CN107591576A CN201710781670.5A CN201710781670A CN107591576A CN 107591576 A CN107591576 A CN 107591576A CN 201710781670 A CN201710781670 A CN 201710781670A CN 107591576 A CN107591576 A CN 107591576A
Authority
CN
China
Prior art keywords
battery
monitoring unit
battery pack
main frame
control main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710781670.5A
Other languages
Chinese (zh)
Inventor
章迎春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Minzhe Information Technology Co ltd
Original Assignee
Hefei Minzhe Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Minzhe Information Technology Co ltd filed Critical Hefei Minzhe Information Technology Co ltd
Priority to CN201710781670.5A priority Critical patent/CN107591576A/en
Publication of CN107591576A publication Critical patent/CN107591576A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Abstract

The invention provides a kind of mining two-stage distributed management system of battery pack, including managing battery pack, battery monitoring unit, field control main frame and server, the management battery pack refers to be made up of in a series arrangement multiple batteries, the management battery pack is differentiated to be electrically connected by the total monitoring unit of battery and current sensor with field control main frame, the battery is electrically connected by battery monitoring unit with field control main frame respectively, the field control main frame respectively with temperature sensor, voltage sensor, battery monitoring unit and server electrical connection, the voltage sensor electrically connects with the total monitoring unit of battery.The present invention is by the total monitoring unit of battery and battery monitoring unit to whole battery distribution type two-level management, simplify interface and control complexity, server is analyzed using the battery parameter information received the performance of battery, obtain accurate cell health state.

Description

A kind of two-stage distributed management system of mining battery pack
Technical field
The present invention relates to a kind of management system, more particularly to a kind of two-stage distributed management system of mining battery pack.
Background technology
The principle of existing battery is by mutually converting chemical energy and direct current energy, can be answered through overcharge after discharge Original, so as to reach reuse effect.With the fast development of the industries such as China communicates, electric power, UPS, the dosage of battery also exists Quick increase.Just our current battery use condition, some unexpected situations often occur and occur, for example seem just But electricity can not be put during normal battery discharge to come.The generation of this situation is not main reason is that the running status of battery is had The monitoring of effect, once by there is a certain piece of battery failure in multiple batteries battery pack in series, it may result in whole battery Group is unable to regular picture.Last one of safeguard that battery is powered as continuous safe, while be also uninterrupted power supply system The most unsafe factor in system the inside.Therefore in order to ensure the reliability service of uninterruptible power system, the performance of battery pack is carried out Comprehensive continual monitoring and analysis are particularly important.
Existing battery management system is most of using management principle nearby, the pipe for the local battery that can only be detected Manage information, the data of detection are also local data, detection it is not comprehensive enough, cannot guarantee that battery pack is unable to regular picture, So as to which operating efficiency in ore deposit can be influenceed.
The content of the invention
The technical problem to be solved in the present invention is to overcome the defects of existing, there is provided a kind of mining two-stage distributed pipe of battery pack Reason system, it is combined using management nearby with centralized management principle, simplifies interface and control complexity, can effectively solve The problem of in background technology.
In order to solve the above-mentioned technical problem, the invention provides following technical scheme:
The present invention provides a kind of mining two-stage distributed management system of battery pack, including manages battery pack, battery monitoring unit, shows Field control main frame and server, the management battery pack refer to be made up of in a series arrangement multiple batteries, the management battery pack Differentiate and electrically connected by the total monitoring unit of battery and current sensor with field control main frame, the battery passes through battery cell monitoring respectively Unit electrically connects with field control main frame, the field control main frame respectively with temperature sensor, voltage sensor, battery cell monitoring Unit and server electrical connection, the voltage sensor electrically connect with the total monitoring unit of battery.
As a preferred technical solution of the present invention, the battery monitoring unit includes battery parameter measuring unit, filled Electrical equalization administrative unit and communications interface unit.
As a preferred technical solution of the present invention, to be managed battery straight by coupled for the battery monitoring unit Connect power supply.
As a preferred technical solution of the present invention, the field control main frame include display unit, power supply unit and Storage element.
The beneficial effect that is reached of the present invention is compared with prior art:The present invention passes through the total monitoring unit of battery and battery Monitoring unit is to whole battery distribution type two-level management;It is combined using management nearby with centralized management principle, simplifies and connect Mouth and control complexity, improve system reliability, easy to use, server is utilized the battery parameter letter received Cease and the performance of battery is analyzed, obtain accurate cell health state, so as to be the reliability service for ensuring battery system, Used beneficial to staff in ore deposit.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Apply example to be used to explain the present invention together, be not construed as limiting the invention.
In the accompanying drawings:
Fig. 1 is module map of the present invention;
Fig. 2 is battery monitoring unit structural representation of the present invention;
Fig. 3 is field control main machine structure schematic diagram of the present invention
Label in figure:1st, battery;2nd, the total monitoring unit of battery;3rd, current sensor;4th, field control main frame;41st, display unit; 42nd, storage element;5th, battery monitoring unit;51st, parameter measurement unit;52nd, charge balancing administrative unit;53rd, communication interface list Member;6 temperature sensors, connecting tube;7th, voltage sensor;8th, server.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein preferred real Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment:As Figure 1-3, the present invention provides a kind of mining two-stage distributed management system of battery pack, including pipe Battery pack, battery monitoring unit 5, field control main frame 4 and server 8 are managed, management battery pack refers to by multiple batteries 1 to connect Mode is formed, and management battery pack is electrically connected by the total monitoring unit 2 of battery and current sensor 3 with field control main frame 4 respectively, Battery 1 is electrically connected by battery monitoring unit 5 with field control main frame 4 respectively, field control main frame 4 respectively with temperature sensor 6th, voltage sensor 7, battery monitoring unit 5 and server 8 electrically connect, and the monitoring unit 2 total with battery of voltage sensor 7 is electrically connected Connect.
Battery monitoring unit 5 includes battery parameter measuring unit 51, charge balancing administrative unit 52 and communications interface unit 53, battery parameter measuring unit 51 is used to measure the coupled parameter information for being managed battery 1, charge balancing administrative unit 52 are used under the control of control main frame at the scene, realize the charge balancing management for being managed battery pack, and communications interface unit 53 is used In the communication for realizing battery monitoring unit 5 and field control main frame 4.
Battery monitoring unit 5 is directly powered by the coupled battery 1 that is managed, and is easy to battery management.
Field control main frame includes display unit 41, power supply unit and storage element 42, for storage battery monitoring unit Pass the 5 battery parameter information and remote control information for giving field control main frame 4.
Specifically, can be communicated simultaneously and nearby with multiple battery monitoring units 5 in a field control main frame 4, and will be more The parameter information for multiple management batteries 2 that individual battery monitoring unit 2 gathers sends far-end server 8 to, therefore only remote with one Journey communication interface can realizes the remote monitoring to multiple batteries, and what can be gathered by the total monitoring unit 2 of battery is managed electricity The parameter information of pond group sends far-end server 8 to, using nearby management with centralized management principle be combined, simplify interface and Complexity is controlled, reduces the cost of system.
The present invention provides a kind of mining two-stage distributed management system of battery pack, by passing through the total monitoring unit of battery and electricity Cell monitoring unit is to whole battery distribution type two-level management;It is combined, is simplified with centralized management principle using management nearby Interface and control complexity, improve system reliability, easy to use, server is utilized the battery parameter received Information is analyzed the performance of battery, obtains accurate cell health state, so as to be the reliable fortune for ensuring battery system OK, used beneficial to staff in ore deposit.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic. Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's Within protection domain.

Claims (4)

1. a kind of two-stage distributed management system of mining battery pack, including management battery pack, battery monitoring unit(5), scene control Main frame processed(4)And server(8), it is characterised in that the management battery pack refers to by multiple batteries(1)Group in a series arrangement Into the management battery pack passes through the total monitoring unit of battery respectively(2)And current sensor(3)With field control main frame(4)Electricity Connection, the battery(1)Pass through battery monitoring unit respectively(5)With field control main frame(4)Electrical connection, the field control master Machine(4)Respectively with temperature sensor(6), voltage sensor(7), battery monitoring unit(5)And server(8)Electrical connection, it is described Voltage sensor(7)With the total monitoring unit of battery(2)Electrical connection.
A kind of 2. mining two-stage distributed management system of battery pack according to claim 1, it is characterised in that the battery Monitoring unit(2)Including battery parameter measuring unit(21), charge balancing administrative unit(22)And communications interface unit(23).
A kind of 3. mining two-stage distributed management system of battery pack according to claim 1, it is characterised in that the battery Monitoring unit(2)Directly powered by the coupled battery that is managed.
A kind of 4. mining two-stage distributed management system of battery pack according to claim 1, it is characterised in that the scene Control main frame includes display unit(41), power supply unit and storage element(42).
CN201710781670.5A 2017-09-02 2017-09-02 A kind of two-stage distributed management system of mining battery pack Pending CN107591576A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710781670.5A CN107591576A (en) 2017-09-02 2017-09-02 A kind of two-stage distributed management system of mining battery pack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710781670.5A CN107591576A (en) 2017-09-02 2017-09-02 A kind of two-stage distributed management system of mining battery pack

Publications (1)

Publication Number Publication Date
CN107591576A true CN107591576A (en) 2018-01-16

Family

ID=61050659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710781670.5A Pending CN107591576A (en) 2017-09-02 2017-09-02 A kind of two-stage distributed management system of mining battery pack

Country Status (1)

Country Link
CN (1) CN107591576A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102255352A (en) * 2011-05-26 2011-11-23 南昌大学 Distributed intelligent power battery pack management system
CN103779883A (en) * 2012-10-24 2014-05-07 杭州海伟辰电子科技有限公司 Distributed battery management system
CN104091973A (en) * 2014-07-04 2014-10-08 山东金煜电子科技有限公司 Automatic zero-clearance by-pass connection system for storage battery pack
KR101648804B1 (en) * 2016-03-23 2016-08-17 동도전력 주식회사 Energy storage system having a structure that a plurality of battery system is distributed and method for processing thereof
US20160303990A1 (en) * 2011-04-22 2016-10-20 Angel A. Penilla Carrier for Exchangeable Batteries for Use by Electric Vehicles

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160303990A1 (en) * 2011-04-22 2016-10-20 Angel A. Penilla Carrier for Exchangeable Batteries for Use by Electric Vehicles
CN102255352A (en) * 2011-05-26 2011-11-23 南昌大学 Distributed intelligent power battery pack management system
CN103779883A (en) * 2012-10-24 2014-05-07 杭州海伟辰电子科技有限公司 Distributed battery management system
CN104091973A (en) * 2014-07-04 2014-10-08 山东金煜电子科技有限公司 Automatic zero-clearance by-pass connection system for storage battery pack
KR101648804B1 (en) * 2016-03-23 2016-08-17 동도전력 주식회사 Energy storage system having a structure that a plurality of battery system is distributed and method for processing thereof

Similar Documents

Publication Publication Date Title
CN204154825U (en) A kind of alternating-current charging pile failure detector
CN102848929B (en) Battery monitor circuit, electrical storage device, electronic installation and electric vehicle
CN103779883A (en) Distributed battery management system
CN108270230A (en) A kind of distributed energy storage system
CN104092236B (en) hybrid renewable energy and energy storage system power supply system and control method thereof
CN205846815U (en) A kind of electric automobile split type DC charging motor system
CN110061551A (en) A kind of battery management system and method
CN106787152A (en) Monitoring power distribution system and electric power system
CN107275694A (en) Have active equalization and passive distributed storage battery balancer and method in a balanced way concurrently
CN208209594U (en) base station power battery management system
CN108599210A (en) A kind of echelon battery energy storage system and method for household photovoltaic power grid
JP2014023276A (en) Storage battery control system
CN106160181A (en) A kind of uninterruptible power system
CN202906507U (en) Distributed cell power supply device and method thereof
CN107591576A (en) A kind of two-stage distributed management system of mining battery pack
US9929571B1 (en) Integrated energy storage system
CN107425227A (en) Suitable for the battery online management platform of large-scale energy storage system
CN104333083A (en) Online maintenance system of distributed power supply
CN110763348A (en) Cable joint temperature monitoring device and system
CN106253460A (en) A kind of device and method of the prolonging service life of battery for machine room scene
CN216872867U (en) Intelligent power supply equipment
CN105720687A (en) Electric meter incorrect-installation monitoring system
CN108638893A (en) A kind of unmanned plane charging system based on transmission tower
CN108539816A (en) A kind of lithium battery module series equalizer
KR102284859B1 (en) Grid participant charging system for easy management of multiple chargers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180116

WD01 Invention patent application deemed withdrawn after publication