CN109902950A - Management method, management equipment and the managing device of cultivation task - Google Patents

Management method, management equipment and the managing device of cultivation task Download PDF

Info

Publication number
CN109902950A
CN109902950A CN201910133357.XA CN201910133357A CN109902950A CN 109902950 A CN109902950 A CN 109902950A CN 201910133357 A CN201910133357 A CN 201910133357A CN 109902950 A CN109902950 A CN 109902950A
Authority
CN
China
Prior art keywords
pig
task
transferred
information
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910133357.XA
Other languages
Chinese (zh)
Inventor
杨翔
孙晨曦
张彩云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shadow Technology Co Ltd
Original Assignee
Guangzhou Shadow Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shadow Technology Co Ltd filed Critical Guangzhou Shadow Technology Co Ltd
Priority to CN201910133357.XA priority Critical patent/CN109902950A/en
Publication of CN109902950A publication Critical patent/CN109902950A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of management methods of cultivation task.Management method includes: to enter pig transfer task according to the first trigger action, and pig transfer task includes the multiple tasks node that predetermined order generates, and multiple tasks node includes producing node and being transferred to node;Node is produced according to the execution of the second trigger action;And node is transferred to according to the execution of third trigger action.Disclosed herein as well is the management equipments and managing device of a kind of cultivation task.In the management method of the application embodiment, management equipment and managing device, the record platform that pig shifts task is provided for user, the pig information of the management equipment record transfer of cultivation task can be used in user, it is corresponding produce node be transferred to node accurately record pig transfer details, conveniently and efficiently the operation such as inquired, traced to the pig information of transfer on this record platform convenient for subsequent user, the case where grasping pig transfer in time, is conducive to the intelligent management of pig cultivation.

Description

Management method, management equipment and the managing device of cultivation task
Technical field
This application involves cultural technique field, in particular to a kind of management method, management equipment and the management of cultivation task Device.
Background technique
In existing pig farm, need to be located at pig in different fields for the different cultivation stages of pig, so that Cultivation stages corresponding with pig are gone on smoothly.And the staff when pig farm is when needing to shift pig, it may be because of needing The pig quantity to be shifted is more and occurs to omit or emergency event occurs during shifting pig, causes pig can not It is timely transferred in corresponding field, causes the mistake of pig information in transfer process, omits, the pig that can not timely update turns The record of shifting is unfavorable for the intelligent management on pig farm.
Summary of the invention
Embodiments herein provides management method, management equipment and the managing device of a kind of cultivation task.
The cultivation task management method of the application embodiment includes: to enter pig transfer according to the first trigger action to appoint Business, the pig transfer task include the multiple tasks node that predetermined order generates, and multiple task nodes include producing Node and it is transferred to node;Node is produced according to the execution of the second trigger action;And described turn is executed according to third trigger action Ingress.
In some embodiments, into before the pig transfer task, the cultivation task management method further include: root According to the first triggering input starting visioning procedure;Determine that task type is that the pig shifts task according to the first operation input;It obtains The current field information for taking pig information to be transferred and being bound with the pig to be transferred;And according to described to be transferred Pig described in pig information and the current field information creating shifts task.
In some embodiments, described to produce node according to the execution of the second trigger action, comprising: according to the second touching Hair input produces node described in entering;The current field for obtaining pig information to be transferred and being bound with the pig to be transferred Information;And the pig information to be transferred and the current field information are registered to producing note according to the second operation input Record.
In some embodiments, described to be transferred to node according to the execution of third trigger action, comprising: to be touched according to third Hair input is transferred to node described in entering;Obtain field information to be transferred to;And pig to be transferred is bound according to third operation input Information and the field information to be transferred to.
In some embodiments, the quantity of the pig is single, and the pig transfer task is task of jumping.
In some embodiments, the quantity of the pig is multiple, and the pig transfer task is that batch pig turns group's task.
In some embodiments, described to be transferred to node according to the execution of third trigger action, further includes: according to the 4th Triggering input starts selected process;The transfering type of the pig transfer task is selected according to the 4th operation input;Described in judgement Whether pig quantity to be transferred and the pig quantity being actually transferred to are consistent;And if it is not, then push the pig transfer task Confirmation message.
In some embodiments, the current field is pre-configured with field card and/or feeding instrument, and the acquisition is to be transferred Pig information and current field information with the pig binding to be transferred, comprising: scan the field card and/or described Instrument is fed to obtain the pig information to be transferred and the current field information.
In some embodiments, the cultivation task management method further include: when executing current task node, if connecing The instruction for executing the pig transfer task need to be suspended by receiving, then suspends and execute the pig transfer task.
In the cultivation task management device of the application embodiment, the cultivation task management device include: into module, For entering pig transfer task according to the first trigger action, the pig transfer task includes the multiple of predetermined order generation Task node, multiple task nodes include producing node and being transferred to node;First execution module, for according to the second triggering Operation produces node described in executing;And second execution module, for according to third trigger action execute described in be transferred to node.
In the aquaculture management equipment of the application embodiment, the cultivation task management equipment includes processor, the place Reason device is used for: entering pig transfer task according to the first trigger action, the pig transfer task includes that predetermined order generates Multiple tasks node, multiple task nodes include producing node and to be transferred to node;Institute is executed according to the second trigger action It states and produces node;And node is transferred to according to the execution of third trigger action.
In some embodiments, the cultivation task management equipment further includes information acquisition device, the information acquisition device Current field information for acquiring pig information to be transferred and with the pig binding to be transferred;Entering the pig Before transfer task, the manager is also used to: according to the first triggering input starting visioning procedure;It is determined according to the first operation input Task type is that the pig shifts task;It obtains pig information to be transferred and is bound with the pig to be transferred current Field information;And the pig according to the pig information to be transferred and the current field information creating shifts task.
In some embodiments, the cultivation task management equipment further includes information acquisition device, the information acquisition device Current field information for acquiring pig information to be transferred and with the pig binding to be transferred;The processor is also used In: it is inputted according to the second triggering and produces node described in entering;Obtain pig information to be transferred and with the pig to be transferred The current field information of binding;And the pig information to be transferred and the current field are believed according to the second operation input Breath registration to produce record.
In some embodiments, the cultivation task management equipment further includes information acquisition device, the information acquisition device For acquire the pig information to be transferred and with the field information to be transferred to;The processor is also used to: according to Three triggering inputs are transferred to node described in entering;Obtain field information to be transferred to;And it is bound according to third operation input to be transferred Pig information and the field information to be transferred to.
In some embodiments, the processor is also used to: when the quantity of the pig is single, determining the pig Transfer task is task of jumping.
In some embodiments, the processor is also used to: when the quantity of the pig is multiple, determining the pig Transfer task is that batch pig turns group's task.
In some embodiments, the processor is also used to: starting selected process according to the 4th triggering input;According to Four operation inputs select the transfering type of the pig transfer task;Judge the pig quantity to be transferred and is actually transferred to Whether pig quantity is consistent;And if it is not, then push the confirmation message of the pig transfer task.
In some embodiments, the current field is pre-configured with field card and/or feeding instrument, the information acquisition device For scanning the field card and/or the feeding instrument to obtain the pig information to be transferred and the current field information
In some embodiments, the processor is also used to: when executing current task node, being held if receiving to suspend The instruction of the row pig transfer task, then suspend and execute the pig transfer task.
In the management method of the application embodiment, management equipment and managing device, pig transfer is provided for user and is appointed The record platform of business, user can be used the pig information of the management equipment record transfer of cultivation task, produce section corresponding Point accurately records the details of pig transfer with node is transferred to, conveniently and efficiently right on this record platform convenient for subsequent user The case where pig information of transfer such as is inquired, traced at the operation, grasps pig transfer in time, is conducive to the intelligence of pig cultivation Change management.
The additional aspect and advantage of the application will be set forth in part in the description, and will partially become from the following description It obtains obviously, or recognized by the practice of the application.
Detailed description of the invention
The application is above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Obviously and it is readily appreciated that, in which:
Fig. 1 is the flow diagram of the pig transfer task management method of the application certain embodiments;
Fig. 2 and Fig. 3 is the structural schematic diagram of the pig transfer task management equipment of the application certain embodiments;
Fig. 4 is the module diagram of the pig transfer task management device of the application certain embodiments;
Fig. 5 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments;
Fig. 6 and Fig. 7 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments;
Fig. 8 is the flow diagram of the pig transfer task management method of the application certain embodiments;
Fig. 9 is the module diagram of the pig transfer task management device of the application certain embodiments;
Figure 10 to Figure 13 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments;
Figure 14 is the flow diagram of the pig transfer task management method of the application certain embodiments;
Figure 15 is the module diagram of the pig transfer task management device of the application certain embodiments;
Figure 16 to Figure 19 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments;
Figure 20 is the flow diagram of the pig transfer task management method of the application certain embodiments;
Figure 21 is the module diagram of the pig transfer task management device of the application certain embodiments;
Figure 22 to Figure 24 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments;
Figure 25 is the flow diagram of the pig transfer task management method of the application certain embodiments;
Figure 26 is the module diagram of the pig transfer task management device of the application certain embodiments;
Figure 27 to Figure 30 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments;
Figure 31 is the flow diagram of the pig transfer task management method of the application certain embodiments;
Figure 32 is the module diagram of the pig transfer task management device of the application certain embodiments;
Figure 33 is the schematic diagram of a scenario of the pig transfer task management method of the application certain embodiments.
Specific embodiment
Embodiments herein is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the application, and should not be understood as the limitation to the application.
In existing pig farm, for the ease of the management to pig, generally the pig of same type is cultivated in the same area Field in.In some special circumstances, it is understood that there may be have different types of pig, such as same type in the field of the same area Sow between there are pigs of boar, piglet or other different kind etc..And the pig of same type passes through in the same area Same feeding instrument is fed, and carries out the aquaculture management of uniform type, if there are different kind in the pig of same type Pig, then be easy because feeding or certain aquaculture managements difference and cause the pig of different kind to go wrong.At this point, needing The pig of different kind in the same area is transferred in the field of the pig of corresponding the type.
In addition, when pig needs to carry out specific cultivation task, if the field that the pig is currently located is not able to satisfy The condition that the cultivation required by task to be carried out is wanted then needs for the pig to be transferred in suitable field to guarantee cultivation task Go on smoothly.Alternatively, with the growth and development of pig, the different cultivation stages of corresponding pig need for pig to be transferred to pair It is cultivated in the field answered, pig is made to obtain more accurate aquaculture management.
In one example, if the quantity of pig is more, when such as pig being piglet, when batch pig (i.e. more piglets) wean When, it needs to be transferred to corresponding field from the field being currently located;Alternatively, if giving birth to the milk of the sow of this batch of piglet not Foot, and the field where needing batch pig being transferred to other sows of milk abundance is breast-feeded;Also, it is different for batch pig Growth and development stage, it is also desirable to batch pig be transferred in corresponding field and cultivate.And since the quantity of piglet is more, turning It may wander away during shifting, the case where batch pig dies unexpectedly even occur, it is therefore desirable to accurately count and record transfer Piglet quantity, the type that shifts of the number of batch pig, the field address produced, the field address to be transferred to, piglet etc., make The executor of current transfer task grasps the details of transfer task, accurately executes transfer task, while it is subsequent to be also convenient for user Inquire relevant data.
And existing pig farm is since electronic popularity is high, pig information, column involved in pig transfer task Position information etc. still relies on manual record.When the cultivation scale of pig is smaller, the negligible amounts of pig can be used artificial at this time The mode of management carries out the management of pig transfer task.And when the cultivation of pig is larger, the pig cultivation to be carried out is appointed Be engaged in it is more, when needing the pig quantity that shifts more, if the pig transfer task various information that are related to only manually record, no It only needs to take a substantial amount of time and manpower, and the information manually recorded is easily lost, inquiry is also more difficult, causes to raise pigs The aquaculture cost of field increases.
Referring to Fig. 1, the application embodiment provides a kind of management method of cultivation task, management method comprising steps of
01: pig transfer task being entered according to the first trigger action, it includes what predetermined order generated that pig, which shifts task, Multiple tasks node, multiple tasks node include producing node and being transferred to node;
02: node is produced according to the execution of the second trigger action;And
03: node is transferred to according to the execution of third trigger action.
Please refer to figs. 2 and 3, and the application embodiment also provides a kind of management equipment 10 of cultivation task.Management equipment 10 include processor 13.The management equipment 10 of the application embodiment can be used for implementing the management method of the application embodiment. Specifically, processor 13 can be used for implementing above-mentioned steps 01,02 and 03, that is, processor 13 can be used for according to the first trigger action Into pig transfer task, (pig transfer task includes the multiple tasks node that predetermined order generates, multiple tasks node packet Include and produce node and be transferred to node), processor 13 can be used for being executed according to the second trigger action and produces node, triggered according to third Operation executes and is transferred to node.
Referring to Fig. 4, the application embodiment also provides a kind of managing device 20 of cultivation task.Managing device 20 includes Into module 21, the first execution module 22 and the second execution module 23.The managing device 20 of the application embodiment can be used for reality Apply the management method of the application embodiment.Specifically, it can be used for implementation steps 01 into module 21, that is, entering module 21 can For entering pig transfer task according to the first trigger action, (pig transfer task includes the multiple tasks that predetermined order generates Node, multiple tasks node include producing node and being transferred to node).First execution module 22 can be used for implementation steps 02, that is, the One execution module 22, which can be used for being executed according to the second trigger action, produces node.Second execution module 23 can be used for implementation steps 03, that is, the second execution module 23, which can be used for being executed according to third trigger action, is transferred to node.
Example as shown in Figure 2 is two different views of management equipment 10.Management equipment 10 can be a terminal, pipe It is integrated with processor 13 and multiple functions device in reason equipment 10, function element for example can be camera, display screen etc..Management Equipment 10 can be mobile phone, tablet computer, a laptop etc., and user can carry out pig transfer by management equipment 10 Task.Certainly, management equipment 10 is also possible to other, herein with no restrictions.
In example shown in Fig. 3, the processor 13 of management equipment 10 can be the server 13 in setting beyond the clouds, processing Device 13 and multiple terminal scattering devices and being in communication with each other are connect.User is obtained by multiple terminals by after the relevant information of material culture It is sent to processor 13, after processor 13 handles these information, the information that can send that treated to terminal or is sent out to terminal Send instruction.
It is appreciated that can be animal or plant, animal such as pig, ox, sheep etc., plant such as flowers, vegetables, water by material culture Fruit etc..The embodiment of the present application is to be animal by material culture: being illustrated for pig, pig can be sow, boar, boar or batch pig (more piglets) etc., hereafter using pig as narration.Principle is identical when by material culture being other animal or plants, no longer superfluous herein It states.
Cultivation task can be any task in sow whole life cycle, such as detection of oestrus task, looks into and return feelings and appoint Business, breeding task, pregnant inspection task, upper obstetric table task, childbirth task, immune task, sow wean task, weaned piglet task, Miscarriage task starts to be isolated domestication task, terminates isolation domestication task, task of jumping, batch pig sales task, batch pig and turn group to appoint Business, sow health care task, piglet health care task, entrust one's child to the care of sb. task, whole nest is posted into task, individual treatment task dispatching task type.This The pig transfer task of application embodiment can be used for shifting pig involved in any one above-mentioned cultivation task.
In the management method of the application embodiment, management equipment 10 and managing device 20, pig turn is provided for user The record platform of shifting task, the pig information of the record transfer of management equipment 10 of cultivation task can be used in user, corresponding It produces node and accurately records the details that pig shifts with node is transferred to, it is convenient fast on this record platform convenient for subsequent user The case where promptly operation such as being inquired, traced to the pig information of transfer, grasping pig transfer in time, is conducive to pig cultivation Intelligent management.
Specifically, in the different breeding stage of pig, when pig needs to carry out transfer task, user can artificially create pig Only transfer task.Or, processor 13 can obtain the cultivation task that pig needs to carry out, the cultivation task and pig that needs are jumped Transfer task is associated, automatically creates before needing the cultivation task jumped and pushes pig transfer task, user to user After the push for receiving pig transfer task, pig transfer task is entered according to the first trigger action.Pig shifts task can To be pushed to the equipment connecting with processor 13 or element by processor 13, such as processor 13 turns to display screen push pig Shifting task, display screen show that the pig shifts task;Alternatively, processor 13 shifts task, language to speech player push pig Sound player plays the prompt tone etc. of pig transfer task.
In this way, user shifts task by the pig of push, can know has pig transfer task to need to be implemented, without logical Cross that artificial memory which pig needs to be implemented pig transfer task, in order to avoid miss the time of transfer pig.
In one example, incorporated by reference to the processing interface of pig shown in fig. 5 transfer task, the push of processor 13 or user The pig transfer task artificially created can show by " task " icon P1, user can be checked by clicking " task " the icon P1 or Further start corresponding pig transfer task.Trigger action can be the operation of user's touch-control specific region, can be user Input the operation and any other operation of special sound information.User can just start pig by trigger action and shift task, with It avoids pig transfer task by false triggering, influences the progress for normally cultivating task.
It is worth noting that, pig transfer task includes that task of jumping and batch pig turn group's task.When pig is single, pig Transfer task is task of jumping shown in Fig. 5 b;When pig is multiple, it is that batch pig shown in Fig. 5 a turns that pig, which shifts task, Group's task.Include the case where that pig is single and multiple shown in Fig. 5 c.
Incorporated by reference to Fig. 5 to Fig. 7, the first trigger action can be the successive touch-control of user " pig transfer " icon shown in fig. 5 " entrance " icon P2 shown in P1 and Fig. 5.After user clicks " entrance " icon P2, as shown in FIG. 6 current wanted will be shown Carry out the details of the pig of pig transfer task.User clicks " continuation " icon P3, will show that pig as shown in Figure 7 turns The multiple tasks node of shifting task, multiple tasks node may include one in " beginning ", " being transferred to ", " producing " and " summary " It is a or multiple.After user has clicked " beginning " icon P5, it is considered as user and inputs the completion of the first trigger action, processor 13 starts pig Only transfer task;After user has clicked " producing " icon P6, it is considered as user and inputs the completion of the second trigger action;User, which clicks, " to be turned Enter " after icon P7, it is considered as user and inputs third trigger action and complete.In addition, user clicks " modification executor " icon P4 of Fig. 6 The executor of the pig transfer task currently carried out can then be modified.
Referring to Fig. 8, in some embodiments, before entering pig transfer task, cultivation task management method is also Comprising steps of
04: according to the first triggering input starting visioning procedure;
05: determining that task type is that pig shifts task according to the first operation input;
06: the current field information for obtaining pig information to be transferred and being bound with pig to be transferred;And
07: task is shifted according to pig information to be transferred and current field information creating pig.
Fig. 2 and Fig. 3 are please referred to, processor 13 can be used for executing step 04, step 05, step 06 and step 07, that is, place Reason device 13 can be used for determining that task type is pig according to the first triggering input starting visioning procedure, according to the first operation input Transfer task obtains pig information to be transferred and the current field information bound with pig to be transferred and according to be transferred Pig information and current field information creating pig shift task.
Referring to Fig. 9, managing device 20 further includes creation module 24, the acquisition module 26 and first of determining module 25, first Processing module 27.Creation module 24 can be used for implementation steps 04, that is, creation module 24 can be used for according to the first triggering input starting Visioning procedure;Determining module 25 can be used for implementation steps 05, that is, determining module 25 can be used for being determined according to the first operation input Task type is that pig shifts task;First acquisition module 26 can be used for implementation steps 06, that is, the first acquisition module 26 can be used for The current field information for obtaining pig information to be transferred and being bound with pig to be transferred;First processing module 27 can use implementation Step 07, that is, first processing module 27 can be used for being shifted according to pig information to be transferred and current field information creating pig Task.
Incorporated by reference to Figure 10, user clicks " newly-built " icon P8, is considered as user's input the first triggering input and completes, obtains " wound Build task " interface, " creation task " interface display has " task type " determination block P9 and " time started " frame, and user's point " is appointed Service type " determination block P9 is considered as user and inputs the completion of the first operation input, and the selected interface that multiple tasks can be obtained (is schemed not Show).User can select " pig transfer " task in multiple tasks (such as breeding task, whole nest post, upper obstetric table) option, The interface as shown in Figure 11 is obtained after selected " pig transfer " task, user can pass through click " barcode scanning addition " icon P10 or " hand The current field information that dynamic addition " icon P11 adds pig information to be transferred and binds with pig to be transferred.User clicks " barcode scanning addition " icon P10 obtains scanning window P12 as shown in figure 12, user by scanning window P12 scanning with it is to be transferred The pattern code (such as one-dimension code, two dimensional code, bar code, shown in Figure 12 by taking two dimensional code as an example) of the field binding of pig, will scan Window P12 alignment pattern code is to obtain pig information and current field information to be transferred.Further according to obtained to be transferred Pig shifts task as shown in fig. 13 that for pig information and current field information creating, and the task interface of pig transfer task is shown Just like position (A1 as shown in fig. 13 that), overbit (penCGL1 as shown in fig. 13 that), coding (penCGL1 as shown in fig. 13 that), Operation (deleting as shown in fig. 13 that) etc..If the current loaded pig information to be transferred of user and mistake when current field information Accidentally or miss, user can also be re-entered by point " barcode scanning gravity treatment " icon P13 or " manual reselection " icon P14 pig letter Breath and field information.More, task interface may also display the information such as field, batch pig number, stage condition (lactation, child care).
Please refer to Figure 14, in some embodiments, step 02 comprising steps of
022: being entered according to the second triggering input and produce node;
024: the current field information for obtaining pig information to be transferred and being bound with pig to be transferred;And
026: being registered pig information to be transferred and current field information to producing record according to the second operation input.
Fig. 2 and Fig. 3 are please referred to, processor 13 can be used for executing step 022, step 024 and step 026, that is, processor 13 It can be used for being entered according to the second triggering input and produce node, obtain pig information to be transferred and bound with pig to be transferred Current field information and pig information to be transferred and current field information are registered to producing note according to the second operation input Record.
Incorporated by reference to Figure 15, managing device 20 further includes that first entering module 27, second obtains module 28 and second processing mould Block 29.First entering module 27 can be used for implementation steps 022, that is, first entering module 27 can be used for according to the second triggering input Into producing node;Second acquisition module 28 can be used for implementation steps 024, that is, the second acquisition module 28 can be used for obtaining wait turn The pig information of shifting and the current field information bound with pig to be transferred;Second processing module 29 can be used for implementation steps 026, that is, Second processing module 29 can be used for being stepped on pig information to be transferred and current field information according to the second operation input Note to produce record.
Specifically, after user clicks " beginning " icon P5 as shown in Figure 7, the start node of pig transfer task be will become " pause " node as shown in figure 16, the node that pig transfer task is currently carried out can be moved to " producing " node.User needs When shifting pig, there is scanning window P15 as shown in figure 17 after clicking " producing " icon P6, will click on " producing " icon P6 Regard as the second triggering input.User scans the pattern code with the binding of the field of pig to be transferred first, by scanning window P15 Alignment pattern code is obtained with the current field information for obtaining pig information to be transferred and binding with pig to be transferred such as Figure 18 Shown in produce windows registry.The information that windows registry includes pig to be transferred and current field is produced, user can click pig Quantity frame P16 inputs the quantity of current pig to be transferred, clicks " determinations " icon and enters the next node that pig shifts task (being transferred to node) will click on " determination " key and regard as the second operation input.
Incorporated by reference to Figure 19, in one example, when pig transfer task is to jump task, produces windows registry and be shown as Be registered with the pig of current field (column A1 as shown in figure 19) from column information and mark the serial number of current shifted pig (serial number 5 as shown in figure 19) produces windows registry P17.In one example, the transfer of pig shown in Figure 18 task is batch Pig turns schematic diagram when group's task.Pig information to be transferred and current field information are registered to record is produced, convenient for subsequent User query retrospect, and avoid repeating pig transfer operation.
Please refer to Figure 20, in some embodiments, step 03 comprising steps of
031: triggering to input to enter being transferred to node according to third;
032: obtaining field information to be transferred to;And
033: pig information to be transferred and field information to be transferred to are bound according to third operation input.
Fig. 2 and Fig. 3 are please referred to, processor 13 can be used for executing step 031, step 032 and step 033.That is, processor 13 It can be used for being triggered according to third inputting to enter and be transferred to node, obtain field information to be transferred to and tied up according to third operation input Fixed pig information to be transferred and field information to be transferred to.
Incorporated by reference to Figure 21, managing device 20 further includes the second entrance module 2a, third obtains module 2b and third handles mould Block 2c.Second can be used for implementation steps 031 into module 2a, that is, second can be used for triggering input according to third into module 2a Into being transferred to node.Third, which obtains module 2b, can be used for implementation steps 032, that is, third, which obtains module 2b, can be used for obtaining wait turn The field information entered.Third processing module 2c can be used for implementation steps 033, that is, third processing module 2c can be used for according to third Operation input binds pig information to be transferred and field information to be transferred to.
Specifically, after the completion of " producing " node of pig transfer task, the task interface that pig shifts task is as schemed Shown in 22, i.e., by current " producing " node motion to " being transferred to " node, there is such as Figure 23 after clicking " being transferred to " icon P7 in user Shown in scanning window P18, will click on " being transferred to " icon P7 regard as third triggering input.At this point, pig is by current field It is transferred at field to be transferred to, user passes through scanning window P18 first and scans pattern code at field to be transferred to, will scan Window P18 alignment pattern code is to obtain field information to be transferred to.And pig information to be transferred to has produced node previous It obtains, the pattern code acquisition for scanning field to be transferred to is transferred to windows registry P19 as of fig. 24, this is transferred to windows registry P19 includes field information to be transferred to (A2 as shown), changes type (piglet as shown turns child care), non-rotary head number (such as Shown in 12), batch pig number (* * * as shown), be transferred to a number (as shown 10), average age in days (as shown 40 days) Deng.User, which clicks, determines that icon can bind pig information to be transferred and field information to be transferred to shown in Figure 24, by point It hits " determination " icon and regards as third operation input.
Figure 25 is please referred to, in some embodiments, step 03 further comprises the steps of:
034: selected process is started according to the 4th triggering input;
035: the transfering type of pig transfer task is selected according to the 4th operation input;
036: judging whether pig quantity to be transferred and the pig quantity being actually transferred to are consistent;And
037: if it is not, then pushing the confirmation message of pig transfer task.
Incorporated by reference to Fig. 2 and Fig. 3, processor 13 can be used for executing step 034, step 035 and step 036, that is, processor 13 It can be used for starting selected process according to the 4th triggering input, select the transfer class of pig transfer task according to the 4th operation input Type judges whether pig quantity to be transferred and the pig quantity being actually transferred to are consistent.Management equipment 10 further includes pusher 14, Pusher 14 and processor 13 can be used for executing step 037 jointly, and pusher 14 can be used for showing the confirmation of pig transfer task Information, processor 13 can be used for pushing the confirmation message of pig transfer task and shown by pusher 14.
Figure 26 is please referred to, managing device 20 further includes starting module 2d, chosen module 2e, judgment module 2f and pushing module 2g.Starting module 2d can be used for implementation steps 034, that is, starting module 2d can be used for implementing according to the 4th triggering input starting choosing Constant current journey.Chosen module 2e can be used for implementation steps 035, that is, chosen module 2e can be used for implementing being selected according to the 4th operation input Determine the transfering type of pig transfer task.Judgment module 2f can be used for implementation steps 036, that is, judgment module 2f can be used for implementing Judge whether pig quantity to be transferred and the pig quantity being actually transferred to are consistent.Pushing module 2g can be used for implementation steps 037, That is, pushing module 2g can be used for implementing if it is not, then pushing the confirmation message of pig transfer task.
Specifically, by before binding pig information to be transferred to and field to be transferred to, user can click the change of Figure 24 Dynamic type input frame P20, i.e. click input frame P20 regard as the 4th triggering input, obtain variation type choosing as shown in figure 27 Window P21 is selected, with the variation type of selected corresponding current pig transfer task.Changing type includes that piglet as shown in figure 27 turns Child care (after suckling pig wean switchs to child care pig, i.e., be that " suckling pig " to be transferred to the stage be that " child care pig " criticizes pig pair from the stage As in), turn (from the transfer of stage same batch pig object, predominantly subsequent cost accounting differentiated service type) in batch pig, use The transfering type of pig transfer task is selected at family in piglet turns to turn in child care and batch pig, and selected movement is regarded as the 4th Operation input.
In addition, being obtained as shown in figure 28 if pig quantity to be transferred and the pig quantity being actually transferred to are inconsistent The diagram of the acknowledgement window P22, Figure 28 of pig transfer task are acknowledgement window for batch pig turns group's task by pig transfer task P22 includes the specific head number for not being transferred to batch pig, accidental loss icon P23 and continues to be transferred to icon P24.When pig to be produced When quantity and the pig discrepancy of quantity being actually transferred to, the specific head number for not being transferred to batch pig of acknowledgement window, which can be shown, not to be transferred to specifically Pig quantity, when pig occurs during transfer in pig loses even dead situation, user clicks " unexpected damage Mistake " icon P23 can terminate current " being transferred to " node, be directly accessed next node.Continue to be transferred to icon P24 if user clicks, Then current interface switches to scanning window P18 shown in Figure 23, carries out being transferred to information registration again by scanning window P18, use The pig that residue is not transferred to can be continued to be transferred in field to be transferred to by family.Pusher 14 can be touch screen etc., and user can be with By checking that pig shifts the confirmation message of task on touch screen.
In some embodiments, current field includes configured with pre-bound release and/or feeding instrument, step 024 Step 0242: scanning information card and/or feeding instrument are to obtain pig information to be transferred and work as with what pig to be transferred was bound The information of preceding field.
Please refer to figs. 2 and 3, and in some embodiments, management equipment 10 may include first information collector 11.First Information acquisition device 11 and processor 13 can be used for common implementing step 0242, that is, first information collector 11 can be with scanning information Block and/or feeds instrument to acquire the information of pig information and the current field bound with pig to be transferred to be transferred, processing Device 13 can be used for obtaining the collected pig information to be transferred of first information collector 11 and bind with pig to be transferred The information of current field.
Mistake field is scanned in order to prevent, and processor 13 judges the pig of current field after the pattern code of scanning field It whether is pig (that is, whether current field is in current pig transfer task) that current pig transfer task needs to shift, The pig of current field is the current pig transfer task pig that needs to shift (that is, current field shifts task in current pig It is interior) when, corresponding information is produced into producing information registration interface and showing.
In some embodiments, managing device 20 further includes the 4th acquisition module 2h, and the 4th, which obtains module 2h, can be used for Implementation steps 0242, that is, the 4th acquisition module 2h can be used for scanning information card and/or feed instrument to obtain pig letter to be transferred The information of breath and the current field bound with pig to be transferred.
Specifically, release can be the card of entity, such as the card made of the materials such as plastics, foam, metal.Letter Breath card can be fixed on field, could be formed with the patterns such as specific pattern, such as two dimensional code, bar code on release.Letter Breath card is also possible to be formed with the graphical interfaces of specific pattern, such as is formed with figure circle of the patterns such as two dimensional code, bar code Face.At this point, release is storable in managing device 20 or management equipment 10, also can store in other electronic equipments, example In computer.
Feeding instrument, which can be, to be fixed on around field, for feeding the instrument of pig.In one example, feeding instrument can be with It is that essence feeds instrument, essence, which feeds instrument, can automatically control nursing time and quantity according to by the demand of material culture.It can be on each feeding instrument Configured with specific pattern, such as two dimensional code or bar code etc..At this point, first information collector 11 can be the camera of terminal (as shown in Figure 2), first information collector 11 are also possible to the terminal (as shown in Figure 3) with camera.Camera can pass through Scanning information card and/or feeding instrument are to acquire the letter of pig information to be transferred and the current field bound with pig to be transferred Breath.The letter of the collected pig information to be transferred of first information collector 11 and the current field bound with pig to be transferred Breath can be sent to processor 13, processor 13 receive the collected pig information to be transferred of the information acquisition device 11 and with to The information of the field of the pig binding of transfer.First information collector 11 scans field card and/or feeding instrument and can also obtain wait turn The field information entered.
In addition, management equipment 10 further includes the second information acquisition device 12, the second information acquisition device 12 can be taking the photograph for terminal As head (as shown in Fig. 2), the second information acquisition device 12 are also possible to the terminal (as shown in Figure 3) with camera.The application is implemented In the cultivation task management method of mode, management equipment 10 and managing device 20, barcode scanning is needed to obtain the process of various information It can be executed by first information collector 11 and/or the second information acquisition device 12.
Incorporated by reference to Figure 11, Figure 12, Figure 17 and Figure 23, in one example, user clicks " barcode scanning addition " figure in Figure 11 It " is produced " shown in mark P10, Figure 17 and " is transferred to " icon P7 shown in icon P6, Figure 23, the first information shown in Fig. 2 can be made to acquire Device 11 is opened, and pig shifts scanning window shown in the pop-up of processing interface scan box P12, P15 and P18 of task, the first letter Breath collector 11 can scan the specific pattern on the release being placed in scan box P7, to acquire the information of field.
Certainly, in other embodiments, the concrete form of first information collector 11 is not limited to the camera of the example above. First information collector 11 is also possible to the devices such as touch screen, and first information collector 11 acquires what user inputted on touch screen The information such as the coding of field are simultaneously transferred to processor 13.
Incorporated by reference to Figure 29 and Figure 30, in one example, when user, which does not complete, to be produced or be transferred to node, and click as schemed When " summary " icon P25 in 29 is intended to enter the task node summarized, management equipment 10 issues prompting frame as shown in figure 30 P26, to prompt the upper node of user not complete.
Multiple tasks node is arranged according to predesigned order, which can shift task according to pig for processor 13 The factors such as operation ease when practical execution are set.When current task node does not complete, it may be possible to current task node The data for needing to obtain be not fully retrieved or current task node there are also subtask node do not complete, if at this moment into Enter next task node, may result in can not execute subsequent task node, or the information of sow is caused to be lost.Therefore, When entering next task node and current task node does not complete, prompt information is pushed, avoids pig transfer task that from can not holding There is shortage of data after the completion of row or execution.Management equipment can remind user, prompting device by prompting device 15 shown in Fig. 3 15 specifically can be the devices such as display, loudspeaker, and prompt information can be the suggestion voice of the prompt window of display, sending Deng.
Please refer to Figure 31, in some embodiments, management method further include: 08: when executing current task node, if The instruction for executing pig transfer task need to be suspended by receiving, then suspends and execute pig transfer task.
Please refer to figs. 2 and 3, and in some embodiments, step 08 can also be realized by processor 13.In other words, Processor 13 can also be used in when executing current task node, if the instruction for executing pig transfer task need to be suspended by receiving, temporarily Stop executing pig transfer task.
Figure 32 is please referred to, in some embodiments, managing device 20 further includes pause module 2i, and pause module 2i can be used In implementation steps 08, that is, pause module 2i can be used for when executing current task node, execute pig transfer if receiving and need to suspend The instruction of task then suspends and executes pig transfer task.
The instruction of pause pig transfer task, which can be, is preset in managing device 20, in other embodiments, preset Pause instruction can be user and input phonetic order etc., and this is not restricted.
In some embodiments, management method further includes step 09: after executing summary task node, being delivered to pig The evaluation of transfer task performance, according to user's input to the summary of the task of execution and user to the feedback of system operability At least one of or it is multiple.
Please refer to figs. 2 and 3, and in some embodiments, processor 13 can be used for implementation steps 09, that is, processor 13 It can also be used in after executing summary task node, deliver the evaluation to pig transfer task performance, according to user's input pair The summary of appointed task and user are at least one of feedback of system operability or multiple.Wherein, user's input can be Voice input or text input.
In some embodiments, managing device further includes summarizing module.Summarizing module can be used for implementation steps 09, that is, Summarizing module can be used for after executing summary task node, deliver the evaluation to pig transfer task performance, according to user Summary to the task of execution and user are inputted at least one of feedback of system operability or multiple.
Specifically, incorporated by reference to Figure 29 and Figure 33, after user completes current pig transfer task, management equipment 10 is shown such as The prompting interface of Figure 29, to prompt user to enter the step of summarizing this pig transfer task." summary " icon is clicked in user After P25, processing interface can show that as shown in figure 33 includes delivering the evaluation to pig transfer task performance, according to user It inputs to the summary of the task of execution and user at least one of feedback of system operability or multiple processing block P26.
Wherein, it delivers and management equipment 10, which executes pig to user and turns, to be referred to the evaluation of pig transfer task performance The evaluation of shifting task.The foundation of evaluation includes at least one of the following: executing the duration used of pig transfer task, pig turns The completeness of shifting task is (for example, the data that each task node obtains when whether having execution, executing each task node are complete Degree etc.).Evaluation can be shown in the form of task score, for example, 100 points, 95 points, 80 points, 60 points, 40 points, 0 point etc. Deng specific evaluation can also be further displayed.For example 100 points of specific evaluation is " Good job ", 40 points of specific evaluation is " do not complete ' pig transfer ' task node ", i.e., for may indicate that task execution process in the evaluation for not the obtaining full marks of the task The defects of place etc..Management equipment 10 can be by a little evaluations as the performance assessment criteria of employee KPI, and do to these evaluations Analysis processing after formed quantization KPI as a result, and shown with intuitive way, facilitate management of the enterprise to employee.
Refer to that gains in depth of comprehension, experience after user executes this subtask etc. are believed to summarys of appointed task according to user's input Breath.What user can be summarized by way of being manually entered or voice inputs fills in, and processor 13 is inputted according to user and controlled Display screen processed shows the summary content of user.Management equipment 10 can will store the summary of the appointed task, for other Employee, especially new employee check, analyze and learn, and are conducive to the sharing and succession of experience.
User refers to evaluation of the user to system, such as the convenience of the operation to system to the feedback of system operability Property, the integrality of task node, interface aesthetics etc. evaluation.By taking the convenience of the operation of system as an example, interface can be shown Show the icons such as " facilitating handy ", " general ", " very poor " for selection by the user, a box can also be shown for user's input pair The improved suggestion of management equipment 10.Management equipment 10 can store these to the evaluation of system, check for developer, Management equipment 10 is improved and be improved.
Although presently filed embodiment has been shown and described above, it is to be understood that above embodiment is Illustratively, it should not be understood as the limitation to the application, those skilled in the art within the scope of application can be right Above embodiment is changed, modifies, replacement and variant.

Claims (19)

1. a kind of cultivation task management method, which is characterized in that the cultivation task management method includes:
Enter pig transfer task according to the first trigger action, the pig transfer task includes the multiple of predetermined order generation Task node, multiple task nodes include producing node and being transferred to node;
Node is produced according to the execution of the second trigger action;And
Node is transferred to according to the execution of third trigger action.
2. cultivation task management method according to claim 1, which is characterized in that before entering the pig transfer task, The cultivation task management method further include:
According to the first triggering input starting visioning procedure;
Determine that task type is that the pig shifts task according to the first operation input;
The current field information for obtaining pig information to be transferred and being bound with the pig to be transferred;And
Task is shifted according to pig described in the pig information to be transferred and the current field information creating.
3. cultivation task management method according to claim 1, which is characterized in that described to be executed according to the second trigger action It is described to produce node, comprising:
Node is produced according to the second triggering input entrance;
The current field information for obtaining pig information to be transferred and being bound with the pig to be transferred;And
The pig information to be transferred and the current field information are registered to producing record according to the second operation input.
4. cultivation task management method according to claim 1, which is characterized in that described to be executed according to third trigger action It is described to be transferred to node, comprising:
It is triggered to input according to third and is transferred to node described in entrance;
Obtain field information to be transferred to;And
Pig information and the field information to be transferred to be transferred are bound according to third operation input.
5. cultivation task management method according to claim 1, which is characterized in that the quantity of the pig is single, institute Stating pig transfer task is task of jumping.
6. cultivation task management method according to claim 1, which is characterized in that the quantity of the pig is multiple, institute Stating pig transfer task is that batch pig turns group's task.
7. cultivation task management method according to claim 6, which is characterized in that described to be executed according to third trigger action It is described to be transferred to node, further includes:
Start selected process according to the 4th triggering input;
The transfering type of the pig transfer task is selected according to the 4th operation input;
Judge whether the pig quantity to be transferred and the pig quantity being actually transferred to are consistent;And
If it is not, then pushing the confirmation message of the pig transfer task.
8. cultivation task management method according to claim 2 or 3, which is characterized in that the current field is pre-configured with Field card and/or feeding instrument, the current field for obtaining pig information to be transferred and being bound with the pig to be transferred Information, comprising:
The field card and/or the feeding instrument are scanned to obtain the pig information to be transferred and the current field and believe Breath.
9. cultivation task management method according to claim 1, which is characterized in that the cultivation task management method also wraps It includes:
When executing current task node, if the instruction for executing the pig transfer task need to be suspended by receiving, suspends and execute institute State pig transfer task.
10. a kind of cultivation task management device, which is characterized in that the cultivation task management device includes:
Into module, for entering pig transfer task according to the first trigger action, the pig transfer task includes by predetermined The multiple tasks node that order generates, multiple task nodes include producing node and being transferred to node;
First execution module, for producing node according to the execution of the second trigger action;And
Second execution module, for being transferred to node according to the execution of third trigger action.
11. a kind of aquaculture management equipment, which is characterized in that the cultivation task management equipment includes processor, the processor For:
Enter pig transfer task according to the first trigger action, the pig transfer task includes the multiple of predetermined order generation Task node, multiple task nodes include producing node and being transferred to node;
Node is produced according to the execution of the second trigger action;And
Node is transferred to according to the execution of third trigger action.
12. cultivation task management equipment according to claim 11, which is characterized in that the cultivation task management equipment is also Including information acquisition device, the information acquisition device is used to acquire pig information to be transferred and binds with the pig to be transferred Current field information;Before entering the pig transfer task, the manager is also used to:
According to the first triggering input starting visioning procedure;
Determine that task type is that the pig shifts task according to the first operation input;
The current field information for obtaining pig information to be transferred and being bound with the pig to be transferred;And
Task is shifted according to pig described in the pig information to be transferred and the current field information creating.
13. cultivation task management equipment according to claim 11, which is characterized in that the cultivation task management equipment is also Including information acquisition device, the information acquisition device is used to acquire pig information to be transferred and binds with the pig to be transferred Current field information;The processor is also used to:
Node is produced according to the second triggering input entrance;
The current field information for obtaining pig information to be transferred and being bound with the pig to be transferred;And
The pig information to be transferred and the current field information are registered to producing record according to the second operation input.
14. cultivation task management equipment according to claim 11, which is characterized in that the cultivation task management equipment is also Including information acquisition device, the information acquisition device for acquire the pig information to be transferred and with the field to be transferred to Information;The processor is also used to:
It is triggered to input according to third and is transferred to node described in entrance;
Obtain field information to be transferred to;And
Pig information and the field information to be transferred to be transferred are bound according to third operation input.
15. cultivation task management equipment according to claim 11, which is characterized in that the processor is also used to: working as institute When to state the quantity of pig be single, determine that pig transfer task is task of jumping.
16. cultivation task management equipment according to claim 11, which is characterized in that the processor is also used to: working as institute When to state the quantity of pig be multiple, determine that pig transfer task is that batch pig turns group's task.
17. cultivation task management equipment according to claim 16, which is characterized in that the processor is also used to:
Start selected process according to the 4th triggering input;
The transfering type of the pig transfer task is selected according to the 4th operation input;
Judge whether the pig quantity to be transferred and the pig quantity being actually transferred to are consistent;And
If it is not, then pushing the confirmation message of the pig transfer task.
18. cultivation task management equipment according to claim 12 or 13, which is characterized in that the current field is pre-configured There are field card and/or feeding instrument, the information acquisition device to obtain for scanning the field card and/or the feeding instrument described Pig information and the current field information to be transferred.
19. cultivation task management equipment according to claim 11, which is characterized in that the processor is also used to: being held When row current task node, if the instruction for executing the pig transfer task need to be suspended by receiving, suspends and execute the pig turn Shifting task.
CN201910133357.XA 2019-02-22 2019-02-22 Management method, management equipment and the managing device of cultivation task Pending CN109902950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910133357.XA CN109902950A (en) 2019-02-22 2019-02-22 Management method, management equipment and the managing device of cultivation task

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910133357.XA CN109902950A (en) 2019-02-22 2019-02-22 Management method, management equipment and the managing device of cultivation task

Publications (1)

Publication Number Publication Date
CN109902950A true CN109902950A (en) 2019-06-18

Family

ID=66945439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910133357.XA Pending CN109902950A (en) 2019-02-22 2019-02-22 Management method, management equipment and the managing device of cultivation task

Country Status (1)

Country Link
CN (1) CN109902950A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580589A (en) * 2019-09-26 2019-12-17 四川长虹电器股份有限公司 Live pig intelligent turning system and turning method thereof
CN111367912A (en) * 2020-03-03 2020-07-03 福州农福腾信息科技有限公司 Cultivation data management method and system based on Internet of things
CN112036817A (en) * 2020-08-24 2020-12-04 新希望六和股份有限公司 Livestock information processing method and device and computer equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952006A (en) * 2016-01-07 2017-07-14 上海玉霖实业发展有限公司 A kind of pig breeding farm produces monitoring and managing method
CN107563730A (en) * 2017-08-31 2018-01-09 临沂市兔兔畜牧科技有限公司 A kind of scale rabbit cultivates intelligent management system
CN108925446A (en) * 2018-09-04 2018-12-04 江西农业大学 A kind of live pig healthy aquaculture intelligence system
CN109087210A (en) * 2018-08-27 2018-12-25 中国联合网络通信集团有限公司 A kind of animal epidemic prevention processing method and system based on block chain technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952006A (en) * 2016-01-07 2017-07-14 上海玉霖实业发展有限公司 A kind of pig breeding farm produces monitoring and managing method
CN107563730A (en) * 2017-08-31 2018-01-09 临沂市兔兔畜牧科技有限公司 A kind of scale rabbit cultivates intelligent management system
CN109087210A (en) * 2018-08-27 2018-12-25 中国联合网络通信集团有限公司 A kind of animal epidemic prevention processing method and system based on block chain technology
CN108925446A (en) * 2018-09-04 2018-12-04 江西农业大学 A kind of live pig healthy aquaculture intelligence system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
非凡软件站: "宏达猪场管理系统V1.0普及版", 《HTTPS://WWW.CRSKY.COM/SOFT/104800.HTML》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580589A (en) * 2019-09-26 2019-12-17 四川长虹电器股份有限公司 Live pig intelligent turning system and turning method thereof
CN110580589B (en) * 2019-09-26 2022-02-01 四川长虹电器股份有限公司 Live pig intelligent turning system and turning method thereof
CN111367912A (en) * 2020-03-03 2020-07-03 福州农福腾信息科技有限公司 Cultivation data management method and system based on Internet of things
CN111367912B (en) * 2020-03-03 2022-10-14 福州农福腾信息科技有限公司 Cultivation data management method and system based on Internet of things
CN112036817A (en) * 2020-08-24 2020-12-04 新希望六和股份有限公司 Livestock information processing method and device and computer equipment
CN112036817B (en) * 2020-08-24 2023-12-22 新希望六和股份有限公司 Livestock information processing method, device and computer equipment

Similar Documents

Publication Publication Date Title
CN109902950A (en) Management method, management equipment and the managing device of cultivation task
CN101645111B (en) Report generation support apparatus, report generation support system, and medical image referring apparatus
CN106934212A (en) Full-automatic blood sampling management system and management method
CN109583793A (en) A kind of farm's intellectualized management system and method based on two dimensional code task navigation
CN109447662A (en) A kind of cultivation monitoring method and system
CN109961371A (en) Management system for breeding
JP2022075681A (en) Timeline system for monitoring culture media protocol
CN109886566A (en) Cultivate task management method and device, cultivation task management equipment and system
CN114270313A (en) Computer-implemented method, computer program and physical computing environment
CN109658015A (en) Cultivate task management method, managing device, management equipment and management system
CN109919467A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109919457A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109919575A (en) Management method, managing device and the management system of Farrowing task
CN109872068A (en) Cultivate task management method and device, cultivation task management equipment and system
CN107526590A (en) Operation guidance information methods of exhibiting, device and the terminal of Medical Devices
CN110047009A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109685679A (en) Management method, managing device and the management system of sow wean task
CN109691398A (en) Management method, managing device and the management system of the back fat measurement task of pig
CN109902960A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109919795A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109858881A (en) Management method, managing device and the management system of the immune task of material culture
CN111144202B (en) Object control method, device and system, electronic equipment and storage medium
CN109902946A (en) Cultivate task management method, managing device, management equipment and management system
JP4378305B2 (en) Mammal breeding support program, program storage medium, breeding support device
CN109658283A (en) Cultivate task management method, managing device, management equipment and management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618