Prior art keywords
project
label
information
destination item
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910618938.2A
Other languages
Chinese (zh)
Inventor
王彦平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Notice Network Technology Co Ltd
Original Assignee
Xi'an Notice Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Notice Network Technology Co Ltd filed Critical Xi'an Notice Network Technology Co Ltd
Priority to CN201910618938.2A priority Critical patent/CN110310100A/en
Publication of CN110310100A publication Critical patent/CN110310100A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2228Indexing structures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2474Sequence data queries, e.g. querying versioned data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Human Resources & Organizations (AREA)
  • Software Systems (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Computational Linguistics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of project management method, device, electronic equipment and storage medium, is related to software technology field.This method comprises: obtain waiting task, waiting task include release label, in waiting task the mark of the corresponding destination item management system of projects, projects project label;According to the project information of projects in release label fit version database;The project information of projects is added in corresponding destination item management system in the comment information of project label, so that passing through the project label in object management system, establish the incidence relation in waiting task and waiting task between the project information of projects, so that the project information of the links of waiting task can be got by the comment information of project label in destination item management system, the unified management to waiting task links is realized.

Description

Project management method, device, electronic equipment and storage medium
Technical field
The present invention relates to software technology field, in particular to a kind of project management method, device, electronic equipment and storage are situated between Matter.
Background technique
It is lasting to deliver (Continuous delivery, CD), it is a kind of soft project gimmick, allows the output of software product Process is completed in a short cycle, with guarantee software can stablize, it is lasting be maintained at the situation that can be issued at any time so that Building, test and the publication of software become faster and more frequently, reduce cost and the time of software development, reduce risks.
Existing, in lasting delivery, enterprise generally can press class to product, exploitation, test and O&M for the ease of management Other grouping management, this will make there is stealthy " wall " between communication between each department, and each department only understands oneself department Affairs, for example, product and developing department may know quite well product demand, but test and O&M and do not know about product demand.
But existing this mode, due to there is recessive " wall " independently of each other between each department, product demand can not be held Links in continuous delivery process are known, the unified management to links cannot be achieved.
Summary of the invention
It is an object of the present invention in view of the deficiency of the prior art, provide a kind of project management method, device, Electronic equipment and storage medium, to solve the problems, such as in the prior art not being managed collectively project links.
To achieve the above object, technical solution used in the embodiment of the present invention is as follows:
In a first aspect, the embodiment of the invention provides a kind of project management methods, comprising: waiting task is obtained, wait locate Reason task include release label, in waiting task the mark of the corresponding destination item management system of projects, projects item Target is known;According to the project information of projects in release label fit version database;The project information of projects is added to In corresponding destination item management system in the comment information of project label.
Optionally, above-mentioned that the project information of projects is added to project label in corresponding destination item management system After in comment information, further includes: add respective items purpose release label in each destination item management system.
Optionally, the above method further include: receive project inquiry request, project query request includes: the item of destination item Target is known;It is requested according to project query, inquiry obtains the comment information and/or release label of destination item.
Optionally, above-mentioned project information includes: code link;It is requested according to project query, inquiry obtains destination item After comment information, further includes: obtain the project information of destination item according to the comment information of destination item;It is linked according to code Jump to the corresponding code of destination item.
Optionally, the above method further include: generate the corresponding statistics list of projects, the index information for counting list includes The release label of projects, release label are associated with corresponding destination item management system.
Second aspect, the embodiment of the invention provides a kind of project management devices, comprising: obtain module, matching module and Adding module;Module is obtained, for obtaining waiting task, waiting task includes release label, every in waiting task The project label of the mark of the corresponding destination item management system of mesh, projects;Matching module, for being matched according to release label The project information of projects in edition data library;Adding module, for the project information of projects to be added to corresponding target In project management system in the comment information of project label.
Optionally, above-mentioned adding module is also used to add respective items purpose version mark in each destination item management system Label.
Optionally, above-mentioned apparatus further includes receiving module and enquiry module;Receiving module is asked for receiving project query It asks, project query request includes: the project label of destination item;Enquiry module, for being requested according to project query, inquiry is obtained The comment information and/or release label of destination item.
Optionally, above-mentioned project information includes: code link;Enquiry module is also used to be believed according to the comment of destination item Breath obtains the project information of destination item;The corresponding code of destination item is jumped to according to code link.
Optionally, above-mentioned apparatus further includes generation module, for generating the corresponding statistics list of projects, counts list Index information includes the release label of projects, and release label is associated with corresponding destination item management system.
The third aspect, the embodiment of the invention provides a kind of electronic equipment, comprising: processor, storage medium and bus are deposited Storage media is stored with the executable machine readable instructions of processor, when electronic equipment operation, between processor and storage medium By bus communication, processor executes machine readable instructions, executing the project management method as described in above-mentioned first aspect Step.
Fourth aspect is stored with computer program the embodiment of the invention provides a kind of storage medium on storage medium, meter The step of project management method as described in above-mentioned first aspect is executed when calculation machine program is run by processor.
The beneficial effects of the present invention are:
In project management method provided in an embodiment of the present invention, device, electronic equipment and storage medium, by obtaining wait locate Reason task, waiting task include release label, the mark of the corresponding destination item management system of projects in waiting task, The project label of projects;According to the project information of projects in release label fit version database;By the project of projects Information is added in corresponding destination item management system in the comment information of project label, so that by object management system Project label, the incidence relation in waiting task and waiting task between the project information of projects is established, to make The project information for obtaining the links of waiting task can pass through the comment letter of project label in destination item management system Breath is got, and realizes the unified management to waiting task links.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is a kind of flow diagram of project management method provided in an embodiment of the present invention;
Fig. 2 is the flow diagram of another project management method provided in an embodiment of the present invention;
Fig. 3 is the flow diagram of another project management method provided in an embodiment of the present invention;
Fig. 4 is the flow diagram of another project management method provided in an embodiment of the present invention;
Fig. 5 is the flow diagram of another project management method provided in an embodiment of the present invention;
Fig. 6 is a kind of structural schematic diagram of project management device provided in an embodiment of the present invention;
Fig. 7 is the structural schematic diagram of another project management device provided in an embodiment of the present invention;
Fig. 8 is the structural schematic diagram of another project management device provided in an embodiment of the present invention;
Fig. 9 is a kind of electronic equipment structural schematic diagram provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
Fig. 1 is a kind of flow diagram of project management method provided in an embodiment of the present invention.The executing subject of this method Can be computer, server, processor, terminal etc. can be used for the equipment of project management.Optionally, this method can be applied In Taiga project management system, other similar project management system also can be applied to.
The application is illustrated by taking Taiga project management system as an example herein, wherein Taiga is free as one, increases income Project management platform, using Python Django Development of Framework, front end is realized based on AngularJS.As shown in Figure 1, the party Method includes:
S101, waiting task is obtained, waiting task includes release label, the corresponding mesh of projects in waiting task Mark the mark of project management system, the project label of projects.
Wherein, the task of waiting task, that is, to be managed, the waiting task can be product demand process, development process Or item file etc. to be managed in test process, which may include item code, project demands document etc., this Shen The type of waiting task is not defined please.
Optionally, when waiting task is item code, which can pass through preset code management system It imports, which can be Gitlab code management system or other similar code management system, In, Gitlab code management system can be accessed disclosed or private from trustship Git project warehouse by web interface People's project.Certainly, waiting task can also be obtained in other way, and the application is not herein to the acquisition of waiting task Mode is defined.
Release label in waiting task is used to identify the version information of waiting task, according to project different phase Different function can correspond to different release labels;The mark of the corresponding destination item management system of projects is used in waiting task In the classification of instruction destination item management system;The project label of projects is used to indicate waiting task and exists in waiting task Number, serial number in object management system etc. can be corresponded to uniquely in object management system wait locate with will pass through the mark Reason task, realization manage different waiting tasks respectively.
Optionally, the release label of waiting task, the corresponding destination item management system of projects in waiting task Mark, projects project label may be embodied in the code of waiting task, can also carry in waiting task File designation in, naturally it is also possible to be partially contained in the code of waiting task, part carry waiting task text In part name, the application is not limited the mode for including.
For example, destination item management system is Taiga project management system, waiting task Task is from Gitlab code It is obtained in management system, waiting task Task includes sub-project A1 and A2, and acquired waiting task Task may include Following the description: the release label of waiting task Task is V001, the corresponding destination item pipe of sub-project A1 in waiting task Reason system is identified as TG, and the corresponding destination item management system of sub-project A2 is identified as TG, sub-project in waiting task The project label of A1 and A2 is Git_Pro001.
Optionally, the release label of waiting task is included in the code of waiting task, every in waiting task The mark of the corresponding destination item management system of mesh, the project label of projects carry in the file designation of waiting task When, then sub-project A1 can be named using following naming methods in waiting task Task: TG-ref, wherein TG represents Taiga Project management system, ref refer to the project label that project is created in Taiga.
S102, according to the project information of projects in release label fit version database.
Waiting task includes release label, can be matched to the corresponding edition data of waiting task according to release label Library can get the project information of projects according in the matched edition data library of waiting task release label institute.Its In, edition data library includes the relevant information of waiting task corresponding to the release label, can be obtained by edition data library Corresponding project information is got, optionally, which may include: project demands information, project development information, item range estimation Information, item address, version information, code description information, marking code, code update record, author information etc. are tried, according to not Same waiting task, can correspond to corresponding project information, the application just repeats no more herein.
For example, corresponding project information includes project when waiting task is obtained from Gitlab code management system When address, project testing information and marking code, then corresponding item address is Gitlab item address;Project testing information As Issue relevant information may include report etc. that bug, a function suggestion, the document of a software lack, each Issue should include all information and history of the problem, will be seen that all aspects of problem convenient for the staff of Issue And process;Marking code can correspond to the unique ID of the distinctive code of Gitlab.
S103, the comment that the project information of projects is added to project label in corresponding destination item management system is believed In breath.
Wherein, the management of destination item management system by the project label in destination item management system manage it is different to Processing task, so as to distinguish each waiting task;And the project information of projects is added to corresponding target In project management system in the comment information of project label, so that waiting task is corresponding corresponding in destination item management system Project label, again include the item of projects in waiting task in the comment information of project label in destination item management system Mesh information, and then the comment information by obtaining project label in destination item management system, can get waiting task The project information of middle projects allows to know the relevant item information of projects in the waiting task.
For example, the naming method of waiting task is TG-ref, wherein TG represents Taiga project management system, and ref refers to The project label of project is created in Taiga, project information corresponding to the waiting task is M, then according to the waiting task Naming method the waiting task can be matched in Taiga project management system, and will be corresponding to the waiting task Project information M be added into Taiga project management system project label be ref comment information in.
In conclusion in project management method provided herein, by obtaining waiting task, waiting task packet Include release label, in waiting task the mark of the corresponding destination item management system of projects, projects project label;Root According to the project information of projects in release label fit version database;The project information of projects is added to corresponding target In project management system in the comment information of project label, so that being established by the project label in object management system wait locate Incidence relation in reason task and waiting task between the project information of projects, so that each ring of waiting task The project information of section can be got by the comment information of project label in destination item management system, be realized to be processed The unified management of task links.
Fig. 2 is the flow diagram of another project management method provided in an embodiment of the present invention.Optionally, such as Fig. 2 institute Show, it is above-mentioned that the project information of projects is added to it in the comment information of project label in corresponding destination item management system Afterwards, further includes:
S201, respective items purpose release label is added in each destination item management system.
It is alternatively possible to release label corresponding to projects is added in each object management system, specifically when addition, It can be added in each destination item management system in comment information corresponding to project label, it can also will be corresponding to projects Release label be appended to behind the project label of projects, i.e., by: into one in a manner of the project label-release label of projects Step mark projects, may be selected corresponding addition manner according to different application scenarios, the application is not herein to the addition side Formula is defined.
From the foregoing, it will be observed that the application by each destination item management system add respective items purpose release label, thus So that project demands information, project development information, project testing information and version information phase in task items information to be managed Association, so that code auditor can inquire according to project demands information and audit the function in project development process Item code;Code tester personnel are allowed during project testing to inquire the release label at any time corresponding to be processed The performance of the project demands information of task, project development information and project testing information, so as to tester can and When tracking and testing, realize gathering for the version relevant information of each waiting task, break " partition wall " limitation, each link staff The relevant risk in each waiting task operating process can be assessed, for example operation maintenance personnel is discovered brought by tables of data modification task It, can be according to each waiting task when data risk or developer perceive the spilling risk of memory brought by caching task Old version label return back to old version, or the content for being included according to project information, quickly positions the relevant people of the project Member's information, is modified correlative code information, and then assesses rollback risk, realizes to waiting task integrated management.
Fig. 3 is the flow diagram of another project management method provided in an embodiment of the present invention.Optionally, such as Fig. 3 institute Show, the above method further include:
S301, project inquiry request is received, project query request includes: the project label of destination item.
Project query is requested for inquiring corresponding project information, project query request packet in destination item management system Include the project label of destination item, i.e., by inputting the project label of the destination item to be inquired in object management system, Corresponding project information can be inquired in destination item management system.
Certainly, destination item can be the exploration project in development process, the test item in test process, be also possible to The relevant item in other stages, the application are defined not to this.
It should be noted that above-mentioned project query request can be associated user's input, it is also possible to other equipment hair It send, is not specifically limited in the embodiment of the present application.
S302, it is requested according to project query, inquiry obtains the comment information and/or release label of destination item.
Receive project query request when, can according to the project query request included in project label inquiry obtain Get comment information corresponding to the project label and/or release label, so can according to the comment information of destination item and/ Or release label, know destination item in the project information of links.
Optionally, according to project query request inquired when, can choose inquiry obtain destination item comment information, Or inquiry obtains the release label of destination item, can also inquire the comment information and release label for obtaining destination item, root According to actual application scenarios and demand, corresponding inquiry mode may be selected, the application does not limit the inquiry mode herein It is fixed.
In the present embodiment, inquiry is carried out based on project query request and obtains comment information and/or release label, may be implemented In any link of project, any operative personnel can inquire the item address of project corresponding to the release label, institute quickly The relevant project information such as the problem of solved in the project demands of completion, test process, code update record, and then it is convenient for item Mesh administrative staff carry out integrated management to the project.
Fig. 4 is the flow diagram of another project management method provided in an embodiment of the present invention.Optionally, such as Fig. 4 institute Show, above-mentioned project information includes: code link.
Correspondingly, above-mentioned to be requested according to project query, inquiry obtains after the comment information of destination item, further includes:
S401, the project information that destination item is obtained according to the comment information of destination item.
Since the project information of projects is added to corresponding destination item management system in object management system In system in the comment information of project label, then the project that can obtain destination item by the comment information of destination item is believed Breath, wherein content included by project information can be found in above-mentioned relevant portion, and details are not described herein by the application.
S402, the corresponding code of destination item is jumped to according to code link.
Project information includes code link, and code link can correspond to target item destination address, therefore, when needs know When the detailed code information of destination item, it can be linked according to the code in the comment information of destination item and jump to destination item Corresponding code facilitates the work people of links so that inquiring corresponding code in object management system Member checks.
Optionally, destination item is corresponding when being the exploration project in development process, then correspondence jumps to the exploration project Corresponding exploitation code;Destination item is corresponding when being the test item in test process, then correspondence jumps to the test item Corresponding test code then jumps to corresponding code section for different destination items when jumping, the application is herein no longer It repeats.
Fig. 5 is the flow diagram of another project management method provided in an embodiment of the present invention.Optionally, such as Fig. 5 institute Show, the above method further include:
S501, the corresponding statistics list of projects being generated, the index information for counting list includes the release label of projects, Release label is associated with corresponding destination item management system.
The corresponding statistics list of projects is used to count the project information of projects, may include the version mark of projects Label, the project label of projects, mark of the corresponding destination item management system of projects etc..
Optionally, the index information for counting list may include the release label of projects, and release label association pair The object management system answered, and then according to the statistics list of projects, the version of projects can be got in the statistics list This label, and corresponding destination item management system can be determined according to the release label, allow in the objective management system Corresponding project information is obtained in system, corresponding mesh can be inquired according to the release label of projects convenient for project manager Mark project management system.
Optionally, the release label of the projects for being included according to statistics list index information and release label association pair When the list of requirements of destination item, test list, component version list, update also can be generated in the destination item management system answered Between list etc., corresponding list is produced according to actual demand, details are not described herein by the application.
Fig. 6 is a kind of structural schematic diagram of project management device provided in an embodiment of the present invention.The device basic principle and The technical effect of generation is identical as aforementioned corresponding embodiment of the method, to briefly describe, does not refer to part in the present embodiment, can join Corresponding contents in test method embodiment.The device can integrate can be used in computer, server, processor, terminal etc. The equipment of project management.As shown in fig. 6, the device includes: to obtain module 110, matching module 120 and adding module 130.
Module 110 is obtained, for obtaining waiting task, waiting task includes release label, each in waiting task The project label of the mark of the corresponding destination item management system of project, projects;Matching module 120, for according to version mark Sign the project information of projects in fit version database;Adding module 130, for the project information of projects to be added to institute In corresponding destination item management system in the comment information of project label.
Optionally, above-mentioned adding module 130 is also used to add respective items purpose version in each destination item management system Label.
Fig. 7 is the structural schematic diagram of another project management device provided in an embodiment of the present invention.Optionally, such as Fig. 7 institute Show, above-mentioned apparatus further includes receiving module 140 and enquiry module 150;Receiving module 140, for receiving project inquiry request, item Mesh inquiry request includes: the project label of destination item;Enquiry module 150, for being requested according to project query, inquiry obtains mesh The comment information and/or release label of mark project.
Optionally, above-mentioned project information includes: code link;Enquiry module 150 is also used to the comment according to destination item The project information of acquisition of information destination item;The corresponding code of destination item is jumped to according to code link.
Fig. 8 is the structural schematic diagram of another project management device provided in an embodiment of the present invention.Optionally, such as Fig. 8 institute Show, above-mentioned apparatus further includes generation module 160, for generating the corresponding statistics list of projects, counts the index information of list Release label including projects, release label are associated with corresponding destination item management system.
The method that above-mentioned apparatus is used to execute previous embodiment offer, it is similar that the realization principle and technical effect are similar, herein not It repeats again.
The above module can be arranged to implement one or more integrated circuits of above method, such as: one Or multiple specific integrated circuits (Application Specific Integrated Circuit, abbreviation ASIC), or, one Or multi-microprocessor (Digital Signal Processor, abbreviation DSP), or, one or more field programmable gate Array (Field Programmable Gate Array, abbreviation FPGA) etc..For another example, when some above module passes through processing elements When the form of part scheduler program code is realized, which can be general processor, such as central processing unit (Central Processing Unit, abbreviation CPU) or it is other can be with the processor of caller code.For another example, these modules can integrate Together, it is realized in the form of system on chip (system-on-a-chip, abbreviation SOC).
Fig. 9 is a kind of electronic equipment structural schematic diagram provided in an embodiment of the present invention.As shown in figure 9, the electronic equipment can To include: processor 210, storage medium 220 and bus 230, storage medium 220 is stored with the executable machine of processor 210 Readable instruction is communicated between processor 210 and storage medium 220 by bus 230, processor 210 when electronic equipment operation Machine readable instructions are executed, the step of to execute above-mentioned project management method.Specific implementation is similar with technical effect, here It repeats no more.
Optionally, the present invention also provides a kind of storage medium, computer program, computer program are stored on storage medium The step of above-mentioned project management method is executed when being run by processor.Specific implementation is similar with technical effect, here no longer It repeats.
In several embodiments provided by the present invention, it should be understood that disclosed device and method can pass through it Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only Only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can be tied Another system is closed or is desirably integrated into, or some features can be ignored or not executed.Another point, it is shown or discussed Mutual coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or logical of device or unit Letter connection can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
The above-mentioned integrated unit being realized in the form of SFU software functional unit can store and computer-readable deposit at one In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or the network equipment etc.) or processor (English: processor) execute this hair The part steps of bright each embodiment the method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (English: Read-Only Memory, abbreviation: ROM), random access memory (English: Random Access Memory, letter Claim: RAM), the various media that can store program code such as magnetic or disk.

Claims (10)

1. a kind of project management method characterized by comprising
Waiting task is obtained, the waiting task includes release label, the corresponding mesh of projects in the waiting task Mark the mark of project management system, the project label of each project;
According to the project information of the project each in the release label fit version database;
The project information of each project is added to commenting for project label described in the corresponding destination item management system By in information.
2. the method according to claim 1, wherein the project information by each project be added to pair After answering in the comment information of project label described in the destination item management system, further includes:
Respective items purpose release label is added in each destination item management system.
3. according to the method described in claim 2, it is characterized in that, the method also includes:
Reception project inquiry request, the project query request include: the project label of destination item;
It is requested according to the project query, inquiry obtains the comment information and/or release label of the destination item.
4. according to the method described in claim 3, it is characterized in that, the project information includes: code link;
Described to be requested according to the project query, inquiry obtains after the comment information of the destination item, further includes:
The project information of the destination item is obtained according to the comment information of the destination item;
The corresponding code of the destination item is jumped to according to code link.
5. according to the method described in claim 2, it is characterized in that, the method also includes:
The corresponding statistics list of projects is generated, the index information of the statistics list includes the release label of projects, described Release label is associated with corresponding destination item management system.
6. a kind of project management device characterized by comprising obtain module, matching module and adding module;
The acquisition module, for obtaining waiting task, the waiting task includes release label, the waiting task The project label of the mark of the corresponding destination item management system of middle projects, each project;The matching module is used for root According to the project information of each project in the release label fit version database;The adding module, being used for will be each described The project information of project is added in the comment information of project label described in the corresponding destination item management system.
7. device according to claim 6, which is characterized in that the adding module is also used in each destination item Respective items purpose release label is added in management system.
8. device according to claim 7, which is characterized in that further include receiving module and enquiry module;
The receiving module, for receiving project inquiry request, the project query request includes: the item target of destination item Know;The enquiry module, for being requested according to the project query, inquiry obtain the destination item comment information and/or Release label.
9. a kind of electronic equipment characterized by comprising processor, storage medium and bus, the storage medium storage is The executable machine readable instructions of processor are stated, when electronic equipment operation, are led between the processor and the storage medium Bus communication is crossed, the processor executes the machine readable instructions, to execute the project management as described in claim 1-5 is any The step of method.
10. a kind of storage medium, which is characterized in that be stored with computer program, the computer program on the storage medium It is executed when being run by processor as described in claim 1-5 is any the step of project management method.
CN201910618938.2A 2019-07-09 2019-07-09 Project management method, device, electronic equipment and storage medium Pending CN110310100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910618938.2A CN110310100A (en) 2019-07-09 2019-07-09 Project management method, device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910618938.2A CN110310100A (en) 2019-07-09 2019-07-09 Project management method, device, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN110310100A true CN110310100A (en) 2019-10-08

Family

ID=68080650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910618938.2A Pending CN110310100A (en) 2019-07-09 2019-07-09 Project management method, device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110310100A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110865747A (en) * 2019-11-05 2020-03-06 广东优世联合控股集团股份有限公司 Project management method, device, medium and electronic equipment
CN111581915A (en) * 2020-04-29 2020-08-25 上海庆科信息技术有限公司 Project task management method, platform, electronic equipment and storage medium
CN111782635A (en) * 2020-06-29 2020-10-16 京东数字科技控股有限公司 Data processing method and apparatus, storage medium, and electronic apparatus
CN111833028A (en) * 2020-07-24 2020-10-27 中国工商银行股份有限公司 Project management method, project management device, electronic equipment and computer-readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103679369A (en) * 2013-12-14 2014-03-26 中国航空工业集团公司第六三一研究所 Method for project management for data
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system
US9646268B1 (en) * 2011-06-16 2017-05-09 Brunswick Corporation Systems and methods of supporting a product life cycle management (PLM) implementation
CN109669915A (en) * 2018-12-12 2019-04-23 浪潮(北京)电子信息产业有限公司 A kind of computer task management method, device and relevant device
CN109800019A (en) * 2018-12-17 2019-05-24 北京达佳互联信息技术有限公司 Code administration method, system, electronic equipment and computer readable storage medium
CN109976801A (en) * 2019-04-24 2019-07-05 网宿科技股份有限公司 A kind of code development method, system and computer readable storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9646268B1 (en) * 2011-06-16 2017-05-09 Brunswick Corporation Systems and methods of supporting a product life cycle management (PLM) implementation
CN103679369A (en) * 2013-12-14 2014-03-26 中国航空工业集团公司第六三一研究所 Method for project management for data
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system
CN109669915A (en) * 2018-12-12 2019-04-23 浪潮(北京)电子信息产业有限公司 A kind of computer task management method, device and relevant device
CN109800019A (en) * 2018-12-17 2019-05-24 北京达佳互联信息技术有限公司 Code administration method, system, electronic equipment and computer readable storage medium
CN109976801A (en) * 2019-04-24 2019-07-05 网宿科技股份有限公司 A kind of code development method, system and computer readable storage medium

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110865747A (en) * 2019-11-05 2020-03-06 广东优世联合控股集团股份有限公司 Project management method, device, medium and electronic equipment
CN111581915A (en) * 2020-04-29 2020-08-25 上海庆科信息技术有限公司 Project task management method, platform, electronic equipment and storage medium
CN111782635A (en) * 2020-06-29 2020-10-16 京东数字科技控股有限公司 Data processing method and apparatus, storage medium, and electronic apparatus
CN111782635B (en) * 2020-06-29 2024-04-05 京东科技控股股份有限公司 Data processing method and device, storage medium and electronic device
CN111833028A (en) * 2020-07-24 2020-10-27 中国工商银行股份有限公司 Project management method, project management device, electronic equipment and computer-readable storage medium
CN111833028B (en) * 2020-07-24 2023-08-11 中国工商银行股份有限公司 Project management method, apparatus, electronic device, and computer-readable storage medium

Similar Documents

Publication Publication Date Title
CN110310100A (en) Project management method, device, electronic equipment and storage medium
US9990383B2 (en) Constructing a data adaptor in an enterprise server data ingestion environment
KR102317535B1 (en) Methods and systems for implementing data tracking with software development kits
US8874704B2 (en) Semi-automatic discovery and generation of useful service blueprints
US8484662B2 (en) Systems and/or methods for end-to-end business process management, business event management, and/or business activity monitoring
CN109902105B (en) Data query system, method, device and storage medium for micro-service architecture
US8640149B2 (en) Method and apparatus for dynamic web service composition and invocation
US8799230B2 (en) Method and system for centralized issue tracking
EP2453397A1 (en) Systems and methods for business network management discovery and consolidation
CN101819551B (en) Method and system for recording service interaction data of enterprise message system
CN111090587A (en) Method, device and equipment for testing production point service and storage medium
US11665247B2 (en) Resource discovery agent computing device, software application, and method
CN110795697A (en) Logic expression obtaining method and device, storage medium and electronic device
CN109981745A (en) A kind of journal file processing method and server
US20120102075A1 (en) Management of configuration data structures in multi-layer data models
CN114997706A (en) Workflow-based business processing method, device, equipment and storage medium
US8978041B2 (en) Service virtualization container
CN108959294A (en) A kind of method and apparatus accessing search engine
CN111951040A (en) Information sending method and device, electronic equipment and storage medium
CN106330556B (en) A kind of method and apparatus calling related information for generating service module
CN114880321A (en) Service early warning method and device
CN113760969A (en) Data query method and device based on elastic search
US8250146B2 (en) Service adaptation machine
CN108920182A (en) A kind of novel source code statistical analysis technique and system
US11561979B2 (en) Dynamically detecting and correcting errors in queries

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191008