CN204303029U - For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance - Google Patents

For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance Download PDF

Info

Publication number
CN204303029U
CN204303029U CN201420455361.0U CN201420455361U CN204303029U CN 204303029 U CN204303029 U CN 204303029U CN 201420455361 U CN201420455361 U CN 201420455361U CN 204303029 U CN204303029 U CN 204303029U
Authority
CN
China
Prior art keywords
dimensional
collision detection
chip
subway
database systems
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420455361.0U
Other languages
Chinese (zh)
Inventor
李多贵
常虹
王飞飞
刘学明
胡洋
张鹏
林敏�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd
Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd
Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd, Shanghai Civil Engineering Co Ltd of CREC filed Critical CRECSHANGHAI CIVIL ENGINEERING GROUP NO2 ENGINEERING Co Ltd
Priority to CN201420455361.0U priority Critical patent/CN204303029U/en
Application granted granted Critical
Publication of CN204303029U publication Critical patent/CN204303029U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to BIM Database Systems, be specifically related to a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance, described Database Systems comprise three-dimensional modeling data storehouse chip, collision detection chip and equipment control chip, and described collision detection chip and described equipment control chip are connected with described three-dimensional modeling data storehouse chip respectively.The utility model has the advantages that, conventional planar two dimension drawing can be overcome and easily occur that scarce shortcoming is touched in mistakes and omissions, solve the technical matters of the complicated electromechanical installation pipeline collisions such as subway; In the operation maintenance process in later stage, can the relevant information of browse queries equipment whenever and wherever possible by webpage client, effectively improve search efficiency, assets protection, renewal, efficient administration are accurate, and installations and facilities accurate positioning, quantity is distinct.

Description

For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
Technical field
The utility model relates to BIM Database Systems, is specifically related to a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance.
Background technology
The dynamo-electric installation project in subway station relates to tens specialties such as ventilation, plumbing, fire-fighting, power and illumination, communication, signal, power supply, pipeline arrange feature be space little, diversified in specifications, arrange intensive, need within the limited time with install concentratedly in space and do not interfere with each other mutually, co-ordination amount is large, conventional installation method is that the line holder of each specialty is independently installed separately, but easily occurs following problem in construction and later maintenance:
1, the deficiency of design drawing requires more perfect design
Current construction drawing is CAD figure, and different specialties is designed by different personnel, or even different specialties is designed by different designing institutees, confusing communication each other, causing and fight separately, so the cooperation between each specialty exists more leak, and is plane drawing, cause the pipeline drawing of each specialty well can not react virtual condition, in space environment, just have collision.
2, construction requirement drawing energy actual response is actual
Each specialty intersection is installed, mutual serious interference, and pipeline arrangement is in disorder, and coordinate difficulty large, work efficiency is low; The pipeline first installed is comparatively abundant in space, choice is also comparatively large, and usually becoming of rear installation pipeline is very passive, often occurs the pipeline collision of different majors, the special pipelines even had cannot be installed, the economic loss that unit in charge of construction can be caused larger because of frequent " doing over again ".
3, operation maintenance difficulty is large
In operation maintenance process, pipeline, equipment data search difficulty, and maintenance difficulty is large, and operator management transformation is difficult.Along with the increase of subway construction mileage, this situation has been installed in operation maintenance at subway station electromechanics and has day by day been manifested, seriously govern the work efficiency in operation maintenance, maintenance cost, pipeline management mixed and disorderly in a large number is also that one of maintenance work operation stage is perplexed greatly simultaneously.
Given this, we need more advanced drawing to solve the problem of this type of installation and operation maintenance.Along with the development of BIM technology, we believe that BIM technology can well solve problems.BIM(Building Information Modeling) also known as BIM, come from the eighties in 20th century, be the another important Computer Applied Technology of the construction field occurred after computer aided design cad technology, be one and comprise and enrich data, OO, the digitized representations with the Architectural Equipment of intellectuality and parametrization feature.
The essence of BIM does not have the actual buildings starting to build and set up in computer in process of construction and updating maintenance one is virtual at buildings, that is, a house makes twice, first in computer, make one time virtually, to finding and solving the contingent problem of actual building course and mistake, carry out practice of construction according to virtual construction process again, thus greatly increase project controllability, reduce mistake, reduce risk, the reduction of erection time, control cost, improve quality.
The BIM of present stage is applied in the typing of design process and every data by more, also cannot detect the collision in design process between subway pipeline quickly and easily, and the every terms of information retrieved needed for later stage operation maintenance, therefore a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance are badly in need of in this area.
Summary of the invention
The purpose of this utility model is according to above-mentioned the deficiencies in the prior art part, a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance are provided, these Database Systems create three-dimensional modeling data storehouse chip, this chip has annexation with collision detection chip and equipment control chip respectively, thus forms a set of Database Systems by chip portfolio.
The utility model object realizes being completed by following technical scheme:
A kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance, it is characterized in that described Database Systems comprise three-dimensional modeling data storehouse chip, collision detection chip and equipment control chip, described collision detection chip and described equipment control chip are connected with described three-dimensional modeling data storehouse chip respectively.
Described three-dimensional modeling data storehouse chip is the chip that burning has three-dimensional subway concourse BUILDINGS MODELS, three-dimensional electromechanical model and three-dimensional tube line model.
Described three-dimensional subway concourse BUILDINGS MODELS specifically refers to the three-dimensional model of the space structure of subway concourse.
Described three-dimensional electromechanical model specifically assigns the three-dimensional model that electronic box, Fire Hose and air-conditioning box distribute in described three-dimensional subway concourse BUILDINGS MODELS.
Described three-dimensional tube line model specifically refers to the three-dimensional model that exhaust duct, water pipe and fulgurite distribute in described three-dimensional subway concourse BUILDINGS MODELS.
The utility model has the advantages that, conventional planar two dimension drawing can be overcome and easily occur that scarce shortcoming is touched in mistakes and omissions, solve the technical matters of the complicated electromechanical installation pipeline collisions such as subway; Make portion of techniques work more intuitively, sooner, more laborsaving, more accurate, can effectively reduce technician's labour intensity; The most perfect function can be reached by minimum cost, can accomplish to avoid doing over again, cut the waste, reduce costs 10%, save the duration 8%; In the operation maintenance process in later stage, can the relevant information of browse queries equipment whenever and wherever possible by webpage client, effectively improve search efficiency, assets protection, renewal, efficient administration are accurate, and installations and facilities accurate positioning, quantity is distinct.
Accompanying drawing explanation
Fig. 1 is the structural representation of BIM Database Systems in the utility model.
Embodiment
Feature of the present utility model and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that the understanding of technician of the same trade:
Embodiment: as shown in Figure 1, the present embodiment is specifically related to a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance, these BIM Database Systems are made up of three-dimensional modeling data storehouse chip, collision detection chip and equipment control chip, wherein collision detection chip and equipment control chip are connected with three-dimensional modeling data storehouse chip respectively, can carry out the operation of data interaction.
As shown in Figure 1, three-dimensional modeling data storehouse chip is arranged in BIM Database Systems, specifically by three-dimensional subway concourse BUILDINGS MODELS, three-dimensional electromechanical model and three-dimensional tube line model are formed, wherein three-dimensional subway concourse BUILDINGS MODELS specifically refers to the three-dimensional model of subway concourse space structure, as the installation carrier of three-dimensional electromechanical model and three-dimensional tube line model, three-dimensional electromechanical model relates generally to the distribution of all kinds of electromechanical equipment in three-dimensional subway concourse BUILDINGS MODELS, as panel box, Fire Hose, air-conditioning box etc., and three-dimensional tube line model relates generally to exhaust duct, water pipe and this three classes pipeline distribution in three-dimensional subway concourse BUILDINGS MODELS of fulgurite, each model all transforms structure based on D CAD domain paper and forms also burning in the chip of three-dimensional modeling data storehouse, namely gather the information such as position, size, mark, layer of D CAD planimetric map, the structure after completing with Practical Project to make each model in the chip of three-dimensional modeling data storehouse is consistent comprehensively.
Collision detection chip is mainly used in design, iron pipe line carries out collision detection over the ground in work progress, in this chip, burning has trace routine, use this trace routine the three-dimensional subway concourse BUILDINGS MODELS in three-dimensional modeling data storehouse, three-dimensional electromechanical model and three-dimensional tube line model derived and three merged, each model all has D coordinates value; Different tolerances is set by the processing data information instrument in trace routine automatic collision analysis is carried out to the three-dimensional electromechanical model in three-dimensional subway concourse model and three-dimensional tube line model, export collision detection result, in each model, D coordinates value repeated overlapping part is the pipeline point of impingement.In the collision detection process of reality, except using except aforesaid processing data information instrument detects automatically, manual detection method can also be roamed by 3D, namely the distinct device in each three-dimensional model is all shown with different colours to facilitate differentiation, and workmen carries out by trace routine the intersection-type collision point that 3D roaming can detect each pipeline, equipment.The practical application of collision detection chip exemplifies, as the collision detection of the collision detection between extinguishing pipe and exhaust duct, exhaust duct and cable testing bridge, the collision detection between cable testing bridge and panel box, export collision node and report afterwards, designer modifies, to avoid again colliding to the pipeline of relevant position and electromechanical equipment according to collision node and report.
In equipment control chip, burning has device manager, is mainly used in, in the later stage operation maintenance after the completion of subway subway concourse, comprising: ventilate and water supply and sewerage pipeline maintenance, signal facility maintenance and fire-fighting system maintenance etc.Metro project Influence to operation face is large, and repair and maintenance standard is high, and great impact may be caused in a minor matter former capital.Pinpoint the problems and want rush repair, and the past is when equipment installation fault produces, and investigates very time-consuming, find related data difficulty, the later stage repeatedly transforms and more cannot check on inner case.Can be consulted fast by the device manager in equipment control chip now, staff calls any information in the chip of inquiry three-dimensional modeling data storehouse by browser high in the clouds.When setting up three-dimensional modeling data storehouse chip, in three-dimensional subway concourse BUILDINGS MODELS in it, three-dimensional electromechanical model and three-dimensional tube line model, typing has relevant every terms of information to consult amendment for equipment control chip, and relevant every terms of information specifically comprises device id coding, device parameter, installation repair and maintenance date, production supplier and maintenance contact method etc.By the visualized graph interface in the device manager in this equipment control chip, can intuitively view current subway station plane space in real time and take situation, when a certain electromechanical equipment in subway station breaks down, by equipment control chip, maintenance personal can check the every terms of information of this electromechanical equipment fast, comprise the critical datas such as repair and maintenance record, device parameter, production supplier, effectively can improve the efficiency of management maintenance.
The large Core Feature of in the present embodiment two is subway pipeline collision detection and later stage operation maintenance function, and its good effect is:
1. overcome conventional planar two dimension drawing to be very easy to mistakes and omissions and to touch scarce shortcoming, solve the technical matters of the complicated electromechanical installation pipeline collisions such as subway.Owing to have employed the technology of dummy model construction simulation scene, the present embodiment has following technical progress: the application of BIM technology in the dynamo-electric installation project of subway engineering, make portion of techniques work more directly perceived, sooner, more laborsaving, more accurate, can effectively reduce technician's labour intensity.By this technology, the most perfect function can be reached by minimum cost, can accomplish to avoid doing over again, cut the waste, reduce costs 10%, save the duration 8%.Most importantly by this BIM technology, let us recognizes that BIM is not only a kind of technology, but the one of workflow changes, it is a kind of method, people are allowed to enter the environment of central collectivization from the environment based on a kind of design, difference between comprehensive Design intention and construction perform, be a kind of social change, BIM technology will be fully developed talents in subway engineering.
The foundation of the device manager 2. in equipment control chip, improves search efficiency nearly a hundred times, and the data that just can inquire for past 2-3 hour, can retrieve for present 1-2 minute; Can the relevant information of browse queries equipment whenever and wherever possible by webpage client, assets protection, renewal, efficient administration are accurate, and installations and facilities accurate positioning, quantity is distinct.

Claims (5)

1. the BIM Database Systems for subway pipeline collision detection and later stage operation maintenance, it is characterized in that described Database Systems comprise three-dimensional modeling data storehouse chip, collision detection chip and equipment control chip, described collision detection chip and described equipment control chip are connected with described three-dimensional modeling data storehouse chip respectively.
2. a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance according to claim 1, is characterized in that described three-dimensional modeling data storehouse chip is the chip that burning has three-dimensional subway concourse BUILDINGS MODELS, three-dimensional electromechanical model and three-dimensional tube line model.
3. a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance according to claim 2, is characterized in that described three-dimensional subway concourse BUILDINGS MODELS specifically refers to the three-dimensional model of the space structure of subway concourse.
4. a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance according to claim 2, is characterized in that the three-dimensional model that described three-dimensional electromechanical model specifically assigns electronic box, Fire Hose and air-conditioning box and distributes in described three-dimensional subway concourse BUILDINGS MODELS.
5. a kind of BIM Database Systems for subway pipeline collision detection and later stage operation maintenance according to claim 2, is characterized in that described three-dimensional tube line model specifically refers to the three-dimensional model that exhaust duct, water pipe and fulgurite distribute in described three-dimensional subway concourse BUILDINGS MODELS.
CN201420455361.0U 2013-08-13 2014-08-13 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance Expired - Fee Related CN204303029U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420455361.0U CN204303029U (en) 2013-08-13 2014-08-13 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201320491474 2013-08-13
CN201420455361.0U CN204303029U (en) 2013-08-13 2014-08-13 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance

Publications (1)

Publication Number Publication Date
CN204303029U true CN204303029U (en) 2015-04-29

Family

ID=53108553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420455361.0U Expired - Fee Related CN204303029U (en) 2013-08-13 2014-08-13 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance

Country Status (1)

Country Link
CN (1) CN204303029U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880986A (en) * 2015-06-03 2015-09-02 中建地下空间有限公司 System and method for comprehensive pipe gallery management based on BIM
CN105260541A (en) * 2015-10-13 2016-01-20 中国十七冶集团有限公司 Pipeline deepening method based on BIM model
CN105279329A (en) * 2015-10-13 2016-01-27 中国十七冶集团有限公司 BIM (Building Information Modeling)-based sample plate guide quality management method
CN105302937A (en) * 2015-09-15 2016-02-03 中国十七冶集团有限公司 Construction design method for residential complex in areas cold in winter and hot in summer based on BIM system
CN106895949A (en) * 2017-03-10 2017-06-27 浙江华电器材检测研究所 The automatically controlled distribution automatic ram tester of cable testing bridge
CN107577901A (en) * 2017-10-20 2018-01-12 浙江建设职业技术学院 A kind of collision detection BIM Database Systems for construction site
CN108197356A (en) * 2017-12-20 2018-06-22 中国铁路总公司 A kind of four electric facility location optimization method and devices based on BIM technology
CN108595882A (en) * 2018-05-09 2018-09-28 上海营邑城市规划设计股份有限公司 A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system
CN109299675A (en) * 2018-09-07 2019-02-01 广州算易软件科技有限公司 A kind of distribution box recognition methods and device based on electric installation drawing
CN110097239A (en) * 2018-01-29 2019-08-06 上海宝信软件股份有限公司 A kind of subway work collision detection method and system based on matrix analysis
CN110439214A (en) * 2019-07-17 2019-11-12 中铁十二局集团有限公司 Conduit optimizes construction method of installation under subway antistatic floor

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880986A (en) * 2015-06-03 2015-09-02 中建地下空间有限公司 System and method for comprehensive pipe gallery management based on BIM
CN105302937A (en) * 2015-09-15 2016-02-03 中国十七冶集团有限公司 Construction design method for residential complex in areas cold in winter and hot in summer based on BIM system
CN105279329B (en) * 2015-10-13 2019-02-26 中国十七冶集团有限公司 A kind of template based on BIM is led the way method for quality control
CN105279329A (en) * 2015-10-13 2016-01-27 中国十七冶集团有限公司 BIM (Building Information Modeling)-based sample plate guide quality management method
CN105260541A (en) * 2015-10-13 2016-01-20 中国十七冶集团有限公司 Pipeline deepening method based on BIM model
CN106895949A (en) * 2017-03-10 2017-06-27 浙江华电器材检测研究所 The automatically controlled distribution automatic ram tester of cable testing bridge
CN107577901A (en) * 2017-10-20 2018-01-12 浙江建设职业技术学院 A kind of collision detection BIM Database Systems for construction site
CN108197356A (en) * 2017-12-20 2018-06-22 中国铁路总公司 A kind of four electric facility location optimization method and devices based on BIM technology
CN110097239A (en) * 2018-01-29 2019-08-06 上海宝信软件股份有限公司 A kind of subway work collision detection method and system based on matrix analysis
CN108595882A (en) * 2018-05-09 2018-09-28 上海营邑城市规划设计股份有限公司 A kind of city of battalion plans that pipeline BIM design Pipe Costs generate system
CN108595882B (en) * 2018-05-09 2020-09-29 上海营邑城市规划设计股份有限公司 Yinyi planning pipeline BIM design pipeline cost generation system
CN109299675A (en) * 2018-09-07 2019-02-01 广州算易软件科技有限公司 A kind of distribution box recognition methods and device based on electric installation drawing
CN109299675B (en) * 2018-09-07 2021-05-07 广州算易软件科技有限公司 Electrical drawing based distribution box identification method and device
CN110439214A (en) * 2019-07-17 2019-11-12 中铁十二局集团有限公司 Conduit optimizes construction method of installation under subway antistatic floor
CN110439214B (en) * 2019-07-17 2021-03-30 中铁十二局集团有限公司 Optimized installation construction method for underground antistatic floor lower channel

Similar Documents

Publication Publication Date Title
CN204303029U (en) For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
CN103093061B (en) A kind of subway electromechanical engineering comprehensive pipeline collision optimization method
CN102750618B (en) A kind of comprehensive pipeline of metro construction aided management system and implementation method
CN102867076B (en) BIM (Building Information Modeling)-based metro comprehensive pipeline clearance detection method
CN108399652A (en) Method, apparatus, storage medium and the terminal device of City Buried Pipeline three-dimension monitor model foundation
Zolfagharian et al. Current trends in construction site layout planning
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN104063529A (en) Simulation method of layout planning of digital automobile plant
CN112257160B (en) BIM-based standardized forward design method for garbage incineration power plant
CN110929326A (en) BIM-based basement electromechanical modeling method
CN106446033A (en) Potential safety hazard information management system and method for underground pipelines
CN110991670A (en) Power cable management method
CN104599093A (en) Distribution network power failure range visualization method based on GIS (geographic information system) imaging
CN107067174A (en) A kind of distributed energy resource system three dimensional design appraisal procedure based on BIM
CN112365246A (en) AI + GIS + BIM-based intelligent pipe gallery comprehensive management platform
Zhou et al. A BIM-based identification and classification method of environmental risks in the design of Beijing subway
CN107194566A (en) A kind of electric intelligent archive management method based on virtual reality
CN102663168A (en) Method for three-dimensional conversion and pipeline conflict processing of two-dimensional drawing of cable layer
Luo et al. A sustainable BIM-based multidisciplinary framework for underground pipeline clash detection and analysis
CN103810310A (en) Parameterization determination method for pitch foaming module equipment oriented to bituminous mixing plant
CN104408218A (en) Visual examination method of oil gas pipeline design achievement
CN112328666A (en) Intelligent building supervision operation and maintenance system based on cloud platform technology
Gao et al. Research on BIM technology in construction safety & emergency management
Wang et al. Integration of GIS and BIM in Metro Construction
CN108920860A (en) A kind of GIL piping lane Engineering Digital modeling method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20180813

CF01 Termination of patent right due to non-payment of annual fee