DE202006020218U1 - Stacking bridge and stacking bridge for a mobile conveyor system - Google Patents
Stacking bridge and stacking bridge for a mobile conveyor system Download PDFInfo
- Publication number
- DE202006020218U1 DE202006020218U1 DE202006020218U DE202006020218U DE202006020218U1 DE 202006020218 U1 DE202006020218 U1 DE 202006020218U1 DE 202006020218 U DE202006020218 U DE 202006020218U DE 202006020218 U DE202006020218 U DE 202006020218U DE 202006020218 U1 DE202006020218 U1 DE 202006020218U1
- Authority
- DE
- Germany
- Prior art keywords
- stacking
- sections
- bridge
- middle section
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G41/00—Supporting frames or bases for conveyors as a whole, e.g. transportable conveyor frames
- B65G41/007—Means for moving conveyor frames and control arrangements therefor
- B65G41/008—Means for moving conveyor frames and control arrangements therefor frames mounted on wheels or caterpillar
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G47/00—Article or material-handling devices associated with conveyors; Methods employing such devices
- B65G47/34—Devices for discharging articles or materials from conveyor
- B65G47/46—Devices for discharging articles or materials from conveyor and distributing, e.g. automatically, to desired points
- B65G47/51—Devices for discharging articles or materials from conveyor and distributing, e.g. automatically, to desired points according to unprogrammed signals, e.g. influenced by supply situation at destination
- B65G47/5195—Devices for discharging articles or materials from conveyor and distributing, e.g. automatically, to desired points according to unprogrammed signals, e.g. influenced by supply situation at destination for materials in bulk
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Loading Or Unloading Of Vehicles (AREA)
Abstract
Mobiles
Einstapel- und Ausstapelsystem zum Betrieb eines im Prinzip rechteckigen
On/Off-Lead Pads, bestehend aus einer an sich bekannten Einstapelbrücke (3)
und einer an sich bekannten Ausstapelbrücke (5) gekennzeichnet durch
die Kombination folgender Merkmale:
• die Einstapelbrücke (3)
und die Ausstapelbrücke
(5) besteht jeweils aus fünf
Sektionen (33 bis 37 und 52 bis 56), die auf Raupenfahrwerken (60)
verfahrbar sind und über die
jeweils ein gemeinsames Förderband
(38, 57) geführt wird,
• von den
fünf Sektionen
(33 bis 37 und 52 bis 56) der Einstapelbrücke (3) und der Ausstapelbrücke (5)
ist jeweils eine Sektion eine Mittelsektion (35, 54), jeweils zwei
Sektionen sind Außensektionen
(33 und 37, 52 und 56) und jeweils zwei weitere Sektionen sind zwischen
der Mittelsektion (35, 54) und einer der beiden Außensektionen
(33 und 37, 52 und 56) angeordneten Zwischensektion (34 und 36, 53
und 55),
• die
Mittelsektion (35, 54) ist mit zwei Raupenfahrwerken...Mobile stacking and destacking system for operating a basically rectangular on / off lead pad, consisting of a known stacking bridge (3) and a known stacking bridge (5) characterized by the combination of the following features:
The stacking bridge (3) and the stacking bridge (5) each consist of five sections (33 to 37 and 52 to 56) which are movable on crawler tracks (60) and over each of which a common conveyor belt (38, 57) is guided,
Of the five sections (33 to 37 and 52 to 56) of the stacking bridge (3) and the stacking bridge (5), one section each is a middle section (35, 54), two sections each are outer sections (33 and 37, 52 and 56 ) and in each case two further sections are intermediate sections (34 and 36, 53 and 55) arranged between the middle section (35, 54) and one of the two outer sections (33 and 37, 52 and 56),
• the middle section (35, 54) is equipped with two crawler tracks ...
Description
Die Erfindung betrifft die beiden, zu einer Gerätekombination für ein mobiles Einstapel- und Ausstapelsystem gehörenden verfahrbaren Förderbrücken zum Betrieb eines On/Off-Lead-Pads zur Kupfergewinnung.The Invention relates to the two, to a device combination for a mobile Stacking and stacking system belonging to movable conveyor bridges for Operation of an on / off lead pad for copper extraction.
Stand der TechnikState of the art
Gebrochenes Erz wird zum Auslaugen des Metalls in Schichten von ca. 5 bis 10 Metern Höhe aufgeschüttet. Nach dem Aufhalden wird es ca. 3 bis 4 Monate mit Wasser und Säure zum Lösen des an den Oberflächen der Erzbrocken angelagerten Metalls besprüht. Anschließend wird es durch ein Schaufelrad-Rückladegerät aufgenommen und auf einer permanenten Halde verkippt.Cracked Ore is used to leach the metal in layers of about 5 to 10 Meters high. To It will take about 3 to 4 months with water and acid Solve the on the surfaces the ore chunks of deposited metal sprayed. Subsequently, will it was picked up by a paddle wheel reclaimer and dumped on a permanent heap.
Die
generelle Anordnung eines On/Off-Lead-Pads wird in der Zeichnung
nach
Das
Einstapeln erfolgt über
das Einstapelband
Auf
dieser einige hundert Meter langen Einstapelbrücke
Ist
die eine Fläche
I des Lead-Pads aufgehaldet, wird die gesamte Einstapelbrücke
Das
Ausstapel-System besteht aus einem, auf Raupen auf- und abfahrenden
Schaufelrad-Rückladegerät
Nach
dem Abbau einer Haldenseite fahren der Schaufelrad-Rückladegerät und die
Ausstapelbrücke
Dieses vorstehend beschriebene System ist grundsätzlich bekannt und mehrfach in Betrieb.This The system described above is basically known and multiple in operation.
Die auf Raupen verfahrbaren Brücken der bisher ausgeführten Lead-Pads bestehen aus einer größere Anzahl verhältnismäßig kurzer miteinander gekoppelter Brückensektionen, über die ein gemeinsames Förderband geführt wird. Diese Sektionen jeweils einer der beiden Brücken werden beim Verfahren synchron gesteuert, so dass sich die Sektionen einer jeden Brücke sowohl bei der Geradeausfahrt als auch beim Durchfahren der 180°-Wende zueinander nahezu in einer Geraden bewegen.The on caterpillar movable bridges the previously executed Lead pads consist of a larger number relatively short coupled bridge sections, over the a common conveyor belt guided becomes. These sections each become one of the two bridges Synchronously controlled in the process, so that the sections of a every bridge both when driving straight ahead and when driving through the 180 ° turn to each other move almost in a straight line.
Eine
dafür geeignete
Lösung
ist in der Druckschrift
Aus
der Patentschrift
Weiterhin
ist aus
Die Tragkonstruktionen der einzelnen Sektionen bekannter fahrbarer Förderbrücken bestehen bisher vornehmlich aus geschweißten Längsträgern und geschweißten Verbänden. Das Schweißen der Verbandsträger an die Längsträger führt zu Kerbwirkungen und ist daher ungünstig bezüglich der dynamischen Kräfte durch das Überfahren des Bandschleifenwagens bzw. Trichterwagens auf den Brücken. Dies hat gelegentlich zu Schäden geführt.The Support structures of the individual sections known mobile conveyor bridges exist so far mainly made of welded Side members and welded Associations. Welding the bandage wearer to the side members leads to notch effects and is therefore unfavorable in terms of the dynamic forces by driving over of the tripper car or funnel car on the bridges. This occasionally causes damage guided.
Aufgabetask
Der Erfindung liegt die Aufgabe zugrunde, die Einstapelbrücke und die Ausstapelbrücke einer Gerätekombination für ein mobiles Einstapel- und Ausstapelsystem zum Betrieb eines On/Off-Lead-Pads so zu verbessern, dass sich der Aufwand für die Technik, die Steuerung und die Regelung verringert und potentiell Schäden im Stahlbau vermieden werden.Of the Invention is the object of the stacking bridge and the stacking bridge a device combination for a Mobile stacking and destacking system for operating an on / off lead pad to improve so that the effort for the technology, the control and reduce the regulation and potentially prevent damage in steel construction.
Diese Aufgabe wird durch eine Reduzierung der Anzahl der Sektionen beider Brücken gelöst. Um die gleiche Brückenlängen zu erreichen, die zum Betrieb eines Lead-Pads benötigt wird, ist dazu eine Verlängerung der Segmente erforderlich. Eine solche Lösung bereitet für die Konstruktion und den Stahlbau keine Probleme. Damit jedoch das Stahltragwerk den dynamischen Belastungen besser standhält, wird die Fachwerkskonstruktion der Sektionen von geschweißten Längsträgern und daran angeschraubten Verbänden gebildet. Dadurch wird vermieden, dass die Stahlkonstruktion durch die dynamische Belastung in Folge möglicher Kerbwirkungen beim ständigen Überfahren des Bandschleifenwagens bzw. Trichterwagens auf den Brücken beschädigt werden kann.These Task is by reducing the number of sections of both bridges solved. To the same bridge lengths too reach, which is needed to operate a lead pad, is an extension the segments required. Such a solution prepares for the construction and steel construction no problems. But that the steel structure the Dynamic structure better withstand the truss structure the sections of welded Side members and attached to it educated. This will prevent the steel structure from passing through the dynamic load due to possible notch effects constantly over driving of the tripper or trolley on the bridges can be damaged.
Zur Minimierung des Steuerungs- und Regelungsaufwandes wird die Anzahl der Sektionen und ihre Anordnung zueinander so gewählt, dass nicht jede Sektion mit einem kompletten Steuer- und Regelungsmechanismus ausgerüstet werden muss. Deshalb besteht jede dieser beiden Brücken aus einer Mittelsektion, zwei Außensektionen und jeweils einer zwischen der Mittelsektion und einer der beiden Außensektionen angeordneten Zwischensektion. Die Mittelsektion ist mit zwei Raupenfahrwerken und die anderen vier Sektionen sind mit einem Raupenfahrwerk ausgerüstet. Als Raupenfahrwerke kommen Ein- oder Doppelraupenfahrwerke zum Einsatz. Durch die Verwendung von nur fünf Brückensektionen kann die Anzahl der Koppelpunkte und damit die Anzahl der Regelkreise zur Längsausrichtung der Brückensektionen auf vier begrenzt werden. Wegen der geringeren Anzahl an Koppelpunkten ist bei einem Ausfall der Regeltechnik auch ein Ausrichten durch Handsteuerung möglich.to Minimizing the control and regulation effort is the number the sections and their arrangement to each other chosen so that not every section with a complete control mechanism equipped must become. Therefore, each of these two bridges exists a middle section, two outer sections and one each between the center section and one of the two outer sections arranged intermediate section. The middle section is with two crawler tracks and the other four sections are equipped with a crawler track. When Crawler tracks are single or double crawler tracks used. By the use of only five bridge sections can the number of crosspoints and thus the number of control loops for longitudinal alignment the bridge sections be limited to four. Because of the smaller number of crosspoints is in case of failure of the control technology also an alignment by Manual control possible.
Eine Reduzierung des Aufwandes für die Horizontierung beider Brücken wird dadurch erreicht, dass sich bestimmte Sektionen auf den benachbarten Sektionen kippsicher abstützen und so nicht alle Sektionen mit Horizontiereinrichtungen ausgerüstet werden müssen. Dazu werden zunächst die Verbindungen jeder der beiden Zwischensektionen mit der Mittelsektion und der Außensektionen mit den Zwischensektionen als sphärische Lagerung ausgebildet. Eine solche Lagerung kann in der Praxis als Kugelgelenk, Kreuzgelenk oder mittels eines Pendellagers realisiert werden. Dadurch werden senkrecht wirkende Kräfte übertragen. Die Außensektionen stützen sich so auf den Zwischensektionen und die Zwischensektionen auf der Mittelsektion ab. Relative Lageabweichungen der benachbarten Sektionen zueinander, die durch Höhenunterschiede des Fahrplanums und/oder durch ungleichmäßige Vorwärtsbewegungen entstehen, können jedoch ausgeglichen werden. Zur Aufnahme der seitlichen Kräfte der der Zwischensektionen durch die Mittelsektion werden an der Mittelsektion beiderseits am Traggerüst Stützen angebracht, die geradlinige waagerechte Stützflächen aufweisen, auf denen die Zwischensektionen mit Bolzen oder Rollen aufliegen und sich so kippsicher abstützen. Der Ausgleich möglicher relativer Längsbewegungen zueinander ist durch die Länge der Stützflächen gewährleistet. Durch diese seitliche und damit kippsichere Abstützung der Zwischensektionen gegenüber der Mittelsektion ist es nicht erforderlich, die Zwischensektionen mit einer Horizontiereinrichtung auszurüsten. Somit werden für beide Brücken mit ihren fünf Sektionen jeweils nur eine Horizontiereinrichtung, bestehend aus Hydraulikzylindern und einem Regelkreis, für die Mittelsektion sowie die beiden Außensektionen benötigt.A Reduction of the effort for the leveling of both bridges is achieved by certain sections on the adjacent Support sections so that they do not tip over and so not all sections are equipped with leveling equipment have to. To do this first the connections of each of the two intermediate sections with the middle section and the outer sections formed with the intermediate sections as a spherical bearing. Such a bearing can be used in practice as a ball joint, universal joint or realized by means of a self-aligning bearing. This will be transmitted vertically acting forces. The outer sections are supported so on the intermediate sections and intermediate sections on the middle section from. Relative positional deviations of the neighboring sections to each other, by height differences of the timetable and / or caused by uneven forward movements, however, may be compensated. To absorb the lateral forces of the intermediate sections through the middle section will be at the middle section on both sides of the support frame Support attached, the rectilinear horizontal support surfaces on which the Intermediate sections with bolts or rollers rest and thus tip over support. The compensation of possible relative longitudinal movements each other is determined by the length of the Ensures support surfaces. Through this lateral and therefore non-tilting support of the intermediate sections across from the middle section does not require the intermediate sections equipped with a leveling device. Thus, for both bridges with her five Sections each only one leveling, consisting of Hydraulic cylinders and a control circuit, for the middle section and the two outer sections needed.
Durch die übereinstimmende Ausbildung der Spurweiten der Fahrwerke der Einstapelbrücke und der Ausstapelbrücke wird erreicht, dass beim Durchfahren der 180°-Wendekurven immer die gleichen Radien durchfahren werden und so die Überführungen, die über den Zuförderer und den Abförderer führen, schmal ausgebildet werden können.By the matching one Training the gauges of the chassis of the stacking bridge and the Ausstapelbrücke is achieved that when driving through the 180 ° turn curves always the same radii be driven through and so the overpasses, the above the feeder and the conveyor to lead, can be formed narrow.
Ausführungsbeispielembodiment
Weitere Einzelheiten und Vorteile des Erfindungsgegenstandes ergeben sich aus der nachfolgenden Beschreibung und den dazugehörigen Zeichnungen, in denen ein bevorzugtes Ausführungsbeispiel dargestellt ist. Es zeigen:Further Details and advantages of the subject invention arise from the description below and the accompanying drawings, in which a preferred embodiment is shown. Show it:
In
der Zeichnung nach
Zum
Ausstapeln des Erzes nach dem Auslaugen ist parallel zur Einstapelbrücke
Die
Einstapelbrücke
Von
der Mitte nach Außen
der Einstapelbrücke
Durch
das seitlich Abstützen
der Zwischensektionen
Das
Abwurfband
Die
fünf Sektionen
der Ausstapel-Brücke
Die
Förderrichtung
der Ausstapelbrücke
Das
Fördergut
wird nach
Auf
der Tragkonstruktion der Einstapelbrücke
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202006020218U DE202006020218U1 (en) | 2006-07-12 | 2006-07-12 | Stacking bridge and stacking bridge for a mobile conveyor system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200610032190 DE102006032190A1 (en) | 2006-07-12 | 2006-07-12 | Portable stacking and unstacking system for operating rectangular on/off lead pad, has stacking strap and unstacking strap provided with intermediate sections arranged between mid section and outer sections |
DE202006020218U DE202006020218U1 (en) | 2006-07-12 | 2006-07-12 | Stacking bridge and stacking bridge for a mobile conveyor system |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202006020218U1 true DE202006020218U1 (en) | 2008-01-17 |
Family
ID=38955228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202006020218U Expired - Lifetime DE202006020218U1 (en) | 2006-07-12 | 2006-07-12 | Stacking bridge and stacking bridge for a mobile conveyor system |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE202006020218U1 (en) |
-
2006
- 2006-07-12 DE DE202006020218U patent/DE202006020218U1/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102005039067B3 (en) | Conveyer belt assembly for copper ore stockpile in a leach production system has base section and intermediate standard extensions feeding head transfer unit | |
EP3015601B1 (en) | Movable, height-adjustable and horizontally rotatable conveyor assembly for railway track construction | |
AT505403B1 (en) | MACHINE FOR RECEIVING AND STORING SMALL IRONS OF A TRACK AND PROCESS | |
DE2720064C2 (en) | Mobile device for continuously changing the sleepers of a track | |
WO2010112019A1 (en) | Mobile crusher | |
DE19941799C2 (en) | Surface mining equipment | |
DE2550391A1 (en) | METHOD OF REMOVING BED MATERIAL FROM GRAPH BEDS | |
WO1993016945A1 (en) | Novel conveyor belt bridge for open-cast mining | |
EP0844330A1 (en) | Bulk goods handling wagon | |
EP0096236B1 (en) | Track conveyer waggon, transport train and method of loading and unloading materials for railroad construction | |
EP0609647B1 (en) | Renewal or cleaning apparatus for ballastway | |
DE3040795A1 (en) | Conveyor band track with several straight conveyor bands - makes or removes dumps of coal and includes transfer station, consigning station and throw-off point | |
DE202008003589U1 (en) | Track rehabilitation machine with base layer milling machine | |
DE202005021058U1 (en) | Mobile conveying and stacking system for the multi-layered dumping of ore has transfer grasshopper with conveying device forming in plan view an angle of 30 - 60 degrees to conveying devices of standard grasshoppers | |
EP2500470A2 (en) | Head maintenance vehicle | |
DE2557372C2 (en) | Mobile track-laying machine, for picking up, distributing and reintroducing separate bedding materials, especially point cleaning machine | |
DE102006032190A1 (en) | Portable stacking and unstacking system for operating rectangular on/off lead pad, has stacking strap and unstacking strap provided with intermediate sections arranged between mid section and outer sections | |
WO2019053212A1 (en) | Mobile conveyor bridge system having a decoupled stacking system | |
EP2295637B1 (en) | Device for transporting material in railway construction | |
DE202006020218U1 (en) | Stacking bridge and stacking bridge for a mobile conveyor system | |
EP2071077B1 (en) | Method of renewing the multiple layer sub-structure of rails | |
DE2848996C2 (en) | Transport device for heavy opencast mining equipment | |
DE2827767C2 (en) | ||
DE4339833C2 (en) | Construction machine for the new construction, expansion or dismantling of paved traffic routes | |
DE3120565A1 (en) | Device for keeping large opencast-mining units horizontal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20080221 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20090812 |
|
R082 | Change of representative |
Representative=s name: KAILUWEIT & UHLEMANN PATENTANWAELTE PARTNERSCH, DE Representative=s name: KAILUWEIT & UHLEMANN, PATENTANWAELTE, DE Representative=s name: KAILUWEIT & UHLEMANN, PATENTANWAELTE, 01187 DRESDE |
|
R151 | Utility model maintained after payment of second maintenance fee after six years | ||
R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20120514 |
|
R152 | Utility model maintained after payment of third maintenance fee after eight years | ||
R152 | Utility model maintained after payment of third maintenance fee after eight years |
Effective date: 20140422 |
|
R071 | Expiry of right |