CN107846461A - File uploading method and management method and file designation method based on BIM models - Google Patents

File uploading method and management method and file designation method based on BIM models Download PDF

Info

Publication number
CN107846461A
CN107846461A CN201711054071.XA CN201711054071A CN107846461A CN 107846461 A CN107846461 A CN 107846461A CN 201711054071 A CN201711054071 A CN 201711054071A CN 107846461 A CN107846461 A CN 107846461A
Authority
CN
China
Prior art keywords
file
mobile terminal
bim
information
item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711054071.XA
Other languages
Chinese (zh)
Inventor
谢子聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Xinyu Engineering Consulting Co Ltd
Original Assignee
Guangzhou Xinyu Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Xinyu Engineering Consulting Co Ltd filed Critical Guangzhou Xinyu Engineering Consulting Co Ltd
Priority to CN201711054071.XA priority Critical patent/CN107846461A/en
Publication of CN107846461A publication Critical patent/CN107846461A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/11File system administration, e.g. details of archiving or snapshots
    • G06F16/113Details of archiving
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/13File access structures, e.g. distributed indices
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/17Details of further file system functions
    • G06F16/176Support for shared access to files; File sharing support
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/51Indexing; Data structures therefor; Storage structures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/083Network architectures or network communication protocols for network security for authentication of entities using passwords
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0876Network architectures or network communication protocols for network security for authentication of entities based on the identity of the terminal or configuration, e.g. MAC address, hardware or software configuration or device fingerprint
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/10Network architectures or network communication protocols for network security for controlling access to devices or network resources
    • H04L63/107Network architectures or network communication protocols for network security for controlling access to devices or network resources wherein the security policies are location-dependent, e.g. entities privileges depend on current location or allowing specific operations only from locally connected terminals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W12/00Security arrangements; Authentication; Protecting privacy or anonymity
    • H04W12/06Authentication

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Computing Systems (AREA)
  • Software Systems (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of file uploading method based on BIM models and management method and file designation method, occur to upload the request of item file by foundation and the communication connection of mobile terminal and to mobile terminal, file is transmitted in permission mobile terminal to it after the subscriber identity information of BIM management systems examination & verification movement;The title of upper transmitting file is identified afterwards so that after to file to be uploaded progress classifying and dividing, is received the file of upload, is updated BIM information model databases.BIM management systems are in transmitting file in receiving, according to the different purposes of file, file to be uploaded carried out in purposes to be divided into three major types:According to file, procedure file and Outcome Document, needing to recall file in use, according to file to be found entered in three above disparate modules, inquiring about file, the search efficiency of file can be improved.

Description

File uploading method and management method and file designation method based on BIM models
Technical field
The present invention relates to architecture information management domain, more particularly to a kind of item file method for uploading based on BIM models And management method and file designation method.
Background technology
BIM(Building Information Modeling)It is related with the items of construction-engineering project Extrusion of the information data as model, carries out the foundation of BUILDINGS MODELS, by possessed by digital information analogue simulation building Real information.It has information completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization property and Eight big feature of figure can be gone out.BIM information models are applied to each stage of engineering construction, and it is applied to program full-life period Different field, it is BIM observational construction systems(Hereinafter referred to as BIM management systems)Core.
With the development of society, the management means to unit in charge of construction.Management mode requires more and more higher, BIM management systems As a kind of scientific and effective management platform, it is intended to carry out whole process control, Real-time Feedback and On-the-spot Interaction to project, optimize resource Distribution, reduces project risk to greatest extent, to ensure the stabilization of enterprise, efficiently, scientifically operate, enterprise managerial skills. All construction management functions of BIM management systems are all based on the threedimensional model performance of BIM information models, can understand accurate Show the spatial relation of each electric equipment.3D solid method can respectively match somebody with somebody from multiple angles, multiple views to check Position relationship between electric installation, unit module, design problem can be found early and adjusted in time.
In BIM management systems, an essential ring is exactly the upload of relevant documentation and shared, at present in practical application Central, the document made or drawing are uploaded in cloud disk by the responsible person of relevant item, and by related personnel to being uploaded to Case in cloud disk is managed classification, when reusing, is used after file is downloaded from cloud disk.
The content of the invention
It is an object of the invention to provide the file uploading method based on BIM models.
The present invention above-mentioned technical purpose technical scheme is that:A kind of text based on BIM models Part method for uploading, based on BIM management systems, including:
Request based on mobile terminal, establish the communication connection with mobile terminal;
Mobile terminal sends the request for uploading item file to high in the clouds, and request uploads the item corresponded in BIM information model databases Mesh file;
Request based on mobile terminal, the port information of mobile terminal is identified, identify the formatting title of item file, identification BIM letters There is no same file in breath model database;
Receive the request of mobile terminal, according to the formatting title of item file, the item file that will be uploaded is identified point Class;And/or
Receive the request of mobile terminal, according to the file format of item file, classification is identified to the item file that will be uploaded; And/or
Receive the request of mobile terminal, manually select the generic of item file, and upload;And/or
Mobile terminal is allowed to upload specified format and the item file of specified title;
Receive the item file of mobile terminal upload, successfully instructed to mobile terminal feedback reception;
Update BIM information model databases.
Preferably, the request based on mobile terminal, the port information of mobile terminal is identified, including:
Verify the subscriber identity information of mobile terminal;
Detect the network state information of mobile terminal;
Mobile terminal subscriber identity information is proved to be successful and the network state information of mobile terminal meets or higher than setting value, detects BIM The classification corresponding to item file uploaded in information model database with mobile terminal request, pushed to mobile terminal optimal to be uploaded File most preferably uploads classification and uploads for mobile terminal selection automatic identification or upload manually.
Preferably, the subscriber identity information of checking mobile terminal includes:
Obtain the login place of mobile terminal;
Obtain the login account and password of mobile terminal;
Identify that the login place of mobile terminal logs in place to be conventional, the login account for identifying mobile terminal is with being recorded in BIM management Account matching in system, the mobile terminal user name that is obtained by login account and password identification is sent and by mobile terminal to mobile terminal Confirmed.
Preferably, receiving the request of mobile terminal, the generic of item file is manually selected, including:
According to file;
Procedure file;
Outcome Document;
Include design condition, alteration command, government's certification, national lex loci, specification, standard, contract according to file;
Procedure file includes meeting summary, engineering contact letter;
Outcome Document includes model file containing BIM and BIM application achievements files.
The present invention above-mentioned technical purpose technical scheme is that:Project class file is real according to project Apply the stage carries out segmentation name to file, line character of going forward side by side limitation.
Preferably, file designation is divided into five sections:Design/stage/major field/floor/illustrates;
Design includes engineering and subitem:
Job number is D, and to be related to after contract number four, character limits 4 bit digitals;
Subitem numbering is S, and the engineering for there is the subregion of multiple subitems or subregion is related to project;
Stage numbering is C, and representative is related to stage, construction stage or completed papers;
Major field numbering is P, represents total figure, building, structure, plumbing, electric, light current, HVAC or combustion gas;
Floor represents specific floor marked as F;
It is M to illustrate numbering, for illustrating the content in item file, avoids repeating with other fields;
The reference format of item file name is DS-CP-F-M.
Preferably, mobile terminal is based on, including:
The communication connection established between BIM management systems;
Operation requests based on mobile terminal, recognition user information simultaneously establish file uploading channel;
Actual progress is calculated with applying based on above-mentioned BIM information models digital simulation construction speed, and according to the item file of upload The time deviation of work plan, and construction plan is planned again;And/or
Actual progress is calculated with actually applying based on BIM information model digital simulation construction speeds, and according to the item file of upload The time deviation of work progress, and recalculate construction schedule.
The present invention above-mentioned technical purpose technical scheme is that:BIM information model data include BIM databases, progress control information, cost management information, quality management information, safety management information, working sources management letter Breath and work progress information.
In summary, the invention has the advantages that:
(1)Mobile terminal sends request to BIM management systems, establishes and communicates to connect with BIM management systems;Afterwards, BIM management systems By auditing mobile terminal subscriber identity information, establish and contact with mobile terminal, the further network state for auditing mobile terminal is with treating After upper transmitting file, determine whether that mobile terminal uploads item file to BIM management systems;
(2)When auditing the subscriber identity information of mobile terminal, whether the login place for auditing mobile terminal first is conventional login place, Inputted login account and password by mobile terminal afterwards and be committed to BIM management systems and audited, BIM judges the login of mobile terminal Account and password do not log in correctly abnormal(Log in ground in conventional), the connection established between BIM management systems and mobile terminal System, send the user name being recorded in BIM management systems to mobile terminal from BIM management systems and confirmation is made by mobile terminal, keep away Exempt from that situations such as user name is chaotic or mobile terminal mistake is stepped on occurs in BIM management systems;
(3)Mobile terminal audits whether filename to be uploaded bears the same name with existing file first after file to be uploaded is audited, it Afterwards by identifying that filename to be uploaded positions uploading position(Affiliated sub-project), or classifying and dividing is carried out, make the file of upload In order, logicality is stored in BIM management systems;
(4)File to be uploaded is named in order to which BIM management systems it are identified point with DS-CP-F-M form Class;Wherein D represents job number, is nominally being divided to being under the jurisdiction of different engineerings, S represents some subitems in project Mesh, some small projects in each engineering project are distinguished, C is the engineering phase involved by this document, be may correspond to Design phase, construction stage or completed papers, with time shaft divide the affiliated stage of file, P under each sub-project For major field, the professional domain related to each file to be uploaded divides below the stage, is further led in specialty Continue to divide according to different floors in domain;By the refinement of above series of, if still there is duplication of name phenomenon can be in filename Brief division is finally done to the content in file with brief word, so as to avoid bear the same name phenomenon;
(5)During file designation, between segmentation division carried out with "-", be advantageous to the word of the identification of BIM management systems, D items and S items Fu Jun does standard restriction, is advantageous to be searched for generally in BIM management systems, such as just knows that the involved of some engineering Contract tail number after two, can unknown input character adduction inquired about with tail number;Allow when filename occurs to repeat, it is allowed to Last in file is described briefly to file, is avoided identical file being nominally present, is carried out in BIM management systems During document searching, the file that some titles are the same but content is different be present, easily influence the ensuing progress of work and work is imitated Rate;
(6)BIM management systems, according to the different purposes of file, split the file into three major types in transmitting file in receiving:According to text Part, procedure file and Outcome Document, wherein according to file be design condition, alteration command, government's certification, national lex loci, Specification, standard, contract regulation etc., this class file are mainly the procedure file in projects;Procedure file refers to engineering project Ongoing file;Outcome Document is comprising BIM model files and BIM application achievements files, to file to be uploaded in purposes On divided;Needing to recall file in use, according to file to be found being entered in three above disparate modules, inquiry text Part, the search efficiency of file can be improved;
(7)BIM manage and mobile terminal between establish communication connection after, to BIM management systems on transmitting file, according to BIM information BIM databases, progress control information in model data etc. and the file for being related to projects implementation of upload are contrasted, So as to calculate practice of construction progress and plan the difference between construction speed, and construction plan is planned by mobile terminal selection again Make projects be expected complete, also or recalculate construction complete time.
Brief description of the drawings
Fig. 1 is that item file uploads schematic flow sheet in embodiment 2;
Fig. 2 is that item file uploads partial process view in embodiment 2;
Fig. 3 is that item file uploads schematic flow sheet in embodiment 3;
Fig. 4 is that item file uploads schematic flow sheet in embodiment 4.
Embodiment
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.
BIM information model data in the present invention, discussed to simplify, it should be understood that with a kind of data, be not specific to reality Using central BIM information model data;Mobile terminal refers to the hand with wireless data communication function and human-computer interaction function One of in machine, tablet personal computer, notebook computer, MP4/5.
Embodiment 1:
A kind of file designation mode, file to be uploaded is subjected to segmentation name according to project implementation phase, line character of going forward side by side limitation; The name of document is broadly divided into five sections:Design-stage-major field-floor-illustrates.
Design includes engineering and subitem, and job number D, subitem numbering is S, and limitation job number is after Contract NO Four, represented when subitem is not present with XX, stage numbering is C, and major field illustrates volume marked as P, floor marked as F Number it is M.
Table 1(Sub-project is named):
Table 2(Major field is named):
Floor(F)When name, aerial layer coding should be started with alphabetical F plus 2 bit digitals(More than the 99 layers bit digital of use 3)Expression, Subterranean layer coding should be started with letter b plus the expression of 2 bit digitals, roof coding should be expressed with RF, and interlayer coded representation method is;Building Layer coding+M.
Table 3:
Structural elevation is named:Add (S below in the name of corresponding architecture storey), as shown in table 4;
Table 4:
Embodiment 2:
A kind of file uploading method based on BIM models, as depicted in figs. 1 and 2, mobile terminal to transmitting file in BIM management systems, Mainly include the following steps that:
S100:Mobile terminal sends request, and BIM management systems are established with mobile terminal and connected;
S200:Mobile terminal sends the request for uploading item file to BIM management systems;
S300:BIM management systems demonstrate,prove the port information of mobile terminal by following two step;
S310:The subscriber identity information of mobile terminal is verified, is divided into following three step:
S311:Obtain the login place of mobile terminal;
S312:Obtain the login account and password of mobile terminal;
S313:BIM management systems receive the login account that mobile terminal provides, password and judge that the login place of mobile terminal is Sent and this account, password match and the user name being recorded in BIM management systems to mobile terminal behind conventional login place;
S320:The network state of mobile terminal is detected, identifies whether the network state information of mobile terminal meets or higher than setting value;
S400:After the user profile of mobile terminal is by checking, BIM management systems are compared based on BIM information model databases It is right, confirm whether there is the file of same names in BIM information model databases;
S500:According to the title of item file to be uploaded, classification is identified to the item file that will be uploaded, is divided to Generic;
S600:Receive the request of mobile terminal, it is allowed to which item file is uploaded in BIM information model databases by mobile terminal;
S700:Item file is successfully uploaded in BIM information model databases, and BIM information model databases carry out data renewal.
In step S500, file is approximately separated into three classes in BIM information model data:
1. according to file;
2. procedure file;
3. Outcome Document.
Include design condition, alteration command, government's certification, national lex loci, specification, standard, contract according to file;
Procedure file includes meeting summary, engineering contact letter;
Outcome Document includes model file containing BIM and BIM application achievements files.
In step S100, the communication connection between BIM management systems and mobile terminal, mainly led to by LAN, such as WIFI Letter module crosses mobile communications network, as 4G/5G communication networks or 4G wireless private networks and VPN designated lanes are communicated.
User uploads engineering project schedule file or formulation engineering item by man-machine interaction model into BIM model databases Mesh target date, BIM model databases mainly include BIM databases, progress control information, cost management information, quality management Information, safety management information, working sources management information and work progress information, BIM management systems are based on BIM model datas Storehouse construction simulation progress;After engineering project starts, user periodically uploads item file, analysis project to BIM management systems The time deviation of practice of construction progress and construction plan is analyzed in file, and plans construction plan again or according to actual progress meter Calculate the time that construction is completed.
For example, being based on BIM management systems, user is set by man-machine interaction model and uploaded often into BIM model databases The acceptance(check) report of one sub-project, the carry out progress of positioning engineering project is reported by acceptance(check).
Embodiment 3:
Embodiment 3 and step in embodiment 2 are essentially identical, and difference is a kind of file uploading method based on BIM models, such as scheme Shown in 3, mobile terminal mainly includes the following steps that to transmitting file in BIM management systems:
S100:Mobile terminal sends request, and BIM management systems are established with mobile terminal and connected;
S200:Mobile terminal sends the request for uploading item file to BIM management systems;
S300:BIM management systems demonstrate,prove the port information of mobile terminal by following two step;
S310:The subscriber identity information of mobile terminal is verified, is divided into following three step:
S311:Obtain the login place of mobile terminal;
S312:Obtain the login account and password of mobile terminal;
S313:BIM management systems receive the login account that mobile terminal provides, password and judge that the login place of mobile terminal is Sent and this account, password match and the user name being recorded in BIM management systems to mobile terminal behind conventional login place;
S320:The network state of mobile terminal is detected, identifies whether the network state information of mobile terminal meets or higher than setting value;
S400:After the user profile of mobile terminal is by checking, BIM management systems are compared based on BIM information model databases It is right, confirm whether there is the file of same names in BIM information model databases;
S500:According to the form of item file to be uploaded(Suffix name), it is enterprising in file class to the item file that will upload Row classification, is divided to generic;
S600:Receive the request of mobile terminal, it is allowed to which item file is uploaded in BIM information model databases by mobile terminal;
S700:Item file is successfully uploaded in BIM information model databases, and BIM information model databases carry out data renewal.
User uploads engineering project schedule file or formulation engineering item by man-machine interaction model into BIM model databases Mesh target date, BIM model databases mainly include BIM databases, progress control information, cost management information, quality management Information, safety management information, working sources management information and work progress information, BIM management systems are based on BIM model datas Storehouse construction simulation progress;After engineering project starts, user periodically uploads item file, analysis project to BIM management systems The time deviation of practice of construction progress and construction plan is analyzed in file, and plans construction plan again or according to actual progress meter Calculate the time that construction is completed.
For example, being based on BIM management systems, user is set by man-machine interaction model and uploaded often into BIM model databases The acceptance(check) report of one sub-project, the carry out progress of positioning engineering project is reported by acceptance(check).
Embodiment 4:
Embodiment 4 and step in embodiment 2 are essentially identical, and difference is a kind of file uploading method based on BIM models, such as scheme Shown in 4, mobile terminal mainly includes the following steps that to transmitting file in BIM management systems:
S100:Mobile terminal sends request, and BIM management systems are established with mobile terminal and connected;
S200:Mobile terminal sends the request for uploading item file to BIM management systems;
S300:BIM management systems demonstrate,prove the port information of mobile terminal by following two step;
S310:The subscriber identity information of mobile terminal is verified, is divided into following three step:
S311:Obtain the login place of mobile terminal;
S312:Obtain the login account and password of mobile terminal;
S313:BIM management systems receive the login account that mobile terminal provides, password and judge that the login place of mobile terminal is Sent and this account, password match and the user name being recorded in BIM management systems to mobile terminal behind conventional login place;
S320:The network state of mobile terminal is detected, identifies whether the network state information of mobile terminal meets or higher than setting value;
S400:After the user profile of mobile terminal is by checking, BIM management systems are compared based on BIM information model databases It is right, confirm whether there is the file of same names in BIM information model databases;
S500:User is allowed to manually select classification belonging to item file to be uploaded on mobile terminal;
S600:Receive the request of mobile terminal, it is allowed to which item file is uploaded in BIM information model databases by mobile terminal;
S700:Item file is successfully uploaded in BIM information model databases, and BIM information model databases carry out data renewal.
User uploads engineering project schedule file or formulation engineering item by man-machine interaction model into BIM model databases Mesh target date, BIM model databases mainly include BIM databases, progress control information, cost management information, quality management Information, safety management information, working sources management information and work progress information, BIM management systems are based on BIM model datas Storehouse construction simulation progress;After engineering project starts, user periodically uploads item file, analysis project to BIM management systems The time deviation of practice of construction progress and construction plan is analyzed in file, and plans construction plan again or according to actual progress meter Calculate the time that construction is completed.
For example, being based on BIM management systems, user is set by man-machine interaction model and uploaded often into BIM model databases The acceptance(check) report of one sub-project, the carry out progress of positioning engineering project is reported by acceptance(check).

Claims (8)

  1. A kind of 1. file uploading method based on BIM models, it is characterised in that based on BIM management systems, including:
    Request based on mobile terminal, establish the communication connection with mobile terminal;
    Mobile terminal sends the request for uploading item file to high in the clouds, and request uploads the item corresponded in BIM information model databases Mesh file;
    Request based on mobile terminal, the port information of mobile terminal is identified, identify the formatting title of item file, identification BIM letters There is no same file in breath model database;
    Receive the request of mobile terminal, according to the formatting title of item file, the item file that will be uploaded is identified point Class;And/or
    Receive the request of mobile terminal, according to the file format of item file, classification is identified to the item file that will be uploaded; And/or
    Receive the request of mobile terminal, manually select the generic of item file, and upload;And/or
    Mobile terminal is allowed to upload specified format and the item file of specified title;
    Receive the item file of mobile terminal upload, successfully instructed to mobile terminal feedback reception;
    Update BIM information model databases.
  2. A kind of 2. file uploading method based on BIM models according to claim 1, it is characterised in that:Based on mobile terminal Request, the port information of mobile terminal is identified, including:
    Verify the subscriber identity information of mobile terminal;
    Detect the network state information of mobile terminal;
    Mobile terminal subscriber identity information is proved to be successful and the network state information of mobile terminal meets or higher than setting value, detects BIM The classification corresponding to item file uploaded in information model database with mobile terminal request, pushed to mobile terminal optimal to be uploaded File most preferably uploads classification and uploads for mobile terminal selection automatic identification or upload manually.
  3. A kind of 3. file uploading method of BIM models according to claim 2, it is characterised in that:Verify the use of mobile terminal Family identity information includes:
    Obtain the login place of mobile terminal;
    Obtain the login account and password of mobile terminal;
    Identify that the login place of mobile terminal logs in place to be conventional, the login account for identifying mobile terminal is with being recorded in BIM management Account matching in system, the mobile terminal user name that is obtained by login account and password identification is sent and by mobile terminal to mobile terminal Confirmed.
  4. A kind of 4. file uploading method of BIM models according to claim 1, it is characterised in that:Receive asking for mobile terminal Ask, manually select the generic of item file, including:
    According to file;
    Procedure file;
    Outcome Document;
    Include design condition, alteration command, government's certification, national lex loci, specification, standard, contract according to file;
    Procedure file includes meeting summary, engineering contact letter;
    Outcome Document includes model file containing BIM and BIM application achievements files.
  5. 5. a kind of file designation method of the project method for uploading of BIM models applied to described in claim 1-4, its feature exist In:Project class file carries out segmentation name according to project implementation phase to file, line character of going forward side by side limitation.
  6. 6. a kind of file designation method according to claim 5, it is characterised in that file designation is divided into five sections:Design/rank Section/major field/floor/illustrate;
    Design includes engineering and subitem:
    Job number is D, and to be related to after contract number four, character limits 4 bit digitals;
    Subitem numbering is S, and the engineering for there is the subregion of multiple subitems or subregion is related to project;
    Stage numbering is C, and representative is related to stage, construction stage or completed papers;
    Major field numbering is P, represents total figure, building, structure, plumbing, electric, light current, HVAC or combustion gas;
    Floor represents specific floor marked as F;
    It is M to illustrate numbering, for illustrating the content in item file, avoids repeating with other fields;
    The reference format of item file name is DS-CP-F-M.
  7. A kind of 7. item file management method based on BIM management systems, it is characterised in that:Based on mobile terminal, including:
    The communication connection established between BIM management systems;
    Operation requests based on mobile terminal, recognition user information simultaneously establish file uploading channel;
    Actual progress is calculated with applying based on above-mentioned BIM information models digital simulation construction speed, and according to the item file of upload The time deviation of work plan, and construction plan is planned again;And/or
    Actual progress is calculated with actually applying based on BIM information model digital simulation construction speeds, and according to the item file of upload The time deviation of work progress, and recalculate construction schedule.
  8. A kind of 8. item file management method of BIM management systems according to claim 7, it is characterised in that:BIM information Model data includes BIM databases, progress control information, cost management information, quality management information, safety management information, applied Work resource management information and work progress information.
CN201711054071.XA 2017-10-31 2017-10-31 File uploading method and management method and file designation method based on BIM models Pending CN107846461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711054071.XA CN107846461A (en) 2017-10-31 2017-10-31 File uploading method and management method and file designation method based on BIM models

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711054071.XA CN107846461A (en) 2017-10-31 2017-10-31 File uploading method and management method and file designation method based on BIM models

Publications (1)

Publication Number Publication Date
CN107846461A true CN107846461A (en) 2018-03-27

Family

ID=61681119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711054071.XA Pending CN107846461A (en) 2017-10-31 2017-10-31 File uploading method and management method and file designation method based on BIM models

Country Status (1)

Country Link
CN (1) CN107846461A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108984940A (en) * 2018-07-31 2018-12-11 深圳市斯维尔科技股份有限公司 A kind of architectural design Synergistic method and device based on BIM
CN109190094A (en) * 2018-09-05 2019-01-11 盈嘉互联(北京)科技有限公司 Building Information Model file cutting method based on IFC standard
CN109558508A (en) * 2018-10-22 2019-04-02 百度在线网络技术(北京)有限公司 Data digging method, device, computer equipment and storage medium
CN109948239A (en) * 2019-03-15 2019-06-28 中民筑友科技投资有限公司 A kind of technological design progress exchange method, apparatus and system based on BIM
CN110135070A (en) * 2019-05-16 2019-08-16 深圳天际云数字技术有限公司 A kind of method and device of BIM model creation
CN110232264A (en) * 2019-06-12 2019-09-13 郑州西亚斯学院 A kind of computer big data processing unit
CN110554995A (en) * 2019-08-13 2019-12-10 武汉中海庭数据技术有限公司 Deep learning model management method and system
CN110673909A (en) * 2019-09-09 2020-01-10 北京中铁建电气化设计研究院有限公司 One-rod one-file information processing method of overhead line system based on building information model
CN113987199A (en) * 2021-10-19 2022-01-28 清华大学 BIM intelligent image examination method, system and medium with standard automatic interpretation
CN114677123A (en) * 2022-04-19 2022-06-28 赵德群 Management system for low-carbon green building supervision engineering project

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104881751A (en) * 2015-06-04 2015-09-02 北京建工土木工程有限公司 System and method for construction material management based on building information model
CN105335558A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering circle establishment method and system on basis of BIM (building information modeling)
CN106682257A (en) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 Construction facility BIM component library construction method
CN106779476A (en) * 2017-01-11 2017-05-31 江苏省第建筑安装股份有限公司 A kind of Construction Schedule management platform and method based on BIM IFC technologies

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN104881751A (en) * 2015-06-04 2015-09-02 北京建工土木工程有限公司 System and method for construction material management based on building information model
CN105335558A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering circle establishment method and system on basis of BIM (building information modeling)
CN106682257A (en) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 Construction facility BIM component library construction method
CN106779476A (en) * 2017-01-11 2017-05-31 江苏省第建筑安装股份有限公司 A kind of Construction Schedule management platform and method based on BIM IFC technologies

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李峰等: ""BIM技术在商业综合体管网中的应用"", 《施工技术》 *
洪骏飞: ""BIM技术在大型桥梁工程项目管理中的应用研究"", 《中国优秀硕士论文全文数据库信息科技辑》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108984940A (en) * 2018-07-31 2018-12-11 深圳市斯维尔科技股份有限公司 A kind of architectural design Synergistic method and device based on BIM
CN109190094A (en) * 2018-09-05 2019-01-11 盈嘉互联(北京)科技有限公司 Building Information Model file cutting method based on IFC standard
CN109190094B (en) * 2018-09-05 2023-03-10 盈嘉互联(北京)科技有限公司 Building information model file segmentation method based on IFC standard
CN109558508A (en) * 2018-10-22 2019-04-02 百度在线网络技术(北京)有限公司 Data digging method, device, computer equipment and storage medium
CN109948239A (en) * 2019-03-15 2019-06-28 中民筑友科技投资有限公司 A kind of technological design progress exchange method, apparatus and system based on BIM
CN110135070A (en) * 2019-05-16 2019-08-16 深圳天际云数字技术有限公司 A kind of method and device of BIM model creation
CN110232264A (en) * 2019-06-12 2019-09-13 郑州西亚斯学院 A kind of computer big data processing unit
CN110554995A (en) * 2019-08-13 2019-12-10 武汉中海庭数据技术有限公司 Deep learning model management method and system
CN110673909A (en) * 2019-09-09 2020-01-10 北京中铁建电气化设计研究院有限公司 One-rod one-file information processing method of overhead line system based on building information model
CN113987199A (en) * 2021-10-19 2022-01-28 清华大学 BIM intelligent image examination method, system and medium with standard automatic interpretation
CN114677123A (en) * 2022-04-19 2022-06-28 赵德群 Management system for low-carbon green building supervision engineering project

Similar Documents

Publication Publication Date Title
CN107846461A (en) File uploading method and management method and file designation method based on BIM models
WO2020056669A1 (en) Control method and apparatus for unmanned aerial vehicle cruise based on prefabricated building platform
CN106446026B (en) File management method and file management system
CN101443799A (en) Systems and methods for process-driven bill of material
CN109815254B (en) Cross-region task scheduling method and system based on big data
CN104579747B (en) A kind of model data rapid transmission method in distributed power device emulation
CN109961264A (en) A kind of enterprise information management system and management method
CN110503321B (en) Project total contractor management system
US20240112586A1 (en) Methods and devices for unmanned aerial vehicle based site inspection and scale rendered analysis
CN110648116B (en) Management method for digital paperless real-time dynamic filing of whole process of building engineering
US20210334733A1 (en) Project Management Devices, Systems and Methods
CN109360123B (en) Multi-professional construction management method and system based on room
CN115033380A (en) Building engineering intelligent integrated cloud platform based on BIM technology
CN117035691B (en) Engineering construction digital project management method and system based on BIM technology
CN105335558A (en) Engineering circle establishment method and system on basis of BIM (building information modeling)
CN107730103B (en) Spatial data processing flow control method
CN111522695A (en) Application-level disaster recovery system of cooperative office system
CN115564397A (en) Automatic model management method suitable for three-dimensional collaborative design platform
CN115952989A (en) Natural disaster emergency scheduling system based on digital twins
CN115660619A (en) Production management system and server based on BIM information management
CN114529438A (en) Rescue site risk assessment and resource management system
CN112463871A (en) Urban management-based two-violation regulation information processing system and processing method
CN113569306A (en) BIM modeling implementation and application method of waste incineration power plant based on BIM technology
CN111177266B (en) Data synchronization system in CG production
CN112652188A (en) Vehicle searching method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180327