CN110276469A - Order distribution control method, device and computer system - Google Patents

Order distribution control method, device and computer system Download PDF

Info

Publication number
CN110276469A
CN110276469A CN201810215130.5A CN201810215130A CN110276469A CN 110276469 A CN110276469 A CN 110276469A CN 201810215130 A CN201810215130 A CN 201810215130A CN 110276469 A CN110276469 A CN 110276469A
Authority
CN
China
Prior art keywords
information
period
order
currently
issues
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810215130.5A
Other languages
Chinese (zh)
Other versions
CN110276469B (en
Inventor
胡鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alibaba China Network Technology Co Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201810215130.5A priority Critical patent/CN110276469B/en
Publication of CN110276469A publication Critical patent/CN110276469A/en
Application granted granted Critical
Publication of CN110276469B publication Critical patent/CN110276469B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • G06Q30/0635Processing of requisition or of purchase orders

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)

Abstract

The embodiment of the present application discloses order distribution control method, device and computer system, wherein the described method includes: determination issues the period, wherein issues operation in each order of period execution that issues;For currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein operating efficiency dynamic change at any time;According to period corresponding operating efficiency prediction result information is currently issued, Xiang Suoshu warehouse system carries out order and issues.By the embodiment of the present application, in the case where the operation complexity in warehouse can be made controllable, realize that warehouse production capacity maximizes.

Description

Order distribution control method, device and computer system
Technical field
This application involves order information processing technology fields, more particularly to order distribution control method, device and calculating Machine system.
Background technique
For online sale platform, storage+logistics is the very important part in entire electric business link.Especially Be " C2C " mode platform for, seller and buyer belong to the user of platform, and under initial mode, platform is only played Information bridges beam action, and the storage and logistics of specific commodity are settled a dispute by the parties concerned themselves by seller user.That is, seller needs voluntarily Prepare warehouse, after placing an order, the relevant staff of seller user needs to get ready the goods from warehouse buyer user, and gives correlation Logistics service provider execute specific delivery service.
But with the development of online sale platform, platform no longer functions only as information bridges beam action, but more Seller user can be helped to provide some solutions, to improve efficiency of service and quality on the whole.Wherein, unification is provided Storage and dispatching, be exactly one of them critically important aspect.For example, being provided for " Taobao " platform for seller user " green hand " system, " green hand " system deploy multiple " green hand storehouses " in multiple regions, for example, " Hang Zhoucang ", " Shang Haicang ", " Bei Jingcang ", etc..Seller user will can need the commodity sold by " Taobao " to get ready the goods in this " green hand storehouse " in advance, In this way, buyer user after line places an order, can execute corresponding picking and delivery, dispatching by the relevant staff in green hand storehouse Etc. relevant service.That is, in this scenario, seller user only needs early period by kinds of goods stock to specific " green hand Storehouse ", it is subsequent delivery and dispatching etc. work just can assist completing by " green hand " system, and can be realized picking, The unitized and standardization of delivery and dispatching, can promote the service efficiency of platform.In addition, due to the warehouse of Platform deployment Multiple areas can be dispersed in, and hence it is also possible to realize the nearest delivery of the shipping address according to specified by buyer, can be improved and match Efficiency is sent, allows users to receive bought commodity within the shorter time.Certainly, " green hand storehouse " not only can be only used for The kinds of goods of third party businessman user are stored, if platform has the commodity of self-operation class, corresponding kinds of goods can also be got ready the goods and arrive " dish Bird storehouse ".
In short, can be according to online sale the characteristics of, provide large-scale storehouse with supply chain system, realize to storage, dispatching Unitized management, certainly, for the businessman user of some large sizes, it is also possible to voluntarily set up oneself storehouse with supply linkwork System, etc..No matter which kind of situation specifically corresponded to, storehouse usually requires to be docked with ordering system with supply chain system, wherein orders Order data will be handed down to warehouse management system by single system, and warehouse management system goes out after commodity in order are packaged into package Library, and buyer is distributed to by Delivery Co., Ltd.But in the case where storage has the commodity of a large amount of businessman users, alternatively, some During large-scale advertising campaign etc., it is usually all very big for matching the quantity on order that supply chain system docks with storehouse, and often There is the concurrent situation of a large amount of orders.
Summary of the invention
This application provides order distribution control method, device and computer systems, and the operation in warehouse can be made complicated In the case that degree is controllable, realize that warehouse production capacity maximizes.
This application provides following schemes:
A kind of order processing system, comprising:
Client submits the request for generating order according to data object operation result for providing data object information;
Ordering system server, request for being submitted according to client generate order, and under warehouse system server Send out order information;
Warehouse system server, for generating shipping tasks according to the order information received, and after the completion of delivery, to Ordering system server returns to delivery completion notice message;
The ordering system server is also used to, and is predicted in real time the operating efficiency information of warehouse system, according to work The real-time prediction result information of industry efficiency, controls the speed that order issues.
A kind of order distribution control method, comprising:
Determination issues the period, wherein issues operation in each order of period execution that issues;
For currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein the operating efficiency with Time dynamic;
According to period corresponding operating efficiency prediction result information is currently issued, Xiang Suoshu warehouse system is carried out under order Hair.
A kind of order issues control device, comprising:
Period determination unit is issued, issues the period for determination, wherein is issued in each order of period execution that issues Operation;
Capability forecasting unit, for predicting the operating efficiency information of warehouse system for currently the period is issued, In, operating efficiency dynamic change at any time;
Control unit is issued, for issuing period corresponding operating efficiency prediction result information, the storehouse Xiang Suoshu according to current Library system carries out order and issues.
A kind of computer system, comprising:
One or more processors;And
With the memory of one or more of relational processors, the memory is for storing program instruction, the journey Sequence instruction is performed the following operations when reading execution by one or more of processors:
Determination issues the period, wherein issues operation in each order of period execution that issues;
For currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein the operating efficiency with Time dynamic;
According to period corresponding operating efficiency prediction result information is currently issued, Xiang Suoshu warehouse system is carried out under order Hair.
According to specific embodiment provided by the present application, this application discloses following technical effects:
It by the embodiment of the present application, may be implemented to issue the period each, the operating efficiency information of warehouse system carried out Prediction, then, according to predicting as a result, issuing the workload that the period issues to warehouse system to each and controlling.In this way, In the case where the operation complexity in warehouse can be made controllable, realize that warehouse production capacity maximizes.
Certainly, any product for implementing the application does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the schematic diagram of system architecture provided by the embodiments of the present application;
Fig. 2 is the flow chart of method provided by the embodiments of the present application;
Fig. 3 is the schematic diagram of device provided by the embodiments of the present application;
Fig. 4 is the schematic diagram of computer system provided by the embodiments of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on Embodiment in the application, those of ordinary skill in the art's every other embodiment obtained belong to the application protection Range.
In the embodiment of the present application, situation can be issued to warehouse system order to ordering system to control, wherein such as What coordinates the quantity on order and speed that ordering system is issued to warehouse management system, becomes problem in need of consideration, disposably Issue operation selection dimension and operation complexity that excessive order will increase warehouse;Disposably issue very little order then warehouse Production capacity can not maximize.For this purpose, can determine the operating efficiency information of warehouse system, then, order first when specific implementation System controls the quantity and speed that order issues according to the operating efficiency information of warehouse system.But the operation of warehouse system Efficiency is usually to be difficult to carry out order by way of presetting a fixed value to issue with time dynamic The control of speed.Therefore, in the embodiment of the present application, the period that order issues can be determined first, then, respectively under each The hair period determines the current operating efficiency information of warehouse system, carries out order downloading speed further according to current operating efficiency Control.For example, order volume is very big for the warehouse management system of the large size such as " green hand ", the processing capacity in warehouse is usual Can be in hundreds of thousands of single magnitudes per second, therefore, can specifically set is to issue the period for one in one second, that is, ordering system is every Second issues an order to warehouse, at this point, being assured that out the warehouse system workload per second that can be handled, and then accordingly really Make the quantity on order, etc. per second for needing to issue to warehouse system.Wherein, with each arrival for issuing the period, to warehouse The statistics of system work efficiency is also ongoing, for example, if ordering system is per second to make an order to warehouse system It issues, then while also needs the operating efficiency information in warehouse of statistics per second can be with warehouse system when being counted every time Unite newest return delivery completion notice message etc. for according to carrying out, statistics is that can to obtain warehouse system real-time every time as far as possible Operating efficiency information.In short, by dynamically determining the operating efficiency information of warehouse system, and ordered on this basis to control Single system issues the speed of order to warehouse system, the situation that can make the operation complexity in warehouse controllable in this way Under, realize that warehouse production capacity maximizes.
Specifically for product architecture angle, referring to Fig. 1, the embodiment of the present application can be related to following components: first Ordering system before this, the ordering system are mainly used for passing through its mobile terminal device according to consumer-user, buyer user etc. Deng it is online lower single the case where, generate trade order, later, specific delivery can also be selected according to the shipping address etc. of user Warehouse, generates corresponding logistics order etc., and this logistics order can specifically issue week as order to be issued It is issued in phase to warehouse system.Certainly, in practical applications, the order specifically issued to warehouse system is also likely to be transaction Therefore order, is referred to as order here without specifically limiting.Followed by warehouse system, warehouse system can specifically include Entity operation part and information processing part, wherein entity operation part mainly includes various warehouse resources, for example, storage Space resources, human resources, packaging, transport resource, etc. in storehouse, specifically for completing picking, packing etc. in releases Operation.Information processing part is then used to be docked with ordering system, on the one hand receives the order that ordering system issues, another party Face can also return to the notification message that delivery is completed to ordering system for the order that delivery is completed.Ordering system is receiving It delivers after the notification message completed, specific message can also be supplied to the corresponding client such as consumer-user, buyer user End, is inquired for user.In the embodiment of the present application, the information treatment part between ordering system and warehouse system is related generally to Point, and in particular to order information is carried out to warehouse system to ordering system and issues the optimization that link carries out.Below to specific reality Existing scheme describes in detail.
Embodiment one
The embodiment one provides firstly a kind of order processing system, and referring to Fig. 1, which may include:
Client 101 is submitted according to data object operation result for providing data object information and generates asking for order It asks;
Ordering system server 102, request for being submitted according to client generate order, and to warehouse system server Issue order information;
Warehouse system server 103 for generating shipping tasks according to the order information received, and is completed in delivery Afterwards, delivery completion notice message is returned to ordering system server;
Wherein, the ordering system server 102 is also used to, and is carried out to the operating efficiency information of warehouse system pre- in real time It surveys, according to the real-time prediction result information of operating efficiency, the speed that order issues is controlled.
Below to mainly from ordering system, describing in detail to the control mode specifically to order downloading speed, That is, may refer to the introduction in subsequent embodiment two about relevant specific implementation in the embodiment one.
Embodiment two
In the embodiment of the present application two, mainly from the angle of ordering system, a kind of order distribution control method is provided, is joined See Fig. 2, this method can specifically include:
S201: determination issues the period, wherein issues operation in each order of period execution that issues;
In the embodiment of the present application, it can set first and issue the period, that is, ordering system can issue week according to this Phase carries out periodic order and issues, and each issues the period and to warehouse system issues a collection of order, still, each issues the period The quantity on order issued may be different, specific to need according to warehouse system in the operating efficiency for currently issuing the period come really It is fixed.
Wherein, about the time span for specifically issuing the period, can be made according to the order magnitude and warehouse actually generated The magnitude of industry ability is determined, for example, as it was noted above, for systems such as " green hands ", since system scale is larger, in system The quantity on order of generation is very big, and the processing capacity of warehouse system is usually that therefore, can will issue in per second kind of hundreds of thousands of lists Cycle set is one second, that is, per second issue to a warehouse system order of execution, the quantity on order issued every time is usually all Hundreds of thousands of lists, wherein specific quantity is exactly the problem of required determination in the embodiment of the present application.Certainly, for some small-sized System can also be appropriately extended order and issue the period if quantity on order is no so big, for example, one minute is extended to, etc. Deng.
S202: for currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein the operation Efficiency dynamic change at any time;
After determining specifically to issue the period, so that it may issue the period each respectively, be imitated to the operation of warehouse system Rate is once counted respectively, with this predict it is each issue period corresponding operating efficiency, and then may be implemented more accurately The control of order placement speed.Wherein, it specifically specifically can be when statistics currently issues period corresponding warehouse homework efficiency Warehouse system is currently issued by the workload that can be done in the period is predicted described, by the predicted value, as working as Before issue period corresponding warehouse homework efficiency information.That is, it is assumed that issuing the period is one second, then the mistake of above-mentioned statistics Journey is exactly the historical data for executing delivery by warehouse, predicts the workload that next second warehouse can be completed, the operation Measurer body can be embodied by information such as quantity on order.
It wherein,, can be to ordering since warehouse system is after the order that is provided according to ordering system completes delivery when specific implementation Single system carries out the notice of delivery completion, wherein and specifically notice can be corresponding with order, and, it is generally the case that Each notice can correspond to an order, that is, every delivery for completing an order, can return to ordering system and deliver At notification message, wherein the identification informations such as the ID of order can be carried.Certainly, in specific implementation, it is also possible to logical there are one The case where knowing corresponding multiple orders.In short, ordering system can obtain the delivery completion notice of warehouse system feedback, in turn, just The operating efficiency in warehouse can be counted as the historical data of warehouse delivery according to this delivery completion notice message.
It in an implementation mode, will specifically when currently issuing period corresponding warehouse homework efficiency and being predicted The period for currently issuing the start time point in period preset first time length forward is determined as the first statistical time section, And determine the associated quantity on order information of delivery completion notice received in the first statistical time section;Then, according to institute Quantity on order, the preset first time length information and the time span information for issuing the period are stated, to currently issuing Period, corresponding real time job efficiency information was predicted.
When specific implementation, the first time length information can simply be set as one and issue the period, that is to say, that It can determine the described upper one interior associated quantity on order information of delivery completion notice received for issuing the period, then, according to The quantity on order, it is described issue period corresponding time span information, to currently issuing period corresponding real time job efficiency Information is predicted.That is, can issue the warehouse homework efficiency in period as currently issuing the period for upper one can handle work The predicted value of industry amount.For example, issuing the period is one second, that is, the completion that can be delivered in upper one second according to warehouse system is ordered Information, the workloads that can be handled next second such as odd number amount are predicted.
Alternatively, in specific implementation, the preset first time length can be with warehouse system first on the same day The scheduling of resource period is related.That is, on the same day, the resource in warehouse would generally be one for warehouse system It is once dispatched in fixed cycle, for example, every two hour executes relieving a sentry for one-stop operation personnel, every two hours replacement is primary to be made Industry mode, etc..Wherein, within same dispatching cycle, since the configuration of the resources such as operating personnel, operation mode is usually identical , therefore, operating efficiency typically exhibits out more stable state.At this point, the first time length can be two hours, That is, can it is each issue the period take out current time to the first two hour statistical data, and determine the two hours The information such as the quantity on order of delivery are inside completed in total, then, according to this quantity on order information divided by the time of the two hours Length information determines the current work efficiency information in warehouse.Wherein, when carrying out above-mentioned division arithmetic, can also first into The conversion of row time span information, specifically, can be converted according to the length for issuing the period, for example, determining this two Hour issues the period comprising how many altogether, for example, be it is N number of, then, recycle the information such as blanket order quantity divided by N, determine Real time job efficiency information.
After calculating above-mentioned real time job efficiency information, period corresponding operating efficiency specifically is being issued according to current Information, it is determining when currently issuing the workload information issued in the period to warehouse system, it can be directly according to the real-time work Industry efficiency information, determination are currently issuing the workload information issued in the period to warehouse system.
Alternatively, can be combined with history average operation efficiency information under another implementation, comprehensive meter is carried out Calculate, according to COMPREHENSIVE CALCULATING obtain in operating efficiency information, determine and currently issue period corresponding warehouse system operating efficiency letter Breath.Specifically, due to warehouse system in addition within one day to carry out scheduling of resource other than, from the point of view of the long-term time, also deposit In more macroscopical scheduling of resource behavior.For example, can also execute first resource scheduling weekly, can execute every month primary more extensive Scheduling of resource, etc., wherein within same dispatching cycle, substantially due to operating personnel, operation mode, place, environmental factor It is identical, so that may also can there are the characteristics that similitude on operating efficiency, therefore, specifically carrying out the pre- of warehouse homework efficiency When survey, in addition to considering the real time job efficiency in nearest two hours, it is also contemplated that the average operation efficiency in same week, it is same Average operation efficiency in a month, etc., then, then comprehensive real time job efficiency and each history average operation efficiency, it carries out Currently issue the prediction of period corresponding warehouse homework efficiency.For example, it is assumed that when the time point in fact for currently issuing the period is 10 20 points 30 seconds, current date be March 15, Thursday;When can then count from 8 20 divide 29 seconds to 10 when 20 divide in 29 seconds Real time job efficiency, the history average operation efficiency and this month in this week from Monday to Wednesday are interior from 1 day to March March History average operation efficiency on the 14th, then, in summary three, is currently issued period corresponding warehouse homework efficiency letter Breath.
Specifically, the Secondary resource that can obtain the warehouse system (can be one week or other times dispatching cycle Length) and information resources dispatching cycle (can be one month or other times length), wherein the Secondary resource tune The period is spent greater than the first resource dispatching cycle, and is less than the information resources dispatching cycle, the Secondary resource scheduling week Phase and the information resources dispatching cycle are greater than 1 day positive integer.Described currently period institute is issued it is then possible to obtain Secondary resource dispatching cycle in, the first history average operation efficiency information of the warehouse system and described when front lower It sends out in the information resources dispatching cycle where the period, the second history average operation efficiency information of the warehouse system.In this way, tool For body according to period corresponding operating efficiency information is currently issued, determination is currently issuing the work issued in the period to warehouse system It, can be according to the real time job efficiency information and the first history average operation efficiency information, second when industry amount information History average operation efficiency information, determine it is described currently issue period corresponding operating efficiency information, and according to the operating efficiency Information determination is currently issuing the workload information issued in the period to warehouse system.Wherein, a variety of different operating efficiency letters Breath can correspond to different weights, such as:
Previous unit time average productivity: N, weight RN
Unit time the last week average productivity: M1, weight R1
Unit time the last week average productivity: M2, weight R2
The workload that the period can be done of currently issuing then predicted can be with are as follows:
(N×RN+M1×R1+M2×R2)/(RN+R1+R2)
Wherein, it specifically when counting the first history average operation efficiency, will can currently issue belonging to the period The from date in two scheduling of resource periods to the previous date for currently issuing the date where the period be determined as the second statistics when Between section;It currently issues the from date of information resources belonging to period dispatching cycles and currently issues the place date in period to described The previous date is determined as third statistical time section.In this way, the first history average operation efficiency information is according to second system In the meter period the corresponding total number of orders of delivery completion notice that receives and the second statistical time section it is corresponding second when Between length be determined;The second history average operation efficiency information is according to the delivery received in the third statistical time section The corresponding total number of orders of completion notice and the corresponding third time span of the third statistical time section are determined.
It should be noted that the factor mainly considered is long in certain time in the aforementioned calculating for carrying out operating efficiency The quantity on order information handled in degree, still, during practical warehouse homework, also to operation production capacity, there are shadows for order itself It rings.Such as: under normal circumstances, the order of multiple commodity is higher than the order task difficulty of particular commodity.That is, different orders Between task difficulty may be different, this is also resulted in, if considering that delivery in same time span completed orders merely Single quantity information then may result in inaccurate to the estimation of warehouse production capacity.For example, it is mono- to complete M in certain time span t1 altogether, in addition It is mono- that N is completed in one section of identical time span t2, wherein M > N still much includes due to existing in each order in t2 The order of multiple commodity, therefore, actual production capacity can may also be greater than the production capacity, etc. in the t1 period.Wherein, operation is influenced The case where difficulty, can specifically include commodity amount, packaging material requirement, picking difficulty, special packaging material etc., and these information be all can With what is known in advance in the case where known order information, therefore, the corresponding task difficulty of each order can be carried out respectively It calculates.
For this purpose, in the preferred embodiment of the application, specifically according to the time span information of statistical time section and When the corresponding total number of orders of delivery completion notice received in the statistical time section determines corresponding operating efficiency, either in fact When operating efficiency or the first history average operation efficiency, the second history average operation efficiency, can determine the system first The detail information of the corresponding each order of delivery completion notice received in the meter period, the detail information include influencing warehouse to make The information of industry difficulty, for example, commodity amount, packaging material requirement, picking difficulty, special packaging material etc. in order.Then, according to respectively ordering Single detail information and preset task difficulty Rule Information, determines the associated task difficulty coefficient information of each order;In turn, It can be corresponding according to the delivery completion notice received in the time span information and the statistical time section of statistical time section Total number of orders and the corresponding task difficulty coefficient information of each order, determine corresponding operating efficiency.For example, calculating operation effect When rate, the corresponding degree-of-difficulty factor of order each in specific time span can be added, which can be more accurate Embody the workload that warehouse is completed in same time span, and then the determining ratio with specific time span, it in this way can be with The more accurate actual job efficiency for determining warehouse system.
Wherein, the timing really of order degree-of-difficulty factor specifically is being carried out, the attribute value and hardly possible of various factors can be provided previously Corresponding relationship between angle value, then, order specific for one can determine the attribute value in each factor first, Then, the corresponding relationship is compareed, is converted into difficulty value, and then difficulty is calculated according to specific degree-of-difficulty factor calculation formula Coefficient.For example, in an implementation mode, the corresponding relationship between the attribute value and difficulty value of the various factors can be such as table Shown in 1:
Table 1
Factor pattern Influence the factor of packaging Factor values Difficulty value Weight
001 Commodity amount 1 1 1
001 Commodity amount 10 3 3
001 Commodity amount 30 5 5
001 Commodity amount 50 7 7
001 Commodity amount 100 9 9
001 Commodity amount 200 10 10
002 Packaging material requirement 0 1 1
002 Packaging material requirement 1 5 2
002 Packaging material requirement 10 10 5
003 Picking difficulty 0 1 1
003 Picking difficulty 1 5 2
003 Picking difficulty 10 10 5
004 Extra package requirement 0 1 1
004 Extra package requirement 1 5 2
004 Extra package requirement 10 10 5
The task difficulty coefficient formulas of order can be with are as follows:
R=(d1w1+d2w2+d3w3+ ...+diwi)/(w1+w2+w3+ ...+wi) (1)
Wherein, r value can be 1-10, and r value is lower to illustrate that task difficulty is lower;
D is factor difficulty value;
W Factor Weight;
I factor number.
For example, the commodity amount for including in some order is 10, packaging material requires to be 1, and picking difficulty is 10, and extra package is wanted Asking is 0, then by inquiring above-mentioned table 1 it is found that the corresponding difficulty value of the commodity amount factor is 3, weight 3;Packaging material requires the factor Corresponding difficulty value is 5, weight 2;The corresponding difficulty value of the picking difficulty factor is 10, weight 5;Extra package requires the factor Corresponding difficulty value is 1, weight 1.In this way, the degree-of-difficulty factor of the order can be calculated according to above-mentioned formula (1) are as follows:
R=(3 × 3+5 × 2+10 × 5+1 × 1)/(3+2+5+1)=5.38
The degree-of-difficulty factor of other orders can also be calculated by this.
S203: according to currently period corresponding operating efficiency prediction result information is issued, Xiang Suoshu warehouse system is ordered Singly issue.
After currently being issued period corresponding warehouse homework efficiency information, so that it may which determination issues in the period currently The workload information issued to warehouse system.Wherein, for ordering system, the order generated in system can be unified to store In " the order pond " interim to one, also, the chronological order etc. that can also be generated according to order is ranked up, certainly, In practical applications, when being ranked up to order, it is also contemplated that buyer user dispenses the requirement factor of timeliness to order, or The associated businessman of person's order or seller user's factor, etc., can by these factors, to the order sequence in order pond into Row adjustment.Each issuing the period carries out order when issuing, and can take out from front to back ordering for corresponding number from the order pond It is single, it is issued to warehouse system, and this part order is deleted from order pond.
When determination currently issues the workload that the period needs to issue, particularly as can be, determine which can be issued Order.If the aforementioned operating efficiency information determined is corresponding quantity on order in each period, the then work determined here Industry amount can be quantity on order information, for example, the quantity on order that warehouse system can be completed in next second is predicted, then, When progress order issues within next second, the order for just taking out corresponding number from order pond according to the quantity on order is issued i.e. It can.
But as it was noted above, consider that quantity on order may result in inaccuracy merely, therefore, in progress operating efficiency Prediction when, it is also contemplated that the task difficulty coefficient information of each order.In this case, it is carrying out issuing week according to current Phase corresponding operating efficiency information, it is determining when currently issuing the workload information issued in the period to warehouse system, it can be first The corresponding detail information of order to be issued first is obtained, the detail information includes the information for influencing warehouse homework difficulty;Then, root According to the respectively detail information of order to be issued and preset task difficulty Rule Information, the associated operation of order respectively to be issued is determined Degree-of-difficulty factor information;Finally further according to currently issuing period corresponding operating efficiency information, and respectively order to be issued is corresponding Task difficulty coefficient information, determination are currently issuing the order issued in the period to warehouse system.
Wherein, it specifically treats when issuing order and carrying out the calculating of degree-of-difficulty factor, it equally can be first by way of table 1 pair The corresponding difficulty value of each factor and weight are inquired in each order, then, are calculated according to formula (1).In this way, can be with Corresponding degree-of-difficulty factor is converted by each order.Then, it according to currently period corresponding operating efficiency information is issued, determines Currently issuing the workload information issued in the period to warehouse system.Specifically, one can be taken out from order pond every time Order after calculating degree-of-difficulty factor, adds up with the degree-of-difficulty factor for the order having been taken out before, until accumulated value reaches pair When currently issuing the workload that can be done that period forecasting goes out, then new order is no longer taken out from order pond, will have been taken out Order as currently issue in the period wait issue order.
In short, may be implemented to issue the period each, to the operating efficiency information of warehouse system by the embodiment of the present application It is predicted, then, according to predicting as a result, issuing the workload that the period issues to warehouse system to each and controlling. In this way, realizing that warehouse production capacity maximizes in the case where the operation complexity in warehouse can be made controllable.
Corresponding with order distribution control method provided by the embodiments of the present application, the embodiment of the present application also provides one kind to order Control device is singly issued, referring to Fig. 3, which be can specifically include:
Period determination unit 301 is issued, issues the period for determination, wherein issues order of period execution each Issue operation;
Capability forecasting unit 302, for being carried out to the operating efficiency information of warehouse system pre- for currently the period is issued It surveys, wherein operating efficiency dynamic change at any time;
Control unit 303 is issued, for issuing period corresponding operating efficiency prediction result information, Xiang Suoshu according to current Warehouse system carries out order and issues.
Wherein, the period corresponding operating efficiency information that currently issues currently is issued by the warehouse system described The predicted value for the workload that can be done in period is indicated.
When specific implementation, the work that can be done in the period currently can be issued described to warehouse system in the following manner Industry amount is predicted, comprising:
Notification information receiving unit, for receiving the delivery completion notice information of warehouse system return, wherein the delivery Completion notice information is corresponding with order;
First statistical time section determination unit, for currently issuing the start time point in period forward preset first for described The period of time span is determined as the first statistical time section, and determines that the delivery received in the first statistical time section is complete At notifying associated quantity on order information;
First predicting unit, for according to the quantity on order, the preset first time length information and it is described under The time span information for sending out the period is predicted currently period corresponding real time job efficiency information is issued.
When specific implementation, the first time length is one and issues the period;
At this point, the first statistical time section determination unit specifically can be used for:
Determine the described upper one interior associated quantity on order information of delivery completion notice received for issuing the period;
First predicting unit specifically can be used for:
According to the quantity on order, it is described issue period corresponding time span information, to currently, to issue the period corresponding Real time job efficiency information is predicted.
Alternatively, the preset first time length can also be with first resource dispatching cycle of the warehouse system on the same day It is related.
Under in one way in which, issuing control unit specifically can be used for:
According to the real time job efficiency information, determines and currently issuing the workload letter issued in the period to warehouse system Breath.
Alternatively, under another implementation, which can also include:
Dispatching cycle obtaining unit, for obtaining Secondary resource dispatching cycle and the information resources of the warehouse system Dispatching cycle, wherein be greater than the first time length Secondary resource dispatching cycle, and be less than the information resources and dispatch Period, the Secondary resource dispatching cycle and the information resources dispatching cycle are greater than 1 day positive integer;
Historical Jobs efficiency obtaining unit, for obtaining the Secondary resource dispatching cycle currently issued where the period It is interior, the first history average operation efficiency information of the warehouse system and the information resources currently issued where the period In dispatching cycle, the second history average operation efficiency information of the warehouse system;
The control unit that issues specifically can be used for:
It is average according to the real time job efficiency information and the first history average operation efficiency information, the second history Operating efficiency information, determine it is described currently issue period corresponding operating efficiency information, and determined according to the operating efficiency information Currently issuing the workload information issued in the period to warehouse system.
When specific implementation, the from date for currently issuing Secondary resource belonging to period dispatching cycle can be worked as described in Before issue the previous date on date where the period and be determined as the second statistical time section;Currently issue information resources tune belonging to the period Spend the from date in period to it is described currently issue the period where previous date on date be determined as third statistical time section;
The first history average operation efficiency information is completed logical according to the delivery received in the second statistical time section Know that corresponding total number of orders and corresponding second time span of the second statistical time section are determined;
The second history average operation efficiency information is completed logical according to the delivery received in the third statistical time section Know that corresponding total number of orders and the corresponding third time span of the third statistical time section are determined.
In addition, the device can also include:
Order detail information obtainment unit, for determining that the delivery completion notice received in the statistical time section is corresponding The detail information of each order, the detail information include the information for influencing warehouse homework difficulty;
Degree-of-difficulty factor determination unit, for the detail information and preset task difficulty Rule Information according to each order, Determine the associated task difficulty coefficient information of each order;
Operating efficiency determination unit, for inscribed according to the time span information of statistical time section and the statistical time section The corresponding total number of orders of delivery completion notice received and the corresponding task difficulty coefficient information of each order, determine corresponding work Industry efficiency.
Specifically, the control unit that issues can specifically include:
Order detail information acquisition subelement, for obtaining the corresponding detail information of order to be issued, the detail information Information including influencing warehouse homework difficulty;
Degree-of-difficulty factor determines subelement, for according to the respectively detail information of order to be issued and preset task difficulty rule Then information determines the associated task difficulty coefficient information of order respectively to be issued;
Order determines subelement, currently issues period corresponding operating efficiency information for basis, and respectively order wait issue Single corresponding task difficulty coefficient information, determination are currently issuing the order issued in the period to warehouse system.
In addition, the embodiment of the present application also provides a kind of computer system, which may include:
One or more processors;And
With the memory of one or more of relational processors, the memory is for storing program instruction, the journey Sequence instruction is performed the following operations when reading execution by one or more of processors:
With the memory of one or more of relational processors, the memory is for storing program instruction, the journey Sequence instruction is performed the following operations when reading execution by one or more of processors:
Determination issues the period, wherein issues operation in each order of period execution that issues;
For currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein the operating efficiency with Time dynamic;
According to period corresponding operating efficiency prediction result information is currently issued, Xiang Suoshu warehouse system is carried out under order Hair.
Wherein, Fig. 4 illustratively illustrates the framework of computer system, can specifically include processor 410, and video is aobvious Show adapter 411, disc driver 412, input/output interface 413, network interface 414 and memory 420.Above-mentioned processing Device 410, video display adapter 411, disc driver 412, input/output interface 413, network interface 414, with memory It can be communicatively coupled by communication bus 430 between 420.
Wherein, processor 410 can using general CPU (Central Processing Unit, central processing unit), Microprocessor, application specific integrated circuit (Application Specific Integrated Circuit, ASIC) or The modes such as one or more integrated circuits are realized, for executing relative program, to realize technical solution provided herein.
Memory 420 can use ROM (Read Only Memory, read-only memory), RAM (Random Access Memory, random access memory), static storage device, the forms such as dynamic memory realize.Memory 420 can store For controlling the operating system 421 of the operation of computer system 400, the base of the low-level operation for controlling computer system 400 This input-output system (BIOS).Furthermore it is also possible to web browser 423 is stored, data storage management system 424, and order Singly issue control system 425 etc..It can be before implementing in the embodiment of the present application that the above order, which issues control system 425, State the application program of each step operation.In short, when realizing technical solution provided herein by software or firmware, Relevant program code is stored in memory 420, and execution is called by processor 410.
Input/output interface 413 is for connecting input/output module, to realize information input and output.Input and output/ Module can be used as component Configuration (not shown) in a device, can also be external in equipment to provide corresponding function.Wherein Input equipment may include keyboard, mouse, touch screen, microphone, various kinds of sensors etc., output equipment may include display, Loudspeaker, vibrator, indicator light etc..
Network interface 414 is used for connection communication module (not shown), to realize the communication of this equipment and other equipment Interaction.Wherein communication module can be realized by wired mode (such as USB, cable etc.) and be communicated, can also be wirelessly (such as mobile network, WIFI, bluetooth etc.) realizes communication.
Bus 430 includes an access, in various components (such as the processor 410, video display adapter 411, magnetic of equipment Disk drive 412, input/output interface 413, network interface 414, with memory 420) between transmit information.
Had in addition, the computer system 400 can also be got in condition information database 441 from virtual resource object Body gets the information of condition, for carrying out condition judgement, etc..
It should be noted that although above equipment illustrates only processor 410, video display adapter 411, disk drive Device 412, input/output interface 413, network interface 414, memory 420, bus 430 etc., but in the specific implementation process, The equipment can also include realizing to operate normally necessary other assemblies.In addition, it will be appreciated by those skilled in the art that It is, it can also be only comprising realizing component necessary to application scheme, without including whole shown in figure in above equipment Component.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can It realizes by means of software and necessary general hardware platform.Based on this understanding, the technical solution essence of the application On in other words the part that contributes to existing technology can be embodied in the form of software products, the computer software product It can store in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that a computer equipment (can be personal computer, server or the network equipment etc.) executes the certain of each embodiment of the application or embodiment Method described in part.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system or For system embodiment, since it is substantially similar to the method embodiment, so describing fairly simple, related place is referring to method The part of embodiment illustrates.System and system embodiment described above is only schematical, wherein the conduct The unit of separate part description may or may not be physically separated, component shown as a unit can be or Person may not be physical unit, it can and it is in one place, or may be distributed over multiple network units.It can root According to actual need that some or all of the modules therein is selected to achieve the purpose of the solution of this embodiment.Ordinary skill Personnel can understand and implement without creative efforts.
Above to order distribution control method, device and computer system provided herein, it is described in detail, Specific examples are used herein to illustrate the principle and implementation manner of the present application, and the explanation of above embodiments is only used The present processes and its core concept are understood in help;At the same time, for those skilled in the art, according to the application's Thought, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification should not be construed as Limitation to the application.

Claims (13)

1. a kind of order processing system characterized by comprising
Client submits the request for generating order according to data object operation result for providing data object information;
Ordering system server, the request for being submitted according to client generates order, and issues and order to warehouse system server Single information;
Warehouse system server, for generating shipping tasks according to the order information received, and after the completion of delivery, to order System server returns to delivery completion notice message;
The ordering system server is also used to, and is predicted in real time the operating efficiency information of warehouse system, is imitated according to operation The real-time prediction result information of rate, controls the speed that order issues.
2. a kind of order distribution control method characterized by comprising
Determination issues the period, wherein issues operation in each order of period execution that issues;
For currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein the operating efficiency is at any time Dynamic change;
According to period corresponding operating efficiency prediction result information is currently issued, Xiang Suoshu warehouse system carries out order and issues.
3. according to the method described in claim 2, it is characterized in that,
It is described currently to issue period corresponding operating efficiency information institute in the period is currently issued described by the warehouse system The predicted value for the workload that can be completed is indicated.
4. according to the method described in claim 3, it is characterized in that,
Warehouse system is currently issued by the workload that can be done in the period is predicted described in the following manner, comprising:
Receive the delivery completion notice information that warehouse system returns, wherein the delivery completion notice information is corresponding with order;
The period for currently issuing the start time point in period preset first time length forward is determined as the first statistics Period, and determine the associated quantity on order information of delivery completion notice received in the first statistical time section;
According to the quantity on order, the preset first time length information and the time span information for issuing the period, It predicts currently period corresponding real time job efficiency information is issued.
5. according to the method described in claim 4, it is characterized in that,
The first time length is one and issues the period;
It is described that warehouse system is currently issued by the workload that can be done in the period is predicted described, comprising:
Determine the described upper one interior associated quantity on order information of delivery completion notice received for issuing the period;
According to the quantity on order, it is described issue period corresponding time span information, to currently issue the period it is corresponding in real time Operating efficiency information is predicted.
6. according to the method described in claim 4, it is characterized in that,
The preset first time length is related dispatching cycle in first resource interior on the same day to warehouse system.
7. according to the method described in claim 4, it is characterized in that,
The basis currently issues period corresponding operating efficiency prediction result information, and Xiang Suoshu warehouse system carries out under order Hair, comprising:
According to the real time job efficiency information, determination is currently issuing the workload information issued in the period to warehouse system, And it carries out order and issues.
8. according to the method described in claim 4, it is characterized by further comprising:
Obtain the Secondary resource dispatching cycle and information resources dispatching cycles of the warehouse system, wherein the Secondary resource It is greater than the first time length dispatching cycle, and is less than the information resources dispatching cycle, the Secondary resource dispatching cycle And the information resources dispatching cycle is greater than 1 day positive integer;
It obtains in the Secondary resource dispatching cycle currently issued where the period, the first history of the warehouse system is averagely made Industry efficiency information and in the information resources dispatching cycle currently issued where the period, the second of the warehouse system is gone through History average operation efficiency information;
The basis currently issues period corresponding operating efficiency prediction result information, and Xiang Suoshu warehouse system carries out under order Hair, comprising:
According to the real time job efficiency information and the first history average operation efficiency information, the second history average operation Efficiency information, determine it is described currently issue period corresponding operating efficiency information, and worked as according to operating efficiency information determination Before issue the workload information issued in the period to warehouse system, and carry out order and issue.
9. according to the method described in claim 8, it is characterized in that,
By the from date for currently issuing Secondary resource belonging to period dispatching cycle to it is described currently issue the period where the date The previous date be determined as the second statistical time section;The from date for currently issuing information resources belonging to period dispatching cycles arrives The previous date for currently issuing the place date in period is determined as third statistical time section;
The first history average operation efficiency information is according to the delivery completion notice pair received in the second statistical time section The total number of orders and corresponding second time span of the second statistical time section answered are determined;
The second history average operation efficiency information is according to the delivery completion notice pair received in the third statistical time section The total number of orders and the corresponding third time span of the third statistical time section answered are determined.
10. according to the described in any item methods of claim 4 to 9, which is characterized in that
The delivery completion notice specifically received in the time span information and the statistical time section according to statistical time section When corresponding total number of orders determines corresponding operating efficiency, comprising:
Determine the detail information of the corresponding each order of delivery completion notice received in the statistical time section, the detail information Information including influencing warehouse homework difficulty;
According to the detail information of each order and preset task difficulty Rule Information, the associated task difficulty system of each order is determined Number information;
It is corresponding according to the delivery completion notice received in the time span information of statistical time section and the statistical time section Total number of orders and the corresponding task difficulty coefficient information of each order, determine corresponding operating efficiency.
11. according to the described in any item methods of claim 2 to 10, which is characterized in that
The basis currently issues period corresponding operating efficiency prediction result information, and Xiang Suoshu warehouse system carries out under order Hair, comprising:
The corresponding detail information of order to be issued is obtained, the detail information includes the information for influencing warehouse homework difficulty;
According to the respectively detail information of order to be issued and preset task difficulty Rule Information, respectively order association to be issued is determined Task difficulty coefficient information;
According to currently issuing period corresponding operating efficiency information, and the respectively corresponding task difficulty coefficient letter of order to be issued Breath, determination are currently issuing the order issued in the period to warehouse system.
12. a kind of order issues control device characterized by comprising
Period determination unit is issued, issues the period for determination, wherein issues behaviour in each order of period execution that issues Make;
Capability forecasting unit, for predicting the operating efficiency information of warehouse system for currently the period is issued, wherein Operating efficiency dynamic change at any time;
Control unit is issued, for issuing period corresponding operating efficiency prediction result information, the warehouse Xiang Suoshu system according to current System carries out order and issues.
13. a kind of computer system characterized by comprising
One or more processors;And
With the memory of one or more of relational processors, for storing program instruction, described program refers to the memory It enables when reading execution by one or more of processors, performs the following operations:
Determination issues the period, wherein issues operation in each order of period execution that issues;
For currently the period is issued, the operating efficiency information of warehouse system is predicted, wherein the operating efficiency is at any time Dynamic change;
According to period corresponding operating efficiency prediction result information is currently issued, Xiang Suoshu warehouse system carries out order and issues.
CN201810215130.5A 2018-03-15 2018-03-15 Order placing control method, order placing control device and computer system Active CN110276469B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810215130.5A CN110276469B (en) 2018-03-15 2018-03-15 Order placing control method, order placing control device and computer system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810215130.5A CN110276469B (en) 2018-03-15 2018-03-15 Order placing control method, order placing control device and computer system

Publications (2)

Publication Number Publication Date
CN110276469A true CN110276469A (en) 2019-09-24
CN110276469B CN110276469B (en) 2023-10-03

Family

ID=67957697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810215130.5A Active CN110276469B (en) 2018-03-15 2018-03-15 Order placing control method, order placing control device and computer system

Country Status (1)

Country Link
CN (1) CN110276469B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112561253A (en) * 2020-11-18 2021-03-26 广东赛意信息科技有限公司 Order assignment method, system, platform and storage medium based on production plan

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1971609A (en) * 2006-11-30 2007-05-30 广州宝钢南方贸易有限公司 Spot business system
US20090144109A1 (en) * 2007-10-30 2009-06-04 Electrolux Home Products, Inc. Method and apparatus for monitoring an order status
CN103426072A (en) * 2013-07-16 2013-12-04 无限极(中国)有限公司 Order processing system of high concurrency competitive inventory and processing method thereof
CN104361482A (en) * 2014-12-09 2015-02-18 北京京东尚科信息技术有限公司 Method and system for distributing orders to storehouse
CN104599102A (en) * 2015-01-04 2015-05-06 荣庆物流供应链有限公司 Cold-chain logistics storage supervisory system and method
CN104951852A (en) * 2014-03-24 2015-09-30 阿里巴巴集团控股有限公司 Method and system for processing periodic order information
CN106203894A (en) * 2015-04-30 2016-12-07 阿里巴巴集团控股有限公司 The processing method of the inventory information of merchandise items and system
CN106447248A (en) * 2015-08-11 2017-02-22 阿里巴巴集团控股有限公司 Method and device for providing distribution time efficiency information of business object
CN106886874A (en) * 2017-01-24 2017-06-23 武汉奇米网络科技有限公司 A kind of order splits delivery system and splits delivery method
CN106960302A (en) * 2017-03-23 2017-07-18 江苏金易达供应链管理有限公司 A kind of Intelligent logistics management method
CN107038629A (en) * 2017-06-13 2017-08-11 舒达家居用品(深圳)有限公司 Order processing method, device and server in a kind of commodity transaction
CN107230120A (en) * 2016-03-24 2017-10-03 阿里巴巴集团控股有限公司 Sequence information processing method, apparatus and system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1971609A (en) * 2006-11-30 2007-05-30 广州宝钢南方贸易有限公司 Spot business system
US20090144109A1 (en) * 2007-10-30 2009-06-04 Electrolux Home Products, Inc. Method and apparatus for monitoring an order status
CN103426072A (en) * 2013-07-16 2013-12-04 无限极(中国)有限公司 Order processing system of high concurrency competitive inventory and processing method thereof
CN104951852A (en) * 2014-03-24 2015-09-30 阿里巴巴集团控股有限公司 Method and system for processing periodic order information
CN104361482A (en) * 2014-12-09 2015-02-18 北京京东尚科信息技术有限公司 Method and system for distributing orders to storehouse
CN104599102A (en) * 2015-01-04 2015-05-06 荣庆物流供应链有限公司 Cold-chain logistics storage supervisory system and method
CN106203894A (en) * 2015-04-30 2016-12-07 阿里巴巴集团控股有限公司 The processing method of the inventory information of merchandise items and system
CN106447248A (en) * 2015-08-11 2017-02-22 阿里巴巴集团控股有限公司 Method and device for providing distribution time efficiency information of business object
CN107230120A (en) * 2016-03-24 2017-10-03 阿里巴巴集团控股有限公司 Sequence information processing method, apparatus and system
CN106886874A (en) * 2017-01-24 2017-06-23 武汉奇米网络科技有限公司 A kind of order splits delivery system and splits delivery method
CN106960302A (en) * 2017-03-23 2017-07-18 江苏金易达供应链管理有限公司 A kind of Intelligent logistics management method
CN107038629A (en) * 2017-06-13 2017-08-11 舒达家居用品(深圳)有限公司 Order processing method, device and server in a kind of commodity transaction

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
TUSHAR SEMWAL: "On Ordering Multi-Robot Task Executions within a Cyber Physical System", 《ACM TRANSACTIONS ON AUTONOMOUS AND ADAPTIVE SYSTEMS》 *
乔钦辉: "CLMO公司ODM代工国内直接发货分析报告", 《黑龙江科技信息》 *
张秋岚: "基于物联网技术的智慧仓储管理系统的开发", 《企业科技与发展》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112561253A (en) * 2020-11-18 2021-03-26 广东赛意信息科技有限公司 Order assignment method, system, platform and storage medium based on production plan

Also Published As

Publication number Publication date
CN110276469B (en) 2023-10-03

Similar Documents

Publication Publication Date Title
Gordon et al. A survey of the state-of-the-art of common due date assignment and scheduling research
CN110276571B (en) Cargo scheduling method and apparatus and computer readable storage medium
JP3698433B2 (en) Safety stock quantity calculation device, safety stock quantity calculation program and order point calculation device
US8359218B2 (en) Computer readable medium for implementing supply chain control using service-oriented methodology
CN111985748A (en) Order batch processing method, device and computer system
CN109670721A (en) Method for scheduling task, device, electronic equipment and computer readable storage medium
US8417572B1 (en) Expected exhaustion time
Hegedus et al. Setting procurement safety lead-times for assembly systems
US11481858B2 (en) Peak period network capacity planning
CN110276469A (en) Order distribution control method, device and computer system
Dewan et al. Dynamic single-machine scheduling under distributed decision-making
Caceres et al. Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times
JP2005242839A (en) Store management system, method, and program
Holden Inventory Optimization Using a SimPy Simulation Model
JP2020119388A (en) Information processing device, information processing method and program
Zhang et al. Scheduling with compressible and stochastic release dates
JP2002318840A (en) Inventory management system by predicting shipping amount and managing inventory
CN111292032A (en) Warehousing operation method, device, readable medium and system
JP2006244470A (en) Delivery date reply system, delivery date reply method, and delivery date reply program
US7475022B1 (en) Method and apparatus for handling disruptive events and replacement items
Rappold et al. A model for level-loading production in the process industries when demand is stochastic
CN113222304A (en) Inventory scheduling method and device
JP6950063B1 (en) Information processing system, information processing device and information processing program
JP6713963B2 (en) Method and apparatus for generating initial inventory information for supply chain operation simulation
JP6474511B1 (en) Demand forecasting device, demand forecasting method and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230727

Address after: No. 699, Wangshang Road, Binjiang District, Hangzhou, Zhejiang

Applicant after: Alibaba (China) Network Technology Co.,Ltd.

Address before: Box 847, four, Grand Cayman capital, Cayman Islands, UK

Applicant before: ALIBABA GROUP HOLDING Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant