CN109215157A - The tour management method and system of fuel gas transmission pipeline - Google Patents
The tour management method and system of fuel gas transmission pipeline Download PDFInfo
- Publication number
- CN109215157A CN109215157A CN201810876537.2A CN201810876537A CN109215157A CN 109215157 A CN109215157 A CN 109215157A CN 201810876537 A CN201810876537 A CN 201810876537A CN 109215157 A CN109215157 A CN 109215157A
- Authority
- CN
- China
- Prior art keywords
- tour
- inspection
- inspection point
- point provided
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/20—Checking timed patrols, e.g. of watchman
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
- F17D5/02—Preventing, monitoring, or locating loss
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of tour management method of fuel gas transmission pipeline and systems, this method comprises: the line distribution figure, piece Division table, inspection point provided number and its tour in server based on data library require, floor manager's shift report and personnel-terminal correspond to table, generates tour task and be sent to the handheld terminal of corresponding floor manager;Tour task includes tour time, the tour requirement for making an inspection tour section, the inspection point provided number in section and inspection point provided;Handheld terminal receives tour task, receives the feedback information of floor manager according to tour task and returns to server.The present invention can generate specific tour task and be sent to floor manager, instruct the work of floor manager, avoid omitting inspection point provided during the details or inspection of omitting work when inspection point provided is maked an inspection tour.
Description
Technical field
The present invention relates to the safety monitoring field of fuel gas transmission pipeline more particularly to the tour managers of fuel gas transmission pipeline
Method and system.
Background technique
Combustion gas is the essential resource of common people's daily life.However as the high speed development in city, by constructing road, city
Political affairs construction, it is violating the regulations excavate, barbarous construction and the factors such as cover violating the regulations influence, be likely to jeopardize gas ductwork all the time and set
The safety applied, and then jeopardize the security of the lives and property of the people.
The safeguard measure of burning line relies primarily on: one, using on the gas pipeline of city backbone network warning pile be installed,
It plays a warning role;Two, construction is checked whether there is using artificial walking (cycling) line walking mode, avoids the generation of accident.
Since burning line is widely distributed, ambient enviroment and ground condition are different;And as sub-high pressure class backbone major part is located at
Suburban areas, it is more remote with a distance from urban district, it can only accomplish to make an inspection tour for one day at present primary.It is numerous that tour personnel is resulted in this way, it is difficult
With management.
Current Patrol Management System can only be returned by the location information of the terminal of tour personnel, determine tour personnel
Whether the position for whether arriving inspection point provided completes all tour requirements of the inspection point provided without can confirm that, makes an inspection tour whether process has
It omits;In addition, be also not optimized for making an inspection tour path and time, entirely by person works for a period of time after, to the ripe of region
Degree is known, is unfavorable for forked working in this way, also will increase the work difficulty of new personnel, and be easy due to tour time excessive cycle
Increase the risk that pipeline is destroyed.
Summary of the invention
The embodiment of the present invention provides the tour management method and system of a kind of fuel gas transmission pipeline, to solve existing tour pipe
Reason system only reacts the technical issues of tour personnel position.
To achieve the above object, the embodiment of the invention provides a kind of tour management methods of fuel gas transmission pipeline, including
Following steps:
Line distribution figure, piece Division table, inspection point provided number and its tour in server based on data library are required, are maked an inspection tour
Member's shift report and personnel-terminal correspond to table, generate tour task and are sent to the handheld terminal of corresponding floor manager;Tour task
Tour requirement including inspection point provided number and inspection point provided in tour time, tour section, section;
Handheld terminal receives tour task, receives the feedback information of floor manager according to tour task and returns to server.
Preferably, after server receives the feedback information from handheld terminal, according to the content selection of feedback information to
Requirement or processing step corresponding with feedback information are maked an inspection tour in handheld terminal push in next step.
Preferably, tour task further includes the tour path of one or more, and server need to be patrolled by road series connection floor manager
Depending on section in all inspection point provided generate and make an inspection tour path, and make an inspection tour path and sent according to the handheld terminal of floor manager to server
Geo-location adjusted in real time.
Preferably, when server generates tour path, also estimation makes an inspection tour path and makes an inspection tour all inspection point provideds on path
It makes an inspection tour total used time of work, and corresponding handheld terminal will be sent to after total used time and tour route matching label.
Preferably, server connect all inspection point provideds when, select transitable nearest road between every two point to carry out
Series connection, so that total path is most short or total used time is minimum.
Preferably, after server receives the feedback information of floor manager, patrolling for current inspection point provided is judged according to feedback information
Depending on requiring whether to complete:
When the tour of current inspection point provided requires to complete, server sends next on tour path to corresponding handheld terminal
The position of a inspection point provided and the transitable nearest road for going to next inspection point provided;
The tour of current inspection point provided require not completing or complete it is nonconforming, server will not be completed in tour task or
Or it completes nonconforming step and is pushed to corresponding handheld terminal again.
Preferably, the feedback information of floor manager includes: to choose type options, shooting picture, input measurement data, alarm
With or request assist.
Preferably, type options include: valve well and or condensate well mark whether complete display, well lid and or walling crib be
On no intact, pipeline whether there is or not building and or accumulation sundries and pipeline underground and surrounding space and temporary building in whether there is or not combustions
Gas leakage;
Shooting picture includes: to intersect to apply around the picture and burning line for having building and or accumulation sundries on pipeline
The picture of work;
Input measurement data include: the pipe leakage point data that leak detector measures.
Preferably, request assist include: discovery pipe leakage point after request gas detection analyst carry out concentration analysis or
The assistance of constituent analysis.
The embodiment of the invention also provides a kind of computer system, including memory, processor and it is stored in memory
Computer program that is upper and can running on a processor, processor realize the step of any of the above-described method when executing computer program
Suddenly.
The invention has the following advantages:
1, the tour management method and system of fuel gas transmission pipeline of the invention can generate specific tour task and be sent to
Floor manager instructs the work of floor manager, avoids omitting during the details or inspection of omitting work when inspection point provided is maked an inspection tour
Inspection point provided.
2, all tour requirements of inspection point provided in a preferred approach, can be checked, make an inspection tour whether process has omission;In addition, right
It is also optimized in tour path and time, after being pushed to staff, staff can also be executed by step, avoid omitting
Or it makes an inspection tour not comprehensive.Also, by feedback information, higher level personnel can be understood in time by server the work of floor manager into
Degree when pipeline malicious event occurs, can quickly confirm generation point and local conditions.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention.
Below with reference to accompanying drawings, the present invention is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention
It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow diagram of the tour management method of the fuel gas transmission pipeline of the preferred embodiment of the present invention.
Specific embodiment
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be defined by the claims
Implement with the multitude of different ways of covering.
Referring to Fig. 1, the embodiment of the invention provides a kind of tour management methods of fuel gas transmission pipeline, including following step
It is rapid:
Line distribution figure, piece Division table, inspection point provided number and its tour in server based on data library are required, are maked an inspection tour
Member's shift report and personnel-terminal correspond to table, generate tour task and are sent to the handheld terminal of corresponding floor manager;Tour task
Tour requirement including inspection point provided number and inspection point provided in tour time, tour section, section;
Handheld terminal receives tour task, receives the feedback information of floor manager according to tour task and returns to server.
Through the above steps, specific tour task can be generated and is sent to floor manager, instructed the work of floor manager, avoid
When inspection point provided is maked an inspection tour, during the details or inspection of omitting work, inspection point provided is omitted.
When practical application, the above method can also be optimized, and the method after optimization is exemplified below:
S1: line distribution figure, piece Division table, inspection point provided in server based on data library are numbered and its tour requires,
Floor manager's shift report and personnel-terminal correspond to table, generate tour task and are sent to the handheld terminal of corresponding floor manager;It makes an inspection tour
Task includes tour time, the tour requirement for making an inspection tour section, the inspection point provided number in section and inspection point provided.
When implementation, tour task further includes the tour path of one or more, and server need to be patrolled by road series connection floor manager
Depending on section in all inspection point provided generate and make an inspection tour path, and make an inspection tour path and sent according to the handheld terminal of floor manager to server
Geo-location adjusted in real time.When server generates tour path, also estimation is maked an inspection tour path and is maked an inspection tour on path and owns
Total used time of the tour work of inspection point provided, and corresponding handheld terminal will be sent to after total used time and tour route matching label.
Server connect all inspection point provideds when, select every two point between transitable nearest road connect so that total path
Most short or total used time is minimum.In this way, can not only plan route to floor manager and recommend road, but also server can be allowed to grasp in time
The job schedule of staff and present position.
S2: handheld terminal receives tour task, receives the feedback information of floor manager according to tour task and returns to service
Device.The feedback information of floor manager includes: to choose type options, shooting picture, input measurement data, alarm and or request assistance.
Type options include: valve well and or condensate well mark whether complete display, well lid and or whether walling crib intact, has on pipeline
No building and or accumulation sundries (if it find that have on pipeline building or accumulation sundries when, need to take a picture upload, as
Record other departments that put on record or coordinate remove or the case where notify party to remove as data) and pipeline underground and
Whether there is or not gas leakages in surrounding space and temporary building.Shooting picture includes: the figure for having building and on pipeline or accumulating sundries
The picture of crossed construction around piece and burning line.Input measurement data include: the pipe leakage point data that leak detector measures
(needing to report or request to assist).Request assist include: discovery pipe leakage point after request gas detection analyst into
The assistance of row concentration analysis or constituent analysis.
S3: after server receives the feedback information from handheld terminal, according to the content selection of feedback information to hand-held
Requirement or processing step corresponding with feedback information are maked an inspection tour in terminal push in next step.When implementation, server receives floor manager
Feedback information after, judge whether the tour requirement of current inspection point provided is completed according to feedback information:
(1) when the tour of current inspection point provided requires to complete, server sends to corresponding handheld terminal and makes an inspection tour on path
The position of next inspection point provided and the transitable nearest road for going to next inspection point provided;
(2) tour of current inspection point provided requires not completing or complete nonconforming, and server will not complete in tour task
Or it or completes nonconforming step and is pushed to corresponding handheld terminal again.
As a general technical idea, the embodiment of the present invention also provides a kind of computer system, including memory, processing
On a memory and the computer program that can run on a processor, when processor execution computer program, is realized for device and storage
The step of any of the above-described method.
In summary, the present invention can generate specific tour task and be sent to floor manager, instruct the work of floor manager, avoid
When inspection point provided is maked an inspection tour, inspection point provided is omitted during the details or inspection of omitting work.Further, inspection point provided can be checked
All tours requirement, make an inspection tour process whether have omission;In addition, being also optimized for making an inspection tour path and time, push
After staff, staff can also be executed by step, avoided omitting or be maked an inspection tour not comprehensive.Also, pass through feedback information, on
The job schedule that grade personnel can understand floor manager in time by server can quickly confirm hair when pipeline malicious event occurs
Raw point and local conditions.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of tour management method of fuel gas transmission pipeline, which comprises the following steps:
Line distribution figure, piece Division table, inspection point provided number and its tour requirement, floor manager row in server based on data library
Shift report and personnel-terminal correspond to table, generate tour task and are sent to the handheld terminal of corresponding floor manager;The tour task
Tour requirement including inspection point provided number and inspection point provided in tour time, tour section, section;
Handheld terminal receives the tour task, receives the feedback information of floor manager according to tour task and returns to server.
2. the tour management method of fuel gas transmission pipeline according to claim 1, which is characterized in that the server receives
To after the feedback information of handheld terminal, pushed in next step according to the content selection of the feedback information to the handheld terminal
Make an inspection tour requirement or processing step corresponding with the feedback information.
3. the tour management method of fuel gas transmission pipeline according to claim 1, which is characterized in that the tour task is also
Including the tour path of one or more, server is connected all inspection point provideds in the section that the floor manager need to make an inspection tour by road
The tour path is generated, and the geo-location making an inspection tour path and sending according to the handheld terminal of the floor manager to server
It is adjusted in real time.
4. the tour management method of fuel gas transmission pipeline according to claim 3, which is characterized in that the server generates
When the tour path, also estimates the tour path and makes an inspection tour total used time of the tour work of all inspection point provideds on path,
And corresponding handheld terminal will be sent to after total used time and tour route matching label.
5. the tour management method of fuel gas transmission pipeline according to claim 4, which is characterized in that the server series connection
When all inspection point provideds, transitable nearest road between every two point is selected to connect, so that total path is most short or total
Used time is minimum.
6. the tour management method of fuel gas transmission pipeline according to claim 5, which is characterized in that the server receives
To after the feedback information of floor manager, judge whether the tour requirement of current inspection point provided is completed according to the feedback information:
When the tour of current inspection point provided requires to complete, server sends next on the tour path to corresponding handheld terminal
The position of a inspection point provided and the transitable nearest road for going to next inspection point provided;
The tour of current inspection point provided require not completing or complete it is nonconforming, server will not be completed in the tour task or
Or it completes nonconforming step and is pushed to corresponding handheld terminal again.
7. the tour management method of fuel gas transmission pipeline according to any one of claim 1 to 6, which is characterized in that institute
The feedback information for stating floor manager includes: to choose type options, shooting picture, input measurement data, alarm and or request assistance.
8. the tour management method of fuel gas transmission pipeline according to claim 7, which is characterized in that the type options packet
Include: valve well and or condensate well mark whether complete display, well lid and or whether walling crib intact, whether there is or not buildings on pipeline
With or accumulation sundries and pipeline underground and surrounding space and temporary building in whether there is or not gas leakages;
The shooting picture includes: to intersect to apply around the picture and burning line for having building and or accumulation sundries on pipeline
The picture of work;
The input measurement data include: the pipe leakage point data that leak detector measures.
9. the tour management method of fuel gas transmission pipeline according to claim 8, which is characterized in that packet is assisted in the request
Include: request gas detection analyst carries out the assistance of concentration analysis or constituent analysis after discovery pipe leakage point.
10. a kind of computer system, can run on a memory and on a processor including memory, processor and storage
Computer program, which is characterized in that the processor realizes that the claims 1 to 9 are any when executing the computer program
The step of the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810876537.2A CN109215157A (en) | 2018-08-03 | 2018-08-03 | The tour management method and system of fuel gas transmission pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810876537.2A CN109215157A (en) | 2018-08-03 | 2018-08-03 | The tour management method and system of fuel gas transmission pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109215157A true CN109215157A (en) | 2019-01-15 |
Family
ID=64988055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810876537.2A Pending CN109215157A (en) | 2018-08-03 | 2018-08-03 | The tour management method and system of fuel gas transmission pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109215157A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110264677A (en) * | 2019-06-03 | 2019-09-20 | 北京讯腾智慧科技股份有限公司 | Burning line supervisory control for gas leak system and method |
CN110390737A (en) * | 2019-07-25 | 2019-10-29 | 新奥(中国)燃气投资有限公司 | A kind of gas leakage intelligent polling method and intelligent patrol detection vehicle |
CN110533790A (en) * | 2019-08-29 | 2019-12-03 | 江苏燕宁工程科技集团有限公司 | Inspection realization method and system based on piping lane BIM |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4877738B2 (en) * | 2006-02-17 | 2012-02-15 | セイコーインスツル株式会社 | Recording apparatus and recording method |
CN204117210U (en) * | 2014-09-26 | 2015-01-21 | 中国能源建设集团广东省电力设计研究院 | The online mobile cruising inspection system of a kind of substation equipment based on electric power wireless private network |
CN104732607A (en) * | 2015-03-06 | 2015-06-24 | 深圳市燃气集团股份有限公司 | Intelligent pipe network patrolling method and system |
CN105118108A (en) * | 2015-08-04 | 2015-12-02 | 中国石油天然气股份有限公司 | Patrol inspection method and system for long oil and gas delivery pipeline |
CN204887267U (en) * | 2015-08-26 | 2015-12-16 | 成都千嘉科技有限公司 | Automatic tour system of burning line |
CN105741377A (en) * | 2016-02-02 | 2016-07-06 | 深圳市中燃科技有限公司 | Method and system for monitoring inspector |
US20170148239A1 (en) * | 2015-11-20 | 2017-05-25 | Bohnas LLC | Tracking and Access System |
CN106846529A (en) * | 2016-12-12 | 2017-06-13 | 国网北京市电力公司 | The method for inspecting and inspection device of cable |
-
2018
- 2018-08-03 CN CN201810876537.2A patent/CN109215157A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4877738B2 (en) * | 2006-02-17 | 2012-02-15 | セイコーインスツル株式会社 | Recording apparatus and recording method |
CN204117210U (en) * | 2014-09-26 | 2015-01-21 | 中国能源建设集团广东省电力设计研究院 | The online mobile cruising inspection system of a kind of substation equipment based on electric power wireless private network |
CN104732607A (en) * | 2015-03-06 | 2015-06-24 | 深圳市燃气集团股份有限公司 | Intelligent pipe network patrolling method and system |
CN105118108A (en) * | 2015-08-04 | 2015-12-02 | 中国石油天然气股份有限公司 | Patrol inspection method and system for long oil and gas delivery pipeline |
CN204887267U (en) * | 2015-08-26 | 2015-12-16 | 成都千嘉科技有限公司 | Automatic tour system of burning line |
US20170148239A1 (en) * | 2015-11-20 | 2017-05-25 | Bohnas LLC | Tracking and Access System |
CN105741377A (en) * | 2016-02-02 | 2016-07-06 | 深圳市中燃科技有限公司 | Method and system for monitoring inspector |
CN106846529A (en) * | 2016-12-12 | 2017-06-13 | 国网北京市电力公司 | The method for inspecting and inspection device of cable |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110264677A (en) * | 2019-06-03 | 2019-09-20 | 北京讯腾智慧科技股份有限公司 | Burning line supervisory control for gas leak system and method |
CN110390737A (en) * | 2019-07-25 | 2019-10-29 | 新奥(中国)燃气投资有限公司 | A kind of gas leakage intelligent polling method and intelligent patrol detection vehicle |
CN110533790A (en) * | 2019-08-29 | 2019-12-03 | 江苏燕宁工程科技集团有限公司 | Inspection realization method and system based on piping lane BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Farah et al. | Leakage detection using smart water system: Combination of water balance and automated minimum night flow | |
Park et al. | Framework of automated construction-safety monitoring using cloud-enabled BIM and BLE mobile tracking sensors | |
CN109215157A (en) | The tour management method and system of fuel gas transmission pipeline | |
US20200320650A1 (en) | Multi-utility integrity monitoring and display system | |
KR20190098784A (en) | Intelligent electric power facility management system based on Merged Reality of Internet of Things, Big data, 3D Technology, Method thereof, and Computer readable storage medium having the method | |
CN111401581A (en) | Building operation and maintenance management method, system, equipment and storage medium | |
CN109767513A (en) | A kind of pipe network equipment inspection device and pipe network equipment method for inspecting | |
CN111611439A (en) | Fire safety monitoring method and device, computer equipment and storage medium | |
Dahan et al. | Network inspection for detecting strategic attacks | |
CN113781732A (en) | Cable channel fire early warning method and device based on intelligent gateway | |
CN115033887A (en) | Open source component safety management method and system, electronic equipment and storage medium | |
CN110503793A (en) | A kind of pipeline invasion automatic early warning method, system and equipment based on artificial intelligence | |
Cao et al. | Optimal cable laying across an earthquake fault line considering elliptical failures | |
Bristow et al. | Simulation to aid disaster planning and mitigation: Tools and techniques for water distribution managers and emergency planners | |
KR102203173B1 (en) | Method, apparatus and computer-readable medium for inspection of fire fighting facility based on augmented reality | |
RU123187U1 (en) | SYSTEM OF AUTOMATED FUNCTIONAL-TECHNICAL MANAGEMENT IN REAL TIME BY THE INFRASTRUCTURE OF ENGINEERING SAFETY OF UNDERLOADING CONSTRUCTIONS OF UNIQUE RESIDENTIAL AND PUBLIC BUILDINGS | |
CN111967856A (en) | Government affair project management method and device | |
KR20170122443A (en) | System and method for managing space, and mobile device for executing the same | |
Zhou et al. | Risk index assessment for urban natural gas pipeline leakage based on artificial neural network | |
CN110264058A (en) | A kind of method for early warning and system of the geological disaster based on gas ductwork | |
Fragiadakis et al. | Reliability assessment of urban water networks | |
Vinnem et al. | Integrated barrier analysis in operational risk assessment in offshore petroleum operations | |
CN114355969A (en) | Intelligent heat supply pipe network leakage detection method and system by using unmanned aerial vehicle inspection | |
KR20220165393A (en) | Apparatus for Managing Hazardous Facility of Hydrogen Gas and Driving Method Thereof | |
CN108895308A (en) | The on-line monitoring method and system for preventing gas ductwork to be destroyed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |
|
RJ01 | Rejection of invention patent application after publication |