DE2327691C2 - Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬ - Google Patents

Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬

Info

Publication number
DE2327691C2
DE2327691C2 DE2327691A DE2327691A DE2327691C2 DE 2327691 C2 DE2327691 C2 DE 2327691C2 DE 2327691 A DE2327691 A DE 2327691A DE 2327691 A DE2327691 A DE 2327691A DE 2327691 C2 DE2327691 C2 DE 2327691C2
Authority
DE
Germany
Prior art keywords
lines
connection
bundle
line
free
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE2327691A
Other languages
German (de)
Other versions
DE2327691B1 (en
Inventor
Heiko Dipl.-Ing. 8000 Muenchen Sorgenfrei
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE2327691A priority Critical patent/DE2327691C2/en
Priority to NL7406410A priority patent/NL7406410A/xx
Priority to IT2305974A priority patent/IT1017627B/en
Priority to FR7418085A priority patent/FR2232162A1/fr
Priority to DK286374A priority patent/DK286374A/da
Priority to LU70172A priority patent/LU70172A1/xx
Priority to JP6064374A priority patent/JPS5023104A/ja
Priority to SE7407196A priority patent/SE7407196L/
Priority to BE144921A priority patent/BE815743A/en
Publication of DE2327691B1 publication Critical patent/DE2327691B1/en
Application granted granted Critical
Publication of DE2327691C2 publication Critical patent/DE2327691C2/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q3/00Selecting arrangements
    • H04Q3/0016Arrangements providing connection between exchanges

Description

3 43 4

suche in entgegengesetzten Verkehrsrichtungen auf erforderlich machen wurden. Diese Ersparnis der Verein und derselben Verbindungsleitung Vorschub ge- kchrsbelastung der zentralen Steuerungen ist besonleistet. Für die betreffende Vermittlungsstelle — das ders deshalb so wesentlich, weil sie Zeiträume beist also die jeweils nicht bevorzugte Vermittlungs- trifft, in denen die zentralen Steuerungen ohnehin stelle — bedeutet dies, daß ein für eine Verbindungs- 5 ihre höchste Belastung aufweisen; denn der BeIahersteilung unternommener Belegxingsversuch der stungsgrad der Leitungsbfmdel ist einerseits ungefähr Belegung einer Verbindungsleitung abgebrochen und verhältnisgleich dem Belastungsgrad der zentralen von vorne beginnend wiederholt werden muß. Dies Steuerung und andererseits ungefähr verhältnisgleich stellt für die Steuereinrichtungen eine zusätzliche un- der Wahrscheinlichkeit des Zusammentreffens von günstige Belastung dar, die besser vermieden .väre. io zwei Verbindungen, die zugleich aufgebaut werdensearch in opposite directions of traffic. This saving the club and the same connection line, feed, load on the central controls is special. For the exchange in question - this is so essential because it contributes time periods So the not preferred switching meets in which the central controls anyway place - this means that a connection 5 has its highest load; because of the granting of shares Attempted occupation test the degree of performance of the lines is on the one hand approximate Occupancy of a connection line broken off and in proportion to the load on the central one must be repeated starting from the beginning. This control and on the other hand approximately proportionate represents for the control devices an additional and the probability of the coincidence of a favorable burden that would be better avoided. io two connections that are established at the same time

Für die Erfindung besteht deshalb die Aufgabe, und Leitungen ein und desselben Bündels in verdie FälL gleichzeitiger und sich auf ein und dieselbe schiedenen Verkehrsrichtungen beanspruchen. Diese Verbindungsleitung richtender Belegungsvereuche in Wahrscheinlichkeit ist nämlich umso höher, je kleientgegengesetzten Verkehrsrichtungen möglichst ner die Anzahl der jeweils noch freien Leitungen weitgehend zu vermeiden. Hierbei soll aber zwecks 15 eines Bündels ist.For the invention there is therefore the object, and lines of one and the same bundle in verdie Fallen simultaneously and claiming one and the same different traffic directions. These The probability of the connecting line directing occupancy attempts is higher, the smaller the opposite Traffic directions as far as possible to avoid the number of lines that are still free. Here, however, is intended for the purpose of 15 a bundle.

optimaler Veikehrsbelastung der Leitungsbündel das Durch die deutsche Auslegeschrift 1196 720 ist es Prinzip des im deutschen Patent 1 196 719 erläuterten zwar bereits bekannt, Amtsübertragungen in Grup- >vollkommenen Bündels« durch die Möglichkeit der pen zu ordnen, um in Abhängigkeit von der Ver-Verbindungsherstellung in beiden Richtungen auf kehrsbelastung den Teilnehmern verschiedener Besämtlichen Leitungen eines Bündels gewahrt werden, ao rechtigungsklassen in entsprechend unterschiedli-Diese Aufgabe setzt jedoch die Übermittlung der für ehern Umfange die Amtsübertragungen zugänglich zu die Herstellung, Aufrechterhaltung und Auslösung machen; Teilnehmer niedrigerer Berechtigungsklaserforderlichen Schaltkennzeichen auf bündeleigenem sen haben dabei zu zahlenmäßig weniger Gruppen Datenkanal nicht voraus, sondern zielt schlechthin von Amtsübertragungen Zugang als Teilnehmer höauf eine Verminderung der Gefahr der Doppelbele- as herer Berechtigungsklassen; Teilnehmer der höchsten gung von Verbindungsleitungen in entgegengesetzten Berechtigungsklasse haben z. B. Zugang zu allen Verkehrsrichtungen hin. Die Erfindung ist dadurch Gruppen von Amtsübertragungen. Diese bekannte gekennzeichnet, daß die Leitungen der in je ein Teil- Anordnung dient also einer gewissen Reservierung bündel für bevorzugte Verbindungsherstellung in der von Amtsverbindungsleitungen für Teilnehmer höheeinen Verkehrsrichtung und ein Teilbündel für be- 30 rer Berechtigungsklassen gegenüber Teilnehmern vorzugte Verbindungsherstellung in der anderen Ver- niedrigerer Berechtigungsklassen in Abhängigkeit kehrsrichtung unterteilten Leitungsbündel in der vom Auftreten höherer Verkehrsbelastungen, und Weise zur Verbindungsherstellung herangezogen zwar auf Kosten der Verkehrsmöglichkeiten der Teilwerden, daß in jeder der beiden durch das Leitungs- nehmer niedrigerer Berechtigungsklassen. Die angebündel verbundenen Vermittlungsstellen jeweils die 35 sprochene Gruppenbildung dient aber nicht zum Leitungen des bevorzugt für abgehende Verbin- Ausgleich der Verkehrsbelastung wie die vorliegende dungsherstellung vorgesehenen Teilbündels in an Erfindung und gibt bereits deshalb keine zur Lösung sich bekannter Weise abgehend in der gleichen Rei- der der Erfindung zugrunde liegenden Aufgabe gehenfolge belegt werden, wie sie bei vorausgegangener eigneten Hinweise. Darüber hinaus wird das Problem Verbindungsauslösung frei werden, und die Leitun- 40 der Gefahr der Doppelbelegung von Verbindungsleigen des bevorzugt der ankommenden Verbindungs- tungen in entgegengesetzten Verkehrsrichtungen herstellung vorbehaltenen Teilbündels nur bei Be- nicht berührt.optimal traffic load of the bundle of lines that By the German Auslegeschrift 1196 720 it is Principle of the already known in the German patent 1 196 719, transfers of office in groups "perfect bundle" through the possibility of the pen to be arranged in dependence on the connection establishment in both directions to the traffic load to the participants of various Besämnten Lines of a bundle are guaranteed, ao authorization classes in correspondingly differenti-These The task, however, involves the transmission of the official transfers accessible for iron volumes make the establishment, maintenance and triggering; Participants with lower eligibility requirements Switching indicators on bundle-owned sen have fewer groups in number Data channel does not advance, but simply aims for access as a subscriber from office transmissions a reduction in the risk of double-loading authorization classes; Participant of the highest supply of connecting lines in opposite authorization class have z. B. Access to all Traffic directions. The invention is thereby groups of office transfers. This well-known characterized in that the lines each in a partial arrangement thus serves a certain reservation bundle for preferential connection establishment at the level of trunk connection lines for subscribers Direction of traffic and a partial bundle for more than 30 admission classes for subscribers preferred connection establishment in the other lower authorization classes depending on In the direction of traffic, the trunk group divided by the occurrence of higher traffic loads, and Manner used to establish the connection, although at the expense of the traffic possibilities of the part, that in each of the two through the line user of lower authorization classes. The bundle connected exchanges each the 35 spoken group formation is not used for Lines of the preferred for outgoing connec- Compensating for the traffic load like this one preparation production provided sub-bundle in an invention and therefore does not give a solution In a known manner, proceeding in the same sequence of tasks on which the invention is based be documented, as they are with previous appropriate instructions. It also becomes the problem Connection release become free, and the lines 40 the risk of double occupancy of connection lines Preferably the incoming connections in opposite directions of traffic The partial bundle reserved for production is only not affected if it is affected.

setztsein aller Leitungen des anderen Teilbündels für In der Zeichnung ist ein Ausführungsbeispiel dersets all lines of the other sub-bundle for In the drawing, an embodiment is the

abgehenden Verbindungsverkehr in einer von der zu- Erfindung dargestellt, worauf diese jedoch keines-outgoing connection traffic shown in one of the to- invention, whereupon this no-

vor genannten Reihenfolge abweichenden Reihen- 45 wegs beschränkt ist.45 before the order mentioned is restricted to a different order.

folge belegt werden. An ein Koppelfeld K sind eingangsseitig Teilneh-can be occupied. On the input side of a switching matrix K subscribers are

Die Erfindung gewährleistet also eine gleichmä- merstationen Tl bis In und ausgangsseitig Verbinßige Verkehrsbelastung aller Leitungen eines Bün- dungsleitungen, z.B. Bi bis BO, angeschlossen. Die dels und eine optimale Verkehrsbelastbarkeit der Bün- Verbindungsleitungen sind in Leitungsbündel B, C del durch Wahrung des Prinzips des »vollkommenen 50 und weitere, nicht gezeigte, zusammengefaßt. Alle Bündels«. Hierbei verringert die Erfindung ganz ent- Leitungen der Leitungsbündel sind für doppeltgescheidend die Gefahr der Doppelbelegung einer Ver- richteten Verkehr vorgesehen. Das heißt, auf jeder bindungsleitung infolge gleichzeitiger Belegung der Leitung können sowohl Verbindungen in von der in betreffenden Verbindungsleitung in entgegengesetzter der Zeichnung dargestellten Vermittlungsstelle abge-Verkehrsrichtung. Dadurch wird die Belastung zen- 55 hender Verkehrsrichtung als auch in ankommender traler Steuereinrichtungen herabgesetzt, die bei sol- Verkehrsrichtung hergestellt werden. Abgehende chen Doppelbelegungen oder dem Versuch solcher Verbindungen sind also solche von einer Teilnehmer-Doppelbelegungen die Aufgabe haben, Doppelbele- station, z. B. T1, zu einer Verbindungsleitung, z. B. gungen zu vermeiden und für zwei gleichzeitig im Bl, und ankommende solche von einer Verbin-Aufbau befindliche und in verschiedenen Verkehrs- 60 dungsleitung, z. B. B 5, zu einer Teilnehmerstation, richtungen Leitungen ein und desselben Leitungs- z.B. Tn. — Für den Fall, daß außerdem auch bündeis beanspruchende Verbindungen zwei ver- Durchgangsverbindungen herzustellen sind, wird als schiedene Verbindungsleitungen hierfür bereitzustel- Koppelfeld zweckmäßig ein solches mit Umkehrten. Dadurch, daß die Erfindung bereits den Versuch gruppierung gemäß dem deutschen Bündel von Versolcher gegenläufiger Doppelbelegungen nahezu ver- 65 bindungsleitungen verlaufen, bekanntlich zwischen je unmöglicht, erspart sie den zentralen Steuerungen zwei Vermittlungsstellen. Eine davon ist in der Verbindungsversuche, die erfolglos bleiben und ein Zeichnung auszugsweise dargestellt. Das Leitungsnochmaliges Tätigwerden der zentralen Steuerung bündel B verläuft von der dargestellten Vermittlungs-The invention thus ensures a gleichmä- merstationen Tl to In and the output side Verbinßige traffic load of all the lines-making lines of a basis, has, for example, Bi up BO connected. The dels and an optimal traffic load capacity of the bundle connection lines are summarized in line bundles B, C del by maintaining the principle of the "perfect 50" and others, not shown. All bundles «. In this case, the invention completely reduces the risk of double occupancy of a traffic that is carried out. That is, on each connection line as a result of the simultaneous seizure of the line, both connections in the traffic direction from the exchange shown in the relevant connection line in the opposite direction of the drawing can be used. As a result, the load in the incoming traffic direction as well as in incoming central control devices is reduced, which are established in the case of sol traffic direction. Outgoing small double assignments or attempts to make such connections are those of a subscriber double assignments that have the task of double assignment, e.g. B. T1, to a connecting line, e.g. B. conditions to avoid and for two at the same time in the Bl, and incoming such from a connection structure located and in different traffic 60 training line, z. B. B 5, to a subscriber station, directions lines one and the same line eg Tn . The fact that the invention already makes the attempt grouping according to the German bundle of Versolcher opposing double assignments almost connecting lines run, as is well known, between each impossible, it saves the central controls from two exchanges. One of them is shown in the connection attempts that remain unsuccessful and a drawing is shown in extracts. The central control bundle B takes action again from the switching center shown.

stelle zu einer weiteren, nicht dargestellten, jedoch terien über den Freizustand der betreffenden Leiebenso aufgebauten Vermittlungsstelle. Jedes Lei- tung. In dem Speicherteil S (B 1 bis B 4) werden dietungsbündel, z.B. B, ist in zwei TeilbündelBa und jenigen der Leitungen des BündelteilsBa eingeschrie- Bb unterteilt. Das Teilbündel Ba dient vorzugsweise ben, die frei sind. In dem Speicherteil S (B S bis B 0) zur Herstellung von abgehenden Verbindungen. Das 5 werden ebenfalls diejenigen Leitungen des Bündel-Leitungsbündel Bb dient vorzugsweise zur Herstel- teils Bb eingeschrieben, die frei sind. Die Leitungen lung von ankommenden Verbindungen. der Bündelteile werden nun nicht etwa in einer festen Da bezüglich der dargestellten Vermittlungsstelle Zuordnung zu den nacheinander angeordneten abgehende Verbindungen die gleichen sind, wie be- Speicherzeilen der Speicherteile eingeschrieben, sonzüglich der nicht dargestellten Gegen-Vermittlungs- io dem in der Reihenfolge ihres Freiwerdens. Wird also stelle die ankommenden Verbindungen, sind in die- eine Leitung eines Bündelteils infolge Verbindungsser Gegen-Vermittlungsstelle die jeweiligen beiden auslösung wieder frei, so wird sie über die Zentral-Bündelteile vertauscht bezeichnet. Der Bündelteil Ba steuerung .Z in den zugehörigen Speicherteil einge-(bzw. Bb) in der dargestellten Vermittlungsstelle ist schrieben. Wird danach eine weitere Leitung desselin der betreffenden Gegen-Vermittlungsstelle mit Bb 15 ben Bündelteils frei, so wird sie anschließend in der (bzw. Ba) bezeichnet. nächsten Zeile des betreffenden Speicherteils einge-Das Unterteilungsverhältnis der Bündel in jeweils schrieben. Aus der Reihenfolge der Einschreibung zwei Teilbündel ist den gegebenen Verkehrsverhältnis- der Leitungsadressen ist dann also erkennbar, welche sen angepaßt. Beträgt also z. B. auf dem Leitungs- von den eingeschriebenen freien Leitungen diejenige bündel B der Anteil der abgehenden Verbindung 20 ist, die schon am längsten frei ist. Bei der Leitungs-40% und der der ankommenden Verbindungen auswahl zur Verbindungsherstellung läßt sich da-60 %, so werden die Leitungen dieses Bündels im durch auf sehr einfache Weise eine möglichst gleichgleichen Verhältnis aufgeteilt: 40 Ve der Leitungen mäßige Verkehrsbelastung aller Leitungen erreichen, gehören zu dem vorzugsweise für abgehende Verbin- Für abgehende Verbindungen werden — wie bedungen vorgesehenen Teilbündel Ba und 60 % der as reits erwähnt — vorzugsweise die Leitungen B1 bis Leitungen gehören zu dem vorzugsweise für ankom- B 4 des Bündelteils Ba verwendet. Das heißt, sofern mende Verbindungen vorgesehenen Teilbündel Bb. wenigstens eine Leitung dieses Bündelteils noch frei Die Steuerungsvorgänge, z. B. also die Einstellvor- ist, wird sie für die Verbindungsherstellung in Angänge für das Koppelfeld K, werden mit Hilfe einer spruch genommen. Sind dagegen alle Leitungen des gemeinsamen Zentralsteuerung Z abgewickelt. Ein- 30 bevorzugt für die abgehende Verbindungsherstellung zelheiten dieser Steuerungsvorgänge mögen z. B. dem vorgesehenen Bündelteils Ba belegt, und ist in diesem deutschen Patent 1 537 849 entnommen werden. Die Betriebszustand eine weitere Verbindung abgehend Zentralsteuerung Z verfügt über einen zentralen herzustellen, so wird hierzu eine der freien Leitungen Speicher, in welchem unter anderem die Belegungs- des bevorzugt für ankommende Verbindungsherstelzustände aller Zwischenleitungen und aller Eingänge 35 lung vorgesehenen Bündelteils Bb verwendet,
und aller Ausgänge des Koppelfeldes K gespeichert Sofern bei Herstellung einer abgehenden Verbinwerden. Aus diesem Speicher vermag die Zentral- dung noch mehrere Leitungen des bevorzugt für absteuerungZ also zu entnehmen, welche Zwischenlei- gehende Verbindungsherstellung vorgesehenen Büntungen, Eingänge und Ausgänge im jeweiligen Be- delteilsBa frei sind, wird an Hand der Reihenfolge triebszustand frei oder besetzt sind. Bei der der Ver- 40 ihrer Einschreibung im Speicherteil S (B 1 bis B 4) bindungsherstellung jeweils vorausgehenden Wege- diejenige Leitung ausgewählt, welche bereits am suche und Wegeauswahl entnimmt die Zentralsteue- längsten frei ist. In der gleichen Weise wird bei Herrung Z die betreffenden Daten und verknüpft sie mit- stellung einer ankommenden Verbindung von den einander. Unter anderem hat die Zentralsteuerung noch freien Leitungen des Bündelteils Bb in der in die Aufgabe, bei Ansteuerung eines bestimmten Lei- 45 der Zeichnung nicht dargestellten Gegen-Vermitttungsbündels, z. B. B, eine bestimmte freie Leitung lungsstelle diejenige freie Leitung ausgewählt, die bezu belegen. reits am längsten frei ist. Die bereits am längsten Im Speicher S sind unter anderem Speichereinhei- freien Leitungen sind — wie bereits ausgeführt ten SB vorgesehen, in denen Daten über den BeIe- wurde — in dem betreffenden Speicherteil jeweils in gungszustand der Leitungen der verschiedenen Lei- 5° der ersten Speicherzeile eingeschrieben,
tungsbündel abgespeichert sind. Da jede der Leitun- Sofern bei Herstellung einer abgehenden Verbingen jedes Leitungsbündels an einer bestimmten Stelle dung in dem bevorzugt für abgehende Verbindungsam Koppelfeld angeschlossen ist, trägt jede Leitung herstellung vorgesehenen Bündelteil Ba keine Leieine Adresse. Die Speicherung des Belegongszustan- tung mehr frei ist, wird für die Verbindungsdurchdes jeder Leitung hn Speichers erfolgt unter der je- 55 schaltung eine der freien Leitungen des bevorzugt für weiligen Leitungsadresse. Die für die Belegungszu- ankommende Verbindungsherstellung vorgesehenen standsspeicherung der Verbmdungsleitungen vorge- Bündelteils Bb ausgewählt. Hierbei wird nicht die am sehenen Speicheremheiten, z.B. SB, des SpeichersS längsten bereits freie Leitung, sondern die zuletzt bestehen entsprechend der Bündelunterteilung m frei gewordene Leitung ausgewählt Da die Reihenzwei Teilbündel ebenfalls aus zwei Spetcherteilen. 60 folge der Einschreibung der frei gewordenen Leitun-Der Speicherteils (Bl bis B4) der Speicheren!- gen eines Bündelteils in den betreffenden beiden heu SB entspricht dem Bündelteil Ba (Bl bis B 4) Vermittlungsstellen die gleiche ist, wird durch die bei des Leitungsbündels B. Der Speicherteil S (B 5 bis der Auswahl einer freien Leitung in einem Teilbün-B 0) entspricht dem Bündel Bb. Die Speicherteile be- del angewendete gegenläufige Auswahlreihenfolge in stehen wiederum aus Speicherzeilen. Jede Speicher- 65 den beiden betreffenden Vermittlungsstellen sicherzeile dient zur Aufnahme der Adresse und der Lei- gestellt, daß diese Auswahl auch bei Gleichzeitigkeit tungsdaten jeweils einer der Leitungen. Bei diesen zweier Auswahlvorgänge in diesen beiden Vermitt-Leitungsdaten handelt es sich unter anderem um Kri- lungsstellen niemals auf dieselbe Verbindungsleitung
place to a further, not shown, but series over the free status of the relevant Leiebens in such a structured exchange. Every line. In the storage part S (B 1 to B 4) are diet bundles, for example B, is divided into two sub-bundles Ba and those of the lines of the bundle part Ba inscribed Bb . The sub-bundle Ba is preferably used ben that are free. In the memory part S (BS to B 0) for the establishment of outgoing connections. The 5 are also those lines of the bundle-line bundle Bb , preferably used for the production part Bb , which are free. The lines development of incoming connections. the bundle parts are now not written in a fixed. Since with regard to the switching center shown, the assignment to the consecutively arranged outgoing connections are the same as the memory lines of the memory parts, plus the counter switching (not shown) in the order in which they become free. If, therefore, the incoming connections are made, if the respective two tripping are released again in one line of a bundle part as a result of the connection between the counterpart switching center, then it is called interchanged over the central bundle parts. The bundle part Ba control .Z is written into the associated memory part (or Bb) in the switching center shown. If a further line is then free in the relevant counterpart exchange with Bb 15 ben bundle part, it is then designated in the (or Ba) . The subdivision ratio of the bundles in each case is written in the next line of the relevant memory section. From the order of the enrollment of two sub-bundles is the given traffic situation - the line addresses can then be recognized which sen is adapted. So z. B. on the line from the inscribed free lines that bundle B is the portion of the outgoing connection 20 that has been free the longest. With the line-40% and that of the incoming connections for the connection establishment there can be -60%, so the lines of this bundle are divided in a very simple way in the same ratio as possible: 40 Ve of the lines achieve a moderate traffic load of all lines, belong For outgoing connections are - as conditionally provided sub-bundles Ba and 60% of the as already mentioned - preferably the lines B1 to lines belong to the preferably used for incoming B 4 of the bundle part Ba . That is to say, provided that the sub-bundle Bb is provided. At least one line of this bundle part is still free. B. So the setting is before, it is for the connection establishment in approaches for the switching matrix K, are taken with the help of a saying. If, however, all lines of the common central control Z are handled. A 30 preferred for the outgoing connection establishment details of these control processes such. B. occupied by the intended bundle part Ba , and can be found in this German patent 1,537,849. The operating state of a further connection outgoing central control Z has a central one to be established, so for this purpose one of the free lines memory is used, in which, among other things, the bundle part Bb provided is preferably used for incoming connection establishment states of all intermediate lines and all inputs.
and all outputs of the switching matrix K are stored, provided that an outgoing connection is established. From this memory, the central connection can still take several lines of the preferred for absteuerZ so which intermediate connection establishment provided bungs, entrances and exits are free in the respective loading part, is based on the sequence operating status are free or occupied. When the route prior to the creation of the connection in each case of their enrollment in the memory part S (B 1 to B 4) is selected, the line is selected which is already looking for and taking the route selection and the central control is longest free. In the same way, Herrung Z takes the relevant data and links them with an incoming connection from each other. Among other things, the central control still has free lines of the bundle part Bb in the task, when a certain line is activated, the counter-switching bundle, not shown in the drawing, e.g. B. B, a certain free line management point selected that free line that occupy bezu. has been free for the longest. The lines that have already been in the memory S for the longest time are, among other things, memory units - as already stated SB , in which data about the BeIe was provided - in the relevant memory part in each case in the supply state of the lines of the various lines of the first memory line registered,
bundles are stored. Since each of the lines is connected to the switching network preferably for outgoing connections when an outgoing connection is established, each line bundle is connected to a certain point, each line production part of the bundle Ba does not have an address. The storage of the occupancy status is more free, for the connection through the each line hn memory takes place under the respective circuit one of the free lines of the preferred for the respective line address. The state-of-the-art storage of the connection lines provided for the connection establishment to be seized prior to bundle part Bb selected. In this case, it is not the line that has been free for the longest time, such as SB, of the store S, but the line that has become free according to the bundle subdivision m selected. The storage part (B1 to B4) of the storages! - gen a bundle part in the two concerned hay SB corresponds to the bundle part Ba (B1 to B4) exchanges is the same, is the same by the line bundle B. The memory section S (B 5 to the selection of a free line in a sub-group B 0) corresponds to the bundle Bb . Each memory line of the two relevant switching centers serves to receive the address and the line, so that this selection is made even if line data is used for one of the lines at the same time. These two selection processes in these two switching line data are, among other things, scandal points never on the same connection line

treffen kann, es sei denn, es ist nur noch eine einzige Leitung frei. In diesem Fall, der ohnehin eine Ausnahme ist, kann aber ohnehin eine der beiden gewählten Verbindungen nicht durchgeschaltet werden. Es ist aber ebensogut auch möglich, für den Fall der Auswahl einer freien Leitung für die Herstellung einer abgehenden Verbindung aus dem bevorzugt für die ankommende Verbindungsherstellung vorgesehenen Teilbündel nicht die jeweils zuletzt frei gewordene Leitung auszuwählen, sondern die bereits am zweitlängsten freie Leitung dieses Teilbündels. In diesem Falle wird also ebenso wie bei der Auswahl einer freien Leitung aus dem bevorzugt für abgehende Verbindungen vorgesehenen Teilbündel Ba eine Auswahl unter den freien Leitungen entsprechend der chronologischen Reihenfolge vorgenommen, in der die Leitungen zuvor frei geworden sind. Hierbei wird jedoch lediglich diejenige freie Leitung ausgelassen, die am längsten bereits frei ist. Dadurch wird zugleich gewährleistet, daß bei Besetztsein allerunless there is only one free line left. In this case, which is an exception anyway, one of the two selected connections cannot be switched through anyway. However, if a free line is selected for the establishment of an outgoing connection, it is just as possible not to select the line that was last vacated from the sub-bundle that is preferably intended for the establishment of the incoming connection, but rather the second-longest free line of this sub-bundle. In this case, as with the selection of a free line from the sub-bundle Ba preferably provided for outgoing connections, a selection is made among the free lines according to the chronological order in which the lines were previously free. In this case, however, only the free line that has been free for the longest is left out. This ensures at the same time that when everyone is occupied

Leitungen des für eine der beiden Verkehrsrichtungen vorgesehenen Bündelteils diejenigen des für die andere Verkehrsrichtung vorgesehenen Bündelteils nicht unbeschränkt beansprucht werden können. Vielmehr wird für die Verbindungsherstellung in der anderen Verkehrsrichtung, für die ja der andere Bündelteil vorgesehen ist, immer noch eine freie Leitung reserviert.
Es ist auch noch darauf hinzuweisen, daß durch
Lines of the bundle part intended for one of the two traffic directions those of the bundle part intended for the other traffic direction cannot be used without restriction. Rather, a free line is still reserved for establishing the connection in the other traffic direction, for which the other part of the bundle is intended.
It should also be pointed out that through

ίο die Unterteilung der Bündel in jeweils zwei Teilbündel das Prinzip des »vollkommenen Bündels« erhalten bleibt. Denn jede der Teilnehmerstationen T1 bis Tn kann mit jeder der Leitungen beider Teilbündel Ba und Bb des Leitungsbündels B sowohl in abgehenden als auch in ankommenden Verbindungen zusammengeschaltet werden. Gleiches betrifft die anderen Leitungsbündel.ίο the subdivision of the bundles into two sub-bundles each, the principle of the "perfect bundle" is retained. This is because each of the subscriber stations T 1 to Tn can be interconnected with each of the lines of both sub-bundles Ba and Bb of the line bundle B in both outgoing and incoming connections. The same applies to the other trunk groups.

Zur Technik der Auswahl von Leitungen mittels eines Speichers sei auf die deutsche Patentschrift 1 800 656 hingewiesen.For the technique of selecting lines by means of a memory, refer to the German patent specification 1 800 656 pointed out.

Hierzu 1 Blatt Zeichnungen .509617/248 1 sheet of drawings .509617 / 248

Claims (4)

1 2 gegebenenfalls in der gleichen Reihenfolge belegt Patentansprüche: werden. "; Es ist bereits bekannt, den Belegungszustand von1 2 if necessary, in the same order occupied Claims: are. "; It is already known the occupancy status of 1. Verfahren zur Belegung von Verbbidungs- Verbindungsleitungen, d. h. ob sie frei sind oder beleitungen in Femmeldevermittlungsanlagen, insbe- 5 setzt, in einem zentralen Speicher einzuschreiben, sondere Femsprechvermittlungsanlagen, in denen Hierbei werden Adressen der frei werdenden Verbindiese Verbindungsleitungen von ihren beiden En- diujgsleitungen in der chronologischen Reihenfolge den her belegbar sind, und in denen zum Aus- ihres Freiwerdens gespeichert. Um eine möglichst gleich der Verkehrsbelastung die Reihenfolge des gleichmäßige Verkehrsbelastung aller Leitungen Freiwerdens bei Verbindungsauslösung der Ver- io zwecks gleichmäßiger Abnutzung aller der Abnutbindungsleitungen gespeichert wird und die Ver- zung unterliegenden Bestandteile der Verbindungsbindungsleitungen bei erneuter Verbindungsher- leitungen zu erzielen, ist es üblich, bei Auswahl einer stellung gegebenenfalls in der gleichen Reihen- freien Verbindungsleitung die jeweils bereits am folge belegt werden, dadurch gekenn- längsten freie Verbindungsleitung auszuwählen, also zeichnet, daß die Leitungen der in je ein 15 diese Auswahl entsprechend ihrer chronologischen Teilbündel für bevorzugte Verbindungsherstel- Speicherung vorzunehmen. Dieses Verfahren läßt lung in der einen Verkehrsrichtung und ein Teil- sich in Vermittlungsanlagon, in denen die den Bebündel für bevorzugte Verbindungsherstellung in triebszustand von Verbindungsleitungen anzeigenden <3er anderen Verkehrsrichtung unterteilten Lei- Daten zentral gespeichert und mittels Adressen der tungsbündel in der Weise zur Verbindungsher- ao Verbindungsleitungen aus dem betreffenden Speicher !teilung herangezogen werden, daß in jeder der abgefragt werden, in besonders einfacher Weise verbeiden durch das Leitungsbündel verbundenen wirklichen.1. Procedure for the assignment of connection lines, d. H. whether they are free or guided in telecommunication switching systems, especially 5 to be written in a central memory, Special telephony switching systems, in which here the addresses of the free connections Connecting lines from their two end lines in chronological order which are verifiable and in which they are stored to become free. To get one as possible equal to the traffic load the sequence of the equal traffic load of all lines When the connection is released, the verio becomes free for the purpose of uniform wear of all of the wear connection lines is stored and the constituent parts of the connecting link lines which are subject to distortion to achieve when deriving connections again, it is common to select a position, if necessary, in the same row-free connection line that was already on sequence, thereby selecting the longest free connection line, i.e. draws that the lines of each in a 15 this selection according to their chronological Carry out sub-bundle for preferred connection establishment storage. This procedure leaves ment in the one traffic direction and a part in switching system, in which the bundle for preferred connection establishment in the operating state of connection lines indicating <3 other traffic direction subdivided Lei data stored centrally and using addresses of the bundle of services in the manner for connecting her- ao connecting lines from the relevant memory ! division can be used that in each of the interrogated, two in a particularly simple way real connected by the bundle of wires. Vermittlungsstellen jeweils die Leitungen des be- Die Erfassung unter anderem der Belegungszuvorzugt für abgehende Verbindungsherstellung stände der Verbindungsleitungen in einem zentralen vorgesehenen Teilbündels in an sich bekannter as Speicher ist insbesondere in solchen Fernmeldever-Weise abgehend in der gleichen Reihenfolge be- mittlungsanlagen zweckmäßig, in denen den Bündeln legt werden, wie sie bei vorausgegangener Ver- von Verbinduugsleitungen einzeln zentrale Datenkabindungsauslösung frei werden, und die Leitun- näle zur Übermittlung aller während der Herstellung, gen des bevorzugt der ankommenden Verbin- Aufrechterhaltung und Auslösung von Verbindungen dungsherstellung vorbehaltenen Teilbündels nur 30 dienenden Schaltkennzeichen zugeordnet sind. Die bei Besetztsein aller Leitungen des anderen Teil- Speicherung der Belegungszustände der Leitungen bündeis für abgehenden Verbindungsverkehr in eines Bündels findet dann also in den an den beiden einer von der zuvor genannten Reihenfolge ab- Enden der Leitungen dieses Bündels liegenden Verweichenden Reihenfolge belegt werden. mittlungsstellen statt.Switching centers each take the lines of the loading The recording, among other things, the occupancy is preferred for outgoing connection establishment, the connection lines are located in a central provided sub-bundle in known as memory is particularly in such telecommunication manner outgoing in the same order information systems expediently in which the bundles are laid out, as they would be individually central data cable release when connecting cables had been connected beforehand become free, and the line tunnels for the transmission of all during the production, Incoming connection maintenance and release of connections is preferred The sub-bundle reserved for manufacturing production is assigned only 30 switching indicators. the when all lines of the other part are busy, the occupancy status of the lines is saved bündeis for outgoing connection traffic in a bundle is then found in the two a deviating end of the lines of this bundle from the order mentioned above Order. intermediaries take place. 2. Verfahren nach Anspruch 1, dadurch ge- 35 Diese Übermittlung der Schaltkennzeichen über kennzeichnet, daß die Leitungen des bevorzugt die den Leitungen der Bündel jeweils gemeinsamen der ankommenden Verbindungsherstellung vor- Datenkanäle schafft eine relativ große Sicherheit gebehaltenen Teilbündels in einer der Reihenfolge gen eine Doppelbelegung der Leitungen, indem bei ihres Fieiwerdens entgegengesetzten Reihenfolge Ncubelegung einer Verbindungsleitung in einer der belegt werden. 40 beiden Vermittlungsstellen die entsprechenden Da-2. The method according to claim 1, characterized in that the switching indicator is transmitted via indicates that the lines of the preferably common to the lines of the bundle the incoming connection establishment before data channels creates a relatively high level of security retained Partial bundle in one of the order genes a double assignment of the lines by at their occurrence opposite sequence Ncuassembly of a connection line in one of the be occupied. 40 transfer the relevant data to both exchanges 3. Verfahren nach Anspiuchl, dadurch ge- ten, unter anderem ihrer Adresse, zur anderen Verkennzeichnet, daß die Leitungen des bevorzugt mittlungsstelle übertragen werden, und indem die beder ankommenden Verbindungsherstellung vor- treffende Verbindungsleitung nur unter der Vorausbehaltcnen Teilbündels in einer der Reihenfolge setzung tatsächlich belegt wird, daß sie im Speicher ihres Freiwerdens entsprechenden, jedoch die in 45 der anderen Vermittlungsstelle bis dahin ebenfalls dieser Reihenfolge jeweils an erster Stelle ste- noch als frei eingespeichert ist. Sofern jedoch zuhende Leitung überspringenden Reihenfolge be- gleich eine Belegung derselben Verbindungsleitung in legt werden. Gegenrichtung in Vorbereitung ist, ist diese Verbin-3. The method according to Anspiuchl, characterized, among other things, their address, to the other marked, that the lines of the preferred switching center are transmitted, and by the operator incoming connection can only be made with the proviso Sub-bundle in one of the sequence setting is actually occupied that they are in the memory when they become free, but also in 45 of the other exchange until then in this order, in the first place, is still stored as free. However, provided that they are to be addressed Line skipping sequence same connection line in will be laid. Opposite direction is in preparation, this connection is 4. Schaltungsanordnung zur Durchführung des dungsleitung nicht mehr als frei gespeichert. In die-Verfahrens nach Anspruch 1, dadurch gekenn- 5° sem Falle wird eine gleichzeitige Belegung ein und zeichnet, daß das Größenverhältnis der beiden derselben Verbindungsleitung in beiden Richtungen Teilbündel eines Leitungsbündels den für jede unterbunden. Dies kann in bekannter Weise z. B. dader beiden Verkehrsrichtungen anfallenden Ver- durch sichergestellt werden, daß für den Fall der kehrsbelastungen entsprechend gewählt ist. Gleichzeitigkeit zweier Belegungsversuche, die sich4. Circuit arrangement for the implementation of the training line no longer saved as free. In the procedure according to claim 1, characterized 5 ° sem case a simultaneous occupancy and draws that the size ratio of the two of the same connecting line in both directions Part of a bundle of lines that is prevented for each. This can be done in a known manner, for. B. dader in both directions of traffic, it is ensured that in the event of traffic loads is selected accordingly. Simultaneous two occupancy attempts that 55 auf ein und dieselbe Verbindungsleitung richten, der einen Verkehrsrichtung Vorrang vor der anderen55 on one and the same connection line, one traffic direction taking precedence over the other Verkehrsrichtung gegeben wird. Das bedeutet, daßTraffic direction is given. It means that die eine im Aufbau befindliche Verbindung zum Zuge kommt, während für die andere Verbindungone connection under construction is used, while for the other connection Die Erfindung betrifft ein Verfahren zur Belegung 60 eine andere Leitung ausgewählt werden muß.The invention relates to a method for seizing 60 another line must be selected. von Verbindungsleitungen in Fernmeldevermittlungs- In diesem Falle ist zwar ein Zustandekommenof connecting lines in telecommunication switching In this case, it has come about anlagen, insbesondere Fernsprechvermittlungsanla- einer Falschverbindung durch Zusammenschaltungsystems, in particular telephone exchange system- a wrong connection through interconnection gen, in denen diese Verbindungsleitungen von ihren zweier rufender Teilnehmer infolge Doppelbelegunggen, in which these connecting lines from their two calling subscribers as a result of double occupancy beiden Enden her belegbar sind, und in denen zum einer doppelt gerichteten Verbindungsleitung in bei-both ends can be assigned, and in which, on the one hand, a double-directional connecting line in both Amsgleich der Verkehrsbelastung die Reihenfolge des 65 den Verkehrsrichtungen verhindert. Da jedoch dieAt the same time as the traffic load, the sequence of the traffic directions is prevented. However, since the Freiwerdens bei Verbindungsauslösung der Verbin- Leitungsauswahl in der chronologischen ReihenfolgeWhen the connection is released, the connection line selection is released in chronological order dungsleitungen gespeichert wird und die Verbin- ihres vorherigen Freiwerdens vorgenommen wird,connection lines are saved and the connection is made before they become free, dungsleitungen bei erneuter Verbindungsherstellung wird dem Zusammentreffen zweier Belegungsver-connection lines when the connection is re-established, the meeting of two occupancy
DE2327691A 1973-05-30 1973-05-30 Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬ Expired DE2327691C2 (en)

Priority Applications (9)

Application Number Priority Date Filing Date Title
DE2327691A DE2327691C2 (en) 1973-05-30 1973-05-30 Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬
NL7406410A NL7406410A (en) 1973-05-30 1974-05-13
IT2305974A IT1017627B (en) 1973-05-30 1974-05-22 CIRCUIT ARRANGEMENT FOR TELECOMMUNICATIONS SYSTEMS ESPECIALLY FOR SYSTEMS OF TELEPHONE SWITCHING CENTRAL UNITS WITH CONNECTION LINES FOR FORM RE TO CHOOSE ALTERNATIVE
FR7418085A FR2232162A1 (en) 1973-05-30 1974-05-24
DK286374A DK286374A (en) 1973-05-30 1974-05-27
LU70172A LU70172A1 (en) 1973-05-30 1974-05-28
JP6064374A JPS5023104A (en) 1973-05-30 1974-05-29
SE7407196A SE7407196L (en) 1973-05-30 1974-05-30
BE144921A BE815743A (en) 1973-05-30 1974-05-30 MOUNTING FOR TELECOMMUNICATION CENTERS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2327691A DE2327691C2 (en) 1973-05-30 1973-05-30 Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬

Publications (2)

Publication Number Publication Date
DE2327691B1 DE2327691B1 (en) 1974-08-29
DE2327691C2 true DE2327691C2 (en) 1975-04-24

Family

ID=5882656

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2327691A Expired DE2327691C2 (en) 1973-05-30 1973-05-30 Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬

Country Status (9)

Country Link
JP (1) JPS5023104A (en)
BE (1) BE815743A (en)
DE (1) DE2327691C2 (en)
DK (1) DK286374A (en)
FR (1) FR2232162A1 (en)
IT (1) IT1017627B (en)
LU (1) LU70172A1 (en)
NL (1) NL7406410A (en)
SE (1) SE7407196L (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE411611B (en) * 1978-05-22 1980-01-14 Ellemtel Utvecklings Ab SET UP AT A TELEPHONE STATION WHERE THE WIRES CAN BE SUBMITTED SAVEL FROM THIS STATION THAT SIMPLIFY FROM THE REMOTE STATION
JPS5647191A (en) * 1979-09-26 1981-04-28 Nec Corp Free trunk selection system
EP0185929A3 (en) * 1984-12-21 1988-04-20 Siemens Aktiengesellschaft Circuit arrangement for telecommunication exchanges, especially telephone exchanges, with subexchanges connected to exchanges via line bundles
JPS6251395A (en) * 1985-08-30 1987-03-06 Hitachi Ltd Two-way line selection system
JPH01284099A (en) * 1988-05-11 1989-11-15 Hitachi Ltd Exchange and its line two-way operating system
US6137875A (en) * 1997-05-30 2000-10-24 Lucent Technologies Inc. System and method to minimize glare in interoffice trunk allocation

Also Published As

Publication number Publication date
JPS5023104A (en) 1975-03-12
DE2327691B1 (en) 1974-08-29
NL7406410A (en) 1974-12-03
LU70172A1 (en) 1974-10-09
FR2232162A1 (en) 1974-12-27
IT1017627B (en) 1977-08-10
BE815743A (en) 1974-12-02
SE7407196L (en) 1974-12-02
DK286374A (en) 1975-01-13

Similar Documents

Publication Publication Date Title
DE2327691C2 (en) Method and circuit arrangement for the assignment of connecting lines in telecommunication switching systems, ins¬
DE2803065C2 (en) Unlimited expandable reverse coupling for telecommunication, especially telephone systems
DE3626870C2 (en)
DE2758775C2 (en) Process for handling switching processes in telephone systems, in particular telephone private branch exchanges, via connecting lines
EP0211245B1 (en) Circuit arrangement for telecommunication exchanges, particularly telephone exchanges, comprising switching networks for single and multichannel connexions
DE1165680B (en) Arrangement for telecommunications, in particular telephone systems with direct and detour traffic
DE3511618C2 (en)
DE1202345B (en) Circuit arrangement for establishing telephone connections
DE2635884C3 (en) Circuit arrangement for establishing and changing connections in computer-controlled telecommunications switching systems, in particular private branch exchanges
DE2922233C2 (en) Circuit arrangement for telecommunication switching systems, in particular telephone switching systems, with fault detection devices that detect faulty connection-specific switching devices
DE1537876C3 (en) Circuit arrangement for the production of connections between connection sets in telecommunication switching systems, in particular telephone branch exchange systems with cross connections
EP0213382A1 (en) Circuit arrangement for telecommunication exchanges, particularly for telephone exchanges equipped with control processors and traffic-measuring devices
DE3404087C2 (en)
CH631851A5 (en) Method for handling waiting function sequences in a centrally controlled telephone switching system, particularly in a centrally controlled telephone branch exchange
DE1912610C (en) Circuit arrangement for centrally controlled telecommunication switching systems, in particular telephone switching systems, with backflow lines
DE961988C (en) Circuit arrangement for telephone networks with self-dialing long-distance traffic
DE1299679B (en) Method for classifying connections in a switched data network
DE1917442C (en) Circuit arrangement for allocators for routing in centrally controlled telecommunications switching systems, in particular telephone switching systems
DE1901241C3 (en) Circuit arrangement for centrally controlled telecommunications, in particular telephone switching systems
DE2602129C3 (en) Circuit arrangement for telecommunications switching systems, in particular telephone switching systems with multi-stage switching networks
DE3012466A1 (en) Intelligent teleprinter group terminal system - has group terminals interconnected by pairs of control and data lines
DE1762807B2 (en) Method for searching for free connection paths in a telecommunications network
EP0185929A2 (en) Circuit arrangement for telecommunication exchanges, especially telephone exchanges, with subexchanges connected to exchanges via line bundles
DE1762170B2 (en) PROCEDURE FOR SEARCHING FREE CONNECTION ROUTES IN A REMOTE COMMUNICATION NETWORK
DE1110243B (en) Unrestricted number allocation regardless of the spatial location of the subscriber connections in the output multiple of the subscriber selection stage (s) of the local office enabling circuit arrangement for telecommunication, in particular telephone switching systems

Legal Events

Date Code Title Description
B1 Publication of the examined application without previous publication of unexamined application
C2 Grant after previous publication (2nd publication)