CN112712330A - Investigation monitoring and feasibility summarizing system for construction environment - Google Patents

Investigation monitoring and feasibility summarizing system for construction environment Download PDF

Info

Publication number
CN112712330A
CN112712330A CN202011481970.XA CN202011481970A CN112712330A CN 112712330 A CN112712330 A CN 112712330A CN 202011481970 A CN202011481970 A CN 202011481970A CN 112712330 A CN112712330 A CN 112712330A
Authority
CN
China
Prior art keywords
data
research
module
main control
investigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011481970.XA
Other languages
Chinese (zh)
Inventor
付国良
叶紫贤
廖东生
夏晴晴
李剑波
丘威雄
李刚毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guangjian Project Management Co ltd
Original Assignee
Guangdong Guangjian Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Guangjian Project Management Co ltd filed Critical Guangdong Guangjian Project Management Co ltd
Priority to CN202011481970.XA priority Critical patent/CN112712330A/en
Publication of CN112712330A publication Critical patent/CN112712330A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1097Protocols in which an application is distributed across nodes in the network for distributed storage of data in networks, e.g. transport arrangements for network file system [NFS], storage area networks [SAN] or network attached storage [NAS]

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Signal Processing (AREA)
  • Operations Research (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a research monitoring and feasibility summarizing system for a construction environment, which comprises a data acquisition terminal, a background monitoring system and a mobile equipment terminal, wherein the data acquisition terminal is connected with the background monitoring system; the data acquisition terminal is used for acquiring the research data and uploading the research data to the background monitoring system for storage; the background monitoring system comprises a communication module, a data preprocessing module and a main control module; the data acquisition terminal is connected with the data preprocessing module through the communication module, and the data preprocessing module is electrically connected with the main control module; the data preprocessing module is used for preprocessing the research data uploaded by the data acquisition terminal and then sending the data to the main control module, so that the main control module performs format conversion and classification processing on the research data and then stores the research data in the FLASH storage module. According to the invention, the investigation data are acquired in a distributed manner, and the investigation data are electronized, so that the investigation data can be shared.

Description

Investigation monitoring and feasibility summarizing system for construction environment
Technical Field
The invention relates to construction investigation, in particular to an investigation monitoring and feasible summarizing system for a construction environment.
Background
The investigation of the construction environment is generally that relevant workers perform investigation on the construction environment, the surrounding environment of the construction environment, construction projects and the like, then form corresponding paper investigation reports, transfer to relevant workers of engineering design to perform construction design, and finally transfer the construction design results to the constructors for construction. However, the traditional investigation of construction environment is manual investigation, and then the paper investigation is formed manually, and the investigation mode is slow in efficiency, ambiguous in labor division, and incapable of sharing the investigated data in real time, so that the investigation before construction usually needs a long time to complete.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a calling monitoring and feasibility summarizing system for a construction environment, which can solve the problems that the calling data of the construction environment cannot be shared in the prior art and the like.
The purpose of the invention is realized by adopting the following technical scheme:
a research monitoring and feasibility summarizing system for a construction environment comprises a data acquisition terminal, a background monitoring system and a mobile equipment terminal; the data acquisition terminal and the mobile equipment terminal are respectively in communication connection with the background monitoring system; the data acquisition terminal is used for acquiring the research data and uploading the research data to the background monitoring system for storage; the background monitoring system comprises a communication module, a data preprocessing module and a main control module; the data acquisition terminal is connected with the data preprocessing module through the communication module, and the data preprocessing module is electrically connected with the main control module; the data preprocessing module is used for preprocessing the research data uploaded by the data acquisition terminal and then sending the data to the main control module, so that the main control module performs format conversion and classification processing on the research data and then stores the research data in the FLASH storage module.
Furthermore, the data acquisition terminals comprise one or more data acquisition terminals, and each data acquisition terminal is in communication connection with the data preprocessing module through the communication module; the main control module is further used for classifying the research data uploaded by each data acquisition terminal and then integrating the research data uploaded by a plurality of data acquisition terminals of the same research project or construction environment.
Further, the mobile device terminal is configured to send a control instruction to the background monitoring system to perform management operation on research data stored in a FLASH storage module of the background monitoring system; the management operations include at least query, modify, and delete operations.
Furthermore, the background monitoring system is also used for processing the research data according to preset rules pre-stored in the system; the preset rules comprise data type conversion formats, project to which the research data belong and construction environment to which the research data belong.
Further, the mobile device terminal is further configured to obtain the preset rule and upload the preset rule to a main control module of the background monitoring system, so as to update the preset rule in the background monitoring system.
Further, the background monitoring system also comprises a user management module; the user management module is used for managing the user types in the system; the user types comprise managers, research personnel and research project responsible persons; the main control module is also used for acquiring a user login account sent by the mobile equipment terminal, acquiring a user type according to the user login account and endowing a corresponding management authority to the user; when the user is a research staff, the mobile equipment terminal is used for sending a research data query instruction to the main control module so as to realize query operation on the research data; when the user is a manager or a research project responsible person, the mobile equipment terminal is used for sending a control instruction to the main control module so as to realize query, modification and deletion operations of research and development data; and when the user is an administrator, the mobile equipment terminal is used for sending a control instruction to the main control module so as to realize query, modification and deletion of research data and uploading operation of preset rules.
Further, a cloud storage platform is included; the main control module of the background monitoring system is in communication connection with the cloud storage platform; and the main control module is used for uploading the research data in the FLASH storage module to the cloud storage platform at regular time.
Further, the main control module is further configured to obtain, through the mobile device terminal, the research reports uploaded by one or more users, and generate a final research report after performing summary detection and format conversion processing on the one or more research reports, and store the final research report in the FLASH storage module.
Furthermore, the background monitoring system also comprises an expert system, and the main control module is electrically connected with the expert system; and the main control module is used for generating a construction suggestion of a construction environment according to a research report in the system and by combining with an expert system and sending the construction suggestion to a corresponding user through the notification module.
Further, the background monitoring system also comprises a notification module; the notification module is electrically connected with the main control module; and when the main control module receives the research data and/or the research report, the notification module is used for generating corresponding notification content and sending the notification content to a corresponding user.
Furthermore, the background monitoring system also comprises a research progress management module, and the call progress management module is electrically connected with the main control module; the mobile equipment terminal is used for uploading the research task to a main control module of the background monitoring system and sending the research task to the research progress management module; and the main control module is also used for receiving the research data and sending the research data to the research progress management module for comparison, so that the call progress management module updates the completion degree of the call task.
And the investigation progress management module is used for detecting the investigation task according to preset early warning rules at regular time, and when the early warning conditions are met, the main control module generates an early warning notice and sends the early warning notice to the corresponding data acquisition terminal through the notification module.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, investigation and research data can be uploaded to a background monitoring system in time by the cooperation of investigation and division of labor of the construction environment, so that electronization and real-time sharing of calling data are realized, and the problems of poor efficiency, long time, incapability of sharing data and the like of manual investigation in the prior art are solved.
Drawings
Fig. 1 is a block diagram of a survey monitoring and feasibility summarizing system for a construction environment according to the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that any combination of the embodiments or technical features described below can be used to form a new embodiment without conflict.
The invention provides a research monitoring and feasibility summarizing system for a construction environment, which can realize electronization of research data, supervise the research progress in real time and ensure the sharing of the research data in the whole research project process. As shown in fig. 1, the present invention provides a preferred embodiment of a system for investigation, monitoring and feasibility summary of a construction environment, which includes a data acquisition terminal, a background monitoring system and a mobile device terminal.
The data acquisition terminal is in communication connection with the background monitoring system and used for uploading the acquired research data to the background monitoring system for storage. Preferably, the data acquisition terminal can be a relatively common mobile device terminal, and corresponding investigation APP is installed on the mobile device terminal, so that the investigation data can be uploaded to the background monitoring system. After the investigation personnel investigate the construction environment, the investigation data are input to the data acquisition terminal through a manual interface provided by the investigation APP, and then are uploaded to the background monitoring system through the data acquisition terminal. Preferably, the data acquisition terminal can be a mobile phone, a tablet, an ipad, a notebook and other mobile equipment terminals, and is convenient for a user to carry to a construction site. When the investigation personnel carried out construction environment investigation at the construction site, can type in the investigation data through this data acquisition terminal and upload to backstage monitored control system, and then realize electronizing the investigation data, solved among the prior art investigation data and lost easily when with the paper form, can not share the scheduling problem.
Preferably, when the user enters the research data through the data acquisition terminal, the research data is not only entered, but also contents such as research personnel, research time and the like need to be entered, so that the time and the staff of the research data can be distinguished, and the follow-up tracing can be facilitated.
Preferably, the data acquisition terminal in this embodiment only needs to have a network access function, and can be implemented by installing a corresponding investigation APP, and the specific type can be selected according to actual needs. More preferably, the data acquisition terminal is a mobile terminal device, and is connected with the background monitoring system through a mobile communication network.
The data acquisition terminal provides corresponding manual interface to the investigation personnel through the investigation APP, and the investigation personnel only need input corresponding data in the manual interface according to actual investigation data to click the upload button in the investigation APP and can upload the investigation data to backstage monitored control system.
More preferably, the data acquisition terminal comprises one or more. And each data acquisition terminal is in communication connection with the background monitoring system. In the calling project, a plurality of investigators or investigation teams can be distributed according to the expertise of different investigators to simultaneously investigate the same construction environment. Each investigator or each research team is provided with a data acquisition terminal, so that data collection of each investigator or each research team can be realized.
The background monitoring system comprises a communication module, a data preprocessing module, a main control module and a FLASH storage module. The data preprocessing module and the FLASH storage module are respectively electrically connected with the main control module. The master control module is a core component of the whole background monitoring system.
Each data acquisition terminal is in communication connection with the data preprocessing module through the communication module and is used for uploading research data to the background monitoring system. And the data preprocessing module is used for preprocessing the research data uploaded by each data acquisition terminal and then sending the preprocessed research data to the main control module.
The data preprocessing module is electrically connected with the main control module. And the main control module is used for carrying out format conversion, classification and summary processing on the research data according to a preset rule and then storing the research data in the FLASH storage module.
The research data format is firstly converted into a uniform format according to a preset rule after the main control module receives the research data, and the unified format is classified and summarized to form the research data storage FLASH storage module.
Preferably, the preset rules are derived and stored in the system by an engineer based on experience summaries of those skilled in the art.
Preferably, there are a plurality of data acquisition terminals in this embodiment, and meanwhile, this embodiment adopts a labor division investigation manner, that is, when the master control module receives the investigation data sent by each data acquisition terminal, the investigation data is integrated, and the investigation data from the plurality of data acquisition terminals is integrated to form the investigation data of the construction environment and is stored in the FLASH storage module. And when the FLASH storage module stores the research data, the research data are classified and stored according to the construction environment or the type of the construction project.
Preferably, the present embodiment further includes a mobile device terminal. The mobile equipment terminal is in communication connection with the background monitoring system and is used for inquiring, modifying, deleting, processing and the like the research data in the FLASH storage module of the background monitoring system.
That is, the staff can send corresponding control instructions to the background monitoring system through the mobile device terminal to realize operations such as query, modification, deletion, processing and the like of research data. Specifically, the research personnel send a processing instruction to the main control module through a manual operation interface of the mobile device terminal, and the main control module can perform format conversion, classification, summarization and other processing on the research data according to the processing instruction, so that the manual research data processing is realized. Meanwhile, the staff can update the preset rule of the research data processing in the background monitoring system, and the preset rule is uploaded to the background monitoring system through the mobile device terminal. More preferably, the background monitoring system further comprises a user management module, and the user management module is used for managing the user types in the system. The types of users are different, and the user rights are different. Preferably, the users include research personnel, administrators, project managers, and the like. Different personnel have different authorities and can be used for correspondingly managing the research data in the FLASH storage module. For example, the research personnel can only inquire the research data in the FLASH storage module. That is, after the research personnel upload the research data, the research data cannot be changed, only the research data uploaded by the FLASH memory module can be checked, and meanwhile, the research data uploaded by other research personnel can also be checked.
And for an administrator or a project principal, the system has more permissions and can perform various operations such as query, modification, deletion and the like on the research data of the FLASH storage module. For an administrator, the preset rules can be uploaded to the main control module through the mobile device terminal, and various system parameters in the background monitoring system can be set.
Preferably, the background monitoring system further comprises a notification module, and the notification module is electrically connected with the main control module and is used for realizing various kinds of management on system notification. For example, after the research personnel upload research data, the main control module sends a corresponding control instruction through the notification module, so that the notification module generates and issues a corresponding notification. The notification issuing mode can comprise various notification types such as short message notification, WeChat notification, system notification and the like.
Preferably, the main control module further uploads the research data stored in the FLASH storage module to the cloud storage platform for storage.
Preferably, a survey report is generated for the survey data in general. Therefore, the mobile device terminal is further configured to obtain the call report uploaded by the user and send the call report to the main control module of the background monitoring system. Specifically, after the research report worker writes the research report, the research report is uploaded to a main control module of the background monitoring system by logging in an application APP on the mobile device terminal, and thus the research report is processed by the main control module and is stored in the FLASH storage module.
In addition, because the writing habits of workers are different among the workers in the writing process, errors can occur in the form and content of the research report, and therefore the uploaded research report is subjected to preliminary examination and is modified.
Meanwhile, the research report is written in a division and cooperation mode, that is, the research report staff can complete the content of the corresponding part of the research report according to the work tasks of the staff, and then upload the research report to the main control module through the mobile terminal device. And the main control module is used for integrating the contents of the research reports uploaded by a plurality of users to generate a final research report. Preferably, when the research reports are collated, a plurality of research reports are directed to the same construction environment or construction project. In the embodiment, a final research report is generated by summarizing a plurality of research report intermediate files of the same topic. By adopting the mode of division of labor and cooperation, the writing of research reports can be more professional and more efficient.
Preferably, the background monitoring system further comprises an expert system, and the main control module is electrically connected with the expert system; and the main control module is used for generating a construction suggestion of a construction environment according to a research report in the system and by combining with an expert system and sending the construction suggestion to a corresponding user through the notification module.
Preferably, the background monitoring system further comprises a research progress management module, and the call progress management module is electrically connected with the main control module.
And the mobile equipment terminal is used for uploading the research task to the main control module of the background monitoring system and sending the research task to the research progress management module. And the main control module is used for receiving the research data and sending the research data to the research progress management module for comparison, so that the calling progress management module updates the completion degree of the calling task. Therefore, the research and development tasks can be managed by the calling progress management module, and the research and development progress is monitored.
Preferably, the investigation progress management module is configured to detect the investigation task at regular time according to a preset early warning rule, and when an early warning condition is met, the main control module generates an early warning notification and sends the early warning notification to a corresponding user through the notification module. When the system judges that the research task exceeds the expiration limit, the notification module can send a notification to the corresponding caller to prompt the corresponding caller to complete research in time, so as to realize real-time detection of research progress.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are within the protection scope of the present invention.

Claims (12)

1. A research monitoring and feasibility summarizing system for a construction environment is characterized by comprising a data acquisition terminal, a background monitoring system and a mobile equipment terminal; the data acquisition terminal and the mobile equipment terminal are respectively in communication connection with the background monitoring system; the data acquisition terminal is used for acquiring the research data and uploading the research data to the background monitoring system for storage; the background monitoring system comprises a communication module, a data preprocessing module and a main control module; the data acquisition terminal is connected with the data preprocessing module through the communication module, and the data preprocessing module is electrically connected with the main control module; the data preprocessing module is used for preprocessing the research data uploaded by the data acquisition terminal and then sending the data to the main control module, so that the main control module performs format conversion and classification processing on the research data and then stores the research data in the FLASH storage module.
2. The investigation monitoring and feasibility summarizing system for a construction environment of claim 1, wherein the data acquisition terminals comprise one or more, each data acquisition terminal is in communication connection with the data preprocessing module through a communication module; the main control module is further used for classifying the research data uploaded by each data acquisition terminal and then integrating the research data uploaded by a plurality of data acquisition terminals of the same research project or construction environment.
3. The investigation monitoring and feasibility summarizing system for a construction environment according to claim 1, wherein the mobile device terminal is configured to send a control instruction to a background monitoring system to perform a management operation on the investigation data stored in a FLASH storage module of the background monitoring system; the management operations include at least query, modify, and delete operations.
4. The investigation monitoring and feasibility summarizing system for a construction environment according to claim 3, wherein the background monitoring system is further configured to process the investigation data according to preset rules pre-stored in the system; the preset rules comprise data type conversion formats, project to which the research data belong and construction environment to which the research data belong.
5. The investigation monitoring and feasibility summarizing system for a construction environment of claim 4, wherein the mobile device terminal is further configured to obtain the preset rule and upload the preset rule to a main control module of the background monitoring system, so as to update the preset rule in the background monitoring system.
6. The investigation monitoring and feasibility summarizing system for a construction environment of claim 1, wherein said back-office monitoring system further comprises a user management module; the user management module is used for managing the user types in the system; the user types comprise managers, research personnel and research project responsible persons; the main control module is also used for acquiring a user login account sent by the mobile equipment terminal, acquiring a user type according to the user login account and endowing a corresponding management authority to the user; when the user is a research staff, the mobile equipment terminal is used for sending a research data query instruction to the main control module so as to realize query operation on the research data; when the user is a manager or a research project responsible person, the mobile equipment terminal is used for sending a control instruction to the main control module so as to realize query, modification and deletion operations of research and development data; and when the user is an administrator, the mobile equipment terminal is used for sending a control instruction to the main control module so as to realize query, modification and deletion of research data and uploading operation of preset rules.
7. The investigation monitoring and feasibility summary system for a construction environment of claim 1, comprising a cloud storage platform; the main control module of the background monitoring system is in communication connection with the cloud storage platform; and the main control module is used for uploading the research data in the FLASH storage module to the cloud storage platform at regular time.
8. The investigation monitoring and feasibility summarizing system for a construction environment according to claim 1, wherein the main control module is further configured to obtain, through the mobile device terminal, the investigation report uploaded by one or more users, and generate a final investigation report according to the summary detection and format conversion processing of the one or more investigation reports and store the final investigation report in the FLASH storage module.
9. The investigation monitoring and feasibility summarizing system for a construction environment of claim 8, wherein the background monitoring system further comprises an expert system, the main control module being electrically connected to the expert system; and the main control module is used for generating a construction suggestion of a construction environment according to a research report in the system and by combining with an expert system and sending the construction suggestion to a corresponding user through the notification module.
10. The investigation monitoring and feasibility summarizing system for a construction environment of claim 8, wherein the background monitoring system further comprises a notification module; the notification module is electrically connected with the main control module; and when the main control module receives the research data and/or the research report, the notification module is used for generating corresponding notification content and sending the notification content to a corresponding user.
11. The investigation monitoring and feasibility summarizing system for a construction environment of claim 1, wherein the background monitoring system further comprises an investigation progress management module, the investigation progress management module is electrically connected with the main control module; the mobile equipment terminal is used for uploading the research task to a main control module of the background monitoring system and sending the research task to the research progress management module; and the main control module is also used for receiving the research data and sending the research data to the research progress management module for comparison, so that the call progress management module updates the completion degree of the call task.
12. The investigation monitoring and feasibility summarizing system for construction environments of claim 11, wherein the investigation progress management module is configured to detect investigation tasks according to preset early warning rules at regular time, and when the early warning conditions are met, the main control module generates an early warning notification and sends the early warning notification to the corresponding data acquisition terminal through the notification module.
CN202011481970.XA 2020-12-15 2020-12-15 Investigation monitoring and feasibility summarizing system for construction environment Pending CN112712330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011481970.XA CN112712330A (en) 2020-12-15 2020-12-15 Investigation monitoring and feasibility summarizing system for construction environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011481970.XA CN112712330A (en) 2020-12-15 2020-12-15 Investigation monitoring and feasibility summarizing system for construction environment

Publications (1)

Publication Number Publication Date
CN112712330A true CN112712330A (en) 2021-04-27

Family

ID=75542121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011481970.XA Pending CN112712330A (en) 2020-12-15 2020-12-15 Investigation monitoring and feasibility summarizing system for construction environment

Country Status (1)

Country Link
CN (1) CN112712330A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107194713A (en) * 2017-03-21 2017-09-22 西南财经大学 A kind of area of computer aided interview management information system
CN109840859A (en) * 2019-01-30 2019-06-04 中材海外工程有限公司 Cement works construction project intelligent management system
CN210605801U (en) * 2019-08-29 2020-05-22 深圳大学 Construction engineering project construction informatization supervision system
CN111198878A (en) * 2018-11-19 2020-05-26 北京宸瑞科技股份有限公司 Basic information investigation system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107194713A (en) * 2017-03-21 2017-09-22 西南财经大学 A kind of area of computer aided interview management information system
CN111198878A (en) * 2018-11-19 2020-05-26 北京宸瑞科技股份有限公司 Basic information investigation system and method
CN109840859A (en) * 2019-01-30 2019-06-04 中材海外工程有限公司 Cement works construction project intelligent management system
CN210605801U (en) * 2019-08-29 2020-05-22 深圳大学 Construction engineering project construction informatization supervision system

Similar Documents

Publication Publication Date Title
US7088997B1 (en) System, method and apparatus for maintaining cellular telephone network site information
CN103646437B (en) Based on the student attendance method and system of IC-card and gsm communication mode
CN104573611A (en) Distributed face recognition trunking system
CN110764834B (en) Automatic safety monitoring platform, management method and storage medium
CN110704873A (en) Method and system for preventing sensitive data from being leaked
CN104751286A (en) Automatic checking and analyzing method and system of coal mine safety monitoring system data
US20200020186A1 (en) Systems and methods for providing an access management platform
CN112150122A (en) Agile network resource positioning and decision-making system
CN105704130A (en) Electricity safety system based on wireless communication devices
CN104477776A (en) A role-based crane remote graded monitoring system
CN112070388A (en) Petrochemical engineering supervision, inspection, detection and consultation management system
CN115017484A (en) Access control method and device
CN112116332A (en) Task management system and method for wind tunnel test of aerospace aerodynamic technology
CN114157679A (en) Cloud-native-based distributed application monitoring method, device, equipment and medium
CN104793570A (en) Portable motor train unit fault processing support equipment and portable motor train unit fault processing support system
CN112712330A (en) Investigation monitoring and feasibility summarizing system for construction environment
CN110390466A (en) A kind of multidimensional visualized O&M managing device based on cloud SOA framework
CN113438248B (en) Network IP address self-checking management system convenient for master station
CN201601832U (en) Wireless communication network working condition monitoring device
CN114138639A (en) Robot process automation management system and method
CN111967854A (en) Intelligent mobile office platform
CN114398579B (en) Ultralow emission monitoring system of iron and steel enterprise
US20240135470A1 (en) Smart building data connector
RU52218U1 (en) AUTOMATED SYSTEM OF SITUATIONAL ANALYSIS
US20240134326A1 (en) Smart building data connector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210427