DE102014116313A1 DE102014116313.3A DE102014116313A DE102014116313A1 DE 102014116313 A1 DE102014116313 A1 DE 102014116313A1 DE 102014116313 A DE102014116313 A DE 102014116313A DE 102014116313 A1 DE102014116313 A1 DE 102014116313A1
Authority
DE
Germany
Prior art keywords
energy
specific
print jobs
printing
print job
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102014116313.3A
Other languages
German (de)
Inventor
Alf Haberditzl
Ramona Schneider
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Manroland Sheetfed GmbH
Original Assignee
Manroland Sheetfed GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Manroland Sheetfed GmbH filed Critical Manroland Sheetfed GmbH
Priority to DE102014116313.3A priority Critical patent/DE102014116313A1/en
Publication of DE102014116313A1 publication Critical patent/DE102014116313A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41FPRINTING MACHINES OR PRESSES
    • B41F33/00Indicating, counting, warning, control or safety devices
    • B41F33/16Programming systems for automatic control of sequence of operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41FPRINTING MACHINES OR PRESSES
    • B41F33/00Indicating, counting, warning, control or safety devices
    • B41F33/0009Central control units

Abstract

Der Betrieb einer Druckmaschine soll kostengünstig und nach einer bestmöglichen Klimabilanz erfolgen. Dazu wird ein spezifischer Energieverbrauch auf Druckaufträge bezogen ermittelt. Der spezifische Energieverbrauch kann den ganzen Druckauftrag oder alle für den Druckauftrag erforderlichen Rüst- und Produktionsschritte umfassen. Zur zeitlichen Zuordnung der Ausführung von Druckaufträgen und/oder Rüst- und Produktionsschritte werden Daten von Energieversorgern mit zeitlicher Zuordnung von Energiekosten und/oder Klimabilanzdaten erfasst und in einem Energie-Auftrags-Steuerungssystem den Druckaufträgen und/oder Rüstund Produktionsschritten zugeordnet anzuordnen. Die Zuordnung wird verwendet, um die Druckaufträge und/oder Rüst- und Produktionsschritte energiekostenoptimiert und/oder mit einer optimierten Klimabilanz auszuführen. The operation of a printing machine should be cost-effective and for the best possible climate balance. For this purpose, a specific energy consumption based on print jobs is determined. The specific energy consumption may include the entire print job or all setup and production steps required for the print job. For the temporal assignment of the execution of print jobs and / or set-up and production steps, data from energy suppliers are recorded with temporal allocation of energy costs and / or carbon footprint data and assigned to the print jobs and / or setup and production steps in an energy job control system. The assignment is used to perform the print jobs and / or set-up and production steps energy-optimized and / or with an optimized climate balance.

Figure DE102014116313A1_0001
Figure DE102014116313A1_0001

Description

Die Erfindung betrifft ein System für das Energiemanagement an Druckmaschinen nach dem Oberbegriff des Anspruchs 1. The invention relates to a system for the energy management of printing machines according to the preamble of claim 1.

Es ist bekannt den Energieverbrauch beim Betrieb von Druckmaschinen zu erfassen und zu überwachen. Dies kann im Hinblick auf energieintensive Aggregate, die Belastung von Stromnetzen oder auch im Zusammenhang mit einem auftragsbezogenen Energieverbrauch erfolgen. In Druckereien ist es eine wesentliche Aufgabe, Kosten zu reduzieren und dazu die internen Abläufe zu optimieren. Es sollen etwa mehr Druckaufträge in kürzerer Zeit durchgesetzt werden, während oder weil gleichzeitig die durchschnittlichen Auflagehöhen sinken. It is known to detect and monitor the energy consumption in the operation of printing presses. This can be done with regard to energy-intensive aggregates, the load on electricity grids or even in connection with an order-related energy consumption. In print shops, reducing costs and optimizing internal processes is an essential task. For example, more print jobs should be enforced in a shorter time, while or at the same time the average print run height drops.

Aus DE 10 2008 024 615 A1 ist ein Verfahren zum Betreiben einer Druckmaschine bekannt. Dabei werden zum Bedrucken eines Bedruckstoffs Aggregate der Druckmaschine mit definierter Maschinengeschwindigkeit betrieben. Wenn eine stationäre Druckbedingung vorliegt, werden Strom- und/oder Gasverbrauch von Aggregaten der Druckmaschine messtechnisch erfasst und zusammen mit der aktuellen Maschinengeschwindigkeit gespeichert. So wird für unterschiedliche Maschinengeschwindigkeiten ein spezifischer Strom- und/oder Gasverbrauch messtechnisch ermittelt. Abhängig von entsprechend gespeicherten Daten wird für einen Druckauftrag eine hinsichtlich Strom- und/oder Gasverbrauch optimierte Druckgeschwindigkeit ermittelt.Out DE 10 2008 024 615 A1 For example, a method for operating a printing press is known. In this case, units of the printing press are operated at a defined machine speed for printing on a printing substrate. If a stationary pressure condition exists, power and / or gas consumption of aggregates of the printing press are measured and stored together with the current machine speed. Thus, a specific power and / or gas consumption is determined metrologically for different machine speeds. Depending on correspondingly stored data, a print speed optimized for electricity and / or gas consumption is determined for a print job.

Aus Patentschrift DE 195 30 826 C1 ist ein Verfahren zur Optimierung der Leistungsaufnahme bei einem Energieverteilungssystem bekannt. Bei einem Energieverteilungssystem mit mehreren Verbrauchern kann durch Zu- und Abschalten von Verbrauchern mit Energiespeicherverhalten, jedem Verbraucher eine Prioritätskenngröße für die Zelt In der dieser ab- bzw. angeschaltet Ist, gewonnen werden. From patent DE 195 30 826 C1 For example, a method of optimizing power consumption in an energy distribution system is known. In an energy distribution system with multiple consumers can be obtained by switching on and off of consumers with energy storage behavior, each consumer a priority parameter for the tent in this off or on.

Bei Bedarf kann derjenige Verbraucher mit der höchsten Prioritätskenngröße ab- bzw. zugeschaltet werden. Die Prioritätskenngröße wird dabei zeitlich gemäß einer Funktion verändert, so dass mit deren Höhe und zeitlichem Verhalten das Energiespeicherverhalten der Verbraucher nachgebildet wird. If necessary, the consumer with the highest priority characteristic can be switched off or switched on. The priority parameter is changed over time in accordance with a function, so that the energy storage behavior of the consumer is simulated with their height and temporal behavior.

Aus DE 198 17 191 A1 ist ein Verfahren zum Regeln der Gesamtleistung von energietechnischen Anlagen, insbesondere einer Gruppe von elektrischen Verbrauchern bekannt. Dabei ermittelt eine Grundstation die momentane Gesamtleistung der energietechnischen Anlage und legt in einer Tabelle für jeden Verbraucher eine Identifikation, eine aktuelle Priorität und eine aktuelle Schaltleistung an. Weiter wird aus einem Vergleich der Gesamtleistung und einer Leistungsspitze oder eines einzuhaltenden Absolutwertes anhand der Tabelle eine Prioritätsstufe ermittelt. Damit wird eine Grenze zwischen Verbrauchern definiert, die in den Lastabwurf zu bringen, freizuschalten und/oder zum Speichern von Energie zu bringen sind und Verbrauchern, die im Normalbetrieb zu betreiben sind. Out DE 198 17 191 A1 is a method for controlling the overall performance of energy systems, in particular a group of electrical consumers known. In this case, a base station determines the instantaneous total power of the power plant and sets in a table for each consumer an identification, a current priority and a current switching capacity. Furthermore, a priority level is determined from a comparison of the total power and a peak power or an absolute value to be maintained based on the table. This defines a boundary between consumers that are to be brought into load shedding, to enable and / or to store energy and consumers who are to be operated in normal operation.

Aus DE 10 2007 062 287 A1 ist ein Verfahren zum Herstellen eines Druckprodukts bekannt. Ein unbedruckter Bedruckstoff wird auf Grundlage von in einer Druckvorstufe bereitgestellten Bilddaten in einer Druckmaschine bedruckt und nach dem Bedrucken in mindestens einer Weiterverarbeitungsmaschine zum fertigen Druckprodukt verarbeitet. Eine Leistungsaufnahme der an der Herstellung des Druckprodukts beteiligten Aggregate von Druckvorstufe, Druckmaschine und Weiterverarbeitungsmaschine erfasst. Mindestens ein Aggregat wird auf Grundlage der erfassten Leistungsaufnahme derart betrieben, dass sich der Energieverbrauch bzw. die Leistungsaufnahme bei der Herstellung des Druckprodukts reduziert.Out DE 10 2007 062 287 A1 For example, a method for producing a printed product is known. An unprinted printing material is printed on the basis of image data provided in a prepress stage in a printing press and processed after printing in at least one further processing machine to the finished printed product. A power consumption of the participating in the production of the printed product aggregates of prepress, printing press and finishing machine recorded. At least one aggregate is operated based on sensed power consumption such that power consumption or power consumption during manufacture of the printed product is reduced.

Aus DE 10 2007 026 012 A1 ist ein gesteuerter Energieverbrauch von elektrischen Antrieben in Maschinen bekannt. Eine Steuerung von elektrischen Antrieben in Maschinen besitzt eine Steuerungselektronik, die die von dem wenigstens einen elektrischen Antrieb benötigte elektrische Energie in Abhängigkeit von Bewegungsprofilen des elektrischen Antriebs vorausberechnet. Out DE 10 2007 026 012 A1 is a controlled power consumption of electric drives in machines known. A control of electrical drives in machines has a control electronics, which calculates the electrical energy required by the at least one electric drive as a function of movement profiles of the electric drive.

Aus DE 100 64 755 A1 ist eine Stromversorgung für eine Rotationsdruckmaschine bekannt. Eine Rotationsdruckmaschine bezieht Energie aus einem Kundennetz. Um bei Netzspannungsstörungen und -ausfällen die Druckmaschinen in einem kontrollierten Betriebszustand zu halten, wird die Rotationsdruckmaschine von einer unterbrechungsfreien Stromversorgung (UVD) gespeist, die eingangsseitig an dem Kundennetz anliegt.Out DE 100 64 755 A1 is a power supply for a rotary printing machine known. A rotary press draws energy from a customer network. In order to keep the printing presses in a controlled operating state in the event of mains voltage disturbances and failures, the rotary printing press is fed by an uninterruptible power supply (UVD) which is applied to the customer's network on the input side.

Aus DE 103 18 541 A1 ist ein Verfahren zur Messung, Dokumentation und Überwachung elektrischer Parameter bekannt. Es sollen elektrische Netz- und Leistungsparametern bei der Druckmaschineninbetriebnahme, im Druckbetrieb und bei der Fernwartung an Druckmaschinen mit Maschinen- und Auftragsdatenmanagement erfasst werden. Mit geringerem Aufwand sollen relevante elektrische Parameter permanent erfasst und ausgewertet werden, um den Druckmaschinenbetrieb und die Störungsanalyse zu optimieren. Dazu ist wenigstens ein Multifunktionsmodul ist in die Maschinensteuerung integriert ist und mit Schnittstellen zu einem Maschinen- und Auftragsdatenmanagementsystem versehen. Es sind Schritte zur Messung und Dokumentation von elektrischen Leistungsparametern sowie einer Oberwellenanalyse bei der Inbetriebnahme der Druckmaschine, eine kontinuierliche Messung und Dokumentation der elektrischen Leistungsparameter während des Druckbetriebes, zur Ermittlung und Speicherung des auf die zu bearbeitenden Druckaufträge bezogenen Energieverbrauches innerhalb des Maschinenund Auftragsdatenmanagementsystems und zur Übergabe der Energieverbrauchswerte für die Nachkalkulation an das übergeordnete Produktionsplanungssystem und zur Überwachung der elektrischen Netz- und Leistungsparameter an der Druckmaschine während der Fernwartung der Druckmaschine vorgesehen.Out DE 103 18 541 A1 a method for measuring, documenting and monitoring electrical parameters is known. The aim is to record electrical network and performance parameters during press commissioning, during printing operation and during remote maintenance on presses with machine and job data management. With less effort relevant electrical parameters should be permanently recorded and evaluated in order to optimize the printing press operation and the fault analysis. For this purpose, at least one multifunction module is integrated into the machine control and provided with interfaces to a machine and order data management system. These are steps for the measurement and documentation of electrical performance parameters as well as a harmonic analysis during the commissioning of the printing machine, a continuous measurement and Documentation of the electrical performance parameters during the printing operation, for the determination and storage of the energy consumption related to the print jobs to be processed within the machine and order data management system and for transferring the energy consumption values for the post calculation to the higher level production planning system and for monitoring the electrical network and performance parameters at the printing press during the printing operation Remote maintenance of the printing machine provided.

Aus DE 10 2008 045 427 A1 ist ein Verfahren zur Steuerung von elektrischen Verbrauchern in einer Druckerei bekannt. Die steuerbaren Verbraucher von Bedruckstoffe verarbeitenden Maschinen, von den Maschinen zugeordneten peripheren Einrichtungen und von zentralen Einrichtungen sind der Druckerei zugeordnet. Das Energiemanagement der Maschinen soll verbessert werden. Die Steuerungen der Verbraucher sind mit einem zentralen verbraucherübergreifenden Energiemanagementsystem koordiniert. Dabei wird die Leistungsaufnahme der Verbraucher und deren Abhängigkeit erfasst. Danach werden zeitflexibel steuerbare erste Verbraucher mit anpassbaren Einschaltprioritäten in Abhängigkeit vom Leistungsbedarf nicht oder eingeschränkt zeitflexibel steuerbarer zweiter Verbraucher der Maschinen spezifisch betrieben. Hierbei werden Maxima der Gesamtleistungsaufnahme relativ zu einem nicht koordinierten Betrieb der Verbraucher reduziert.Out DE 10 2008 045 427 A1 a method for controlling electrical loads in a printing company is known. The controllable consumers of substrates processing machines, assigned by the machinery peripheral equipment and central facilities are assigned to the printer. The energy management of the machines should be improved. The consumer controls are coordinated with a central consumer energy management system. It records the power consumption of consumers and their dependency. Thereafter, time-flexibly controllable first consumers with adaptable switch-on priorities are operated in a manner that is dependent on the power requirement, not limited or time-limited controllable second consumer of the machines specifically. In this case, maxima of the total power consumption are reduced relative to a non-coordinated operation of the consumers.

Schließlich ist aus dem VDMA-Einheitsblatt VDMA 8873-1 eine Richtlinie zur Ermittlung der betriebsspezifischen Leistungsaufnahme von Bogenoffsetdruckmaschinen bekannt. Hierbei wird ausgesagt, dass Energieeffizienzvergleiche und Betriebskostenabschätzungen für Druckmaschinen sowie CO2-Bilanzen für Druckprodukte eine praxisgerechte und branchenweit einheitlich geregelte Ermittlung der Leistungsaufnahme der Maschinen erfordern. Um den Energiebedarf abzuschätzen wird meist der Anschlusswert einer Maschine zu Rate gezogen, was zu nicht praxisgerechten Werten führt. Durch die Veröffentlichung einheitlich ermittelter Energiekennzahlen sollen Kunden besser in die Lage versetzt werden, Maschinen hinsichtlich Leistungsaufnahme zu bewerten. Die in der Vergangenheit veröffentlichten Werte zur Leistungsaufnahme waren nicht vergleichbar, da es keine gemeinsame Festlegung hinsichtlich Berücksichtigung von Peripheriegeräten und zum Messzyklus gab. Die Leistungsaufnahme soll zukünftig in einheitlicher Form für die Bogenoffsetdruckmaschinen dokumentiert werden. Einheitlich ermittelte Energiekennzahlen für Bogenoffsetdruckmaschinen werden u.a. gebraucht für

  • – eine Bewertung von Maschinen und Peripheriegeräten hinsichtlich Leistungsaufnahme und Energieeffizienz,
  • – eine Betriebskostenabschätzung für Investitionsplanungen,
  • – Lebenszyklusanalysen,
  • – einen Nachweis von Energieeffizienzsteigerungen und
  • – eine Berechnung von klimarelevanten Energiebilanzen für Druckprodukte (CO2-Fußabdruck)
Finally, a guideline for determining the operating-specific power consumption of sheet-fed offset printing machines is known from VDMA standard sheet VDMA 8873-1. It is stated that energy efficiency comparisons and operating cost estimates for printing presses as well as CO2 balances for printed products require a practice-oriented and industry-wide uniform determination of the power consumption of the machines. In order to estimate the energy requirement, the connected load of a machine is usually consulted, which leads to values that are not practical. By publishing uniformly determined energy figures, customers should be better placed to value machines in terms of power consumption. The power consumption figures published in the past were not comparable as there was no common definition of peripherals and the measurement cycle. The power consumption will be documented in the future in a uniform form for the sheetfed offset presses. Uniformly determined energy figures for sheet-fed offset printing presses are used, among others
  • - an assessment of machines and peripherals in terms of power consumption and energy efficiency,
  • - an operating cost estimate for investment planning,
  • - Life cycle analyzes,
  • Proof of energy efficiency improvements and
  • - a calculation of climate-relevant energy balances for printed products (CO2 footprint)

Die bekannten Verfahren berücksichtigen zwar Verbräuche und den Energiebedarf von Maschinen, Aufträgen und ganzen Druckereien. Es wird aber keine Rücksicht darauf genommen, wie sich die Energiekosten dazu verhalten. Although the known methods take into account consumption and the energy consumption of machines, orders and entire printing companies. However, no consideration is given to how the energy costs relate to it.

Aufgabe der Erfindung ist es daher ein Verfahren zu beschreiben, das die Energiekosten einer Druckmaschine oder einer Druckerei minimiert. The object of the invention is therefore to describe a method which minimizes the energy costs of a printing press or a printing company.

Die Lösung der Aufgabe gestaltet sich nach den Merkmalen von Anspruch 1. Vorteilhafte Weiterbildungen ergeben sich aus den Unteransprüchen. The solution of the problem is designed according to the features of claim 1. Advantageous developments emerge from the dependent claims.

Ein Verfahren zum Betreiben einer oder mehrerer Druckmaschinen innerhalb einer Druckerei umfasst Druckmaschinen, die mit verschiedenen Aggregaten wie Druckwerken, Lackmodulen und Trocknern ausgestattet sind, wobei die Druckmaschine und deren Aggregate elektrischer Antriebe und Verbraucher aufweisen. Der Energieverbrauch der Aggregate und Verbraucher der Druckmaschine wird messtechnisch erfasst und wahlweise zusammen mit einer zugehörigen Maschinengeschwindigkeit gespeichert. Dem Energieverbrauch können weiterhin auch Parameterdaten von Druckaufträgen, wie Farbbelegung in den Druckwerken, Lackzufuhr im Lackmodul oder Betrieb und Art von Trocknern zugeordnet werden. A method of operating one or more printing presses within a printing works includes printing presses equipped with various aggregates such as printing units, paint modules and dryers, the printing press and its units having electric drives and consumers. The energy consumption of the aggregates and consumers of the printing press is measured and optionally stored together with an associated machine speed. The energy consumption can also be assigned to parameter data of print jobs, such as color assignment in the printing units, paint supply in the paint module or operation and type of dryers.

Erfindungsgemäß werden in der/den Druckmaschinen abzuarbeitende Druckaufträge mit Parameterdaten zur Nutzung der Aggregate und Verbraucher bereitgestellt. Weiterhin wird zu den in der/den Druckmaschinen abzuarbeitenden Druckaufträgen ein spezifischer für den/die Druckaufträge erforderlicher Energiebedarf zur Nutzung der Aggregate und Verbraucher bereitgestellt. Weiterhin werden auf spezifische Zeitpunkte bezogene Energiebereitstellungsdaten erfasst und gespeichert. Weiterhin wird in Bezug auf die gespeicherten Energiebereitstellungsdaten anhand des für den oder jeden Druckauftrag ermittelten spezifischen Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge festgelegt. According to the invention to be processed in the / the printing press jobs with parameter data for the use of aggregates and consumers provided. Furthermore, a specific energy requirement for the use of the units and consumers is provided for the print jobs to be processed in the printing press (s). Furthermore, energy related data related to specific times are acquired and stored. Furthermore, with respect to the stored energy supply data, a time determination and / or an order for processing the print job (s) is determined on the basis of the specific energy requirement determined for the or each print job.

In Weiterbildung kann anhand eines für den oder jeden Druckauftrag ermittelten Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge und eine Zuordnung zu einer bestimmten Druckmaschine festgelegt werden. In a further development, a time determination and / or an order for processing the print job (s) can be determined on the basis of an energy requirement determined for the or each print job an assignment to a particular press can be specified.

Alternativ oder zusätzlich werden erfindungsgemäß bei dem Verfahren zum Betreiben einer oder mehrerer Druckmaschinen der in der/den Druckmaschinen abzuarbeitende Druckaufträge mit Parameterdaten zur Nutzung der Aggregate und Verbraucher bereitgestellt werden. Weiterhin wird zu den in der/den Druckmaschinen abzuarbeitenden Druckaufträgen ein spezifischer für den/die Druckaufträge über einen, mehrere oder alle Rüst- und Produktionsschritte erforderlicher Energiebedarf für eine jeweilig bei dem/den bestimmten Druckaufträgen bestimmte Nutzungsart der Druckmaschine bereitgestellt. Weiterhin werden auf spezifische Zeitpunkte bezogene Energiebereitstellungsdaten erfasst und gespeichert. Weiterhin wird in Bezug auf die gespeicherten Energiebereitstellungsdaten anhand eines für den oder jeden Druckauftrag über einen, mehrere oder alle Rüst- und Produktionsschritte ermittelten spezifischen Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge und eines, mehrerer oder aller Rüst- und Produktionsschritte festgelegt.Alternatively or additionally, according to the invention, in the method for operating one or more printing presses, the print jobs to be processed in the printing press (s) are provided with parameter data for the use of the units and consumers. Further, to the jobs to be processed in the / the presses, a specific energy demand required for the print job (s) over one, several or all setup and production steps is provided for each type of use of the press determined at the particular print job (s). Furthermore, energy related data related to specific times are acquired and stored. Furthermore, with respect to the stored energy supply data, a time determination and / or an order for a processing of the print job (s) and one, several or all setups is determined on the basis of a specific energy requirement determined for one or more print jobs via one, several or all setup and production steps and production steps.

In Weiterbildung wird anhand eines für den oder jeden Druckauftrag ermittelten Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge über einen, mehrere oder alle Rüst- und Produktionsschritte und eine Zuordnung zu einer bestimmten Druckmaschine festgelegt. In a further development, a time determination and / or an order for a processing of the print job (s) over one, several or all setup and production steps and an assignment to a specific printing press are determined on the basis of an energy requirement determined for the or each print job.

In Weiterbildung werden die Energiebereitstellungsdaten zeitlich regelmäßig von einem Energieplanungssystem mittels einer Datenverbindung aus einer Energiedatenbank eines oder mehrere Energieversorger für Primärenergie für einen Bereitstellungszeitraum spezifiziert entnommen und gespeichert. In a further development, the energy supply data are periodically taken from an energy planning system by means of a data connection from an energy database of one or more energy suppliers for primary energy specified for a provision period and stored.

In Weiterbildung werden mit zeitraumspezifizierten Energiekosten erfasste und gespeicherte Energiebereitstellungsdaten von einem Energieplanungssystem zeitraumspezifiziert bereitgestellt. Diese Energiebereitstellungsdaten sind an ein Energie-Auftrags-Steuerungssystem zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druck-aufträge erforderlichen Rüst- und Produktionsschritte übermittelbar. In a further development, energy supply data recorded and stored with period-specific energy costs is provided by an energy planning system for a specific period of time. These energy provisioning data can be transmitted to an energy order control system for assignment to one or more print jobs and / or one, several or all set-up and production steps required for the execution of the print job (s).

In Weiterbildung werden die erfassten und gespeicherten Energiebereitstellungsdaten von dem Energie-Auftrags-Steuerungssystem zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte verwendet werden, um den/die Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte in einer zeitlichen Zuordnung zur Ausführung mit minimalen Energiekosten zu ordnen. In further development, the collected and stored energy provisioning data from the energy job control system is used to associate with one or more print jobs and / or one or more or all of the setup and production jobs required to execute the print job (s) and / or to order one or more or all of the setup and production steps required to execute the print job (s) in a temporal assignment for execution with minimal energy costs.

In Weiterbildung werden mit zeitraumspezifizierten Klimabilanzdaten erfasste und gespeicherte Energiebereitstellungsdaten von einem Energieplanungssystem zeitraumspezifiziert bereitgestellt werden. Diese erfassten und gespeicherten Energiebereitstellungsdaten werden von einem Energieplanungssystem an ein Energie-Auftrags-Steuerungssystem zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte übermittelt. In a further development, energy supply data acquired and stored with period-specific climate balance data are provided by an energy planning system for a specific period of time. These captured and stored energy provisioning data are communicated by a power planning system to an energy job control system for association with one or more print jobs and / or one or more or all of the setup and production steps required to complete the print job (s).

In Weiterbildung werden die erfassten und gespeicherten Energiebereitstellungsdaten von dem Energie-Auftrags-Steuerungssystem (EAS) zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte verwendet, um den/die Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte in einer zeitlichen Zuordnung zur Ausführung mit einer geforderten oder optimierten Klimabilanz zu ordnen oder zu priorisieren. In a further development, the collected and stored energy supply data is used by the energy order control system (EAS) to associate with one or more print jobs and / or one or more or all of the setup and production steps required to execute the print job (s) to: order or prioritize the print jobs and / or one or more or all of the setup and production steps required to complete the print job (s) in a temporal assignment for execution with a required or optimized carbon footprint.

In Weiterbildung wird der für den oder jeden Druckauftrag oder die erforderlichen Rüst- und Produktionsschritte ermittelte spezifische Energiebedarf für einen oder mehrere zur energieoptimierten Ausführung bestimmen Druckaufträge an ein Energie-Auftrags-Steuerungssystem übermittelt. Der jeweilige spezifische Energiebedarf kann in einem Planungsschritt einem jeweiligen Druckauftrag oder jeweilig erforderlichen Rüst- und Produktionsschritten zugeordnet gespeichert werden und wird zur Planung an einer Bedieneinheit des Energie-Auftrags-Steuerungssystems ausgegeben. In a further development, the specific energy requirement determined for the or each print job or the required set-up and production steps for one or more print jobs intended for energy-optimized execution is transmitted to an energy job control system. The respective specific energy requirement can be stored in a planning step assigned to a respective print job or respectively required set-up and production steps and is output for planning on an operating unit of the energy-order control system.

In Weiterbildung wird der für den oder jeden Druckauftrag oder die erforderlichen Rüst- und Produktionsschritte ermittelte spezifische Energiebedarf für einen oder mehrere mit nach Auftragsanforderung oder allgemeinen Vorgaben der Druckerei zur Ausführung bestimmten Klimabilanzdaten der Druckaufträge an ein Energie-Auftrags-Steuerungssystem übermittelt. Der jeweilige spezifische Energiebedarf kann in einem Planungsschritt einem jeweiligen Druckauftrag oder jeweilig erforderlichen Rüst- und Produktionsschritten mit den Klimabilanzdaten gespeichert werden und wird zur Planung an einer Bedieneinheit des Energie-Auftrags-Steuerungssystems ausgegeben. In a further development, the specific energy requirement determined for the or each print job or the required set-up and production steps is transmitted to an energy job control system for one or more of the print jobs to be executed according to the order request or general specifications of the print shop. The respective specific energy requirement can be stored in a planning step a respective print job or respectively required set-up and production steps with the carbon footprint data and is output to the planning on a control unit of the energy job control system.

Zusammengefasst umfasst die Erfindung, dass der Betrieb einer Druckmaschine soll kostengünstig und nach einer bestmöglichen Klimabilanz erfolgen soll. Dazu wird ein spezifischer Energieverbrauch auf Druckaufträge bezogen ermittelt. Der spezifische Energieverbrauch kann den ganzen Druckauftrag oder alle für den Druckauftrag erforderlichen Rüst- und Produktionsschritte umfassen. Zur zeitlichen Zuordnung der Ausführung von Druckaufträgen und/oder Rüst- und Produktionsschritte werden Daten von Energieversorgern mit zeitlicher Zuordnung von Energiekosten und/oder Klimabilanzdaten erfasst und in einem Energie-Auftrags-Steuerungssystem den Druckaufträgen und/oder Rüst- und Produktionsschritten zugeordnet anzuordnen. Die Zuordnung wird verwendet, um die Druckaufträge und/oder Rüst- und Produktionsschritte energiekostenoptimiert und/oder mit einer optimierten Klimabilanz auszuführen.In summary, the invention includes that the operation of a printing press should cost-effective and for the best possible climate balance. For this purpose, a specific energy consumption based on print jobs is determined. The specific energy consumption may include the entire print job or all setup and production steps required for the print job. For time assignment of the execution of print jobs and / or set-up and production steps, data from energy suppliers with temporal allocation of energy costs and / or carbon footprint data are recorded and assigned to the print jobs and / or set-up and production steps in an energy job control system. The assignment is used to perform the print jobs and / or set-up and production steps energy-optimized and / or with an optimized climate balance.

Die Erfindung ist im folgenden Umfeld angeordnet:
Mit dem Energie-Auftrags-Steuerungssystem können die Arbeitsvorbereitung und Planung der Maschine auch zentral im Büro durchgeführt werden. Darüber hinaus kann die Maschine in den Druckerei-Workflow integriert werden. Dieser Vorgang erfolgt optimiert, indem CIP3-Datensätze oder die JDF-Schnittstellen verwendet werden. Dadurch werden Fehler in die Arbeitsabläufe früh identifiziert und somit eliminiert. Das Energie-Auftrags-Steuerungssystem enthält folgende Funktionen:

  • – Eine schnelle Vorbereitung aller Einstellmaßnahmen kann über eine zentrale Arbeitsvorbereitung und im Zusammenhang mit allen vorhandenen Druckmaschinen für alle Druckaufträge einschließlich deren Farbvoreinstellung erfolgen.
  • – Die automatisierte Generierung von Druckaufträgen erfolgt nach JDF- und CIP3-Standards (Generierung von Datensätzen mit JDF- und CIP3-Vorgaben).
  • – Zentrale Planung und Optimierung Abläufen für alle anstehenden Druckaufträge erfolgt zentral für alle in der Druckerei vernetzten Druckmaschinen.
  • – Gruppierung von nach Maschinennutzung und Betriebsmitteleinsatz ähnlich gestalteten Druckaufträgen wird für die Druckverarbeitung vorgenommen.
  • – Es ist eine Kopierfunktion vorhanden, um Einstellungen von zuvor gedruckten Druckaufträgen zu übernehmen. Diese Daten können sich auf alle Maschinenparameter einschließlich der Farbvoreinstellung beziehen.
  • – In einer Vorschau werden gewonnene, modifizierte und schließlich zum Drucken fertig eingestellte Daten für den Ablauf eines Druckauftrages dargestellt.
  • – In einer zentralen Stammdatenverwaltung werden alle dazu notwendigen Daten für jede Druckmaschine in der Druckerei und für die in den Druckaufträgen verwendeten Arbeits-/Betriebsmittel bereitgestellt.
  • – Zentrale Druckauftragsdatenbank speichert Auftragsparameter für alle bereits durchgeführten und auch für die zur Bearbeitung anstehenden Druckaufträge.
  • – Hieraus kann die Erstellung von Datenetiketten für zu jeweiligen Druckaufträgen bereitzustellende und zu verarbeitende Bedruckstoffpaletten erfolgen.
The invention is arranged in the following environment:
With the energy order control system, the work preparation and planning of the machine can also be carried out centrally in the office. In addition, the machine can be integrated into the printing workflow. This process is optimized by using CIP3 records or the JDF interfaces. As a result, errors in the workflow are identified early and thus eliminated. The energy job control system includes the following functions:
  • - A quick preparation of all adjustment measures can take place via a central work preparation and in connection with all existing printing machines for all print jobs including their color presetting.
  • - The automated generation of print jobs is based on JDF and CIP3 standards (generation of data records with JDF and CIP3 specifications).
  • - Centralized planning and optimization Processes for all upcoming print jobs are done centrally for all printers networked in the print shop.
  • - Grouping of print jobs configured similarly to machine usage and resource usage is done for print processing.
  • - There is a copy function to accept settings from previously printed jobs. This data can refer to all machine parameters including color presetting.
  • - In a preview are obtained, modified and finally ready for printing data set for the expiration of a print job.
  • - In a central master data management all necessary data for each printing press in the printing house and for the used in the print jobs / resources are provided.
  • - Central print job database stores job parameters for all jobs already executed and also for the print jobs pending for processing.
  • - From this, the creation of data labels can be made available for each print job and processed substrate pallets.

Hieraus ergibt sich eine Reihe von Vorteilen für die Druckauftragsverarbeitung.

  • 1. Verringerung der Fertigungszeit durch angepasste Farbeinstellung und weniger Makulatur beim Drucken.
  • 2. Trainingszeit für die Druckaufträge wird reduziert.
  • 3. Einsparung von Arbeitszeit in der Arbeitsvorbereitung pro Druckauftrag.
  • 4. Verringerung der Personalbelastung an allen Arbeitsplätzen.
  • 5. Verbesserte Bedienungsfreundlichkeit bei der Druckauftragserzeugung
  • 6. Zusammenhang von Anwendungen bei Auftragserstellung wird in Energie-Auftrags-Steuerungssystem weiterer Funktionalitäten integriert.
This results in a number of advantages for print job processing.
  • 1. Reduction of production time due to adapted color adjustment and less waste during printing.
  • 2. Training time for the print jobs is reduced.
  • 3. Saving of working time in the work preparation per print job.
  • 4. Reduce the workload at all workplaces.
  • 5. Improved ease of use in print job creation
  • 6. Connection of applications in order creation will be integrated into energy order control system of other functionalities.

Erfindungsgemäß ist eine Schnittstelle zu einem übergeordneten Energie-Auftrags-Steuerungssystem einer Druckerei vorgesehen. Das Energie-Auftrags-Steuerungssystem dient dazu die zur Verfügung stehende Primärenergie an den Verbrauch an Energie in einer Druckerei optimal anzupassen. Dieses ist wiederum mit einem Informationsdienst eines Energieversorgers verbunden. Dieser Informationsdienst liefert Informationen über tageszeitlichen Preis der Primärenergie und einer dabei anfallenden CO2-Erzeugung. Grundparameter ist etwa, dass bei(viel Windeinsatz, wenig CO2-Erzeugung erfolgt. Die Daten werden für einen bestimmten nachfolgenden Zeitraum an das Energie-Auftrags-Steuerungssystem der Druckmaschine und/oder der Druckerei übergeben. Bei vordefinierten Betriebsarten der Druckmaschinen wie einer Betriebsart "CO2 Optimiert" werden die Druckaufträge entsprechend einem Liefertermin und bei dann möglichst niedriger CO2-Erzeugung sortiert. Hierfür sind insbesondere Druckaufträge unter Einsatz von Lackbeschichtung und Trocknung von Bedeutung, die in Zeiten mit viel Windstromerzeugung und damit wenig CO2-Erzeugung gelegt werden können. Eine vergleichbare Verfahrensweise kann auch für die Zuordnung von Druckaufträgen zur Erreichung von niedrigen Energiekosten angewendet werden, wenn der Energieversorger die Belieferung mit Primärenergie mit unterschiedlichen Energiepreisen zu unterschiedlichen Zeiten anbietet. According to the invention, an interface to a higher-level energy order control system of a printing company is provided. The energy order control system serves to optimally adapt the available primary energy to the consumption of energy in a printing house. This in turn is connected to an information service of an energy supplier. This information service provides information about the daily price of primary energy and associated CO2 production. The basic parameters are, for example, that there is (a lot of wind input, low CO2 production.) The data is transferred to the energy job control system of the printing press and / or the printing press for a certain period of time, for predefined operating modes of the printing machines, such as a "CO2 Optimized ", the print jobs are sorted according to a delivery date and then with the lowest possible CO2 production.This is particularly important for print jobs using paint coating and drying, which can be used in times of high wind power generation and thus low CO2 production can also be used to allocate print jobs to achieve low energy costs if the energy supplier offers primary energy supply with different energy prices at different times.

Voraussetzung für die Durchführung des erfindungsgemäßen Verfahrens ist das Energie-Auftrags-Steuerungssystem innerhalb des Produktions-Planungs-Steuerungssystems in Verbindung mit einer Energiebedarfsmessung und einer Hinterlegung von hierzu maschinenspezifischen Daten. In diesem Zusammenhang wird eine Vorhersage des Energiebedarfs für die anstehenden Druckaufträge möglich und diese können in das optimale Zeitfenster mit den niedrigsten möglichen Energiekosten gelegt werden.Prerequisite for the implementation of the method according to the invention is the energy order control system within the production Planning control system in conjunction with an energy demand measurement and a deposit of this machine-specific data. In this context, a prediction of the energy demand for the upcoming print jobs becomes possible and these can be put into the optimal time window with the lowest possible energy costs.

Die Daten aus den Energiebedarfsmessungen werden systematisch den einzelnen Rüstschritten und Produktionsschritten zugeordnet. Dies kann aufgrund des dabei anfallenden Datenumfangs zum Beispiel mit einem Tabellenkalkulationsprogramm erfolgen, das dann als Energieeffizienzrechner ausgebildet ist. Diese Funktionalität wird in der Software des Energie-Auftrags-Steuerungssystems integriert. Aufgrund der Druckauftragsdaten im Energie-Auftrags-Steuerungssystem erfolgt in einer Auftragsliste eine Darstellung des benötigten Energieeinsatzes (Einheit in kWh). Wenn ein übergeordnetes Energie-Auftrags-Steuerungssystem vorhanden ist, werden die Daten des benötigten Energieeinsatzes an das Energie-Auftrags-Steuerungssystem übermittelt. Umgekehrt werden bei einer Auswahl "Energieoptimiert produzieren" auf der Bedienoberfläche des Energie-Auftrags-Steuerungssystems die Kennzahlen des Energie-Auftrags-Steuerungssystems mit für kommende Zeitfenster jeweils vorgesehenen Energiepreisen dazu verwendet, die Aufträge kostenoptimiert zu sortieren. Dann kann die Ausführung von energieintensive Druckaufträge zu Zeiten mit niedrigen Energiepreisen und Druckaufträge mit weniger Energieverbrauch in zu Zeiten mit höheren Energiepreisen zugeordnet werden. The data from the energy demand measurements are systematically assigned to the individual set-up steps and production steps. This can be done due to the resulting data volume, for example, with a spreadsheet program, which is then designed as an energy efficiency calculator. This functionality is integrated in the software of the energy order control system. Based on the print order data in the energy order control system, an order list shows the required energy input (unit in kWh). If there is a higher-level power order control system, the data of the required energy input is transmitted to the power order control system. Conversely, when selecting "Produce energy-optimized" on the user interface of the energy order control system, the key figures of the energy order control system are used with energy prices provided for future time windows to sort the orders cost-optimized. Then, the execution of energy-intensive print jobs at times of low energy prices and jobs with less energy consumption can be assigned in times of higher energy prices.

Zur Durchführung ist daher vorgesehen, zusätzliche energiebezogene Informationen zu Druckaufträgen in einem Eingabebereich des Energie-Auftrags-Steuerungssystems zu ermöglichen. Hierbei werden der Energiebedarf und die CO2-Erzeugung pro 1000 Bogen definiert. Ein normaler Wert kann zum Beispiel bei 12,50 kWh Energieeinsatz und 5,5 kg CO2-Erzeugung pro 1000 Bogen liegen. For implementation it is therefore intended to enable additional energy-related information on print jobs in an input area of the energy job control system. Here the energy requirement and the CO2 production are defined per 1000 sheets. For example, a normal value can be 12.50 kWh energy input and 5.5 kg CO2 production per 1000 sheets.

Der Energiebedarf und die CO2-Erzeugung für einen kompletten Druckauftrag entsprechen einer maximal möglichen Druckauflage wird im Energie-Auftrags-Steuerungssystem errechnet und hinterlegt. Für die weitere Handhabung werden Grundeingaben zum Energieeinsatz und der CO2-Erzeugung durch einen Betreiber der Energieversorgung in einer entsprechenden Maske vorgenommen:
Dabei wird die CO2 Erzeugung pro Einheit des Energieverbrauchs in kWh hinterlegt. Der Wert liegt zwischen 0 und 700 Gramm CO2. Quelle ist die Stromrechnung der Druckerei oder ein "Carbon Footprint" eines für solche Aufgaben qualifizierten Beratungsunternehmens. Weiterhin soll im Energie-Auftrags-Steuerungssystem eine Reportfunktion ergänzt werden. Darin werden Daten aus dem Betriebssystem der Druckmaschinen im Hintergrund bereitgestellt. Hierzu gehört der Energiebedarf eines spezifischen Maschinentyps von Druckmaschinen mit verschiedenen Randparametern für Ausstattung und Betriebsweise (mit Lackauftrag, mit Trocknereinsatz) bei einer jeweils entsprechend vorgesehenen Druckgeschwindigkeit.
The energy requirement and the CO2 production for a complete print job correspond to a maximum possible print run is calculated and stored in the energy job control system. For further handling, basic inputs for the use of energy and the generation of CO2 by an operator of the energy supply are made in a corresponding mask:
The CO2 production per unit of energy consumption is stored in kWh. The value is between 0 and 700 grams of CO2. The source is the electricity bill of the printing house or a "carbon footprint" of a consulting firm qualified for such tasks. Furthermore, a report function should be added to the energy order control system. It provides data from the printing press operating system in the background. This includes the energy requirement of a specific machine type of printing presses with different marginal parameters for equipment and operation (with paint application, with dryer insert) at a correspondingly provided printing speed.

Im Folgenden wird ein Ausführungsbeispiel anhand von schematischen Darstellungen näher erläutert. In the following, an embodiment will be explained in more detail with reference to schematic representations.

Dabei zeigen Show

1 ein Schema einer Druckerei, 1 a scheme of a printing company,

2 ein Schema zu einem erfindungsgemäßen Verfahren und 2 a diagram of a method according to the invention and

3 ein Schema zu Details des erfindungsgemäßen Verfahrens. 3 a scheme for details of the method according to the invention.

In 1 ist eine Druckereiinfrastruktur schematisch dargestellt. Ausgehend von einer Druckereileitung DL wird der gesamte Maschinenpark über eine Arbeitsvorbereitung AV überwacht und gesteuert. Im Maschinenpark ist ein Vorstufenbereich mit Vorstufeneinrichtungen V1, V2 vorgesehen. Der Vorstufenbereich liefert Druckplatten an Druckmaschinen D1, D2 zur Ausführung von Druckaufträgen.In 1 is a printing infrastructure shown schematically. Starting from a printing line DL, the entire machine park is monitored and controlled via a work preparation AV. In the machine park, a pre-stage area with pre-stage equipment V1, V2 is provided. The precursor area provides printing plates on printing machines D1, D2 for executing print jobs.

Die von den Druckmaschinen D1, D2 bei den Druckaufträgen erzeugten Druckprodukte werden in einem Weiterverarbeitungsbereich in Weiterverarbeitungseinrichtungen W1, W2 zu verkaufbaren Druckprodukten endbearbeitet. The printed products produced by the printing machines D1, D2 during the print jobs are finished in a further processing area in further processing devices W1, W2 to salable print products.

Der Druckbereich und der Weiterverarbeitungsbereich sind über ein Produktions-Planungs-Steuerungssystem PPS mit der Arbeitsvorbereitung AV und der Druckereileitung DL verbunden. The printing area and the finishing area are connected to the job preparation AV and the printing line DL via a production planning control system PPS.

In 2 ist das Produktions-Planungs-Steuerungssystem PPS schematisch in größerer Detaillierung dargestellt. Das Produktions-Planungs-Steuerungssystem PPS kann hierbei Module für die die Auftragsverwaltung, Farbvoreinstellung, Maschinenvoreinstellung, für Produktionsreports und für ein Energieplanungssystem enthalten. In 2 the production planning control system PPS is shown schematically in greater detail. The production planning control system PPS can contain modules for order management, color presetting, machine presetting, production reports and an energy planning system.

Wenigstens die Module zur Auftragsverwaltung, zur Maschinenvoreinstellung und das Energieplanungssystem werden mit einem Energie-Auftrags-Steuerungssystem gekoppelt. At least the order management, machine presetting and energy planning systems are coupled with an energy order control system.

In 3 ist schematisch das Zusammenwirken der Module nach 2 in der Funktionalität des Energie-Auftrags-Steuerungssystems dargestellt. Innerhalb des Energie-Auftrags-Steuerungssystem sind folgende Verarbeitungsstufen angegeben:

  • 1. Spezifischer Energieverbrauch V
  • 2. Spezifischer Energiebedarf B
  • 3. Spezifische Energiebereitstellung BS
  • 4. Spezifische Klimabilanzdaten K
  • 5. Spezifische Auftragspriorität AP
In 3 is schematically the interaction of the modules after 2 represented in the functionality of the energy order control system. Within the energy contract Control system, the following processing stages are indicated:
  • 1. Specific energy consumption V
  • 2. Specific energy consumption B
  • 3. Specific energy provision BS
  • 4. Specific climate balance data K
  • 5. Specific order priority AP

Der spezifische Energieverbrauch V wird anhand der Maschinensteuerung innerhalb des Produktions-Planungs-Steuerungssystems PPS ermittelt oder vorgehalten. Hierbei werden Energieverbrauchsdaten für bestimmte Druckmaschinen und der Aggregate bereitgestellt und auf die vorkommenden Produktionsparameter bezogen hinterlegt. The specific energy consumption V is determined or maintained based on the machine control within the production planning control system PPS. In this case, energy consumption data for specific printing machines and the aggregates are provided and stored in relation to the occurring production parameters.

Der spezifische Energiebedarf B betrifft einen geplanten Druckauftrag und wird aus den Vorgaben zu einem Druckauftrag aus der Datenbank der Auftragsverwaltung zugesteuert. In diesem Zusammenhang werden die spezifischen Energieverbräuche V von für den Druckauftrag verfügbaren Druckmaschinen einkalkuliert, so dass ein Gesamtenergiebedarf für den Druckauftrag abhängig von dazu verwendbaren Druckmaschinen bereitgestellt wird. Damit ist nach der Stufe des spezifischen Energiebedarfs B eine Auftragsliste vorhanden, die nach dem erforderlichen Energieeinsatz sortiert werden kann. The specific energy requirement B relates to a planned print job and is fed from the specifications for a print job from the order management database. In this connection, the specific energy consumptions V of printing presses available for the print job are calculated in, so that a total energy requirement for the print job is provided depending on presses which can be used for this purpose. Thus, after the level of specific energy demand B, there is an order list which can be sorted according to the required energy input.

Die spezifische Energiebereitstellung BS wird von dem Energieplanungssystem beeinflusst. Das Energieplanungssystem steht dazu mit einer Energiedatenbank in Verbindung, die ein oder mehrere Energieversorger zu Verfügung stellen. The specific energy supply BS is influenced by the energy planning system. The energy planning system is connected to an energy database, which one or more energy suppliers provide.

Die Energiedatenbank weist Energiepreise und Klimabilanzen für die Energieversorgung aus. Diese Daten werden in einer Vorschau für einen bestimmten Zeitraum bereitgestellt, so dass für bestimmte Produktionszeiten sowohl die Energiepreise als auch die Klimabilanzen bestimmt werden können. The energy database shows energy prices and climate balances for the energy supply. These data are provided in a preview for a certain period of time, so that for certain production times both energy prices and climate balances can be determined.

Abhängig von den zeitbezogen spezifischen Daten der Energiekosten kann also auf Stufe der spezifischen Energiebereitstellung BS schon eine Sortierung von vorhandenen und zu bearbeitenden Druckaufträgen nach deren Energieeinsatz bestimmten Zeiten der verfügbaren Primärenergie zugeordnet werden. So kann ein energieintensiv zu bearbeitender Druckauftrag in Zeiten mit niedrigen Energiekosten gelegt werden. Andererseits kann ein mit geringerem Energieeinsatz zu bearbeitender Druckauftrag in Zeiten mit höheren Energiekosten verschoben werden. Depending on the time-related specific data of the energy costs, a sorting of existing and to-be-processed print jobs after their energy input can thus be assigned to specific times of the available primary energy at the level of the specific energy provision BS. This allows an energy-intensive print job to be processed in times of low energy costs. On the other hand, a print job to be processed with a lower energy input can be postponed in times with higher energy costs.

Die spezifischen Klimabilanzdaten K werden sowohl von Auftragsdaten als auch von den Daten des Energieplanungssystems beeinflusst. Wenn nämlich ein Druckauftrag vorliegt, der auf Kundenwunsch unter besonderen Klimabilanzprioritäten zu fertigen ist, dann wird in der Stufe der spezifischen Klimabilanzdaten K eine neue Zuordnung der Druckauftragsreihenfolge erfolgen. Ein solcher Druckauftrag wird dann unabhängig von dem erforderlichen Energieeinsatz in Zeiten mit positiver Klimabilanz der Energiebereitstellung verschoben. The specific climate balance data K are influenced both by order data and by the data of the energy planning system. Namely, if a print job is present, which is to be produced on customer's request under special climatic balance priorities, then in the stage of the specific climate balance data K, a new assignment of the print order will be done. Such a print job is then shifted regardless of the required energy use in times with positive climate balance of the energy supply.

Schließlich kann auf der Stufe der spezifischen Auftragspriorität AP auch noch die gesamte Reihenfolge der Druckaufträge endgültig beeinflusst werden. Hierbei können sowohl die Energiekosten als auch die Klimabilanz außer Betracht gelassen werden, wenn Druckaufträge umgehend zu erledigen sind oder wenigsten bis zu einem bestimmten Zeitpunkt ausgeführt sein müssen. Finally, at the level of the specific order priority AP, the entire order of the print jobs can finally be influenced. In this case, both the energy costs and the carbon footprint can be disregarded when print jobs are to be done immediately or at least have to be executed by a certain time.

Nach der Verarbeitung aller Daten aus Auftragsverwaltung, Maschinenvoreinstellung und Energieplanungssystem liegt also eine Auftragsreihenfolge vor, die nach einer unter Betracht von Energiekosten, einer möglichen Vorgabe von Klimabilanzdaten und allgemeinen Prioritätsgesichtspunkten gewichtet ist. After the processing of all data from order management, machine presetting and energy planning system, there is thus an order sequence that is weighted according to an energy cost, a possible specification of carbon footprint data and general priority aspects.

Hierbei erlaubt das Produktions-Planungs-Steuerungssystem PPS innerhalb des Energie-Auftrags-Steuerungssystems auch eine Veränderung der Prioritäten, so das auch Klimabilanzdaten das höchste Priorisierungsgewicht haben können oder dass sie gar nicht in Betracht gezogen werden. Here, the production planning control system PPS also allows a change of priorities within the energy job control system, so that carbon footprint data can have the highest prioritization weight or that they are not considered at all.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102008024615 A1 [0003] DE 102008024615 A1 [0003]
  • DE 19530826 C1 [0004] DE 19530826 C1 [0004]
  • DE 19817191 A1 [0006] DE 19817191 A1 [0006]
  • DE 102007062287 A1 [0007] DE 102007062287 A1 [0007]
  • DE 102007026012 A1 [0008] DE 102007026012 A1 [0008]
  • DE 10064755 A1 [0009] DE 10064755 A1 [0009]
  • DE 10318541 A1 [0010] DE 10318541 A1 [0010]
  • DE 102008045427 A1 [0011] DE 102008045427 A1 [0011]

Claims (11)

Verfahren zum Betreiben einer oder mehrerer Druckmaschinen innerhalb einer Druckerei, wobei die Druckmaschinen mit verschiedenen Aggregaten wie Druckwerken, Lackmodulen und Trocknern ausgestattet sind und wobei die Druckmaschine und deren Aggregate elektrischer Antriebe und Verbraucher aufweisen, wobei der Energieverbrauch der Aggregate und Verbraucher der Druckmaschine messtechnisch erfasst und wahlweise zusammen mit einer zugehörigen Maschinengeschwindigkeit gespeichert wird, – wobei dem Energieverbrauch weiterhin auch Parameterdaten von Druckaufträgen wie Farbbelegung in den Druckwerken, Lackzufuhr im Lackmodul, Betrieb und Art von Trocknern zugeordnet werden, dadurch gekennzeichnet, – dass in der/den Druckmaschinen abzuarbeitende Druckaufträge mit Parameterdaten zur Nutzung der Aggregate und Verbraucher bereitgestellt werden, – dass zu den in der/den Druckmaschinen abzuarbeitenden Druckaufträgen ein spezifischer für den/die Druckaufträge erforderlicher Energiebedarf zur Nutzung der Aggregate und Verbraucher bereitgestellt wird, – dass auf spezifische Zeitpunkte bezogene Energiebereitstellungsdaten erfasst und gespeichert werden und – dass in Bezug auf die gespeicherten Energiebereitstellungsdaten anhand des für den oder jeden Druckauftrag ermittelten spezifischen Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge festgelegt wird.Method for operating one or more printing presses within a printing press, wherein the printing presses are equipped with various units such as printing units, paint modules and dryers and wherein the printing press and its units have electric drives and consumers, wherein the energy consumption of the aggregates and consumers of the printing press is detected by measurement and is optionally stored together with an associated machine speed, - wherein the energy consumption is also assigned to parameter data of print jobs such as color assignment in the printing units, paint supply in the paint module, operation and type of dryers, characterized in that - to be processed in the / the presses print jobs with parameter data be provided for the use of aggregates and consumers, - that the print jobs to be completed in the press (s) require a specific amount of energy required for the print job (s) Provision of aggregates and consumers is provided, that energy provisioning data related to specific times are detected and stored, and that, with respect to the stored energy provisioning data, a time determination and / or an order of execution of the specific energy demand determined for the or each print job / of the print jobs. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass anhand eines für den oder jeden Druckauftrag ermittelten spezifischen Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge und eine Zuordnung zu einer bestimmten Druckmaschine festgelegt wird. A method according to claim 1, characterized in that based on a determined for the or each print job specific energy demand, a timing and / or an order for processing of the / the print jobs and an assignment to a particular printing machine is set. Verfahren zum Betreiben einer oder mehrerer Druckmaschinen innerhalb einer Druckerei, wobei die Druckmaschinen mit verschiedenen Aggregaten wie Druckwerken, Lackmodulen und Trocknern ausgestattet sind und wobei die Druckmaschine und deren Aggregate elektrischer Antriebe und Verbraucher aufweisen, wobei ein spezifischer Energieverbrauch der Druckmaschine für die Ausführung von allen vorkommenden für eine jeweilig bestimmte Nutzungsart spezifischen Rüstschritten und für die Ausführung von allen vorkommenden für eine jeweilig bestimmte Nutzungsart spezifischen Produktionsschritten messtechnisch erfasst und gespeichert wird, wobei der Energieverbrauch wahlweise zusammen mit einer zugehörigen Maschinengeschwindigkeit gespeichert wird, dadurch gekennzeichnet, – dass in der/den Druckmaschinen abzuarbeitende Druckaufträge mit Parameterdaten zur Nutzung der Aggregate und Verbraucher bereitgestellt werden, – dass zu den in der/den Druckmaschinen abzuarbeitenden Druckaufträgen ein spezifischer für den/die Druckaufträge über einen, mehrere oder alle Rüst- und Produktionsschritte erforderlicher Energiebedarf für eine jeweilig bei dem/den bestimmten Druckaufträgen bestimmte Nutzungsart der Druckmaschine bereitgestellt wird, – dass auf spezifische Zeitpunkte bezogene Energiebereitstellungsdaten erfasst und gespeichert werden und – dass in Bezug auf die gespeicherten Energiebereitstellungsdaten anhand eines für den oder jeden Druckauftrag ermittelten spezifischen Energiebedarfs über einen, mehrere oder alle Rüst- und Produktionsschritte eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge festgelegt wird.Method for operating one or more printing presses within a printing press, the printing presses being equipped with various units such as printing units, lacquer modules and dryers, and the printing press and its units having electric drives and consumers, wherein a specific energy consumption of the printing machine for the execution of all occurring is metrologically recorded and stored for each specific type of use specific setup steps and for the execution of all occurring for each particular type of use specific production steps, the energy consumption is optionally stored together with an associated machine speed, characterized in that - processed in the / the presses Print jobs with parameter data for the use of the aggregates and consumers are provided, - that for the print jobs to be processed in the press (s) a s specific for the / the print jobs over one, several or all set-up and production steps required energy required for each particular in the particular print jobs specific use of the press is provided, - that specific time points related energy supply data are recorded and stored and - that in relation a temporal determination and / or an order for a processing of the print job (s) is determined on the stored energy supply data on the basis of a specific energy requirement determined for the or each print job via one, several or all set-up and production steps. Verfahren nach Anspruch 3, dadurch gekennzeichnet, dass anhand eines für den oder jeden Druckauftrag ermittelten spezifischen Energiebedarfs eine zeitliche Bestimmung und/oder eine Reihenfolge für eine Abarbeitung des/der Druckaufträge über einen, mehrere oder alle Rüst- und Produktionsschritte und eine Zuordnung zu einer bestimmten Druckmaschine festgelegt wird. A method according to claim 3, characterized in that based on a determined for the or each print job specific energy demand, a timing and / or order for processing the / of the print jobs on one, several or all set-up and production steps and an assignment to a specific Printing machine is set. Verfahren nach einem oder mehreren der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Energiebereitstellungsdaten zeitlich regelmäßig von einem Energieplanungssystem (PPS5) mittels einer Datenverbindung aus einer Energiedatenbank eines oder mehrere Energieversorger für Primärenergie für einen Bereitstellungszeitraum spezifiziert entnommen und gespeichert werden. Method according to one or more of Claims 1 to 4, characterized in that the energy supply data are periodically taken out and stored by a power planning system (PPS5) by means of a data connection from an energy database of one or more energy suppliers for primary energy for a provision period. Verfahren nach einem oder mehreren der Ansprüche 1 bis 5, dadurch gekennzeichnet, – dass mit zeitraumspezifizierten Energiekosten erfasste und gespeicherte Energiebereitstellungsdaten von einem Energieplanungssystem (PPS5) zeitraumspezifiziert bereitgestellt werden und – dass diese Energiebereitstellungsdaten an ein Energie-Auftrags-Steuerungssystem (EAS) zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte übermittelbar sind. Method according to one or more of Claims 1 to 5, characterized in that energy supply data acquired and stored with time-specific energy costs are provided by an energy planning system (PPS5) in a time-specific manner and - this energy supply data is assigned to an energy order control system (EAS) for assignment one or more print jobs and / or one, several or All set-up and production steps required for the execution of the print job (s) can be transferred. Verfahren nach einem oder mehreren der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die erfassten und gespeicherten Energiebereitstellungsdaten von dem Energie-Auftrags-Steuerungssystem (EAS) zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte verwendet werden, um den/die Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte in einer zeitlichen Zuordnung zur Ausführung mit minimalen Energiekosten zu ordnen. Method according to one or more of claims 1 to 6, characterized in that the collected and stored energy supply data from the energy order control system (EAS) for assignment to one or more print jobs and / or one, several or all for the execution of / the setup and production steps required to order the print job (s) and / or one or more or all of the setup and production steps required to execute the print job (s) are scheduled to run with minimal energy cost. Verfahren nach einem oder mehreren der Ansprüche 1 bis 7, dadurch gekennzeichnet, – dass mit zeitraumspezifizierten Klimabilanzdaten erfasste und gespeicherte Energiebereitstellungsdaten von einem Energieplanungssystem (PPS5) zeitraumspezifiziert bereitgestellt werden und dass diese erfassten und gespeicherten Energiebereitstellungsdaten von einem Energieplanungssystem (PPS5) an ein Energie-Auftrags-Steuerungssystem (EAS) zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte übermittelbar sind. Method according to one or more of Claims 1 to 7, characterized in that energy supply data acquired and stored with period-specific climate balance data is provided by an energy planning system (PPS5) in a time-specific manner and in that this acquired and stored energy supply data is transferred from an energy planning system (PPS5) to an energy order Control system (EAS) for assignment to one or more print jobs and / or one, several or all necessary for the execution of / the print jobs setup and production steps are transferable. Verfahren nach einem oder mehreren der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass die erfassten und gespeicherten Energiebereitstellungsdaten von dem Energie-Auftrags-Steuerungssystem (EAS) zur Zuordnung zu einem oder mehreren Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte verwendet werden, um den/die Druckaufträgen und/oder einen, mehrere oder alle für die Ausführung des/der Druckaufträge erforderlichen Rüst- und Produktionsschritte in einer zeitlichen Zuordnung zur Ausführung mit einer geforderten oder optimierten Klimabilanz zu ordnen oder zu priorisieren. Method according to one or more of claims 1 to 8, characterized in that the collected and stored energy supply data from the energy order control system (EAS) for assignment to one or more print jobs and / or one, several or all for the execution of / the set-up and production steps required to order the print job (s) and / or one or more or all setup and production steps required to execute the print job (s) are scheduled to run with a required or optimized carbon footprint or to prioritize. Verfahren nach einem oder mehreren der Ansprüche 1 bis 9, dadurch gekennzeichnet, – dass der für den oder jeden Druckauftrag oder die erforderlichen Rüst- und Produktionsschritte ermittelte spezifische Energiebedarf für einen oder mehrere zur energieoptimierten Ausführung bestimme Druckaufträge an ein Energie-Auftrags-Steuerungssystem (EAS) übermittelt wird und – dass der jeweilige spezifische Energiebedarf in einem Planungsschritt einem jeweiligen Druckauftrag oder jeweilig erforderlichen Rüst- und Produktionsschritten zugeordnet speicherbar und ausgebbar ist. Method according to one or more of claims 1 to 9, characterized in that - the determined for the or each print job or the required set-up and production steps specific energy demand for one or more for energy-optimized execution bestimme print jobs to an energy order control system (EAS ) is transmitted and - that the respective specific energy requirements in a planning step associated with a respective print job or respectively required setup and production steps can be stored and output. Verfahren nach einem oder mehreren der Ansprüche 1 bis 10, dadurch gekennzeichnet, – dass der für den oder jeden Druckauftrag oder die erforderlichen Rüst- und Produktionsschritte ermittelte spezifische Energiebedarf für einen oder mehrere mit nach Auftragsanforderung oder allgemeinen Vorgaben der Druckerei zur Ausführung bestimmten Klimabilanzdaten der Druckaufträge an ein Energie-Auftrags-Steuerungssystem (EAS) übermittelt wird und – dass der jeweilige spezifische Energiebedarf in einem Planungsschritt einem jeweiligen Druckauftrag oder jeweilig erforderlichen Rüst- und Produktionsschritten mit den Klimabilanzdaten zugeordnet speicherbar und ausgebbar ist. Method according to one or more of claims 1 to 10, characterized in that - the specific energy requirement determined for the or each print job or the required set-up and production steps for one or more with according to order request or general specifications of the printing house for the execution of carbon footprint data of the print jobs is transmitted to an energy order control system (EAS) and - that the respective specific energy requirement can be stored and output in a planning step assigned to a respective print job or respectively required set-up and production steps with the carbon footprint data.
DE102014116313.3A 2014-11-09 2014-11-09 Energy management for printing presses Pending DE102014116313A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102014116313.3A DE102014116313A1 (en) 2014-11-09 2014-11-09 Energy management for printing presses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102014116313.3A DE102014116313A1 (en) 2014-11-09 2014-11-09 Energy management for printing presses

Publications (1)

Publication Number Publication Date
DE102014116313A1 true DE102014116313A1 (en) 2016-05-12

Family

ID=55802687

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102014116313.3A Pending DE102014116313A1 (en) 2014-11-09 2014-11-09 Energy management for printing presses

Country Status (1)

Country Link
DE (1) DE102014116313A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015116569A1 (en) 2015-09-30 2017-03-30 Manroland Web Systems Gmbh Method for planning and assigning productions
DE102016209118A1 (en) 2016-05-25 2017-11-30 Koenig & Bauer Ag Energy Management System
DE102016015707A1 (en) 2016-05-25 2017-11-30 Koenig & Bauer Ag Energy Management System
CN113190186A (en) * 2020-01-29 2021-07-30 海德堡印刷机械股份公司 Improved execution of printing tasks by means of compatible materials
CN113211973A (en) * 2020-02-05 2021-08-06 海德堡印刷机械股份公司 Flexible processing of work queues
EP3967495A1 (en) * 2020-09-10 2022-03-16 Hubergroup Deutschland GmbH Control system and method for printing machines for setting and monitoring drying, migration and/or cross-linking relevant parameters

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19530826C1 (en) 1995-08-22 1997-01-23 Dieter Rupert Bruederl Power output optimisation system for energy distribution system
DE19817191A1 (en) 1998-04-17 1999-10-21 Thomas Frank Method for regulating the total power consumption of power consuming installations using ripple control
DE10064755A1 (en) 2000-12-22 2002-07-11 Roland Man Druckmasch Power supply for a rotary printing press
DE10318541A1 (en) 2003-04-24 2004-11-11 Koenig & Bauer Ag Measurement, documentation and monitoring of electrical parameters relating to a print machine by use of a multi-function monitoring module integrated in the machine control unit
DE102007026012A1 (en) 2006-07-10 2008-01-24 Heidelberger Druckmaschinen Ag Electric drive controlling device for printing material processing machine, has electronic control unit calculating electric energy required by electric drive as function of motion profiles of electric drive
DE102007062287A1 (en) 2007-12-21 2009-06-25 Manroland Ag Method for producing a printed product
DE102008024615A1 (en) 2008-05-21 2009-11-26 Manroland Ag Method for operating a printing machine
DE102008001966A1 (en) * 2008-05-26 2009-12-03 Manroland Ag Method for producing a printed product
DE102008045427A1 (en) 2008-09-02 2010-03-04 Koenig & Bauer Aktiengesellschaft Electrical load e.g. main drive motor, controlling method for use in printing press, involves operating time-limitedly controllable electrical load, such that maximum of total power consumption is reduced
DE102009054829A1 (en) * 2009-12-17 2011-06-22 Siemens Aktiengesellschaft, 80333 Method for operating machine tool, involves determining electrical energies consumed by machine and/or electric energy consumers per processing steps of machine and/or per flow of processing program from determined active electric power

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19530826C1 (en) 1995-08-22 1997-01-23 Dieter Rupert Bruederl Power output optimisation system for energy distribution system
DE19817191A1 (en) 1998-04-17 1999-10-21 Thomas Frank Method for regulating the total power consumption of power consuming installations using ripple control
DE10064755A1 (en) 2000-12-22 2002-07-11 Roland Man Druckmasch Power supply for a rotary printing press
DE10318541A1 (en) 2003-04-24 2004-11-11 Koenig & Bauer Ag Measurement, documentation and monitoring of electrical parameters relating to a print machine by use of a multi-function monitoring module integrated in the machine control unit
DE102007026012A1 (en) 2006-07-10 2008-01-24 Heidelberger Druckmaschinen Ag Electric drive controlling device for printing material processing machine, has electronic control unit calculating electric energy required by electric drive as function of motion profiles of electric drive
DE102007062287A1 (en) 2007-12-21 2009-06-25 Manroland Ag Method for producing a printed product
DE102008024615A1 (en) 2008-05-21 2009-11-26 Manroland Ag Method for operating a printing machine
DE102008001966A1 (en) * 2008-05-26 2009-12-03 Manroland Ag Method for producing a printed product
DE102008045427A1 (en) 2008-09-02 2010-03-04 Koenig & Bauer Aktiengesellschaft Electrical load e.g. main drive motor, controlling method for use in printing press, involves operating time-limitedly controllable electrical load, such that maximum of total power consumption is reduced
DE102009054829A1 (en) * 2009-12-17 2011-06-22 Siemens Aktiengesellschaft, 80333 Method for operating machine tool, involves determining electrical energies consumed by machine and/or electric energy consumers per processing steps of machine and/or per flow of processing program from determined active electric power

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Norm VDMA 8873-1 2011-11. Richtlinie zur Ermittlung der betriebsspezifischen Leistungsaufnahme von Bogenoffsetdruckmaschinen - Teil 1: Druckmaschinen mit oder ohne Bogenwendeeinrichtung, konventionell. *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015116569A1 (en) 2015-09-30 2017-03-30 Manroland Web Systems Gmbh Method for planning and assigning productions
DE102016209118A1 (en) 2016-05-25 2017-11-30 Koenig & Bauer Ag Energy Management System
DE102016015707A1 (en) 2016-05-25 2017-11-30 Koenig & Bauer Ag Energy Management System
DE102016209118B4 (en) 2016-05-25 2018-05-09 Koenig & Bauer Ag Energy Management System
DE102016015707B4 (en) 2016-05-25 2023-06-15 Koenig & Bauer Ag energy management system
CN113190186A (en) * 2020-01-29 2021-07-30 海德堡印刷机械股份公司 Improved execution of printing tasks by means of compatible materials
CN113211973A (en) * 2020-02-05 2021-08-06 海德堡印刷机械股份公司 Flexible processing of work queues
EP3862186A1 (en) * 2020-02-05 2021-08-11 Heidelberger Druckmaschinen AG Flexible processing of job queue
US11294610B2 (en) 2020-02-05 2022-04-05 Heidelberger Druckmaschinen Ag Method for flexible processing of a job queue
EP3967495A1 (en) * 2020-09-10 2022-03-16 Hubergroup Deutschland GmbH Control system and method for printing machines for setting and monitoring drying, migration and/or cross-linking relevant parameters

Similar Documents

Publication Publication Date Title
DE102014116313A1 (en) Energy management for printing presses
DE102008045427A1 (en) Electrical load e.g. main drive motor, controlling method for use in printing press, involves operating time-limitedly controllable electrical load, such that maximum of total power consumption is reduced
EP2400616A2 (en) Method and device for operating a number of decentralised units supplied with electrical energy consumers/suppliers connected to an electric low voltage network conforming to the network
DE102013102756A1 (en) Production planning and control system and reporting system for printing presses
EP3205500A2 (en) Method for compensating application and machine specific jig inaccuracies and register error
EP3635651B1 (en) Method for operating a plurality of technical units as a composite on an electric distribution network, controller, and electric device
EP2072257B2 (en) Method for producing a printed product
EP2945804B1 (en) Device and method for automatic ink presetting
EP2577829B1 (en) Method and system for adapting a production flow schedule for a production process
DE102018200017A1 (en) METHOD AND DEVICE FOR POWER SUPPLYING A DRIVE SYSTEM WITH INTERMEDIATE CIRCUIT
DE102011102776A1 (en) Production machine, particularly plastic manufacturing machine, such as plastic injection molding machine, comprises multiple power consumers and master device for coordination of electric consumption for power consumers
EP3439886B1 (en) Processing machine system and method for operating a processing machine system
DE102012207974A1 (en) Method for increasing the efficiency of the use of printing equipment
DE102018204918A1 (en) Processing machine system and method for operating a processing machine system
DE102019117582A1 (en) PROCEDURE AND SYSTEM FOR THE COORDINATION OF CHARGING PROCEDURES FOR ELECTRIC VEHICLES
DE19932833A1 (en) Regulating total power of power generation system(s) with group of loads involves using load schema enabling more cost-effective utilization of energy tariffs with load time shifts
DE102017205471A1 (en) Method for determining the order during the processing of print jobs and a printing machine with control computer
DE102016015707B4 (en) energy management system
DE102016209118B4 (en) Energy Management System
DE102021101124A1 (en) Process for planning production processes of orders on printing material processing machines
EP3715125B1 (en) Machine stoppage
DE102012025228A1 (en) Method for power management in system, involves transmitting controller-total-power management information to superordinate controller, where power in system is managed in superordinate controller based on transmitted information
DE102017205576A1 (en) Processing machine system and method for operating a processing machine system
EP3744522A1 (en) Paint consumption prediction
DE102017205578B4 (en) Processing machine system and operating method of a processing machine system

Legal Events

Date Code Title Description
R082 Change of representative
R163 Identified publications notified
R012 Request for examination validly filed