CN110472925A - A kind of laboratory test process management system and method based on webpage flow chart - Google Patents

A kind of laboratory test process management system and method based on webpage flow chart Download PDF

Info

Publication number
CN110472925A
CN110472925A CN201810447660.2A CN201810447660A CN110472925A CN 110472925 A CN110472925 A CN 110472925A CN 201810447660 A CN201810447660 A CN 201810447660A CN 110472925 A CN110472925 A CN 110472925A
Authority
CN
China
Prior art keywords
project
data
database
flow chart
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810447660.2A
Other languages
Chinese (zh)
Inventor
蒋立衡
生雅君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yi Valley Intelligent Technology (shanghai) Co Ltd
Original Assignee
Yi Valley Intelligent Technology (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yi Valley Intelligent Technology (shanghai) Co Ltd filed Critical Yi Valley Intelligent Technology (shanghai) Co Ltd
Priority to CN201810447660.2A priority Critical patent/CN110472925A/en
Publication of CN110472925A publication Critical patent/CN110472925A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The present invention relates to a kind of laboratory test process management system based on webpage flow chart, including server, page end, page end are connect with server communication.Server includes project table database, project process chart database, the synchronous conversion module of data.Page end includes system main interface, project table interactive interface, project flow chart interactive interface.The processes such as laboratory test flow management method based on webpage flow chart, including browsing, creation, deletion, modification project flow chart, table and synchrodata that the invention also discloses a kind of.The present invention is had the characteristics that convenient for management, efficient using the dynamic flow diagram scheme for generating, updating synchronous with table.

Description

A kind of laboratory test process management system and method based on webpage flow chart
Technical field
The present invention relates to a kind of laboratory test process management system and methods, in particular to a kind of to be based on webpage flow chart Laboratory test process management system and method, belong to testing process management domain.
Background technique
Current social gradually enhances the attention degree of quality and safety problem, has pushed the quick of laboratory test industry Development.With the continuous development of laboratory test industry, the testing process in laboratory is constantly perfect, and testing progress requires more Fastly, it more accurately feeds back.Currently, flow chart is widely used in enterprise, most of enterprise is raw by softwares such as Word, Excle At static flow chart.Work is instructed by these static flow charts, and each participates in the people in this workflow Identical static map only all is received, interpersonal direct docking ability can only be passed through to the progress of other employee works Enough checking on a procedure and having carried out on earth does not have, what subsequent work should pay attention to.Meanwhile static flow chart It is also a very big challenge to the manager taken the whole situation into account and plan accordingly, manager is it is to be understood that the process of each process must be gone and each rank Personnel's docking of section, listens to their working report.
Summary of the invention
The present invention is based on the laboratory test process management systems and method of webpage flow chart to disclose new scheme, uses The dynamic flow diagram scheme for generating, updating synchronous with table, solves that existing similar project management difficulty is big, low efficiency asks Topic.
Laboratory test process management system the present invention is based on webpage flow chart includes server, page end, page end It is connect with server communication.Server includes project table database, project process chart database, the synchronous conversion module of data, Project table database is used for storage management sheet format project information, and project process chart database is used for storage management flow diagram Project information, the synchronous conversion module of data are used for the synchronous bidirectional conversion between sheet format and flowchart format by project information.Net Page end includes system main interface, project table interactive interface, project flow chart interactive interface, and project table interactive interface is for handing over Mutually exclusive project form data, project flow chart interactive interface is for interacting project flow chart information.
Further, the server of this programme further includes normal process chart database, and normal process chart database is for storing Administrative standard flow chart information.
Further, the project table interactive interface of this programme is equipped with creation table row button, Delete Table row button, double Triggering link, data save button are hit, creation table row button is for creating list data, and Delete Table row button is for deleting List data double-clicks triggering link for modifying list data, and data save button is for saving list data.
Further, the project flow chart interactive interface of this programme is equipped with node creation link, knot removal link, node Linking button, clicking trigger link, data save button, node creation link are used for for creating node, knot removal link Deletion of node, node link button are used for hinged node, and clicking trigger link is used for modifying node data, data save button In preservation process diagram data.
The invention also discloses a kind of laboratory test flow management method based on webpage flow chart, laboratory test stream Thread management method is based on laboratory test process management system, and laboratory test process management system includes server, page end, Page end is connect with server communication, and server includes project table database, project process chart database, the synchronous conversion of data Module, page end include system main interface, project table interactive interface, project flow chart interactive interface, including process: Yong Hutong It crosses web page access and enters system main interface.User enters project flow chart interactive interface by system main interface, and user passes through item Mesh flow chart interactive interface calls the creation of project process chart database or transfers flow diagram project information, and user is in project process It creates, delete on figure interactive interface, modification project flow chart information.User enters project table interaction circle by system main interface Face, user call the creation of project table database by project table interactive interface or transfer sheet format project information, Yong Hu It creates, delete on project table interactive interface, modification project form data.The synchronous conversion module of data will be created, delete, be modified The project information that operation generates changes the synchronous bidirectional between project table database and project process chart database and converts.
Further, the server of the method for this programme further includes normal process chart database, project process chart database tune The normal process schema project information in normal process chart database is taken to carry out auxiliary establishing case flow diagram project.
Further, the project table interactive interface of the method for this programme is equipped with creation table row button, Delete Table row Button double-clicks triggering link, data save button, and user triggers calling project list data by clicking creation table row button Library creates list data, and user triggers calling project table database Delete Table data by clicking Delete Table row button, User is pressed by double-clicking triggering link triggering calling project table database update list data, user by click data preservation Button triggering calls the synchronous conversion module of data in project table database, the synchronous preservation information change behaviour of project process chart database Make result.
Further, the project flow chart interactive interface of the method for this programme is equipped with node creation link, knot removal chain It connects, the link of node link button, clicking trigger, data save button, user calls stream of items by node create chain contact hair Journey chart database creates node, and user links triggering calling project process chart database deletion of node, user by knot removal Calling project process chart database hinged node is triggered by clicking node link button, user is linked by clicking trigger and triggered Calling project process chart database modifies node data, and user calls the synchronous conversion of data by the triggering of click data save button Module saves information change operation result in project process chart database, project table database synchronization.
The present invention is based on the laboratory test process management systems and method of webpage flow chart to use dynamic flow diagram and table The synchronous scheme for generating, updating of lattice, has the characteristics that convenient for management, efficient.
Detailed description of the invention
Fig. 1 is the schematic diagram of the laboratory test process management system based on webpage flow chart.
Fig. 2 is the flow chart of the laboratory test flow management method based on webpage flow chart.
Specific embodiment
Laboratory test process management system the present invention is based on webpage flow chart includes server, page end, page end It is connect with server communication.Server includes project table database, project process chart database, the synchronous conversion module of data, Project table database is used for storage management sheet format project information, and project process chart database is used for storage management flow diagram Project information, the synchronous conversion module of data are used for the synchronous bidirectional conversion between sheet format and flowchart format by project information.Net Page end includes system main interface, project table interactive interface, project flow chart interactive interface, and project table interactive interface is for handing over Mutually exclusive project form data, project flow chart interactive interface is for interacting project flow chart information.Further, case is created in order to give Flow chart item provides reference, and the server of this programme further includes normal process chart database, and normal process chart database is used for Storage management normal process figure information.Above scheme passes through handle using the dynamic flow diagram scheme for generating, updating synchronous with table Flow chart is embedded into the real time monitoring that each link is realized in Web page system, and administrative convenience and management effect greatly improved Rate.
In order to realize that management project table, the project table interactive interface of this programme are equipped with creation table row button, delete Except table row button, triggering link, data save button are double-clicked, creation table row button deletes table for creating list data Table rows button is used for Delete Table data, double-clicks triggering link for modifying list data, data save button is for saving table Lattice data.
In order to realize management project flow chart, the project flow chart interactive interface of this programme be equipped with node creation link, Knot removal link, the link of node link button, clicking trigger, data save button, node creation are linked for creating node, Knot removal link is used for deletion of node, and node link button is used for hinged node, and clicking trigger is linked for modifying number of nodes According to data save button is for saving process diagram data.
The invention also discloses a kind of laboratory test flow management method based on webpage flow chart, laboratory test stream Thread management method is based on laboratory test process management system, and laboratory test process management system includes server, page end, Page end is connect with server communication, and server includes project table database, project process chart database, the synchronous conversion of data Module, page end include system main interface, project table interactive interface, project flow chart interactive interface, including process: Yong Hutong It crosses web page access and enters system main interface.User enters project flow chart interactive interface by system main interface, and user passes through item Mesh flow chart interactive interface calls the creation of project process chart database or transfers flow diagram project information, and user is in project process It creates, delete on figure interactive interface, modification project flow chart information.User enters project table interaction circle by system main interface Face, user call the creation of project table database by project table interactive interface or transfer sheet format project information, Yong Hu It creates, delete on project table interactive interface, modification project form data.The synchronous conversion module of data will be created, delete, be modified The project information that operation generates changes the synchronous bidirectional between project table database and project process chart database and converts.In order to give It creates case flow chart item and reference is provided, improve the efficiency for creating new case, the server of the method for this programme further includes standard Process chart database, it is next auxiliary that project process chart database transfers the normal process schema project information in normal process chart database Help creation case flow diagram project.
In order to realize that management project table, the project table interactive interface of the method for this programme are equipped with creation table row and press Button, Delete Table row button double-click triggering link, data save button, and user is adjusted by clicking creation table row button triggering List data is created with project table database, user triggers calling project table database by clicking Delete Table row button Delete Table data, user are passed through by double-clicking triggering link triggering calling project table database update list data, user The triggering of click data save button calls the synchronous conversion module of data synchronous in project table database, project process chart database Save information change operation result.
In order to realize that management project flow chart, the project flow chart interactive interface of the method for this programme are created equipped with node Link, knot removal link, the link of node link button, clicking trigger, data save button, user are created by node and are linked It triggers calling project process chart database and creates node, user links triggering calling project process chart database by knot removal Deletion of node, user trigger calling project process chart database hinged node by clicking node link button, and user passes through a little Triggering link triggering calling project process chart database modification node data is hit, user is adjusted by the triggering of click data save button Information change operation result is saved in project process chart database, project table database synchronization with the synchronous conversion module of data.
This programme discloses a kind of laboratory test process control system, the two-way modification of implementation flow chart and table, together Walk display problem.In order to not influence the progress of experiment test, this programme realizes work by the way that flow chart is embedded into Web page system Make the displaying flowed, modification determines the work in each stage, the display etc. of job schedule, in favor of faster, more accurately dock after Continuous work, is scheduled.The real time monitoring for realizing each link in Web page system by the way that flow chart is embedded into, meets pipe Mode required for reason person, because there is flowchart control system, it is only necessary to open webpage just it can be seen that specific each link Job schedule, while this is also required for each link personnel, because there is flowchart control system, as long as opening webpage It is seen that oneself work approximate time, next what the performance of previous procedure should pay attention to, therefore can be Work at present progress status is intuitively seen in the shortest time, is subsequently whose work.The flow chart behaviour of this programme simultaneously List data can be modified by modification process figure, realize two-way modification, be used by table product process figure by making system More convenient, use scope is more wide.
Present solution provides a kind of flowchart control systems, can be with table product process figure, can be good with table Flow for displaying figure details realize two-way modification and display between table and flow chart, can more intuitively show each work Data of process and as a result, detailed show information and points for attention required for its specific each process, can be most In the short time, the concrete condition of each process is most accurately reflected.
As shown in Figure 1, flowchart control system is mainly the subdivision for carrying out some detailed programs and carrying out specific workflow. Wherein normal process figure is the suitable workflow of certain resulting specific project of predecessor experience, and this programme is establishing each project When workflow, this workflow can be referred to or quoted.The corresponding table of each project and flow chart are its workflows A kind of representation, realizes that flow chart interface is synchronous with spreadsheet interface data, so that the modification of flow chart and writing more Simplicity.Normal process figure is the summary of predecessor experience and the summary of knowledge, is summarized in project each time, while right The same or similar project is summarized, so that normal process more improves specifically, in favor of later project workflow management change Must be more simple, accurately.Projects module is the object of flow chart service.Flow chart interface is the core of flowchart control system The heart is the display of workflow result, modifies interface, is the Important Platform of data exchange between manager and staff.We Case can show the concrete outcome of each process by different colours, by corresponding operation carry out the checking or modify of data, It uploads.Spreadsheet interface is another form of expression of project process, and the modification of flow chart interface and spreadsheet interface data can be double To progress.
As shown in Fig. 2, the implementation method of flowchart control system.Flowchart control system is a Web project, passes through visit It asks that url carries out direct access system, some project is determined with the presence or absence of flow chart by accessing database data.When there is process When figure, specific flow chart can be directly viewable or check specific list data, data can also be modified accordingly, when When not having flow chart, flow chart can be generated.Concrete operations are as follows.
Process diagram data is increased by table, deletes, change.Table is corresponded into project, is modified to list data Increase, operation saves key i.e. such as the rewriting of Excel list data, as long as pressing after having changed.Its data after preservation It will synchronize to flow chart and show the page.Specifically: (1) table increases data, increases the button of data by clicking, gives table A line is added, filling in for corresponding data is carried out;(2) deletion of list data, by being added in every data line backmost a lattice Delete button controls the delete operation of this current row data;(3) modification of list data, it is only necessary to double-click corresponding unit lattice, just It can be modified accordingly.
To the increasings of the data of process diagram page, deletes, changes.Into the corresponding process diagram page of the project, when certain processes Through starting, its progress is distinguished by different colours that the page shows each process, such as white expression does not carry out, and black indicates Cancel this process, red indicates that this process goes out item problem etc., can intuitively see very much when opening this page in this way To the state of each process.By clicking process by right key, detailed procedure information can be checked, while this stream can also be uploaded The result data tested at that time and picture concerned of journey.Specifically: (1) increase of process diagram data, first creation node, right button That clicks that the node shows specifying information fills in frame, and flow chart collective information is inserted, detail information data is saved, then sharp Node link is carried out with the button of hinged node and determines that flow chart moves towards, and finally clicks save button;(2) process diagram data Deletion, it is only necessary to the lines of deletion of node and corresponding hinged node, at the same the process of its upper level and next stage link Get up;(3) modification of process diagram data, it is only necessary to which clicking the node to be modified by right key can show that the modification page counts it According to modifying.
This programme is conducive to the management and monitoring of workflow, enables manager and staff faster, more accurately Work at present progress is grasped, so that staff is more efficiently made corresponding preparation, simplifies the friendship to work between staff It connects, keeps manager more convenient, accurately make corresponding judgement and carry out scheduling.Meanwhile the preservation of this programme data is more It is perfect, be conducive to the summary to data, corresponding judgement can be made to previous work in every task, work afterwards Similar mistake is avoided the occurrence of in work.The summary of normal process figure is so that the personnel of those experience relative deficiencies also can be quick Grasp the item that work at present needs to pay attention to.In addition, this programme can also to the checking of flow chart, modify and do corresponding permission and sentence It is disconnected, keep workflow control system administrative power duty bright, realizes power duty, the intelligence of work management.Based on the above feature, we The laboratory test process management system based on webpage flow chart and method of case have substance outstanding compared to existing scheme Feature and significant progress.
The laboratory test process management system based on webpage flow chart and method of this programme are not limited to be embodied Content disclosed in mode, the technical solution occurred in embodiment can the understanding based on those skilled in the art and extend, this Field technical staff also belongs to the range of this programme according to the simple replacement scheme that this programme combination common knowledge is made.

Claims (8)

1. a kind of laboratory test process management system based on webpage flow chart, it is characterized in that including server, page end, institute Page end is stated to connect with the server communication,
The server includes project table database, project process chart database, the synchronous conversion module of data, the project table Lattice database is used for storage management sheet format project information, and the project process chart database is used for storage management flow diagram item Mesh information, the synchronous conversion module of the data are used for the synchronous bidirectional conversion between sheet format and flowchart format by project information,
The page end includes system main interface, project table interactive interface, project flow chart interactive interface, the project table Interactive interface is for interacting project form data, and the project flow chart interactive interface is for interacting project flow chart information.
2. the laboratory test process management system according to claim 1 based on webpage flow chart, which is characterized in that institute Stating server further includes normal process chart database, and the normal process chart database is believed for storage management normal process figure Breath.
3. the laboratory test process management system according to claim 1 based on webpage flow chart, which is characterized in that institute Project table interactive interface is stated to save and press equipped with creation table row button, Delete Table row button, double-click triggering link, data Button, for the creation table row button for creating list data, the Delete Table row button is used for Delete Table data, described Triggering link is double-clicked for modifying list data, the data save button is for saving list data.
4. the laboratory test process management system according to claim 1 based on webpage flow chart, which is characterized in that institute Project flow chart interactive interface is stated equipped with node creation link, knot removal link, node link button, clicking trigger chain It connects, data save button, the node creation link is used for deletion of node, institute for creating node, the knot removal link Node link button is stated for hinged node, the clicking trigger link is for modifying node data, the data save button For saving process diagram data.
5. a kind of laboratory test flow management method based on webpage flow chart, the laboratory test flow management method base In laboratory test process management system, the laboratory test process management system includes server, page end, the webpage End is connect with the server communication, and the server includes project table database, project process chart database, data synchronization Conversion module, the page end include system main interface, project table interactive interface, project flow chart interactive interface, feature Being includes process:
User enters system main interface by web page access,
User enters project flow chart interactive interface by system main interface, and user calls item by project flow chart interactive interface Mesh process chart database creates or transfers flow diagram project information, user creates on project flow chart interactive interface, deletes, Modification project flow chart information,
User enters project table interactive interface by system main interface, and user calls project table by project table interactive interface Lattice database creates or transfers sheet format project information, and user creates on project table interactive interface, deletes, modifies project table Lattice information,
The project information change that the synchronous conversion module of data generates creation, deletion, modification operation project table database with Synchronous bidirectional is converted between project process chart database.
6. the laboratory test flow management method according to claim 5 based on webpage flow chart, which is characterized in that institute Stating server further includes normal process chart database, and project process chart database transfers the normal stream in normal process chart database Journey schema project information carrys out auxiliary establishing case flow diagram project.
7. the laboratory test flow management method according to claim 5 based on webpage flow chart, which is characterized in that institute Project table interactive interface is stated to save and press equipped with creation table row button, Delete Table row button, double-click triggering link, data Button, user trigger calling project table database creation list data by clicking creation table row button, and user passes through click Delete Table row button triggers calling project table database Delete Table data, and user is called by double-clicking triggering link triggering Project table database update list data, user call the synchronous conversion module of data to exist by the triggering of click data save button Project table database, project process chart database are synchronous to save information change operation result.
8. the laboratory test flow management method according to claim 5 based on webpage flow chart, which is characterized in that institute Project flow chart interactive interface is stated equipped with node creation link, knot removal link, node link button, clicking trigger chain It connects, data save button, user creates node by node create chain contact hair calling project process chart database, and user passes through Knot removal link triggering calling project process chart database deletion of node, user are called by clicking the triggering of node link button Project process chart database hinged node, user link triggering calling project process chart database by clicking trigger and modify node Data, user call the synchronous conversion module of data in project process chart database, project by the triggering of click data save button Table database is synchronous to save information change operation result.
CN201810447660.2A 2018-05-11 2018-05-11 A kind of laboratory test process management system and method based on webpage flow chart Pending CN110472925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810447660.2A CN110472925A (en) 2018-05-11 2018-05-11 A kind of laboratory test process management system and method based on webpage flow chart

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810447660.2A CN110472925A (en) 2018-05-11 2018-05-11 A kind of laboratory test process management system and method based on webpage flow chart

Publications (1)

Publication Number Publication Date
CN110472925A true CN110472925A (en) 2019-11-19

Family

ID=68504152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810447660.2A Pending CN110472925A (en) 2018-05-11 2018-05-11 A kind of laboratory test process management system and method based on webpage flow chart

Country Status (1)

Country Link
CN (1) CN110472925A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111798128A (en) * 2020-07-02 2020-10-20 东土科技(宜昌)有限公司 Interface operation method of process flow, computer equipment and storage medium
WO2023093487A1 (en) * 2021-11-26 2023-06-01 北京字跳网络技术有限公司 Project stream determination method and apparatus, electronic device, and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1395193A (en) * 2001-07-05 2003-02-05 英业达股份有限公司 Method fro producing dynamic form which can be edited on web page
CN1638414A (en) * 2003-12-25 2005-07-13 日本电气株式会社 Data refreshing system for reproduction and data refreshing method for reproduction
CN104239429A (en) * 2014-08-26 2014-12-24 北京航天在线网络科技有限公司 Method and device for editing flowchart in webpage
CN104751276A (en) * 2015-03-20 2015-07-01 七朵云(贵州)科技股份有限公司 Working process managing method based on database
CN106371851A (en) * 2016-09-19 2017-02-01 深圳市彬讯科技有限公司 Activiti-based business flow management system
CN106610774A (en) * 2015-10-23 2017-05-03 北京国双科技有限公司 Webpage table editing method and device
CN107369003A (en) * 2017-07-10 2017-11-21 唐郡 A kind of intelligent laboratory management system method and system
CN107729392A (en) * 2017-09-19 2018-02-23 广州市妇女儿童医疗中心 Text structure method, apparatus, system and non-volatile memory medium
CN107766428A (en) * 2017-09-15 2018-03-06 北京大学 A kind of automatic method and system for realizing data visualization

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1395193A (en) * 2001-07-05 2003-02-05 英业达股份有限公司 Method fro producing dynamic form which can be edited on web page
CN1638414A (en) * 2003-12-25 2005-07-13 日本电气株式会社 Data refreshing system for reproduction and data refreshing method for reproduction
CN104239429A (en) * 2014-08-26 2014-12-24 北京航天在线网络科技有限公司 Method and device for editing flowchart in webpage
CN104751276A (en) * 2015-03-20 2015-07-01 七朵云(贵州)科技股份有限公司 Working process managing method based on database
CN106610774A (en) * 2015-10-23 2017-05-03 北京国双科技有限公司 Webpage table editing method and device
CN106371851A (en) * 2016-09-19 2017-02-01 深圳市彬讯科技有限公司 Activiti-based business flow management system
CN107369003A (en) * 2017-07-10 2017-11-21 唐郡 A kind of intelligent laboratory management system method and system
CN107766428A (en) * 2017-09-15 2018-03-06 北京大学 A kind of automatic method and system for realizing data visualization
CN107729392A (en) * 2017-09-19 2018-02-23 广州市妇女儿童医疗中心 Text structure method, apparatus, system and non-volatile memory medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111798128A (en) * 2020-07-02 2020-10-20 东土科技(宜昌)有限公司 Interface operation method of process flow, computer equipment and storage medium
WO2023093487A1 (en) * 2021-11-26 2023-06-01 北京字跳网络技术有限公司 Project stream determination method and apparatus, electronic device, and storage medium

Similar Documents

Publication Publication Date Title
CN107103448A (en) Data integrated system based on workflow
US20060111953A1 (en) Virtual knowledge management system
CN105069025A (en) Intelligent aggregation visualization and management control system for big data
CN101662493A (en) Data acquiring method, system and server of user access path
CN111988176A (en) Fault positioning system visualization method based on simulation topological structure
CN108845798A (en) A kind of visualization big data task cradle and processing method
CN101414945A (en) Platform system and method for building information system
CN110472925A (en) A kind of laboratory test process management system and method based on webpage flow chart
CN109933416A (en) A kind of moving method, device and storage medium using data
CN112540975B (en) Multi-source heterogeneous data quality detection method and system based on petri net
CN107609794A (en) A kind of technology maturity evaluation information processing unit
CN107220515A (en) Post-abortion cares about intelligent follow-up management system
Sarfraz et al. ICT revolution from traditional office to virtual office: A study on teleworking during the COVID-19 pandemic
CN111461575A (en) Visual task management and control system and method
CN106971289A (en) A kind of collaborative design method and cooperative system based on data-driven
CN115222077A (en) Work order operation and maintenance statistical analysis system
CN110348607A (en) The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system
CN114281509A (en) Spacecraft multi-user collaborative task planning system based on scene description
CN108920724A (en) Data check method, apparatus and system
Berenbach A 25 year retrospective on model-driven requirements engineering
CN102509195A (en) Digitalized management platform for call center
CN108564281A (en) The implementation method of outsourcing work task scheduling system based on structuring
KR20060012572A (en) System and methods for managing distributed design chains
CN104598211B (en) The method and device of management service software program
CN110391943A (en) A kind of distributed meteorological data life cycle building and monitoring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination