CN109309713A - Piping lane operation management system based on wisdom piping lane aware communications integrating device - Google Patents
Piping lane operation management system based on wisdom piping lane aware communications integrating device Download PDFInfo
- Publication number
- CN109309713A CN109309713A CN201811087534.7A CN201811087534A CN109309713A CN 109309713 A CN109309713 A CN 109309713A CN 201811087534 A CN201811087534 A CN 201811087534A CN 109309713 A CN109309713 A CN 109309713A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- wisdom
- integrating device
- subsystem
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Piping lane operation management system based on wisdom piping lane aware communications integrating device, belong to piping lane monitoring and administrative skill field, the present invention is by multiple sensor integrations in the segment limit of specific piping lane storehouse into a data summarization and the minimum system of translation, pass through wisdom piping lane aware communications integrating device transmission of monitoring perception data packet, inside carries IP address, multiple wisdom piping lane aware communications integrating devices are connected on a relay node, pass through optical fiber Data Over Cable.Transmitting in data includes various types of shared and information to be processed, is translated, is shown in O&M subsystem in the form of 3-D graphic by operation management system server code.According to the difference of operation management content, pipeline performance monitoring subsystem, internal environment monitoring subsystem, security watchdog subsystem are set.Realize the accurate measurements from entity piping lane state, the classification of the translation to information, again to the remote transmission of information, until the overall process of operating status intuitively shown.
Description
Technical field
The invention belongs to piping lane monitoring and administrative skill field, especially relate to a kind of based on wisdom piping lane aware communications
The piping lane operation management system of integrating device.
Background technique
Underground pipe gallery is the general favour engineering of the people's livelihood for determining emphasis in current Urban Construction in China and supporting, process of construction
Be conducive to improve urban carrying capacity and urbanization quality, be conducive to increase public product effective investment, pull society
Can capital input, make the new power of economic development, but the underground pipe gallery construction that various regions are carried out, there is also many short slabs,
It is embodied in multiple links such as investment and financing, construction consulting, ad hoc planning, survey and design, construction management, processing and manufacturing, operation management
Link is especially weak.It is in particular in following three aspects: firstly, existing chinese national standard does not have phase in terms of standard
The operation and maintenance specification answered also lacks considering for corresponding persistently input;Secondly, in terms of management tool framework, at present
Business and technical support framework, it is difficult to meet different levels and profession subdivision O&M demand;Finally, in theory side
Face, all kinds of infrastructure, including monitoring and control, the translation more like intelligent building from ground to underground lack to O&M number
This is solved with there is an urgent need for a kind of novel technical solutions in the wisdom functional promotion therefore the prior art of feedback according to analysis
One problem.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of piping lane based on wisdom piping lane aware communications integrating device
Operation management system, by the minimum system of multiple sensor integrations in the segment limit of specific piping lane storehouse a to data summarization and translation
In system, by minimum system transmission of monitoring perception data packet, inside carries IP address, and multiple minimum systems are connected to a relaying
On node, data then are sent to operation management system by way of optical fiber wire transmission.It includes various types of for transmitting in data
The shared and information to be processed of type, is translated by operation management system server code, with the display of patterned formal intuition
In O&M subsystem, to realize the accurate measurements from entity piping lane state, the classification of the translation to information, again to the remote of information
Journey is transmitted, until the overall process of operating status intuitively shown.
Based on the piping lane operation management system of wisdom piping lane aware communications integrating device, it is characterized in that: including boundary layer, function
Ergosphere, data translation transport layer and data basis layer, the boundary layer include more than one fixed clients, more than one shifting
Dynamic client and three-dimensional visualization user interface;
The functional layer includes piping lane basic information Query Subsystem, pipeline performance monitoring subsystem, internal environment monitoring
Subsystem, security watchdog subsystem and be based on BIM O&M piping lane Tomcat-AdminPortal;
Data translation transport layer includes piping lane BIM model, line equipment BIM model and exchange board relay node,
The piping lane BIM model and the line equipment BIM model include Visualization Model system and design drawing and as-built information
Storage system, the Visualization Model system show three-dimensional physical model, and the design drawing and as-built information storage system are aobvious
Show original as-built information;
The exchange board relay node and wisdom piping lane aware communications integrating device communication connection, the wisdom piping lane perception
Communicate integrating device shell be it is rectangular, enclosure interior include composition of air detector, temperature sensor, humidity sensor and
Raspberry pie development board, the raspberry pie development board and composition of air detector, temperature sensor, humidity sensor pass through Du Pont pair
The connection of half data line;The hull outside of wisdom piping lane aware communications integrating device is provided with video-frequency monitor and hydraulic and air pressure transmission
Sensor, the video-frequency monitor are fixed at the bottom of shell by PVC card part, and pass through the tree of data line and enclosure interior
The certain kind of berries sends development board to connect;Described hydraulic and baroceptor is fixed at piping lane water pipe, drainpipe, thermal pipe and fuel gas conduit
Valve location, and by data line with inside raspberry pie development board connect;
The data basis layer acquisition data are uploaded to piping lane BIM model and line equipment BIM model, by visualizing mould
Type system and design drawing and as-built information storage system are uploaded to based on BIM O&M piping lane Tomcat-AdminPortal, are based on BIM
Piping lane basic information Query Subsystem, pipeline performance monitoring subsystem, internal environment inside O&M piping lane Tomcat-AdminPortal
Monitoring subsystem and security watchdog subsystem information generate threedimensional model by three-dimensional visualization user interface, by one with
Upper fixed clients or more than one mobile client are shown.
The wisdom piping lane aware communications integrating device is set as more than one, and in the top surface that piping lane warehouse is arranged in
Axial location is divided into 20 meters~22 meters between two neighboring wisdom piping lane aware communications integrating device.
The exchange board relay node is set as more than one, each exchange board relay node with 10~12 wisdom
The transmission of piping lane aware communications integrating device data connects, and is connected between more than one exchange board relay node by optical fiber, wherein
One exchange board relay node is connected with based on the transmission of BIM O&M piping lane Tomcat-AdminPortal data.
Oxygen ratio in temperature, humidity, air in the internal environment monitoring subsystem segmentation real-time monitoring piping lane warehouse
Example and the variation of fuel gas ratio, carry out modularized processing to environmental information.
The security watchdog subsystem accesses Video Applications user and carries out safety certification, provides the access of video system resource
Catalogue carries out video resource positioning, multistage node signaling exchange and video data information forwarding, completes being total to for video information resources
It enjoys.
Through the above design, the present invention can be brought the following benefits: integrated based on wisdom piping lane aware communications
The piping lane operation management system of device can provide necessary basic data for the construction of smart city, operation stage data
Accumulation more can solve the Problems of Scientific Research of the certain quantitative analyses of underground engineering;Wisdom piping lane aware communications integrating device as
The key node of chained sensors sense and operational system, the number for monitoring perception point for efficiently solving geographic distance farther out and dispersing
According to convergence problem, and by the way that relay node is arranged within the scope of certain space, solves data mapping node directly facing opening
The problems such as data volume is huge, data reliability is poor, delay is more is sent out caused by platform;The arrangement of each detection subsystem is realized
Accurate measurements from entity piping lane state, the Lossless transport to information, again to the translation classification of information, straight until operating status
See the overall process of display;Wisdom piping lane operational system user circle based on piping lane BIM model Yu d engine software development and design
Face, from humanized, intuitive and convenient, clear layer, profession divide rationally etc. levels further improve this system practicability and
Easily behaviour's property.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated:
Fig. 1 is that the present invention is based on the piping lane operation management system structural representation frames of wisdom piping lane aware communications integrating device
Figure.
Fig. 2 is wisdom piping lane aware communications integrating device structural schematic block diagram of the present invention.
Fig. 3 is that the present invention is based on the signals of the piping lane operation management system operational process of wisdom piping lane aware communications integrating device
Figure.
1- composition of air detector, 2- temperature sensor, 3- humidity sensor, 4- video-frequency monitor, 5- raspberry pie in figure
Development board, 6- be hydraulic and baroceptor.
Specific embodiment
Based on the piping lane operation management system of wisdom piping lane aware communications integrating device, as depicted in figs. 1 and 2, including boundary
Surface layer, functional layer, data translation transport layer and data basis layer, the boundary layer include more than one fixed clients, one
A above mobile client and three-dimensional visualization user interface;
The functional layer includes piping lane basic information Query Subsystem, pipeline performance monitoring subsystem, internal environment monitoring
Subsystem, security watchdog subsystem and be based on BIM O&M piping lane Tomcat-AdminPortal;
Data translation transport layer includes piping lane BIM model, line equipment BIM model and exchange board relay node,
The piping lane BIM model and the line equipment BIM model include Visualization Model system and design drawing and as-built information
Storage system;
The exchange board relay node and wisdom piping lane aware communications integrating device communication connection, the wisdom piping lane perception
Communicate integrating device shell be it is rectangular, enclosure interior includes composition of air detector 1, temperature sensor 2, humidity sensor 3
And raspberry pie development board 5, the raspberry pie development board 5 and composition of air detector 1, temperature sensor 2, humidity sensor 3
Pass through double of data line connection of Du Pont;The hull outside of wisdom piping lane aware communications integrating device is provided with 4 He of video-frequency monitor
Hydraulic and baroceptor 6, the video-frequency monitor 4 are fixed at the bottom of shell by PVC card part, and pass through data line
It is connect with the raspberry pie development board 5 of enclosure interior;Described hydraulic and baroceptor 6 be fixed at piping lane water pipe, drainpipe,
The valve location of thermal pipe and fuel gas conduit, and connect by data line with internal raspberry pie development board 5;
The data basis layer acquisition data are uploaded to piping lane BIM model and line equipment BIM model, by visualizing mould
Type system and design drawing and as-built information storage system are uploaded to based on BIM O&M piping lane Tomcat-AdminPortal, are based on BIM
Piping lane basic information Query Subsystem, pipeline performance monitoring subsystem, internal environment inside O&M piping lane Tomcat-AdminPortal
Monitoring subsystem and security watchdog subsystem information generate threedimensional model by three-dimensional visualization user interface, by one with
Upper fixed clients or more than one mobile client are shown.
The wisdom piping lane aware communications integrating device is set as more than one, and in the top surface that piping lane warehouse is arranged in
Axial location is divided into 20 meters~22 meters between two neighboring wisdom piping lane aware communications integrating device.
The exchange board relay node is set as more than one, each exchange board relay node with 10~12 wisdom
The transmission of piping lane aware communications integrating device data connects, and is connected between more than one exchange board relay node by optical fiber, wherein
One exchange board relay node is connected with based on the transmission of BIM O&M piping lane Tomcat-AdminPortal data.
Oxygen ratio in temperature, humidity, air in the internal environment monitoring subsystem segmentation real-time monitoring piping lane warehouse
Example, the variation of fuel gas ratio etc..Various environmental informations are classified, classification processing.If there is jumbo fluctuation in certain class numerical value,
Operation management system can return existing tracking monitor to numerical value change minimum integrated system IP address, system is notified that related personnel
Processing alarm event in time.Environmental monitoring subsystem is divided into monitoring center port and mobile subscriber port, the former can transfer one
Environmental monitoring data table in the section time, and pass through the current piping lane internal environment status of geography information position enquiring;The latter is only
Has inquiry presence functionality.
The security watchdog subsystem accesses Video Applications user and carries out safety certification, provides the access of video system resource
Catalogue carries out video resource positioning, multistage node signaling exchange and video data information forwarding, completes being total to for video information resources
It enjoys.Simultaneously in main node position, such as access path entrance, fire compartment gate node and important electromechanical equipment warehouse field
Institute needs to set thermal imaging monitor, alarm linkage equipment, for incuding invasion information in real time and generating alarm.Remaining storehouse section
Video camera is set depending on the site environment.Security watchdog subsystem can be monitored in real time, OSD superposition, screen locking, video storage, be used
Family priority management, video record downloading and playback, PTZ control function, Streaming Media forward distribution, configuration management, video alarm,
The functions such as video taking turn, alarm linkage, video equipment management.
The present invention is by the minimum of multiple sensor integrations in the segment limit of specific piping lane storehouse a to data summarization and translation
In system, by wisdom piping lane aware communications integrating device transmission of monitoring perception data packet, inside carries IP address, this IP address
It is sent simultaneously with perception monitoring data, can be used for the positioning of high risk position.Multiple minimum systems are connected to a relay node
On, data then are sent to operation management system by way of optical fiber wire transmission.It includes various types of for transmitting in data
Shared and information to be processed, is translated by operation management system server code, is shown in fortune with patterned formal intuition
It ties up in subsystem.According to the difference of operation management content, three big O&M subsystems: pipeline performance monitoring subsystem, inside are set
Environmental monitoring subsystem, security watchdog subsystem.To realize the accurate measurements from entity piping lane state, the translation to information point
Class, the remote transmission for arriving information again, the overall process intuitively shown until operating status.
The 5 hardware integration degree of Raspberry3.0Development Board raspberry pie development board used in the present invention is high
And performance is stablized;(SuSE) Linux OS can be carried;Configuration network service is convenient;And at the same time having general microcontroller development board
Scalability.
As shown in figure 3, by taking piping lane construction is 200 meters of settings, one access path outlet as an example, workflow of the invention
Are as follows: each wisdom piping lane aware communications integrating device with 20 meters for interval, fixed ip address;It is arranged one in access path mouth simultaneously
Platform exchange board relay node, the data that 4~5 minimum integrated systems to collect neighbouring two sections of piping lanes generate.Pass through light
Fibre connects the exchange board relay node of each access path mouth, and wisdom piping lane aware communications integrating device in entire piping lane is acquired
Data be transferred at a distance based on BIM O&M piping lane Tomcat-AdminPortal.Finally, server carries out the data being collected into
Classification display is in a management system.Meanwhile according to the source IP address carried in data packet, can quickly be positioned in conjunction with GIS technology
The position of high risk storehouse section and line equipment.
Wisdom piping lane aware communications integrating device of the invention as chained sensors sense and operational system key node,
It efficiently solves the problems, such as geographic distance farther out and the data of the monitoring perception point of dispersion converges, and by within the scope of certain space
Relay node is set, solves that data mapping node is huge directly facing data volume caused by development platform, data are reliable
Property it is poor, delay it is more the problems such as.Rely on reality in the demand analysis for building piping lane project, in wisdom piping lane aware communications integrating device
On architecture, is write using JAVA and develop pipeline performance monitoring subsystem, internal environment monitoring subsystem, security monitoring
Subsystem.To realize the accurate measurements from entity piping lane state, the Lossless transport to information, again to information translation classification,
Until the overall process of operating status intuitively shown.Wisdom pipe based on piping lane BIM model Yu d engine software development and design
Corridor operational system user interface divides the levels such as reasonable from humanized, intuitive and convenient, clear layer, profession and further improves
The practicability of this system and easily behaviour's property.
Claims (5)
1. based on the piping lane operation management system of wisdom piping lane aware communications integrating device, it is characterized in that: including boundary layer, function
Layer, data translation transport layer and data basis layer, the boundary layer include more than one fixed clients, more than one movement
Client and three-dimensional visualization user interface;
The functional layer includes piping lane basic information Query Subsystem, pipeline performance monitoring subsystem, internal environment monitoring subsystem
System, security watchdog subsystem and be based on BIM O&M piping lane Tomcat-AdminPortal;
Data translation transport layer includes piping lane BIM model, line equipment BIM model and exchange board relay node, described
Piping lane BIM model and the line equipment BIM model include Visualization Model system and design drawing and as-built information storage
System, the Visualization Model system show three-dimensional physical model, and the design drawing and the display of as-built information storage system are former
Beginning as-built information;
The exchange board relay node and wisdom piping lane aware communications integrating device communication connection, the wisdom piping lane aware communications
The shell of integrating device be it is rectangular, enclosure interior includes composition of air detector (1), temperature sensor (2), humidity sensor
(3) and raspberry pie development board (5), the raspberry pie development board (5) and composition of air detector (1), temperature sensor (2),
Humidity sensor (3) passes through double of data line connection of Du Pont;The hull outside of wisdom piping lane aware communications integrating device is provided with
Video-frequency monitor (4) and hydraulic and baroceptor (6), the video-frequency monitor (4) are fixed at shell by PVC card part
Bottom, and connected by the raspberry pie development board (5) of data line and enclosure interior;Described hydraulic and baroceptor (6) is solid
The valve location of piping lane water pipe, drainpipe, thermal pipe and fuel gas conduit is set calmly, and passes through data line and internal raspberry pie
Development board (5) connection;
The data basis layer acquisition data are uploaded to piping lane BIM model and line equipment BIM model, pass through Visualization Model system
System and design drawing and as-built information storage system are uploaded to based on BIM O&M piping lane Tomcat-AdminPortal, are based on BIM O&M
Piping lane basic information Query Subsystem, pipeline performance monitoring subsystem, internal environment monitoring inside piping lane Tomcat-AdminPortal
Subsystem and security watchdog subsystem information are solid by more than one by three-dimensional visualization user interface generation threedimensional model
Determine client or more than one mobile client is shown.
2. the piping lane operation management system according to claim 1 based on wisdom piping lane aware communications integrating device, special
Sign is: the wisdom piping lane aware communications integrating device is set as more than one, and in the top surface axis that piping lane warehouse is arranged in
Line position is divided into 20 meters~22 meters between two neighboring wisdom piping lane aware communications integrating device.
3. the piping lane operation management system according to claim 1 based on wisdom piping lane aware communications integrating device, special
Sign is: the exchange board relay node is set as more than one, each exchange board relay node with 10~12 wisdom pipes
Aware communications integrating device data transmission in corridor connects, and is connected between more than one exchange board relay node by optical fiber, wherein one
A exchange board relay node is connected with based on the transmission of BIM O&M piping lane Tomcat-AdminPortal data.
4. the piping lane operation management system according to claim 1 based on wisdom piping lane aware communications integrating device, special
Sign is: in the temperature, humidity, air in the internal environment monitoring subsystem segmentation real-time monitoring piping lane warehouse oxygen proportion with
And the variation of fuel gas ratio, modularized processing is carried out to environmental information.
5. the piping lane operation management system according to claim 1 based on wisdom piping lane aware communications integrating device, special
Sign is: the security watchdog subsystem accesses Video Applications user and carries out safety certification, provides video system resource access mesh
Record carries out video resource positioning, multistage node signaling exchange and video data information forwarding, completes being total to for video information resources
It enjoys.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811087534.7A CN109309713A (en) | 2018-09-18 | 2018-09-18 | Piping lane operation management system based on wisdom piping lane aware communications integrating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811087534.7A CN109309713A (en) | 2018-09-18 | 2018-09-18 | Piping lane operation management system based on wisdom piping lane aware communications integrating device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109309713A true CN109309713A (en) | 2019-02-05 |
Family
ID=65223822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811087534.7A Pending CN109309713A (en) | 2018-09-18 | 2018-09-18 | Piping lane operation management system based on wisdom piping lane aware communications integrating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109309713A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111089619A (en) * | 2019-12-26 | 2020-05-01 | 罗普特科技集团股份有限公司 | Pipe gallery monitoring method, device and system and storage medium |
CN112150755A (en) * | 2019-06-27 | 2020-12-29 | 国网江苏省电力有限公司南京供电分公司 | Underground pipe gallery robot and wireless ad hoc network system |
CN114270907A (en) * | 2019-09-19 | 2022-04-01 | 思科技术公司 | Automatic access point placement system and method |
CN115908762A (en) * | 2022-11-11 | 2023-04-04 | 广州烽云信息科技有限公司 | Wisdom computer lab based on BIM remote monitoring and operation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013125330A (en) * | 2011-12-13 | 2013-06-24 | Ohbayashi Corp | Building management system and building management method |
US20140303796A1 (en) * | 2013-04-05 | 2014-10-09 | Electronics And Telecommunications Research Institute | Apparatus and method for controlling building energy |
CN106960410A (en) * | 2017-03-30 | 2017-07-18 | 中建地下空间有限公司 | Underground pipe gallery approaches to IM based on BIM and GIS technology |
CN107016502A (en) * | 2017-03-30 | 2017-08-04 | 中建地下空间有限公司 | A kind of pipe gallery intelligent management system |
CN107909303A (en) * | 2017-12-19 | 2018-04-13 | 泰州职业技术学院 | A kind of Urban Underground pipe gallery operation platform and implementation based on BIM |
CN108334959A (en) * | 2018-01-30 | 2018-07-27 | 广州晟能电子科技有限公司 | Pipe gallery operation management platform based on BIM models |
-
2018
- 2018-09-18 CN CN201811087534.7A patent/CN109309713A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013125330A (en) * | 2011-12-13 | 2013-06-24 | Ohbayashi Corp | Building management system and building management method |
US20140303796A1 (en) * | 2013-04-05 | 2014-10-09 | Electronics And Telecommunications Research Institute | Apparatus and method for controlling building energy |
CN106960410A (en) * | 2017-03-30 | 2017-07-18 | 中建地下空间有限公司 | Underground pipe gallery approaches to IM based on BIM and GIS technology |
CN107016502A (en) * | 2017-03-30 | 2017-08-04 | 中建地下空间有限公司 | A kind of pipe gallery intelligent management system |
CN107909303A (en) * | 2017-12-19 | 2018-04-13 | 泰州职业技术学院 | A kind of Urban Underground pipe gallery operation platform and implementation based on BIM |
CN108334959A (en) * | 2018-01-30 | 2018-07-27 | 广州晟能电子科技有限公司 | Pipe gallery operation management platform based on BIM models |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112150755A (en) * | 2019-06-27 | 2020-12-29 | 国网江苏省电力有限公司南京供电分公司 | Underground pipe gallery robot and wireless ad hoc network system |
CN112150755B (en) * | 2019-06-27 | 2021-11-02 | 国网江苏省电力有限公司南京供电分公司 | Underground pipe gallery robot and wireless ad hoc network system |
CN114270907A (en) * | 2019-09-19 | 2022-04-01 | 思科技术公司 | Automatic access point placement system and method |
CN114270907B (en) * | 2019-09-19 | 2024-04-23 | 思科技术公司 | Automatic access point arrangement system and method |
CN111089619A (en) * | 2019-12-26 | 2020-05-01 | 罗普特科技集团股份有限公司 | Pipe gallery monitoring method, device and system and storage medium |
CN115908762A (en) * | 2022-11-11 | 2023-04-04 | 广州烽云信息科技有限公司 | Wisdom computer lab based on BIM remote monitoring and operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101937096B1 (en) | 3D monitoring server using 3D BIM object model and 3D monitoring system comprising it | |
CN109309713A (en) | Piping lane operation management system based on wisdom piping lane aware communications integrating device | |
CN105023188B (en) | Digital city management data sharing system based on cloud data | |
Kang et al. | BIM-and IoT-based monitoring framework for building performance management | |
CN109164779A (en) | Pipe gallery monitoring system | |
CN107483253A (en) | A kind of data center machine room operation management system based on three-dimensional VR | |
CN108334959A (en) | Pipe gallery operation management platform based on BIM models | |
CN104077667A (en) | Digital campus integrated application system based on two-dimensional and three-dimensional integration | |
CN111708778B (en) | Big data management method and system | |
CN111726403B (en) | Cross-cloud-platform big data management method and system | |
CN107464284A (en) | Three-dimensional visualization property information management system based on mobile terminal | |
CN107562953A (en) | A kind of river information system based on GIS geographical information technologies | |
CN111885643A (en) | Multi-source heterogeneous data fusion method applied to smart city | |
CN103985009A (en) | Coal industry comprehensive dispatching management system based on informatization | |
CN106814671A (en) | Underground engineering operational management integrated monitoring apparatus | |
WO2016081628A1 (en) | System and method for aggregating and analyzing data and creating a spatial and/or non-spatial graphical display based on the aggregated data | |
CN103617691A (en) | Forest fire early warning monitoring center | |
CN211015113U (en) | Intelligent type pipe control system for underground comprehensive pipe gallery | |
CN111209323A (en) | Spatial geographic information big data processing system | |
CN115409643A (en) | Digital twin operation monitoring system for electric power facilities | |
CN112598369A (en) | Intelligent valley management platform | |
CN112328666A (en) | Intelligent building supervision operation and maintenance system based on cloud platform technology | |
CN111882177A (en) | Pressure drainage system fault maintenance method, server, user terminal and medium | |
CN208782845U (en) | Wisdom piping lane aware communications integrating device | |
KR102640497B1 (en) | Apparatus for light weighted setting spatial data of 3d modeling data and video monitoring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190205 |