CN108197802A - It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control - Google Patents

It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control Download PDF

Info

Publication number
CN108197802A
CN108197802A CN201711480910.4A CN201711480910A CN108197802A CN 108197802 A CN108197802 A CN 108197802A CN 201711480910 A CN201711480910 A CN 201711480910A CN 108197802 A CN108197802 A CN 108197802A
Authority
CN
China
Prior art keywords
bim
construction
concrete structure
node
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711480910.4A
Other languages
Chinese (zh)
Inventor
王海东
孙博
罗雨佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201711480910.4A priority Critical patent/CN108197802A/en
Publication of CN108197802A publication Critical patent/CN108197802A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses a kind of method and system based on BIM technology to concrete structure construction quality management and control, includes the following steps:BIM threedimensional models are established according to arrangement and method for construction;Setting critical construction checks and accepts node in the three-dimensional model;Examination image information, which is acquired, using image documentation equipment is uploaded to BIM threedimensional models;The live material information of verification is uploaded to BIM threedimensional models;Upload information is matched with BIM three-dimensional model informations;Next construction node is carried out if successful match to check and accept;If it fails to match, rectified and improved, checked and accepted until successful match carries out next construction node again.It is of the present invention to be based on BIM construction quality managing and control systems, by BIM threedimensional models, the substep control of construction site and BIM model informations are realized, high degree reduces construction quality problem and the nonstandard problem of onsite acceptance.

Description

It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control
Technical field
The present invention relates to it is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control, especially relate to And large-sized concrete structure, quality control require the method and system of high construction site quality management and control.
Background technology
In heavy construction construction field, construction quality management is the key that one ring of field control.In the prior art, due to item The mesh duration is tight, blindly pursues speed and the engineering project of economic benefit emerges in an endless stream, final construction quality is caused to be difficult to be protected Card.Quality management is caused to disconnect due to excessively pursuing progress control and cost management, once key node control is not in place, And in order to pursue speed blindly overwork, it will cause great security risk, and bring economic loss difficult to the appraisal.
Meanwhile compared to external construction quality management level, the existing construction quality management level in China also relatively lags behind, The quality information acquisition of traditional mode is copied repeatedly mostly using papery data, and information is lengthy and jumbled to cause many unnecessary labour, Slow down the duration.Shared difficulty is big simultaneously, stays mostly in paper form, and it is extremely serious to practise fraud, and is hardly formed effective letter Breathization.And key message missing is easily caused, brings great security risk.
Invention content
The technical problem to be solved in the present invention is to provide a kind of by BIM technology model and concrete structure construction quality management It is combined, realizes that the quality management of concrete structure site operation is qualified, ensure the method and system of project quality, while can be real It is now generated to checking and accepting the synchronous of data, greatly reduces unnecessary manual labor, to accelerate engineering construction.
For solution more than technical problem, the present invention uses following scheme:One kind is based on BIM technology to concrete structure construction The method and system of quality management and control, include the following steps:
Step 1:It identifies project arrangement and method for construction, and arrangement and method for construction is imported into BIM systems, establish BIM threedimensional models, and The critical construction of concrete structure is set to check and accept node in BIM threedimensional models;
Step 2:Live Quality Inspector is believed critical construction node image using the technical equipment such as digital camera, panoramic scanning Breath acquires and uploads to BIM threedimensional models;
Step 3:Live Quality Inspector acquires corresponding construction node material requested, and quantity, position, which is put, waits construction inspection rules Require information, and upload to BIM threedimensional models;
Step 4:Collected information and the arrangement and method for construction in BIM models are matched, if successful match, carried out The construction of next step;If it fails to match, it will rectify and improve rapidly, after reaching quality requirement, BIM models could carry out next step Operation;Step 5:According to《Concrete structure engineering construction quality accident specification》Each construction node identified project, and to each Node construct according to above-mentioned requirements control;
Step 6:After a node examination of constructing passes through, data will be checked and accepted by BIM threedimensional models and exported, and by phase It closes responsible party and represents signature confirmation.
Further, in step 1, pass through the foundation to threedimensional model and examination node, you can institute is checked and accepted in export The key messages such as each part dimension structure needed, material property, convenient for the matching work of step 4.
Further, in step 4, to ensure that concealment part sets up examination node before pouring for concealed work, Ensure the inspection of quality before pouring.
Further, by the operational mode of preceding step, once there is construction quality problem, you can pass through model text Part clears the responsibility of the main at the first time.
Compared with prior art, the present invention has following benefit:
1 present invention based on BIM technology to the method and system of concrete structure construction quality management and control by BIM technology with The combination of construction site ensure that the stringent supervision of quality information, information-based, effectively prevent the generation that information is played tricks.
Information timely and effectively can be transmitted to management side and Party A by 2 quality control systems from construction party, be reduced Cumbersome copies process, improves work efficiency.
3 quality control systems, it is ensured that the accuracy that information is transmitted, by with no paper office, with generation The transmission of the forms such as table or document, reduces the information error copied privately and brought.
4 quality control systems by three-dimensional modeling, break away from the abstract of word, can be more intuitively by quality feelings Condition shows Construction Party, and the intuitive mode of intelligence transmission substantially increases reading efficiency.
Description of the drawings
Fig. 1 is a kind of based on operation of the BIM technology to the method and system of concrete structure construction quality management and control for the present invention Flow chart.
Specific embodiment
Illustrate the specific embodiment of the invention below by way of specific particular instance, those skilled in the art can be by this theory Content described in bright book understands feature and effect of the present invention.The present invention can also be subject to reality by way of a different and different embodiment It applies or applies, the details of this specification can also be based on different viewpoints and application, under the premise of the spirit without departing from the present invention It is modified.
As shown in fig.1, a kind of for the present invention to the method for concrete structure construction quality management and control and be based on BIM technology System operational flowchart.As shown in Figure 1, the present invention it is a kind of based on BIM technology to the method for concrete structure construction quality management and control and System mainly includes the following steps:
Step 1:BIM threedimensional models are established according to arrangement and method for construction;
Step 2:Setting critical construction checks and accepts node in the three-dimensional model;
Step 3:Examination image information, which is acquired, using image documentation equipment is uploaded to BIM threedimensional models;
Step 4:The live material information of verification is uploaded to BIM threedimensional models;
Step 5:Upload information is matched with BIM three-dimensional model informations;
Step 6:Next construction node is carried out if successful match to check and accept;If it fails to match, rectified and improved, It is checked and accepted until successful match carries out next construction node again;
(BIM models type software, and same type can be used by taking the AutodeskRevit softwares in BIM technology as an example below Other classes BIM softwares, the present invention is not to using software to be particularly limited to), to further illustrate the present invention, to concrete knot The concrete scheme of the method and system of structure construction quality management and control is as follows:
In step 1:According to the arrangement and method for construction for having designed completion, engineering is established using AutodeskRevit softwares Threedimensional model and structure three-dimensional model are arranged in construction main flat face.The Chinese of AutodeskRevit is architectural design and construction Software, major function is constructs Building Information Model.BIM is to design, construct to whole operation and the structure based on information The model system built.In the present invention, using the modeling function of AutodeskRevit softwares, it is three-dimensional to establish construction main flat face arrangement Arrangement and method for construction is imported into BIM systems by model and structure three-dimensional model.
In step 2:According to the arrangement and method for construction worked out and《Concrete structure engineering construction quality accident specification》Choosing Examination node during rounding concrete structure construction, and these nodes are carried out in the threedimensional model having had built up Setting.Each construction node is inserted into block mold using AutodeskRevit softwares.
In step 3:The equipment such as digital photographing, video camera, panoramic scanning, which can be used, in Quality Inspector at the scene needs scene The situation of construction node is checked and accepted by taking a picture, imaging the progress physical record in the form of image.It will by AutodeskRevit softwares Photograph, video are uploaded in established threedimensional model.
In step 4:Quality Inspector's basis at the scene《Concrete structure engineering construction quality accident specification》In specifically will It asks, each scantling at acquisition construction node, position, model, the key messages such as quantity.It will by AutodeskRevit softwares Collected information is uploaded in established threedimensional model.
In step 5:Using AutodeskRevit softwares by the information of upload with establishing in the threedimensional model completed Information is matched.Critical control point and non-key control point are divided into according to node setting in matching process, ensure crucial control Point highly consistent and non-key control point it is unanimous on the whole.
In step 6:If successful match in step 5, next construction is then entered in AutodeskRevit softwares Node is checked and accepted, and generates acceptance report simultaneously with document form.If it fails to match, the content according to software unsuccessfully It is rectified and improved, and information upload is resurveyed after rectification, until by checking and accepting, proceeded to next construction node and check and accept.
The present invention it is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control, further include:For The examination problem of concealed work can in advance set before concealed work pours and check and accept node, to ensure to test concealed work It is retracted into reminding effect.Generation for engineering accident can at the first time be cleared the responsibility of the main by the information uploaded in software, And it calls to account.It separately needs to illustrate, the structure shown in the drawings of this specification, size, ratio etc., is all used for aiding in illustrating specification Particular content, so that skilled addressee is read, be not the present invention qualifications.Any rational adjustment, is repaiied Decorations are under the premise of without prejudice to original intention of the present invention, in technical scope of the present invention.Meanwhile this specification is applied Such as " on ", " under ", "left", "right" term also the non-limiting present invention can practical range, in the premise without essence change technology Under, also it is regarded as implementation scope of the invention.
Above-described invention example not does formal limitation to the present invention, and those skilled in the art can be to corresponding Technology contents are modified or are adjusted, as long as without departing from the content of technical solution of the present invention, still fall within technical solution of the present invention In the range of.

Claims (8)

1. it is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control, which is characterized in that including following Step:
Step 1:It identifies project arrangement and method for construction, and arrangement and method for construction is imported into BIM systems, establish BIM threedimensional models, and in BIM The critical construction of concrete structure is set to check and accept node in threedimensional model
Step 2:Live Quality Inspector is acquired critical construction node image information simultaneously using the technologies such as digital camera, panoramic scanning Upload to BIM threedimensional models
Step 3:Live Quality Inspector acquires the material information of corresponding construction node and uploads to BIM threedimensional models
Step 4:Collected information and the arrangement and method for construction in BIM models are matched, if successful match, carried out next The construction of step;If it fails to match, it will rectify and improve rapidly, after reaching quality requirement, BIM models could carry out the operation of next step
Step 5:According to《Concrete structure engineering construction quality accident specification》Each construction node identified project, and to each Node construct according to above-mentioned requirements control
Step 6:After a node examination of constructing passes through, data will be checked and accepted by BIM threedimensional models and exported, and by construction party, Management side and Party A, which sign, to be confirmed
Further, in step 1, pass through the foundation to threedimensional model and examination node, you can export is checked and accepted required The key messages such as each scantling, material property, convenient for the matching work of step 4
Further, in step 4, to ensure that concealment part sets up examination node before pouring for concealed work, ensure Inspection of quality before pouring
Further, by the operational mode of preceding step, once there is construction quality problem, you can it is carried by BIM models The relevant information of confession clears the responsibility of the main at the first time.
2. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It is described BIM models can set up the construction node of examination in advance according to arrangement and method for construction.
3. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It will apply Work quality in site information is combined by recording equipment with BIM models.
4. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It is described BIM threedimensional models carry out stringent control to construction speed, only by quality matches, could carry out next step construction.
5. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It is described The combination of BIM models and concrete construction acceptance specification highlights the characteristics of concrete structure quality is checked and accepted.
6. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It is described It checks and accepts material to export by BIM threedimensional models, a large amount of numerous and diverse meaningless copy can be reduced.
7. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It is described The BIM of the setting in advance model nodes of concealed work are checked and accepted, reminding effect is played to acceptance of concealed work.
8. the concrete structure construction quality control system according to claim 1 based on BIM, it is characterised in that:It is described To the stringent control of each link, once there is quality accident, can information be recorded according to model at the first time and divide responsibility.
CN201711480910.4A 2017-12-29 2017-12-29 It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control Pending CN108197802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711480910.4A CN108197802A (en) 2017-12-29 2017-12-29 It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711480910.4A CN108197802A (en) 2017-12-29 2017-12-29 It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control

Publications (1)

Publication Number Publication Date
CN108197802A true CN108197802A (en) 2018-06-22

Family

ID=62586789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711480910.4A Pending CN108197802A (en) 2017-12-29 2017-12-29 It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control

Country Status (1)

Country Link
CN (1) CN108197802A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108802677A (en) * 2018-07-05 2018-11-13 国网福建省电力有限公司 Substation project based on RFID checks and accepts Intelligent auxiliary equipment localization method
CN109779261A (en) * 2018-12-20 2019-05-21 上海建工集团股份有限公司 The method and system of concreting dynamic control based on BIM technology
CN109784758A (en) * 2019-01-30 2019-05-21 北京筑业志远软件开发有限公司 Construction quality supervision early warning system and method based on BIM model
CN109886573A (en) * 2019-02-18 2019-06-14 重庆工商职业学院 Building intelligence build guality, safety management system and method
CN110400075A (en) * 2019-07-24 2019-11-01 中煤地建设工程有限公司 A kind of wisdom building site quality safety management system
WO2020006984A1 (en) * 2018-07-04 2020-01-09 成都希盟泰克科技发展有限公司 Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme
CN111080491A (en) * 2019-12-12 2020-04-28 成都阳帆网络科技有限公司 Construction site inspection system and method based on video identification
CN111521162A (en) * 2020-04-15 2020-08-11 广东博智林机器人有限公司 Method and device for determining station measurement, electronic equipment and storage medium
CN111861160A (en) * 2020-07-04 2020-10-30 广东粤源工程咨询有限公司 Construction engineering quality information management method and system
CN112365151A (en) * 2020-11-09 2021-02-12 重庆智慧之源科技有限公司 Intelligent detection system for building concealed engineering
CN112488879A (en) * 2020-12-02 2021-03-12 滨州学院 Intelligent construction site management system based on BIM model
CN112733239A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 Building engineering quality monitoring method and system based on BIM model
WO2021116093A1 (en) * 2019-12-10 2021-06-17 Peri Gmbh Computer-assisted method and device for testing the quality of exposed concrete
CN112990844A (en) * 2020-12-26 2021-06-18 上海建科工程咨询有限公司 Construction method and management system based on BIM
CN114169058A (en) * 2021-12-13 2022-03-11 金螳螂家装电子商务(苏州)有限公司 Construction node quality inspection management method based on home decoration industry
CN116090907A (en) * 2023-03-07 2023-05-09 中建四局第五建筑工程有限公司 Building construction quality traceability management method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform
CN106055839A (en) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 Application method of three-dimensional scanning technology in building engineering based on BIM
CN106096851A (en) * 2016-06-21 2016-11-09 浙江精工钢结构集团有限公司 A kind of structural steelwork based on BIM technology visualization acceptance method
CN107229777A (en) * 2017-05-12 2017-10-03 中国建筑局(集团)有限公司 A kind of acceptance of concealed work method based on mixed reality technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform
CN106096851A (en) * 2016-06-21 2016-11-09 浙江精工钢结构集团有限公司 A kind of structural steelwork based on BIM technology visualization acceptance method
CN106055839A (en) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 Application method of three-dimensional scanning technology in building engineering based on BIM
CN107229777A (en) * 2017-05-12 2017-10-03 中国建筑局(集团)有限公司 A kind of acceptance of concealed work method based on mixed reality technology

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020006984A1 (en) * 2018-07-04 2020-01-09 成都希盟泰克科技发展有限公司 Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme
CN108802677A (en) * 2018-07-05 2018-11-13 国网福建省电力有限公司 Substation project based on RFID checks and accepts Intelligent auxiliary equipment localization method
CN109779261A (en) * 2018-12-20 2019-05-21 上海建工集团股份有限公司 The method and system of concreting dynamic control based on BIM technology
CN109779261B (en) * 2018-12-20 2023-06-23 上海建工集团股份有限公司 BIM technology-based concrete pouring dynamic control method and system
CN109784758A (en) * 2019-01-30 2019-05-21 北京筑业志远软件开发有限公司 Construction quality supervision early warning system and method based on BIM model
CN109886573A (en) * 2019-02-18 2019-06-14 重庆工商职业学院 Building intelligence build guality, safety management system and method
CN110400075A (en) * 2019-07-24 2019-11-01 中煤地建设工程有限公司 A kind of wisdom building site quality safety management system
WO2021116093A1 (en) * 2019-12-10 2021-06-17 Peri Gmbh Computer-assisted method and device for testing the quality of exposed concrete
CN111080491A (en) * 2019-12-12 2020-04-28 成都阳帆网络科技有限公司 Construction site inspection system and method based on video identification
CN111521162A (en) * 2020-04-15 2020-08-11 广东博智林机器人有限公司 Method and device for determining station measurement, electronic equipment and storage medium
CN111861160A (en) * 2020-07-04 2020-10-30 广东粤源工程咨询有限公司 Construction engineering quality information management method and system
CN112365151A (en) * 2020-11-09 2021-02-12 重庆智慧之源科技有限公司 Intelligent detection system for building concealed engineering
CN112365151B (en) * 2020-11-09 2024-05-17 重庆智慧之源科技有限公司 Intelligent detection system for building concealed engineering
CN112488879A (en) * 2020-12-02 2021-03-12 滨州学院 Intelligent construction site management system based on BIM model
CN112990844A (en) * 2020-12-26 2021-06-18 上海建科工程咨询有限公司 Construction method and management system based on BIM
CN112733239A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 Building engineering quality monitoring method and system based on BIM model
CN114169058A (en) * 2021-12-13 2022-03-11 金螳螂家装电子商务(苏州)有限公司 Construction node quality inspection management method based on home decoration industry
CN116090907A (en) * 2023-03-07 2023-05-09 中建四局第五建筑工程有限公司 Building construction quality traceability management method and system
CN116090907B (en) * 2023-03-07 2023-06-20 中建四局第五建筑工程有限公司 Building construction quality traceability management method and system

Similar Documents

Publication Publication Date Title
CN108197802A (en) It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control
CN106652049A (en) Full-professional design delivery method for building based on augmented reality technology of mobile terminal
WO2018121333A1 (en) Real-time generation method for 360-degree vr panoramic graphic image and video
CN108665527A (en) A kind of technical annotation in construction method based on panoramic technique and BIM models
CN108388711A (en) A kind of engineering design based on BIM and management system
CN108510406A (en) Construction based on Building Information Model and panoramic technique is told somebody what one's real intentions are method and system
DE112015007134T5 (en) Method and device for synchronous image display
CN104680320A (en) BIM-based project management system and method
CN203352678U (en) Panoramic image hardware imaging device with six camera heads
JP2017167969A (en) Damage extraction system
CN109462736B (en) Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling
CN107451737A (en) A kind of big data O2O check of drawings cloud platform management systems examined for engineering construction figure
CN106201201A (en) View method of adjustment and system
CN105965894A (en) Automatic control system for 3D printing monitoring based on image processing
CN115760021A (en) GIS-based engineering progress three-dimensional monitoring system
CN105551069B (en) A kind of real-time generation method and system of thumbnail
CN101807289B (en) Modeling method for distributed image processing system
CN113474784A (en) Dynamic two-dimensional code evaluation method, dynamic two-dimensional code evaluation system, and dynamic two-dimensional code evaluation program
CN114666133B (en) Remote inquiry evidence obtaining system and method based on original handwriting signature
CN106203967A (en) Teleconference information exchange method based on BIM and system
CN108765574A (en) 3D scenes intend true method and system and computer readable storage medium
CN108769612A (en) A kind of VR Visualization Platforms
CN109191578B (en) Method, system and device for generating conference bottoms of engineering site and readable storage medium
US20170070705A1 (en) System and method for collating digital content from a plurality of devices into a single media file
CN115797584B (en) Method for constructing live-action model in no-fly zone

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180622