CN107503739B - A kind of pressure monitoring method differentiating inflow direction for horizontal well - Google Patents

A kind of pressure monitoring method differentiating inflow direction for horizontal well Download PDF

Info

Publication number
CN107503739B
CN107503739B CN201710720470.9A CN201710720470A CN107503739B CN 107503739 B CN107503739 B CN 107503739B CN 201710720470 A CN201710720470 A CN 201710720470A CN 107503739 B CN107503739 B CN 107503739B
Authority
CN
China
Prior art keywords
well
horizontal well
water injection
pressure
bottom pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710720470.9A
Other languages
Chinese (zh)
Other versions
CN107503739A (en
Inventor
程时清
李猛
于海洋
王战国
邹雪峰
汪洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201710720470.9A priority Critical patent/CN107503739B/en
Publication of CN107503739A publication Critical patent/CN107503739A/en
Application granted granted Critical
Publication of CN107503739B publication Critical patent/CN107503739B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention provides a kind of pressure monitoring methods that inflow direction is differentiated for horizontal well, comprising the following steps: level monitoring well bottom pressure delta data;Consider the variation of surrounding water injection well working system, designs the interference test between water injection well and horizontal well;Establish the Horizontal Well bottom pressure Plate Analysis under water injection well interference;Analysis is fitted to the bottom pressure data measured, the reservoir parameter under different injection well change water injection rate is obtained, the parameter being fitted under different injection well working system is compared by analysis, determines interwell communication situation, differentiates inflow direction.Of the invention is simple and easy to understand easily operated, due to considering the variation of water injection well water injection rate, therefore it can accurately differentiate horizontal well inflow direction, while carry out horizontal well monitoring pressure interpretation using this method and more tallying with the actual situation, improve the precision of pressure monitoring explanation.

Description

A kind of pressure monitoring method differentiating inflow direction for horizontal well
Technical field
The present invention relates to oil-gas mining field more particularly to the horizontal well production fields of LOW PERMEABILITY RESERVOIR.
Background technique
Straight well fills the water, the joint injection-production method of horizontal well production becomes a kind of universal phenomenon in the exploitation of LOW PERMEABILITY RESERVOIR, Horizontal well production is successively decreased quickly under normal circumstances, once water breakthrough, moisture content is risen rapidly.Pass through Horizontal Well ground potential method, water Horizontal well well test analysis method etc. can effectively determine the water yield of horizontal well.
In a flooding unit, a bite horizontal well corresponds to more mouthfuls of water injection wells, although the water yield of horizontal well can be determined, But existing pressure analysis method cannot accurately differentiate these water from which mouthful water injection well.
Such as application No. is the Chinese patent of CN201621039603.3, provide a kind of determined level well water exit position with The process pipe string of inflow direction, including oil pipe and casing, oil pipe end are equipped with guiding plug wire, each interval are corresponded on oil pipe in the past Horizontal packer, centralizer and pressure gauge are successively arranged after, wherein set between the centralizer and pressure gauge of the last one interval There is intelligent switch device, the cable connected with each interval pressure meter is equipped in oil pipe, the host computer connection on the cable and ground passes Defeated each interval pressure counts.The patent is sealed each interval card according to oil well number of segment, using packer, each card envelope section tripping in pressure Meter, underground segmentation acquisition in real time, judges well water position;By changing surrounding water injection well working system, each interval pressure is tested Power situation of change identifies inflow direction.But above-mentioned patent only provides process pipe string, does not provide and differentiates the specific of inflow direction Method, and conventional method is used, the existing interference effect that water injection well is not accounted for about the model and method of horizontal well, for The feature fitting effect for producing the decline of later period observed pressure derivative curve is bad.
Summary of the invention
In order to overcome the problems of the prior art, the present invention by being filled the water in straight well, in the flooding pattern of horizontal well production, The interference test of design level well and surrounding water injection well establishes a kind of novel pressure that inflow direction is differentiated for horizontal well Monitoring method can determine interwell communication situation, differentiate inflow direction, adjusts water injection well working system for LOW PERMEABILITY RESERVOIR, mentions High oil well output, has great importance.
The present invention solves technical solution used by aforementioned technical problem: a kind of to differentiate inflow direction for horizontal well Pressure monitoring method, comprising the following steps:
1. level monitoring well bottom pressure delta data;
2. considering the variation of surrounding water injection well working system, the interference test between water injection well and horizontal well is designed;
3. establishing the Horizontal Well bottom pressure Plate Analysis under water injection well interference;
4. being fitted analysis to the bottom pressure data measured, obtains the reservoir that different injection well changes under water injection rate and join Number compares the parameter being fitted under different injection well working system by analysis, determines interwell communication situation, differentiates water side To.
Preferably, step 1. in, Horizontal Well bottom pressure delta data is measured by pressure gauge, pressure gauge tripping in position It is set to horizontal well deflecting position.
Any of the above-described scheme is preferably, step 2. in, the variation of the water injection well working system specifically includes change water The injection rate of water injection well around horizontal well.
Any of the above-described scheme is preferably, and the injection rate for changing water injection well around horizontal well includes making horizontal well with certain One yield production changes the injection rate of certain a bite water injection well around it, keeps the injection rate of other water injection wells constant, measures level The bottom pressure of well;Successively change the injection rate of other water injection wells around the horizontal well, while keeping the injection of other water injection wells It measures constant, measures bottom pressure of the horizontal well under water injection well different operating system.The variation of injection rate is theoretically arbitrary, Range is unlimited, and how much be after all situations of change suitable for actual production are initially how many and variation can be according to practical feelings Depending on condition.
Any of the above-described scheme is preferably, step 3. in, further comprise according to well logging and complete well geologic information, be arranged mould The initial parameter of type calculates bottom pressure with the changing value of production time, draws typical plate according to initial parameter.
Any of the above-described scheme is preferably, the initial parameter by being directly acquired in geologic information, including pay thickness, Porosity, formation fluid viscosity, system compressibility, volume factor, well radius, horizontal well production, original formation pressure.Initially The given of parameter can be provided according to oil reservoir real data, can also first use conventional horizontal well models fitting, using its result as just Beginning parameter.
Any of the above-described scheme is preferably, and bottom pressure is dropped with changing value, that is, Horizontal Well bottom pressure of production time, packet Bottom pressure caused by when including horizontal well production drops and as the pressure recovery caused by Horizontal Well bottom of water injection well water filling around.
Any of the above-described scheme is preferably, and using principle of stacking founding mathematical models, the bottom pressure is with the production time Changing value meet following relationship,
Wherein,
Δ p --- bottom pressure is poor, atm;
pi--- original formation pressure, atm;
pwf--- bottom pressure, atm;
Kh--- horizontal permeability, D;
Kv--- vertical permeability, D;
φ --- porosity, decimal;
μ --- formation fluid viscosity, cP;
Ct--- system compressibility, atm-1
η --- piezometric conductivity, Datm/cP;
B --- volume factor, zero dimension;
L --- horizontal well half is long, cm;
H --- core intersection, cm;
(xw,yw,zw) --- horizontal well heel end coordinate position;
qj--- the injection rate of j-th of water injection well, cm3/s;
(xj,yj,zj) --- the shaft bottom coordinate position of j-th of water injection well;
T --- time, s;
τ --- time variable, s.
Any of the above-described scheme is preferably, and the derivation process of the relational expression is
(1) pressure solution when horizontal well individually produces is sought
It introduces
Then horizontal well three dimensional fluid flow partial differential equation can turn to following canonical form:
Primary condition:
p(x,y,z,t)|T=0=pi
Boundary condition:
The instantaneous point source expression formula of above-mentioned model is obtained using Newman product method:
(2) pressure solution when water injection well water filling around is sought
The basis partial differential equation of every mouth water injection well are as follows:
M mouthfuls of water injection well strata pressures are acquired using instantaneous source solution and principle of stacking are as follows:
(3) Bottom Hole Pressure Solution of the horizontal well under water injection well interference is sought
Using principle of stacking, the bottom pressure of the horizontal well under water injection well interference is acquired are as follows:
In above-mentioned derivation process, instantaneous source solution specifically:
Instantaneous point source pressure formula:
Infinity plane line source pressure solution:
Infinity plane band source pressure solution:
Line source pressure solution in strip-form stratum:
Newman product method:
This method is used primarily for solving three-dimensional heat conduction problem, since heat conduction problem mathematically has with Seepage problems Certain general character, Newman product method can also be applied to the instantaneous source function of multidimensional Seepage problems, i.e. a multidimensional oil reservoir can be seen Two to three one-dimensional " oil reservoir " intersections or one-dimensional and two-dimentional oil reservoir intersection are done, multidimensional source function is multiple one-dimensional source letters Several products.After intersection, several one-dimensional shared flow regions constitute a multidimensional flow region;Several one-dimensional shared sources Remittance distributed area constitutes the distributed area Yuan Hui of a multidimensional;Boundary condition is then provided by the appropriately combined of one-dimensional boundary condition.
Any of the above-described scheme is preferably, 4. the step further comprises comparing and judging to survey bottom pressure at any time Between variation it is whether equal with computational theory value, if actual measurement bottom pressure difference changes with time relationship and computational theory value phase Deng then using initial parameter as the practical fitting parameter of horizontal well;If differing, fitting parameter is corrected, until the two is at one Within acceptable error range, horizontal well actual reservoir parameter is obtained, and then determine interwell communication situation, differentiate water side To.It is larger to be fitted obtained permeability, flow coefficient and piezometric conductivity, illustrates the infiltration that interwell communication situation is preferable, is fitted The parameters such as saturating rate, flow coefficient and piezometric conductivity are smaller, illustrate that interwell communication situation is poor.The size of parameter value can reflect Interwell communication situation;Inflow direction is differentiated by comparing the parameter size being fitted under different injection well working system.Example Such as when changing the water injection rate of certain mouthful of well, by being fitted the parameters such as obtained permeability, flow coefficient and piezometric conductivity than changing The result being fitted when the water injection rate of other wells is big, then the production water of the horizontal well can be differentiated mainly from the water injection well.
Any of the above-described scheme is preferably, step 4. in, the described pair of bottom pressure data measured are fitted analysis bag It includes the Horizontal Well bottom pressure Plate Analysis 3. obtained using step and manual Fitting Analysis is carried out to the bottom pressure data measured Or automatic Fitting analysis is carried out using computer programming.
Any of the above-described scheme is preferably, and the obtained parameter that is fitted includes reservoir permeability, piezometric conductivity, flowing system Number, water yield, skin factor, well hole storage coefficient.
Of the invention is simple and easy to understand, easily operated, improves production efficiency.Due to considering water injection well water injection rate Therefore variation can accurately differentiate horizontal well inflow direction using this method, while carrying out horizontal well monitoring using this method Pressure interpretation more tallies with the actual situation, and improves the precision of pressure monitoring explanation, is that LOW PERMEABILITY RESERVOIR horizontal well and its surrounding are infused The adjustment of well working system provides theoretical foundation.It is embodied in:
(1) a kind of pressure monitoring method that inflow direction is differentiated for horizontal well is proposed;
(2) variation for considering water injection well working system around, more meets reality;
(3) the problem of explaining production later period observed pressure derivative curve decline;It is existing about horizontal well at any time Pressure change model and method do not account for the interference effect of water injection well, for production later period observed pressure derivative curve decline Feature fitting effect is bad;And this method considers water injection well interference, the new method of proposition can carry out fine with measured data Fitting, therefore can explain that production later period observed pressure derivative curve decline is interference effect due to water injection well.
(4) in the case where considering water injection well interference, existing technology cannot achieve horizontal well pressure and dynamically be fitted, this The method of invention can be fitted horizontal well pressure dynamic, and theoretical curve and measured data approximation is enable to coincide together.
Detailed description of the invention
Fig. 1 is an a kind of preferred embodiment of pressure monitoring method that inflow direction is differentiated for horizontal well of the invention Flow chart.
Fig. 2 is an a kind of preferred embodiment of pressure monitoring method that inflow direction is differentiated for horizontal well of the invention Pressure gauge tripping in position view.
Fig. 3 is an a kind of preferred embodiment of pressure monitoring method that inflow direction is differentiated for horizontal well of the invention Horizontal Well bottom pressure Plate Analysis under water injection well interference.
Fig. 4 is an a kind of preferred embodiment of pressure monitoring method that inflow direction is differentiated for horizontal well of the invention Horizontal well test model (individual well) and measured data are fitted schematic diagram.
Fig. 5 is that the theoretical curve of embodiment illustrated in fig. 4 of the present invention calculated using the method for the present invention and measured data are fitted Schematic diagram.
Specific embodiment
In order to be further understood that summary of the invention of the invention, the present invention is made below in conjunction with specific embodiment more detailed Thin description, embodiment only has exemplary effect to the present invention, without the effect of any restrictions;Any this field skill The insubstantial modifications that art personnel make on the basis of the present invention, all should belong to the scope of protection of the invention.
Embodiment 1
As shown in Figure 1, straight well water filling, horizontal well production flooding pattern in (such as Five-point method pattern, 7 method wells Net), the present embodiment implements a kind of pressure monitoring method that inflow direction is differentiated for horizontal well, packet by taking Five-point method pattern as an example Include following steps:
1. level monitoring well bottom pressure delta data;
2. considering the variation of surrounding water injection well working system, the interference test between water injection well and horizontal well is designed;
3. establishing the Horizontal Well bottom pressure Plate Analysis under water injection well interference;
4. being fitted analysis to the bottom pressure data measured, obtains the reservoir that different injection well changes under water injection rate and join Number compares the parameter being fitted under different injection well working system by analysis, determines interwell communication situation, differentiates water side To.
As shown in Fig. 2, in the present embodiment, step 1. in, Horizontal Well bottom pressure delta data is measured by pressure gauge, institute Stating pressure gauge tripping in position is horizontal well deflecting position.
In the present embodiment, step 2. in, the variation of the water injection well working system specifically include change horizontal well around The injection rate of water injection well.
In the present embodiment, the injection rate for changing water injection well around horizontal well includes keeping horizontal well raw with a certain yield It produces, water injection well number A, B, C, D respectively, changes the injection rate of A water injection well around it, keep other B, C, D in Five-point method pattern The injection rate of three mouthfuls of water injection wells is constant, measures the bottom pressure of horizontal well;Then successively change the injection rate of water injection well B, C, D, It keeps the injection rate of other three mouthfuls of water injection wells constant simultaneously, measures shaft bottom pressure of the horizontal well under water injection well different operating system Power.
In the present embodiment, step 3. in, further comprise according to well logging and complete well geologic information, the initial of model is set Parameter calculates bottom pressure with the changing value of production time, draws typical plate according to initial parameter, as shown in figure 3, this Plate in embodiment is, according to oil field actual conditions, to give some underlying parameter values first in Five-point method pattern, initial to join Several giving can be provided according to oil reservoir real data, can also first use conventional horizontal well models fitting, using its result as initial Then parameter changes four mouthfuls of water injection well water injection rates, public with the variation of production time using following bottom pressures in the present embodiment Formula calculates theoretical bottom pressure and pressure derivative under 6 kinds of different injection amounts, is plotted in log-log coordinate system.
In the present embodiment, the initial parameter includes pay thickness, porosity, formation fluid viscosity, comprehensive compression system Number, volume factor, well radius, horizontal well production, original formation pressure.
In the present embodiment, bottom pressure is dropped with changing value, that is, Horizontal Well bottom pressure of production time, including horizontal well Bottom pressure caused by when production drops and as the pressure recovery caused by Horizontal Well bottom of water injection well water filling around.
In the present embodiment, using principle of stacking founding mathematical models, the bottom pressure with the production time changing value Meet following relationship,
Wherein,
Δ p --- bottom pressure is poor, atm;
pi--- original formation pressure, atm;
pwf--- bottom pressure, atm;
Kh--- horizontal permeability, D;
Kv--- vertical permeability, D;
φ --- porosity, decimal;
μ --- formation fluid viscosity, cP;
Ct--- system compressibility, atm-1
η --- piezometric conductivity, Datm/cP;
B --- volume factor, zero dimension;
L --- horizontal well half is long, cm;
H --- core intersection, cm;
(xw,yw,zw) --- horizontal well heel end coordinate position;
qj--- the injection rate of j-th of water injection well, cm3/s;
(xj,yj,zj) --- the shaft bottom coordinate position of j-th of water injection well;
T --- time, s;
τ --- time variable, s.
In the present embodiment, the derivation process of the relational expression is
(1) pressure solution when horizontal well individually produces is sought
It introduces
Then horizontal well three dimensional fluid flow partial differential equation can turn to following canonical form:
Primary condition:
p(x,y,z,t)|T=0=pi
Boundary condition:
The instantaneous point source expression formula of above-mentioned model is obtained using Newman product method:
(2) pressure solution when water injection well water filling around is sought
The basis partial differential equation of every mouth water injection well are as follows:
M mouthfuls of water injection well strata pressures are acquired using instantaneous source solution and principle of stacking are as follows:
(3) Bottom Hole Pressure Solution of the horizontal well under water injection well interference is sought
Using principle of stacking, the bottom pressure of the horizontal well under water injection well interference is acquired are as follows:
In the present embodiment, 4. the step further comprises comparing and judging that surveying bottom pressure changes with time Whether equal with computational theory value, if actual measurement bottom pressure difference changes with time, relationship is equal with computational theory value, will be first Practical fitting parameter of the beginning parameter as horizontal well;If differing, fitting parameter is corrected, until the two is in an acceptable mistake Within the scope of difference, horizontal well actual reservoir parameter is obtained, and then determine interwell communication situation, differentiate inflow direction.Fitting obtains Permeability, flow coefficient and piezometric conductivity it is larger, illustrate that interwell communication situation is preferable, the permeability that is fitted, flowing system The parameters such as several and piezometric conductivity are smaller, illustrate that interwell communication situation is poor.The size of parameter value can reflect interwell communication feelings Condition;Inflow direction is differentiated by comparing the parameter size being fitted under different injection well working system.Such as when change certain When the water injection rate of mouth well, by being fitted note of the parameters such as obtained permeability, flow coefficient and piezometric conductivity than changing other wells The result being fitted when water is big, then the production water of the horizontal well can be differentiated mainly from the water injection well.
In the present embodiment, step 4. in, the described pair of bottom pressure data measured be fitted analysis including the use of step Suddenly the Horizontal Well bottom pressure Plate Analysis 3. obtained carries out manual Fitting Analysis or use to the bottom pressure data measured Computer programming carries out automatic Fitting analysis.
In the present embodiment, the obtained parameter that is fitted includes reservoir permeability, piezometric conductivity, flow coefficient, water outlet Amount, skin factor, well hole storage coefficient.
In the present embodiment, when changing the water injection rate of well A, by being fitted the parameters ratios such as obtained permeability, piezometric conductivity The result being fitted when changing the water injection rate of other wells is big, then the production water of the horizontal well can be differentiated mainly from water injection well A.
Of the invention is simple and easy to understand, easily operated, improves production efficiency.Due to considering water injection well water injection rate Therefore variation can accurately differentiate horizontal well inflow direction using this method, while carrying out horizontal well monitoring using this method Pressure interpretation more tallies with the actual situation, and improves the precision of pressure monitoring explanation, is that LOW PERMEABILITY RESERVOIR horizontal well and its surrounding are infused The adjustment of well working system provides theoretical foundation.
Embodiment 2
The present embodiment preferably certain oil field a bite horizontal well, the horizontal well go into operation initial stage Liquid output as 15m3/d.The horizontal well Surrounding has 6 mouthfuls of water injection wells, respectively number water injection well 1, water injection well 2, water injection well 3, water injection well 4, water injection well 5, water injection well 6, note Water is respectively 15,20,25,15,20,30m3It is respectively 445,460,457,468,455,450m at a distance from/d, with horizontal well. The pressure monitoring method that inflow direction is differentiated for horizontal well in the present embodiment, comprising the following steps:
1. level monitoring well bottom pressure delta data;
2. considering the variation of surrounding water injection well working system, the interference test between water injection well and horizontal well is designed;
3. establishing the Horizontal Well bottom pressure Plate Analysis under water injection well interference;
4. being fitted analysis to the bottom pressure data measured, obtains the reservoir that different injection well changes under water injection rate and join Number compares the parameter being fitted under different injection well working system by analysis, determines interwell communication situation, differentiates water side To.
According to the method described above, firstly, by pressure gauge tripping in horizontal well deflecting position, when real-time monitoring horizontal well opening well and making production Bottom pressure changing value.It records the horizontal well under different injection well working system and surveys pressure data, the shaft bottom of (or conversion) will be measured Pressure difference and time and bottom pressure difference and the derivative curve of time are plotted under log-log coordinate system.
Secondly, giving an initial parameter value, calculated using following formula:
Wherein,
Δ p --- bottom pressure is poor, atm;
pi--- original formation pressure, atm;
pwf--- bottom pressure, atm;
Kh--- horizontal permeability, D;
Kv--- vertical permeability, D;
φ --- porosity, decimal;
μ --- formation fluid viscosity, cP;
Ct--- system compressibility, atm-1
η --- piezometric conductivity, Datm/cP;
B --- volume factor, zero dimension;
L --- horizontal well half is long, cm;
H --- core intersection, cm;
(xw,yw,zw) --- horizontal well heel end coordinate position;
qj--- the injection rate of j-th of water injection well, cm3/s;
(xj,yj,zj) --- the shaft bottom coordinate position of j-th of water injection well;
T --- time, s;
τ --- time variable, s.
It is calculated using above-mentioned formula, obtains the pressure and pressure derivative plate under log-log coordinate system.The present embodiment In horizontal well master data it is as shown in table 1.
Certain the fine and close oil field a bite horizontal well underlying parameter of table 1
Then, the difference compared between theoretical value and actual test value illustrates preset parameter value if the two essentially coincides Rationally;If the two gap is larger, given initial value need to be continued, constantly adjusted, until the two is within reasonable error range.? Under above-mentioned water injection well water injection rate, measured data and the theoretical curve of horizontal well single-well test model are fitted first, such as Fig. 4 Shown, curve matching effect is poor, and the later stage derivative decline stage is not fitted.Then by side in measured data and this patent The theoretical curve that method calculates is fitted, as shown in figure 5, curve matching is fine, fitting result are as follows: well stores up coefficient C=1.08m3/ MPa, skin factor S=0.35, effective length 95.6m, horizontal permeability Kb=5.63 × 10-3μm2, flow coefficientPiezometric conductivity η=3221.74 × 10-8μm2·MPa/(mPa·s)。
Finally, differentiating inflow direction.It is real to the water injection rate of 6 mouthfuls of water injection wells around it for the inflow direction for differentiating horizontal well Dynamic is applied to adjust.Adjustment mode are as follows: successively change 6 mouthfuls of wells water injection rate (while certain mouthful of well water injection rate changes, other 5 mouthfuls The water injection rate that well keeps original is constant), the daily water-injection rate of every mouthful of water injection well all increases 10m on the basis of the original3.Measure level Bottom pressure of the well under 6 kinds of different injection well working systems, the measured data under 6 kinds of situations is intended with theoretical curve It closes, obtains explaining parameter, as shown in table 2.
Fitting parameter result under 26 kinds of water injection well working systems of table
From Table 2, it can be seen that when changing the water injection rate of water injection well 1 and water injection well 5, the permeability that is fitted, flowing Coefficient and piezometric conductivity are larger, it is possible to judge that the production water of this horizontal well is mainly derived from water injection well 1 and water injection well 5.
Although the present invention has shown and described referring particularly to its preferred embodiment, those skilled in the art can be with Understand, various changes in form and details can be made without departing from model of the invention described in the appended claims It encloses.It is described in detail above in conjunction with specific embodiments of the present invention, but is not limitation of the present invention.It is all according to this hair Any simple modification made to the above embodiment of bright technical spirit, still falls within the range of technical solution of the present invention.

Claims (9)

1. a kind of pressure monitoring method for differentiating inflow direction for horizontal well, comprising the following steps:
1. level monitoring well bottom pressure delta data;
2. considering the variation of surrounding water injection well working system, the interference test between water injection well and horizontal well is designed;
3. establishing the Horizontal Well bottom pressure Plate Analysis under water injection well interference;
4. being fitted analysis to the bottom pressure data measured, the reservoir parameter under different injection well change water injection rate is obtained, Compare the parameter being fitted under different injection well working system by analysis, determine interwell communication situation, differentiates inflow direction;
Step 3. in, further comprise that the initial parameter of model is arranged according to well logging and complete well geologic information, according to initial ginseng Number calculates bottom pressure with the changing value of production time, draws typical plate, bottom pressure is with the changing value of production time Horizontal Well bottom pressure drop, including when horizontal well produces caused by bottom pressure drop and since the water filling of around water injection well is in horizontal well Pressure recovery caused by shaft bottom;
Using principle of stacking founding mathematical models, the bottom pressure meets following relationship with the changing value of production time,
Wherein,
Δ p --- bottom pressure is poor, atm;
pi--- original formation pressure, atm;
pwf--- bottom pressure, atm;
Kh--- horizontal permeability, D;
Kv--- vertical permeability, D;
φ --- porosity, decimal;
μ --- formation fluid viscosity, cP;
Ct--- system compressibility, atm-1
η --- piezometric conductivity, Datm/cP;
B --- volume factor, zero dimension;
L --- horizontal well length, cm;
H --- core intersection, cm;
(xw,yw,zw) --- horizontal well heel end coordinate position;
qj--- the injection rate of j-th of water injection well, cm3/s;
(xj,yj,zj) --- the shaft bottom coordinate position of j-th of water injection well;
T --- time, s;
τ --- time variable, s.
2. the pressure monitoring method according to claim 1 for differentiating inflow direction for horizontal well, it is characterised in that: step 1. in, Horizontal Well bottom pressure delta data is measured by pressure gauge, and pressure gauge tripping in position is horizontal well deflecting position.
3. the pressure monitoring method according to claim 1 for differentiating inflow direction for horizontal well, it is characterised in that: step 2. in, the variation of the water injection well working system specifically includes the injection rate for changing water injection well around horizontal well.
4. the pressure monitoring method according to claim 3 for differentiating inflow direction for horizontal well, it is characterised in that: described The injection rate for changing water injection well around horizontal well includes making horizontal well with a certain yield production, changes certain a bite water injection well around it Injection rate, keep the injection rate of other water injection wells constant, measure the bottom pressure of horizontal well;Successively change around the horizontal well The injection rate of other water injection wells, while keeping the injection rate of other water injection wells constant, horizontal well is measured in water injection well different operating Bottom pressure under system.
5. the pressure monitoring method according to claim 1 for differentiating inflow direction for horizontal well, it is characterised in that: described Initial parameter by being directly acquired in geologic information, including pay thickness, porosity, formation fluid viscosity, system compressibility, Volume factor, well radius, horizontal well production, original formation pressure.
6. the pressure monitoring method according to claim 1 for differentiating inflow direction for horizontal well, it is characterised in that: described The derivation process of relational expression is
(1) pressure solution when horizontal well individually produces is sought
It introduces
Then horizontal well three dimensional fluid flow partial differential equation can turn to following canonical form:
Primary condition:
p(x,y,z,t)|T=0=pi
Boundary condition:
The instantaneous point source expression formula of above-mentioned model is obtained using Newman product method:
(2) pressure solution when water injection well water filling around is sought
The basis partial differential equation of every mouth water injection well are as follows:
M mouthfuls of water injection well strata pressures are acquired using instantaneous source solution and principle of stacking are as follows:
(3) Bottom Hole Pressure Solution of the horizontal well under water injection well interference is sought
Using principle of stacking, the bottom pressure of the horizontal well under water injection well interference is acquired are as follows:
7. the pressure monitoring method according to claim 1 for differentiating inflow direction for horizontal well, it is characterised in that: described 4. step further comprises comparing and judging whether actual measurement bottom pressure changes with time equal with computational theory value, if real The well logging bottom pressure difference relationship that changes with time is equal with computational theory value, then using initial parameter as the practical fitting of horizontal well Parameter;If differing, fitting parameter is corrected, until the two within an acceptable error range, obtains horizontal well reality Reservoir parameter, and then determine interwell communication situation, differentiate inflow direction.
8. the pressure monitoring method according to claim 1 for differentiating inflow direction for horizontal well, it is characterised in that: step 4. in, the described pair of bottom pressure data measured are fitted 3. Horizontal Well bottom pressure point that analysis is obtained including the use of step Analysis plate carries out manual Fitting Analysis to the bottom pressure data measured or carries out automatic Fitting analysis using computer programming.
9. the pressure monitoring method according to claim 8 for differentiating inflow direction for horizontal well, it is characterised in that: described Being fitted obtained parameter includes reservoir permeability, piezometric conductivity, flow coefficient, water yield, skin factor, well hole storage coefficient.
CN201710720470.9A 2017-08-21 2017-08-21 A kind of pressure monitoring method differentiating inflow direction for horizontal well Active CN107503739B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710720470.9A CN107503739B (en) 2017-08-21 2017-08-21 A kind of pressure monitoring method differentiating inflow direction for horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710720470.9A CN107503739B (en) 2017-08-21 2017-08-21 A kind of pressure monitoring method differentiating inflow direction for horizontal well

Publications (2)

Publication Number Publication Date
CN107503739A CN107503739A (en) 2017-12-22
CN107503739B true CN107503739B (en) 2019-10-18

Family

ID=60692139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710720470.9A Active CN107503739B (en) 2017-08-21 2017-08-21 A kind of pressure monitoring method differentiating inflow direction for horizontal well

Country Status (1)

Country Link
CN (1) CN107503739B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159260B (en) * 2019-04-02 2023-06-06 中国石油大学(北京) Method and device for judging main water supply direction of fracture part closed fracturing vertical well
CN111178785B (en) * 2020-01-06 2023-01-24 中国海洋石油集团有限公司 Horizontal well variable flow oil-water two-phase pressure dynamic evaluation method under drainage well pattern
CN112906178B (en) * 2020-06-22 2022-08-30 中国海洋石油集团有限公司 Method for calculating pressure field of horizontal water injection well by using point source function
CN111894707B (en) * 2020-07-24 2021-11-23 东风商用车有限公司 Valve bank controlled urea injection system and control method thereof
CN115680609A (en) * 2021-07-27 2023-02-03 中国石油天然气股份有限公司 Method for establishing communication relation based on injection-production well group well testing data
CN115929279B (en) * 2022-10-18 2023-08-08 常州大学 Plate analysis method for judging interference intensity under mining balance

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2301886C1 (en) * 2006-08-17 2007-06-27 Анастасия Викторовна Белова Reservoir conductivity determination method
CN105550438A (en) * 2015-12-11 2016-05-04 中国石油大学(北京) Method for diagnosing oil (gas) production position of fishbone-shaped multi-branch horizontal well and system thereof
CN206071468U (en) * 2016-09-06 2017-04-05 中国石油天然气股份有限公司 A kind of determined level well water exit position and the process pipe string of inflow direction
CN107066651A (en) * 2016-12-15 2017-08-18 中国石油天然气股份有限公司 A kind of oil well excitement and groundwater prospecting method and the application of monitoring water injection well pressure-responsive

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2301886C1 (en) * 2006-08-17 2007-06-27 Анастасия Викторовна Белова Reservoir conductivity determination method
CN105550438A (en) * 2015-12-11 2016-05-04 中国石油大学(北京) Method for diagnosing oil (gas) production position of fishbone-shaped multi-branch horizontal well and system thereof
CN206071468U (en) * 2016-09-06 2017-04-05 中国石油天然气股份有限公司 A kind of determined level well water exit position and the process pipe string of inflow direction
CN107066651A (en) * 2016-12-15 2017-08-18 中国石油天然气股份有限公司 A kind of oil well excitement and groundwater prospecting method and the application of monitoring water injection well pressure-responsive

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
干扰试井模型及试井分析方法研究;陈阳阳;《中国优秀硕士学位论文全文数据库 程科技Ⅰ辑》;20150815;第11-14,57-59页 *
应用干扰试井确定水平井SNHW827井的来水方向;张河等;《新疆石油天然气》;20100331;第6卷(第1期);第55-58页 *

Also Published As

Publication number Publication date
CN107503739A (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN107503739B (en) A kind of pressure monitoring method differentiating inflow direction for horizontal well
CN107725034A (en) A kind of pressure monitoring method that inflow direction is differentiated for multistage fracturing horizontal well
CN101684727B (en) Optimization method for determining proportion of mixing light oil into heavy oil of ultra-deep well and light hydrocarbon mixer thereof
Wolfsteiner et al. Approximate model for productivity of nonconventional wells in heterogeneous reservoirs
CN105089582B (en) Numerical reservoir simulation method and device based on downhole flow control device
CN104504604B (en) A kind of method of qualitative Wellbore of Gas Wells hydrops
CN105386751B (en) A kind of horizontal wellbore logging PRODUCTION FORECASTING METHODS based on reservoir model
CN104879104B (en) Oil reservoir water injection method
CN105089566A (en) Gas well system production allocation method
CN109236273B (en) Dynamic data processing method for oil field development and production
CN107577831A (en) A kind of fracture-cavity type carbonate oil-gas reservoir solution cavity scale computational methods
CN107630686A (en) Interlock between net horizontal section the fine and close oily energy supplement method of displacement and the imbibition displacement of reservoir oil
CN104989369A (en) High-flow-rate underground oil-water separation and annular space testing and regulating system
CN105626036A (en) Oil reservoir engineering calculation method for determining reasonable oil reservoir liquid yield
CN105893679A (en) Afterflow correction well test interpretation method of low-production horizontal well
CN106499370A (en) Well group synchronization dispensing divides each interval Liquid output computational methods of the separate-zone producer that adopts and device
CN109033541A (en) Shale gas reservoir heterogeneity evaluation method after a kind of pressure based on EUR
CN107725035A (en) A kind of pressure monitoring method that inflow direction is differentiated for non-homogeneous production liquid horizontal well
CN108979612A (en) A kind of densification oil-gas reservoir fracture acidizing complex fracture fluid ability optimization method
CN107480383A (en) A kind of method by pressure measurement data monitoring water filling dynamic crack
CN106640021A (en) Calculating method and device for post-fracture blow-off parameters
CN109858177A (en) A kind of horizontal well with bottom water reservoir water drive method for numerical simulation based on quasi- streamline method
Ismadi et al. The use of combined static-and dynamic-material-balance methods with real-time surveillance data in volumetric gas reservoirs
CN104915530A (en) Method for establishing communication relationship between oil deposit wells
CN109826600A (en) A kind of fracture-pore reservoir nitrogen injection oil recovery opportunity preferred method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant