CN112257041A - Item control method and device and electronic equipment - Google Patents

Item control method and device and electronic equipment Download PDF

Info

Publication number
CN112257041A
CN112257041A CN202011121671.5A CN202011121671A CN112257041A CN 112257041 A CN112257041 A CN 112257041A CN 202011121671 A CN202011121671 A CN 202011121671A CN 112257041 A CN112257041 A CN 112257041A
Authority
CN
China
Prior art keywords
target
project
information
response
management platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011121671.5A
Other languages
Chinese (zh)
Inventor
黎晓迎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dangjia Mobile Green Internet Technology Group Co ltd
Original Assignee
Dangjia Mobile Green Internet Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dangjia Mobile Green Internet Technology Group Co ltd filed Critical Dangjia Mobile Green Internet Technology Group Co ltd
Priority to CN202011121671.5A priority Critical patent/CN112257041A/en
Publication of CN112257041A publication Critical patent/CN112257041A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The embodiment of the invention provides a project control method and device and electronic equipment, and relates to the technical field of management platforms. The method comprises the following steps: under the condition that a project is published in a project management platform, acquiring target account information corresponding to a target project in the project; sending request information for requesting to start a target project to a server, wherein the request information carries target account information; receiving response information which is sent by a server and generated according to the target account information, and verifying the response information; and if the verification is successful, controlling the target item to start. According to the scheme, delivery maintenance is simple and easy to operate, and a unique dynamic non-manual verification key is adopted, so that safety is improved.

Description

Item control method and device and electronic equipment
Technical Field
The invention relates to the technical field of management platforms, in particular to a project control method and device and electronic equipment.
Background
At present, the smart system platform is mainly three major operation management platforms of smart city, smart building and smart park. The management of the platforms comprises the work of delivery, safety, upgrading and the like of the platforms.
In the existing scheme, a project manager and a salesperson cooperate together to deliver projects through a third-party cloud platform. And the management platform has large project size and needs some basic knowledge for installation and use. Besides, the intelligent platform has no security mechanism except that the intelligent platform is independently made into a login system. The copyright protection of the intelligent platform is not guaranteed, and if the platform installation package is leaked, sensitive information can be obtained outside, so that loss is caused. And the payment is carried out through a third party cloud platform, so that the payment is easy to acquire by people. And the upgrade is also delivered through a third-party cloud platform by the cooperation of a project manager and a salesperson. And the management platform has a large project size, needs to replace the old version, and needs some basic knowledge for installation and use.
In summary, the prior art has two major disadvantages: the first delivery is complex to maintain and the second security is poor.
Disclosure of Invention
The invention provides a project control method, a project control device and electronic equipment, and aims to solve the problems of complex project delivery maintenance and poor safety in the prior art to a certain extent.
In a first aspect of the present invention, a method for controlling a project is provided, which is applied to a project management platform, and includes:
under the condition that a project is published in a project management platform, acquiring target account information corresponding to a target project in the project;
sending request information for requesting to start a target project to a server, wherein the request information carries target account information;
receiving response information which is sent by a server and generated according to the target account information, and verifying the response information;
and if the verification is successful, controlling the target item to start.
Optionally, the response information includes: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes the first response information, the first response information includes first key information for starting the target item.
Optionally, in a case that the response information includes the first key information, a verification method for verifying the response information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is successfully verified.
Optionally, after acquiring target account information corresponding to a target item in the items, the method further includes:
acquiring a first input of a user to a project management platform;
in response to the first input, the project management platform and the target project are migrated to the target location.
Optionally, after acquiring target account information corresponding to a target item in the items, the method further includes:
acquiring a second input of the user to the target item;
in response to the second input, the target item is updated.
In a second aspect of the present invention, there is provided a control apparatus for a project, applied to a project management platform, including:
the system comprises a first acquisition module, a second acquisition module and a third acquisition module, wherein the first acquisition module is used for acquiring target account information corresponding to a target project in the project under the condition that the project is issued in a project management platform;
the sending module is used for sending request information for requesting to start a target project to the server, and the request information carries target account information;
the processing module is used for receiving response information which is sent by the server and generated according to the target account information, and verifying the response information;
and the control module is used for controlling the target project to be started if the verification is successful.
Optionally, the response information includes: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes the first response information, the first response information includes first key information for starting the target item.
Optionally, in a case that the response information includes the first key information, a verification method for verifying the response information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is successfully verified.
Optionally, the apparatus further comprises:
the second acquisition module is used for acquiring the first input of the user to the project management platform;
a migration module to migrate the project management platform and the target project to a target location in response to the first input.
Optionally, the apparatus further comprises:
the third acquisition module is used for acquiring a second input of the user to the target item;
an update module to update the target item in response to the second input.
In a third aspect of the present invention, there is also provided an electronic device, including a processor, a communication interface, a memory, and a communication bus, where the processor, the communication interface, and the memory complete communication with each other through the communication bus;
a memory for storing a computer program;
the processor is configured to implement the steps of the method for controlling the items described above when executing the program stored in the memory.
In a fourth aspect of the present invention implementation, there is also provided a computer-readable storage medium on which a computer program is stored, which when executed by a processor, implements the method of controlling an item as described above.
Aiming at the prior art, the invention has the following advantages:
in the embodiment of the invention, the target account information corresponding to the target project is acquired, the request information for requesting to start the target project is sent to the server, then the response information generated according to the target account information and sent by the server is received, the response information can be verified, if the verification is successful, the target project can be controlled to start, the delivery and starting processes are simple and easy to operate, and the verification process adopts a unique dynamic non-manual verification mode, so that the safety is improved.
The foregoing description is only an overview of the technical solutions of the present invention, and the embodiments of the present invention are described below in order to make the technical means of the present invention more clearly understood and to make the above and other objects, features, and advantages of the present invention more clearly understandable.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments will be briefly described below.
Fig. 1 is a schematic flow chart of a project control method according to an embodiment of the present invention;
fig. 2 is a block diagram of a control device of an item according to an embodiment of the present invention;
fig. 3 is a block diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some, but not all, embodiments of the present application. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The terms first, second and the like in the description and in the claims of the present application are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It will be appreciated that the data so used may be interchanged under appropriate circumstances such that embodiments of the application may be practiced in sequences other than those illustrated or described herein, and that the terms "first," "second," and the like are generally used herein in a generic sense and do not limit the number of terms, e.g., the first term can be one or more than one. In addition, "and/or" in the specification and claims means at least one of connected objects, a character "/" generally means that a preceding and succeeding related objects are in an "or" relationship.
As shown in fig. 1, an embodiment of the present invention provides a method for controlling a project, which is applied to a project management platform, and includes:
step 101, acquiring target account information corresponding to a target item in the item under the condition that the item is issued in the item management platform.
Specifically, the project management platform is an online delivery platform, is used for delivering projects online, is equivalent to a windows desktop operating system program, and has downloading and starting functions. The method comprises the steps that a developer develops one or more projects, target projects in the projects are issued to a project management platform, target account information corresponding to the target projects is sent to a user through a mailbox and the like, and the user can log in the project management platform according to the target account information and start the target projects.
It should be noted that the items may be management platform items. In other words, the developer can automatically generate the target account information through the encryption core algorithm, the developer can establish an association relationship between the target project and the target account information, the target project can be started in the project management platform through the target account information, if the target project cannot be started through the project management platform, namely, if the target project cannot be started, the target project cannot be started if the target project is separated from the project management platform.
Step 102, sending request information for requesting to start the target project to a server, wherein the request information carries the target account information.
Specifically, a user inputs target account information at a project management platform, and because the target account information has an association relationship with a target project, the project management platform sends request information to a server to request to start target project information corresponding to the target account information under the condition that the target account information input by the user is acquired, wherein the request information carries the target account information and the like.
After the server receives request information sent by a project management platform, the server judges whether the target project is allowed to be started or not according to target account information and the like in the request information. The judging method can be as follows: mainly judging whether the target account information corresponds to a target project, and if so, sending first response information allowing the target project to be started to the project management platform; if the target account information does not correspond to the target item, the server may send second response information to the item management platform, where the starting of the target item is prohibited.
Step 103, receiving response information generated according to the target account information and sent by the server, and verifying the response information.
Specifically, the project management platform receives response information sent by the server, where the response information may be first response information allowing the target project to be started or second response information prohibiting the target project from being started. If the response information is first response information allowing the target project to be started, the project management platform automatically verifies the received first response information without manually inputting verification, if the verification of the first response information is successful, the step 104 is entered, otherwise, the target project is prohibited from being started, namely, the project management platform does not operate. If the response message is a second response message for prohibiting starting the target project, the project management platform does not operate, or the project management platform automatically verifies the received second response message without manually inputting verification, if the verification of the second response message is successful, the step 104 is entered, otherwise, the target project is prohibited from starting, namely, the project management platform does not operate.
And 104, if the verification is successful, controlling the target item to start.
Specifically, if the item management platform successfully verifies the second response information, the item management platform may control the target item to be started, the target item is displayed to the user through the item management platform, and the user may view and use the target item through the item management platform.
According to the embodiment of the invention, the target account information corresponding to the target project is acquired, the request information for requesting to start the target project is sent to the server, then the response information generated according to the target account information and sent by the server is received, the response information can be verified, if the verification is successful, the target project can be controlled to start, the delivery and starting processes are simple and easy to operate, and the verification process adopts a unique dynamic non-manual verification mode, so that the safety is improved.
Optionally, the response information includes: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes first response information, the first response information includes first key information for starting the target item.
Specifically, the project management platform receives response information sent by the server, where the response information may be first response information allowing the target project to be started or second response information prohibiting the target project from being started; when the response information is first response information allowing the target item to be started, the first response information contains first key information allowing the target item to be started, and the first key information is key information generated by the server according to target account information, time and the like; the project management platform can automatically verify the first key information, manual input verification is not needed in the process, and safety is improved.
Optionally, in a case that the response information includes the first key information, a verification method for verifying the response information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is verified successfully.
Specifically, an agreement exists between the server and the target project, and after receiving request information sent by a project management platform, the server may determine whether to allow starting of the target project according to the target project corresponding to the target account information in the request information. If the target project is allowed to be started, first key information can be generated according to an agreed protocol and the target account information, and the first key information is sent to the project management platform.
The project management platform may store a corresponding relationship between account information and key information, after receiving the first key information, the project management platform may acquire second key information corresponding to the target account information, and perform consistency check on the first key information and the second key information, and if the check is successful, it is determined that the verification of the response information is successful, and the project management platform may start the target project. The project management platform starts the target project by the first key sent by the server, the project management platform does not generate and maintain the first key, and the generation and maintenance of the first key are carried out by the server, so that the safety is improved.
Optionally, after the step 101, the method may further include:
acquiring a first input of a user to the project management platform;
migrating the project management platform and the target project to a target location in response to the first input.
Specifically, the project management platform has strong portability, and if a target project is to be transplanted, a first input of a user to the project management platform needs to be acquired under the condition that target account information corresponding to the target project is acquired, and the project management platform carrying the target project is transplanted to a target position.
It should be noted that the first input may be an operation such as clicking and dragging, and a specific input form is not limited herein. The target position can be set according to the needs of the user.
Optionally, after the step 101, the method may further include:
acquiring a second input of the user to the target item;
updating the target item in response to the second input.
Specifically, after a developer publishes the target project on a project management platform, a user downloads and receives the target project according to target account information; if the target project is updated by the developer, the developer issues the updated target project to the project management platform, the user can select to update the target project under the condition that the target account information corresponding to the target project is obtained, the user needs to perform second input on the target project, the project management platform can update the target project after obtaining the second input of the user on the target project, the whole downloading, installing and updating process is automatic, the method is simple and easy to use, the method can be used without basic knowledge, and convenience is brought to the user. If the user does not want to update the target item, the user can continue to use the old version of the target item, i.e., the target item before updating, and the user's selectivity is wider.
In summary, in the embodiment of the present invention, in the delivery maintenance, the user can start, update, and download the target project only by inputting the target account information on the project management platform, so that the operation is simple, and convenience is provided for the user; if a user needs to start a target project, a project management platform needs to send request information to a server, then after response information generated according to target account information and sent by the server is received, the project management platform verifies the response information, if verification is successful, the target project is started, and irrelevant personnel in the whole process are difficult to obtain; the processes of starting, downloading, updating and the like are all required on the project management platform, and if the project management platform is separated, the operations of starting, downloading, updating and the like of the target project cannot be executed, so that the safety is improved; and the first key information is generated by the server and transmitted to the project management platform, the transmission process is stable, and the verification process of the first key information adopts a unique dynamic non-manual verification key without manual input, so that the safety is improved.
As shown in fig. 2, a project control apparatus 200 according to an embodiment of the present invention is applied to a project management platform, and includes:
a first obtaining module 201, configured to obtain, when the project is published in the project management platform, target account information corresponding to a target project in the project;
a sending module 202, configured to send request information requesting to start the target project to a server, where the request information carries the target account information;
the processing module 203 is configured to receive response information, which is sent by the server and generated according to the target account information, and verify the response information;
and the control module 204 is configured to control the target item to be started if the verification is successful.
According to the embodiment of the invention, the target account information corresponding to the target project is acquired, the request information for requesting to start the target project is sent to the server, then the response information generated according to the target account information and sent by the server is received, the response information can be verified, if the verification is successful, the target project can be controlled to start, the delivery and starting processes are simple and easy to operate, and the verification process adopts a unique dynamic non-manual verification mode, so that the safety is improved.
Optionally, the response information includes: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes first response information, the first response information includes first key information for starting the target item.
Optionally, in a case that the response information includes the first key information, a verification method for verifying the response information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is verified successfully.
Optionally, the apparatus further comprises:
the second acquisition module is used for acquiring the first input of the user to the project management platform;
a migration module to migrate the project management platform and the target project to a target location in response to the first input.
Optionally, the apparatus further comprises:
the third acquisition module is used for acquiring a second input of the user to the target item;
an update module to update the target item in response to the second input.
In summary, in the embodiment of the present invention, in the delivery maintenance, the user can start, update, and download the target project only by inputting the target account information on the project management platform, so that the operation is simple, and convenience is provided for the user; if a user needs to start a target project, a project management platform needs to send request information to a server, then after response information generated according to target account information and sent by the server is received, the project management platform verifies the response information, if verification is successful, the target project is started, and irrelevant personnel in the whole process are difficult to obtain; the processes of starting, downloading, updating and the like are all required on the project management platform, and if the project management platform is separated, the operations of starting, downloading, updating and the like of the target project cannot be executed, so that the safety is improved; and the first key information is generated by the server and transmitted to the project management platform, the transmission process is stable, and the verification process of the first key information adopts a unique dynamic non-manual verification key without manual input, so that the safety is improved.
It should be noted that the embodiment of the control apparatus in this item is an apparatus corresponding to the control method in the above item, and all implementation manners of the embodiment of the method are applicable to the embodiment of the apparatus, and can achieve the same technical effect as that of the embodiment of the apparatus, and are not described herein again.
The embodiment of the invention also provides the electronic equipment. As shown in fig. 3, the system comprises a processor 301, a communication interface 302, a memory 303 and a communication bus 304, wherein the processor 301, the communication interface 302 and the memory 303 are communicated with each other through the communication bus 304.
A memory 303 for storing a computer program.
When the processor 301 is configured to execute the program stored in the memory 303, the following steps are implemented:
under the condition that the project is issued in the project management platform, acquiring target account information corresponding to a target project in the project;
sending request information for requesting to start the target project to a server, wherein the request information carries the target account information;
receiving response information which is sent by the server and generated according to the target account information, and verifying the response information;
and if the verification is successful, controlling the target project to be started.
Optionally, the response information includes: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes first response information, the first response information includes first key information for starting the target item.
Optionally, in a case that the response information includes the first key information, a verification method for verifying the response information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is verified successfully.
Optionally, after obtaining the target account information corresponding to the target item in the items, when the processor 301 is configured to execute the program stored in the memory 303, the following steps are further implemented:
acquiring a first input of a user to the project management platform;
migrating the project management platform and the target project to a target location in response to the first input.
Optionally, after obtaining the target account information corresponding to the target item in the items, when the processor 301 is configured to execute the program stored in the memory 303, the following steps are further implemented:
acquiring a second input of the user to the target item;
updating the target item in response to the second input.
The communication bus mentioned in the electronic device may be a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, or the like. The communication bus may be divided into an address bus, a data bus, a control bus, etc. For ease of illustration, only one thick line is shown, but this does not mean that there is only one bus or one type of bus.
The communication interface is used for communication between the terminal and other equipment.
The Memory may include a Random Access Memory (RAM) or a non-volatile Memory (non-volatile Memory), such as at least one disk Memory. Optionally, the memory may also be at least one memory device located remotely from the processor.
The Processor may be a general-purpose Processor, and includes a Central Processing Unit (CPU), a Network Processor (NP), and the like; the Integrated Circuit may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other Programmable logic device, a discrete Gate or transistor logic device, or a discrete hardware component.
In still another embodiment provided by the present invention, there is also provided a computer-readable storage medium having stored therein instructions which, when run on a computer, cause the computer to execute the method of controlling items described in the above embodiments.
In a further embodiment provided by the present invention, there is also provided a computer program product containing instructions which, when run on a computer, cause the computer to perform the method of controlling the items described in the above embodiments.
In the above embodiments, the implementation may be wholly or partially realized by software, hardware, firmware, or any combination thereof. When implemented in software, may be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When loaded and executed on a computer, cause the processes or functions described in accordance with the embodiments of the invention to occur, in whole or in part. The computer may be a general purpose computer, a special purpose computer, a network of computers, or other programmable device. The computer instructions may be stored in a computer readable storage medium or transmitted from one computer readable storage medium to another, for example, from one website site, computer, server, or data center to another website site, computer, server, or data center via wired (e.g., coaxial cable, fiber optic, Digital Subscriber Line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device, such as a server, a data center, etc., that incorporates one or more of the available media. The usable medium may be a magnetic medium (e.g., floppy Disk, hard Disk, magnetic tape), an optical medium (e.g., DVD), or a semiconductor medium (e.g., Solid State Disk (SSD)), among others.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
All the embodiments in the present specification are described in a related manner, and the same and similar parts among the embodiments may be referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, for the system embodiment, since it is substantially similar to the method embodiment, the description is simple, and for the relevant points, reference may be made to the partial description of the method embodiment.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims (10)

1. A project control method is applied to a project management platform and is characterized by comprising the following steps:
under the condition that the project is issued in the project management platform, acquiring target account information corresponding to a target project in the project;
sending request information for requesting to start the target project to a server, wherein the request information carries the target account information;
receiving response information which is sent by the server and generated according to the target account information, and verifying the response information;
and if the verification is successful, controlling the target project to be started.
2. The method of claim 1, wherein the response information comprises: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes first response information, the first response information includes first key information for starting the target item.
3. The method according to claim 2, wherein the authentication method for authenticating the response information when the response information includes the first key information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is verified successfully.
4. The method of claim 1, wherein after obtaining target account information corresponding to a target item of the items, the method further comprises:
acquiring a first input of a user to the project management platform;
migrating the project management platform and the target project to a target location in response to the first input.
5. The method of claim 1, wherein after obtaining target account information corresponding to a target item of the items, the method further comprises:
acquiring a second input of the user to the target item;
updating the target item in response to the second input.
6. A project control device applied to a project management platform is characterized by comprising:
the first acquisition module is used for acquiring target account information corresponding to a target project in the project under the condition that the project is issued in the project management platform;
the sending module is used for sending request information for requesting to start the target project to a server, and the request information carries the target account information;
the processing module is used for receiving response information which is sent by the server and generated according to the target account information, and verifying the response information;
and the control module is used for controlling the target project to be started if the verification is successful.
7. The apparatus of claim 6, wherein the response information comprises: allowing the first response message of the target item to be started or prohibiting the second response message of the target item to be started;
wherein, when the response information includes first response information, the first response information includes first key information for starting the target item.
8. The apparatus according to claim 7, wherein the authentication method for authenticating the response information when the response information includes the first key information includes:
acquiring second key information corresponding to the target account information according to the corresponding relation between the account information and the key information;
carrying out consistency check on the first key information and the second key information;
and if the verification is successful, determining that the response information is verified successfully.
9. An electronic device, comprising: a processor, a communication interface, a memory, and a communication bus; the processor, the communication interface and the memory complete mutual communication through a communication bus;
a memory for storing a computer program;
a processor for implementing the steps in the method of controlling an item as claimed in any one of claims 1 to 5 when executing a program stored on the memory.
10. A computer-readable storage medium, on which a computer program is stored, which program, when being executed by a processor, is adapted to carry out a method of controlling an item according to any one of claims 1 to 5.
CN202011121671.5A 2020-10-19 2020-10-19 Item control method and device and electronic equipment Pending CN112257041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011121671.5A CN112257041A (en) 2020-10-19 2020-10-19 Item control method and device and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011121671.5A CN112257041A (en) 2020-10-19 2020-10-19 Item control method and device and electronic equipment

Publications (1)

Publication Number Publication Date
CN112257041A true CN112257041A (en) 2021-01-22

Family

ID=74245608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011121671.5A Pending CN112257041A (en) 2020-10-19 2020-10-19 Item control method and device and electronic equipment

Country Status (1)

Country Link
CN (1) CN112257041A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002288405A (en) * 2001-03-27 2002-10-04 Ricoh Co Ltd Method for project management, project managing server, accepting server, and program
US20110179412A1 (en) * 2007-05-23 2011-07-21 Nec Corporation Information sharing system, computer, project managing server, and information sharing method used in them
US20140189808A1 (en) * 2012-12-28 2014-07-03 Lookout, Inc. Multi-factor authentication and comprehensive login system for client-server networks
CN105721452A (en) * 2016-01-28 2016-06-29 沈文策 Unified login management method for multiple project management backgrounds
EP3361425A1 (en) * 2017-02-13 2018-08-15 Accenture Global Solutions Limited Project management platform
CN108429638A (en) * 2018-02-22 2018-08-21 北京奇艺世纪科技有限公司 A kind of server O&M method, apparatus, system and electronic equipment
CN109257381A (en) * 2018-11-08 2019-01-22 江苏恒宝智能系统技术有限公司 A kind of key management method, system and electronic equipment
CN109328348A (en) * 2016-09-30 2019-02-12 华为技术有限公司 A kind of service authentication method, system and relevant device
CN110138588A (en) * 2019-04-04 2019-08-16 微梦创科网络科技(中国)有限公司 Configuration file automatic management method and system, configuration management platform and client
CN110392015A (en) * 2018-04-17 2019-10-29 网宿科技股份有限公司 A kind of method and system of processing business request
CN110752929A (en) * 2019-09-29 2020-02-04 华为终端有限公司 Application program processing method and related product
CN110784433A (en) * 2018-07-31 2020-02-11 阿里巴巴集团控股有限公司 User access processing method, device and equipment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002288405A (en) * 2001-03-27 2002-10-04 Ricoh Co Ltd Method for project management, project managing server, accepting server, and program
US20110179412A1 (en) * 2007-05-23 2011-07-21 Nec Corporation Information sharing system, computer, project managing server, and information sharing method used in them
US20140189808A1 (en) * 2012-12-28 2014-07-03 Lookout, Inc. Multi-factor authentication and comprehensive login system for client-server networks
CN105721452A (en) * 2016-01-28 2016-06-29 沈文策 Unified login management method for multiple project management backgrounds
CN109328348A (en) * 2016-09-30 2019-02-12 华为技术有限公司 A kind of service authentication method, system and relevant device
EP3361425A1 (en) * 2017-02-13 2018-08-15 Accenture Global Solutions Limited Project management platform
CN108429638A (en) * 2018-02-22 2018-08-21 北京奇艺世纪科技有限公司 A kind of server O&M method, apparatus, system and electronic equipment
CN110392015A (en) * 2018-04-17 2019-10-29 网宿科技股份有限公司 A kind of method and system of processing business request
CN110784433A (en) * 2018-07-31 2020-02-11 阿里巴巴集团控股有限公司 User access processing method, device and equipment
CN109257381A (en) * 2018-11-08 2019-01-22 江苏恒宝智能系统技术有限公司 A kind of key management method, system and electronic equipment
CN110138588A (en) * 2019-04-04 2019-08-16 微梦创科网络科技(中国)有限公司 Configuration file automatic management method and system, configuration management platform and client
CN110752929A (en) * 2019-09-29 2020-02-04 华为终端有限公司 Application program processing method and related product

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
埃弗雷姆 特班等: "电子商务:管理与社交网络视角 原书第9版", 31 August 2020, 机械工业出版社, pages: 93 - 97 *
肖健;蒋发俊;曾兰;: "基于SaaS平台的科技项目管理系统设计与实现", 大众科技, no. 02, 20 February 2015 (2015-02-20) *

Similar Documents

Publication Publication Date Title
CN108900559B (en) Login certificate management method and device, computer equipment and storage medium
CN108418787B (en) Method for acquiring enterprise resource planning data, terminal device and medium
CN108829581B (en) Application program testing method and device, computer equipment and storage medium
RU2554570C2 (en) Method and system for executing services on server and client of client-server architecture
CN110895603B (en) Multi-system account information integration method and device
JP2018517982A (en) Automatic recharge system, method and server
CN106682491B (en) Application downloading method and device
KR20190119059A (en) Remote management of initial computer operating system setup options
CN110945504B (en) Delivering configuration-based workflows
CN113591068A (en) Online login equipment management method and device and electronic equipment
CN114035830A (en) Software upgrading method and device and electronic equipment
CN109948330B (en) Method, device, equipment and storage medium for implementing application management service
CN111585954A (en) Authentication method, authentication device, computer equipment and storage medium
CN111984520A (en) Buried point testing method, computer device and computer-readable storage medium
CN112437071B (en) Method, system, device and storage medium for controlling device
US10061908B2 (en) Program editing device, program management device, and computer readable medium
CN113010238A (en) Permission determination method, device and system for micro application call interface
CN112507668A (en) Project data storage certificate method, storage certificate system, terminal equipment and readable storage medium
CN109348472B (en) OTA (over the air) upgrading method and system based on single-point pushing
CN112257041A (en) Item control method and device and electronic equipment
CN116126380A (en) Firmware upgrading method and device, electronic equipment and storage medium
US11757976B2 (en) Unified application management for heterogeneous application delivery
CN114020313A (en) Application updating method and related equipment
CN109218452B (en) Method and device for pushing node information
CN114553855A (en) Plug-in gray level release method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100089 room 307, 3 / F, supporting public building, Mantingfangyuan community, Qingyun Li, Haidian District, Beijing

Applicant after: Beijing Wuyi Vision digital twin Technology Co.,Ltd.

Address before: 100089 room 307, 3 / F, supporting public building, Mantingfangyuan community, Qingyun Li, Haidian District, Beijing

Applicant before: DANGJIA MOBILE GREEN INTERNET TECHNOLOGY GROUP Co.,Ltd.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination