CN108241965A - Gauge table installation management method and system, computer equipment and storage medium - Google Patents

Gauge table installation management method and system, computer equipment and storage medium Download PDF

Info

Publication number
CN108241965A
CN108241965A CN201711298813.3A CN201711298813A CN108241965A CN 108241965 A CN108241965 A CN 108241965A CN 201711298813 A CN201711298813 A CN 201711298813A CN 108241965 A CN108241965 A CN 108241965A
Authority
CN
China
Prior art keywords
gauge table
terminal
sent
information
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711298813.3A
Other languages
Chinese (zh)
Inventor
林克全
高明
陆宏治
刘己未
张文斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201711298813.3A priority Critical patent/CN108241965A/en
Publication of CN108241965A publication Critical patent/CN108241965A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of gauge tables to install management method and system, computer equipment and storage medium.This method includes:Obtain the gauge table installation application information that user side's terminal is sent, it is instructed according to installation application information generation dress table and is sent to construction party terminal, receive the gauge table erection schedule information that construction party terminal is uploaded according to dress table instruction, when according to erection schedule infomation detection to gauge table, installation is complete, generation, which is checked and accepted, instructs and is sent to the rule side of building terminal, receive the acceptance information that the rule side's of building terminal is sent according to instruction is checked and accepted, when detecting that examination is completed according to acceptance information, generate gauge table mount message table and store.Unified management to the data information in gauge table installation process is realized by the above method.Corresponding assignment instructions are automatically generated based on status information is currently installed on, relevant staff performs corresponding task operating according to assignment instructions, so as to simplify the work handover flow between each department, and then improves the installation effectiveness of gauge table.

Description

Gauge table installation management method and system, computer equipment and storage medium
Technical field
The present invention relates to gauge table installing areas, install management method and system more particularly to a kind of gauge table, calculate Machine equipment and storage medium.
Background technology
In real life application, the use of gauge table is very extensive, such as electric energy meter common in daily life, water meter With gas meter, flow meter etc., with the increase of user demand, the installation workload of gauge table is consequently increased.
The installation of gauge table generally involves multiple and different departments, and work handover flow is cumbersome between each department, And then cause gauge table installation effectiveness low.Therefore, how to realize that the Fast Installation of gauge table, raising working efficiency become currently urgently Problem to be solved.
Invention content
Based on this, it is necessary to for gauge table installation effectiveness it is low the problem of, provide a kind of gauge table installation management method and System, computer equipment and storage medium.
A kind of gauge table installs management method, including:
Obtain the gauge table installation application information that user side's terminal is sent;
It is instructed according to the installation application information generation dress table and is sent to construction party terminal;
Receive the gauge table erection schedule information that construction party terminal is uploaded according to the dress table instruction;
When according to the erection schedule infomation detection to the gauge table, installation is complete, generation, which is checked and accepted, to be instructed and is sent to Advise the side's of building terminal;
The rule side's of building terminal is received according to the acceptance information checked and accepted instruction and sent;
When detecting that examination is completed according to the acceptance information, generate gauge table mount message table and store.
It is described in one of the embodiments, to be instructed according to the installation application information generation dress table and be sent to construction party The step of terminal, including:
It is instructed according to the installation application information generation dam site investigation and is sent to the rule side of building terminal;
Gauge table that the rule side's of building terminal is sent, progress dam site investigation being instructed to obtain according to dam site investigation is received to install Scheme;
It is instructed according to gauge table mount scheme generation dress table and is sent to construction party terminal.
It is described in one of the embodiments, to be instructed according to mount scheme generation dress table and be sent to construction party terminal The step of before, further include:
Cost information is generated according to the mount scheme;
The cost information is sent to user side's terminal corresponding with gauge table installation application information;
When detecting that payment is completed, generation payment is completed information and is exported.
The gauge table is Domestic electric meter in one of the embodiments, and the gauge table mount scheme includes:Use capacitance It is one or more in amount, load nature of electricity consumed, power supply mode, supply path, metering method and metering device configuration.
In one of the embodiments, described the step of obtaining the gauge table installation application information that user side terminal is sent it Afterwards, it further includes:
It is instructed according to the installation application information generation signal auditing and is sent to audit side's terminal;
Receive the msu message that audit side's terminal audits instruction upload according to described information;
When detecting signal auditing success according to the msu message, perform described according to the installation application information life The step of being instructed into dress table and being sent to construction party terminal.
A kind of gauge table installs management system, including:
Application information acquisition module, the gauge table for obtaining the transmission of user side's terminal install application information;
Table directive generation module is filled, for being instructed according to the installation application information generation dress table and being sent to construction party end End;
Erection schedule acquisition module is installed into for receiving construction party terminal according to the gauge table that dress table instruction uploads Journey information;
Directive generation module is checked and accepted, for when installation is complete according to the erection schedule infomation detection to the gauge table When, generation, which is checked and accepted, instructs and is sent to the rule side of building terminal;
Acceptance information receiving module, for receiving the rule side's of building terminal according to the examination letter checked and accepted instruction and sent Breath;
Mount message table generation module, for when detecting that examination is completed according to the acceptance information, generating gauge table Mount message table simultaneously stores.
It further includes in one of the embodiments,:
Dam site investigation directive generation module, for instructing and being sent to according to the installation application information generation dam site investigation Advise the side's of building terminal;
Mount scheme acquisition module, for receive it is described rule the side's of building terminal send, according to dam site investigation instruction showed The gauge table mount scheme that field is surveyed;
Table directive generation module is filled, be additionally operable to be instructed according to gauge table mount scheme generation dress table and is sent to construction Square terminal.
It further includes in one of the embodiments,:
Cost information generation module, for generating cost information according to the mount scheme;
Expense sending module, for the cost information to be sent to use corresponding with gauge table installation application information Family side's terminal;
Module is completed in payment, for when detecting that payment is completed, generation payment to be completed information and exported.
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage Computer program, processor any one of realizes the gauge table installation management method described in embodiment when performing program.
A kind of computer readable storage medium, is stored thereon with computer program, which realizes when being executed by processor Gauge table installation management method described in any one embodiment.
Above-mentioned gauge table installation management method and system, computer equipment and storage medium, when getting user side's terminal During the gauge table installation application information of transmission, automatically generate that dress table instruct and to be sent to construction party whole according to installation application information End receives the gauge table erection schedule information that construction party terminal uploads, and when detecting that gauge table erection schedule is completed, generation is tested It receives and instructs and be sent to the rule side of building terminal, when detecting that examination is completed, generation includes gauge table installation application information and installation It completes the gauge table mount message table of information and stores.By carrying out unified pipe to the data information in gauge table installation process Reason realizes the information system management process of gauge table installation.Referred to based on being currently installed on status information and automatically generate corresponding task It enables, relevant staff performs corresponding task operating according to assignment instructions, so as to simplify the work handover stream between each department Journey, improves the Upon Cooperative Efficiency of each department, and then improves the installation effectiveness of gauge table.
Description of the drawings
Fig. 1 is the flow diagram that gauge table installing pipe manages method in an embodiment;
Fig. 2 is the interaction flow schematic diagram that gauge table installing pipe manages method in another embodiment;
Fig. 3 is the flow diagram that gauge table installing pipe manages method in another embodiment;
Fig. 4 is the flow diagram that gauge table installing pipe manages method in another embodiment;
Fig. 5 is the structure diagram that gauge table installing pipe manages system in an embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the object, technical solution and advantage for making the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, and It is not used in restriction the application.
As shown in Figure 1, in the present embodiment, a kind of gauge table installation management method includes step S110 to step S160:
S110 obtains the gauge table installation application information that user side's terminal is sent.
Gauge table installation is actively applied to install, then provide metering by business company for company's application to related service from user Table is simultaneously installed.User needs to provide relevant application information, packet to corresponding business company when carrying out application and applying to install Include subscriber identity information, contact method, type of service etc..
In the present embodiment, the installation application information of gauge table is made a report on by user by user side's terminal.Specifically, Can website or APP be declared by the gauge table of user side's terminal registering service company, complete making a report on and submitting Shen for application information Please, so that website is declared by gauge table by business company or APP gets the application information of user's upload.Wherein, user Square terminal can be that mobile terminal, computer, tablet computer etc. are therein one or more.
Further, application information can also declare website by gauge table or APP is uploaded to information management server, business Company can also pass through the application information of the quick-downloading upload of information management server.
In the present embodiment, user can easily complete the declaration item of gauge table installation by user side's terminal, and Business company need not be gone to correspond to window make a report on by hand, business company also quickly can inerrably get the letter of application of user Breath, starts declaration item without by way of business personnel's craft typing, improves the efficiency of gauge table installation application.
S120 is instructed according to installation application information generation dress table and is sent to construction party terminal.
When getting gauge table installation application information, the instruction of dress table is automatically generated, and the instruction of dress table is sent to construction Square terminal completes installation task to be visited by construction department.
Further, the instruction of dress table includes construction party terminal corresponding address mark and dress table task, fill table task into One step may include installation addresses and type of service etc., and table mission dispatching will be filled to construction party terminal, construction based on address mark Square terminal performs corresponding dress table task after dress table task is received.
S130 receives the gauge table erection schedule information that construction party terminal is uploaded according to dress table instruction.
In gauge table installation process, construction party can upload the erection schedule information of gauge table in time, for example construction party exists Installation is uploaded by construction party terminal when performing gauge table installation task and starts information, is uploaded when completing gauge table installation task Information that installation is complete etc., the gauge table erection schedule information uploaded by receiving construction party terminal, you can understand gauge table in time Be currently installed on progress.
S140, when according to erection schedule infomation detection to gauge table, installation is complete, generation, which is checked and accepted, instructs and is sent to rule The side's of building terminal.
When detect gauge table erection schedule complete when namely gauge table installed, generate corresponding test at this time It receives to instruct and is simultaneously sent to the corresponding rule side's of building terminal, to be carried out an acceptance inspection inspection by the rule side of the building mounted gauge table of terminal-pair. Correspondingly, it checks and accepts instruction to include advising the corresponding address mark of the side's of building terminal and check and accept task, examination task further may include Installation addresses and type of service etc., rule the side's of building terminal after examination task is received, by the rule side of building to mounted gauge table into Row checks, information is completed when checking to check and accept without upload of mistaking, when checking relevant issues in the course of receiving, then by relevant issues Construction party terminal is fed back to, and performs dress table task again by construction party, until checking and accepting successfully.
S150 receives the acceptance information that the rule side's of building terminal is sent according to instruction is checked and accepted.
S160 when detecting that examination is completed according to acceptance information, generates gauge table mount message table and stores.
When detecting that examination is completed, gauge table mount message table is generated, which includes gauge table Application information and installation is complete information are installed, by storing the gauge table mount message table so as to the mounted metering of subsequent query The relevant information of table, and installation can be counted based on stored mount message table, convenient for believing gauge table The unified management and maintenance of breath.In addition, gauge table mount message table may also include gauge table erection schedule information and/or installation Related personnel verifies convenient for the relevant information to installation process.
Further, with reference to Fig. 2, management method is installed by the gauge table described in Fig. 1 Fig. 2 shows management platform and is realized The interaction schematic diagram of each end data interaction.Specific interactive process is as follows:
Gauge table installation application information is sent by user side's terminal first, management platform receives gauge table installation letter of application After breath, generation dress table instructs and is sent to construction party terminal, the erection schedule information that construction party terminal is uploaded according to dress table process To management platform, when management platform detects gauge table installation is complete when, generation, which is checked and accepted to instruct, is simultaneously sent to the rule side of building terminal, advises The side's of building terminal receives examination and instructs the operation that carries out an acceptance inspection, and uploads acceptance information to management platform, when management platform detects When checking and accepting completion, generate gauge table mount message table and simultaneously store.
By being managed collectively to the data information in gauge table installation process, the informationization of gauge table installation is realized Managing process.It automatically generates corresponding assignment instructions based on status information is currently installed on and is sent to corresponding terminal, related work Make personnel and perform corresponding task operating according to assignment instructions, so as to simplify the work handover flow between each department, improve The Upon Cooperative Efficiency of each department, and then improve the installation effectiveness of gauge table.
In another embodiment, as shown in figure 3, being instructed according to installation application information generation dress table and being sent to construction party end The step of end, including step S210 to step S230:
S210 is instructed according to installation application information generation dam site investigation and is sent to the rule side of building terminal.
After gauge table installation application information is received, generation dam site investigation instruction, and dam site investigation instruction is sent to Correlation performs the corresponding terminal in the rule side of building for task of surveying, and carries out dam site investigation to erecting bed by the rule side of building, to determine Mount scheme.Further, dam site investigation instruction includes the address mark of the related rule side's of the building counterpart terminal for performing task of surveying And task is surveyed, surveying task further may include installation addresses and type of service etc..
S220 receives gauge table that the rule side's of building terminal is sent, progress dam site investigation being instructed to obtain according to dam site investigation and pacifies Dress scheme.
The side of building is advised based on the erecting bed situation surveyed, carries out the design of gauge table mount scheme, and gauge table is installed Scheme uploads.For example, when gauge table be Domestic electric meter when, gauge table mount scheme electricity capacity, load nature of electricity consumed, power supply mode, It is one or more in supply path, metering method and metering device configuration.
S230 is instructed according to gauge table mount scheme generation dress table and is sent to construction party terminal.
It is instructed according to gauge table mount scheme generation dress table and is sent to construction party terminal, to measure construction party according to meter Scale mount scheme chooses the gauge table of corresponding model and quantity, and construction party performs installation according to gauge table mount scheme and appoints Business.In the present embodiment, dress table instruction further comprises gauge table mount scheme.
After surveying erecting bed, corresponding mount scheme is determined according to information is surveyed, so that it is guaranteed that efficiently and accurate Really complete the installation of gauge table.
In another embodiment, it is instructed and the step of be sent to construction party terminal according to installation application information generation dress table Before, it further includes:Instruct according to installation application information generation pickup and is sent to metering side's terminal, reception metering side's terminal according to Information is completed in the pickup that pickup instruction uploads.
Further, it is instructed according to installation application information generation dress table and included the step of being sent to construction party terminal:Root It is instructed according to installation application information and pickup completion information generation dress table and is sent to construction party terminal.
Metering side is used for the pickup of execution gauge table and gauge table information record when receiving pickup instruction, when metering side Information is completed into pickup after completion pickup and passes through the upload of metering side's terminal, then regeneration dress table instructs, and carried out by construction party Fill table handling.Specifically, pickup instruction includes the corresponding address mark of metering side's terminal and gauge table model.
In another embodiment, as shown in figure 4, being instructed according to mount scheme generation dress table and being sent to construction party terminal Before step, step S310 is further included to step S330:
S310 generates cost information according to mount scheme.
Cost information is sent to user side's terminal corresponding with gauge table installation application information by S320.
S330, when detecting that payment is completed, generation payment is completed information and is exported.
In the present embodiment, the expense paid needed for user is determined based on gauge table mount scheme, and cost information is sent out It send to corresponding user side's terminal, when user completes payment and then generates dress table instruction according to gauge table mount scheme.
In another embodiment, it after the step of obtaining the gauge table installation application information that user side's terminal is sent, also wraps It includes:It is instructed according to installation application information generation signal auditing and is sent to audit side's terminal, receive audit side's terminal according to information The msu message that audit instruction uploads when detecting signal auditing success according to msu message, performs described according to installation Shen It please information generation dress table the step of instructing and being sent to construction party terminal.
In the present embodiment, it after the gauge table for getting user's submission installs application information, further includes and this application is believed Breath is audited, and only after signal auditing success, is just further performed and is referred to according to gauge table installation application information generation dress table The step of enabling.Specifically, get user submission gauge table installation application information after, to identity information in application information into Row audit, to verify the legitimacy of the identity information, only when the identity information submitted is legal, just further according to the Shen It please information execution dress table task.It is instructed by generating signal auditing, and determines whether application leads to according to signal auditing result It crosses, to ensure the legitimacy of gauge table installation.
Further, in the corresponding business company of installation gauge table, each department can carry out data letter by terminal device The upload and reception of breath.Specifically, terminal device can be mobile terminal, computer, tablet computer etc. it is therein a kind of or It is a variety of.
Above-mentioned gauge table installs management method, by being managed collectively to the data information in gauge table installation process, The information system management process of gauge table installation is realized, simplifies the work handover flow between each department, and then improve each work Make the Upon Cooperative Efficiency of department and the installation effectiveness of gauge table.
As shown in figure 5, also providing a kind of gauge table installation management system in another embodiment, which includes:Application Data obtaining module 110, dress table directive generation module 120, erection schedule acquisition module 130, check and accept directive generation module 140, Acceptance information receiving module 150 and mount message table generation module 160.
Application information acquisition module 110, for obtaining gauge table installation application information.
In the present embodiment, the installation application information of gauge table is made a report on by user by user side's terminal.Specifically, Can website or APP be declared by the gauge table of user side's terminal registering service company, complete making a report on and submitting Shen for application information Please, so that website is declared by gauge table by business company or APP gets the application information of user's upload.Wherein, user Square terminal can be that mobile terminal, computer, tablet computer etc. are therein one or more.
Further, application information can also declare website by gauge table or APP is uploaded to information management server, business Company can also pass through the application information of the quick-downloading upload of information management server.
In the present embodiment, user can easily complete the declaration item of gauge table installation by user side's terminal, and Business company need not be gone to correspond to window make a report on by hand, business company also quickly can inerrably get the letter of application of user Breath, starts declaration item without by way of business personnel's craft typing, improves the efficiency of gauge table installation application.
Table directive generation module 120 is filled, for being instructed according to installation application information generation dress table and being sent to construction party end End.
When getting gauge table installation application information, the instruction of dress table is automatically generated, and the instruction of dress table is sent to construction Square terminal completes installation task to be visited by construction department.
Further, the instruction of dress table includes construction party terminal corresponding address mark and dress table task, fill table task into One step may include installation addresses and type of service etc., and table mission dispatching will be filled to construction party terminal, construction based on address mark Square terminal performs corresponding dress table task after dress table task is received.
Erection schedule acquisition module 130 is installed into for receiving construction party terminal according to the gauge table that the instruction of dress table uploads Journey information.
In gauge table installation process, construction party can upload the erection schedule information of gauge table in time, for example construction party exists Installation is uploaded by construction party terminal when performing gauge table installation task and starts information, is uploaded when completing gauge table installation task Information that installation is complete etc., the gauge table erection schedule information uploaded by receiving construction party terminal, you can understand gauge table in time Be currently installed on progress.
Directive generation module 140 is checked and accepted, for when installation is complete according to erection schedule infomation detection to gauge table, generating It checks and accepts and instructs and be sent to the rule side of building terminal.
When detect gauge table erection schedule complete when namely gauge table installed, generate corresponding test at this time It receives to instruct and is simultaneously sent to the corresponding rule side's of building terminal, to be carried out an acceptance inspection inspection by the rule side of the building mounted gauge table of terminal-pair. Correspondingly, it checks and accepts instruction to include advising the corresponding address mark of the side's of building terminal and check and accept task, examination task further may include Installation addresses and type of service etc., rule the side's of building terminal after examination task is received, by the rule side of building to mounted gauge table into Row checks, information is completed when checking to check and accept without upload of mistaking, when checking relevant issues in the course of receiving, then by relevant issues Construction party terminal is fed back to, and performs dress table task again by construction party, until checking and accepting successfully.
Acceptance information receiving module 150, for receiving the acceptance information that the rule side's of building terminal is sent according to instruction is checked and accepted.
Mount message table generation module 160, for when detecting that examination is completed according to acceptance information, generation gauge table to be pacified Dress information table simultaneously stores.
When detecting that examination is completed, gauge table mount message table is generated, which includes gauge table Application information and installation is complete information are installed, by storing the gauge table mount message table so as to the mounted metering of subsequent query The relevant information of table, and installation can be counted based on stored mount message table, convenient for believing gauge table The unified management and maintenance of breath.In addition, gauge table mount message table may also include gauge table erection schedule information and/or installation Related personnel verifies convenient for the relevant information to installation process.
In the present embodiment, by being managed collectively to the data information in gauge table installation process, metering is realized The information system management process of table installation.It automatically generates corresponding assignment instructions based on status information is currently installed on and is sent to correspondence Terminal, relevant staff performs corresponding task operating according to assignment instructions, handed over so as to simplify the work between each department Flow is connect, improves the Upon Cooperative Efficiency of each department, and then improves the installation effectiveness of gauge table.
In another embodiment, gauge table installation management system further includes:Dam site investigation directive generation module and installation side Case acquisition module.
Dam site investigation directive generation module is built for instructing according to installation application information generation dam site investigation and being sent to rule Square terminal.
After gauge table installation application information is received, generation dam site investigation instruction, and dam site investigation instruction is sent to Correlation performs the corresponding terminal in the rule side of building for task of surveying, and carries out dam site investigation to erecting bed by the rule side of building, to determine Mount scheme.Further, dam site investigation instruction includes the address mark of the related rule side's of the building counterpart terminal for performing task of surveying And task is surveyed, surveying task further may include installation addresses and type of service etc..
Mount scheme acquisition module, for receive it is that the rule side's of building terminal is sent, carry out scene is instructed to look into according to dam site investigation The gauge table mount scheme surveyed.
The side of building is advised based on the erecting bed situation surveyed, carries out the design of gauge table mount scheme, and gauge table is installed Scheme uploads.For example, when gauge table be Domestic electric meter when, gauge table mount scheme electricity capacity, load nature of electricity consumed, power supply mode, It is one or more in supply path, metering method and metering device configuration.
Further, dress table directive generation module is additionally operable to instruct and be sent to according to gauge table mount scheme generation dress table Construction party terminal.
It is instructed according to gauge table mount scheme generation dress table and is sent to construction party terminal, to measure construction party according to meter Scale mount scheme chooses the gauge table of corresponding model and quantity, and construction party performs installation according to gauge table mount scheme and appoints Business.In the present embodiment, dress table instruction further comprises gauge table mount scheme.
After surveying erecting bed, corresponding mount scheme is determined according to information is surveyed, so that it is guaranteed that efficiently and accurate Really complete the installation of gauge table.
In another embodiment, gauge table installation management system further includes gauge table pickup module, for according to installation Shen Please information generation pickup instruct and is sent to metering side terminal, receive metering side's terminal according to pickup instruct upload pickup completion Information.
Further, dress table directive generation module 120 is additionally operable to complete information generation according to installation application information and pickup Dress table instructs and is sent to construction party terminal.
Metering side is used for the pickup of execution gauge table and gauge table information record when receiving pickup instruction, when metering side Information is completed into pickup after completion pickup and passes through the upload of metering side's terminal, then regeneration dress table instructs, and carried out by construction party Fill table handling.Specifically, pickup instruction includes the corresponding address mark of metering side's terminal and gauge table model.
In another embodiment, gauge table installation management system further includes:Cost information generation module, expense sending module Module is completed with payment.
Cost information generation module, for generating cost information according to mount scheme.
Expense sending module, it is whole for cost information to be sent to user side corresponding with gauge table installation application information End.
Module is completed in payment, for when detecting that payment is completed, generation payment to be completed information and exported.
In the present embodiment, the expense paid needed for user is determined based on gauge table mount scheme, and cost information is sent out It send to corresponding user side's terminal, when user completes payment and then generates dress table instruction according to gauge table mount scheme.
In another embodiment, gauge table installation management system further includes signal auditing module, for being applied according to installation Information generation signal auditing instructs and is sent to audit side's terminal, receives audit side's terminal and is examined according to what signal auditing instruction uploaded Nuclear information.
Further, dress table directive generation module 120 is additionally operable to when detecting signal auditing success according to msu message, It is instructed according to installation application information generation dress table and is sent to construction party terminal.
In the present embodiment, it after the gauge table for getting user's submission installs application information, further includes and this application is believed Breath is audited, and only after signal auditing success, is just further performed and is referred to according to gauge table installation application information generation dress table The step of enabling.Specifically, get user submission gauge table installation application information after, to identity information in application information into Row audit, to verify the legitimacy of the identity information, only when the identity information submitted is legal, just further according to the Shen It please information execution dress table task.It is instructed by generating signal auditing, and determines whether application leads to according to signal auditing result It crosses, to ensure the legitimacy of gauge table installation.
Further, in the corresponding business company of installation gauge table, each department can carry out data letter by terminal device The upload and reception of breath.Specifically, terminal device can be mobile terminal, computer, tablet computer etc. it is therein a kind of or It is a variety of.
Above-mentioned gauge table installs management system, by being managed collectively to the data information in gauge table installation process, The information system management process of gauge table installation is realized, simplifies the work handover flow between each department, and then improve each work Make the Upon Cooperative Efficiency of department and the installation effectiveness of gauge table.
In another embodiment, a kind of computer equipment is also provided, including memory, processor and is stored in memory Computer program that is upper and can running on a processor, processor realize the gauge table installation of any one embodiment when performing program Management method.
In another embodiment, a kind of computer readable storage medium is also provided, is stored thereon with computer program, the journey The gauge table installation management method of any one embodiment is realized when sequence is executed by processor.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that those of ordinary skill in the art are come It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of gauge table installs management method, which is characterized in that including:
Obtain the gauge table installation application information that user side's terminal is sent;
It is instructed according to the installation application information generation dress table and is sent to construction party terminal;
Receive the gauge table erection schedule information that construction party terminal is uploaded according to the dress table instruction;
When according to the erection schedule infomation detection to the gauge table, installation is complete, generation is checked and accepted to instruct and be sent to rule and be built Square terminal;
The rule side's of building terminal is received according to the acceptance information checked and accepted instruction and sent;
When detecting that examination is completed according to the acceptance information, generate gauge table mount message table and store.
2. gauge table according to claim 1 installs management method, which is characterized in that described according to the installation letter of application The step of breath generation dress table instructs and is sent to construction party terminal, including:
It is instructed according to the installation application information generation dam site investigation and is sent to the rule side of building terminal;
Receive gauge table installation side that the rule side's of building terminal is sent, progress dam site investigation being instructed to obtain according to dam site investigation Case;
It is instructed according to gauge table mount scheme generation dress table and is sent to construction party terminal.
3. gauge table according to claim 2 installs management method, which is characterized in that described to be given birth to according to the mount scheme Before the step of being instructed into dress table and being sent to construction party terminal, further include:
Cost information is generated according to the mount scheme;
The cost information is sent to user side's terminal corresponding with gauge table installation application information;
When detecting that payment is completed, generation payment is completed information and is exported.
4. gauge table according to claim 2 installs management method, which is characterized in that the gauge table is Domestic electric meter, The gauge table mount scheme includes:Electricity capacity, load nature of electricity consumed, power supply mode, supply path, metering method and metering device It is one or more in configuration.
5. management method is installed according to claim 1-4 any one of them gauge table, which is characterized in that the acquisition user side After the step of gauge table installation application information that terminal is sent, further include:
It is instructed according to the installation application information generation signal auditing and is sent to audit side's terminal;
Receive the msu message that audit side's terminal audits instruction upload according to described information;
When detecting signal auditing success according to the msu message, perform described according to the installation application information generation dress The step of table instructs and is sent to construction party terminal.
6. a kind of gauge table installs management system, which is characterized in that including:
Application information acquisition module, the gauge table for obtaining the transmission of user side's terminal install application information;
Table directive generation module is filled, for being instructed according to the installation application information generation dress table and being sent to construction party terminal;
Erection schedule acquisition module is believed for receiving construction party terminal according to the gauge table erection schedule that dress table instruction uploads Breath;
Directive generation module is checked and accepted, for when installation is complete according to the erection schedule infomation detection to the gauge table, giving birth to It is instructed into examination and is sent to the rule side of building terminal;
Acceptance information receiving module, for receiving the rule side's of building terminal according to the acceptance information checked and accepted instruction and sent;
Mount message table generation module, for when detecting that examination is completed according to the acceptance information, generation gauge table to be installed Information table simultaneously stores.
7. gauge table according to claim 6 installs management system, which is characterized in that further includes:
Dam site investigation directive generation module is built for instructing according to the installation application information generation dam site investigation and being sent to rule Square terminal;
Mount scheme acquisition module, for receive it is that the rule side's of building terminal is sent, carry out scene is instructed to look into according to dam site investigation The gauge table mount scheme surveyed;
Table directive generation module is filled, is additionally operable to that construction party end is instructed and be sent to according to gauge table mount scheme generation dress table End.
8. gauge table according to claim 7 installs management system, which is characterized in that further includes:
Cost information generation module, for generating cost information according to the mount scheme;
Expense sending module, for the cost information to be sent to user side corresponding with gauge table installation application information Terminal;
Module is completed in payment, for when detecting that payment is completed, generation payment to be completed information and exported.
9. a kind of computer equipment can be run on a memory and on a processor including memory, processor and storage Computer program, which is characterized in that processor realizes claim 1-5 any one of them gauge table installing pipes when performing program Reason method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor Claim 1-5 any one of them gauge table installation management method is realized during execution.
CN201711298813.3A 2017-12-08 2017-12-08 Gauge table installation management method and system, computer equipment and storage medium Pending CN108241965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711298813.3A CN108241965A (en) 2017-12-08 2017-12-08 Gauge table installation management method and system, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711298813.3A CN108241965A (en) 2017-12-08 2017-12-08 Gauge table installation management method and system, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN108241965A true CN108241965A (en) 2018-07-03

Family

ID=62701060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711298813.3A Pending CN108241965A (en) 2017-12-08 2017-12-08 Gauge table installation management method and system, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN108241965A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070168492A1 (en) * 2001-11-09 2007-07-19 Hitachi, Ltd. Equipment Maintenance Assisting Method and Equipment Maintenance Assisting Server
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN107256466A (en) * 2017-06-29 2017-10-17 成都方米科技有限公司 A kind of gas works construction management system and management method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070168492A1 (en) * 2001-11-09 2007-07-19 Hitachi, Ltd. Equipment Maintenance Assisting Method and Equipment Maintenance Assisting Server
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN107256466A (en) * 2017-06-29 2017-10-17 成都方米科技有限公司 A kind of gas works construction management system and management method

Similar Documents

Publication Publication Date Title
CN107240002B (en) Electric power transaction method and device and micro-grid system
CN110829590B (en) Intelligent monitoring system, method, platform and storage medium for line loss of transformer area
CN111651647B (en) Display method, device and computer system for waybill price
CN108711206A (en) Gate control method, relevant device, system and storage medium
CN106781057B (en) Intelligent electric energy meter supplements the method that fault detection system and detection processing supplement failure with money with money
CN112801658B (en) Cross-border resource transfer authenticity auditing method and device and electronic equipment
JP6424255B2 (en) Fleet vehicle fuel measurement
US20230229215A1 (en) Cloud Computing Power Allocation Method, User Terminal, Cloud Computing Power Platform and System
CN112367680A (en) External communication test method and device based on intelligent electric meter and computer equipment
KR20160088135A (en) Meter reading system using mobile terminal and meter reading method thereof
CN107861735A (en) A kind of firmware installation progress monitoring method and computer-readable recording medium
CN108241965A (en) Gauge table installation management method and system, computer equipment and storage medium
CN106055326A (en) Program processing method and dispatch server
KR20220037571A (en) Renewable energy trading system using a renewable energy supply platform and method for operating the system
CN105137776B (en) Metering automation terminal control accessory system
CN111047408A (en) Service order processing method and device, storage medium and electronic equipment
CN116955148A (en) Service system testing method, device, equipment, storage medium and product
CN108921442A (en) The picture examination method and device of grid equipment
CN115631065A (en) File accuracy detection method based on front-end electricity utilization service change
CN109066658A (en) A kind of method of electric energy transfer and relevant device
CN108334448A (en) Code verification method, apparatus and equipment
CN106856599B (en) Terminal, detection service device, short message receiving-transmitting fault detection method and system
CN106327076A (en) Engineering acceptance system capable of supporting automatic inspection report generation
CN101604412A (en) Gate automatic test data management system
CN111797149A (en) Data acquisition method, device, equipment and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200917

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20180703

RJ01 Rejection of invention patent application after publication