CN110532807B - Electronic certificate generation method, device, computer equipment and storage medium - Google Patents

Electronic certificate generation method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN110532807B
CN110532807B CN201910696743.XA CN201910696743A CN110532807B CN 110532807 B CN110532807 B CN 110532807B CN 201910696743 A CN201910696743 A CN 201910696743A CN 110532807 B CN110532807 B CN 110532807B
Authority
CN
China
Prior art keywords
resource
resource pool
entry
usage
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910696743.XA
Other languages
Chinese (zh)
Other versions
CN110532807A (en
Inventor
刘小翱
孙飞翔
简雁峰
汤建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201910696743.XA priority Critical patent/CN110532807B/en
Priority to PCT/CN2019/118228 priority patent/WO2021017310A1/en
Publication of CN110532807A publication Critical patent/CN110532807A/en
Application granted granted Critical
Publication of CN110532807B publication Critical patent/CN110532807B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/64Protecting data integrity, e.g. using checksums, certificates or signatures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/38Payment protocols; Details thereof
    • G06Q20/382Payment protocols; Details thereof insuring higher security of transaction
    • G06Q20/3821Electronic credentials

Abstract

The application relates to the field of data processing, and aims to realize electronic certification under the condition that a resource adjustment instruction and a resource pool are not matched one by generating a resource usage entry for one or more resource usage records corresponding to the resource adjustment instruction. The method comprises the following steps: acquiring resource adjustment instructions and all resource usage records corresponding to the resource adjustment instructions from a service system; generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction; acquiring instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from a resource statistics system, and acquiring a first resource usage entry corresponding to the resource pool as a second resource usage entry according to the instruction information; generating a resource pool use entry according to the total amount of resources of the resource pool, and combining the resource pool use entry with the second resource use entry to obtain a credential corresponding to the resource pool.

Description

Electronic certificate generation method, device, computer equipment and storage medium
Technical Field
The present disclosure relates to the field of computer data processing technologies, and in particular, to a method and apparatus for generating an electronic certificate, a computer device, and a storage medium.
Background
At present, the business volume of many enterprises is large, and each resource usage record needs to generate a resource statistics certificate. With the development of informationized office technology, electronic certificates are becoming more and more common. And (5) preparing the certificate, namely preparing the electronic certificate. At present, the resource adjustment transaction form and the resource use record are in a one-to-one correspondence relationship in the preparation process; however, in practical application, there is often a case that the resource adjustment transaction and the resource usage record are not matched one-to-one; the existing certificate making system is complex in processing logic, easy to make mistakes and low in processing efficiency.
Disclosure of Invention
The embodiment of the application provides an electronic certificate generation method, an electronic certificate generation device, computer equipment and a storage medium, which can better realize that the logic of electronic certificate processing is clear and reliable under the condition that resource adjustment transactions and resource usage records of a resource pool are not matched one to one, prevent the situation of certificate making mistakes, and have higher processing efficiency.
In a first aspect, the present application provides an electronic credential generation method for a credential production system, the method comprising:
Acquiring a resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction from a service system, wherein the resource usage records are used for representing the usage amount of resources in a resource pool corresponding to the resource usage records by the resource adjustment instruction;
generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction;
acquiring instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from a resource statistics system, acquiring a first resource usage entry corresponding to the resource pool according to each instruction information, and taking the acquired first resource usage entry as a second resource usage entry;
and generating a resource pool use address book according to the total resource amount of the resource pool, and combining the resource pool use address book with the second resource use address book to obtain a credential corresponding to the resource pool.
In a second aspect, the present application provides a method for generating an electronic certificate, for use in a service system, where the method includes:
if a resource adjustment instruction is acquired, at least one resource pool is matched according to the resource adjustment instruction, at least one resource use record corresponding to the resource adjustment instruction is generated, and the resource use records are in one-to-one correspondence with the resource pools;
The resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to a resource statistics system for rechecking;
and if the feedback information passed by the rechecking of the resource statistics system is obtained, the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to the certification system for certification.
In a third aspect, the present application provides an electronic credential generating device, the device comprising:
the resource utilization record acquisition module is used for acquiring a resource adjustment instruction and all resource utilization records corresponding to the resource adjustment instruction from the service system, wherein the resource utilization records are used for representing the utilization amount of resources in a resource pool corresponding to the resource utilization records by the resource adjustment instruction;
the usage entry generation module is used for generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction;
the usage entry determining module is used for acquiring instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from the resource statistics system, acquiring a first resource usage entry corresponding to the resource pool according to the instruction information, and taking the acquired first resource usage entry as a second resource usage entry;
And the credential generation module is used for generating a resource pool use entry according to the total resource amount of the resource pool, combining the resource pool use entry with the second resource use entry, and obtaining the credential corresponding to the resource pool.
In a fourth aspect, the present application provides a computer device comprising a memory and a processor; the memory is used for storing a computer program; the processor is configured to execute the computer program and implement the electronic certificate generation method when executing the computer program.
In a fifth aspect, the present application provides a computer readable storage medium storing a computer program, which, if executed by a processor, implements the above-described electronic certificate generation method.
The application discloses a method, a device, equipment and a storage medium for generating an electronic certificate, which are used for generating resource usage records by one or more resource usage records corresponding to resource adjustment instructions, wherein each resource usage record corresponds to a different resource pool; then when a certain resource pool needs to be subjected to evidence making, all resource usage entries corresponding to the resource pool and the resource pool usage entries of the resource pool are called and combined to obtain evidence corresponding to the resource pool; under the condition that the resource adjustment transaction and the resource usage record of the resource pool are not matched one to one, the processing logic of the certification system is clear and reliable, the certification error is prevented, and the processing efficiency is higher.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are needed in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present application, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a flow chart of an electronic certificate generation method according to an embodiment of the present application;
FIG. 2 is a schematic diagram of a resource maintenance system;
FIG. 3 is a flow diagram of one embodiment of an electronic certificate generation method;
FIG. 4 is a flow diagram of another embodiment of an electronic credential generation method;
FIG. 5 is a schematic flow chart of a sub-process of merging the credentials corresponding to the resource pool in FIG. 1;
FIG. 6 is a flow diagram of yet another embodiment of an electronic certificate generation method;
FIG. 7 is a flow diagram of yet another embodiment of an electronic credential generation method;
FIG. 8 is a flow chart of an electronic certificate generation method according to another embodiment of the present application;
FIG. 9 is a schematic structural diagram of an electronic certificate generating device according to an embodiment of the present application;
FIG. 10 is a schematic diagram of an embodiment of an electronic certificate generation device;
fig. 11 is a schematic structural diagram of an electronic certificate generating device according to another embodiment of the present application;
fig. 12 is a schematic structural diagram of a computer device according to an embodiment of the present application.
Detailed Description
The following description of the embodiments of the present application will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are some, but not all, of the embodiments of the present application. All other embodiments, which can be made by one of ordinary skill in the art without undue burden from the present disclosure, are within the scope of the present disclosure.
The flow diagrams depicted in the figures are merely illustrative and not necessarily all of the elements and operations/steps are included or performed in the order described. For example, some operations/steps may be further divided, combined, or partially combined, so that the order of actual execution may be changed according to actual situations. In addition, although the division of the functional modules is performed in the apparatus schematic, in some cases, the division of the modules may be different from that in the apparatus schematic.
The embodiment of the application provides an electronic certificate generation method, device, equipment and storage medium. The method for generating the electronic certificate can be applied to a terminal or a server to realize clear and reliable processing logic of a certificate making system and higher processing efficiency under the condition that resource adjustment transactions and resource usage records of a resource pool are not matched one to one.
For example, the electronic certificate generation method is used for a server, and can be used for a terminal. The terminal can be electronic equipment such as a notebook computer, a desktop computer, a personal digital assistant and the like; the servers may be independent servers or may be server clusters. For ease of understanding, however, the following embodiments will be described in detail with respect to an electronic credential generation method applied to a server.
Some embodiments of the present application are described in detail below with reference to the accompanying drawings. The following embodiments and features of the embodiments may be combined with each other without conflict.
Referring to fig. 1, fig. 1 is a flowchart of an electronic certificate generation method according to an embodiment of the present application, where the electronic certificate generation method in the embodiment may be used in a certificate making system.
Fig. 2 is a schematic diagram of a resource maintenance system. The resource maintenance system comprises a certification system, a business system and a resource statistics system. The resource statistics system and the certification system provide standard interfaces to the outside through a Message server, such as a Message Queue (Message Queue), and broadcast results; the business system can be in communication connection with the resource statistics system and the certification system through the message server.
The resource statistics system receives a resource adjustment instruction sent by the service system through the message server, adjusts the number of resources in the resource pool according to the received resource adjustment instruction, and broadcasts an adjustment result; the adjustment result may include, for example, the usage amount of the resource in each resource pool, the correspondence between each usage amount, and the resource adjustment instruction.
The certification system monitors a message queue in the message server to receive a resource adjustment instruction sent by the service system, and receives usage of resources in the resource pool, correspondence between each usage and the resource adjustment instruction, and the like.
By way of example, the resource statistics system and the certification system can be connected with one or more service systems through standard interfaces provided outside the message server, so as to achieve the purpose that the service systems can be freely expanded.
The resource statistics system is specifically an application-level funding system, and the certification system comprises a certification platform of the application layer. The fund system receives the information of the resource adjustment instruction through the message server and broadcasts the payment result and the relation between the resource adjustment instruction and a resource pool, such as running water; the certification system monitors a message queue of the message server, receives information of the resource adjustment instruction, information of a resource pool such as running water, and a relation between the resource adjustment instruction and the resource pool.
As shown in fig. 1, the method for generating an electronic certificate in the present embodiment includes the following steps S110 to S140.
Step S110, acquiring resource adjustment instructions from a service system and all resource usage records corresponding to the resource adjustment instructions.
Specifically, the resource usage record is used for indicating the usage amount of the resource in the resource pool corresponding to the resource usage record by the resource adjustment instruction.
Illustratively, as shown in fig. 2, the certification system acquires the resource adjustment instruction a, the resource adjustment instruction B, and the resource adjustment instruction C from the service system through the message server; the certification system also acquires a resource usage record x1 and a resource usage record z1 corresponding to the resource adjustment instruction a, a resource usage record y1 and a resource usage record z2 corresponding to the resource adjustment instruction B, and a resource usage record x2, a resource usage record y2 and a resource usage record z3 corresponding to the resource adjustment instruction C from the service system. The resource usage record X1 is used to represent the usage of the resource in the resource pool X by the resource adjustment instruction a.
Illustratively, the resource usage record Z1 is used to represent the usage of the resource in the resource pool Z by the resource adjustment instruction a, such as 50 units; the resource usage record Z2 is used for indicating the usage of the resource in the resource pool Z by the resource adjustment instruction B, for example, 25 units; the resource usage record Z3 is used to indicate the usage of the resource in the resource pool Z by the resource adjustment instruction C, for example, 25 units.
Illustratively, the resource is a monetary amount, a credit, etc., and the resource adjustment instruction is, for example, a borrowing instruction, an amount usage instruction, etc.
For example, after obtaining a resource adjustment instruction, such as an amount operation instruction, for indicating that an amount of the running water is operated, the service system matches at least one resource pool according to the resource adjustment instruction, such as matches two resource pools, namely running water, respectively, a resource pool X and a resource pool Z according to the resource adjustment instruction a; the resource adjustment instruction thus operates on resources in resource pool X and resource pool Z.
The service system matches at least one resource pool for the resource adjustment instruction according to a preset resource usage rule, and allocates the number of resources in each resource pool used by the resource adjustment instruction.
For example, the resource statistics system is used for calculating the remaining available resources in each resource pool, such as counting the remaining available amount of each running water, and locking the remaining available resources in the resource pool; the remaining available resources can be used by the resource adjustment instructions.
Illustratively, the service system reads information of the remaining available resources in each of the resource pools from the resource statistics system, matches the resource pools for the resource adjustment instruction according to the information of the remaining available resources, and allocates the number of resources in each of the resource pools used by the resource adjustment instruction; specifically, the number of resources in a certain resource pool used by the resource adjustment instruction is less than or equal to the number of remaining available resources in the resource pool.
And the service system generates at least one resource use record corresponding to the resource adjustment instruction according to the quantity of the resources in each resource pool, wherein the resource use record corresponds to the resource pools one by one. For example, a resource usage record x1 and a resource usage record z1 corresponding to the resource adjustment instruction a are generated.
In some embodiments, as shown in fig. 3, step S110 includes obtaining a resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction from the service system, including step S111.
Step S111, acquiring a resource adjustment instruction rechecked by a resource statistics system from a service system, and acquiring all resource usage records corresponding to the resource adjustment instruction rechecked by the resource statistics system from the service system.
The service system obtains the resource adjustment instruction, matches at least one resource pool according to the resource adjustment instruction, generates at least one resource usage record corresponding to the resource adjustment instruction, and then sends the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction to the resource statistics system for rechecking through the message server. And if the service system acquires the feedback information which is checked to pass by the resource statistics system, the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to the certification system.
For example, the service system sends the resource usage record corresponding to each resource pool matched with the resource adjustment instruction to the resource statistics system, and the resource statistics system checks whether the actual usage situation of the resources in each resource pool is matched with the resource usage record sent by the service system; if the auditing result includes that a certain resource usage record is matched with the actual usage situation, the resource statistics system sends feedback information passing the rechecking of the resource usage record to the service system. And if the service system receives feedback information which is used for indicating that all the resource usage records corresponding to the resource adjustment instruction pass rechecking from the resource statistics system, the resource adjustment instruction and the resource usage records corresponding to the resource pools matched by the resource adjustment instruction are sent to the certification system.
The service system records the matching relation between the resource adjustment instruction and the corresponding resource pool and the corresponding resource usage record of each resource pool after receiving the feedback information passed by the rechecking; such as storing the data in a database for recording.
The resource statistics system is used for rechecking the resource adjustment instruction and the resource use record, so that the accuracy of data acquired by the certification system from the service system can be ensured, the uniformity of data among the service system, the resource statistics system and the certification system is ensured, and the electronic certification is prevented from making mistakes.
And step 120, generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction.
In some embodiments, the resource usage entry includes information of a resource adjustment instruction corresponding to the resource usage entry and information of a resource pool corresponding to the resource usage entry, and further includes an actual amount of a resource.
Illustratively, as shown in fig. 2, the certification system generates a first resource usage entry a1 corresponding to the resource usage record x1 and a first resource usage entry a2 corresponding to the resource usage record z1 according to the resource adjustment instruction a; generating a first resource usage entry B1 corresponding to the resource usage record y1 and a first resource usage entry B2 corresponding to the resource usage record z2 according to the resource adjustment instruction B; the first resource usage entry C1 corresponding to the resource usage record x2, the first resource usage entry C2 corresponding to the resource usage record y2, and the first resource usage entry C3 corresponding to the resource usage record z3 are generated according to the resource adjustment instruction C.
Illustratively, the first resource usage entry a2, the first resource usage entry b2, and the first resource usage entry c3 are shown in table 1.
TABLE 1 first resource usage entry
First resource usage entry Resource adjustment instruction Usage amount Resource pool
First resource usage entry a2 A 50 Z
First resource usage entry b2 B 25 Z
First oneResource usage entry c3 C 25 Z
Step S130, instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated is obtained from a resource statistics system, a first resource usage entry corresponding to the resource pool is obtained according to each instruction information, and the obtained first resource usage entry is used as a second resource usage entry.
In some embodiments, if a request for preparing a certificate is received, the resource pool is the resource pool to be prepared. For example, if the received certification command includes a flowing water identifier, such as a flowing water ID, the flowing water corresponding to the flowing water identifier is used as the flowing water to be certified.
For example, if the resource pool Z is a to-be-authenticated resource pool, the authentication system obtains instruction information of all the resource adjustment instructions corresponding to the resource pool Z from the resource statistics system through the message server, that is, uses information of the resource adjustment instructions of the resources in the resource pool Z, such as numbers of the resource adjustment instructions a, B, and C.
And then, acquiring a first resource usage entry corresponding to the resource pool to be authenticated as a second resource usage entry according to the resource adjustment instruction.
For example, if the resource usage record Z1 corresponding to the resource adjustment instruction a uses the resource in the to-be-authenticated resource pool Z, a first resource usage entry a2 corresponding to the resource usage record Z1 is obtained; the resource usage record Z2 corresponding to the resource adjustment instruction B uses the resources in the to-be-manufactured resource pool Z, and a first resource usage entry B2 corresponding to the resource usage record Z2 is obtained; the resource usage record Z3 corresponding to the resource adjustment instruction C uses the resources in the to-be-manufactured resource pool Z, and a first resource usage entry C3 corresponding to the resource usage record Z3 is obtained; the first resource usage entry a2, the first resource usage entry b2, and the first resource usage entry c3 are marked as second resource usage entries.
In other embodiments, the resource pool to be authenticated represents a resource pool where resources are used up.
For example, as shown in fig. 4, before step S130 obtains instruction information of all resource adjustment instructions corresponding to the resource pool to be authenticated from the resource statistics system, steps S101 to S102 are included.
Step S101, sending a query instruction corresponding to each resource pool to the resource statistics system so as to query whether the resources in each resource pool are used.
In some embodiments, the certification system periodically sends a query instruction to the resource statistics system to query whether resources in the resource pool are used.
In some embodiments, if a certification request for certifying a certain resource pool is received, the certification system periodically sends a query instruction to the resource statistics system to query whether resources in the resource pool are used.
Illustratively, the total number of available resources is assigned at the time of resource pool creation; for example, when a certain running water is created, the total number of available amounts is included. As the corresponding resource adjustment instruction uses the resources in the resource pool, the remaining available resources in the resource pool are gradually subtracted until the remaining available resources are exhausted to zero.
Specifically, if the resource statistics system determines that the remaining available resources in a certain resource pool are zero, feedback information for indicating that the resources in the resource pool are used up is sent to the certification system.
And step S102, if feedback information for indicating that the resources in the resource pool are used up is received, marking the resource pool as a resource pool to be prepared.
Inquiring whether the resources in the resource pool are in a spent state or not from a resource statistics system, and taking the resource pool with the spent state as a resource pool to be authenticated for authentication; unnecessary certification process can be prevented, and the calculation amount and calculation time of the system can be reduced.
And step 140, generating a resource pool usage entry according to the total amount of resources of the resource pool, and combining the resource pool usage entry with the second resource usage entry to obtain a credential corresponding to the resource pool.
In some embodiments, the total amount of resources in a resource pool is equal to the sum of the amounts of resources in the resource pool used by all the resource adjustment instructions corresponding to the resource pool. For example, the resource adjustment instruction a uses the number of resources in the to-be-authenticated resource pool Z as Z1, the resource adjustment instruction B uses the number of resources in the to-be-authenticated resource pool Z as Z2, and the resource adjustment instruction C uses the number of resources in the to-be-authenticated resource pool Z as Z3, so that the total amount of resources in the to-be-authenticated resource pool Z is z1+z2+z3.
In other embodiments, the total amount of resources of the resource pool is equal to the total amount of available resources assigned at the time of creation of the resource pool. Specifically, in this embodiment, the resource pool to be authenticated represents a resource pool in which resources are used.
Illustratively, if the total amount of resources in the resource pool Z is 100, the entry of the resource pool usage of the resource pool Z is shown in table 2.
TABLE 2 resource pool usage entry
Z 100
And merging the resource pool use entry and the second resource use entry corresponding to the resource pool to obtain a credential corresponding to the resource pool. Illustratively, the credentials corresponding to resource pool Z are shown in Table 3:
TABLE 3 credential for resource pool Z
Illustratively, the certification system pre-stores a plurality of certification templates. The target template can be selected according to the type of the resource pool to be authenticated, and then the resource pool usage entry and the corresponding second resource usage entry are combined to the target template to obtain the credential corresponding to the resource pool to be authenticated. The generated certificates can be consistent in specification, and the data can be stored and reprocessed conveniently.
In some embodiments, as shown in fig. 5, in step S140, the resource pool usage entry and the second resource usage entry are combined to obtain a credential corresponding to the resource pool, including steps S141 to S143.
Step S141, generating a certificate identifier corresponding to the resource pool.
Illustratively, a credential identification corresponding to the resource pool Z is generated to identify credentials corresponding to the resource pool.
Step S142, adding the credential identification to the resource pool usage entry, and adding the credential identification to the second resource usage entry.
And adding the certificate identification to a resource pool usage entry corresponding to the resource pool of the certificate and a second resource usage entry so as to mark data corresponding to the same certificate.
And step S143, storing the certificate identification, the resource pool use entry and the second resource use entry in a database.
Therefore, the certificate corresponding to the resource pool can be quickly found according to the certificate identification in the resource pool use entry, and the certificate corresponding to the resource use entry can be quickly positioned according to the certificate identification in the resource use entry.
In some embodiments, as shown in fig. 6, step S140 further includes step S103 before merging the resource pool usage entry and the second resource usage entry to obtain the credential corresponding to the resource pool.
Step S103, obtaining resource balance data corresponding to a resource pool to be authenticated from a service system, and generating a balance record corresponding to the resource pool according to the resource balance data.
Illustratively, in the scenarios of crediting, financing, insurance claim settlement, etc., the resources in the resource pool may also be affected by, for example, financial benefits. For the profit or loss generated by the right of debt, financial deposit, insurance claim, etc., the business system generates the resource balance data corresponding to the resource pool, and then sends the data to the certification system.
And after the certification system acquires the resource balance data corresponding to the resource pool from the service system, generating a balance record corresponding to the resource pool.
In this embodiment, as shown in fig. 6, in step S140, the resource pool usage entry and the second resource usage entry are combined to obtain a credential corresponding to the resource pool, including step S1401.
Step S1401, merging the resource pool usage entry, the second resource usage entry, and the difference entry to obtain a credential corresponding to the resource pool.
Exemplary, in step S1401, the merging the resource pool usage entry, the second resource usage entry, and the differential entry to obtain a credential corresponding to the resource pool includes: generating a credential identifier corresponding to the resource pool; adding the credential identification to the resource pool usage profile, adding the credential identification to the second resource usage profile, and adding the credential identification to the differential profile; and storing the certificate identification, the resource pool use entry and the second resource use entry in a database.
Generating a differential record for the differential part of the resources in the resource pool, and combining the differential record to the corresponding certificate of the resource pool, so that the generation of the electronic certificate for the differential scene is realized; and the accuracy of data matching can be further improved.
In some embodiments, after obtaining the credentials corresponding to the resource pool, the certification system sends a notification of successful certification to the business system and the resource statistics system; the business system and the resource statistics system can mark the resource adjustment instruction corresponding to the certificate, the resource pool and the resource use record corresponding to the resource pool as the prepared state.
In some embodiments, as shown in fig. 7, step S140 further includes step S150 after merging the resource pool usage entry and the second resource usage entry to obtain the credential corresponding to the resource pool.
Step S150, if a credential rollback instruction corresponding to the credential identifier is received, deleting a resource pool usage entry with the credential identifier and a second resource usage entry with the credential identifier.
For example, if the resource pool corresponding to the credential rollback instruction received by the credential platform is only used by one resource adjustment instruction, then rollback the one resource adjustment instruction; if the resource pool corresponding to the credential rollback instruction is used by a plurality of resource adjustment instructions, rollback the plurality of resource adjustment instructions; if the resource pool corresponding to the credential rollback instruction is used by a plurality of resource adjustment instructions, and at least one resource adjustment instruction in the plurality of resource adjustment instructions also uses resources in other resource pools, the credentials corresponding to the other resource pools need to be rolled back at the same time, so that the credential platform generates the credential rollback instruction corresponding to the other resource pools.
When a certificate corresponding to a certain resource pool is returned, deleting a resource pool usage entry with a certificate identifier of the certificate and a second resource usage entry with the certificate identifier in a database; the method can also broadcast the result notice of the credential rollback, so that the business system and the resource statistics system mark the resource adjustment instruction corresponding to the credential, the resource pool and the resource usage record corresponding to the resource pool as a rolled-back state according to the result notice of the credential rollback.
According to the electronic certificate generation method, resource usage entries are generated through one or more resource usage records corresponding to the resource adjustment instruction, and each resource usage entry corresponds to a different resource pool; then when a certain resource pool needs to be subjected to evidence making, all resource usage entries corresponding to the resource pool and the resource pool usage entries of the resource pool are called and combined to obtain evidence corresponding to the resource pool; under the condition that the resource adjustment transaction and the resource usage record of the resource pool are not matched one to one, the processing logic of the certification system is clear and reliable, the certification error is prevented, and the processing efficiency is higher.
Furthermore, the certification making platform and the resource statistics system provide interfaces to the outside, the business system only needs to manage the transaction, the resource statistics system and the certification making platform match the transaction and automatically generate the certification data to be combined, so that the docking efficiency of the business system is improved, and the generation efficiency of a single certification is improved. And asynchronous processing is carried out on the certification process, and single-step processing can be carried out after partial data are received, so that occupation of a memory and a CPU is reduced, and single-task efficiency is improved.
Furthermore, the certification platform, the resource statistics system and the information server can be distributed, so that the transverse or longitudinal expansion of the butted service system is supported, a plurality of systems can be butted theoretically, and each system can be processed concurrently. And carrying out distributed processing on the concurrent data of the multiple systems in a message mode, thereby improving the capability of processing requests in unit time of application.
Referring to fig. 8, fig. 8 is a flowchart of an electronic certificate generation method according to an embodiment of the present application. The method for generating the electronic certificate in the embodiment can be used for a business system.
As shown in fig. 8, the electronic certificate generation method in the present embodiment includes the following steps S210 to S230.
Step S210, if a resource adjustment instruction is acquired, at least one resource pool is matched according to the resource adjustment instruction, and at least one resource usage record corresponding to the resource adjustment instruction is generated.
Specifically, the resource usage records are in one-to-one correspondence with the resource pools.
Illustratively, the resource usage record Z1 is used to represent the usage of the resource in the resource pool Z by the resource adjustment instruction a, such as 50 units; the resource usage record Z2 is used for indicating the usage of the resource in the resource pool Z by the resource adjustment instruction B, for example, 25 units; the resource usage record Z3 is used to indicate the usage of the resource in the resource pool Z by the resource adjustment instruction C, for example, 25 units.
Illustratively, the resource is a monetary amount, a credit, etc., and the resource adjustment instruction is, for example, a borrowing instruction, an amount usage instruction, etc.
For example, after obtaining a resource adjustment instruction, such as an amount operation instruction, for indicating that an amount of the running water is operated, the service system matches at least one resource pool according to the resource adjustment instruction, such as matches two resource pools, namely running water, respectively, a resource pool X and a resource pool Z according to the resource adjustment instruction a; the resource adjustment instruction thus operates on resources in resource pool X and resource pool Z.
The service system matches at least one resource pool for the resource adjustment instruction according to a preset resource usage rule, and allocates the number of resources in each resource pool used by the resource adjustment instruction.
For example, the resource statistics system is used for calculating the remaining available resources in each resource pool, such as counting the remaining available amount of each running water, and locking the remaining available resources in the resource pool; the remaining available resources can be used by the resource adjustment instructions.
Illustratively, the service system reads information of the remaining available resources in each of the resource pools from the resource statistics system, matches the resource pools for the resource adjustment instruction according to the information of the remaining available resources, and allocates the number of resources in each of the resource pools used by the resource adjustment instruction; specifically, the number of resources in a certain resource pool used by the resource adjustment instruction is less than or equal to the number of remaining available resources in the resource pool.
And the service system generates at least one resource use record corresponding to the resource adjustment instruction according to the quantity of the resources in each resource pool, wherein the resource use record corresponds to the resource pools one by one. For example, a resource usage record x1 and a resource usage record z1 corresponding to the resource adjustment instruction a are generated.
And step 220, transmitting the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction to a resource statistical system for rechecking.
The service system sends the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction to the resource statistics system for rechecking through the message server. And if the service system acquires the feedback information which is checked to pass by the resource statistics system, the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to the certification system.
For example, the service system sends the resource usage record corresponding to each resource pool matched with the resource adjustment instruction to the resource statistics system, and the resource statistics system checks whether the actual usage situation of the resources in each resource pool is matched with the resource usage record sent by the service system; if the auditing result includes that a certain resource usage record is matched with the actual usage situation, the resource statistics system sends feedback information passing the rechecking of the resource usage record to the service system.
And step S230, if the feedback information passed by the rechecking of the resource statistics system is obtained, the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to the certification system for certification.
For example, if the service system receives feedback information indicating that all the resource usage records corresponding to the resource adjustment instruction pass the review from the resource statistics system, the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to the certification system.
The service system records the matching relation between the resource adjustment instruction and the corresponding resource pool and the corresponding resource usage record of each resource pool after receiving the feedback information passed by the rechecking; such as storing the data in a database for recording.
The resource statistics system is used for rechecking the resource adjustment instruction and the resource use record, so that the accuracy of data acquired by the certification system from the service system can be ensured, the uniformity of data among the service system, the resource statistics system and the certification system is ensured, and the electronic certification is prevented from making mistakes.
The electronic certificate generation method provided by the embodiment of the invention can match the resource adjustment instruction with one or more resource pools, generate resource usage records corresponding to each resource pool, review the resource adjustment instruction and each resource usage record, report the resource statistics system, and send the resource adjustment instruction and all the resource usage records corresponding to the resource adjustment instruction to a certificate making system for certificate making processing after the review is passed; the certification system can generate a resource usage entry for one or more resource usage records corresponding to the resource adjustment instruction, so that the processing logic of the certification system is clear and reliable, the situation of certification error is prevented, and the processing efficiency is higher under the condition that the resource usage records of the resource adjustment transaction and the resource pool are not matched one to one; and the resource statistics system is used for rechecking the resource adjustment instruction and the resource use record, so that the accuracy of data acquired by the certification system from the service system can be ensured, the uniformity of the data among the service system, the resource statistics system and the certification system is ensured, and the electronic certification is prevented from making mistakes.
Referring to fig. 9, fig. 9 is a schematic structural diagram of an electronic certificate generating device according to an embodiment of the present application, where the electronic certificate generating device may be configured in a terminal or a server, and is configured to execute the electronic certificate generating method for a certificate making system.
As shown in fig. 9, the electronic certificate generation apparatus includes:
a usage record obtaining module 110, configured to obtain a resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction from a service system, where the resource usage record is used to represent usage amounts of resources in a resource pool corresponding to the resource adjustment instruction to the resource usage record;
the usage entry generation module 120 is configured to generate, according to the resource adjustment instruction, a first resource usage entry corresponding to each of the resource usage records one to one;
the usage entry determination module 130 is configured to obtain instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from a resource statistics system, obtain a first resource usage entry corresponding to the resource pool according to each instruction information, and use the obtained first resource usage entry as a second resource usage entry;
and the credential generation module 140 is configured to generate a resource pool usage entry according to the total amount of resources in the resource pool, and combine the resource pool usage entry with the second resource usage entry to obtain a credential corresponding to the resource pool.
In some embodiments, the usage record obtaining module 110 is specifically configured to obtain, from a service system, a resource adjustment instruction that is checked by a resource statistics system, and obtain, from the service system, all the resource usage records corresponding to the resource adjustment instruction that are checked by the resource statistics system.
In some embodiments, as shown in fig. 10, the electronic certificate generation device further includes a to-be-authenticated resource pool determination module 10. Illustratively, the to-be-certified resource pool determining module 10 includes:
a resource pool query sub-module 101, configured to send a query instruction corresponding to each resource pool to the resource statistics system, so as to query whether resources in each resource pool are used completely;
and the to-be-prepared mark sub-module 102 marks the resource pool as the resource pool to be prepared if feedback information for indicating that the resources in the resource pool are used up is received.
In some implementations, as shown in fig. 10, the credential generation module 140 includes:
the identifier generation sub-module 141 is configured to generate a credential identifier corresponding to the resource pool;
an identification adding sub-module 142, configured to add the credential identification to the resource pool usage entry, and add the credential identification to the second resource usage entry;
And the association preservation sub-module 143 is used for storing the credential identifier, the resource pool use entry and the second resource use entry association in a database.
In some embodiments, as shown in fig. 10, the electronic credential generating device further includes:
the differential record generating module 20 is configured to obtain, from a service system, differential data corresponding to a resource pool to be authenticated, and generate a differential record corresponding to the resource pool according to the differential data.
In this embodiment, the credential generation module 140 is specifically configured to combine the resource pool usage entry, the second resource usage entry, and the differential entry to obtain a credential corresponding to the resource pool.
In some embodiments, as shown in fig. 10, the electronic credential generating device further includes:
the credential rollback module 30 is configured to delete the resource pool usage entry with the credential identifier and the second resource usage entry with the credential identifier if a credential rollback instruction corresponding to the credential identifier is received.
Referring to fig. 11, fig. 11 is a schematic structural diagram of an electronic certificate generating device according to another embodiment of the present application, where the electronic certificate generating device may be configured in a terminal or a server, for executing the electronic certificate generating method for a service system.
As shown in fig. 11, the electronic certificate generation apparatus includes:
the usage record generating module 210 is configured to, if a resource adjustment instruction is acquired, match at least one resource pool according to the resource adjustment instruction, and generate at least one resource usage record corresponding to the resource adjustment instruction, where the resource usage record corresponds to the resource pool one by one;
the rechecking data sending module 220 is configured to send the resource adjustment instruction and a resource usage record corresponding to each resource pool matched by the resource adjustment instruction to a resource statistics system for rechecking;
and the certification data sending module 230 is configured to send the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction to the certification system for certification if the feedback information passed by the review of the resource statistics system is obtained.
It should be noted that, for convenience and brevity of description, specific working processes of the above-described apparatus and each module, unit may refer to corresponding processes in the foregoing method embodiments, which are not repeated herein.
The methods and apparatus of the present application are operational with numerous general purpose or special purpose computing system environments or configurations. For example: personal computers, server computers, hand-held or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments that include any of the above systems or devices, and the like.
By way of example, the methods, apparatus described above may be implemented in the form of a computer program that is executable on a computer device as shown in fig. 12.
Referring to fig. 12, fig. 12 is a schematic structural diagram of a computer device according to an embodiment of the present application. The computer device may be a server or a terminal.
With reference to FIG. 12, the computer device includes a processor, memory, and a network interface connected by a system bus, where the memory may include a non-volatile storage medium and an internal memory.
The non-volatile storage medium may store an operating system and a computer program. The computer program comprises program instructions that, when executed, cause a processor to perform any of a number of methods of generating electronic vouchers.
The processor is used to provide computing and control capabilities to support the operation of the entire computer device.
The internal memory provides an environment for the execution of a computer program in a non-volatile storage medium that, when executed by a processor, causes the processor to perform any of a number of methods for generating electronic vouchers.
The network interface is used for network communication such as transmitting assigned tasks and the like. It will be appreciated by those skilled in the art that the structure of the computer device is merely a block diagram of some of the structures associated with the present application and is not limiting of the computer device to which the present application may be applied, and that a particular computer device may include more or less components than those shown, or may combine some of the components, or have a different arrangement of components.
It should be appreciated that the processor may be a central processing unit (Central Processing Unit, CPU), but may also be other general purpose processors, digital signal processors (Digital Signal Processor, DSP), application specific integrated circuits (Application Specific Integrated Circuit, ASIC), field-programmable gate arrays (Field-Programmable Gate Array, FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or the like. Wherein the general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
Wherein in one embodiment the processor is configured to run a computer program stored in the memory to implement the steps of:
acquiring a resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction from a service system, wherein the resource usage records are used for representing the usage amount of resources in a resource pool corresponding to the resource usage records by the resource adjustment instruction;
generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction;
acquiring instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from a resource statistics system, acquiring a first resource usage entry corresponding to the resource pool according to each instruction information, and taking the acquired first resource usage entry as a second resource usage entry;
And generating a resource pool use address book according to the total resource amount of the resource pool, and combining the resource pool use address book with the second resource use address book to obtain a credential corresponding to the resource pool.
In an exemplary embodiment, when the processor implements the obtaining, from the service system, a resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction, the method is configured to implement:
and acquiring a resource adjustment instruction which is checked by the resource statistics system from the service system, and acquiring all resource usage records corresponding to the resource adjustment instruction which are checked by the resource statistics system from the service system.
For example, before the processor implements the instruction information of all the resource adjustment instructions corresponding to the resource pool to be authenticated from the resource statistics system, the processor is further configured to implement:
sending a query instruction corresponding to each resource pool to the resource statistics system so as to query whether the resources in each resource pool are used;
and if feedback information for indicating that the resources in the resource pool are used up is received, marking the resource pool as a resource pool to be authenticated.
In an example, before the processor implements the merging of the resource pool usage entry and the second resource usage entry to obtain the credential corresponding to the resource pool, the processor is further configured to implement:
Acquiring resource balance data corresponding to a resource pool to be authenticated from a service system, and generating a balance record corresponding to the resource pool according to the resource balance data;
combining the resource pool usage entry and the second resource usage entry to obtain a credential corresponding to the resource pool, including:
and merging the resource pool use entry, the second resource use entry and the difference entry to obtain a credential corresponding to the resource pool.
In an example, when the processor implements the merging of the resource pool usage entry and the second resource usage entry to obtain the credential corresponding to the resource pool, the processor is configured to implement:
generating a credential identifier corresponding to the resource pool;
adding the credential identification to the resource pool usage entry and adding the credential identification to the second resource usage entry;
and storing the certificate identification, the resource pool use entry and the second resource use entry in a database.
In an example, after the processor implements the merging of the resource pool usage entry and the second resource usage entry to obtain the credential corresponding to the resource pool, the processor is further configured to implement:
And if a credential rollback instruction corresponding to the credential identifier is received, deleting the resource pool usage entry with the credential identifier and the second resource usage entry with the credential identifier.
In another embodiment, the processor is configured to execute a computer program stored in the memory to implement the steps of:
if a resource adjustment instruction is acquired, at least one resource pool is matched according to the resource adjustment instruction, at least one resource use record corresponding to the resource adjustment instruction is generated, and the resource use records are in one-to-one correspondence with the resource pools;
the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to a resource statistics system for rechecking;
and if the feedback information passed by the rechecking of the resource statistics system is obtained, the resource adjustment instruction and the resource usage record corresponding to each resource pool matched by the resource adjustment instruction are sent to the certification system for certification.
From the above description of embodiments, it will be apparent to those skilled in the art that the present application may be implemented in software plus a necessary general purpose hardware platform. Based on such understanding, the technical solutions of the present application may be embodied essentially or in a part contributing to the prior art in the form of a software product, which may be stored in a storage medium, such as a ROM/RAM, a magnetic disk, an optical disk, etc., and include several instructions to cause a computer device (which may be a personal computer, a server, or a network device, etc.) to perform the methods described in the embodiments or some parts of the embodiments of the present application, such as:
A computer readable storage medium storing a computer program, where the computer program includes program instructions, and the processor executes the program instructions to implement any one of the electronic credential generation methods provided in the embodiments of the present application.
The computer readable storage medium may be an internal storage unit of the computer device according to the foregoing embodiment, for example, a hard disk or a memory of the computer device. The computer readable storage medium may also be an external storage device of the computer device, such as a plug-in hard disk, a Smart Media Card (SMC), a Secure Digital (SD) Card, a Flash memory Card (Flash Card), or the like, which are provided on the computer device.
While the invention has been described with reference to certain preferred embodiments, it will be understood by those skilled in the art that various changes and substitutions of equivalents may be made and equivalents will be apparent to those skilled in the art without departing from the scope of the invention. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.

Claims (9)

1. A method of generating an electronic certificate, comprising:
acquiring a resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction from a service system, wherein the resource usage records are used for representing the usage amount of resources in a resource pool corresponding to the resource usage records by the resource adjustment instruction;
generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction;
acquiring instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from a resource statistics system, acquiring a first resource usage entry corresponding to the resource pool according to each instruction information, and taking the acquired first resource usage entry as a second resource usage entry;
and generating a resource pool use address book according to the total resource amount of the resource pool, and combining the resource pool use address book with the second resource use address book to obtain a credential corresponding to the resource pool.
2. The method for generating electronic certificate according to claim 1, wherein the step of acquiring the resource adjustment instruction and all resource usage records corresponding to the resource adjustment instruction from the service system includes:
And acquiring a resource adjustment instruction which is checked by the resource statistics system from the service system, and acquiring all resource usage records corresponding to the resource adjustment instruction which are checked by the resource statistics system from the service system.
3. The method for generating electronic certificate according to claim 2, wherein before obtaining instruction information of all resource adjustment instructions corresponding to the resource pool to be authenticated from the resource statistics system, the method comprises:
sending a query instruction corresponding to each resource pool to the resource statistics system so as to query whether the resources in each resource pool are used;
and if feedback information for indicating that the resources in the resource pool are used up is received, marking the resource pool as a resource pool to be authenticated.
4. The method of generating electronic certificates according to claim 1, wherein before merging the resource pool usage entry and the second resource usage entry to obtain the certificates corresponding to the resource pool, further comprising:
acquiring resource balance data corresponding to a resource pool to be authenticated from a service system, and generating a balance record corresponding to the resource pool according to the resource balance data;
Combining the resource pool usage entry and the second resource usage entry to obtain a credential corresponding to the resource pool, including:
and merging the resource pool use entry, the second resource use entry and the difference entry to obtain a credential corresponding to the resource pool.
5. The method for generating an electronic certificate according to any one of claims 1 to 4, wherein the merging the resource pool usage entry and the second resource usage entry to obtain the certificate corresponding to the resource pool includes:
generating a credential identifier corresponding to the resource pool;
adding the credential identification to the resource pool usage entry and adding the credential identification to the second resource usage entry;
and storing the certificate identification, the resource pool use entry and the second resource use entry in a database.
6. The method of generating electronic certificates according to claim 5, wherein the merging the resource pool usage entry and the second resource usage entry to obtain the certificates corresponding to the resource pool further comprises:
and if a credential rollback instruction corresponding to the credential identifier is received, deleting the resource pool usage entry with the credential identifier and the second resource usage entry with the credential identifier.
7. An electronic certificate generation apparatus, comprising:
the resource utilization record acquisition module is used for acquiring a resource adjustment instruction and all resource utilization records corresponding to the resource adjustment instruction from the service system, wherein the resource utilization records are used for representing the utilization amount of resources in a resource pool corresponding to the resource utilization records by the resource adjustment instruction;
the usage entry generation module is used for generating a first resource usage entry corresponding to each resource usage record one by one according to the resource adjustment instruction;
the usage entry determining module is used for acquiring instruction information of all resource adjustment instructions corresponding to a resource pool to be authenticated from the resource statistics system, acquiring a first resource usage entry corresponding to the resource pool according to the instruction information, and taking the acquired first resource usage entry as a second resource usage entry;
and the credential generation module is used for generating a resource pool use entry according to the total resource amount of the resource pool, combining the resource pool use entry with the second resource use entry, and obtaining the credential corresponding to the resource pool.
8. A computer device, the computer device comprising a memory and a processor;
The memory is used for storing a computer program;
the processor is configured to execute the computer program and implement when executing the computer program:
an electronic certificate generation method as claimed in any one of claims 1 to 6.
9. A computer-readable storage medium storing a computer program, characterized in that: if the computer program is executed by a processor, the implementation is as follows:
an electronic certificate generation method as claimed in any one of claims 1 to 6.
CN201910696743.XA 2019-07-30 2019-07-30 Electronic certificate generation method, device, computer equipment and storage medium Active CN110532807B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910696743.XA CN110532807B (en) 2019-07-30 2019-07-30 Electronic certificate generation method, device, computer equipment and storage medium
PCT/CN2019/118228 WO2021017310A1 (en) 2019-07-30 2019-11-13 Electronic voucher generation method and apparatus, computer device, and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910696743.XA CN110532807B (en) 2019-07-30 2019-07-30 Electronic certificate generation method, device, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN110532807A CN110532807A (en) 2019-12-03
CN110532807B true CN110532807B (en) 2024-03-08

Family

ID=68660501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910696743.XA Active CN110532807B (en) 2019-07-30 2019-07-30 Electronic certificate generation method, device, computer equipment and storage medium

Country Status (2)

Country Link
CN (1) CN110532807B (en)
WO (1) WO2021017310A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112395086B (en) * 2020-11-06 2022-03-08 北京五八信息技术有限公司 Resource allocation method and device, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105825376A (en) * 2015-01-26 2016-08-03 国际商业机器公司 Method for processing resource account transaction and wireless electronic device
CN108681964A (en) * 2018-04-19 2018-10-19 腾讯科技(深圳)有限公司 A kind of business settlement system and settlement of transactions control method
CN109284331A (en) * 2018-08-16 2019-01-29 中国平安人寿保险股份有限公司 Accreditation information acquisition method, terminal device and medium based on business datum resource
CN109544313A (en) * 2018-11-30 2019-03-29 武汉铭天信息科技有限责任公司 A kind of voucher electronic management system
CN109785093A (en) * 2018-12-11 2019-05-21 平安科技(深圳)有限公司 Accreditation method, apparatus, computer equipment and storage medium based on valuation system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2001283128A1 (en) * 2000-08-04 2002-02-18 First Data Corporation Trusted authentication digital signature (TADS) system
US10713660B2 (en) * 2015-09-15 2020-07-14 Visa International Service Association Authorization of credential on file transactions
CN109815470A (en) * 2019-01-04 2019-05-28 深圳壹账通智能科技有限公司 Accreditation data creation method, device, computer equipment and storage medium
CN110009471A (en) * 2019-04-03 2019-07-12 平安信托有限责任公司 Financial affairs receipt generation method, device, computer equipment and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105825376A (en) * 2015-01-26 2016-08-03 国际商业机器公司 Method for processing resource account transaction and wireless electronic device
CN108681964A (en) * 2018-04-19 2018-10-19 腾讯科技(深圳)有限公司 A kind of business settlement system and settlement of transactions control method
CN109284331A (en) * 2018-08-16 2019-01-29 中国平安人寿保险股份有限公司 Accreditation information acquisition method, terminal device and medium based on business datum resource
CN109544313A (en) * 2018-11-30 2019-03-29 武汉铭天信息科技有限责任公司 A kind of voucher electronic management system
CN109785093A (en) * 2018-12-11 2019-05-21 平安科技(深圳)有限公司 Accreditation method, apparatus, computer equipment and storage medium based on valuation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
商业银行UNIX 计算资源池研究与实践;江波;《中国金融电脑》;20150107;第83-86页 *

Also Published As

Publication number Publication date
CN110532807A (en) 2019-12-03
WO2021017310A1 (en) 2021-02-04

Similar Documents

Publication Publication Date Title
US20230129822A1 (en) Resource transfer system
WO2020207090A1 (en) Blockchain-based data processing system and method, computing device and storage medium
WO2020029631A1 (en) Transaction method and system based on centralized settlement and blockchain deposit certificates
CN108304554B (en) File splitting method and device, computer equipment and storage medium
CN104966229A (en) Information processing method and credit platform
CN109933626B (en) Financial business data processing method and device and financial transaction terminal
CN110020846B (en) Transfer service processing method and system
CN111461763A (en) Resource allocation method and device
CN111030983A (en) Data processing method and device based on distributed distribution and related equipment
CN111127181A (en) Voucher bookkeeping method and device
US11095456B2 (en) Distributed tiered data exchanges within a blockchain network
CN111899111A (en) Capital matching method, device, server and storage medium
CN110532807B (en) Electronic certificate generation method, device, computer equipment and storage medium
CN112181628B (en) Resource transfer method, device, system and electronic equipment
CN110532810B (en) Information processing method and device, electronic equipment and readable storage medium
CN107194712B (en) Method and device for recording change information of shared account and method and system for supplementing account of internal account
CN112598289A (en) Index configuration method, system, computer device and computer readable storage medium
CN117196520A (en) Vendor management method, vendor management system, computer device and storage medium
CN111815272B (en) Application auditing method and device, electronic equipment and storage medium
CN106156185A (en) A kind of service request performs the querying method of state, Apparatus and system
CN110602246B (en) Resource distribution method and device based on block chain and block chain system
JP2022084095A (en) Information processing system, information processing method and information processing program
CN110852864A (en) Method and device for processing digital resource amount and storage medium
CN115456802B (en) Insurance event processing system based on digital currency
CN111626882B (en) Data detection method and device, computer readable medium and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant