CN109614190A - Resources configuration management method and platform - Google Patents
Resources configuration management method and platform Download PDFInfo
- Publication number
- CN109614190A CN109614190A CN201811484423.XA CN201811484423A CN109614190A CN 109614190 A CN109614190 A CN 109614190A CN 201811484423 A CN201811484423 A CN 201811484423A CN 109614190 A CN109614190 A CN 109614190A
- Authority
- CN
- China
- Prior art keywords
- resource
- resources
- visualization interface
- data
- configuration management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Human Computer Interaction (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention discloses a kind of resources configuration management method, comprising: obtains Current resource and configures visualization interface;Visualization interface, which is configured, according to Current resource configures resource;The step for updating resource distribution visualization interface, then carrying out the acquisition Current resource configuration visualization interface, wherein updated resource distribution visualization interface is that Current resource configures visualization interface.This method passes through the Current resource got and configures visualization interface, when thering is new service order or old service order to change, the state of current all resources can be intuitively understood quickly in staff according to resource distribution visualization interface, then rapid configuration is carried out again, it is efficient and convenient.
Description
Technical field
The present invention relates to service resources configuration management fields, and in particular to a kind of resources configuration management method and platform.
Background technique
With the development of business economic and increasing for business event amount, the resources configuration management for needing to carry out is also more and more multiple
Miscellaneous, the current resource distribution situation of enterprise is: enterprise is connected to after service order and distributes resource according to the business demand of client, does not have
The enterprise of resources configuration management platform is carried out by the way of manual entry related data, and such mode often will appear resource
The case where repeating configuration and repeatedly error correction, working efficiency is extremely low, has the enterprise of resources configuration management platform will using excel table
Related data list, although such mode can avoid the shortcomings that manual entry to a certain extent, due to inside list
Data it is very much, resource distribution does not have a visual interface, and staff is not intuitive when checking and searching resource status, time-consuming
Arduously, it equally will affect working efficiency.
Summary of the invention
In view of this, the application provides a kind of resources configuration management method, this method passes through the Current resource got and matches
Visualization interface is set, when having new service order or old service order to change, staff can be according to resource
The state of current all resources is intuitively understood quickly in configuration visualization interface, then carries out rapid configuration again, efficient and convenient.
In order to solve the above technical problems, technical solution provided by the invention is as follows:
Resources configuration management method, comprising:
It obtains Current resource and configures visualization interface;
Visualization interface, which is configured, according to Current resource configures resource;
Resource distribution visualization interface is updated, described acquisition Current resource configuration this step of visualization interface is then carried out
Suddenly, wherein updated resource distribution visualization interface is that Current resource configures visualization interface.
Further, the step for acquisition Current resource configuration visualization interface further includes generating resource distribution before
The step for visualization interface, the generation resource distribution visualization interface includes:
Resource data is obtained, the resource data includes the data of device resource, the data of power resource, Internet resources
The data of data and space resources;
Resource associations model is established according to resource data;
Resource distribution visualization interface is generated according to resource associations model, includes setting in the resource distribution visualization interface
Standby resource, the status information of power resource, Internet resources and space resources.
Further, in the resource distribution visualization interface, device resource, power resource, Internet resources and space money
The status information in source includes idle state, occupied state, test mode, preemption state and release conditions.
Further, in the resource distribution visualization interface, idle state, occupied state, test mode, preemption state
Different colors is respectively corresponded with release conditions.
Further, described the step for configuring visualization interface configuration resource according to Current resource, includes:
Service order data are obtained, the service order data include the need of the demand data of device resource, power resource
Seek the demand data of data, the demand data of Internet resources and space resources;
Device resource, power resource, Internet resources and space resources in Current resource configuration visualization interface are obtained respectively
Status information;
It is provided according to the demand data of device resource, the demand data of power resource, the demand data of Internet resources and space
Demand data and device resource, the status information configuration resource of power resource, Internet resources and space resources in source.
Further, the step for update resource distribution visualization interface, includes: and is updated according to resource distribution situation
The status information of device resource, power resource, Internet resources and space resources in resource distribution visualization interface generates after updating
Resource distribution visualization interface.
It further, further include service order audit after the acquisition service order data.
Resources configuration management platform, comprising:
Acquiring unit: for obtaining Current resource configuration visualization interface;
Resources configuration management unit: for configuring visualization interface configuration management resource according to Current resource;
Updating unit: for updating resource distribution visualization interface.
Further, further includes:
Generation unit: for generating resource distribution visualization interface.
Further, the generation unit includes:
Obtain module: for obtaining resource data, the resource data includes the number of the data of device resource, power resource
According to, the data of the data of Internet resources and space resources;
Resource associations model building module: for establishing resource associations model according to resource data
Resources configuration management method provided by the invention passes through the Current resource got and configures visualization interface, once have
When new service order or old service order change, staff can be intuitively fast according to resource distribution visualization interface
The state for recognizing current all resources fastly, then carries out rapid configuration again, efficient and convenient.
Detailed description of the invention
Fig. 1 is the resources configuration management method flow diagram that embodiment 1 provides.
Fig. 2 is the resources configuration management platform structure block diagram that embodiment 2 provides.
Specific embodiment
It is with reference to the accompanying drawing and specific real in order to make those skilled in the art more fully understand technical solution of the present invention
Applying example, the present invention is described in further detail.
Embodiment 1
As shown in Figure 1, the present embodiment provides a kind of resources configuration management methods, comprising:
S1: it obtains Current resource and configures visualization interface;
S2: visualization interface is configured according to Current resource and configures resource;
S3: updating resource distribution visualization interface, then carry out the acquisitions Current resource configure visualization interface this
Step, wherein updated resource distribution visualization interface is that Current resource configures visualization interface.
Preferably, the step for acquisition Current resource configuration visualization interface, i.e. before step S1 further include:
S0: resource distribution visualization interface, the step for the generation resource distribution visualization interface, i.e. step S0 are generated
Include:
S01: obtaining resource data, and the resource data includes the data of device resource, the data of power resource, network money
The data in source and the data of space resources;
S02: resource associations model is established according to resource data;
S03: resource distribution visualization interface is generated according to resource associations model, is wrapped in the resource distribution visualization interface
Include the status information of device resource, power resource, Internet resources and space resources.
What needs to be explained here is that device resource includes storage equipment, blade apparatus and host equipment in step S01, move
Power resource includes power distribution cabinet, first cabinet of each row and PDU, and Internet resources include interchanger, port, IP address, bandwidth and ODF, space money
Source includes building, floor, computer room, seat in the plane and cabinet U, and in actual conditions, the quantity of some resources or resource apparatus is more
A, some is 1, but each resource or resource apparatus have corresponding identity, working condition, occupancy situation etc.,
When obtaining resource data, related resource type is not only obtained, identity, the work of each resource or resource apparatus are also obtained
Make state, occupancy situation, to distinguish configuration, step S01 and step S02 are with regard to carrying out before no service order, in fact
When border is implemented, resource associations model is established, exactly by all device resources, power resource, Internet resources and space resources
Information association is got up, such as some device resource, here by taking a cabinet (belonging to host equipment) as an example, needs associated power
Resource information include with the relevant information of the matching used power distribution cabinet of the cabinet, first cabinet of each row and PDU (such as by which power distribution cabinet to
Which the first cabinet of each row of the cabinet distribution, the cabinet or power distribution cabinet is, what the information of the PDU of use is), similarly arrive Internet resources
And space resources, briefly, an exactly cabinet has a relevant location information certainly, for example building, floor, which is located at
Specific seat in the plane in computer room, computer room and cabinet U, when cabinet works with having corresponding exchanger information, port information, IP
Location, bandwidth and ODF are novel, these information are all mutually to close associated, and then whole resource informations associate and just establish
Resource associations model.
It should also be noted that, can use the knot of those skilled in the art's routine after establishing resource associations model
Structure modeling method establishes resource Visualization Model, generates 2D or 3D resource visualization interface further according to resource Visualization Model.
In addition, in the resource distribution visualization interface of the present embodiment, device resource, power resource, Internet resources and space
The status information of resource includes idle state, occupied state, test mode, preemption state and release conditions.
What needs to be explained here is that idle state, which refers to, not to be rented by client in vacant for some resource
The state of situation, occupied state refer to that client has rented and completed the state of contract signing, and preemption state refers to and objective
Family is reached an agreement but the state signed a contract not yet, and release conditions refer to that occupied resource is in order expiration of contract
Afterwards, resource needs the state being released, when it is implemented, can retain a timing for client after just referring to order expiration of contract
Between, resource belongs to release conditions during this, after retention time has arrived, if client still theres is a decision to discontinue rental, and money
Source switchs to idle state by release conditions, if client decides to continue with rental during retaining, resource switchs to preempt shape by discharging
State or occupied state can ensure the equity of frequent customer in this way, improve the service impression of client, and test mode refers to according to client
The requirement of transacting business again, the resource of this when after first test, test effect meet the requirements of the customers proposed belongs to test shape
State has not needed release conditions, directly if client does not handle contract after test for the resource of test mode
There is test mode to switch to idle state, other clients can be distributed at once and used, customer experience and enterprise can be balanced in this way
Relationship between operation is classified scientific and reasonable.
In addition, can also include following information: the resource of idle state in the resource distribution visualization interface of the present embodiment
The resource quantity of type and respective resources type, the resource type of occupied state and the resource quantity of respective resources type, test
The resource type of state and the resource quantity of respective resources type, preempt the resource type of state and the resource of respective resources type
Quantity, the resource type of release conditions and the resource quantity of respective resources type can also include: further each resource
Total quantity under the state classification and each state of same attribute resource (such as cabinet) under type (such as device resource), such as
In device resource, the cabinet quantity being in idle condition is how many, and the cabinet quantity in test mode is how many, in preemption
The cabinet quantity of state is how many, and the cabinet quantity in release conditions is how many, and so on arrive other resources, in this way can be with
Greatly improve the working efficiency of staff.
When implementing the present embodiment, the idle state of resource in resource distribution visualization interface, occupied state, test mode,
Preemption state and release conditions respectively correspond different colors.The different conditions of resource, staff are indicated using different colours
Using intuitive and convenient.
Preferably, described the step for configuring visualization interface configuration resource according to Current resource, includes:
Service order data are obtained, the service order data include the need of the demand data of device resource, power resource
Seek the demand data of data, the demand data of Internet resources and space resources;
Device resource, power resource, Internet resources and space resources in Current resource configuration visualization interface are obtained respectively
Status information;
It is provided according to the demand data of device resource, the demand data of power resource, the demand data of Internet resources and space
Demand data and device resource, the status information configuration resource of power resource, Internet resources and space resources in source.
What needs to be explained here is that resource distribution process is exactly to be closed after judging resource status according to service order demand
The process of reason distribution resource, the resource of only idle state can be used for distributing, if said so resource is not idle state
Resource before improving eyesight is all in use or in advance in use, needs further waiting, just can be carried out after having resource to withdraw
Distribution.
Preferably, the step for update resource distribution visualization interface includes: to be updated according to resource distribution situation
The status information of device resource, power resource, Internet resources and space resources in resource distribution visualization interface generates after updating
Resource distribution visualization interface.
Preferably, further including service order audit after the acquisition service order data.
What needs to be explained here is that service order audit is primarily referred to as auditing at present in actual implementation the present embodiment
Resource can meet service order demand, such as some client applies renting 100 cabinets, but shows in current resource status
Show that available idle cabinet only has 80, this when will reject application, cannot handle this business.
Embodiment 2
As shown in Fig. 2, the present embodiment provides a kind of resources configuration management platforms, comprising:
Acquiring unit: for obtaining Current resource configuration visualization interface;
Resources configuration management unit: for configuring visualization interface configuration management resource according to Current resource;
Updating unit: for updating resource distribution visualization interface.
Preferably, the present embodiment can also include:
Generation unit: for generating resource distribution visualization interface.
Preferably, the generation unit of the present embodiment may include:
Obtain module: for obtaining resource data, the resource data includes the number of the data of device resource, power resource
According to, the data of the data of Internet resources and space resources;
Resource associations model building module: for establishing resource associations model according to resource data.
Energy consumption management system in this present embodiment is closed, each unit executes the concrete mode of operation in the related party
It is described in detail in the embodiment of method, explanation will not be elaborated herein.
The above is only the preferred embodiment of the present invention, it is noted that above-mentioned preferred embodiment is not construed as pair
Limitation of the invention, protection scope of the present invention should be defined by the scope defined by the claims..For the art
For those of ordinary skill, without departing from the spirit and scope of the present invention, several improvements and modifications can also be made, these change
It also should be regarded as protection scope of the present invention into retouching.
Claims (10)
1. resources configuration management method characterized by comprising
It obtains Current resource and configures visualization interface;
Visualization interface, which is configured, according to Current resource configures resource;
The step for updating resource distribution visualization interface, then carrying out the acquisition Current resource configuration visualization interface,
In, updated resource distribution visualization interface is that Current resource configures visualization interface.
2. resources configuration management method according to claim 1, which is characterized in that the acquisition Current resource configuration is visual
Change interface the step for before further include generate resource distribution visualization interface, the generation resource distribution visualization interface this
Step includes:
Resource data is obtained, the resource data includes the data of device resource, the data of power resource, the data of Internet resources
With the data of space resources;
Resource associations model is established according to resource data;
Resource distribution visualization interface is generated according to resource associations model, includes that equipment provides in the resource distribution visualization interface
Source, power resource, Internet resources and space resources status information.
3. service resources configuring management method according to claim 2, which is characterized in that the resource distribution visualizes boundary
In face, device resource, power resource, Internet resources and space resources status information include idle state, occupied state, survey
Examination state, preemption state and release conditions.
4. resources configuration management method according to claim 3, which is characterized in that the resource distribution visualization interface
In, idle state, occupied state, test mode, preemption state and release conditions respectively correspond different colors.
5. resources configuration management method according to claim 3 or 4, which is characterized in that described to be configured according to Current resource
Visualization interface configure resource the step for include:
Service order data are obtained, the service order data include the demand number of the demand data of device resource, power resource
According to, the demand data of the demand data of Internet resources and space resources;
The shape of device resource, power resource, Internet resources and space resources in Current resource configuration visualization interface is obtained respectively
State information;
According to the demand data of device resource, the demand data of power resource, the demand data of Internet resources and space resources
The status information configuration resource of demand data and device resource, power resource, Internet resources and space resources.
6. resources configuration management method according to claim 5, which is characterized in that the update resource distribution visualizes boundary
The step for face includes: to update device resource, power resource, net in resource distribution visualization interface according to resource distribution situation
The status information of network resource and space resources generates updated resource distribution visualization interface.
7. resources configuration management method according to claim 5, which is characterized in that after the acquisition service order data
It further include service order audit.
8. resources configuration management platform characterized by comprising
Acquiring unit: for obtaining Current resource configuration visualization interface;
Resources configuration management unit: for configuring visualization interface configuration management resource according to Current resource;
Updating unit: for updating resource distribution visualization interface.
9. resources configuration management platform according to claim 8, which is characterized in that further include:
Generation unit: for generating resource distribution visualization interface.
10. resources configuration management platform according to claim 9, which is characterized in that the generation unit includes:
Obtain module: for obtaining resource data, the resource data include the data of device resource, the data of power resource,
The data of Internet resources and the data of space resources;
Resource associations model building module: for establishing resource associations model according to resource data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811484423.XA CN109614190A (en) | 2018-12-06 | 2018-12-06 | Resources configuration management method and platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811484423.XA CN109614190A (en) | 2018-12-06 | 2018-12-06 | Resources configuration management method and platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109614190A true CN109614190A (en) | 2019-04-12 |
Family
ID=66007269
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811484423.XA Pending CN109614190A (en) | 2018-12-06 | 2018-12-06 | Resources configuration management method and platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109614190A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111651430A (en) * | 2020-05-30 | 2020-09-11 | 京东数字科技控股有限公司 | Equipment automation management method, device, server, client and storage medium |
CN111833024A (en) * | 2020-07-20 | 2020-10-27 | 北京百度网讯科技有限公司 | Method, apparatus, device and storage medium for outputting information |
CN112073241A (en) * | 2020-09-07 | 2020-12-11 | 三一石油智能装备有限公司 | Switch configuration method and device, electronic equipment and storage medium |
CN114844210A (en) * | 2022-04-25 | 2022-08-02 | 苏州安瑞可信息科技有限公司 | Centralized control method, device, equipment and medium for multi-path power distribution unit |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103746823A (en) * | 2011-12-31 | 2014-04-23 | 华茂云天科技(北京)有限公司 | Resource management and operation system |
CN103763117A (en) * | 2011-12-31 | 2014-04-30 | 华茂云天科技(北京)有限公司 | Service and operation management system |
CN104731657A (en) * | 2013-12-24 | 2015-06-24 | 中国移动通信集团山西有限公司 | Resource scheduling method and system |
CN105940378A (en) * | 2014-02-27 | 2016-09-14 | 英特尔公司 | Techniques to allocate configurable computing resources |
CN106293872A (en) * | 2016-07-27 | 2017-01-04 | 云南电网有限责任公司信息中心 | A kind of SLA resources balance management-control method based on resource pool |
CN106576114A (en) * | 2014-08-08 | 2017-04-19 | 甲骨文国际公司 | Policy based resource management and allocation system |
CN107046481A (en) * | 2017-04-18 | 2017-08-15 | 国网福建省电力有限公司 | A kind of information system integrated network management system comprehensive analysis platform |
CN107333332A (en) * | 2017-07-20 | 2017-11-07 | 中通服软件科技有限公司 | A kind of method with prefabricated rule distribution access type communication service resource |
CN107430712A (en) * | 2014-12-19 | 2017-12-01 | 艾诺茨Ip公司 | Resource management system is can access with the network that can be allocated management of |
CN107493522A (en) * | 2017-07-20 | 2017-12-19 | 中通服软件科技有限公司 | A kind of bandwidth type business is from method of completing the square |
CN108200111A (en) * | 2016-12-08 | 2018-06-22 | 中国移动通信集团山西有限公司 | Resource allocation information update method, device and resource interface equipment |
CN108205569A (en) * | 2016-12-19 | 2018-06-26 | 中国移动通信集团山西有限公司 | For updating the method and apparatus of configuration management database |
CN108270592A (en) * | 2016-12-30 | 2018-07-10 | 中兴通讯股份有限公司 | The management-control method and device of a kind of Network resource allocation |
-
2018
- 2018-12-06 CN CN201811484423.XA patent/CN109614190A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103763117A (en) * | 2011-12-31 | 2014-04-30 | 华茂云天科技(北京)有限公司 | Service and operation management system |
CN103746823A (en) * | 2011-12-31 | 2014-04-23 | 华茂云天科技(北京)有限公司 | Resource management and operation system |
CN104731657A (en) * | 2013-12-24 | 2015-06-24 | 中国移动通信集团山西有限公司 | Resource scheduling method and system |
CN105940378A (en) * | 2014-02-27 | 2016-09-14 | 英特尔公司 | Techniques to allocate configurable computing resources |
CN106576114A (en) * | 2014-08-08 | 2017-04-19 | 甲骨文国际公司 | Policy based resource management and allocation system |
CN107430712A (en) * | 2014-12-19 | 2017-12-01 | 艾诺茨Ip公司 | Resource management system is can access with the network that can be allocated management of |
CN106293872A (en) * | 2016-07-27 | 2017-01-04 | 云南电网有限责任公司信息中心 | A kind of SLA resources balance management-control method based on resource pool |
CN108200111A (en) * | 2016-12-08 | 2018-06-22 | 中国移动通信集团山西有限公司 | Resource allocation information update method, device and resource interface equipment |
CN108205569A (en) * | 2016-12-19 | 2018-06-26 | 中国移动通信集团山西有限公司 | For updating the method and apparatus of configuration management database |
CN108270592A (en) * | 2016-12-30 | 2018-07-10 | 中兴通讯股份有限公司 | The management-control method and device of a kind of Network resource allocation |
CN107046481A (en) * | 2017-04-18 | 2017-08-15 | 国网福建省电力有限公司 | A kind of information system integrated network management system comprehensive analysis platform |
CN107493522A (en) * | 2017-07-20 | 2017-12-19 | 中通服软件科技有限公司 | A kind of bandwidth type business is from method of completing the square |
CN107333332A (en) * | 2017-07-20 | 2017-11-07 | 中通服软件科技有限公司 | A kind of method with prefabricated rule distribution access type communication service resource |
Non-Patent Citations (1)
Title |
---|
吴一平: "可视化与量化指标在信息网运维管理中的应用研究", 《电子技术与软件工程》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111651430A (en) * | 2020-05-30 | 2020-09-11 | 京东数字科技控股有限公司 | Equipment automation management method, device, server, client and storage medium |
CN111651430B (en) * | 2020-05-30 | 2023-11-07 | 京东科技控股股份有限公司 | Equipment automation management method, device, server, client and storage medium |
CN111833024A (en) * | 2020-07-20 | 2020-10-27 | 北京百度网讯科技有限公司 | Method, apparatus, device and storage medium for outputting information |
CN112073241A (en) * | 2020-09-07 | 2020-12-11 | 三一石油智能装备有限公司 | Switch configuration method and device, electronic equipment and storage medium |
CN114844210A (en) * | 2022-04-25 | 2022-08-02 | 苏州安瑞可信息科技有限公司 | Centralized control method, device, equipment and medium for multi-path power distribution unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109614190A (en) | Resources configuration management method and platform | |
CN105429780B (en) | A method of virtualization network service business automatically generates and dynamic monitors | |
CN109617759A (en) | Block catenary system stability test method, apparatus, equipment and storage medium | |
CN110740053B (en) | Service arranging method and device | |
CN111190730B (en) | Heterogeneous cloud management platform | |
CN108989091A (en) | Based on the tenant network partition method of Kubernetes network, storage medium, electronic equipment | |
CN107003906A (en) | The type of cloud computing technology part is to type analysis | |
CN106301829A (en) | A kind of method and apparatus of Network dilatation | |
US9813360B2 (en) | Switch board of blade server and port configuring method thereof | |
CN110661842B (en) | Resource scheduling management method, electronic equipment and storage medium | |
CN106878363A (en) | A kind of information processing method, apparatus and system | |
CN107508722A (en) | A kind of business monitoring method and device | |
US10225159B2 (en) | Dynamic graph-based structure for representing a communications network | |
CN106101213A (en) | Information-distribution type storage method | |
CN108377200A (en) | Cloud user management method and system based on LDAP and SLURM | |
Cerroni | Multiple virtual machine live migration in federated cloud systems | |
WO2023098374A1 (en) | Network resource deployment method and apparatus, and electronic device and storage medium | |
CN109905492A (en) | Operation safety management system and method based on distributed modular data center | |
CN106101212A (en) | Big data access method under cloud platform | |
CN109756906A (en) | A kind of network element management method and device | |
CN106506182A (en) | A kind of method and system of configuration PTN business | |
Patni et al. | Infrastructure as a code (IaC) to software defined infrastructure using Azure Resource Manager (ARM) | |
CN106254452A (en) | The big data access method of medical treatment under cloud platform | |
CN114070707A (en) | Internet performance monitoring method and system | |
Santos et al. | Automating the service function chain availability assessment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190412 |