CN107194566A - A kind of electric intelligent archive management method based on virtual reality - Google Patents

A kind of electric intelligent archive management method based on virtual reality Download PDF

Info

Publication number
CN107194566A
CN107194566A CN201710348010.8A CN201710348010A CN107194566A CN 107194566 A CN107194566 A CN 107194566A CN 201710348010 A CN201710348010 A CN 201710348010A CN 107194566 A CN107194566 A CN 107194566A
Authority
CN
China
Prior art keywords
electric
electric power
equipment
power equipment
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710348010.8A
Other languages
Chinese (zh)
Inventor
李福荣
任宇新
钟亮
冯茂森
潘红芳
周海波
王海军
段长君
张彦斌
石玉梅
刘继君
姚强
赵桂廷
张文战
张利锋
岳丽华
任仁
包丽尔
武剑灵
石峰
王亚平
谢炯
韩高飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710348010.8A priority Critical patent/CN107194566A/en
Publication of CN107194566A publication Critical patent/CN107194566A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Computer Graphics (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of electric intelligent archive management method based on virtual reality, including:Obtain power equipment, electric power station X-Y scheme paper that power system is built;According to the two-dimentional drawing creation and real power equipment, the one-to-one power equipment in electric power station, electric power station threedimensional model;Electric power logic in electric power scene is assembled and connects the threedimensional model of the power equipment;The threedimensional model of the power equipment assembled is arranged to the electric intelligent archives that virtual device station is formed in the threedimensional model of electric power station.The present invention is by way of threedimensional model is associated or scans Quick Response Code, operation and maintainer is set to transfer associated electrical drawing at any time by each Terminal Type at work, without transferring paper drawing again, the essential information and historical archives data of designated equipment additionally can be directly transferred according to need of work, and the operating efficiency of monitoring is greatly improved.

Description

A kind of electric intelligent archive management method based on virtual reality
Technical field
The present invention relates to electric power technical field of virtual reality, and in particular to a kind of electric intelligent archives based on virtual reality Management method.
Background technology
This part to reader introduce may be related to various aspects of the invention background technology, it is believed that can be carried to reader The background information being provided with, so as to contribute to reader to more fully understand various aspects of the invention.It is, therefore, to be understood that our department Point explanation be for the above purpose, and not to constitute admission of prior art.
With the fast development of network system, the level of informatization is improved constantly, networking, the digital management of intelligent grid As inexorable trend.Because the number of devices of whole power-supply system is more, distribution wide, traditional detection mode needs to spend more Manpower, the failure for generation can not be positioned accurately.To improve the security of power system maintenance and management, it is necessary to The detecting system of a set of " visualization, intellectuality " is set up, efficient management and safe operation to power-supply system provide strong guarantee.
System Intelligent Measurement is mainly the running status to the power equipment in computer room, and equipment operating data, equipment Warning information carries out effective monitoring, and traditional monitoring technology is generally using forms mode, plan view either screen technology Mode is monitored.
Although the gathered data and warning information of each equipment the 1, can be shown exactly using form, due to lacking position Sense and spatial impression information are put, detection positioning is not easy to.
2nd, because the device category of whole power-supply system is various, type is complicated, often across multiple floors, spread each Place, can not be very clear when using if not only lacking spatial impression using the displaying of multiple plans.
3rd, the limitation that video technique is developed, can only carry out field monitor, it is impossible to understand equipment real-time running data in time And running status, the confirmation of event is very difficult, virtually reduces the stability and security of system.
The content of the invention
The technical problem to be solved is how to provide a kind of electric intelligent archive management method based on virtual reality.
For defect of the prior art, the present invention provides a kind of electric intelligent file administration side based on virtual reality Method, can be with Digital Display power equipment scene.
In a first aspect, the invention provides a kind of electric intelligent archive management method based on virtual reality, including:
Obtain power equipment, electric power station X-Y scheme paper that power system is built;
According to the two-dimentional drawing creation and real power equipment, the one-to-one power equipment in electric power station, field of electric force Stand threedimensional model;
Electric power logic in electric power scene is assembled and connects the threedimensional model of the power equipment;
The threedimensional model of the power equipment assembled is arranged in the threedimensional model of electric power station and forms virtual device The electric intelligent archives of station.
Alternatively, the recognizable unique identification mark of generation and power equipment threedimensional model formation corresponding relation is included Know and bound in the power equipment corresponding with the threedimensional model.
Alternatively, it is described to recognize the recognizable unique mark and obtain the corresponding three-dimensional mould of the recognizable unique mark Type is simultaneously shown.
Alternatively, the recognizable unique mark is Quick Response Code.
Alternatively, in addition to the virtual device station show and evaluate, production drawing is transferred in evaluation after passing through.
Alternatively, the virtual device station or the virtual electric power equipment are by detail LOD forms Displaying.
Alternatively, the virtual device station or the virtual electric power equipment are generation virtual reality scenario displayings 's.
Alternatively, in addition to:Two-dimensional design drawing or report are generated according to virtual device station and exported.
Alternatively, in addition to, the power generation number for gathering and obtaining each power equipment in electric power generation system According to the state of simultaneously power equipment described in real-time exhibition.
As shown from the above technical solution, a kind of electric intelligent file administration side based on virtual reality that the present invention is provided Method, by way of threedimensional model is associated or scans Quick Response Code, makes operation and maintainer at work by each Terminal Type Associated electrical drawing is transferred at any time, without transferring paper drawing again, additionally designated equipment can directly be transferred according to need of work Essential information and historical archives data, and the operating efficiency of monitoring is greatly improved.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to make one simply to introduce, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of electric intelligent archive management method flow signal based on virtual reality in one embodiment of the invention Figure;
Fig. 2 is Review Workflow schematic diagram in one embodiment of the invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
As shown in figure 1, a kind of electric intelligent archive management method based on virtual reality, it is characterised in that including:Obtain Power equipment, the electric power station X-Y scheme paper of power system construction;According to the two-dimentional drawing creation and real power equipment, electricity The one-to-one power equipment in field of force station, electric power station threedimensional model;Electric power logic in electric power scene is assembled and connected The threedimensional model of the power equipment;The threedimensional model of the power equipment assembled is arranged at shape in the threedimensional model of electric power station Into the electric intelligent archives of virtual device station.The electric intelligent archives based on virtual reality provided below the present invention Management method expansion detailed description.
First, power equipment, electric power station X-Y scheme paper that power system is built are obtained.Capital construction is newly-built and extension project Design phase, can all there are various two-dimensional design drawings to be used for planning station and the power equipment of power system, field of electric force The two-dimensional design drawing stood is generated in planning and designing, and the two-dimentional drawing of power equipment can be by the suppliers of power equipment Obtain.Secondly, according to the two-dimentional drawing creation and real power equipment, the one-to-one power equipment in electric power station, electric power Station threedimensional model.Specifically, using acquisition design two-dimentional drawing and the threedimensional model such as section of tubing, circuit based on, By three-dimensional modeling, high accuracy, the station of equal proportion and power equipment threedimensional model are formed, is identical with produce reality.Again Secondary, the electric power logic in actual electric power scene is assembled and connects the threedimensional model of the power equipment;Such as various electricity Control logic or signal between power equipment control the various electric power logics such as flow direction by various power equipment virtual links.Finally will The threedimensional model of the power equipment assembled is arranged at the electric power that virtual device station is formed in the threedimensional model of electric power station Smart profile.
In the present invention, it is convenient to consult each in electric intelligent archives at any time in order to further refine electric intelligent archives The virtual three-dimensional model of individual power equipment, in addition it is also necessary to which further generation forms corresponding relation with the power equipment threedimensional model Recognizable unique identifier is simultaneously bound in the power equipment corresponding with the threedimensional model.For example, this is recognizable unique Mark can also be able to be bar code or Quick Response Code for NFC chip.If user needs to consult the three of some power equipment therein Unique mark is can recognize that when tieing up archives, described in user's identification and obtains the corresponding threedimensional model of the recognizable unique mark and opens up Show.
As shown in Fig. 2 after the completion of design, in addition it is also necessary to further the virtual device station is shown and evaluated, Production drawing is transferred in evaluation after passing through could normally arrange construction.In conceptual design, evaluation, it is easy to related personnel with straight The form of sight is discussed dummy model, evaluated.Solidify concerned countries standard and quality supervision requirement, after the completion of design setting model, It can automatically analyze whether evaluation meets standard requirement.Reasonability, the correctness of design are carried out by the threedimensional model of foundation straight The inspection of sight, more efficiently optimizes device structure and space-consuming, optimizes the arrangement of Substation Station;Equipment is avoided to touch Hit, interfere or the not enough or excessive situation of safe spacing.
With engineering project it is first build, extend realization the 3 D digital file administration based on version.Pass through individual character Change modeling, set up transformer station's three-dimensional data models at different levels in net.Substation equipment master pattern storehouse is set up, is built by high accuracy Mould, high-quality rendering effect, visual various equipment directly perceived.The threedimensional model panorama displaying of high accuracy, equal proportion is realized simultaneously, accurately Realize the one-to-one corresponding of virtual environment and field apparatus in ground.Virtual the three of power equipment is specifically checked according to actual demand in user Dimension module can be generation virtual reality scenario displaying, the virtual device station or described when evaluating design data Virtual electric power equipment can be shown by detail LOD forms.For example for Partial key device model, use LOD technologies are shown, low mould, middle mould, three kinds of states of high mould are switched by the distance based on observer and device model, are come excellent Change scene rendering efficiency, while lifting visual experience.For electric power real work scene, according to the function type of model, to void Intend the optimization of scene, different processing are carried out to model.The model of environment expressive function is only made for building etc., reduced model Face number, expresses the difference that part is built by the loading of different textures as far as possible.
From Three Dimensional Design Model storehouse, two-dimensional design drawing or report are generated according to virtual device station and exported. In the present invention, a variety of two-dimensional design drawings, report can be exported automatically, transfer process is automatically performed by software, exclude different The problem of not corresponded between design drawing, it is to avoid leakage changes, spill tag and the problem of clerical error, the drawing of formation is unified, specification, improves Designing quality.
In the present invention, the power generation for gathering and obtaining each power equipment in electric power generation system is being set up Data.Equipment static data, the status data of the management put into operation and operation system are synchronized in scene interactivity platform, transported With panorama presentation device state, operations staff can select equipment in virtual panoramic displaying, check the correlation behavior of the equipment Information, can also have access to relevant information picture by split screen as needed, carry out two-dimentional Three-dimensional monitor linkage, realize that operation monitoring is three-dimensional Visual management is concentrated, solving operations staff needs to log in the problem of multiple systems check equipment essential information and status information, this Not only it is beneficial to judgement of the operations staff to failure, is also laid the foundation for functions such as Risk-warning below, emergency commands.In this hair In bright, the power generation data include:Device location information, date of putting into operation, attendant, equipment deficiency, test data, set Standby status data Gases Dissolved in Transformer Oil, transformer iron core grounding current, apparatus for fixing transformer earth current, transformer are micro- Water, breaker SF6 gas moistures, breaker SF6 gas pressures, breaker shelf depreciation, lightning arrester insulation data.Specifically, The equipment of each virtual environment is corresponded with producing the equipment of true environment, will be existing by data extraction tool Power production management system in static information, the electric power such as various power equipment positional informations, date of putting into operation, attendant set Dynamic data, the device status datas of power equipment monitoring system such as standby defect, experiment and the power transmission and transformation put into operation are supervised online The Gases Dissolved in Transformer Oil of examining system, transformer iron core grounding current, apparatus for fixing transformer earth current, the micro- water of transformer, The data such as breaker SF6 gas moistures, breaker SF6 gas pressures, breaker shelf depreciation, lightning arrester insulation, pass through data Extraction tool is drawn into service end, and corresponds to the relevant device of virtual environment, realizes production environment and virtual environment equipment State consistency, provides the user three-dimensional Centralized Monitoring and visually manages, and user can check all electric power at any time in virtual environment Equipment essential information and status information, check corresponding data, so that pole without being toggled in each original system The big operating efficiency for improving monitoring.
In summary, a kind of electric intelligent archive management method based on virtual reality that the present invention is provided, passes through three-dimensional Model interaction or the mode for scanning Quick Response Code, make operation be transferred at any time by each Terminal Type at work to maintainer related Electronic drawing, without transferring paper drawing again, additionally can directly be transferred according to need of work designated equipment essential information and Historical archives data, and the operating efficiency of monitoring is greatly improved.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the application can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the application can be used in one or more computers for wherein including computer usable program code The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is the flow with reference to method, equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.Term " on ", " under " etc. refers to The orientation or position relationship shown is, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify Description, rather than indicate or imply that the device or element of meaning must have specific orientation, with specific azimuth configuration and behaviour Make, therefore be not considered as limiting the invention.Unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can be Mechanically connect or electrically connect;Can be joined directly together, can also be indirectly connected to by intermediary, can be two The connection of element internal.For the ordinary skill in the art, above-mentioned term can be understood at this as the case may be Concrete meaning in invention.
In the specification of the present invention, numerous specific details are set forth.Although it is understood that, embodiments of the invention can To be put into practice in the case of these no details.In some instances, known method, structure and skill is not been shown in detail Art, so as not to obscure the understanding of this description.Similarly, it will be appreciated that disclose in order to simplify the present invention and helps to understand respectively One or more of individual inventive aspect, above in the description of the exemplary embodiment of the present invention, each of the invention is special Levy and be grouped together into sometimes in single embodiment, figure or descriptions thereof.However, should not be by the method solution of the disclosure Release and be intended in reflection is following:I.e. the present invention for required protection requirement is than the feature that is expressly recited in each claim more Many features.More precisely, as the following claims reflect, inventive aspect is to be less than single reality disclosed above Apply all features of example.Therefore, it then follows thus claims of embodiment are expressly incorporated in the embodiment, Wherein each claim is in itself as the separate embodiments of the present invention.It should be noted that in the case where not conflicting, this The feature in embodiment and embodiment in application can be mutually combined.The invention is not limited in any single aspect, Any single embodiment is not limited to, any combination and/or the displacement of these aspects and/or embodiment is also not limited to.And And, can be used alone the present invention each aspect and/or embodiment or with other one or more aspects and/or its implementation Example is used in combination.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme, it all should cover among the claim of the present invention and the scope of specification.

Claims (10)

1. a kind of electric intelligent archive management method based on virtual reality, it is characterised in that including:
Obtain power equipment, electric power station X-Y scheme paper that power system is built;
According to the two-dimentional drawing creation and real power equipment, the one-to-one power equipment in electric power station, electric power station three Dimension module;
Electric power logic in electric power scene is assembled and connects the threedimensional model of the power equipment;
The threedimensional model of the power equipment assembled is arranged in the threedimensional model of electric power station and forms virtual device station Electric intelligent archives.
2. electric intelligent archive management method according to claim 1, it is characterised in that also including generation and the electric power Equipment threedimensional model forms the recognizable unique identifier of corresponding relation and in the electric power corresponding with the threedimensional model Apparatus bound.
3. the electric intelligent archive management method according to right wants 2, it is characterised in that the identification is described recognizable unique Identify and obtain the corresponding threedimensional model of the recognizable unique mark and show.
4. the electric intelligent archive management method according to right wants 2 or 3, it is characterised in that the recognizable unique mark For Quick Response Code.
5. electric intelligent archive management method according to claim 1, it is characterised in that also including to described virtual electric Equipment station shows and evaluated that production drawing is transferred in evaluation after passing through.
6. the electric intelligent archive management method according to claim 3 or 5, it is characterised in that the virtual device Station or the virtual electric power equipment are shown by detail LOD forms.
7. the electric intelligent archive management method according to claim 3 or 5, it is characterised in that the virtual device Station or the virtual electric power equipment are generation virtual reality scenario displayings.
8. electric intelligent archive management method according to claim 1, it is characterised in that also include:According to virtual electric Equipment station generates two-dimensional design drawing or report and exported.
9. electric intelligent archive management method according to claim 1, it is characterised in that also include, for gathering and obtaining Take the power generation data of each power equipment in electric power generation system.
10. electric intelligent archive management method according to claim 6, it is characterised in that also include, for gathering and obtaining Take the power generation data of each power equipment in electric power generation system and the state of power equipment described in real-time exhibition.
CN201710348010.8A 2017-05-17 2017-05-17 A kind of electric intelligent archive management method based on virtual reality Pending CN107194566A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710348010.8A CN107194566A (en) 2017-05-17 2017-05-17 A kind of electric intelligent archive management method based on virtual reality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710348010.8A CN107194566A (en) 2017-05-17 2017-05-17 A kind of electric intelligent archive management method based on virtual reality

Publications (1)

Publication Number Publication Date
CN107194566A true CN107194566A (en) 2017-09-22

Family

ID=59873972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710348010.8A Pending CN107194566A (en) 2017-05-17 2017-05-17 A kind of electric intelligent archive management method based on virtual reality

Country Status (1)

Country Link
CN (1) CN107194566A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108830540A (en) * 2018-04-03 2018-11-16 国家电网公司 Processing method, the device and system of engineering project archives
CN109000711A (en) * 2018-05-18 2018-12-14 深圳供电局有限公司 A kind of electric power line pole tower cruising inspection system and its method for inspecting
CN110579191A (en) * 2018-06-07 2019-12-17 广东优世联合控股集团股份有限公司 target object inspection method, device and equipment
CN110929117A (en) * 2019-11-27 2020-03-27 山东中创软件商用中间件股份有限公司 Room three-dimensional model data loading method and related device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system
CN105511600A (en) * 2015-07-31 2016-04-20 华南理工大学 Multi-media man-machine interaction platform based on mixed reality
CN105956232A (en) * 2016-04-20 2016-09-21 国网电力科学研究院武汉南瑞有限责任公司 Transformer station three-dimensional real scene simulation system and implementation method
CN106095114A (en) * 2016-06-29 2016-11-09 宁波市电力设计院有限公司 Electric power industry based on VR technology expands engineering aid system and method for work thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system
CN105511600A (en) * 2015-07-31 2016-04-20 华南理工大学 Multi-media man-machine interaction platform based on mixed reality
CN105956232A (en) * 2016-04-20 2016-09-21 国网电力科学研究院武汉南瑞有限责任公司 Transformer station three-dimensional real scene simulation system and implementation method
CN106095114A (en) * 2016-06-29 2016-11-09 宁波市电力设计院有限公司 Electric power industry based on VR technology expands engineering aid system and method for work thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108830540A (en) * 2018-04-03 2018-11-16 国家电网公司 Processing method, the device and system of engineering project archives
CN109000711A (en) * 2018-05-18 2018-12-14 深圳供电局有限公司 A kind of electric power line pole tower cruising inspection system and its method for inspecting
CN110579191A (en) * 2018-06-07 2019-12-17 广东优世联合控股集团股份有限公司 target object inspection method, device and equipment
CN110929117A (en) * 2019-11-27 2020-03-27 山东中创软件商用中间件股份有限公司 Room three-dimensional model data loading method and related device

Similar Documents

Publication Publication Date Title
CN107193375B (en) Electric power safety production scene interaction system based on virtual reality
CN102750618B (en) A kind of comprehensive pipeline of metro construction aided management system and implementation method
CN105938613B (en) Intelligent city pipe network comprehensive platform based on BIM and VR and management method and construction method thereof
CN107332347B (en) Intelligent substation secondary intelligence Computer Aided Design platform
CN102509330B (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN107194566A (en) A kind of electric intelligent archive management method based on virtual reality
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN204303029U (en) For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
CN106802993A (en) A kind of exhibiting method of the operation of the electric network swim under three-dimensional scenic
CN104537573A (en) Power grid operation information panoramic visualized display system
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN111027834A (en) Power cable informatization management system and method based on three-dimensional detection technology
CN109889358B (en) 3D visual IT monitoring management system
CN104317855A (en) Metering producing real-time monitoring method based on real-time database
CN106446033A (en) Potential safety hazard information management system and method for underground pipelines
CN111160795B (en) Management system and method for distribution network pattern abnormal operation and power failure lean assessment
CN106294562A (en) A kind of electric network information methods of exhibiting and device
CN104361184A (en) Automatic layout and wiring system and method of power grid
CN107066500A (en) A kind of electrical network mass data quality indicator method based on PMS models
CN110502803A (en) Wiring method and device based on BIM technology
CN110750910B (en) Three-dimensional model file and configuration method of physical loop model
CN115062198A (en) Visual power grid planning layout platform
CN113128004B (en) Automatic mapping method and device for substation auxiliary control system and storage medium
CN111208384A (en) Smart power grid management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922