EP1563347A1 - Coordination in multilayer process control and optimization schemes - Google Patents

Coordination in multilayer process control and optimization schemes

Info

Publication number
EP1563347A1
EP1563347A1 EP03781818A EP03781818A EP1563347A1 EP 1563347 A1 EP1563347 A1 EP 1563347A1 EP 03781818 A EP03781818 A EP 03781818A EP 03781818 A EP03781818 A EP 03781818A EP 1563347 A1 EP1563347 A1 EP 1563347A1
Authority
EP
European Patent Office
Prior art keywords
process control
loads
limits
control method
limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP03781818A
Other languages
German (de)
French (fr)
Other versions
EP1563347B1 (en
Inventor
Vladimir Havlena
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell International Inc
Original Assignee
Honeywell International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honeywell International Inc filed Critical Honeywell International Inc
Publication of EP1563347A1 publication Critical patent/EP1563347A1/en
Application granted granted Critical
Publication of EP1563347B1 publication Critical patent/EP1563347B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/026Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system using a predictor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • F22B35/008Control systems for two or more steam generators

Abstract

Loads 1, 2, . . ., N are controlled by predicting a total energy requirement for the loads 1, 2, . . ., N at prediction points k = 0, 1, 2, . . ., K, by allocating the total energy requirement to the loads 1, 2, . . ., N at prediction points k = 0, 1, 2, . . ., K, by determining a dynamic energy demand requirement for each of the loads 1, 2, . . ., N at prediction points k = 0, 1, 2, . . ., K based on the allocated energy requirements, and by controlling the loads 1, 2, . . ., N based on the dynamic energy demand requirements.

Description

COORDINATION IN MULTILAYER PROCESS CONTROL AND OPTIMIZATION SCHEMES
Technical Field of the Invention
The present invention relates to dynamic load control.
Background of the Invention
Controls have been developed for a variety of different load control processes. For example, in steam generation plants, several boilers and/or other types of steam generators generate steam and supply the steam to a common header. If individual pressure controllers with integral action running in parallel were used to control the boilers, instability in the operation of the boilers could result.
Therefore, pressure in the header is typically controlled by a single master pressure controller (MPC) that produces a total energy reguirement (usually in terms of fuel feed) for the plant input. An energy allocation module divides the total energy requirement into separate fuel feed demands (i.e., set points) for the individual boilers.
The division of the total energy requirement implemented by the energy allocation module should be cost optimized according to varying economic conditions (such as price of fuels and electricity, environmental limits, etc.) and according to various constraints such as total production demand, technological constraints, runtime hours, and life time consumption. The underlying optimization problem is well known and has been solved in a variety of ways and with various levels of complexity since the 1960's. For example, Real Time Optimizers have been implemented in order to optimize the cost of operating one or more loads.
These Real Time Optimizers have detected a steady state load requirement and then have provided control signals that optimize the cost of operating the loads based on this steady state load requirement. In order to operate in this fashion, the Real Time Optimizers have had to wait for transient process disturbances to settle out so that a steady state condition exists before such Optimizers can invoke their optimization procedures. However, for processes with slow dynamics and/or high levels of disturbances, the dependence of Real Time Optimizers on steady state information substantially deteriorates the performance of the control system, as no optimization is performed during the transients created by disturbances such as changes in set point and/or changes in load.
While predictive controllers have been used in the past, predictive controllers have not been used with Real Time Optimizers such that the Real Time Optimizers dynamically respond to target load values of the predicted process variables projected to the end of a prediction horizon. In one embodiment of the present invention, predictive controllers and Real Time
Optimization are combined in this fashion in order to more effectively control loads during disturbances such as changes in set point and changes in load.
Summary of the Invention
According to one aspect of the present invention, a process control system for controlling a load comprises a predictive controller and a real time optimizer. The predictive controller predicts an energy requirement for the load at prediction points k = 0, 1, -2, . . . , K based on a steady state target energy requirement for the load. The real time optimizer determines an optimized dynamic energy demand requirement for the load at the prediction points k = 0, 1, 2, . . ., K based on the predicted energy requirement, and controls the load based on the dynamic energy demand requirement.
According to another aspect of the present invention, a process control method for controlling loads 1, 2, . . ., N comprises the following: predicting, in a predictive controller, an energy requirement for each of the loads 1, 2, . . . , N at prediction points k = 0, 1,
2, . . ., K based on a steady state target allocation for each of the loads 1, 2, . . ., N; determining, in a real time optimizer, a dynamic energy demand requirement for each of the loads 1, 2, . . . , N at prediction points k =
0, 1, 2, . . . , K based on the predicted energy requirements; and, controlling the loads 1, 2, . . . , N based on the dynamic energy demand requirements.
According to yet another aspect of the present invention, a process control method for controlling loads
1, 2, . . ., N comprises the following: predicting, by way of a predictive controller, a total energy requirement for the loads 1, 2, '. . ., N at prediction points k = 0, 1, 2, . . . , K; allocating, by way of a real time optimizer, the total energy requirement to the loads 1, 2, . . . , N at the prediction points k = 0, 1,
2, . . . , K based on a steady state target for each of the loads 1, 2, . . ., N; determining, by way of the real time optimizer, a dynamic energy demand requirement for each of the loads 1, 2, . . . , N at the prediction points k = 0, 1, 2, . . . , K based on the allocated energy requirements; and, controlling the loads 1, 2, . . . , N based on the dynamic energy demand requirements . Brief Description of the Drawings
These and other features and advantages will become more apparent from a detailed consideration of the invention when taken in conjunction with the drawings in which:
Figure 1 illustrates a control system according to an embodiment of the invention;
Figure 2 illustrate graphs useful in explaining the present invention; and, Figure 3 illustrates a flow chart depicting the operation of the control system shown in Figure 1.
Detailed Description
In one embodiment of the present invention, real-time, on-line, optimized dynamic allocation of time varying total demand among loads, taking into account various constraints, is provided. The resulting dynamic
allocation is composed of a target allocation Fl'arg(k) and
a dynamic portion w " (k)AF"" (k) that is proportional to the
loads' dynamic weights w "(k) for loads i = 1, . . ., N.
The target allocation Fl nas (k) is provided by a Real Time
Optimizer using load cost curves which can be evaluated from efficiency or consumption curves, etc. Likewise, the loads' dynamic weights w " (k) may also be set by the
Real Time Optimizer or by an operator.
The algorithm that implements the optimized dynamic allocation is used with a model-based predictive controller. In this case, a steady state load balance at the end of a prediction horizon can be predicted as the target value for computation of the target economic allocation, and dynamic deviations in the transient part of the prediction period can be allocated in proportion to the dynamic weights. In this way, the system of the present invention need not wait for loads to achieve a steady state condition following a disturbance to economically control the loads.
Moreover, because a predictive controller is used, rate of change constraints, in addition to the absolute constraints, are introduced so as to provide a positive impact on the stability of the control process and on the stresses and life time of the control system equipment . The algorithm that is implemented by the control system may be modular. For example, the target
allocation F'iae(k) is provided by an optimization routine
using the loads' cost curves which can be evaluated from efficiency curves, etc. This modular structure allows the addition of new features that, for example, take into account burner configuration, fuel mixing, etc. without changing the basic algorithm. An off-line what-if analysis as a decision support tool is also possible using existing routines. As shown in Figure 1, a control system 10 includes a predictive controller 12, a Real Time
Optimizer 14, and a plurality of loads lβi - lβN. For
example, the loads 16χ - 16N can be boilers, turbines,
compressors, chillers, etc. Thus, if i = 1, 2, . . . , N
designates the loads lβi - 16N in Figure 1, then N
designates the number of loads.
The predictive controller 12 suitably senses the load requirements (e.g., pressure, and/or fuel feed,
and/or temperature, etc.) of the loads 16ι - lβN and
provides a predicted total load energy demand Ftot to the real time optimizer 14 that divides the total load energy demand Ftot according to a predicted target allocation
E r (/c) into individual allocated fuel feed demands (or
set points) F^ly"(k) for the individual loads 16ι - 16N.
The predictive controller 12 may be any of the controllers supplied by Honeywell under part numbers HT- MPC3L125, HT-MPC3L250, HT-MPC3L500, HT-MPC6L125, HT- MPC6L250, and HT-MPC6L500, or may be any other predictive controller that projects a system response to a set point, load, or other disturbance. The real time optimizer 14 may be any of the real time optimizers supplied by Honeywell under part numbers HT-ELA3L125, HT- ELA3L250, HT-ELA3L500, HT-ELA6L125, HT-ELA6L250, and HT- ELA6L500, or may be any other real time optimizer that can be modified so as to react to load change predictions in order to cost effectively allocate load demand among a plurality of loads.
Because the predictive controller 12 is a predictive controller, the total load energy demand Ftot is a trajectory, i.e., a sequence of values corresponding to a sequence of prediction times k up to a prediction horizon K, where k = 0, 1, . . ., K. Accordingly, the total load energy demand Ftot may be given by the following equation:
F"" = (F""(1), F"" (1), ..., F"" (K)) ( 1 )
The dynamic allocation trajectories Fl dy"(k) for
the loads are determined by the real time optimizer 14 in two steps. First, the unconstrained allocation
trajectories Fl""c""s,r (k) are determined for the loads i = 1,
2, . . ., N. Second, the unconstrained allocation
trajectories F™'" ( ) for the loads i = 1, 2, . . ., N are modified to satisfy constraints and to approach the unconstrained allocation as much as possible (in the sense of minimum least squares of deviations) in order to
obtain the dynamic allocation trajectories F "(k) .
In the first step, the unconstrained allocation
trajectories Fι u"c"nslr (k) are defined by means of two sets of
parameters: (1) the target allocation Fl'asi(k) , and (2) the
dynamic weights w "(k) . Accordingly, the unconstrained
allocation trajectories /V""""""' ( k) are defined according to
the following equation:
F~'r (k) = F;ars (k) + wf"' (k)AF"" (k) (2 )
where
ΔE"" (k) = F"" (k) - F! (k) ( 3 :
=ι
for each load i = 1, 2, . . ., N and for each trajectory point k = 0, 1, . . ., K.
The target allocation F'aϊS(k) corresponds to
values around (or near) which the unconstrained
allocation F™" ' (k) varies, and the dynamic weights w?y" (k) are an indication of the sensitivities of the loads 16ι -
16N to the changes in the total load demand.
Figure 2 illustrates an example of dynamic fuel feed allocation with the samples on the left side of the vertical dashed line representing historical data and the samples on the right side of the vertical dashed line representing predicted (modeled) trajectories. The
samples may be taken at time instants t^ = kTs, where Ts
is a given sampling period. The total load energy demand Ftot shown in the left graph is allocated between a boiler (load) Bl as shown in the top right graph and a boiler (load) B2 as shown in the bottom right graph. The dashed curves 20 and 22 represent the unconstrained allocation
trajectories F%comtr (k) and F™{onstr (k) for loads Bl and B2,
respectively. The solid line curve in the graph on the left represents the total load energy demand Ftot predicted by the predictive controller 12, and the solid line curves in the graphs on the right represent the
dynamically allocation fuel feeds (set points) El=1 n(-c) and
?(k) for loads Bl and B2, respectively, as produced by
the real time optimizer 14. The horizontal solid lines represent absolute limits that are placed on the total load energy demand Ftot and the dynamically allocation fuel feeds (set points) Fι=^n(k) and F^(k) , respectively.
The horizontal dashed lines represent the target
allocations F'arg(k) . Moreover, for the example shown in
Figure 2, the ratio of the dynamic weights used for loads Bl and B2 are assumed to be given by the following equation:
w β. αyynn i .=1 (k)
(4) w dyn ι=2 (k)
Accordingly, the changes in total energy load
demand AF"" (k) are divided into the loads 16ι - 16N
proportionally to the dynamic weights so that the allocated load energy requirement (e.g., fuel feed value)
is composed of the target value Fy' g(k) plus a portion
from the transient deviations AF"" (k) . The dynamic
weights may be provided by the operator. Alternatively, the dynamic weights may be calculated automatically. For example, they may be calculated automatically based on the number of running coal pulverizers, burners, etc. A balance condition exists where the sum over
the loads l β - 16N of the target allocations ^jFl'ars (k) is
equal to total load energy demand Ftot(k) in equation (3). In the balance condition, AF"" (k) is zero, and the
following relationship:
∑F,mc"m,r(k) = F""(k) (5)
;=1
is fulfilled for each trajectory point k, assuming that the non-negative dynamic weights are normalized to 1 according to the following equation:
f 4"(*) = l (6)
As discussed above, the target allocation
F'ars(k) is the prediction horizon for load i and is
allocated to load i by the real time optimizer 14 based upon various economic conditions. The target allocation
E ar8(/c) may be evaluated from offsets.
As indicated by Figure 2, the target allocation
F'a's(k) is assumed to be constant during the prediction
period unless the target allocation Ft'ars(k) is
significantly changed, such as by the operator. When the
target allocation Ft laιe(k) is significantly changed, linear
interpolation from the old value to the new one, instead of using the new value for the whole prediction period, may be used in order to assure bumpless operation.
If the target allocation F'aIS(k) is set (such as
by the operator as indicated above) so that it is time- invariant up to the next operator intervention, the sum
of the target allocation F'are(k) over all loads cannot
follow the time-varying target of the total load energy demand Ftot, i.e., the value of the total load energy demand Ftot at the end of prediction horizon. However, the appreciable balance condition can be fulfilled if the
target allocations Fl""s(k) are evaluated using offsets F"ϋ
as given by the following equation:
where Fav is determined from the following balance condition:
N N
Ftot (K) = ∑ F;** = ∑ Ft off + NF ( 8 )
(=1 .=1
Thus , even if offsets (defining differences between
N loads) are constant, the term ^^'arg is time varying and
/=1 equal to Ftot(K) As indicated above, the dynamic weights w y" (k)
may be set by the operator. The dynamic weights w "(k)
are assumed to be constant during the prediction period unless they are significantly changed by the operator. If they are changed, they may be ramped using a linear
interpolation algorithm. Also, the dynamic weights w y"(k)
are normalized to 1 as discussed above in relation to equation (6) .
As indicated above, the unconstrained
allocation trajectories F~'r (k) do not need to satisfy
constraints. On the other hand, the dynamic allocation
trajectories F?y"(k) are required to be constrained.
Constraints imposed by the real time optimizer 14 may be generated by the operator. Alternatively and/or additionally, constraints may be algorithm-generated constraints that are propagated from slave controllers on all levels of a sub cascade. Also, constraints may be time varying. Moreover, constraints may be absolute
limits (such as low and high limits F, m (k) and F,mm (k) on
the dynamic allocation trajectories F y"(k) ) f and
constraints may be rate of change limits (such as
decremental and incremental limits F~(k) and F (/),
respectively) . While absolute constraints must not be violated, rate of change constraints can be violated. However, such a violation should be highly penalized so as to avoid undesired thermal stress, which may have a negative impact on the life of the control system equipment .
In the second step of calculating the dynamic
allocation trajectories F*"(/), the dynamic allocation
trajectories ,*"(/) are calculated based on the
unconstrained allocation trajectories F""cons"' (k) . The
dynamic allocation trajectories Fl dy"(k) must satisfy the
total load energy demand Ftot (as the unconstrained
allocation trajectories ^""""""' (k) must also do) according
to the following equation:
In addition, the dynamic allocation trajectories ,*"(/)
are constrained by the absolute constraints, considered as hard constraints, and the rate of change constraints, considered as soft constraints in that they can be violated by arbitrary (although highly penalized) values z,(k) . These constraints are given by the following expressions :
< Fdy" < F" (10)
F- < f ?dyynn _ z ≤ p + (11)
where
dn _ fori = \,...,N (12)
Expressions similar to expressions (12) can be written
for Ft mm , F,max , F~ , F; , and zx. Each of the vectors F " ,
^min ^ ^a ^ - ^ p+ ^ an(^ _,^ ^as a corresponding dimension
K + 1. Also, expressions similar to expression (13) can be written for Fmιn, F"13 , F", and F+. Each of the vectors Fdyr^ pπαn^ pmax^ γ- ^ and F+ has a correSponding dimension
N(K + 1) . A difference vector AF "' is defined according
to the following equation :
AF. ayn DFT dyn -F, (14)
where D is a (K + 1) by (K + 1) difference matrix given by the following equation:
and where F°cl are (K + 1) dimensional vectors having the
corresponding loads' actual input energy requirements (such as boilers' actual fuel feed) in the first component and zeros elsewhere as given by the following equation:
(pact \
The actual input energy requirements F"" may be sensed by
appropriate sensors located at the energy inputs of the
loads 16ι - lβN.
Variables z±(k) are introduced in order to penalize violation of the rate of change constraints. If
Zi(k) is equal to zero (no penalty), AFl dy"(k) must lie
within rate of change limits according to the
inequalities (11). If AFdy"(k) is not within corresponding
limits, the variable zι(k) is equal to the deviation of
AF? "(k) from the range (-F'(k), F,+ (k)) , and the limit
violation penalty defined as the norm of z becomes nonzero .
The dynamic demand allocation Fdyn is obtained by minimizing the penalty for the deviation of Fdyn from the unconstrained allocation Funconstr and for violation of the rate of change limits. That is, the dynamic allocation Fdyn is obtained by minimizing the following function:
f(F,z) = p dyn _ τjunconstr + z ( 17 ) β(i) 2(2) with respect to variables Fdyn and z, subject to constraints (9)— (11) . It should be noted that the vector
■vunconstr in equation (17) has a dimension 2N(K + 1) similar to the right hand side of equation (13). Function (17) is a quadratic programming problem with dimension 2N(K +
1) -
The square N (K + 1) by N(K + 1) norm matrices (l) and Q(2) can be chosen as diagonal matrices with elements depending only on boiler i, not on trajectory points k. Accordingly, these matrices may be given by the following equations:
qω = wo)j (19)
where j = 1, 2, where I is a (K + 1) by (K + 1) unity
matrix, and where w,(1) and w,(2) are penalty weights for i
1, N. The penalty weights w; (i) ' and wιX;2) ' may be
defined by the process engineer during the optimizer commissioning, The control algorithm as described above may be implemented by the control system 10 according to the flow chart shown in Figure 3. With k equal to a current value, the total energy load demand Fot(k) is projected by the predictive controller 12, at a block 30 of this flow chart, for each point k out to the horizon K. The
change in Ftot(k), i.e., ΔF""(/c) , is calculated at a block
32 using equation (3) using the predicted steady state
target allocations F'aτe(k) set by the real time optimizer
14 as discussed above. Alternatively, the target
allocations F'are(k) may be determined in accordance with
equations (7) and (8) as discussed above. Also, the
unconstrained allocation trajectories Fl""c°"s"' (k) are
calculated at a block 34 using equation (2), where the
target allocations Fl'a!S(k) are as used at the block 32,
where the dynamic weights w m(k) may be set, for example,
by the operator, and where the total energy load demand Ftot(k) is provided by the block 30.
The dynamic demand allocation trajectories
Fl dy"(k) are then determined at a block 36 in accordance
with equations (17), (18), and (19), and the difference
vector AF*" is determined at a block 38 in accordance
with equations (14), (15), and (16). Constraints are applied to the dynamic allocation trajectories Fj dy"(k) and
the difference vector ΔF,.*" at a block 40 in accordance
with equations (9), (10), and (11). At a block 42, the
constrained dynamic demand allocation trajectories F yn (k)
are used to control energy supplied to the respective loads 1, . . . , N.
The algorithm at a block 44 then waits for the next time k before repeating the operations of the blocks (30)-(44) . Certain modifications of the present invention has been described above. Other modifications of the invention will occur to those skilled in the art. For example, although the present invention has been described above with specific reference to the control of loads such as boilers, the present invention may be used in connection with a variety of other control processes.
Also as described above, the target allocation
F rg(/) is provided by a Real Time Optimizer.
Alternatively, the target allocation Farg(/) may be set by
an operator.
Accordingly, the description of the present invention is to be construed as illustrative only and is for the purpose of teaching those skilled in the art the best mode of carrying out the invention. The details may be varied substantially without departing from the spirit of the invention, and the exclusive use of all modifications which are within the scope of the appended claims is reserved.

Claims

We claim:
1. A process control system for controlling a load comprising: a predictive controller that predicts an energy requirement for the load at prediction points k = 0, 1, 2, . . ., K based on a steady state target energy requirement for the load; and, a real time optimizer that determines an optimized dynamic energy demand requirement for the load at the prediction points k = 0, 1, 2, . . . , K based on the predicted energy requirement and that controls the load based on the dynamic energy demand requirement.
2. The process control system of claim 1 wherein the real time optimizer is arranged to constrain the dynamic energy demand requirement to a limit and controls the load based on the constrained dynamic energy demand requirement.
3. The process control system of claim 2 wherein the limit comprises a maximum limit.
4. The process control system of claim 2 wherein the limit comprises a minimum limit.
5. The process control system of claim 2 wherein the limit comprises a minimum limit and a maximum limit.
6. The process control system of claim 2
wherein the real time optimizer determines ΔF*"' according to the following equation:
AFdy" = DFdyn - Facl
wherein D is a (K + 1) by (K + 1) matrix given by the following equation:
and wherein Facl is a (K + 1) dimensional vector representing an actual energy consumption of the load in the first component and zeros elsewhere as given by the following equation:
wherein Fdyn is the dynamic energy demand requirement, and
wherein AFd " is constrained to a limit.
7. The process control system of claim 6
wherein the limit for AFdy" comprises a maximum limit.
8. The process control system of claim 6
wherein the limit for AFdy" comprises a minimum limit.
9. The process control system of claim 6
wherein the limit for AFdy" comprises a minimum limit and a maximum limit.
10. The process control system of claim 1 wherein the predicted energy requirement is designated
-.unconstr , wherein the dynamic energy demand requirement is designated Fdyn, and wherein Fdyn is determined by minimizing a quadratic function based on a difference between Funconstr and Fdyn.
11. The process control system of claim 10 wherein Funconstr and Fyn each have dimensions K + 1.
12. The process control system of claim 10 wherein the real time controller is arranged to constrain Fyn to a limit and to control the load based on the constrained Fdyn .
13. The process control system of claim 12 wherein the limit comprises a maximum limit.
14. The process control system of claim 12 wherein the limit comprises a minimum limit.
15. The process control system of claim 12 wherein the limit comprises a minimum limit and a maximum limit.
16. A process control method for controlling loads 1, 2, . . ., N comprising: predicting, in a predictive controller, an energy requirement for each of the loads 1, 2, . . . , N at prediction points k = 0, 1, 2, . . . , K based on a steady state target allocation for each of the loads 1, 2 , . . . , N; determining, in a real time optimizer, a dynamic energy demand requirement for each of the loads 1, 2, . . ., N at prediction points k = 0, 1, 2, . . . , K based on the predicted energy requirements; and, controlling the loads 1, 2, . . ., N based on the dynamic energy demand requirements.
17. The process control method of claim 16 wherein the controlling of the loads based on the dynamic energy demand requirements comprises: constraining each of the dynamic energy demand requirements to a corresponding limit; and, controlling the loads 1, 2, . . ., N based on the corresponding constrained dynamic energy demand requirements.
18. The process control method of claim 17 wherein the corresponding limits comprise corresponding maximum limits.
19. The process control method of claim 17 wherein the corresponding limits comprise corresponding minimum limits.
20. The process control method of claim 17 wherein the corresponding limits comprise corresponding minimum limits and corresponding maximum limits.
21. The process control method of claim 17 further comprising;
determining AFdyn according to the following
equation:
AFdy" = DF^" - Faci
wherein D is a (K + 1) by (K + 1) matrix given by the following equation:
and wherein F"cl is a (K + 1) dimensional vector having an
actual energy consumption of a corresponding one of the loads in the first component and zeros elsewhere as given by the following equation: f pacl
wherein i = 1, 2, . . . , N designates the loads, wherein
F y" designate the dynamic energy demand requirements of
the loads 1, 2, . . . , N, and wherein ΔF*" are
constrained to corresponding limits.
22. The process control method of claim 21
wherein the corresponding limits for AF y" comprise
corresponding maximum limits.
23. The process control method of claim 21
wherein the corresponding limits for ΔF,*™ comprise
corresponding minimum limits.
24. The process control method of claim 21
wherein the corresponding limits for ΔF,*" comprise
corresponding minimum limits and corresponding maximum limits.
25. The process control method of claim 16 wherein the predicted energy requirement for each of the
loads 1, 2, . . . , N is designated Fl""com"' , wherein the
dynamic energy demand requirement for each of the loads
1, 2, . . ., N is designated F yn , wherein Fdyn is
determined by minimizing the following quadratic function:
with respect to variables Fdyyn and z, wherein Fdyyn and
-lUnconstr are vectors each having a dimension 2N(K + 1] wherein Q(l) and Q(2) are each square N(K + 1) by N(K + 1) norm matrices given by the following equations:
wherein I is a (K + 1) by (K + 1) unity matrix, wherein
vc,(1) and w,(2) are penalty weights for i = 1, . . . , N, and
wherein z is a penalty vector having a 2N(K + 1) dimension.
26. The process control method of claim 25 wherein Funconstr and Fdyn each have dimensions K + 1.
27. The process control method of claim 25 wherein the controlling of the loads 1, 2, . . ., N based on the dynamic energy demand requirements comprises:
constraining Fdy" to corresponding limits; and,
controlling the load based on the constrained
Fdy" .
28. The process control method of claim 27 wherein the corresponding limits comprise corresponding maximum limits.
29. The process control method of claim 27 wherein the corresponding limits comprise corresponding minimum limits.
30. The process control method of claim 27 wherein the corresponding limits comprise corresponding minimum limits and maximum limits.
31. A process control method for controlling loads 1, 2, . . . , N comprising: predicting, by way of a predictive controller, a total energy requirement for the loads 1, 2, . . ., N at prediction points k = 0, 1, 2, . . . , K; allocating, by way of a real time optimizer, the total energy requirement to the loads 1, 2, . . . , N at the prediction points k = 0, 1, 2, . . . , K based on a steady state target for each of the loads 1, 2, . . ., N; determining, by way of the real time optimizer, a dynamic energy demand requirement for each of the loads 1, 2, . . ., N at the prediction points k = 0, 1, 2, . . . , K based on the allocated energy requirements; and, controlling the loads 1, 2, . . . , N based on the dynamic energy demand requirements.
32. The process control method of claim 31 wherein the allocating of the total energy requirement to the loads 1, 2, . . . , N comprises:
determining a change AF"" (k) in the total energy
requirement according to the following equation: AF"" (k) = F"" (k) - ∑F,,ars(k)
=1
for each of the loads i = 1, 2, . . . , N and for each of the prediction points k = 0, 1, . . . , K; and, allocating the total energy requirement to the loads 1, 2, . . . , N at prediction points k = 0, 1, 2, . . ., K according to the following equation:
F ocα,ed (k) = F/"8 (k) + w " (k)AF"" (k)
wherein F'are(k) are the steady state targets for the loads
1, 2, . . ., N, and wherein wdy"(k) are weights determining
the allocation of the total energy requirement.
33. The process control method of claim 32
wherein w y"(k) are set by an operator.
34. The process control method of claim 32
wherein wdy"(k) are set by an economic load allocation
module.
35. The process control method of claim 32
wherein F rg(/) are set by an operator.
36. The process control method of claim 32
wherein Fl'ar&(k) are set by an economic load allocation
module.
37. The process control method of claim 31 wherein the controlling of the loads 1, 2, . . ., N based on the dynamic energy demand requirements comprises: constraining each of the dynamic energy demand requirements to a corresponding limit; and, controlling the loads 1, 2, . . ., N based on the corresponding constrained dynamic energy demand requirements.
38. The process control method of claim 37 wherein the corresponding limits comprise corresponding maximum limits.
39. The process control method of claim 37 wherein the corresponding limits comprise corresponding minimum limits.
40. The process control method of claim 37 wherein the corresponding limits comprise corresponding minimum limits and corresponding maximum limits.
41. The process control method of claim 31 wherein the total energy requirements allocated to the loads 1, 2, . . . , N at prediction points k = 0, 1, 2,
. . , K are designated F^" , and wherein the process
control method further comprises;
determining a change AF? n in the total energy
requirements allocated to the loads 1, 2, N according to the following equation:
AFdy" = DF^" - FaU
wherein D is a (K + 1) by (K + 1) matrix given by the following equation:
and wherein F°cl is a ( K + 1 ) dimensional vector having an
actual energy consumption of the corresponding loads in the first component and zeros elsewhere as given by the following equation:
wherein i = 1, 2, . . ., N designates the loads, and
wherein AF "" is constrained to a corresponding limit.
42. The process control method of claim 41
wherein the corresponding limits for AF y" comprise
corresponding maximum limits.
43. The process control method of claim 41
wherein the corresponding limits for AFdy" comprise
corresponding minimum limits.
44. The process control method of claim 39
wherein the corresponding limits for AFdy" comprise corresponding minimum limits and corresponding maximum limits.
45. The process control method of claim 31 wherein the total energy requirement allocated to each of
the loads 1, 2, . . . , N is designated F™" , wherein the
dynamic energy demand requirement for each of the loads
1, 2, . . ., N is designated Fd " , and wherein F,dy" is
determined by minimizing the following quadratic function:
f(F,z) = F dyn ρ(i)+||z|rβ(2)
with respect to variables Fidyyn and z, wherein F -.dyyn and
-.unconstr are vectors each having a dimension 2N(K + 1), wherein Q(l) and Q(2) are each square N(K + 1) by N(K + 1) norm matrices given by the following equations:
wherein j = 1, 2, wherein I is a (K + 1) by (K + 1) unity
matrix, wherein w-1' and w,(2) are penalty weights for i =
1, . . ., N, and wherein z is a penalty vector having a 2N(K + 1) dimension.
46. The process control method of claim 45 wherein Funconstr and Fdyn each have dimensions K + 1.
47. The process control method of claim 45 wherein the controlling of the loads 1, 2, . . . , N based on the dynamic energy demand requirements comprises:
constraining F y" to corresponding limits; and,
controlling the load based on the constrained
F, " .
48. The process control method of claim 47 wherein the corresponding limits comprise corresponding maximum limits.
49. The process control method of claim 47 wherein the corresponding limits comprise corresponding minimum limits.
50. The process control method of claim 47 wherein the corresponding limits comprise corresponding minimum limits and maximum limits.
EP03781818A 2002-11-12 2003-11-07 Coordination in multilayer process control and optimization schemes Expired - Fee Related EP1563347B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US292708 2002-11-12
US10/292,708 US6832134B2 (en) 2002-11-12 2002-11-12 Coordination in multilayer process control and optimization schemes
PCT/US2003/035569 WO2004044663A1 (en) 2002-11-12 2003-11-07 Coordination in multilayer process control and optimization schemes

Publications (2)

Publication Number Publication Date
EP1563347A1 true EP1563347A1 (en) 2005-08-17
EP1563347B1 EP1563347B1 (en) 2009-09-30

Family

ID=32229510

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03781818A Expired - Fee Related EP1563347B1 (en) 2002-11-12 2003-11-07 Coordination in multilayer process control and optimization schemes

Country Status (6)

Country Link
US (1) US6832134B2 (en)
EP (1) EP1563347B1 (en)
CN (1) CN1735846A (en)
AU (1) AU2003287573A1 (en)
DE (1) DE60329521D1 (en)
WO (1) WO2004044663A1 (en)

Families Citing this family (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003288115A (en) * 2002-03-28 2003-10-10 Toshiba Corp Power plant integrated control system
US7454270B2 (en) * 2003-05-13 2008-11-18 Siemens Power Transmission & Distribution, Inc. Dynamic economic dispatch for the management of a power distribution system
US7209838B1 (en) * 2003-09-29 2007-04-24 Rockwell Automation Technologies, Inc. System and method for energy monitoring and management using a backplane
US7373222B1 (en) 2003-09-29 2008-05-13 Rockwell Automation Technologies, Inc. Decentralized energy demand management
US7469167B2 (en) * 2004-10-20 2008-12-23 Childress Jr Ronald L Predictive header pressure control
US7310572B2 (en) * 2005-09-16 2007-12-18 Honeywell International Inc. Predictive contract system and method
US20070088448A1 (en) * 2005-10-19 2007-04-19 Honeywell International Inc. Predictive correlation model system
JP5114026B2 (en) * 2006-06-28 2013-01-09 三洋電機株式会社 Demand control device
US20090030758A1 (en) 2007-07-26 2009-01-29 Gennaro Castelli Methods for assessing potentially compromising situations of a utility company
US8069359B2 (en) * 2007-12-28 2011-11-29 Intel Corporation System and method to establish and dynamically control energy consumption in large-scale datacenters or IT infrastructures
US7937928B2 (en) * 2008-02-29 2011-05-10 General Electric Company Systems and methods for channeling steam into turbines
US9818073B2 (en) 2009-07-17 2017-11-14 Honeywell International Inc. Demand response management system
US9760067B2 (en) 2009-09-10 2017-09-12 Honeywell International Inc. System and method for predicting future disturbances in model predictive control applications
JP5510019B2 (en) * 2010-04-16 2014-06-04 富士通株式会社 Power control method, program and apparatus
US8972070B2 (en) 2010-07-02 2015-03-03 Alstom Grid Inc. Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes
US8538593B2 (en) 2010-07-02 2013-09-17 Alstom Grid Inc. Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast
US9727828B2 (en) * 2010-07-02 2017-08-08 Alstom Technology Ltd. Method for evaluating operational and financial performance for dispatchers using after the fact analysis
US9558250B2 (en) * 2010-07-02 2017-01-31 Alstom Technology Ltd. System tools for evaluating operational and financial performance from dispatchers using after the fact analysis
US9093840B2 (en) 2010-07-02 2015-07-28 Alstom Technology Ltd. System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast
US20110071690A1 (en) * 2010-07-02 2011-03-24 David Sun Methods that provide dispatchers in power grid control centers with a capability to manage changes
US20110029142A1 (en) * 2010-07-02 2011-02-03 David Sun System tools that provides dispatchers in power grid control centers with a capability to make changes
ES2395659B1 (en) * 2011-06-30 2013-05-23 Universidad Nacional De Educación A Distancia METHOD AND GUIDANCE SYSTEM BY DERIVATIVE CONTROL.
US9811130B2 (en) * 2011-09-12 2017-11-07 The Boeing Company Power management control system
US9163828B2 (en) * 2011-10-31 2015-10-20 Emerson Process Management Power & Water Solutions, Inc. Model-based load demand control
US9989937B2 (en) * 2013-07-11 2018-06-05 Honeywell International Inc. Predicting responses of resources to demand response signals and having comfortable demand responses
CN103617548B (en) * 2013-12-06 2016-11-23 中储南京智慧物流科技有限公司 A kind of medium-term and long-term needing forecasting method of tendency, periodically commodity
US9665078B2 (en) 2014-03-25 2017-05-30 Honeywell International Inc. System for propagating messages for purposes of demand response
US10541556B2 (en) 2017-04-27 2020-01-21 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
NL2021038B1 (en) * 2018-06-01 2019-12-10 Stork Thermeq B V Steam boiler assembly
JP7107073B2 (en) * 2018-08-02 2022-07-27 三浦工業株式会社 By-product gas utilization system
CN109870924B (en) * 2019-01-18 2021-06-01 昆明理工大学 Distributed system control method for model predictive control by applying multilayer steady-state target calculation
CN110794679A (en) * 2019-11-08 2020-02-14 浙江大学 Prediction control method and system for load regulation of industrial steam supply system
CN111290283B (en) * 2020-04-03 2021-07-27 福州大学 Additive manufacturing single machine scheduling method for selective laser melting process

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4110825A (en) * 1977-04-28 1978-08-29 Westinghouse Electric Corp. Control method for optimizing the power demand of an industrial plant
JPS5947936A (en) * 1982-09-10 1984-03-17 株式会社東芝 Load controller of combined cycle turbine plant
CA1245282A (en) 1984-10-25 1988-11-22 Alan Martens Steam turbine load control in a combined cycle electrical power plant
US5301499A (en) 1990-06-28 1994-04-12 General Electric Company Overspeed anticipation and control system for single shaft combined cycle gas and steam turbine unit
JP2539540B2 (en) * 1990-09-19 1996-10-02 株式会社日立製作所 Process control equipment
US5704011A (en) * 1994-11-01 1997-12-30 The Foxboro Company Method and apparatus for providing multivariable nonlinear control
US6381504B1 (en) * 1996-05-06 2002-04-30 Pavilion Technologies, Inc. Method for optimizing a plant with multiple inputs
US6438430B1 (en) * 1996-05-06 2002-08-20 Pavilion Technologies, Inc. Kiln thermal and combustion control
US6681155B1 (en) * 1998-08-31 2004-01-20 Mitsubishi Chemical Corporation Optimizing control method and optimizing control system for power plant
US6714899B2 (en) * 1998-09-28 2004-03-30 Aspen Technology, Inc. Robust steady-state target calculation for model predictive control
DE59913911D1 (en) * 1999-08-02 2006-11-23 Siemens Schweiz Ag Predicative device for regulating or controlling supply quantities
US6591225B1 (en) * 2000-06-30 2003-07-08 General Electric Company System for evaluating performance of a combined-cycle power plant
US6597958B1 (en) * 2001-03-22 2003-07-22 Abb Automation Inc. Method for measuring the control performance provided by an industrial process control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2004044663A1 *

Also Published As

Publication number Publication date
US20040093124A1 (en) 2004-05-13
US6832134B2 (en) 2004-12-14
DE60329521D1 (en) 2009-11-12
CN1735846A (en) 2006-02-15
AU2003287573A1 (en) 2004-06-03
WO2004044663A1 (en) 2004-05-27
EP1563347B1 (en) 2009-09-30

Similar Documents

Publication Publication Date Title
US6832134B2 (en) Coordination in multilayer process control and optimization schemes
US5873251A (en) Plant operation control system
Ordys et al. Modelling and simulation of power generation plants
Akimoto et al. An optimal gas supply for a power plant using a mixed integer programming model
JP4856468B2 (en) Load frequency control device and load frequency control method
JP3299531B2 (en) Power plant
Schmal et al. Internal versus external heat integration: operational and economic analysis
Aurora et al. Predictive control of thermal power plants
Herrmann et al. A robust sliding-mode output tracking control for a class of relative degree zero and non-minimum phase plants: a chemical process application
Noor et al. Quantifying the demand-side response capability of industrial plants to participate in power system frequency control schemes
Prasad et al. A hierarchical physical model-based approach to predictive control of a thermal power plant for ef” cient plant-wide disturbance rejection
Sandou et al. Short term optimization of cogeneration systems considering heat and electricity demands
Rossiter et al. Applying predictive control to a fossil-fired power station
Kwon et al. Steam temperature controller with LS-SVR-based predictor and PID gain scheduler in thermal power plant
JP2008280972A (en) Optimal operation method for steam system
JPH11223302A (en) Automatic control device and method of power generating plant
Kaya Energy: Industrial energy control: The computer takes charge: Limited intelligence will suffice for local control, but computers are needed for overall system control
JP3649454B2 (en) Power plant control method
JP2856601B2 (en) Operation control device for multiple distribution stations
Swartz An algorithm for hierarchical supervisory control
Jun et al. Supervisory-plus-regulatory control design for efficient operation of industrial furnaces
Hansen et al. A toolbox for simulation of multilayer optimisation system with static and dynamic load distribution
Rivadeneira et al. Dynamic allocation of industrial utilities as an optimal stochastic tracking problem
Kristoffersen et al. Optimal and robust production of high pressure steam
Kaya et al. Methods of energy efficient control and optimization for combined-cycle cogeneration

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20050523

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

DAX Request for extension of the european patent (deleted)
RBV Designated contracting states (corrected)

Designated state(s): DE

17Q First examination report despatched

Effective date: 20060224

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE

REF Corresponds to:

Ref document number: 60329521

Country of ref document: DE

Date of ref document: 20091112

Kind code of ref document: P

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20100701

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20191129

Year of fee payment: 17

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60329521

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES