CN110322147A - A kind of Project Supervision approaches to IM and system - Google Patents

A kind of Project Supervision approaches to IM and system Download PDF

Info

Publication number
CN110322147A
CN110322147A CN201910596613.9A CN201910596613A CN110322147A CN 110322147 A CN110322147 A CN 110322147A CN 201910596613 A CN201910596613 A CN 201910596613A CN 110322147 A CN110322147 A CN 110322147A
Authority
CN
China
Prior art keywords
project
sub
management
information
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910596613.9A
Other languages
Chinese (zh)
Inventor
涂珍伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yuanfeng Construction Project Management Co Ltd
Original Assignee
Sichuan Yuanfeng Construction Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yuanfeng Construction Project Management Co Ltd filed Critical Sichuan Yuanfeng Construction Project Management Co Ltd
Priority to CN201910596613.9A priority Critical patent/CN110322147A/en
Publication of CN110322147A publication Critical patent/CN110322147A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of Project Supervision approaches to IM and systems, the following steps are included: S1, engineering project to be resolved into multiple and different sub-projects, and management process, acceptance specification, working approaches of surveillance and measure are preset to every sub-project, and obtain file needed for every sub-project and carry out filing and form engineering record table;When S2, supervising engineer carry out management in every sub-project, judge the information actually obtained and presupposed information whether different from safe range, if information carries out early warning different from safe range, to the sub-project, and analyzes to adopt an effective measure after reason and be corrected;Conversely, thening follow the steps S3;S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.Construction project is standardized decomposition according to project programme, and the documentation formed to every sub-project is filed in time and orderly management, improves the efficiency of management.

Description

A kind of Project Supervision approaches to IM and system
Technical field
The present invention relates to project supervision technical fields, more particularly, to a kind of Project Supervision approaches to IM and are System.
Background technique
Project supervision refers to engineering project of the supervisor with related qualification by the commission of Party A, according to state approval File, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts are built, Party A is represented A kind of proficient service activity to the engineering construction implementing monitoring of Party B.Project supervision is a kind of paid engineering consulting clothes Business;It is to be entrusted to carry out by Party A;The main foundation of management is law, regulation, technical standard, related contract and file;Management Criterion be to abide by the law, is sincere, is just and scientific;Management purpose is to ensure that engineering construction quality and safety, improves engineering construction water It is flat, give full play to returns of investment.
Project Supervision unit is entrusted by construction unit, according to laws and regulations, engineering construction standard, prospective design file And contract, project delivery method, cost, progress are controlled in the construction stage, contract, information are managed, to engineering The relationship of construction related side is coordinated, and fulfils the service activity of construction project production safety management statutory obligation.Management list Position should requirement according to the scale, property, owner of construction project to management, appoint competent personnel to serve as Project Director science and engineering journey Teacher, chief supervision engineer are the person in overalls of Project Supervision work, he is responsible for interior to supervisor, to export-oriented industry It is main to be responsible for.The personnel component of Supervision Organization is the important content in management tender document, is that owner approves during the assessment of bids, always Supervising engineer, should be according to the supervision commission contract content group of management outline content and signing when setting up Project Surveillance mechanism It builds, and is timely adjusted in survey control measure and specific implementation plan execute.
Currently, the management of Project Supervision information, most of is all to fill in various tables manually, artificial progress information Transmitting and management.It using this way to manage, can not accomplish standardized management, can not accomplish the integration of information and share entirely, And the inefficiency of management, at high cost, poor safety performance.
Summary of the invention
The first object of the present invention is to provide a kind of Project Supervision approaches to IM, and engineering project is divided It cuts, standardizes the conclusion of supervisory information more, improve the efficiency of management.
Foregoing invention purpose of the invention has the technical scheme that a kind of Project Supervision information Management method, comprising the following steps:
S1, engineering project is resolved into multiple and different sub-projects, and management process, receiving gauge is preset to every sub-project Model, working approaches of surveillance and measure, and obtain file needed for every sub-project carry out filing form engineering record table;
When S2, supervising engineer carry out management in every sub-project, judge that the information actually obtained and presupposed information are It is no different from safe range, if information carries out early warning different from safe range, to the sub-project, and taken effectively after analyzing reason Measure is corrected;Conversely, thening follow the steps S3;
S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.
By using above-mentioned technical proposal, construction project is standardized by decomposition according to project programme, carefully Change the work to every sub-project, and the documentation formed to every sub-project is filed in time and orderly management, realizes It to the real time monitoring of engineering project, standardizes the conclusion of supervisory information more, improves the efficiency of management;Meanwhile to every sub-project Supervisory information analyzed and determined, is had and is corrected using taking timely measure.
The present invention is further arranged to: in step S1, every sub-project is also preset with progress chart, and supervising engineer exists Occur sub-project when management to fail to finish on schedule, then analyze reason, existing main problem and difficulty, and proposes how solution Opinion.
By using above-mentioned technical proposal, the deadline and progress chart of every sub-project are compared, obtained The performance of the sub-project, thus the progress situation of the entire engineering project of control, convenient for the work plan to later period sub-project Carry out intelligent adjustment.
The present invention is further arranged to: in step S2, the information actually obtained includes file, video, image and sound.
The present invention is further arranged to: in step S2, supervising engineer should be in time by the various quality in engineering project Situation is concluded and is analyzed in earnest, and is contrasted with related quality standard, is found out deviation and is corrected.
The second object of the present invention is to provide a kind of Project Supervision information management system, and engineering project is divided It cuts, standardizes the conclusion of supervisory information more, improve the efficiency of management.
Foregoing invention purpose of the invention has the technical scheme that a kind of Project Supervision information Management system, including server and management terminal;
The server for typing and store the management process of every sub-project, acceptance specification, working approaches of surveillance and The real time data of measure and project progress simultaneously forms engineering record table;
The management terminal and the server communication understand, and is obtained by the supervising engineer of every sub-project by management is practical Information and sub-project deadline typing engineering record table;
The server includes analysis module and risk evaluation module, and the analysis module is used to carry out the information of institute's typing big Data Integration, analysis simultaneously form data analytical statement, and the risk evaluation module is used to carry out the exception and reason found Automatic risk assessment, and early warning is issued automatically.
By using above-mentioned technical proposal, construction project is standardized by decomposition according to project programme, carefully Change the work to every sub-project, and the documentation formed to every sub-project is filed in time and orderly management, realizes To the real time monitoring of engineering project;Analysis module is integrated the deadline of each sub-project and quality, is analyzed, and engineering is found out The exception and reason that construction occurs;Adjustment is carried out by deadline of the risk evaluation module to each sub-project, so that respectively Sub-project is compact to be connected, to improve engineering efficiency.
The present invention is further arranged to: the server further includes reminding module, and the reminding module is used to remember when engineering When recording table update, management terminal is sent by engineering record table and supervising engineer is reminded.
By using above-mentioned technical proposal, reminding module reminds the completion of each sub-project, is conducive to Supervision engineering Teacher reaches construction site in time.
In conclusion advantageous effects of the invention are as follows: marked construction project according to project programme Standardization is decomposed, and refine to the work of every sub-project, and the documentation formed to every sub-project is filed and had in time Sequence management is realized to the real time monitoring of engineering project, standardizes the conclusion of supervisory information more, and the efficiency of management is improved;Meanwhile to every The supervisory information of sub-project analyzed and determined, is had and is corrected using taking timely measure.
Detailed description of the invention
Fig. 1 is the system block diagram of the embodiment of the present invention.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of Project Supervision approaches to IM, as shown in Figure 1, comprising the following steps: S1, decompose engineering project At multiple and different sub-projects, and management process, acceptance specification, working approaches of surveillance are preset to every sub-project and arranged Apply, and obtain file needed for every sub-project carry out filing form engineering record table;S2, supervising engineer are in each subitem When carrying out management in mesh, judge the information actually obtained and presupposed information whether different from safe range, if information different from Safe range then carries out early warning to the sub-project, and analyzes to adopt an effective measure after reason and be corrected;Conversely, then executing step Rapid S3;S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.
Construction project is standardized decomposition according to project programme, refine to the work of every sub-project, And the documentation formed to every sub-project is filed in time and orderly management, realizes the real time monitoring to engineering project, It standardizes the conclusion of supervisory information more, improves the efficiency of management;Meanwhile the supervisory information of every sub-project is analyzed and determined, Have and is corrected using taking timely measure.
In step S1, every sub-project is also preset with progress chart, and supervising engineer occurs sub-project in management not It can finish on schedule, then analyze reason, existing main problem and difficulty, and propose how the opinion solved.To every sub-project Deadline compared with progress chart, the performance of the sub-project is obtained, thus control entire engineering project Progress situation carries out intelligent adjustment convenient for the work plan to later period sub-project.In step S2, the information actually obtained includes File, video, image and sound;In step S2, supervising engineer should in time by the various quality conditions in engineering project into Row is concluded and is analyzed in earnest, and is contrasted with related quality standard, is found out deviation and is corrected.
A kind of Project Supervision information management system, including server and management terminal;Server is for typing and deposits The real time data of management process, acceptance specification, working approaches of surveillance and the measure and project progress of storing up every sub-project is simultaneously Form engineering record table;Management terminal and the server communication understand, by the supervising engineer of every sub-project that management is real The information and sub-project deadline typing engineering record table that border obtains;Server includes analysis module and risk evaluation module, Analysis module is used to carry out big data integration, analysis to the information of institute's typing and forms data analytical statement, risk evaluation module For carrying out automatic risk assessment to the exception and reason found, and early warning is issued automatically.
Construction project is standardized decomposition according to project programme, refine to the work of every sub-project, And the documentation formed to every sub-project is filed in time and orderly management, realizes the real time monitoring to engineering project; Analysis module is integrated the deadline of each sub-project and quality, is analyzed, and the exception and reason of engineering construction appearance are found out; Adjustment is carried out by deadline of the risk evaluation module to each sub-project, is connected so that each sub-project is compact, from And improve engineering efficiency.Server further includes reminding module, and reminding module is used for when engineering record table updates, by engineering record Table is sent to management terminal and reminds supervising engineer;Reminding module reminds the completion of each sub-project, favorably Construction site is reached in time in supervising engineer.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (6)

1. a kind of Project Supervision approaches to IM, which comprises the following steps:
S1, engineering project is resolved into multiple and different sub-projects, and management process, receiving gauge is preset to every sub-project Model, working approaches of surveillance and measure, and obtain file needed for every sub-project carry out filing form engineering record table;
When S2, supervising engineer carry out management in every sub-project, judge that the information actually obtained and presupposed information are It is no different from safe range, if information carries out early warning different from safe range, to the sub-project, and taken effectively after analyzing reason Measure is corrected;Conversely, thening follow the steps S3;
S3, the information actually obtained and corresponding sub-project are stored, renewal project record sheet.
2. a kind of Project Supervision approaches to IM according to claim 1, which is characterized in that in step S1, often Sub-project is also preset with progress chart, and supervising engineer occurs sub-project in management and fails to finish on schedule, then analyzes original Because, existing for main problem and difficulty, and propose how solve opinion.
3. a kind of Project Supervision approaches to IM according to claim 1, which is characterized in that real in step S2 The information that border obtains includes file, video, image and sound.
4. a kind of Project Supervision approaches to IM according to claim 1, which is characterized in that in step S2, prison Reason engineer should the various quality conditions in engineering project be concluded and be analyzed in earnest in time, and with related quality mark Standard contrasts, and finds out deviation and is corrected.
5. a kind of Project Supervision information management system, which is characterized in that including server and management terminal;
The server for typing and store the management process of every sub-project, acceptance specification, working approaches of surveillance and The real time data of measure and project progress simultaneously forms engineering record table;
The management terminal and the server communication understand, and is obtained by the supervising engineer of every sub-project by management is practical Information and sub-project deadline typing engineering record table;
The server includes analysis module and risk evaluation module, and the analysis module is used to carry out the information of institute's typing big Data Integration, analysis simultaneously form data analytical statement, and the risk evaluation module is used to carry out the exception and reason found Automatic risk assessment, and early warning is issued automatically.
6. a kind of Project Supervision information management system according to claim 5, which is characterized in that the server is also Including reminding module, the reminding module is used to send management terminal simultaneously for engineering record table when engineering record table is updated Supervising engineer is reminded.
CN201910596613.9A 2019-07-04 2019-07-04 A kind of Project Supervision approaches to IM and system Withdrawn CN110322147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910596613.9A CN110322147A (en) 2019-07-04 2019-07-04 A kind of Project Supervision approaches to IM and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910596613.9A CN110322147A (en) 2019-07-04 2019-07-04 A kind of Project Supervision approaches to IM and system

Publications (1)

Publication Number Publication Date
CN110322147A true CN110322147A (en) 2019-10-11

Family

ID=68122498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910596613.9A Withdrawn CN110322147A (en) 2019-07-04 2019-07-04 A kind of Project Supervision approaches to IM and system

Country Status (1)

Country Link
CN (1) CN110322147A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110991990A (en) * 2019-11-25 2020-04-10 四川华通建设工程造价管理有限责任公司 Engineering project cost management system
CN111210196A (en) * 2019-12-27 2020-05-29 宁波国际投资咨询有限公司 Intelligent engineering supervision information supervision method
CN111476425A (en) * 2020-04-15 2020-07-31 中道明华建设工程项目咨询有限责任公司 Engineering project cost progress supervision system and method
CN111738486A (en) * 2020-05-09 2020-10-02 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid inviting and consultation
CN111861166A (en) * 2020-07-06 2020-10-30 广东德尔智慧工厂科技有限公司 Asset health management method, device, system, computer equipment and storage medium
CN111861165A (en) * 2020-07-06 2020-10-30 广东德尔智慧工厂科技有限公司 Project management method and device, computer equipment and storage medium
CN112446690A (en) * 2020-12-15 2021-03-05 湖北省水利水电规划勘测设计院 Hydraulic engineering building-up modularized management system and method
CN112766645A (en) * 2020-12-30 2021-05-07 苏州深鉴信息科技有限公司 Supervision and management platform for whole process of information project
CN113362033A (en) * 2021-06-09 2021-09-07 四川省同瑞达建设工程有限公司 Construction progress management method, system and storage medium for building project
CN113988804A (en) * 2021-10-28 2022-01-28 公诚管理咨询有限公司 Digital management method, device, equipment and storage medium for whole engineering construction process
CN114331190A (en) * 2021-12-31 2022-04-12 惠州市建设集团工程建设监理有限公司 Method and system for checking and actually measuring engineering supervision quality
CN114386851A (en) * 2022-01-13 2022-04-22 广东鸿厦工程管理咨询有限公司 BIM-based municipal public works supervision method and system
CN114924535A (en) * 2022-05-18 2022-08-19 北京天辰信科技有限公司 Method and system for acquiring information from engineering data to perform safety production early warning
CN115358721A (en) * 2022-08-30 2022-11-18 中新华都国际工程咨询有限公司 Engineering supervision information supervision system and method based on big data
CN115409395A (en) * 2022-09-06 2022-11-29 河南正海实业有限公司 Quality acceptance inspection method and system for hydraulic construction engineering
CN115719158A (en) * 2022-11-28 2023-02-28 深圳市汇健智慧医疗有限公司 Process management method for implementing event stream
CN116186136A (en) * 2023-01-06 2023-05-30 三峡高科信息技术有限责任公司 Engineering construction implementation stage data processing method and system

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110991990A (en) * 2019-11-25 2020-04-10 四川华通建设工程造价管理有限责任公司 Engineering project cost management system
CN111210196A (en) * 2019-12-27 2020-05-29 宁波国际投资咨询有限公司 Intelligent engineering supervision information supervision method
CN111476425A (en) * 2020-04-15 2020-07-31 中道明华建设工程项目咨询有限责任公司 Engineering project cost progress supervision system and method
CN111738486B (en) * 2020-05-09 2024-03-01 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid-inviting and consultation
CN111738486A (en) * 2020-05-09 2020-10-02 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid inviting and consultation
CN111861166A (en) * 2020-07-06 2020-10-30 广东德尔智慧工厂科技有限公司 Asset health management method, device, system, computer equipment and storage medium
CN111861165A (en) * 2020-07-06 2020-10-30 广东德尔智慧工厂科技有限公司 Project management method and device, computer equipment and storage medium
CN112446690A (en) * 2020-12-15 2021-03-05 湖北省水利水电规划勘测设计院 Hydraulic engineering building-up modularized management system and method
CN112766645A (en) * 2020-12-30 2021-05-07 苏州深鉴信息科技有限公司 Supervision and management platform for whole process of information project
CN113362033A (en) * 2021-06-09 2021-09-07 四川省同瑞达建设工程有限公司 Construction progress management method, system and storage medium for building project
CN113988804A (en) * 2021-10-28 2022-01-28 公诚管理咨询有限公司 Digital management method, device, equipment and storage medium for whole engineering construction process
CN114331190A (en) * 2021-12-31 2022-04-12 惠州市建设集团工程建设监理有限公司 Method and system for checking and actually measuring engineering supervision quality
CN114386851B (en) * 2022-01-13 2023-01-17 广东鸿厦工程管理咨询有限公司 BIM-based municipal public works supervision method and system
CN114386851A (en) * 2022-01-13 2022-04-22 广东鸿厦工程管理咨询有限公司 BIM-based municipal public works supervision method and system
CN114924535A (en) * 2022-05-18 2022-08-19 北京天辰信科技有限公司 Method and system for acquiring information from engineering data to perform safety production early warning
CN114924535B (en) * 2022-05-18 2022-12-02 北京天辰信科技有限公司 Method and system for acquiring information from engineering data to perform safety production early warning
CN115358721A (en) * 2022-08-30 2022-11-18 中新华都国际工程咨询有限公司 Engineering supervision information supervision system and method based on big data
CN115409395A (en) * 2022-09-06 2022-11-29 河南正海实业有限公司 Quality acceptance inspection method and system for hydraulic construction engineering
CN115409395B (en) * 2022-09-06 2023-08-08 河南正海实业有限公司 Quality acceptance inspection method and system for hydraulic construction engineering
CN115719158A (en) * 2022-11-28 2023-02-28 深圳市汇健智慧医疗有限公司 Process management method for implementing event stream
CN116186136A (en) * 2023-01-06 2023-05-30 三峡高科信息技术有限责任公司 Engineering construction implementation stage data processing method and system
CN116186136B (en) * 2023-01-06 2024-03-12 三峡高科信息技术有限责任公司 Engineering construction implementation stage data processing method and system

Similar Documents

Publication Publication Date Title
CN110322147A (en) A kind of Project Supervision approaches to IM and system
CN111861358A (en) Building information integration platform based on BIM technology
CN107862450A (en) Performance appraisal system and method
CN108564347A (en) Overhaul whole process management system and lean inspection base
CN102117444A (en) System for comprehensive arrangement and execution management of production equipment maintenance plan
CN109299851A (en) A kind of intelligence progress kinetic-control system
CN105931029A (en) Production management system for girder fabrication yard based on BIM
CN109034404A (en) A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses
CN111861799A (en) Intelligent construction site management system and method
CN110570113A (en) Work order processing method and system
CN110232504A (en) A kind of quality manufacturing execution system platform and terminal
CN109146302A (en) Overhaul of the equipments task processing method and system
CN109636142A (en) A kind of technique head detecting method and device based on MES
CN109034673A (en) A kind of method, system, equipment and storage medium for realizing the synchronous control of engineering construction project
CN113780841A (en) Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set
CN115860410A (en) WeChat-based large civil engineering construction potential safety hazard management system
CN114677117A (en) Building engineering management system and device
CN114677044A (en) Management system and method for intelligent building supervision engineering project
CN113379370A (en) Segment production informatization management system
CN112581304A (en) Manufacturing workshop informatization management system and use method thereof
CN201974848U (en) Management system for comprehensively arranging and executing maintenance plan of production equipment
CN116596463A (en) Intelligent management and control system for aviation heat meter processing workshop
CN110865976A (en) Paperless intelligent SOP management platform
CN115456219A (en) Operation and maintenance monitoring method and device of equipment and related equipment
CN114492685A (en) Intelligent system for point inspection of factory equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20191011