CN110472925A - A kind of laboratory test process management system and method based on webpage flow chart - Google Patents
A kind of laboratory test process management system and method based on webpage flow chart Download PDFInfo
- Publication number
- CN110472925A CN110472925A CN201810447660.2A CN201810447660A CN110472925A CN 110472925 A CN110472925 A CN 110472925A CN 201810447660 A CN201810447660 A CN 201810447660A CN 110472925 A CN110472925 A CN 110472925A
- Authority
- CN
- China
- Prior art keywords
- project
- data
- database
- flow chart
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The present invention relates to a kind of laboratory test process management system based on webpage flow chart, including server, page end, page end are connect with server communication.Server includes project table database, project process chart database, the synchronous conversion module of data.Page end includes system main interface, project table interactive interface, project flow chart interactive interface.The processes such as laboratory test flow management method based on webpage flow chart, including browsing, creation, deletion, modification project flow chart, table and synchrodata that the invention also discloses a kind of.The present invention is had the characteristics that convenient for management, efficient using the dynamic flow diagram scheme for generating, updating synchronous with table.
Description
Technical field
The present invention relates to a kind of laboratory test process management system and methods, in particular to a kind of to be based on webpage flow chart
Laboratory test process management system and method, belong to testing process management domain.
Background technique
Current social gradually enhances the attention degree of quality and safety problem, has pushed the quick of laboratory test industry
Development.With the continuous development of laboratory test industry, the testing process in laboratory is constantly perfect, and testing progress requires more
Fastly, it more accurately feeds back.Currently, flow chart is widely used in enterprise, most of enterprise is raw by softwares such as Word, Excle
At static flow chart.Work is instructed by these static flow charts, and each participates in the people in this workflow
Identical static map only all is received, interpersonal direct docking ability can only be passed through to the progress of other employee works
Enough checking on a procedure and having carried out on earth does not have, what subsequent work should pay attention to.Meanwhile static flow chart
It is also a very big challenge to the manager taken the whole situation into account and plan accordingly, manager is it is to be understood that the process of each process must be gone and each rank
Personnel's docking of section, listens to their working report.
Summary of the invention
The present invention is based on the laboratory test process management systems and method of webpage flow chart to disclose new scheme, uses
The dynamic flow diagram scheme for generating, updating synchronous with table, solves that existing similar project management difficulty is big, low efficiency asks
Topic.
Laboratory test process management system the present invention is based on webpage flow chart includes server, page end, page end
It is connect with server communication.Server includes project table database, project process chart database, the synchronous conversion module of data,
Project table database is used for storage management sheet format project information, and project process chart database is used for storage management flow diagram
Project information, the synchronous conversion module of data are used for the synchronous bidirectional conversion between sheet format and flowchart format by project information.Net
Page end includes system main interface, project table interactive interface, project flow chart interactive interface, and project table interactive interface is for handing over
Mutually exclusive project form data, project flow chart interactive interface is for interacting project flow chart information.
Further, the server of this programme further includes normal process chart database, and normal process chart database is for storing
Administrative standard flow chart information.
Further, the project table interactive interface of this programme is equipped with creation table row button, Delete Table row button, double
Triggering link, data save button are hit, creation table row button is for creating list data, and Delete Table row button is for deleting
List data double-clicks triggering link for modifying list data, and data save button is for saving list data.
Further, the project flow chart interactive interface of this programme is equipped with node creation link, knot removal link, node
Linking button, clicking trigger link, data save button, node creation link are used for for creating node, knot removal link
Deletion of node, node link button are used for hinged node, and clicking trigger link is used for modifying node data, data save button
In preservation process diagram data.
The invention also discloses a kind of laboratory test flow management method based on webpage flow chart, laboratory test stream
Thread management method is based on laboratory test process management system, and laboratory test process management system includes server, page end,
Page end is connect with server communication, and server includes project table database, project process chart database, the synchronous conversion of data
Module, page end include system main interface, project table interactive interface, project flow chart interactive interface, including process: Yong Hutong
It crosses web page access and enters system main interface.User enters project flow chart interactive interface by system main interface, and user passes through item
Mesh flow chart interactive interface calls the creation of project process chart database or transfers flow diagram project information, and user is in project process
It creates, delete on figure interactive interface, modification project flow chart information.User enters project table interaction circle by system main interface
Face, user call the creation of project table database by project table interactive interface or transfer sheet format project information, Yong Hu
It creates, delete on project table interactive interface, modification project form data.The synchronous conversion module of data will be created, delete, be modified
The project information that operation generates changes the synchronous bidirectional between project table database and project process chart database and converts.
Further, the server of the method for this programme further includes normal process chart database, project process chart database tune
The normal process schema project information in normal process chart database is taken to carry out auxiliary establishing case flow diagram project.
Further, the project table interactive interface of the method for this programme is equipped with creation table row button, Delete Table row
Button double-clicks triggering link, data save button, and user triggers calling project list data by clicking creation table row button
Library creates list data, and user triggers calling project table database Delete Table data by clicking Delete Table row button,
User is pressed by double-clicking triggering link triggering calling project table database update list data, user by click data preservation
Button triggering calls the synchronous conversion module of data in project table database, the synchronous preservation information change behaviour of project process chart database
Make result.
Further, the project flow chart interactive interface of the method for this programme is equipped with node creation link, knot removal chain
It connects, the link of node link button, clicking trigger, data save button, user calls stream of items by node create chain contact hair
Journey chart database creates node, and user links triggering calling project process chart database deletion of node, user by knot removal
Calling project process chart database hinged node is triggered by clicking node link button, user is linked by clicking trigger and triggered
Calling project process chart database modifies node data, and user calls the synchronous conversion of data by the triggering of click data save button
Module saves information change operation result in project process chart database, project table database synchronization.
The present invention is based on the laboratory test process management systems and method of webpage flow chart to use dynamic flow diagram and table
The synchronous scheme for generating, updating of lattice, has the characteristics that convenient for management, efficient.
Detailed description of the invention
Fig. 1 is the schematic diagram of the laboratory test process management system based on webpage flow chart.
Fig. 2 is the flow chart of the laboratory test flow management method based on webpage flow chart.
Specific embodiment
Laboratory test process management system the present invention is based on webpage flow chart includes server, page end, page end
It is connect with server communication.Server includes project table database, project process chart database, the synchronous conversion module of data,
Project table database is used for storage management sheet format project information, and project process chart database is used for storage management flow diagram
Project information, the synchronous conversion module of data are used for the synchronous bidirectional conversion between sheet format and flowchart format by project information.Net
Page end includes system main interface, project table interactive interface, project flow chart interactive interface, and project table interactive interface is for handing over
Mutually exclusive project form data, project flow chart interactive interface is for interacting project flow chart information.Further, case is created in order to give
Flow chart item provides reference, and the server of this programme further includes normal process chart database, and normal process chart database is used for
Storage management normal process figure information.Above scheme passes through handle using the dynamic flow diagram scheme for generating, updating synchronous with table
Flow chart is embedded into the real time monitoring that each link is realized in Web page system, and administrative convenience and management effect greatly improved
Rate.
In order to realize that management project table, the project table interactive interface of this programme are equipped with creation table row button, delete
Except table row button, triggering link, data save button are double-clicked, creation table row button deletes table for creating list data
Table rows button is used for Delete Table data, double-clicks triggering link for modifying list data, data save button is for saving table
Lattice data.
In order to realize management project flow chart, the project flow chart interactive interface of this programme be equipped with node creation link,
Knot removal link, the link of node link button, clicking trigger, data save button, node creation are linked for creating node,
Knot removal link is used for deletion of node, and node link button is used for hinged node, and clicking trigger is linked for modifying number of nodes
According to data save button is for saving process diagram data.
The invention also discloses a kind of laboratory test flow management method based on webpage flow chart, laboratory test stream
Thread management method is based on laboratory test process management system, and laboratory test process management system includes server, page end,
Page end is connect with server communication, and server includes project table database, project process chart database, the synchronous conversion of data
Module, page end include system main interface, project table interactive interface, project flow chart interactive interface, including process: Yong Hutong
It crosses web page access and enters system main interface.User enters project flow chart interactive interface by system main interface, and user passes through item
Mesh flow chart interactive interface calls the creation of project process chart database or transfers flow diagram project information, and user is in project process
It creates, delete on figure interactive interface, modification project flow chart information.User enters project table interaction circle by system main interface
Face, user call the creation of project table database by project table interactive interface or transfer sheet format project information, Yong Hu
It creates, delete on project table interactive interface, modification project form data.The synchronous conversion module of data will be created, delete, be modified
The project information that operation generates changes the synchronous bidirectional between project table database and project process chart database and converts.In order to give
It creates case flow chart item and reference is provided, improve the efficiency for creating new case, the server of the method for this programme further includes standard
Process chart database, it is next auxiliary that project process chart database transfers the normal process schema project information in normal process chart database
Help creation case flow diagram project.
In order to realize that management project table, the project table interactive interface of the method for this programme are equipped with creation table row and press
Button, Delete Table row button double-click triggering link, data save button, and user is adjusted by clicking creation table row button triggering
List data is created with project table database, user triggers calling project table database by clicking Delete Table row button
Delete Table data, user are passed through by double-clicking triggering link triggering calling project table database update list data, user
The triggering of click data save button calls the synchronous conversion module of data synchronous in project table database, project process chart database
Save information change operation result.
In order to realize that management project flow chart, the project flow chart interactive interface of the method for this programme are created equipped with node
Link, knot removal link, the link of node link button, clicking trigger, data save button, user are created by node and are linked
It triggers calling project process chart database and creates node, user links triggering calling project process chart database by knot removal
Deletion of node, user trigger calling project process chart database hinged node by clicking node link button, and user passes through a little
Triggering link triggering calling project process chart database modification node data is hit, user is adjusted by the triggering of click data save button
Information change operation result is saved in project process chart database, project table database synchronization with the synchronous conversion module of data.
This programme discloses a kind of laboratory test process control system, the two-way modification of implementation flow chart and table, together
Walk display problem.In order to not influence the progress of experiment test, this programme realizes work by the way that flow chart is embedded into Web page system
Make the displaying flowed, modification determines the work in each stage, the display etc. of job schedule, in favor of faster, more accurately dock after
Continuous work, is scheduled.The real time monitoring for realizing each link in Web page system by the way that flow chart is embedded into, meets pipe
Mode required for reason person, because there is flowchart control system, it is only necessary to open webpage just it can be seen that specific each link
Job schedule, while this is also required for each link personnel, because there is flowchart control system, as long as opening webpage
It is seen that oneself work approximate time, next what the performance of previous procedure should pay attention to, therefore can be
Work at present progress status is intuitively seen in the shortest time, is subsequently whose work.The flow chart behaviour of this programme simultaneously
List data can be modified by modification process figure, realize two-way modification, be used by table product process figure by making system
More convenient, use scope is more wide.
Present solution provides a kind of flowchart control systems, can be with table product process figure, can be good with table
Flow for displaying figure details realize two-way modification and display between table and flow chart, can more intuitively show each work
Data of process and as a result, detailed show information and points for attention required for its specific each process, can be most
In the short time, the concrete condition of each process is most accurately reflected.
As shown in Figure 1, flowchart control system is mainly the subdivision for carrying out some detailed programs and carrying out specific workflow.
Wherein normal process figure is the suitable workflow of certain resulting specific project of predecessor experience, and this programme is establishing each project
When workflow, this workflow can be referred to or quoted.The corresponding table of each project and flow chart are its workflows
A kind of representation, realizes that flow chart interface is synchronous with spreadsheet interface data, so that the modification of flow chart and writing more
Simplicity.Normal process figure is the summary of predecessor experience and the summary of knowledge, is summarized in project each time, while right
The same or similar project is summarized, so that normal process more improves specifically, in favor of later project workflow management change
Must be more simple, accurately.Projects module is the object of flow chart service.Flow chart interface is the core of flowchart control system
The heart is the display of workflow result, modifies interface, is the Important Platform of data exchange between manager and staff.We
Case can show the concrete outcome of each process by different colours, by corresponding operation carry out the checking or modify of data,
It uploads.Spreadsheet interface is another form of expression of project process, and the modification of flow chart interface and spreadsheet interface data can be double
To progress.
As shown in Fig. 2, the implementation method of flowchart control system.Flowchart control system is a Web project, passes through visit
It asks that url carries out direct access system, some project is determined with the presence or absence of flow chart by accessing database data.When there is process
When figure, specific flow chart can be directly viewable or check specific list data, data can also be modified accordingly, when
When not having flow chart, flow chart can be generated.Concrete operations are as follows.
Process diagram data is increased by table, deletes, change.Table is corresponded into project, is modified to list data
Increase, operation saves key i.e. such as the rewriting of Excel list data, as long as pressing after having changed.Its data after preservation
It will synchronize to flow chart and show the page.Specifically: (1) table increases data, increases the button of data by clicking, gives table
A line is added, filling in for corresponding data is carried out;(2) deletion of list data, by being added in every data line backmost a lattice
Delete button controls the delete operation of this current row data;(3) modification of list data, it is only necessary to double-click corresponding unit lattice, just
It can be modified accordingly.
To the increasings of the data of process diagram page, deletes, changes.Into the corresponding process diagram page of the project, when certain processes
Through starting, its progress is distinguished by different colours that the page shows each process, such as white expression does not carry out, and black indicates
Cancel this process, red indicates that this process goes out item problem etc., can intuitively see very much when opening this page in this way
To the state of each process.By clicking process by right key, detailed procedure information can be checked, while this stream can also be uploaded
The result data tested at that time and picture concerned of journey.Specifically: (1) increase of process diagram data, first creation node, right button
That clicks that the node shows specifying information fills in frame, and flow chart collective information is inserted, detail information data is saved, then sharp
Node link is carried out with the button of hinged node and determines that flow chart moves towards, and finally clicks save button;(2) process diagram data
Deletion, it is only necessary to the lines of deletion of node and corresponding hinged node, at the same the process of its upper level and next stage link
Get up;(3) modification of process diagram data, it is only necessary to which clicking the node to be modified by right key can show that the modification page counts it
According to modifying.
This programme is conducive to the management and monitoring of workflow, enables manager and staff faster, more accurately
Work at present progress is grasped, so that staff is more efficiently made corresponding preparation, simplifies the friendship to work between staff
It connects, keeps manager more convenient, accurately make corresponding judgement and carry out scheduling.Meanwhile the preservation of this programme data is more
It is perfect, be conducive to the summary to data, corresponding judgement can be made to previous work in every task, work afterwards
Similar mistake is avoided the occurrence of in work.The summary of normal process figure is so that the personnel of those experience relative deficiencies also can be quick
Grasp the item that work at present needs to pay attention to.In addition, this programme can also to the checking of flow chart, modify and do corresponding permission and sentence
It is disconnected, keep workflow control system administrative power duty bright, realizes power duty, the intelligence of work management.Based on the above feature, we
The laboratory test process management system based on webpage flow chart and method of case have substance outstanding compared to existing scheme
Feature and significant progress.
The laboratory test process management system based on webpage flow chart and method of this programme are not limited to be embodied
Content disclosed in mode, the technical solution occurred in embodiment can the understanding based on those skilled in the art and extend, this
Field technical staff also belongs to the range of this programme according to the simple replacement scheme that this programme combination common knowledge is made.
Claims (8)
1. a kind of laboratory test process management system based on webpage flow chart, it is characterized in that including server, page end, institute
Page end is stated to connect with the server communication,
The server includes project table database, project process chart database, the synchronous conversion module of data, the project table
Lattice database is used for storage management sheet format project information, and the project process chart database is used for storage management flow diagram item
Mesh information, the synchronous conversion module of the data are used for the synchronous bidirectional conversion between sheet format and flowchart format by project information,
The page end includes system main interface, project table interactive interface, project flow chart interactive interface, the project table
Interactive interface is for interacting project form data, and the project flow chart interactive interface is for interacting project flow chart information.
2. the laboratory test process management system according to claim 1 based on webpage flow chart, which is characterized in that institute
Stating server further includes normal process chart database, and the normal process chart database is believed for storage management normal process figure
Breath.
3. the laboratory test process management system according to claim 1 based on webpage flow chart, which is characterized in that institute
Project table interactive interface is stated to save and press equipped with creation table row button, Delete Table row button, double-click triggering link, data
Button, for the creation table row button for creating list data, the Delete Table row button is used for Delete Table data, described
Triggering link is double-clicked for modifying list data, the data save button is for saving list data.
4. the laboratory test process management system according to claim 1 based on webpage flow chart, which is characterized in that institute
Project flow chart interactive interface is stated equipped with node creation link, knot removal link, node link button, clicking trigger chain
It connects, data save button, the node creation link is used for deletion of node, institute for creating node, the knot removal link
Node link button is stated for hinged node, the clicking trigger link is for modifying node data, the data save button
For saving process diagram data.
5. a kind of laboratory test flow management method based on webpage flow chart, the laboratory test flow management method base
In laboratory test process management system, the laboratory test process management system includes server, page end, the webpage
End is connect with the server communication, and the server includes project table database, project process chart database, data synchronization
Conversion module, the page end include system main interface, project table interactive interface, project flow chart interactive interface, feature
Being includes process:
User enters system main interface by web page access,
User enters project flow chart interactive interface by system main interface, and user calls item by project flow chart interactive interface
Mesh process chart database creates or transfers flow diagram project information, user creates on project flow chart interactive interface, deletes,
Modification project flow chart information,
User enters project table interactive interface by system main interface, and user calls project table by project table interactive interface
Lattice database creates or transfers sheet format project information, and user creates on project table interactive interface, deletes, modifies project table
Lattice information,
The project information change that the synchronous conversion module of data generates creation, deletion, modification operation project table database with
Synchronous bidirectional is converted between project process chart database.
6. the laboratory test flow management method according to claim 5 based on webpage flow chart, which is characterized in that institute
Stating server further includes normal process chart database, and project process chart database transfers the normal stream in normal process chart database
Journey schema project information carrys out auxiliary establishing case flow diagram project.
7. the laboratory test flow management method according to claim 5 based on webpage flow chart, which is characterized in that institute
Project table interactive interface is stated to save and press equipped with creation table row button, Delete Table row button, double-click triggering link, data
Button, user trigger calling project table database creation list data by clicking creation table row button, and user passes through click
Delete Table row button triggers calling project table database Delete Table data, and user is called by double-clicking triggering link triggering
Project table database update list data, user call the synchronous conversion module of data to exist by the triggering of click data save button
Project table database, project process chart database are synchronous to save information change operation result.
8. the laboratory test flow management method according to claim 5 based on webpage flow chart, which is characterized in that institute
Project flow chart interactive interface is stated equipped with node creation link, knot removal link, node link button, clicking trigger chain
It connects, data save button, user creates node by node create chain contact hair calling project process chart database, and user passes through
Knot removal link triggering calling project process chart database deletion of node, user are called by clicking the triggering of node link button
Project process chart database hinged node, user link triggering calling project process chart database by clicking trigger and modify node
Data, user call the synchronous conversion module of data in project process chart database, project by the triggering of click data save button
Table database is synchronous to save information change operation result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810447660.2A CN110472925A (en) | 2018-05-11 | 2018-05-11 | A kind of laboratory test process management system and method based on webpage flow chart |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810447660.2A CN110472925A (en) | 2018-05-11 | 2018-05-11 | A kind of laboratory test process management system and method based on webpage flow chart |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110472925A true CN110472925A (en) | 2019-11-19 |
Family
ID=68504152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810447660.2A Pending CN110472925A (en) | 2018-05-11 | 2018-05-11 | A kind of laboratory test process management system and method based on webpage flow chart |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110472925A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111798128A (en) * | 2020-07-02 | 2020-10-20 | 东土科技(宜昌)有限公司 | Interface operation method of process flow, computer equipment and storage medium |
WO2023093487A1 (en) * | 2021-11-26 | 2023-06-01 | 北京字跳网络技术有限公司 | Project stream determination method and apparatus, electronic device, and storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1395193A (en) * | 2001-07-05 | 2003-02-05 | 英业达股份有限公司 | Method fro producing dynamic form which can be edited on web page |
CN1638414A (en) * | 2003-12-25 | 2005-07-13 | 日本电气株式会社 | Data refreshing system for reproduction and data refreshing method for reproduction |
CN104239429A (en) * | 2014-08-26 | 2014-12-24 | 北京航天在线网络科技有限公司 | Method and device for editing flowchart in webpage |
CN104751276A (en) * | 2015-03-20 | 2015-07-01 | 七朵云(贵州)科技股份有限公司 | Working process managing method based on database |
CN106371851A (en) * | 2016-09-19 | 2017-02-01 | 深圳市彬讯科技有限公司 | Activiti-based business flow management system |
CN106610774A (en) * | 2015-10-23 | 2017-05-03 | 北京国双科技有限公司 | Webpage table editing method and device |
CN107369003A (en) * | 2017-07-10 | 2017-11-21 | 唐郡 | A kind of intelligent laboratory management system method and system |
CN107729392A (en) * | 2017-09-19 | 2018-02-23 | 广州市妇女儿童医疗中心 | Text structure method, apparatus, system and non-volatile memory medium |
CN107766428A (en) * | 2017-09-15 | 2018-03-06 | 北京大学 | A kind of automatic method and system for realizing data visualization |
-
2018
- 2018-05-11 CN CN201810447660.2A patent/CN110472925A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1395193A (en) * | 2001-07-05 | 2003-02-05 | 英业达股份有限公司 | Method fro producing dynamic form which can be edited on web page |
CN1638414A (en) * | 2003-12-25 | 2005-07-13 | 日本电气株式会社 | Data refreshing system for reproduction and data refreshing method for reproduction |
CN104239429A (en) * | 2014-08-26 | 2014-12-24 | 北京航天在线网络科技有限公司 | Method and device for editing flowchart in webpage |
CN104751276A (en) * | 2015-03-20 | 2015-07-01 | 七朵云(贵州)科技股份有限公司 | Working process managing method based on database |
CN106610774A (en) * | 2015-10-23 | 2017-05-03 | 北京国双科技有限公司 | Webpage table editing method and device |
CN106371851A (en) * | 2016-09-19 | 2017-02-01 | 深圳市彬讯科技有限公司 | Activiti-based business flow management system |
CN107369003A (en) * | 2017-07-10 | 2017-11-21 | 唐郡 | A kind of intelligent laboratory management system method and system |
CN107766428A (en) * | 2017-09-15 | 2018-03-06 | 北京大学 | A kind of automatic method and system for realizing data visualization |
CN107729392A (en) * | 2017-09-19 | 2018-02-23 | 广州市妇女儿童医疗中心 | Text structure method, apparatus, system and non-volatile memory medium |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111798128A (en) * | 2020-07-02 | 2020-10-20 | 东土科技(宜昌)有限公司 | Interface operation method of process flow, computer equipment and storage medium |
WO2023093487A1 (en) * | 2021-11-26 | 2023-06-01 | 北京字跳网络技术有限公司 | Project stream determination method and apparatus, electronic device, and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107103448A (en) | Data integrated system based on workflow | |
US20060111953A1 (en) | Virtual knowledge management system | |
CN105069025A (en) | Intelligent aggregation visualization and management control system for big data | |
CN101662493A (en) | Data acquiring method, system and server of user access path | |
CN111988176A (en) | Fault positioning system visualization method based on simulation topological structure | |
CN108845798A (en) | A kind of visualization big data task cradle and processing method | |
CN101414945A (en) | Platform system and method for building information system | |
CN110472925A (en) | A kind of laboratory test process management system and method based on webpage flow chart | |
CN109933416A (en) | A kind of moving method, device and storage medium using data | |
CN112540975B (en) | Multi-source heterogeneous data quality detection method and system based on petri net | |
CN107609794A (en) | A kind of technology maturity evaluation information processing unit | |
CN107220515A (en) | Post-abortion cares about intelligent follow-up management system | |
Sarfraz et al. | ICT revolution from traditional office to virtual office: A study on teleworking during the COVID-19 pandemic | |
CN111461575A (en) | Visual task management and control system and method | |
CN106971289A (en) | A kind of collaborative design method and cooperative system based on data-driven | |
CN115222077A (en) | Work order operation and maintenance statistical analysis system | |
CN110348607A (en) | The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system | |
CN114281509A (en) | Spacecraft multi-user collaborative task planning system based on scene description | |
CN108920724A (en) | Data check method, apparatus and system | |
Berenbach | A 25 year retrospective on model-driven requirements engineering | |
CN102509195A (en) | Digitalized management platform for call center | |
CN108564281A (en) | The implementation method of outsourcing work task scheduling system based on structuring | |
KR20060012572A (en) | System and methods for managing distributed design chains | |
CN104598211B (en) | The method and device of management service software program | |
CN110391943A (en) | A kind of distributed meteorological data life cycle building and monitoring method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |