CN107967801A - A kind of energy measurement data online acquisition and monitoring method and system - Google Patents

A kind of energy measurement data online acquisition and monitoring method and system Download PDF

Info

Publication number
CN107967801A
CN107967801A CN201711426451.1A CN201711426451A CN107967801A CN 107967801 A CN107967801 A CN 107967801A CN 201711426451 A CN201711426451 A CN 201711426451A CN 107967801 A CN107967801 A CN 107967801A
Authority
CN
China
Prior art keywords
data
communication
collector
meter reading
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711426451.1A
Other languages
Chinese (zh)
Inventor
李跃忠
曾令源
陈锐
严小强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Institute of Technology
Original Assignee
East China Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Institute of Technology filed Critical East China Institute of Technology
Priority to CN201711426451.1A priority Critical patent/CN107967801A/en
Publication of CN107967801A publication Critical patent/CN107967801A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C25/00Arrangements for preventing or correcting errors; Monitoring arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • H04L5/16Half-duplex systems; Simplex/duplex switching; Transmission of break signals non-automatically inverting the direction of transmission

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention discloses a kind of energy measurement data online acquisition method and monitoring system, it is made of two large divisions, a part is the hardware platform centered on MCU control module;Another part is administrative center's platform centered on main website, administrative center's platform can carry out remote management by GPRS module to collector, hardware platform can carry out data acquisition to intelligent meter by 485 modes and carrier system and report to administrative center, it is characterized in that, hardware platform includes embedded controller circuit, 485 telecommunication circuits of RS, GPRS telecommunication circuits, power carrier communication circuit, clock circuit, display circuit, power circuit, input through keyboard circuit, JTAG debugging circuit and storage circuit;Collector employs two kinds of communication modes altogether, two kinds of communication modes all use serial ports into row data communication, 485 telecommunication circuits of RS modulate signals into the transmission that symmetrical form carries out signal in a manner of balance transmission, then received in a differential manner, using hypotactic half duplex mode of communication.

Description

A kind of energy measurement data online acquisition and monitoring method and system
Technical field
The invention belongs to automation instrument technology field, it is related to multi-energy data collection, which is especially suitable for telecommunications Breath carries out data acquisition, analysis and control.
Background technology
For many countries of recent domestic all in the R&D work of Efforts To Develop power information collector, its development is it Rapidly.In China, realizing the method for electrical energy data acquiring and data management has many kinds, existing acquisition scheme and management mode All it is the interim product being born under special scenes, it is complicated and changeable due to site environment in actual moving process, lead to Letter success rate, accuracy rate, real-time all cannot reliably ensure that the scope of application also has certain limitation.Therefore realization convenience, Efficiently, intelligence, power information collector in real time, stable have positive meaning.
Also there is the patent application for solving problems in the prior art, such as:
CN201210502090.5《A kind of ONU equipment with acquisition function》, including collection MCU module, memory, RS-485 interfaces, ethernet switching module and ONU module chips, collection MCU module respectively with memory, RS-485 interfaces, with Too net Switching Module connects, and ethernet switching module is connected with ONU module chips, and RS-485 interfaces are communicated with using DL/T645 The electric energy meter connection of stipulations.This equipment can directly carry out power information collection, and use EPON technologies in LCN local communications network Realize optic communication.High bandwidth, high reliability and the application of networking of EPON networks will cause power information acquisition system Physical network has high capacity, and can easily branch out scope and content, there is provided value-added service.
CN201110376408.5《A kind of more communication technology type of method for electric power information acquisition control》, first opened with monitoring system It is dynamic to establish power information collection network node archives, the physics end by director data by communication interface configuration distributing network node Slogan and address, select the communication network based on TCP/IP communication agreement of Ethernet, hardware module plug and play;Monitoring system The instruction issued judges the physical port number of network node through information gathering control unit, automatically configures into communication pattern, is After system calls corresponding constructing communication network agreement, system completes the communication networking of power information collection, realizes based on more communications Technical form power information acquisition control;Its hardware composition is rational in infrastructure, and principle is reliable, and software configuration science, data acquisition is accurate, It is high to communicate success rate, wide coverage, can effectively realize the control to power system information collection.
CN201210560527.0《A kind of table address uploads the gathering method of meter reading terminal automatically》, start kilowatt meter reading-out system, Establish power information collection electric energy meter archives;Transmitting order to lower levels collects all electric energy meter mailing addresses to meter reading terminal;Meter reading terminal Receive and issue broadcasting command to RS485 electric energy meters all in RS485 buses after order and copy and accept electric energy meter mailing address;RS485 Electric energy meter receives trigger after broadcasting command, electric energy meter successively by different delay times by RS485 bus communications to copying Meter terminal reports respective mailing address automatically;Meter reading terminal will be collected after receiving the mailing address of all uploads and being preserved Electric energy meter mailing address report kilowatt meter reading-out system automatically, realize table address collect;Its technical process is simple, and meter reading efficiency is high, section Human-saving, data are reliable, easy to engineering construction commissioning staff's system debug.
CN201710254661.0《A kind of power information collection and repeater system and equipment based on Internet of Things》, the system Including:Data acquisition module, including electric energy acquisition chip, for gathering the power information of user;Data processing module, including master Chip, for handling the power information of the electric energy acquisition chip transmission;Data forwarding module, for being incited somebody to action by Wi-Fi The power information is forwarded to Cloud Server and is forwarded to mobile terminal by the Cloud Server and shows.Present invention collection electric power is adopted Collection, processing, forwards in one, with reference to Cloud Server and mobile terminal, forms a complete Internet of Things framework, obtains data not Intelligent electric meter is only relied only on, for comprehensive household electricity situation can be integrated by acquisition for mobile terminal, effectively avoids electric energy Waste, lift power resource utilization ratio, respond the call of the energy-saving and emission-reduction low-carbon life of country.
The content of the invention
In view of the prior art goes back Shortcomings in communication stability and line-hit etc., the present invention is asked for this Topic devises power information collector, and the power information collector of design largely solves communication stability and circuit Interference problem, very big extension, the electric power letter of design have been obtained by the scope of application of equipment integrating multiple communication modes system Breath collector has apparent market application value.It is an object of the invention to provide a kind of energy measurement data online acquisition and prison Control method and system.
A kind of energy measurement data online acquisition and monitoring system, are made of, a part is with MCU two large divisions Hardware platform centered on (Microcontroller Unit) control module;Another part is in the management centered on main website Heart platform, administrative center's platform can carry out collector by GPRS module remote management, hardware platform can by 485 modes and Carrier system carries out intelligent meter data acquisition and reports to administrative center, hardware platform include embedded controller circuit, RS-485 telecommunication circuits, GPRS telecommunication circuits, power carrier communication circuit, clock circuit, display circuit, power circuit, keyboard Input circuit, JTAG (Joint Test Action Group) debug circuits and storage circuit;Collector employs two kinds and leads to altogether Letter mode, two kinds of communication modes all modulate signals into symmetrical shape using serial ports into row data communication, RS-485 telecommunication circuits Formula carries out the transmission of signal in a manner of balance transmission, is then received in a differential manner, using hypotactic half pair Work communication pattern;Power carrier communication circuit is the carrier communication mode using power line as transmission medium.
Further, GPRS telecommunication circuits are arranged to the module of dismounting, and clock circuit uses clock chip DS3231, passes through I2C buses are connected with microcontroller;By realizing demand of the system to memory capacity to the extension of FLASH, FLASH leads to system SPI (Serial Peripheral Interface) bus is crossed with microcontroller to be connected;Power circuit is using power supply conversion isolation Set;Exterior FLASH memory is selected in main control in storage circuit;
Further, the communication between collector and intelligent meter have also been devised with electric power in addition to using RS-485 modes Line is the carrier communication mode of transmission medium, the carrier communication carried out data transmission using existing low-voltage power line, carrier circuit By six carrier chip, signal amplification circuit, filter circuit, termination power, zero cross detection circuit, power supply and current-limiting circuit parts Composition.
Further, what is established between administrative center's platform and collector is the communication of interrogation reply system, with administrative center's platform For main website, collector is slave station, and collector, which receives, sends instructions and make corresponding operating under main website, collector can be actively into management Heart platform uploads data;Half-duplex operation mode is used between ammeter and collector, collector is main website, and ammeter is slave station, is adopted Storage by ammeter send the commands to control communication link foundation and releasing;Ammeter and collector all have unique communication Address.In the program design that communicates, when the serial ports of collector receives the order that administrative center issues, GPRS serial ports interrupts Receiving flag bit will be set.
Further, in the main program that communicates, when detecting that GPRS serial ports interruption reception flag bit is effective, will call logical Letter management program realizes the response that data are issued to administrative center;
First determine whether the data that main website issues are properly received, returned if reception failure, if success logarithm Judge according to progress protocol analysis and the type to data;The type of data is broadly divided into two classes, and one kind is to collector Relevant operation instructs, and one kind is the operational order to ammeter;If the instruction that main website issues is for collector, according to finger Make information make relevant operation and return to related data;If instruction is that ammeter is operated, it must just carry out agreement and turn Change, be converted into the downlink communication agreement that ammeter can identify, then call local communication program, command adapted thereto letter is sent to ammeter Breath, the data that ammeter returns must carry out frame assembling according to uplink communication agreement before main website is sent to data.
Further, initialized first after system electrification, configure correlated variables, circularly monitoring task can be entered afterwards, Circularly monitoring task is updated related by the monitoring to serial ports interrupt signal and the contrast to system time to meter reading time The state of flag bit;Meet that collection requires when detecting, by corresponding mark position one, instruction is currently needed for the data class of collection Type;Multi-task state collecting thread will excite the operation of corresponding meter reading procedure when detecting that each state flag bit is effective; Multi-task state collecting thread can carry out repeating query according to the parameter set to every meter reading task, catch the change of correlation behavior amount Change, when detecting that corresponding flag bit is in effective status, corresponding meter reading subprogram will be started.
Further, meter reading subprogram is that the data frame that will be assembled is returned by Serial Port Transmission to intelligent electric meter, reception ammeter The information returned, judges whether to need benefit to copy and make a record meter reading situation according to the information that ammeter returns;In order to realize as far as possible 100% reliably makes a copy of, each meter reading subprogram devises benefit and copies mechanism, will have chance weight twice after first time meter reading failure Copy, still fail if copied again, abandon meter reading, and by meter reading failure flags position position, record meter reading failure time and Ammeter configuration information.
Further, after meter reading procedure is called, 485 modules/carrier module will be switched to normal work mould from sleep mode Formula, then calls data processing module to carry out frame assembling, the number assembled according to DL/T645-2007 agreements to the order issued Electric energy meter is sent to by serial ports according to frame;Time-out does not receive data or the data check received not by then using benefit Mechanism is copied, the data juxtaposition meter reading failure flags position that on the contrary then preservation is made a copy of is zero;Timing is copied and accepted under pattern, after the completion of meter reading Protocol conversion should be carried out to data first, call telecommunication program that the data made a copy of are uploaded to administrative center afterwards;Such as Fruit is transparent transmission task, then need not carry out protocol analysis to data, but directly forwards the data to administrative center, then by managing Central station docks received data and carries out dual parsing.
Further, relaying automatic data logging is also add in carrier communication mode, if opening relaying automatic meter-reading, System can carry out automatic relay search to making a copy of the electric energy meter all to fail three times;Automatic relay search includes infinite search and half certainly Dynamic search two ways, infinite search is by the poll to each carrier power meter, and the method using permutation and combination will be possible to Relay route all copy and accept once, untill correct copy and accept;Semi-automatic relaying is then to set relaying road according to situation is copied and accepted Footpath, can so exclude some ineligible relay routes, improve the accuracy of relay route search.
Further, system communication protocol is divided into downlink communication agreement and uplink communication agreement;
Downlink communication agreement uses DT/L 645-2007 consensus standards, includes in the data frame format of 645 stipulations per frame Begin symbol, tributary address information, control code, data length, user data information, check code and end mark.Wherein low the 5 of control code Position is function code, has reacted the attribute that collector issues action command, including the read-write to ammeter data, address, traffic rate, Clearing to ammeter data, event, maximum demand, and to ammeter data when freezing and broadcasting school;
Collector carries out data protocol analysis and stores, in the resolving to data packet after ammeter data is received In, in the event of mistake, then by meter reading failure flags position 1, represent meter reading failure;
Uplink communication agreement uses the Q/GDW376.1-2009 that national grid is formulated, in the data frame format of 376.1 agreements One frame data include four parts:Header text, user data area, frame check and and end mark;Length L is made of two bytes, Minimum two D1, D0 are protocol-identifier position, this agreement is represented with 1 and 0 respectively, and the remaining 14 D2~D15 of length L are used for anti- Reflect the length of user data, using BIN coding modes, be user data area total amount of byte and;Frame check and be data user The eight-bit group arithmetic sum of area's whole byte;The function code of link user data Layer is made of eight-digit binary number code, different groups Conjunction represents different service functions respectively, including confirms/deny message, reset command, authentication, LI(link interface) detection, ginseng Number setting, parameter query, control command, request of data, file transmission and data forwarding;Wherein request data type is broadly divided into 3 classes:Ask 1 class data i.e. real time data, request 2 class data i.e. historical data, request 3 class data i.e. event data, this three classes Data according to the difference of Data Identification enumerate collection in need energy information;Since the limitation of message length cannot be one The data frame transferred in frame is segmented into multiframe transmission, and frame sequence domain SEQ has then reflected the change of transmission sequence between each frame Change rule, take a byte;Data Identification uses binary coding table by DA1, DA2, DT1, tetra- byte compositions of DT2, DA2 Show 255 information point groups, DA1 represents corresponding 1~8 information point of each information point group, collectively forms 8*255 information point Mark.
The present invention can gather, store, monitor and analyze the automation control system of various energy measurement datas in real time, main To be made of three intelligent meter, collector, administrative center parts.Intelligent electric meter mainly realizes the classification to energy data information Metering, storage and display, have information exchange function, are connected with collector, energy data is transferred to collector and is adopted Storage monitoring in real time and control;Collector is the core apparatus of energy metering data acquisition system, is by establishing communication channel The energy data collected is uploaded into center for information management, and receives the instruction that administrative center issues, is realized to collector sheet The control of body and electric energy meter;Center for information management is classified as the data that the management equipment of whole system is responsible for uploading collector Collect, generate data and curves, providing effective data for energy conservation program supports.
Central inventive technology of the present invention is embodied in:
1 present invention carries out data acquisition using two kinds of communication modes of RS485 and power carrier.Most domestic intelligent electric meter Communicated using RS85 modes and power carrier, the present invention can be applicable in and both compatible communication modes so that the system It can be used in most intelligent electric meter environment.
2 present invention are uploaded using GPRS into row data communication and order.The present invention consider remote districts can not use with Too net, therefore GPRS communicators have been added in systems, enable a system to be applicable in any environment.
3 administrative centers of the present invention have remote control, management and detection function.The present invention considers maintenance and copy reading meter Cost, has added network management center so that system being capable of a one by one district management with network, remote control and inspection in office Collector is surveyed, to reduce the maintenance of collector and the cost of artificial copy reading data.
4 present invention have abundant human-computer interaction interface.
5 compatible power communication consensus standards.
Brief description of the drawings
Fig. 1 is energy measurement data on-line acquisition system overall schematic of the present invention;
Fig. 2 is collector hardware plan block diagram of the present invention;
Fig. 3 is present invention communication main program flow chart;
Fig. 4 is the basic procedure of multi-task state collection of the present invention;
Fig. 5 is meter reading mission flow diagram of the present invention;
Fig. 6 is carrier-current relaying meter reading flow chart of the present invention;
Fig. 7 is GPRS communication tasks flow of the present invention;
Fig. 8 is 645 protocol frame formats of the invention;
Fig. 9 is 645 protocol analysis flow charts of the invention;
Figure 10 is 376.1 protocol frames of the invention.
Embodiment
By specific examples below, the invention will be further described, but the embodiment be merely to illustrate the present invention and It is not the limitation present invention.
Embodiment 1
Such as Fig. 1, a kind of energy measurement data online acquisition and monitoring method and system, mainly by intelligent meter, collector, Administrative center's three parts composition, its function mainly include:Data are copied and accepted, data transfer, data storage with cleaning, automatic correcting time, Parameter query and setting, logout, safeguard protection.
1st, data are copied and accepted:Copying and accepting for data mainly includes three kinds of modes:Copy and accept, periodically copy and accept in real time, mending and copy automatically.In real time The requirement for requiring data collector to answer administrative center is copied and accepted, status information, the phase for specifying collection point are read in given time Close data and time parameter.Timing copies and accepts the parameter for referring to set according to administrative center and carries out cycle automatic transcription, works as meter reading After time and meter reading cycle determine, system can carry out Various types of data to specified electric energy meter automatically when the meter reading moment arrives Copy and accept, it is automatic after copying and accepting successfully to calculate the next meter reading time, into next meter reading task.Automatic benefit, which is copied, requires data collector energy Automatically carry out benefit to the data for copying and accepting failure to copy, mending the result copied should report to administrative center in time.
2nd, data transfer:The data received need to be accurate, and communication need to possess good stability and reliability, equipment Between communication should meet the requirements of related stipulations, the stipulations storehouse of power information collector should may be updated to support more associations View.
3rd, logout:Power information collector should possess event recording function, can classification storage items event information, The main record for including collector parameter modification, the record of data acquisition failure, electric energy meter abnormality record, the overproof note of clock Record etc., is usually divided into alarm event and the common event by event.In the event of event alarm, power information collector should be able to be actively Administrative center is reported to, alarm event mainly is walked to stop including ammeter, traffic overload, clock are abnormal, electric energy meter flies away.Report When content includes abnormal electric energy table address, Exception Type, time, anomalous event occur electric energy meter instant data (three-phase voltage, Three-phase current, active power, reactive power);When acquisition terminal can not active reporting event when, administrative center can be waited next time Access position ACD sets will be required during access in the reply data for issue administrative center, represent that terminal has important thing to wait and visits Ask.Electric power acquisition terminal should can record at least 500 events occurred in the recent period.
4th, parameter setting and inquiry:Administrative center can carry out remotely or by human-computer interaction interface to the parameter of acquisition terminal Set or inquire about, it is main to include to acquisition scheme (including collection period, meter reading time, gathered data item etc.), meter archives (bag Include meter address, collection point numbering, communication protocol, acquisition scheme, baud rate etc.), communication channel (including communication protocol, IP Location, communication mode, heart beat cycle etc.) setting and inquiry.In addition password can also be reset, to disk size into Row inquiry.Therefore system needs preferable man-machine interactive system, to facilitate staff to check by human-computer interaction interface and The parameters of modification system, the operation of real-time monitoring system and order implementation status.
5th, during system school:The record of data-frozen, the record of alarm event and other information is required for whole system to protect Hold the synchronization of clock information.Therefore system be when should support the long-range school of administrative center, and administrative center is instructed when sending school phase of standing firm, Power information acquisition terminal belonging to it is calibrated, power information acquisition terminal again by down channel to intelligent electric meter into During row school, during school the time can arbitrarily be set by back-stage management center, pair when after time difference of clock should be not more than ± 1s.
6th, safeguard protection:In order to ensure the safety of data, either local operation or remote operation, should all possess password Defencive function, only inputs correct password, and data collecting system could be controlled accordingly, so as to prevent from illegally grasping Make;The data of upload need to be tackled and are encrypted according to Encryption Algorithm.
7th, data storage and cleaning:Data collection station transfers data to administrative center by channel the regular hour Interval, transmits the loss and mistake that data may occur, if data collection station can be to each at once after copying and accepting data Item data carries out classification storage, is uploaded when administrative center needs, then by these data, then can reduce the general of loss of data Rate, improves the accuracy of data.Specifically need the data type that stores as shown in table 1.Data collection station is except needing to store Outside energy data, the information such as acquisition terminal and intelligent meter operating status, relevant configuration should also be stored.In order to improve number According to accuracy, the storage of dynamic data should all take time identifier.The capacity of data collection station storage system should be able to meet Storage demand to above-mentioned data, each item data can be in corresponding period memory storages according to the difference of type.Even in power down In the case of, the parameters of acquisition terminal should also preserve in real time after changing.The data of data collection station storage take After disk regulation space, data can be cleared up, be automatically deleted partial data, deleted data in chronological sequence into OK.
Table 1 stores data type
Tab1 Data memory type
System hardware is as shown in Fig. 2, including embedded controller circuit, RS-485 telecommunication circuits, GPRS telecommunication circuits, electricity Power carrier communication circuit, clock circuit, display circuit, power circuit, input through keyboard circuit, JTAG debugging circuit and storage electricity Road.
Using embedded controller circuit as core, RS485 and carrier module form data collecting system, to intelligent electric meter into Row data acquisition;Clock, button and display circuit composition man-machine interactive system, user can be realized by keyboard operation collector The function that user thinks;Jtag circuit is used for system debug;Storage circuit is used to store user information and systematic parameter.
RS-485 telecommunication circuits, GPRS telecommunication circuits, power carrier communication circuit connect MCU by serial ports;During DS3231 Clock circuit is connected by I2C connection MCU, key circuit by the universal I/O port of MCU, and jtag circuit, FLASH storage circuits pass through Spi bus is connected with MCU, and liquid crystal circuit connects MCU by bus expansion interface.
Harvester employs two kinds of communication modes altogether, and for adapting to the demand of varying environment, two kinds of communication modes are all adopted With serial ports into row data communication, wherein three road RS-485 telecommunication circuits are devised, for meeting system to collection ammeter quantity It is required that.In order to improve the communication compatibility of system, the independent making sheet of GPRS telecommunication circuits, is designed to the mould of a separate removable Block, it is convenient to be replaced with other communication modules.In order to which more intuitively the information of collector and intelligent electric meter is inquired about and set Put, system selects the liquid crystal display of 320*240 sizes to show the various information of collector, realizes that information inputs with 6 key boards. Clock circuit uses the high accuracy of DALLAS companies, Low-cost clock chip DS3231, passes through I2C buses and microcontroller phase Even.For system by realizing demand of the system to memory capacity to the extension of FLASH, Flash passes through spi bus and microcontroller It is connected.
System is to data intelligent, quick, collection and transmission in real time demand, and the spy such as capable and experienced immunity of working environment Point, the present invention use core processor of the embedded microcontroller as system.On the one hand can improve system integrated level and Portability, another aspect embedded microcontroller has been internally integrated various powerful functions and peripheral hardware, suitable for complicated and changeable The control of system.To meet the needs of system, strengthen cake core using the STM32F103ZET6 of ST companies.
GPRS telecommunication circuits are the major ways that power information collector realizes uplink communication, and system is connect by GPRS module Enter Internet, then the every data message and logout of reading are transferred to administrative center, administrative center passes through same Collector is issued a command under data channel, so as to fulfill the two-way communication between collector and administrative center.
In order to adapt to different application environments, in the design of invention, communication between collector and intelligent meter except Outside using RS-485 modes, the carrier communication mode using power line as transmission medium is have also been devised, so is being inconvenient to be laid with newly Under the application environment of circuit, the carrier communication carried out data transmission using existing low-voltage power line just seems most important, so Not only cost has been saved, but also the operation being convenient for people to.The carrier circuit of the system design is by carrier chip, signal amplification circuit, filter Six wave circuit, termination power, zero cross detection circuit, power supply and current-limiting circuit parts form.
Variability and complexity in view of carrier communication environment, the power information collector that the present invention designs should also possess Other more stable downlink communication modes.RS-485 bus communications modulate signals into symmetrical form with the side of balance transmission Formula carries out the transmission of signal, is then received in a differential manner, is so capable of the interference of more preferable suppression common mode signal, its Using hypotactic half duplex mode of communication, the energy multiple load equipments of carry, can be good at meeting the system for communication Demand.
The system power module obtains modules using the method for power supply conversion isolation with different power-switching circuits Required independently-powered voltage, greatly avoids interfering with each other between module.
In order to real-time and easily be inquired about data and set, system need to possess human-computer interaction function, electric power letter Ceasing collector needs content to be shown more, display picture is also needed in addition to the display of word, therefore select 320*240 points Man-machine interface of the 2.8 cun of liquid crystal displays of resolution as power information collector.
The memory requirement of the data such as memory module freezes day for satisfaction, the moon freezes, curve, collector must have larger Nonvolatile storage space, Flash cannot substantially meet need of the system to memory capacity in the 512KB pieces that master controller carries Ask, therefore select exterior FLASH memory.
First, communicate program design
What is established between administrative center station and collector is the communication of interrogation reply system, using administrative center station as main website, collection Device is slave station, and collector receives the instruction that main website issues and simultaneously makes corresponding operating, and collector can also be actively in administrative center Pass data.Use half-duplex operation mode between ammeter and collector, collector is main website, and ammeter is slave station, and collector can be with By foundation and releasing that control communication link is sent the commands to ammeter.Ammeter and collector all have uniquely communicatedly Location.
Whether the downlink communication between the uplink communication or collector and meter between collector and main website is all necessary Data communication could be realized according to certain communication protocol, although system employs different communication modes and there are respective rule Plasticity communication protocol, but all communications are realized by serial ports, and it realizes that the substantially flow of communication is similar, simply has The processing mode of body is not quite similar.In the program design that communicates, issued when the serial ports of collector receives administrative center Order when, GPRS serial ports interrupt receive flag bit will be set.In main program, received when detecting that GPRS serial ports interrupts When flag bit is effective, communication management program will be called to realize the responses of data is issued to administrative center, communication task it is specific The process of realization is shown in Fig. 3.
First determine whether the data that main website issues are properly received, returned if reception failure, if success logarithm Judge according to progress protocol analysis and the type to data.The type of data is broadly divided into two classes, and one kind is to collector Relevant operation instructs, and one kind is the operational order to ammeter.If the instruction that main website issues is for collector, basis Command information makes relevant operation and returns to related data;If instruction is that ammeter is operated, agreement must be just carried out Conversion, is converted into the downlink communication agreement that ammeter can identify, then calls local communication program, command adapted thereto is sent to ammeter Information, the data that ammeter returns must carry out frame assembling according to uplink communication agreement before main website is sent to data.
After module brings into operation, multi-task state collecting thread can carry out every meter reading task according to the parameter set Repeating query, catches the change of correlation behavior amount, and when detecting that corresponding flag bit be in effective status, it is sub will to start corresponding meter reading Program, Fig. 4 give the basic procedure of multi-task state collection.
Initialized first after system electrification, configure correlated variables, circularly monitoring task, circularly monitoring can be entered afterwards Task updates correlating markings position by the monitoring to serial ports interrupt signal and the contrast to system time and meter reading time State.Meet that collection requires when detecting, by corresponding mark position one, instruction is currently needed for the data type of collection.Multitask State acquisition thread will excite the operation of corresponding meter reading procedure when detecting that each state flag bit is effective.
As can be seen from Figure 4 whole thread is in the state of a wait effective marker position.Multi-task state is adopted Collect after thread is run in order to real-time meter reading and transparent transmission task (Reading_Current), curve data meter reading (Resding_ 15Min), emphasis user data meter reading (reading_1hour), day meter reading (Reading_Day), moon meter reading (Reading_ Month) flag bit carries out repeating query, when detecting that flag bit is effective, then starts corresponding meter reading subprogram, is returned after the completion of meter reading Return state acquisition program and continue repeating query.If a wheel monitoring is got off, all flag bits are all zero, and Local Communication Module will enter Sleep mode, enters after 1 second and automatically begins to monitoring task again.It so can repeat to monitor to avoid unnecessary, save CPU moneys Source is so as to improve operational efficiency.
2nd, meter reading subroutine design
The major function of meter reading subprogram be the data frame that will assemble by Serial Port Transmission to intelligent electric meter, receive ammeter The information of return, judges whether to need benefit to copy and make a record meter reading situation according to the information that ammeter returns.Whether it is real-time Meter reading or timing meter reading (curve meter reading, moon meter reading, day meter reading, emphasis user meter reading), the process of meter reading be all it is similar, only It is that the data type made a copy of is different with the time.In order to realize that 100% reliably makes a copy of as far as possible, each meter reading subprogram is set Count benefit and copied mechanism, will there is twice that chance is copied again after first time meter reading failure, still failed if copied again, abandon meter reading, and By meter reading failure flags position position, time and ammeter configuration information that meter reading fails are recorded.For carrier communication mode, 3 times are copied and accepted with the ammeter all to fail can also carry out automatic relay meter reading.
3rd, non-relay meter reading
After the specific implementation process of meter reading procedure is as shown in figure 5, meter reading procedure is called, 485 modules/carrier module will be from Sleep mode is switched to normal mode of operation, then calls data processing module to assist the order issued according to DL/T645-2007 View carries out frame assembling, and the data frame assembled is sent to electric energy meter by serial ports.Time-out does not receive data or receives Data check using benefit by then not copying mechanism, the data juxtaposition meter reading failure flags position that on the contrary then preservation is made a copy of is zero.It is fixed When copy and accept under pattern, after the completion of meter reading first should to data carry out protocol conversion, afterwards call telecommunication program will make a copy of Data be uploaded to administrative center.If transparent transmission task, then protocol analysis need not be carried out to data, but directly by data Administrative center is transmitted to, then received data are docked by administrative center station and carry out dual parsing.
4th, carrier-current relaying meter reading
The collector downlink communication that the present invention designs is by the way of RS-485 and carrier communication are combined, 485 bus sides Formula does not support relaying automatic data logging, its meter reading process is described in detail above.And carrier meter reading is introduced above Meter reading on the basis of also add relaying automatic meter-reading, if open relaying automatic meter-reading, system can be to making a copy of three The secondary electric energy meter all to fail carries out automatic relay search.Automatic relay search includes infinite search and semi-automatic two kinds of sides of search Formula, it is infinite search be by the poll to each carrier power meter, using the method for permutation and combination by all possible relay route all Copy and accept once, untill correct copy and accept.Semi-automatic relaying is then to set relay route according to situation is copied and accepted, and can so be arranged Except some ineligible relay routes, the accuracy of relay route search is improved, and then greatly shortens trunking application operation Time, improve junction efficiency.The system selects board inward dialing, and it is as shown in Figure 6 that it implements process.Carrier-current relaying Meter reading flow chart Fig6The flow chart of carrier-relaying meter reading.
After incoming carrier relaying meter reading procedure, relevant parameter should have been configured first, including during the meter reading wait of relaying sum of series Between, system only supports level Four to relay, wherein the non-relay meter reading stand-by period is arranged to 3 seconds, level-one, two level, three-level, level Four difference It is arranged to 4 seconds, 6 seconds, 7.5 seconds, 9 seconds.The repeated link table just issued afterwards according to administrative center is to all electricity for copying and accepting failure Table a little copy, and is carried out according to the order of relaying series from small to large.Will if also having the ammeter do not copied after copying and accepting The non-relay ammeter copied in relaying storehouse as each level-one relaying for not copying table, successfully relays this if copied and accepted in order Link substitutes the repeated link that original administrative center issues.Similarly, two level, three-level, level Four relaying meter reading are carried out, if relaying is copied There is part ammeter not copy and accept after end of list (EOL) successfully then to abandon making a copy of, by meter reading failure flags set, record ammeter relevant information Report administrative center.
5th, the realization of GPRS communication tasks
As shown in fig. 7, module first checks for whether SIM card is normal after the power is turned on, the signal strength of network is inquired about, detects network Whether whether successful registration and GPRS network adhere to, and AT is sent to main website by serial ports in the case of all of the above is all normal Instruction can establish TCP/IP connections.In order to shorten the time of TCP connections foundation, APN can be first set before this, swashed Mobile context living simultaneously obtains local IP.TCP is selected as the transport protocol on network layer, being can not in order to make up IP connections By property, connection-oriented, flexible, reliable byte stream transmission method is provided for data transfer[46].Lead to after TCP successful connections Letter both sides can establish a logical connection, pass through packet number and the corresponding reliability for confirming (ACK) guarantee data transfer. TCP communication has the function of Retransmission timeout, if fruit does not receive and returns to confirmation message and be considered as communication data packet and lost for a long time, Lay equal stress on new transmission.TCP will complete the initiation sequence that three-way handshake carrys out data transmitted by synchronous communication both sides during connection Number.
6th, communication protocol
(1) downlink communication agreement
Downlink communication uses DT/L 645-2007 consensus standards, which specify intelligent meter and power information collector into Data frame format during row communication, has unified communication standard for different ammeter manufacturers, so that the compatibility of equipment is improved, it It is the sole criterion that all electric energy meters in current China must all strictly observe.The data frame format of 645 stipulations is as shown in Figure 8 (645 communication protocol of Fig8 The frame format of), starting character, tributary address are included per frame Information, control code, data length, user data information, check code, end mark.Wherein low 5 of control code are function code, instead Collector has been answered to issue the attribute of action command, the main read-write included to ammeter data, address, traffic rate, to ammeter number According to, the clearing of event, maximum demand, to ammeter data when freezing and broadcasting school etc..
Collector carries out data protocol analysis and stores, resolving is as shown in Figure 9 after ammeter data is received. To in the resolving of data packet, in the event of mistake, then by meter reading failure flags position 1, representing meter reading failure.
(2) uplink communication agreement
Uplink communication agreement uses the Q/GDW376.1-2009 that national grid is formulated, and agreement defines power information collection Data frame format, data encoding and the transmission rule to communicate between device and administrative center.376.1 the data frame format of agreement (376.1 communication protocol of Fig10 The frame format of) as shown in Figure 10.
One frame data include four parts:Header text, user data area, frame check and, end mark.Length L is by two words Section composition, minimum two (D1, D0) are protocol-identifier position, this agreement is represented with 1 and 0 respectively, the remaining 14 (D2 of length L ~D15) be used for reflecting the length of user data, using BIN coding modes, be user data area total amount of byte and.Frame check With the eight-bit group arithmetic sum for being data user area whole byte.The function code of link user data Layer is by eight-digit binary number code character Into, different combinations represents different service functions respectively, it is main include confirming/deny message, reset command, authentication, LI(link interface) detection, parameter setting, parameter query, control command, request of data, file transmission, data forwarding etc..Wherein ask Data type is broadly divided into 3 classes:Ask 1 class data (real time data), 2 class data (historical data) of request, 3 class data of request (event data), this three classes data according to the difference of Data Identification enumerate collection in need energy information.Due to message The data frame that the limitation of length cannot transfer in a frame is segmented into multiframe transmission, and frame sequence domain SEQ has then reflected respectively The rule change of sequence is transmitted between frame, takes a byte.Data Identification be made of four bytes (DA1, DA2, DT1, DT2), DA2 uses 255 information point groups of binary coding representation, and DA1 represents corresponding 1~8 information of each information point group Point, collectively forms a information point identifications of 2040 (8*255).
It should be noted that described above is presently preferred embodiments of the present invention, the invention is not limited in above-mentioned Embodiment, as long as it reaches the technique effect of the present invention with identical means, should all belong to protection scope of the present invention.

Claims (11)

1. a kind of energy measurement data online acquisition and monitoring system, are made of two large divisions, a part is with MCU (Microcontroller Unit)Hardware platform centered on control module;Another part is in the management centered on main website Heart platform, administrative center's platform can carry out collector by GPRS module remote management, hardware platform can by 485 modes and Carrier system carries out data acquisition to intelligent meter and reports to administrative center, it is characterised in that hardware platform includes embedded Controller circuitry, RS-485 telecommunication circuits, GPRS telecommunication circuits, power carrier communication circuit, clock circuit, display circuit, electricity Source circuit, input through keyboard circuit, JTAG(Joint Test Action Group)Debug circuit and storage circuit;Collector is total to Employ two kinds of communication modes, two kinds of communication modes are all using serial ports into row data communication, and RS-485 telecommunication circuits are by signal tune The transmission that symmetrical form carries out signal in a manner of balance transmission is made, is then received in a differential manner, using master From the half duplex mode of communication of structure;Power carrier communication circuit is the carrier communication mode using power line as transmission medium.
2. a kind of energy measurement data online acquisition according to claim 1 and monitoring system, it is characterised in that GPRS Telecommunication circuit is arranged to the module of dismounting, and clock circuit uses clock chip DS3231, passes through I2C buses and microcontroller phase Even;For system by realizing demand of the system to memory capacity to the extension of FLASH, FLASH passes through SPI(Serial Peripheral Interface)Bus is connected with microcontroller;Power circuit is set using power supply conversion isolation;Storage circuit In main control select exterior FLASH memory.
3. a kind of energy measurement data online acquisition according to claim 1 and monitoring system, it is characterised in that collector Communication between intelligent meter have also been devised the carrier communication using power line as transmission medium in addition to using RS-485 modes Mode, the carrier communication carried out data transmission using existing low-voltage power line, carrier circuit amplify electricity by carrier chip, signal Six road, filter circuit, termination power, zero cross detection circuit, power supply and current-limiting circuit parts form.
4. a kind of energy measurement data online acquisition according to claim 1 and monitoring system, it is characterised in that in management What is established between heart platform and collector is the communication of interrogation reply system, and using administrative center's platform as main website, collector is slave station, is adopted Storage, which receives, sends instructions and makes corresponding operating under main website, collector actively can upload data to administrative center's platform;Ammeter and Half-duplex operation mode is used between collector, collector is main website, and ammeter is slave station, and collector is instructed by being sent to ammeter To control the foundation of communication link and releasing;Ammeter and collector all have unique mailing address;In communication program design In, when the serial ports of collector receives the order that administrative center issues, GPRS serial ports interrupts reception flag bit and will be set.
5. a kind of energy measurement data online acquisition according to claim 4 and monitoring system, it is characterised in that communicating In main program, when detecting that GPRS serial ports interruption reception flag bit is effective, communication management program will be called to realize to management Center issues the response of data;
First determine whether the data that main website issues are properly received, returned if reception failure, if success to data into Row protocol analysis and type to data judges;The type of data is broadly divided into two classes, and one kind is the correlation to collector Operational order, one kind are the operational orders to ammeter;If the instruction that main website issues is believed for collector according to instruction Breath makes relevant operation and returns to related data;If instruction is that ammeter is operated, protocol conversion must be just carried out, is turned Change the downlink communication agreement that ammeter can identify into, then call local communication program, command adapted thereto information is sent to ammeter, electricity The data that table returns must carry out frame assembling according to uplink communication agreement before main website is sent to data.
6. a kind of energy measurement data online acquisition according to claim 4 and monitoring system, it is characterised in that in system Initialized first after electricity, configure correlated variables, circularly monitoring task can be entered afterwards, circularly monitoring task passes through to serial ports The monitoring of interrupt signal and the state of correlating markings position updated to the contrast of system time and meter reading time;It is full when detecting Foot collection requires, and by corresponding mark position one, instruction is currently needed for the data type of collection;Multi-task state collecting thread is being examined Measure each state flag bit it is effective when will excite the operation of corresponding meter reading procedure;Multi-task state collecting thread meeting basis is set The parameter put carries out repeating query to every meter reading task, catches the change of correlation behavior amount, when detecting that corresponding flag bit is in Effective status, will start corresponding meter reading subprogram.
7. a kind of energy measurement data online acquisition according to claim 6 and monitoring system, it is characterised in that meter reading Program is the information that the data frame that will be assembled is returned by Serial Port Transmission to intelligent electric meter, reception ammeter, is returned according to ammeter Information judge whether to need benefit to copy and make a record meter reading situation;In order to realize that 100% reliably makes a copy of as far as possible, each is copied Table subprogram all devises benefit and copies mechanism, will there is twice that chance is copied again after first time meter reading failure, still fails if copied again, Abandon meter reading, and by meter reading failure flags position position, record time and the ammeter configuration information of meter reading failure.
8. a kind of energy measurement data online acquisition according to claim 7 and monitoring system, it is characterised in that meter reading journey After sequence is called, RS-485 modules/carrier module will be switched to normal mode of operation from sleep mode, then call data processing Module carries out frame assembling to the order issued according to DL/T645-2007 agreements, and the data frame assembled is sent to electricity by serial ports Can table;Time-out does not receive data or the data check received not by then copying mechanism using benefit, on the contrary then preservation is made a copy of To data juxtaposition meter reading failure flags position be zero;Timing is copied and accepted under pattern, and agreement should be carried out to data first after the completion of meter reading Conversion, calls telecommunication program that the data made a copy of are uploaded to administrative center afterwards;If transparent transmission task, then need not Protocol analysis is carried out to data, but directly forwards the data to administrative center, then received data are docked by administrative center station Carry out dual parsing.
9. a kind of energy measurement data online acquisition according to claim 3 and monitoring system, it is characterised in that carrier wave leads to Relaying automatic data logging is also add in letter mode, if opening relaying automatic meter-reading, system can all be lost three times to making a copy of The electric energy meter lost carries out automatic relay search;Automatic relay search includes infinite search and semi-automatic search two ways, infinite Search is by the poll to each carrier power meter, and all possible relay route is all copied and accepted one using the method for permutation and combination It is secondary, untill correct copy and accept;Semi-automatic relaying is then to set relay route according to situation is copied and accepted, and can so be excluded Ineligible relay route, improves the accuracy of relay route search.
10. a kind of energy measurement data online acquisition according to claim 1 and monitoring system, it is characterised in that system Communication protocol is divided into downlink communication agreement and uplink communication agreement;
Downlink communication agreement uses DT/L 645-2007 consensus standards, includes starting per frame in the data frame format of 645 stipulations Symbol, tributary address information, control code, data length, user data information, check code and end mark;Wherein low 5 of control code For function code, the attribute that collector issues action command, including the read-write to ammeter data, address, traffic rate have been reacted, it is right The clearing of ammeter data, event, maximum demand, and to ammeter data when freezing and broadcasting school;
Collector carries out data protocol analysis and stores, in the resolving to data packet, such as after ammeter data is received Mistake occurs for fruit, then by meter reading failure flags position 1, represents meter reading failure;
Uplink communication agreement uses the Q/GDW376.1-2009 that national grid is formulated, one in the data frame format of 376.1 agreements Frame data include four parts:Header text, user data area, frame check and and end mark;Length L is made of two bytes, most Low two D1, D0 are protocol-identifier position, this agreement is represented with 1 and 0 respectively, and the remaining 14 D2~D15 of length L are used for anti- Reflect the length of user data, using BIN coding modes, be user data area total amount of byte and;Frame check and be data user The eight-bit group arithmetic sum of area's whole byte;The function code of link user data Layer is made of eight-digit binary number code, different groups Conjunction represents different service functions respectively, including confirms/deny message, reset command, authentication, LI(link interface) detection, ginseng Number setting, parameter query, control command, request of data, file transmission and data forwarding;Wherein request data type is broadly divided into 3 classes:Ask 1 class data i.e. real time data, request 2 class data i.e. historical data, request 3 class data i.e. event data, this three classes Data according to the difference of Data Identification enumerate collection in need energy information;Since the limitation of message length cannot be one The data frame transferred in frame is segmented into multiframe transmission, and frame sequence domain SEQ has then reflected the change of transmission sequence between each frame Change rule, take a byte;Data Identification uses binary coding table by DA1, DA2, DT1, tetra- byte compositions of DT2, DA2 Show 255 information point groups, DA1 represents corresponding 1~8 information point of each information point group, collectively forms 8*255 information point Mark.
11. a kind of energy measurement data online acquisition according to claim 1 and monitoring system, including data are copied and accepted, number According to transmission, data storage and cleaning, automatic correcting time, parameter query and setting, logout and safeguard protection, it is characterised in that
(1), data copy and accept:Copying and accepting for data mainly includes three kinds of modes:Copy and accept, periodically copy and accept in real time, mending and copy automatically;Copy in real time The requirement for requiring data collector to answer administrative center is received, status information, the correlation for specifying collection point are read in given time Data and time parameter;Timing copies and accepts the parameter for referring to set according to administrative center and carries out cycle automatic transcription, when meter reading Between and after the meter reading cycle determines, system can carry out copying for Various types of data to specified electric energy meter automatically when the meter reading moment arrives Receive, it is automatic after copying and accepting successfully to calculate the next meter reading time, into next meter reading task;Automatic benefit, which is copied, requires data collector can be certainly Dynamic to carry out benefit to the data of copying and accepting failure and copy, mending the result copied should report to administrative center in time;
(2), data transfer:The data that receive need accurate, and communication need to possess good stability and reliability, equipment it Between communication should meet the requirements of related stipulations, the stipulations storehouse of power information collector should may be updated to support more associations View;
(3), logout:Power information collector should possess event recording function, can classification storage items event information, it is main To include the record of collector parameter modification, the record of data acquisition failure, electric energy meter abnormality record, the overproof record of clock Deng event usually is divided into alarm event and the common event;In the event of event alarm, power information collector should be able to be in active Administrative center is offered, alarm event is walked to stop including ammeter, traffic overload, clock exception and electric energy meter are flown away;The content bag reported The instant data of electric energy meter, instant data include three when including abnormal electric energy table address, Exception Type, time, anomalous event generation Phase voltage, three-phase current, active power and reactive power;When acquisition terminal can not active reporting event when, can wait until management in Access position ACD sets will be required the heart accesses next time when in the reply data for issue administrative center, represent that terminal has important thing Feelings etc. are to be visited;Electric power acquisition terminal should record at least 500 events occurred in the recent period;
(4), parameter setting and inquiry:Administrative center is long-range or the parameter of acquisition terminal is configured by human-computer interaction interface Or inquiry, including setting and inquiry to acquisition scheme, meter archives, communication channel;In addition weight can also be carried out to password Put, disk size is inquired about;
(5), system school when:The record of data-frozen, the record of alarm event and other information is required for whole system to keep The synchronization of clock information;Therefore system be when should support the long-range school of administrative center, and administrative center is instructed when sending school phase of standing firm, right Power information acquisition terminal belonging to it is calibrated, and power information acquisition terminal again carries out intelligent electric meter by down channel During school, during school the time arbitrarily set by back-stage management center, pair when after time difference of clock should be not more than ± 1s;
(6), safeguard protection:In order to ensure the safety of data, either local operation or remote operation, should all possess password guarantor Protective function, only inputs correct password, data collecting system could be controlled accordingly, so as to prevent illegal operation; The data of upload need to be tackled and are encrypted according to Encryption Algorithm;
(7), data storage and cleaning:Data collection station transfers data to administrative center by channel to be had between the regular hour Every copying and accepting after data that the loss and mistake of data may occur for transmission at once, if data collection station can be to items Data carry out classification storage, are uploaded when administrative center needs, then by these data, then can reduce the probability of loss of data, Improve the accuracy of data;Specifically need the data type that stores as shown in table 1;Data collection station is except needing to store electric energy Outside data, the information such as acquisition terminal and intelligent meter operating status, relevant configuration should also be stored;In order to improve data Accuracy, the storage of dynamic data should all take time identifier;The capacity of data collection station storage system should be able to meet to upper The storage demand of data is stated, each item data can be in corresponding period memory storage according to the difference of type;Even in the situation of power down Under, the parameters of acquisition terminal should also preserve in real time after changing;The data of data collection station storage take disk After providing space, data can be cleared up, be automatically deleted partial data, deleted data in chronological sequence carry out.
CN201711426451.1A 2017-12-25 2017-12-25 A kind of energy measurement data online acquisition and monitoring method and system Pending CN107967801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711426451.1A CN107967801A (en) 2017-12-25 2017-12-25 A kind of energy measurement data online acquisition and monitoring method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711426451.1A CN107967801A (en) 2017-12-25 2017-12-25 A kind of energy measurement data online acquisition and monitoring method and system

Publications (1)

Publication Number Publication Date
CN107967801A true CN107967801A (en) 2018-04-27

Family

ID=61994719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711426451.1A Pending CN107967801A (en) 2017-12-25 2017-12-25 A kind of energy measurement data online acquisition and monitoring method and system

Country Status (1)

Country Link
CN (1) CN107967801A (en)

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108732977A (en) * 2018-08-30 2018-11-02 四川中电启明星信息技术有限公司 A kind of collecting method and system
CN108833539A (en) * 2018-06-14 2018-11-16 武汉阿迪克电子股份有限公司 Collector, method and system based on edge calculations
CN109150669A (en) * 2018-11-02 2019-01-04 深圳智微电子科技有限公司 A kind of use based on Ethernet fells and transports the telecommunication system and processing method of dimension
CN109147302A (en) * 2018-11-01 2019-01-04 广州物道水务科技有限公司 A kind of meter register method, device and electronic equipment
CN109218173A (en) * 2018-08-16 2019-01-15 共享智能铸造产业创新中心有限公司 The data interception and resolver and its working method of 645 communication protocol ammeter of DL/T
CN109309724A (en) * 2018-10-24 2019-02-05 广州柏诚智能科技有限公司 A kind of Internet of Things intelligence instrument for supporting NB-IOT
CN109309610A (en) * 2018-11-15 2019-02-05 威胜电气有限公司 Double terminal telecommunication circuits and its communication means
CN109377746A (en) * 2018-09-13 2019-02-22 国网上海市电力公司 A kind of non-resident user power utilization abnormal conditions automatic alarm method of 50KW or more low pressure
CN109406872A (en) * 2018-10-29 2019-03-01 华立科技股份有限公司 Detect the method and apparatus that Data Identification is expanded in electric energy meter private
CN109598918A (en) * 2018-12-26 2019-04-09 宁波三星智能电气有限公司 A kind of transmission method of electric energy meter event information
CN109885731A (en) * 2018-12-29 2019-06-14 国网山东省电力公司博兴县供电公司 A kind of power monitoring platform data information MAP matching process and system
CN110099049A (en) * 2019-04-19 2019-08-06 中电科安科技股份有限公司 Communication protocol for intelligent micro-circuit breaker and control centre's information exchange
CN110138746A (en) * 2019-04-23 2019-08-16 金卡智能集团股份有限公司 A method of protection gas meter, flow meter end subscriber privacy and information security
CN110381139A (en) * 2019-07-19 2019-10-25 福建龙净环保股份有限公司 A kind of remote data acquisition method and apparatus Internet-based
CN110569145A (en) * 2019-08-22 2019-12-13 万洲电气股份有限公司 Energy monitoring and analyzing system for industrial field table changing zero clearing fault-tolerant processing strategy
CN110880938A (en) * 2018-09-06 2020-03-13 云丁智能科技(北京)有限公司 Data acquisition method and device
CN111009110A (en) * 2019-11-28 2020-04-14 江苏智臻能源科技有限公司 Method and hardware equipment for collecting load identification data of user electric meter
CN111292518A (en) * 2020-02-17 2020-06-16 上海威派格智慧水务股份有限公司 Management system of DTU data acquisition unit
CN112118076A (en) * 2020-09-17 2020-12-22 上海汉枫电子科技有限公司 Method for online extension of 645 protocol collector function by using transparent transmission mode
CN112333797A (en) * 2020-10-23 2021-02-05 广西电网有限责任公司 Intelligent switching system and method for terminal communication card operator based on eSIM technology
CN112350749A (en) * 2020-10-27 2021-02-09 华立科技股份有限公司 Smart meter communication method, device and system
CN112395012A (en) * 2020-11-03 2021-02-23 南方电网数字电网研究院有限公司 Data clearing method and device based on double-core intelligent electric meter and computer equipment
CN112468526A (en) * 2019-09-06 2021-03-09 上海宝信软件股份有限公司 Service system suitable for distributed apartment intelligent metering
CN112468269A (en) * 2020-11-26 2021-03-09 北京中电飞华通信有限公司 Controller communication method and system and electronic equipment
CN112987616A (en) * 2021-03-15 2021-06-18 沈阳智谷科技有限公司 Ultrahigh-speed electronic package acquisition system and method based on magnetic variable signals
CN113176742A (en) * 2021-03-24 2021-07-27 广东芬尼克兹节能设备有限公司 Centralized control method and device among multiple devices
CN113437998A (en) * 2021-06-24 2021-09-24 国网北京市电力公司 Operation and maintenance debugging method and system, nonvolatile storage medium and processor
CN113473259A (en) * 2021-06-20 2021-10-01 深圳弘星智联科技有限公司 Data acquisition active reporting mechanism for improving data acquisition success rate
CN113542930A (en) * 2021-07-29 2021-10-22 国家电网有限公司 HPLC (high performance liquid chromatography) acquisition method based on multilayer data cache
CN113568345A (en) * 2021-07-23 2021-10-29 沈阳佳德联益能源科技股份有限公司 Intelligent control device and control method for centralized acquisition of instrument data
CN113778003A (en) * 2021-10-08 2021-12-10 沈阳仪表科学研究院有限公司 Debugging method of intelligent operation and maintenance platform data acquisition unit
CN114745610A (en) * 2022-04-01 2022-07-12 国网山东省电力公司平度市供电公司 Device for improving data acquisition accuracy of ammeter
CN114741349A (en) * 2021-12-31 2022-07-12 杭州拓深科技有限公司 Multi-platform data transparent transmission 485 bus interaction method, medium, equipment and system
CN114779749A (en) * 2022-06-21 2022-07-22 青岛鼎信通讯股份有限公司 Electric power product production detecting system
CN114827223A (en) * 2022-05-10 2022-07-29 哈尔滨圣昌科技开发有限公司 Control system of intelligent pipeline remote equipment and operation method thereof
CN114868364A (en) * 2019-12-26 2022-08-05 三菱电机株式会社 Data collection and analysis system, data collection and analysis device, machine learning device, and data collection and analysis method
CN115694557A (en) * 2021-07-23 2023-02-03 成都天奥测控技术有限公司 Data active reporting method based on power line carrier
CN115994837A (en) * 2023-03-23 2023-04-21 河北雄安睿天科技有限公司 Management system and method for water affair data
CN116132850A (en) * 2023-04-14 2023-05-16 佳源科技股份有限公司 Electric energy meter metering method and system
CN116404757A (en) * 2023-06-02 2023-07-07 青岛鼎信通讯股份有限公司 Distribution area topological relation identification method and equipment
CN116708514A (en) * 2023-08-02 2023-09-05 深圳龙电华鑫控股集团股份有限公司 Electric energy meter data acquisition method and system based on Internet of things
CN116880412A (en) * 2023-08-10 2023-10-13 上海兴岩信息科技有限公司 Visual production management platform based on cloud
CN116938705A (en) * 2023-06-16 2023-10-24 北京天融信网络安全技术有限公司 Terminal management method and device of RS485 bus and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101236693A (en) * 2007-02-01 2008-08-06 上海久隆电力(集团)有限公司 Intelligent meter reading system
CN201562357U (en) * 2009-10-29 2010-08-25 浙江恒业电子有限公司 Data concentrator of automatic meter reading system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101236693A (en) * 2007-02-01 2008-08-06 上海久隆电力(集团)有限公司 Intelligent meter reading system
CN201562357U (en) * 2009-10-29 2010-08-25 浙江恒业电子有限公司 Data concentrator of automatic meter reading system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
欧莉: "能源在线监测系统中电力信息采集器的设计与实现", 《中国优秀硕士学位论文全文数据库·信息科技辑》 *

Cited By (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108833539A (en) * 2018-06-14 2018-11-16 武汉阿迪克电子股份有限公司 Collector, method and system based on edge calculations
CN109218173A (en) * 2018-08-16 2019-01-15 共享智能铸造产业创新中心有限公司 The data interception and resolver and its working method of 645 communication protocol ammeter of DL/T
CN108732977A (en) * 2018-08-30 2018-11-02 四川中电启明星信息技术有限公司 A kind of collecting method and system
CN110880938A (en) * 2018-09-06 2020-03-13 云丁智能科技(北京)有限公司 Data acquisition method and device
CN109377746A (en) * 2018-09-13 2019-02-22 国网上海市电力公司 A kind of non-resident user power utilization abnormal conditions automatic alarm method of 50KW or more low pressure
CN109309724B (en) * 2018-10-24 2024-04-02 广州柏诚智能科技有限公司 Support NB-IOT's thing allies oneself with intelligent instrument
CN109309724A (en) * 2018-10-24 2019-02-05 广州柏诚智能科技有限公司 A kind of Internet of Things intelligence instrument for supporting NB-IOT
CN109406872A (en) * 2018-10-29 2019-03-01 华立科技股份有限公司 Detect the method and apparatus that Data Identification is expanded in electric energy meter private
CN109406872B (en) * 2018-10-29 2020-09-25 华立科技股份有限公司 Method and device for detecting private data identification of electric energy meter
CN109147302A (en) * 2018-11-01 2019-01-04 广州物道水务科技有限公司 A kind of meter register method, device and electronic equipment
CN109150669A (en) * 2018-11-02 2019-01-04 深圳智微电子科技有限公司 A kind of use based on Ethernet fells and transports the telecommunication system and processing method of dimension
CN109309610A (en) * 2018-11-15 2019-02-05 威胜电气有限公司 Double terminal telecommunication circuits and its communication means
CN109309610B (en) * 2018-11-15 2024-04-12 威胜能源技术股份有限公司 Dual-terminal communication circuit and communication method thereof
CN109598918A (en) * 2018-12-26 2019-04-09 宁波三星智能电气有限公司 A kind of transmission method of electric energy meter event information
CN109598918B (en) * 2018-12-26 2020-06-02 宁波三星智能电气有限公司 Electric energy meter event information transmission method
CN109885731A (en) * 2018-12-29 2019-06-14 国网山东省电力公司博兴县供电公司 A kind of power monitoring platform data information MAP matching process and system
CN109885731B (en) * 2018-12-29 2021-06-15 国网山东省电力公司博兴县供电公司 Data information mapping matching method and system for power monitoring platform
CN110099049A (en) * 2019-04-19 2019-08-06 中电科安科技股份有限公司 Communication protocol for intelligent micro-circuit breaker and control centre's information exchange
CN110138746A (en) * 2019-04-23 2019-08-16 金卡智能集团股份有限公司 A method of protection gas meter, flow meter end subscriber privacy and information security
CN110381139B (en) * 2019-07-19 2022-05-27 福建龙净环保股份有限公司 Remote data acquisition method and device based on Internet
CN110381139A (en) * 2019-07-19 2019-10-25 福建龙净环保股份有限公司 A kind of remote data acquisition method and apparatus Internet-based
CN110569145A (en) * 2019-08-22 2019-12-13 万洲电气股份有限公司 Energy monitoring and analyzing system for industrial field table changing zero clearing fault-tolerant processing strategy
CN112468526A (en) * 2019-09-06 2021-03-09 上海宝信软件股份有限公司 Service system suitable for distributed apartment intelligent metering
CN111009110A (en) * 2019-11-28 2020-04-14 江苏智臻能源科技有限公司 Method and hardware equipment for collecting load identification data of user electric meter
CN114868364A (en) * 2019-12-26 2022-08-05 三菱电机株式会社 Data collection and analysis system, data collection and analysis device, machine learning device, and data collection and analysis method
CN111292518A (en) * 2020-02-17 2020-06-16 上海威派格智慧水务股份有限公司 Management system of DTU data acquisition unit
CN112118076A (en) * 2020-09-17 2020-12-22 上海汉枫电子科技有限公司 Method for online extension of 645 protocol collector function by using transparent transmission mode
CN112118076B (en) * 2020-09-17 2022-11-29 上海汉枫电子科技有限公司 Method for online extension of 645 protocol collector function by using transparent transmission mode
CN112333797A (en) * 2020-10-23 2021-02-05 广西电网有限责任公司 Intelligent switching system and method for terminal communication card operator based on eSIM technology
CN112333797B (en) * 2020-10-23 2023-04-25 广西电网有限责任公司 System and method for intelligent switching of terminal communication card operators based on eSIM technology
CN112350749A (en) * 2020-10-27 2021-02-09 华立科技股份有限公司 Smart meter communication method, device and system
CN112395012A (en) * 2020-11-03 2021-02-23 南方电网数字电网研究院有限公司 Data clearing method and device based on double-core intelligent electric meter and computer equipment
CN112395012B (en) * 2020-11-03 2024-02-27 南方电网数字电网科技(广东)有限公司 Data emptying method and device based on double-core intelligent ammeter and computer equipment
CN112468269A (en) * 2020-11-26 2021-03-09 北京中电飞华通信有限公司 Controller communication method and system and electronic equipment
CN112468269B (en) * 2020-11-26 2024-05-10 北京中电飞华通信有限公司 Controller communication method, system and electronic equipment
CN112987616A (en) * 2021-03-15 2021-06-18 沈阳智谷科技有限公司 Ultrahigh-speed electronic package acquisition system and method based on magnetic variable signals
CN113176742A (en) * 2021-03-24 2021-07-27 广东芬尼克兹节能设备有限公司 Centralized control method and device among multiple devices
CN113473259A (en) * 2021-06-20 2021-10-01 深圳弘星智联科技有限公司 Data acquisition active reporting mechanism for improving data acquisition success rate
CN113437998B (en) * 2021-06-24 2022-11-04 国网北京市电力公司 Operation and maintenance debugging method and system, nonvolatile storage medium and processor
CN113437998A (en) * 2021-06-24 2021-09-24 国网北京市电力公司 Operation and maintenance debugging method and system, nonvolatile storage medium and processor
CN113568345A (en) * 2021-07-23 2021-10-29 沈阳佳德联益能源科技股份有限公司 Intelligent control device and control method for centralized acquisition of instrument data
CN115694557A (en) * 2021-07-23 2023-02-03 成都天奥测控技术有限公司 Data active reporting method based on power line carrier
CN113542930A (en) * 2021-07-29 2021-10-22 国家电网有限公司 HPLC (high performance liquid chromatography) acquisition method based on multilayer data cache
CN113778003A (en) * 2021-10-08 2021-12-10 沈阳仪表科学研究院有限公司 Debugging method of intelligent operation and maintenance platform data acquisition unit
CN114741349A (en) * 2021-12-31 2022-07-12 杭州拓深科技有限公司 Multi-platform data transparent transmission 485 bus interaction method, medium, equipment and system
CN114741349B (en) * 2021-12-31 2024-02-27 杭州拓深科技有限公司 Multi-platform data transparent transmission 485 bus interaction method, medium, equipment and system
CN114745610A (en) * 2022-04-01 2022-07-12 国网山东省电力公司平度市供电公司 Device for improving data acquisition accuracy of ammeter
CN114827223A (en) * 2022-05-10 2022-07-29 哈尔滨圣昌科技开发有限公司 Control system of intelligent pipeline remote equipment and operation method thereof
CN114779749A (en) * 2022-06-21 2022-07-22 青岛鼎信通讯股份有限公司 Electric power product production detecting system
CN115994837A (en) * 2023-03-23 2023-04-21 河北雄安睿天科技有限公司 Management system and method for water affair data
CN116132850A (en) * 2023-04-14 2023-05-16 佳源科技股份有限公司 Electric energy meter metering method and system
CN116404757B (en) * 2023-06-02 2023-09-05 青岛鼎信通讯股份有限公司 Distribution area topological relation identification method
CN116404757A (en) * 2023-06-02 2023-07-07 青岛鼎信通讯股份有限公司 Distribution area topological relation identification method and equipment
CN116938705A (en) * 2023-06-16 2023-10-24 北京天融信网络安全技术有限公司 Terminal management method and device of RS485 bus and storage medium
CN116938705B (en) * 2023-06-16 2024-05-17 北京天融信网络安全技术有限公司 Terminal management method and device of RS485 bus and storage medium
CN116708514B (en) * 2023-08-02 2023-10-31 深圳龙电华鑫控股集团股份有限公司 Electric energy meter data acquisition method and system based on Internet of things
CN116708514A (en) * 2023-08-02 2023-09-05 深圳龙电华鑫控股集团股份有限公司 Electric energy meter data acquisition method and system based on Internet of things
CN116880412A (en) * 2023-08-10 2023-10-13 上海兴岩信息科技有限公司 Visual production management platform based on cloud
CN116880412B (en) * 2023-08-10 2024-05-17 上海兴岩信息科技有限公司 Visual production management platform based on cloud

Similar Documents

Publication Publication Date Title
CN107967801A (en) A kind of energy measurement data online acquisition and monitoring method and system
CN101951031B (en) Distribution network automatic system based on broadband wireless communication and realization method thereof
CN106556765B (en) The test method and RTDS emulator of distributed distribution automation system
CN104391499B (en) A kind of simulation electric energy meter and method of testing for AMRS test
CN105914890B (en) A kind of automation of transformation substations control system
CN109193632B (en) A kind of intelligent low-voltage platform area power circuit automated topology system
CN206948382U (en) It is a kind of based on the wireless equipment remote monitoring management systems with Internet technology of LORA
CN104935489B (en) A kind of information collection networking method and power information acquire network
CN203225003U (en) Intelligent electricity utilization system for remote centralized meter reading
CN208141584U (en) A kind of energy measurement data online acquisition and monitoring system
CN103226890A (en) Remote concentrated meter reading intelligent power system and concentrated meter reading method thereof
CN104753085A (en) Remote online monitoring system for distributed photovoltaic access
CN101466156A (en) Remote wireless centralization meter-reading method and system
CN107094091B (en) A kind of intelligent substation station level network configuration method of calibration and system
CN102571429B (en) A kind of OO intelligent power distribution communication business analyzing method and related device
CN102833113A (en) Monitoring method and system of transformer substation Ethernet communication network
CN104362756A (en) Household electricity consumption real-time analyzing system
CN109709870A (en) The equipment management device and system of compatibility multisensor based on Internet of Things
CN109272735A (en) Communication converter for resident's electric energy centralized meter-reading system
CN105353272A (en) Wind farm single-ring network multi-point fault rapid positioning method
CN107566370A (en) A kind of intelligent grid message transmitting method
CN110086859A (en) Intelligent gateway remote maintenance management system and method based on cloud platform
CN109120063A (en) A kind of plug & play sensor monitoring method and its system and acquisition unit
CN105006136A (en) Remote electric quantity automatic acquisition system
Di Leo et al. Towards visual smart metering exploiting wM-Bus and DLMS/COSEM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180427