CN107269265A - A kind of system and method for optimizing and revising oilwell produced fluid amount - Google Patents

A kind of system and method for optimizing and revising oilwell produced fluid amount Download PDF

Info

Publication number
CN107269265A
CN107269265A CN201710508659.1A CN201710508659A CN107269265A CN 107269265 A CN107269265 A CN 107269265A CN 201710508659 A CN201710508659 A CN 201710508659A CN 107269265 A CN107269265 A CN 107269265A
Authority
CN
China
Prior art keywords
msub
mfrac
well
mrow
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710508659.1A
Other languages
Chinese (zh)
Inventor
辛宏
周志平
黄伟
甘庆明
陆梅
韩二涛
李明江
李大建
刘涛
张岩
周杨帆
杨海涛
张磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201710508659.1A priority Critical patent/CN107269265A/en
Publication of CN107269265A publication Critical patent/CN107269265A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/008Monitoring of down-hole pump systems, e.g. for the detection of "pumped-off" conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses computer in a kind of system and method for optimizing and revising oilwell produced fluid amount, including load transducer, displacement transducer, cable, well head collector, well site host RTU, well group antenna, main website center reception antenna, master controller and station;Load transducer is arranged on oil pumping machine well head polished rod eye, and displacement transducer is arranged on below walking beam on pumping units;Load transducer and displacement transducer are connected by cable with well head collector.The present invention is not in the case where increasing any acquisition instrument equipment, realize and calculate flowing bottomhole pressure (FBHP) in real time using indicator card, the shut-in pressure survey method broken traditions, using Two production well testing analysis method, the accurate acquisition of downhole parameters is realized, is that production well proration is optimized and revised with directive significance, reduce influence of the closing well to yield, solve to ask for the contradiction between formation parameter and oil field production, reduce cost of labor and production test expense, meet the demand of oil field digitalized production management.

Description

A kind of system and method for optimizing and revising oilwell produced fluid amount
【Technical field】
The invention belongs to oil field development field, it is related to a kind of system and method for optimizing and revising oilwell produced fluid amount.
【Background technology】
The plain heterogeneity of oil reservoir is to influence one of key factor of reservoir waterflooding effect.In order to rapidly lift ground The pressure of layer, builds efficient pressure displacement system, except utilizing original resource, and oil field wellblock will carry out water filling in advance, its Important form is based on intensification flooding.For microcrack area in oil field, after the reinforcing of early stage, have it is certain into Really, after oil well has certain achievement, the single rate of oil well has certain lifting.But oil well is accompanied by constantly to open Adopt, its water content is improved, in turn resulted in the oil production rate reduction of oil well well group, in order to ensure the oil content in oil field, lifting is driven The effect of oil, can work in terms of two, on the one hand be water injection well:The change that can be occurred first according to oil well conditions is in good time Ground adjusts water injection intensity, the oil production of oil well is sustainedly and stably lifted.Secondly, it can also be entered using unstable water filling form The exploitation in row oil field.This mode efficiently controls the oil content and water content of oil well for microcrack region.The opposing party Face is oil well:By optimizing and revising the Liquid output of different oil wells, to improve plain heterogeneity degree, the effect of the displacement of reservoir oil is lifted.One As adjustment oilwell produced fluid amount be all regular carry out, it is necessary to which artificial make a list or computer statisticses add up liquid measure, then carries out calculating needs The liquid measure of adjustment, lacks ageing and accuracy.
【The content of the invention】
It is an object of the invention to by optimizing in real time to oilwell produced fluid amount, farthest improve plain heterogeneity degree The development effectiveness of stronger oil reservoir is there is provided a kind of system and method for optimizing and revising oilwell produced fluid amount, and this method is to utilize work(figure Method calculates the expansion application of Liquid output technology, and oilwell produced fluid amount can be optimized in real time, improves plain heterogeneity degree stronger Oil reservoir development effectiveness.To reach above-mentioned purpose, the present invention is achieved using following technical scheme:
A kind of system for optimizing and revising oilwell produced fluid amount, including load transducer, displacement transducer, cable, well head are adopted Computer in storage, well site host RTU, well group antenna, main website center reception antenna, master controller and station;Load transducer On oil pumping machine well head polished rod eye, displacement transducer is arranged on below walking beam on pumping units;Load transducer and displacement sensing Device is connected by cable with well head collector;Load transducer and displacement transducer are passed with well site host RTU by wireless telecommunications Information is passed, and passes through well group antenna and website transmission information;Main website center reception antenna receives the letter transmitted from well site host RTU Number, and master controller is sent to, the signal received is converted into data signal reaches computer in station.
Further improve of the invention is:
Displacement transducer is the angular displacement sensor for gathering sucker rod displacement data.
A kind of method for optimizing and revising oilwell produced fluid amount, comprises the following steps:
1) sucker rod load electric signal is gathered by the load transducer that is installed on well head polished rod eye, obtain load and when Half interval contour;Sucker rod displacement electric signal is gathered by being installed on the displacement transducer below walking beam, displacement and time graph is obtained; Polished rod indicator card is obtained using the changing rule of sucker rod load and displacement and time;
2) turn to solve pump dynagraoph by polished rod indicator card, initially set up sucker rod, oil pipe FEM model and fluid column difference Computation model, then iterative go out the graph of a relation of load and sucker rod load and displacement and time at deep-well pumping hole, obtain pump Work(figure;
3) load and displacement electric signal reach well head collector by cable, and each well data passes through well head collector again Well site host RTU is uploaded to, then by well group antenna, gathered data is reached into main website center reception antenna in the form of ripple and enters line number According to reception;
4) signal received is converted to by data signal by the master controller of data processing unit and reaches meter in station Calculation machine;The system network architecture based on client/server configuration, supplemented by browser/server structure is set up, interior calculate of standing Machine installs indicator card and calculates oilwell produced fluid amount software, Liquid output optimization software in real time, is calculated by the work(diagram data gathered in real time Liquid output, solves the ratio between two mouthfuls of well yields, to well group using the accumulative Liquid output after the effective response for water flood of two mouthfuls of wells of a well group Carry out production liquid optimization.
Step 4) in specific method it is as follows:
The quantum of output of individual well is calculated by Darcy's law:
Q=K (A Δ p/ μ L) (1)
Wherein, A is the sectional area that waterflood front flows through, m2;K is permeability, μm2;Δ p is producing pressure differential, MPa;μ is ground Lower viscosity of crude, mPas;L is injector producer distance, m;
And then draw the propulsion flow velocity of waterflood front:
V=q/A=K (Δ p/ μ L) (2)
For a certain oil field, oil well is shown in that injection water time and responding time are directly proportional:
Wherein, t1、t2The responding time of two mouthfuls of oil wells, d in respectively same well group;t′1、t′2In respectively same well group Two mouthfuls of wells are shown in injection water time, d;;L1、L2Two mouthfuls of distances between well and water injection well in respectively same well group, m;v1、v2Respectively For the propulsion flow velocity of waterflood front, m/d;
(1) formula and (2) formula is brought into (3) to obtain:
Wherein, q1、q2Average product from water injection well direction, m when two mouthfuls of oil wells are shown in water filling in respectively same well group3/ d;h1、h2To be respectively the effective thickness of two mouthfuls of wells in same well group, m;
For a certain oil well, in the case where strata pressure keeps stable, if great change does not occur for reservoirs properties Change or heavily contaminated, before oil well water breakthrough, it is constant, i.e. Q/ that the quantity delivered on its any direction, which accounts for the well yield ratio, Q is constant;
If β1=Q1/q1, β2=Q2/q2, then:
Wherein, Q1、Q2To be respectively the average product of full well when two mouthfuls of oil wells are shown in water filling in same well group, m3/d;
Bring (4) formula into (5), and change:
In formula,--- constant, well spacing coefficient;--- coefficient of heterogeneity between constant, two oil wells;β1、 β2Respectively constant, represents the ratio of two mouthfuls of well quantity delivereds and yield;
According to dynamic analysis, it is known that the responding time of two oil wells is respectively t in same well group1=t01、t2=t02, from water filling Well starts the average product respectively Q for this period that water filling takes effect to oil well01、Q02, i.e. Q1=Q01、Q2=Q02, therefore, it is possible to Coefficient of relationship β value is between obtaining the well of two oil wells:
Wherein,--- constant, well spacing coefficient;
When two oil wells are shown in injection water simultaneously, then:
t′1/t′2=α β (Q2/Q1)=1
Q2/Q1=α β (8)
Wherein, t '1、t′2Two mouthfuls of wells are shown in injection water time, d, and t ' in respectively same well group1=t '2
It is capable of determining that by (8) formula in each well group so that any two oil well is while be shown in yield required during injection water Than.
Compared with prior art, the invention has the advantages that:
The present invention is realized in the case where not increasing any acquisition instrument equipment and is calculated shaft bottom stream in real time using indicator card Pressure, the shut-in pressure survey method broken traditions, using Two production well testing analysis method, realizes the accurate acquisition of downhole parameters, is oil Well working system is optimized and revised with directive significance, reduces pressure measurement work operations amount, is reduced influence of the closing well to yield, is solved to ask The contradiction between formation parameter and oil field production is taken, tester is reduced, reduces cost of labor and production test expense, it is full The foot demand of oil field digitalized production management.
【Brief description of the drawings】
Fig. 1 is the structural representation of present system;
Fig. 2 is pump dynagraoph of the invention.
Wherein:1- load transducers;2- displacement transducers;3- cables;4- well head collectors.
【Embodiment】
The present invention is described in further detail below in conjunction with the accompanying drawings:
The system for optimizing and revising oilwell produced fluid amount referring to Fig. 1, the present invention, including load transducer 1, displacement transducer 2, electricity Calculated in cable 3, well head collector 4, well site host RTU, well group antenna, main website center reception antenna, master controller and station Machine;There are load transducer 1, displacement transducer 2, cable 3, well head collector 4, well site host RTU, well group antenna, load in well site Sensor is arranged on oil pumping machine well head polished rod eye, and displacement transducer is arranged on below walking beam on pumping units, loaded displacement pickup It is connected by cable with well head collector, with well site host RTU by wireless telecommunications transmission information, and passes through well group antenna and station Point transmission information, website has main website center reception antenna, master controller, interior computer of standing, and main website center reception antenna is received The signal transmitted from well site host RTU, and master controller is sent to, the signal received is converted into data signal reaches station Interior computer.
The system that the present invention optimizes and revises oilwell produced fluid amount, comprises the following steps:
1) it is right by the displacement transducer (see Fig. 1) below the load transducer and walking beam on well head polished rod eye Pumping rod of well pumping unit load and displacement are measured, collection load and time, displacement and time graph.Utilize the sucker rod The changing rule of load and displacement and time obtain polished rod indicator card.
2) turn to solve pump dynagraoph by polished rod indicator card, initially set up sucker rod, oil pipe FEM model and fluid column difference Computation model, then iterative go out the graph of a relation of load and sucker rod load and displacement and time at deep-well pumping hole, that is, obtain Pump dynagraoph.
3) load and displacement electric signal reach well head collector by cable, and each well data passes through well head collector again Well site host RTU is uploaded to, then by well group antenna, gathered data is reached into main website center reception antenna in the form of ripple and enters line number According to reception.
4) signal received is converted to by data signal by the master controller of data processing unit and reaches meter in station Calculation machine.Set up based on client/server configuration, system network architecture is devised supplemented by browser/server structure, stand interior Computer installs indicator card and calculates oilwell produced fluid amount software, Liquid output optimization software in real time, passes through the work(diagram data gathered in real time Liquid output is calculated, the ratio between two mouthfuls of well yields are solved using the accumulative Liquid output after the effective response for water flood of two mouthfuls of wells of a well group, it is right Well group carries out production liquid optimization, well group development effectiveness is obtained positive effect.
Liquid output optimizes specific method:
The quantum of output of individual well is calculated by Darcy's law
Q=K (A Δ p/ μ L) (1)
And then draw the fltting speed of waterflood front:
V=q/A=K (Δ p/ μ L) (2)
For a certain oil field, oil well is shown in that injection water time and responding time are directly proportional,
(1) formula and (2) formula is brought into (3) to obtain
For a certain oil well, in the case where strata pressure keeps stable, if great change does not occur for reservoirs properties Change or heavily contaminated, before oil well water breakthrough, it is constant, i.e. Q/ that the quantity delivered on its any direction, which accounts for the well yield ratio, Q is constant.
If β1=Q1/q1, β2=Q2/q2, then
Bring (4) formula into (5), and change
In formula--- constant, well spacing coefficient
--- coefficient of heterogeneity between constant, two oil wells.
According to dynamic analysis, it is known that the responding time of two oil wells is respectively t in same well group1=t01、t2=t02, from water filling Well starts the average product respectively Q for this period that water filling takes effect to oil well01、Q02, i.e. Q1=Q01、Q2=Q02, therefore can be with Coefficient of relationship β value is between obtaining the well of two oil wells
When two oil wells are shown in injection water simultaneously, t '1=t '2, then
t′1/t′2=α β (Q2/Q1)=1
Q2/Q1=α β (8)
It can be determined in each well group by (8) formula so that any two oil well is while be shown in yield required during injection water Than.
The sectional area that A --- waterflood front flows through, m2
h1、h2--- it is respectively the effective thickness of two mouthfuls of wells in same well group, m
K --- permeability, μm2
L --- injector producer distance, m
L1、L2--- it is respectively two mouthfuls of distances between well and water injection well, m in same well group
q1、q2--- the average product from water injection well direction, m when respectively two mouthfuls of oil wells are shown in water filling in same well group3/d
Q1、Q2--- respectively two mouthfuls of oil wells are shown in the average product of full well during water filling, m in same well group3/d
t1、t2--- it is respectively the responding time of two mouthfuls of oil wells in same well group, d
t′1、t′2--- respectively two mouthfuls of wells are shown in injection water time, d in same well group
V --- flow velocity, m/d
Δ p_ producing pressure differentials, MPa
Optimum results, by adjusting oilwell produced fluid amount, realize and the dynamic of oil well are managed.
Embodiment:
As having x1 wells and x2 wells in certain well group, the distance of two mouthfuls of wells to water injection wells is respectively 441m and 256m, and the well group begins On January 1st, 2009 metaideophone, two mouthfuls of wells see flood effectiveness respectively on April 1st, 2009 and on 2 15th, 2009, two mouthfuls of wells Responding time is respectively 90d and 45d, and the production liquid of oil well can be obtained in real time by calculating oilwell produced fluid amount software in real time by indicator card Amount, the average product (refer to and start the average daily production that water filling starts to take effect this period to producing well) before taking effect, respectively 12.3m3/ d and 15.9m3/ d, calculating process is as follows:
Q2/Q1=α β=1.722 × 0.898=1.547
Therefore, the ratio between Liquid output of x1 wells and x2 wells, which should be 1.547 times, i.e. x1 wells Liquid output, should be adjusted to 17.13m3/ d, X2 wells Liquid output should be adjusted to 11.07m3/d.By parameter adjustment, the adjustment of Liquid output is realized, while real-time using indicator card Oilwell produced fluid amount software is calculated to the continuous amendment of result of calculation.
The technological thought of above content only to illustrate the invention, it is impossible to which protection scope of the present invention is limited with this, it is every to press According to technological thought proposed by the present invention, any change done on the basis of technical scheme each falls within claims of the present invention Protection domain within.

Claims (4)

1. a kind of system for optimizing and revising oilwell produced fluid amount, it is characterised in that including load transducer (1), displacement transducer (2), cable (3), well head collector (4), well site host RTU, well group antenna, main website center reception antenna, master controller with And computer in station;Load transducer (1) is arranged on oil pumping machine well head polished rod eye, and displacement transducer (2) is arranged on oil pumper Below walking beam;Load transducer (1) and displacement transducer (2) are connected by cable with well head collector (4);Load transducer (1) believe with displacement transducer (2) with well site host RTU by wireless telecommunications transmission information, and by well group antenna and website transmission Breath;Main website center reception antenna receives the signal transmitted from well site host RTU, and is sent to master controller, by what is received Signal is converted to data signal and reaches computer in station.
2. the system according to claim 1 for optimizing and revising oilwell produced fluid amount, it is characterised in that displacement transducer (3) is Angular displacement sensor for gathering sucker rod displacement data.
3. a kind of method for optimizing and revising oilwell produced fluid amount, it is characterised in that comprise the following steps:
1) sucker rod load electric signal is gathered by the load transducer being installed on well head polished rod eye, obtains load bent with the time Line;Sucker rod displacement electric signal is gathered by being installed on the displacement transducer below walking beam, displacement and time graph is obtained;Utilize The changing rule of sucker rod load and displacement and time obtain polished rod indicator card;
2) turn to solve pump dynagraoph by polished rod indicator card, initially set up sucker rod, oil pipe FEM model and fluid column Difference Calculation Model, then iterative go out the graph of a relation of load and sucker rod load and displacement and time at deep-well pumping hole, obtain pump dynagraoph;
3) load and displacement electric signal reach well head collector by cable (3), and each well data passes through well head collector again Well site host RTU is uploaded to, then by well group antenna, gathered data is reached into main website center reception antenna in the form of ripple and enters line number According to reception;
4) signal received is converted to by data signal by the master controller of data processing unit and reaches computer in station; The system network architecture based on client/server configuration, supplemented by browser/server structure is set up, interior computer peace of standing Dress indicator card calculates oilwell produced fluid amount software, Liquid output optimization software in real time, and production liquid is calculated by the work(diagram data gathered in real time Amount, the ratio between two mouthfuls of well yields are solved using the accumulative Liquid output after the effective response for water flood of two mouthfuls of wells of a well group, and well group is carried out Produce liquid optimization.
4. the method according to claim 3 for optimizing and revising oilwell produced fluid amount, it is characterised in that step 4) in specific side Method is as follows:
The quantum of output of individual well is calculated by Darcy's law:
Q=K (A Δ p/ μ L) (1)
Wherein, A is the sectional area that waterflood front flows through, m2;K is permeability, μm2;Δ p is producing pressure differential, MPa;μ is that underground is former Oil viscosity, mPas;L is injector producer distance, m;
And then draw the propulsion flow velocity of waterflood front:
V=q/A=K (Δ p/ μ L) (2)
For a certain oil field, oil well is shown in that injection water time and responding time are directly proportional:
<mrow> <mfrac> <msub> <mi>t</mi> <mn>1</mn> </msub> <msub> <mi>t</mi> <mn>2</mn> </msub> </mfrac> <mo>=</mo> <mfrac> <msubsup> <mi>t</mi> <mn>1</mn> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>t</mi> <mn>2</mn> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>=</mo> <mfrac> <mrow> <msub> <mi>L</mi> <mn>1</mn> </msub> <mo>/</mo> <msub> <mi>v</mi> <mn>1</mn> </msub> </mrow> <mrow> <msub> <mi>L</mi> <mn>2</mn> </msub> <mo>/</mo> <msub> <mi>v</mi> <mn>2</mn> </msub> </mrow> </mfrac> <mo>=</mo> <mfrac> <msub> <mi>L</mi> <mn>1</mn> </msub> <msub> <mi>L</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>v</mi> <mn>2</mn> </msub> <msub> <mi>v</mi> <mn>1</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
Wherein, t1、t2The responding time of two mouthfuls of oil wells, d in respectively same well group;t1′、t2' it is respectively two mouthfuls in same well group Well is shown in injection water time, d;;L1、L2Two mouthfuls of distances between well and water injection well in respectively same well group, m;v1、v2Respectively water Drive the propulsion flow velocity of leading edge, m/d;
(1) formula and (2) formula is brought into (3) to obtain:
<mrow> <mfrac> <msub> <mi>q</mi> <mn>1</mn> </msub> <msub> <mi>q</mi> <mn>2</mn> </msub> </mfrac> <mo>=</mo> <mfrac> <msub> <mi>L</mi> <mn>1</mn> </msub> <msub> <mi>L</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>h</mi> <mn>1</mn> </msub> <msub> <mi>h</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>t</mi> <mn>2</mn> </msub> <msub> <mi>t</mi> <mn>1</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>4</mn> <mo>)</mo> </mrow> </mrow>
Wherein, q1、q2Average product from water injection well direction, m when two mouthfuls of oil wells are shown in water filling in respectively same well group3/d;h1、 h2To be respectively the effective thickness of two mouthfuls of wells in same well group, m;
For a certain oil well, in the case where strata pressure keeps stable, if reservoirs properties do not occur great change or Heavily contaminated, before oil well water breakthrough, it is constant that the quantity delivered on its any direction, which accounts for the well yield ratio, i.e., Q/q is Constant;
If β1=Q1/q1, β2=Q2/q2, then:
<mrow> <mfrac> <msub> <mi>&amp;beta;</mi> <mn>1</mn> </msub> <msub> <mi>&amp;beta;</mi> <mn>2</mn> </msub> </mfrac> <mo>=</mo> <mfrac> <msub> <mi>Q</mi> <mn>1</mn> </msub> <msub> <mi>Q</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>q</mi> <mn>2</mn> </msub> <msub> <mi>q</mi> <mn>1</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> </mrow>
Wherein, Q1、Q2To be respectively the average product of full well when two mouthfuls of oil wells are shown in water filling in same well group, m3/d;
Bring (4) formula into (5), and change:
<mrow> <mfrac> <msub> <mi>t</mi> <mn>1</mn> </msub> <msub> <mi>t</mi> <mn>2</mn> </msub> </mfrac> <mo>=</mo> <mfrac> <msub> <mi>L</mi> <mn>1</mn> </msub> <msub> <mi>L</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>&amp;beta;</mi> <mn>1</mn> </msub> <msub> <mi>&amp;beta;</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>h</mi> <mn>1</mn> </msub> <msub> <mi>h</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>Q</mi> <mn>2</mn> </msub> <msub> <mi>Q</mi> <mn>1</mn> </msub> </mfrac> <mo>=</mo> <mi>&amp;alpha;</mi> <mi>&amp;beta;</mi> <mfrac> <msub> <mi>Q</mi> <mn>2</mn> </msub> <msub> <mi>Q</mi> <mn>1</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
In formula,--- constant, well spacing coefficient;--- coefficient of heterogeneity between constant, two oil wells;β1、β2Respectively For constant, the ratio of two mouthfuls of well quantity delivereds and yield is represented;
According to dynamic analysis, it is known that the responding time of two oil wells is respectively t in same well group1=t01、t2=t02, opened from water injection well The average product for this period that beginning water filling takes effect to oil well respectively Q01、Q02, i.e. Q1=Q01、Q2=Q02, therefore, it is possible to obtain Coefficient of relationship β value is between the well of two oil wells:
<mrow> <mi>&amp;beta;</mi> <mo>=</mo> <mfrac> <mn>1</mn> <mi>&amp;alpha;</mi> </mfrac> <mfrac> <msub> <mi>t</mi> <mn>1</mn> </msub> <msub> <mi>t</mi> <mn>2</mn> </msub> </mfrac> <mfrac> <msub> <mi>Q</mi> <mn>1</mn> </msub> <msub> <mi>Q</mi> <mn>2</mn> </msub> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <mi>&amp;alpha;</mi> </mfrac> <mfrac> <msub> <mi>t</mi> <mn>01</mn> </msub> <msub> <mi>t</mi> <mn>02</mn> </msub> </mfrac> <mfrac> <msub> <mi>Q</mi> <mn>01</mn> </msub> <msub> <mi>Q</mi> <mn>02</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>7</mn> <mo>)</mo> </mrow> </mrow>
Wherein,--- constant, well spacing coefficient;
When two oil wells are shown in injection water simultaneously, then:
t′1/t′2=α β (Q2/Q1)=1
Q2/Q1=α β (8)
Wherein, t '1、t′2Two mouthfuls of wells are shown in injection water time, d, and t ' in respectively same well group1=t '2
It is capable of determining that by (8) formula in each well group so that any two oil well is while be shown in yield ratio required during injection water.
CN201710508659.1A 2017-06-28 2017-06-28 A kind of system and method for optimizing and revising oilwell produced fluid amount Pending CN107269265A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710508659.1A CN107269265A (en) 2017-06-28 2017-06-28 A kind of system and method for optimizing and revising oilwell produced fluid amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710508659.1A CN107269265A (en) 2017-06-28 2017-06-28 A kind of system and method for optimizing and revising oilwell produced fluid amount

Publications (1)

Publication Number Publication Date
CN107269265A true CN107269265A (en) 2017-10-20

Family

ID=60071040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710508659.1A Pending CN107269265A (en) 2017-06-28 2017-06-28 A kind of system and method for optimizing and revising oilwell produced fluid amount

Country Status (1)

Country Link
CN (1) CN107269265A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107575208A (en) * 2017-10-27 2018-01-12 中国石油化工股份有限公司 A kind of method that heavy crude well yield is calculated based on surface dynamometer card
CN111005712A (en) * 2019-11-18 2020-04-14 中国石油天然气股份有限公司 Automatic identification method for offset wear of directional well rod pipe
CN113700460A (en) * 2021-09-30 2021-11-26 西安健尚智能科技有限公司 Method for reducing invalid water circulation of oil well and adjusting injection allocation amount of water injection well
US11525345B2 (en) 2020-07-14 2022-12-13 Saudi Arabian Oil Company Method and system for modeling hydrocarbon recovery workflow

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285463A (en) * 2008-05-30 2008-10-15 华中科技大学 Sucker-rod pump oil pumping machine oil pumping control method and its system
CN101509372A (en) * 2009-03-24 2009-08-19 北京雅丹石油技术开发有限公司 Jack well power display instrument
CN103899300A (en) * 2014-03-25 2014-07-02 中国石油天然气股份有限公司 Double-flow well test analysis method and double-flow well test analysis system on basis of indicator diagrams
CN206957695U (en) * 2017-06-28 2018-02-02 中国石油天然气股份有限公司 A kind of system for optimizing and revising oilwell produced fluid amount

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285463A (en) * 2008-05-30 2008-10-15 华中科技大学 Sucker-rod pump oil pumping machine oil pumping control method and its system
CN101509372A (en) * 2009-03-24 2009-08-19 北京雅丹石油技术开发有限公司 Jack well power display instrument
CN103899300A (en) * 2014-03-25 2014-07-02 中国石油天然气股份有限公司 Double-flow well test analysis method and double-flow well test analysis system on basis of indicator diagrams
CN206957695U (en) * 2017-06-28 2018-02-02 中国石油天然气股份有限公司 A kind of system for optimizing and revising oilwell produced fluid amount

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴书成等: "通过注水受效分析优化油井产液量", 《新疆石油地质》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107575208A (en) * 2017-10-27 2018-01-12 中国石油化工股份有限公司 A kind of method that heavy crude well yield is calculated based on surface dynamometer card
CN107575208B (en) * 2017-10-27 2020-12-29 中国石油化工股份有限公司 Method for calculating yield of heavy oil well based on ground indicator diagram
CN111005712A (en) * 2019-11-18 2020-04-14 中国石油天然气股份有限公司 Automatic identification method for offset wear of directional well rod pipe
US11525345B2 (en) 2020-07-14 2022-12-13 Saudi Arabian Oil Company Method and system for modeling hydrocarbon recovery workflow
CN113700460A (en) * 2021-09-30 2021-11-26 西安健尚智能科技有限公司 Method for reducing invalid water circulation of oil well and adjusting injection allocation amount of water injection well

Similar Documents

Publication Publication Date Title
CN103899300A (en) Double-flow well test analysis method and double-flow well test analysis system on basis of indicator diagrams
CN107269265A (en) A kind of system and method for optimizing and revising oilwell produced fluid amount
CN108868748A (en) A kind of calculation method of shale gas horizontal well refracturing crack cracking pressure
CN107045671A (en) Water-producing gas well hydrops Risk Forecast Method
WO2015143626A1 (en) Two-flow well test analysis method and system on basis of indicator diagram
CN105781504B (en) A kind of segmentation reservoir pressure test method
CN107503739B (en) A kind of pressure monitoring method differentiating inflow direction for horizontal well
CN111810101B (en) Dynamic analysis method and device for water-drive reservoir
CN103823424A (en) Method for adjusting stroke times of beam pumper in automation oil extraction system
CN105178943A (en) Method for correcting well shaft pressure in real time
CN105089566A (en) Gas well system production allocation method
CN103510940B (en) Mechanical oil well operating mode integrated diagnosing and analyzing method and device
CN107609258A (en) A kind of shale refracturing turns to the computational methods of fracture initiation pressure
CN107608940A (en) A kind of oil well interval pumping cycle determination method
CN106777628A (en) Consider the oil reservoir injectivity and productivity plate method for drafting of non-Darcy flow
CN108301825A (en) A kind of high temperature and pressure reservoir pore pressure analysis method
CN105893679A (en) Afterflow correction well test interpretation method of low-production horizontal well
CN111963151B (en) Method for determining formation pressure through suspension point static load of oil pumping unit
CN105464644A (en) Wellhead pressure monitoring method and control system
CN107437127A (en) A kind of oil well stop-spraying Formation pressure prediction method
CN104915530A (en) Method for establishing communication relationship between oil deposit wells
CN206957695U (en) A kind of system for optimizing and revising oilwell produced fluid amount
CN109882141A (en) Polymer flooding production optimization method and system based on inter well connectivity
CN109441415A (en) The Well Test Data Analysis Method of Polymer Flooding Reservoirs testing well based on disturbance from offset wells
CN109958431A (en) A method of oil well daily fluid production rate is calculated based on inflow performance relationship curve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020