners 40 securing wall panels 32 to the floor 31.
  • the wall panels 32 each comprise a structural steel frame cladded on the outside by non-combustible board 45 and on the inside by board 46 and plasterboard 47.
  • the frame comprises a wall plate 60 of angle-section steel, a bottom angle-section 62, and vertical box-section studs 61 at typically 600mm spacings.
  • the structural ceiling 33 comprises multiple vertical trusses 33(a), each having upper and lower horizontal box-section members 50 and vertical box-section steel studs 51 at 300 mm spacings, a bearing plate 52 resting on top of the wall panel 32, and a vertical plate 53 to which the horizontal members 50 and the bearing plate 52 are welded.
  • Fig. 3 The structural aspects of the pod are shown most clearly in Fig. 3 , the non-structural items being omitted for clarity.
  • the ceiling vertical trusses 33(a) terminate at both ends with the vertical plate 53 to which the bearing plates 52 are welded, and this diagram shows how the bearing plates 52 are carefully positioned on the wall panel angle-section wall plate 60 at locations directly over the box-section vertical studs 61.
  • the vertical loading is transferred primarily down through successive bearing plates and wall panel vertical studs 61.
  • This diagram also shows the bottom angle-section members 62 of the wall panels to which the vertical studs 61 are welded. All structural steel is surface treated for corrosion resistance.
  • Fig. 3 also shows a corner vertical stud 70 welded to adjoining vertical studs 61. It also shows an interface plate 71 interconnecting four pods at their corners.
  • the walls illustrated are the external walls of the pod, and these are structural.
  • the pod may contain a number of rooms defined by internal non-structural walls. Indeed, a pod may be a complete apartment or a combined hotel room or suite with integrated bathroom.
  • a platform 80 is movable along a production line on rollers 81. It has a flat planar upper surface and the rollers 81 are carefully positioned so that the top surface of the platform is perfectly horizontal. A film of oil is deposited on the platform top surface.
  • the fabricated floor frame with the edge members 35 is placed by crane onto the platform (or alternatively the floor frame may be fabricated in situ on the platform 80). Re-bar and steel meshes (shown generally as 37) are placed into the frame between the members 35, spacers (not shown) being used to provide a gap between them and the platform surface.
  • a low viscosity Concrete with a low viscosity is poured into the mould formed by the edge frame members 35 until it is flush with the top surfaces of them.
  • sockets 85 are welded into the edge frame members 35 at a mutual spacing chosen according to the estimated final weight of the pod.
  • Lifting rods 87 are subsequently screwed into the sockets 85 at threaded rod ends 86.
  • the lifting rods 87 also have threaded upper ends 88 for subsequent engagement with lifting tackle of a crane.
  • the lifting rods are threaded through the wall panel (there are apertures in the wall plate member 60 and the bottom member 62 to accommodate the rods) to engage into the sockets 85 within the floor frame.
  • Connection of the wall panels to the floor and of the ceiling trusses 33 to the wall panels is shown most clearly in Fig. 3 .
  • overhead gantry cranes are used for lifting and placing the wall panels and ceiling assemblies. This lends itself to a large degree of automation and allow accurate placement of the various assemblies.
  • Fig. 6 shows details of how two pairs of pods are placed alongside each other and atop each other.
  • the wall panels 32 have mineral wool insulation 105. It is clear from this drawing how vertical loads are transferred, directly down via the wall panels 32, the edge floor members 35 and the reinforced concrete of the floor adjacent the members 35.
  • FIG. 7 A plan section is show in Fig. 7 , in which insulation 111 is visible between pods for preventing fire spread and flanking sound transmission.
  • insulation 110 directly on the outside of the external pod wall panels 32. This is applied on site or in the factory.
  • An external stone cladding 112 is tied to the external pod walls.
  • This diagram also shows the vertical angle-section structural member 70 interconnecting adjoining wall panels, vertical strips 116 of non-combustible board within the wall panels, a breathable membrane 115 on the outer surface of the insulation 110, and vertical timber battens 114 between polyisocyanurate/ polyurethane insulation 110 and the fire insulation 111.
  • Fig. 8 also shows how one pod is placed above another at an external wall.
  • This diagram also shows mineral wool cavity barriers 136 and 137 separated by a stone support bracket 139.
  • FIG. 9 An example of pod construction at a window is shown in Fig. 9 .
  • the pod external wall has a layer 150 of insulation applied in the factory, and cladding 155 is tied in place over this on site.
  • the window comprises a conventional window 140 secured in place offset from the wall panel by treated timber battens 157.
  • This drawing also shows a high-density insulation packer piece 156, and an end vertical strip of board 158 forming an internal window reveal.
  • a pod may be provided with a balcony, again manufactured off-site as an integral part of manufacturing a pod.
  • a balcony assembly 200 is secured to an edge floor member 35 via an interface 201 having vertical connector plates 202.
  • the balcony assembly 200 comprises a vertical connector plate 210, horizontal I-beams 211, horizontal angle beams 212, and a peripheral C-shaped member 215 with the flanges extending outwardly. This illustrates versatility of the construction method, and the avoidance of on-site work.
  • a parapet 250 comprises a reinforced concrete slab 260 supporting a vertical parapet having a steel frame 255, inner slab panels 256, external stone cladding 257, and a hand-rail 252.
  • a corridor floor 265 is simply an integral extension of a pod structural floor. It is supported by a pod 30 underneath, and it supports a wall 32.
  • the floor 265 abuts a stair core 270, which was previously cast on site.
  • the stair core comprises cast concrete 271 with embedded re-bars 272, and a side butting plate 278 cast into the side of the concrete 271.
  • An angle-section member 275 is welded to the edge frame member 35 of the floor 265, and is in turn welded to the embedded plate 278. Concrete 276 is cast into the gap between the members 35 and 275.
  • the cast concrete floors provide not only considerable structural strength but also fire and sound insulation.
  • the concrete floor is covered by a soft covering matting, which reduces sound from impacts on the floor.
  • the floors 3 provide an excellent foundation for the wall panels.
  • the structural continuity through the wall panels (particularly the vertical studs), the bearing plates 52, and the floor C-section frame members 35 provide sufficient load-bearing strength to allow up to at least 10 pods to be placed one atop the other for a ten storey building. Because of the structural aspects, the work on site is dramatically reduced as compared to traditional construction methods.
  • Figs. 7 to 9 for example illustrate how simple it is to finish an external cladding of the building, with excellent insulation being provided for the external pods.
  • Figs. 11 and 12 further demonstrate the versatility, as a parapet or balcony can be manufactured off-site, with the option of connecting the balcony to the relevant pod off site or on site if desired.
  • the invention therefore achieves the benefit of factory-production of individual rooms or groups of rooms with completely finished interiors, on a much greater scale than heretofore.
  • the pods are structural and so there is no need for supporting structures to be built on site other than the ground-level floor and a stair and/or elevator core.
  • time for construction on site which is particularly advantageous where access to the site is restricted and there is disruption to adjacent premises, roads, or footpaths.
  • the invention overcomes the perception that one can not provide simultaneously both structural frames and room finishing work.
  • the approach had been to attempt modularity in terms of "drop-in" pods such as bathroom, or pre-cast structural steel or formwork pods - not both together.

Abstract

A building is constructed in a method (1) by constructing in a factory a number of pods, transporting them to the site, placing them one atop the other and side-by-side to provide the rooms, and then erecting external cladding and a roof. The pods are complete, with no need for internal work to be performed. Moreover, they provide the building structure, and so there is no need for any structural work to be done on site other than providing a ground-level floor and a stair or elevator cores. Vertical load is transferred down through load-bearing structural walls (32), primarily through box- section steel vertical studs (61), and also through structural ceiling trusses (33) and structural floors (31). The extent of work done on site is considerably reduced in comparison with conventional construction methods, giving better quality, much reduced construction time, less waste, less disruption to nearby premises or roads or footpaths.

Description

    Field of the Invention
  • The invention relates to construction of buildings.
  • Prior Art Discussion
  • At present, the most common approach to constructing multi-storey buildings such as apartment blocks is to erect a structural frame of reinforced concrete or structural steel and then construct the walls, both internal and external, on site. The interior work such as second fix electrical and plumbing work is completed towards the end of the project.
  • In recent years there has been a trend towards using modules or "pods" for particular rooms, particularly bathrooms and kitchens. This development has reduced the extent of finishing work performed on site, such as second fix plumbing and electrical fittings, tiling, and floor covering. However, considerable care must be taken to ensure co-ordination of the building frame on site and the pods in the factory so that the pods fit in as desired. Any error in construction of the frame in terms of physical dimensions of the supporting floor or external walls or in terms of provision of utility supplies matching those of the pods can be very difficult to rectify.
  • US4,107,886 describes a construction method in which building modules are formed into a building by placing a layer of modules with one side wall of each module adjacent but spaced apart from one side wall of a different module. Concrete is poured into the space between the side walls to form a supporting column which is reinforced by bar girders extending out from the side walls. For multi-storey construction, a shoulder or saddle is formed on top of the supporting column for supporting modules to be placed directly above. While this method appears to speed up building construction, there is still considerable on-site work required.
  • US4,050,215 describes a modular construction method for a multi-storey building. U-shaped reinforced concrete modules are placed one atop the other to build up the building height, and at the top level there is a layer of modules having both floors and ceilings. These modules are used to provide the building frame and the remaining construction work is then performed.
  • EP0544609 describes a modular construction method, but gives very little detail about how this is achieved. It appears that a concrete mould is made and the module is then unmoulded.
  • US3717964 describes a method of making frames for modules of modular buildings.
  • US3925679 describes modular operating centres for use in electric power generating stations.
  • US4833841 describes a prefabricated transportable building module.
  • The invention is directed towards providing for greater efficiency in construction of multi-storey buildings, both in terms of labour required and/or materials required. Another object is to provide a more consistent achievement of building quality. A still further object is to achieve better control of a project, with better predictability of dates for completion of activities. Another object is to reduce the extent of time and materials handling on site. A further object is to reduce construction materials waste.
  • SUMMARY OF TIRE INVENTION
  • According to the invention, there is provided a building pod as set out in claim 1.
  • In one embodiment, the structural walls are secured by bolting to the top flanges of the floor edge structural members.
  • In another embodiment, the trusses each comprise at least two horizontal structural members interconnected by vertical studs.
  • In a further embodiment, the structural members and studs of the vertical trusses are of box-section steel.
  • In one embodiment, each ceiling truss comprises a horizontal bearing plate overlying a wall plate of a structural wall.
  • In another embodiment, the bearing plate overlies a vertical stud of the structural wall.
  • In a further embodiment, the walls comprise non-combustible board cladding on both sides, with insulation such as mineral wool between the claddings.
  • In a further embodiment, the building pod further comprises a balcony secured to the structural floor.
  • In another aspect, there is provided a method of manufacturing any pod as defined above, the method comprising the steps of
    • placing a floor frame on a platform and casting concrete into the frame to provide the structural floor, and
    • securing the structural walls or structural frames of the walls to the structural floor,
    • securing a structural ceiling frame to the structural walls to span and interconnect the structural wall frames,
    • constructing the interior of the pod to substantially complete the structural walls and ceiling to complete a room or rooms with in the pod, and
    • sealing the pod for transport and handling on site.
  • In one embodiment, the method comprises the steps of moving the platform from one work position to the next with successive steps being performed to erect the walls and the ceiling.
  • In another embodiment, the platform is moved on rollers.
  • In a further embodiment, the pod is lifted for transport by lifting it from lifting points on the floor.
  • In one embodiment, lifting rods are secured to the floor frame and extend to a height greater than the walls, and the pod is lifted by engagement of lifting tackle with the lifting rods.
  • In another embodiment, the rods extend upwardly from edge members of the structural floor frame and through the structural walls.
  • In a further embodiment, the rods engage in sockets between flanges of floor edge structural members.
  • In one embodiment, the platform is coated with oil to allow easy separation of the floor concrete from the platform.
  • In another embodiment, the structural ceiling is manufactured by placing a number of vertical trusses horizontally across a jig, securing internal cladding to the trusses, and lifting and flipping over the ceiling so that it spans the structural walls.
  • In another aspect, there is provided a method of constructing a building comprising the steps of:
    • manufacturing a plurality of pods in any method as defined above,
    • transporting the pods to a site where a podium structure or basement has been poured, and lifting and placing the pods to provide a multi-storey self supporting arrangement of the pods, with at least some pods atop lower pods and being supported by said lower pods,
    • erecting an outer wall leaf tied to exposed pod walls,
    • erecting a building roof over the pods, and
    • commissioning services to the pods.
  • In one embodiment, the pods are placed with structural walls aligned so that vertical load is transferred down through the pod structural walls.
  • In another embodiment, the method comprises the further step of erecting a stair or elevator core on site over the podium structure, and some pods are placed to butt against the core.
  • In a further embodiment, the method comprises the further step of embedding a metal plate in a wall of the core, and the floor of a pod butts against said embedded plate.
  • In one embodiment, an interface structural member is mounted between the floor and the embedded core plate.
  • In another embodiment, the interface structural member has a vertical flange welded to the core plate and a horizontal flange welded to the pod floor.
  • DETAILED DESCRIPTIO OF THE INVENTION Brief Description of the Drawings
  • The invention will be more clearly understood from the following description of some embodiments thereof, given by way of example only with reference to the accompanying drawings in which:-
    • Fig. 1 is a flow diagram indicating the major steps of a method of the invention for constructing a multi-storey building;
    • Fig. 2 is a vertical cross-sectional view through part of a floor, a full wall, and part of a ceiling of a pod;
    • Fig. 3 is a perspective view from above of the structural frameworks of pods where they are placed one above the other and side-by-side, details such as cladding and insulation being omitted for clarity;
    • Fig. 4 is a diagram showing how a floor of a pod is manufactured, and Figs. 5(a) and 5(b) are diagrams showing how lifting rods are inserted for lifting of a pod;
    • Fig. 6 is a vertical section at floor level of two adjoining pods, showing how they are placed on pods underneath;
    • Fig. 7 is a cross-sectional plan view showing interconnection of pods at a comer;
    • Fig. 8 is a vertical section showing how a pod fits atop another pod at an external wall;
    • Fig. 9 is a plan section showing construction of a window in a pod wall;
    • Figs 10 and 11 are a perspective view and a cross-sectional elevation respectively of a balcony of a pod;
    • Fig. 12 is a cross-sectional elevation of a parapet of a pod; and
    • Fig. 13 is a cross-sectional elevation showing connection of a pod floor to a stair core.
    Description of the Embodiments
  • Referring to Fig. 1 a building is constructed in a method 1 by constructing in a factory a number of modules (or "pods"), transporting them to the site, placing them one atop the other and side-by-side to provide the rooms, and then erecting external cladding and a roof. The pods are complete, with no need for internal work to be performed. Moreover, they provide the building structure, and so there is no need for any structural work to be done on site other than providing a ground-level floor. The extent of work done on site is considerably reduced in comparison with conventional construction methods.
  • In summary, the following are the steps for constructing a building:
    • 10, Fabrication of a structural floor framework in a factory, using C-section structural steel around the edges and re-bar meshes inside.
    • 11, Pouring self-levelling self-compacting concrete into the framework so that it is flush with the upper surfaces of the structural frame, to complete a- structural floor.
    • 12, Wall panels are separately manufactured by fabricating structural steel frames according to the building specification, inserting services and insulation, and securing board to the internal and external surfaces.
    • 13, Placing the wall panels by crane onto the floor, one at each edge, and bolting each wall in place onto the floor framework.
    • 14, Lifting rods are screwed into sockets in the structural frame at the edges of the floor so that they extend vertically at spaced-apart locations around the periphery of the frame. The lifting rods extend through the wall panels, passing through apertures in the wall panel frame.
    • 15, 16, Structural steel vertical trusses for the ceiling are placed on a jig and board is secured in the upper plane using self-drilling and tapping screws.
    • 17, The interconnected trusses are rotated by crane and placed over the wall panels, with bearing plates of the ceiling trusses resting on the wall panels, and then welded in place. The ceiling truss bearing plates are directly over wall panel vertical structural studs.
    • 18, The interior of the pod is finished in the manner of a conventional pod, with all services, fitted furniture, sanitary ware, tiling, windows, doors, and painting. The pod is then sealed and no further interior work will be required until final inspection of the building. Because all of the interior work is done in the factory there is excellent quality control and little waste. This completes the factory work.
    • 19, After covering with rain-proof GRP sheeting over the ceiling the pod is lifted into position on a lorry with a crane lifting tackle engaging the lifting rods, and so the pod is lifted from the floor.
    • 20, In parallel with the above factory work, on-site, a podium structure or basement is poured to provide a base for the building, and underground building services are incorporated according to the plans. Also a stair core and/or an elevator core is erected by casting re-enforced concrete.
    • 21, When the site is ready, the pods are lifted into position with some side-by-side with opes in alignment, and the pods are placed one atop the other so that vertical load is applied down through the wall panels and floor frames of the pods. Pods adjoining the stair or elevator core are butt-jointed to the core. The pods are lifted from the bottom, as described in more detail below, thus avoiding distortion of the pods during lifting. The utility services protruding from the sealed pods are hooked up to the main building services, or alternatively this is left until final commissioning of building services in step 23. There is no need for construction of support structures above ground level, the pods themselves being self-supporting.
    • 22, Finally, external cladding is secured to the external wall pod wall panels and a roof is constructed over the top-most pods.
    • 23, The building services are commissioned.
  • The method is now described in more detail with reference to Figs. 2 to 13 inclusive.
  • Referring to Figs. 2 and 3 an individual pod 30 is shown. The main components are a structural floor 31, structural walls 32, and a structural ceiling 33.
  • The floor 31 comprises C-section edge frame structural members 35, poured concrete 36 with enmeshed re-bars 37 moulded in situ within the frame, and bolt fasteners 40 securing wall panels 32 to the floor 31.
  • The wall panels 32, each comprise a structural steel frame cladded on the outside by non-combustible board 45 and on the inside by board 46 and plasterboard 47. The frame comprises a wall plate 60 of angle-section steel, a bottom angle-section 62, and vertical box-section studs 61 at typically 600mm spacings.
  • The structural ceiling 33 comprises multiple vertical trusses 33(a), each having upper and lower horizontal box-section members 50 and vertical box-section steel studs 51 at 300 mm spacings, a bearing plate 52 resting on top of the wall panel 32, and a vertical plate 53 to which the horizontal members 50 and the bearing plate 52 are welded.
  • The structural aspects of the pod are shown most clearly in Fig. 3, the non-structural items being omitted for clarity. The ceiling vertical trusses 33(a) terminate at both ends with the vertical plate 53 to which the bearing plates 52 are welded, and this diagram shows how the bearing plates 52 are carefully positioned on the wall panel angle-section wall plate 60 at locations directly over the box-section vertical studs 61. Thus the vertical loading is transferred primarily down through successive bearing plates and wall panel vertical studs 61. Because of the structural interconnection of the vertical studs 61 and their close spacing (600 mm) the load is evenly distributed across the studs. This diagram also shows the bottom angle-section members 62 of the wall panels to which the vertical studs 61 are welded. All structural steel is surface treated for corrosion resistance. Fig. 3 also shows a corner vertical stud 70 welded to adjoining vertical studs 61. It also shows an interface plate 71 interconnecting four pods at their corners.
  • The walls illustrated are the external walls of the pod, and these are structural. The pod may contain a number of rooms defined by internal non-structural walls. Indeed, a pod may be a complete apartment or a combined hotel room or suite with integrated bathroom.
  • Manufacture of a floor 31 is shown in more detail in Figs. 4, 5(a) and 5(b). In the factory, a platform 80 is movable along a production line on rollers 81. It has a flat planar upper surface and the rollers 81 are carefully positioned so that the top surface of the platform is perfectly horizontal. A film of oil is deposited on the platform top surface. The fabricated floor frame with the edge members 35 is placed by crane onto the platform (or alternatively the floor frame may be fabricated in situ on the platform 80). Re-bar and steel meshes (shown generally as 37) are placed into the frame between the members 35, spacers (not shown) being used to provide a gap between them and the platform surface. Concrete with a low viscosity is poured into the mould formed by the edge frame members 35 until it is flush with the top surfaces of them. As shown in Figs. 5(a) and (b) sockets 85 are welded into the edge frame members 35 at a mutual spacing chosen according to the estimated final weight of the pod. Lifting rods 87 are subsequently screwed into the sockets 85 at threaded rod ends 86. The lifting rods 87 also have threaded upper ends 88 for subsequent engagement with lifting tackle of a crane.
  • After the wall panels 32 are positioned on the structural floor 31 the lifting rods are threaded through the wall panel (there are apertures in the wall plate member 60 and the bottom member 62 to accommodate the rods) to engage into the sockets 85 within the floor frame. Connection of the wall panels to the floor and of the ceiling trusses 33 to the wall panels is shown most clearly in Fig. 3. As all of this work is done in the factory, overhead gantry cranes are used for lifting and placing the wall panels and ceiling assemblies. This lends itself to a large degree of automation and allow accurate placement of the various assemblies.
  • Fig. 6 shows details of how two pairs of pods are placed alongside each other and atop each other. The wall panels 32 have mineral wool insulation 105. It is clear from this drawing how vertical loads are transferred, directly down via the wall panels 32, the edge floor members 35 and the reinforced concrete of the floor adjacent the members 35.
  • A plan section is show in Fig. 7, in which insulation 111 is visible between pods for preventing fire spread and flanking sound transmission. There is a layer of insulation 110 directly on the outside of the external pod wall panels 32. This is applied on site or in the factory. An external stone cladding 112 is tied to the external pod walls. This diagram also shows the vertical angle-section structural member 70 interconnecting adjoining wall panels, vertical strips 116 of non-combustible board within the wall panels, a breathable membrane 115 on the outer surface of the insulation 110, and vertical timber battens 114 between polyisocyanurate/ polyurethane insulation 110 and the fire insulation 111.
  • Fig. 8 also shows how one pod is placed above another at an external wall. In this case, there is a stone cladding 130 tied to the pod external wall structural frame by ties 131. There is a layer 125 of polyiso/polyurethane insulation on the outside of the pod external walls, which is retained by wood battens 135. This diagram also shows mineral wool cavity barriers 136 and 137 separated by a stone support bracket 139.
  • An example of pod construction at a window is shown in Fig. 9. In this case the pod external wall has a layer 150 of insulation applied in the factory, and cladding 155 is tied in place over this on site. The window comprises a conventional window 140 secured in place offset from the wall panel by treated timber battens 157. This drawing also shows a high-density insulation packer piece 156, and an end vertical strip of board 158 forming an internal window reveal.
  • A pod may be provided with a balcony, again manufactured off-site as an integral part of manufacturing a pod. Referring to Figs 10 and 11 a balcony assembly 200 is secured to an edge floor member 35 via an interface 201 having vertical connector plates 202. The balcony assembly 200 comprises a vertical connector plate 210, horizontal I-beams 211, horizontal angle beams 212, and a peripheral C-shaped member 215 with the flanges extending outwardly. This illustrates versatility of the construction method, and the avoidance of on-site work.
  • Referring to Fig. 12, a parapet 250 comprises a reinforced concrete slab 260 supporting a vertical parapet having a steel frame 255, inner slab panels 256, external stone cladding 257, and a hand-rail 252.
  • Referring to Fig. 13, a corridor floor 265 is simply an integral extension of a pod structural floor. It is supported by a pod 30 underneath, and it supports a wall 32. The floor 265 abuts a stair core 270, which was previously cast on site. The stair core comprises cast concrete 271 with embedded re-bars 272, and a side butting plate 278 cast into the side of the concrete 271. An angle-section member 275 is welded to the edge frame member 35 of the floor 265, and is in turn welded to the embedded plate 278. Concrete 276 is cast into the gap between the members 35 and 275.
  • This detail together with the pod-to-pod connections enable excellent lateral stability of the building to be provided. The stiff structural floors of the pods span as deep plates between the stair and elevator cores under lateral loads.
  • In the final building the cast concrete floors provide not only considerable structural strength but also fire and sound insulation. In some embodiments the concrete floor is covered by a soft covering matting, which reduces sound from impacts on the floor. Also, the floors 3 provide an excellent foundation for the wall panels. The structural continuity through the wall panels (particularly the vertical studs), the bearing plates 52, and the floor C-section frame members 35 provide sufficient load-bearing strength to allow up to at least 10 pods to be placed one atop the other for a ten storey building. Because of the structural aspects, the work on site is dramatically reduced as compared to traditional construction methods. Figs. 7 to 9 for example illustrate how simple it is to finish an external cladding of the building, with excellent insulation being provided for the external pods. Construction of the cladding is not required to provide building structural support and so a wide variety of types of materials can be used at the choice of the architect. Figs. 11 and 12 further demonstrate the versatility, as a parapet or balcony can be manufactured off-site, with the option of connecting the balcony to the relevant pod off site or on site if desired.
  • The invention therefore achieves the benefit of factory-production of individual rooms or groups of rooms with completely finished interiors, on a much greater scale than heretofore. Here is also a dramatic reduction in the extent of work required on site because the pods are structural and so there is no need for supporting structures to be built on site other than the ground-level floor and a stair and/or elevator core. Also, there is a large reduction in the extent of building materials required, as manufacture is largely off site in the much more controlled environment of a factory. Because of the extent of work done off site, there is better quality control, less snagging work, and much more control of costs of construction.. Further, there is a dramatic reduction in time for construction on site, which is particularly advantageous where access to the site is restricted and there is disruption to adjacent premises, roads, or footpaths.
  • It will be appreciated that the invention overcomes the perception that one can not provide simultaneously both structural frames and room finishing work. Heretofore the approach had been to attempt modularity in terms of "drop-in" pods such as bathroom, or pre-cast structural steel or formwork pods - not both together.
  • The invention is not limited to the embodiments described but may be varied in construction and detail.

Claims (21)

  1. A building pod comprising:
    a structural floor (31),
    structural walls (32) secured to the structural floor, and
    a structural ceiling (33) spanning the structural walls,
    wherein the structural floor, walls, and ceiling have sufficient load-bearing strength to support at least one other pod, and
    wherein the structural walls (32) each comprise a structural metal frame comprising vertical load-bearing studs (61) spaced apart along the length of the wall;
    the wall structural frames comprise box-section steel structural members;
    characterized in that,
    the structural floor (31) comprises concrete (36) cast in a structural frame (35), and reinforcing bars (37) and meshes within the concrete,
    the floor structural frame comprising edge structural members (35) having top horizontal flanges and having a C-shape in cross section, comprising the top flanges, a vertical web providing an edge surface of the floor, and bottom horizontal flanges, and the structural walls (32) are secured to the top flanges;
    the structural ceiling (33) comprises a plurality of vertical trusses (33(a)) interconnecting and spanning opposed structural walls, and
    wherein the interior is finished to a finished room specification with plumbing and electrical services, fitted furniture and sanitaryware, and further comprising internal partition walls defining a plurality of rooms within the pod.
  2. A building pod as claimed in claim 1, wherein the structural walls (32) are secured by bolting (40) to the top flanges of the floor edge structural members.
  3. A building pod as claimed in any preceding claim, wherein the trusses (33(a)) each comprise at least two horizontal structural members (50) interconnected by vertical studs (51).
  4. A building pod as claimed in claim 3, wherein the structural members (50) and studs (51) of the vertical trusses are of box-section steel.
  5. A building pod as claimed in claims 3 or 4, wherein each ceiling truss (33(a)) comprises a horizontal bearing plate (52) overlying a wall plate (60) of a structural wall.
  6. A building pod as claimed in claim 5, wherein the bearing plate (52) overlies a vertical load-bearing stud (61) of the structural wall.
  7. A building pod as claimed in any preceding claim, wherein the walls comprise non-combustible board cladding (45, 46, 47) on both sides, with insulation such as mineral wool (105) between the claddings.
  8. A building pod as claimed in any preceding claim, further comprising a balcony (200) secured to the structural floor.
  9. A method (1) of manufacturing a pod as claimed in any preceding claim, the method comprising the steps of
    placing (10) a floor frame on a platform and casting (11) concrete into the frame to provide the structural floor (31), and
    securing (13) the structural walls (32) or structural frames of the walls to the structural floor (31),
    securing a structural ceiling frame (33(a)) to the structural walls (32) to span and interconnect the structural wall frames,
    constructing (18) the interior of the pod to substantially complete the structural walls and ceiling to complete a room or rooms within the pod, and
    sealing the pod for transport to a site and handling on site.
  10. A method as claimed in claim 9, comprising the steps of moving the platform from one work position to the next with successive steps being performed to erect the walls and the ceiling.
  11. A method as claimed in claim 10, wherein the platform is moved on rollers.
  12. A method as claimed in any of claims 9 to 11, wherein the pod is lifted (19) for transport by lifting it from lifting points on the floor.
  13. A method as claimed in claim 12, wherein lifting rods (87) are secured to the floor frame (35) and extend to a height greater than the walls, and the pod is lifted by engagement of lifting tackle with the lifting rods.
  14. A method as claimed in claim 13, wherein the rods (87) extend upwardly from edge members of the structural floor frame (35) and through the structural walls, and engage in sockets between flanges of floor edge structural members.
  15. A method as claimed in any of claims 9 to 14, wherein the platform is coated with oil to allow easy separation of the floor concrete from the platform.
  16. A method as claimed in any of claims 9 to 15, wherein the structural ceiling is manufactured (15) by placing a number of vertical trusses horizontally across a jig, securing internal cladding to the trusses, and lifting and flipping over the ceiling so that it spans the structural walls.
  17. A method of constructing a building comprising the steps of:
    manufacturing a plurality of pods in a method as claimed in any of claims 9 to 16,
    transporting (19) the pods to a site where a podium structure or basement has been poured (20), and lifting and placing (21) the pods to provide a multi-storey self-supporting arrangement of the pods, with at least some pods atop lower pods and being supported by said lower pods,
    erecting (22) an outer wall leaf tied to exposed pod walls,
    erecting (22) a building roof over the pods, and
    commissioning (23) services to the pods.
  18. A method as claimed in claim 17, wherein the pods are placed with structural walls aligned so that vertical load is transferred down through the pod structural walls, and comprising the further step of erecting a stair or elevator core on site over the podium structure, and some pods are placed to butt against the core.
  19. A method as claimed in claim 18, comprising the further step of embedding a metal plate in a wall of the core, and the floor of a pod butts against said embedded plate.
  20. A method as claimed in claim 19, wherein an interface structural member is mounted between the floor and the embedded core plate.
  21. A method as claimed in claim 20, wherein the interface structural member has a vertical flange welded to the core plate and a horizontal flange welded to the pod floor.
EP06821548A 2006-01-12 2006-12-13 Construction of buildings Active EP1971727B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
IE20060016 2006-01-12
IE20060126 2006-02-21
PCT/IE2006/000139 WO2007080561A1 (en) 2006-01-12 2006-12-13 Construction of buildings

Publications (2)

Publication Number Publication Date
EP1971727A1 EP1971727A1 (en) 2008-09-24
EP1971727B1 true EP1971727B1 (en) 2011-11-09

Family

ID=37735005

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06821548A Active EP1971727B1 (en) 2006-01-12 2006-12-13 Construction of buildings

Country Status (4)

Country Link
EP (1) EP1971727B1 (en)
AT (1) ATE532914T1 (en)
IE (1) IES20060907A2 (en)
WO (1) WO2007080561A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11225789B2 (en) 2018-05-17 2022-01-18 Spanminx Limited Structural module with vertical ties

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2485298B8 (en) * 2009-07-23 2015-09-23 Vision Modular Systems Uk Ltd A structural module for construction of buildings
ES2458917B1 (en) * 2012-07-26 2015-02-10 Cubria Home, S.L. SINGLE-FAMILY HOUSE OF MODULAR STRUCTURE
JP6174430B2 (en) * 2013-09-06 2017-08-02 ミサワホーム株式会社 Support structure for incidental structures
WO2016032537A1 (en) 2014-08-30 2016-03-03 Innovative Building Technologies, Llc A prefabricated wall panel for utility installation
US10260250B2 (en) 2014-08-30 2019-04-16 Innovative Building Technologies, Llc Diaphragm to lateral support coupling in a structure
KR101991055B1 (en) 2014-08-30 2019-06-19 이노베이티브 빌딩 테크놀러지스 엘엘씨 Floor and ceiling panel for use in buildings
WO2017156006A1 (en) 2016-03-07 2017-09-14 Innovative Building Technologies, Llc Floor and ceiling panel for slab-free floor system of a building
US10676923B2 (en) 2016-03-07 2020-06-09 Innovative Building Technologies, Llc Waterproofing assemblies and prefabricated wall panels including the same
US10961710B2 (en) 2016-03-07 2021-03-30 Innovative Building Technologies, Llc Pre-assembled wall panel for utility installation
CN109072609B (en) 2016-03-07 2021-03-16 创新建筑技术有限责任公司 Prefabricated household wall with external conduit jointing function
US10487493B2 (en) 2017-05-12 2019-11-26 Innovative Building Technologies, Llc Building design and construction using prefabricated components
US10724228B2 (en) 2017-05-12 2020-07-28 Innovative Building Technologies, Llc Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls
US11098475B2 (en) 2017-05-12 2021-08-24 Innovative Building Technologies, Llc Building system with a diaphragm provided by pre-fabricated floor panels
EP3981928B1 (en) 2017-06-09 2024-01-31 Spanminx Limited A structural module tie and a method of assembling a plurality of modules
US11898341B2 (en) 2021-08-16 2024-02-13 Greencore Structures Ltd. Building core and kit for assembly

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3717964A (en) * 1970-07-09 1973-02-27 Behring Corp Module frames
US3925679A (en) * 1973-09-21 1975-12-09 Westinghouse Electric Corp Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2588302A1 (en) * 1985-10-03 1987-04-10 Fillod Const PREFABRICATED MODULAR BUILDING ELEMENT AND BUILDING COMPRISING SUCH ELEMENTS
DE3672989D1 (en) * 1985-11-15 1990-08-30 Australian Stratacore Holdings CONSTRUCTION SYSTEM FOR MULTI-STOREY BUILDINGS.
US4833841A (en) * 1987-12-16 1989-05-30 Systems Craft Transportable building module
US5737895A (en) * 1995-12-20 1998-04-14 Perrin; Arthur Prefabricated construction panels and modules for multistory buildings and method for their use
WO2002064900A1 (en) * 2001-02-14 2002-08-22 Gammon Finance Limited Modular structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3717964A (en) * 1970-07-09 1973-02-27 Behring Corp Module frames
US3925679A (en) * 1973-09-21 1975-12-09 Westinghouse Electric Corp Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11225789B2 (en) 2018-05-17 2022-01-18 Spanminx Limited Structural module with vertical ties

Also Published As

Publication number Publication date
IES20060907A2 (en) 2007-09-05
ATE532914T1 (en) 2011-11-15
WO2007080561A1 (en) 2007-07-19
EP1971727A1 (en) 2008-09-24
IE20060906A1 (en) 2007-09-05

Similar Documents

Publication Publication Date Title
EP1971727B1 (en) Construction of buildings
US5867964A (en) Prefabricated construction panels and modules for multistory buildings and method for their use
US3751864A (en) Interstitial space frame system
US6651393B2 (en) Construction system for manufactured housing units
CN109072604B (en) Method for constructing multi-storey building using stacked structural steel wall truss
EP1992750A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
US5737895A (en) Prefabricated construction panels and modules for multistory buildings and method for their use
US20100058687A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
US7421828B2 (en) Integral forming technology, a method of constructing steel reinforced concrete structures
WO1997022770A9 (en) Prefabricated construction panels and modules for multistory buildings and method for their use
US4136492A (en) Industrialized building construction
KR101389203B1 (en) Method for constructing residential building using precast concrete and modular unit
CN108005410B (en) Assembled steel-concrete combined structure residential system and construction method thereof
CN117403934A (en) Novel assembled concrete structure system for low-rise residence
CN111155680A (en) All-bolt connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CA2639339A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
RU218225U1 (en) Volumetric reinforced concrete block for housing construction with flexible housing
IE84811B1 (en) Construction of buildings
US20210071409A1 (en) High-rise self-supporting formwork building system
AU713617C (en) Prefabricated construction panels and modules for multistory buildings and method for their use
JP3190059B2 (en) How to build a building
ES2292276B1 (en) MODULAR CONSTRUCTION SYSTEM.
JPH08184204A (en) Apartment house
CZ16786U1 (en) Modular house
BG62451B1 (en) A set of prefabricated modular building components

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20080717

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20090130

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAX Request for extension of the european patent (deleted)
RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602006025778

Country of ref document: DE

Effective date: 20120119

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20111109

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20111109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120309

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120309

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120210

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120209

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 532914

Country of ref document: AT

Kind code of ref document: T

Effective date: 20111109

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20120817

26N No opposition filed

Effective date: 20120810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602006025778

Country of ref document: DE

Effective date: 20120810

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120109

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120220

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111109

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602006025778

Country of ref document: DE

Representative=s name: MITSCHERLICH, PATENT- UND RECHTSANWAELTE PARTM, DE

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20150910 AND 20150916

Ref country code: DE

Ref legal event code: R081

Ref document number: 602006025778

Country of ref document: DE

Owner name: VISION MODULAR SYSTEMS UK LTD., GB

Free format text: FORMER OWNER: BIOMEDY LTD., BANDON, COUNTY CORK, IE

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230413

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231101

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20231113

Year of fee payment: 18