CN106781446A - Highway emergency vehicles resource allocation method under a kind of construction environment - Google Patents

Highway emergency vehicles resource allocation method under a kind of construction environment Download PDF

Info

Publication number
CN106781446A
CN106781446A CN201710099979.6A CN201710099979A CN106781446A CN 106781446 A CN106781446 A CN 106781446A CN 201710099979 A CN201710099979 A CN 201710099979A CN 106781446 A CN106781446 A CN 106781446A
Authority
CN
China
Prior art keywords
highway
particle
rescue
construction
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710099979.6A
Other languages
Chinese (zh)
Inventor
于德新
林赐云
张伟
赵阳
龚勃文
杨庆芳
周户星
郑黎黎
王树兴
马晓刚
田秀娟
武毅
张行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG EXPRESSWAY CO Ltd
Jilin University
Original Assignee
SHANDONG EXPRESSWAY CO Ltd
Jilin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG EXPRESSWAY CO Ltd, Jilin University filed Critical SHANDONG EXPRESSWAY CO Ltd
Priority to CN201710099979.6A priority Critical patent/CN106781446A/en
Publication of CN106781446A publication Critical patent/CN106781446A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Traffic Control Systems (AREA)

Abstract

The invention discloses highway emergency vehicles resource allocation method under a kind of construction environment, including:Obtain highway basic capacity and the construction section traffic capacity;Highway construction environmental correction coefficient is calculated according to highway basic capacity and the construction section traffic capacity;Highway is segmented, section degree of danger is determined using Field Using Fuzzy Comprehensive Assessment according to highway construction environmental correction coefficient;Resource distribution model is set up using section degree of danger and resource distribution influence factor;Resource distribution model is solved using population optimizing algorithm, best resource allocation plan is obtained.The present invention is configured to the highway emergency vehicles resource under construction environment, it is ensured that the science configuration of rescue resource, improves the emergency management and rescue effect of highway.

Description

Highway emergency vehicles resource allocation method under a kind of construction environment
Technical field
The present invention relates to traffic management technology field, highway emergency vehicles money under more particularly to a kind of construction environment Source collocation method.
Background technology
In highway Lash-up succor system, emergency vehicles resource is the material base of emergency management and rescue, and highway is built Cheng Hou, the whether reasonable quality that often decides rescue effect of the administrative department to vehicle resources configuration of meeting an urgent need.In order to give at a high speed Highway determines the emergency vehicles resource of fair amount, and meets the factors such as rescue demand, rescue time, it is necessary to enter to rescue resource Row science is configured.Highway construction area can take path resource, reduce track, cause wagon flow to be collaborated in upstream section, cause Traffic congestion, produces to express way driving safety and significantly affects, and under construction environment, the emergency resources configuration of highway should This is different from normal pass state.In sum, it is necessary to propose the highway emergency resources configuration under a kind of construction environment Method, the highway emergency vehicles resource under construction environment is configured, it is ensured that rescue resource science configuration, lifting The emergency management and rescue effect of highway.
The content of the invention
It is an object of the invention to provide highway emergency vehicles resource allocation method under a kind of construction environment, with to construction Highway emergency vehicles resource under environment is configured, it is ensured that rescue resource science configuration, Improving Expressway should Effect is helped in first aid.
To achieve the above object, the invention provides highway emergency vehicles resource distribution side under a kind of construction environment Method, including:
Obtain highway basic capacity and the construction section traffic capacity;
Highway construction environmental correction system is calculated according to highway basic capacity and the construction section traffic capacity Number;
Highway is segmented, Field Using Fuzzy Comprehensive Assessment is used according to the highway construction environmental correction coefficient Determine section degree of danger;
Resource distribution model is set up using the section degree of danger and resource distribution influence factor;
The resource distribution model is solved using population optimizing algorithm, best resource allocation plan is obtained.
Optionally, it is described to obtain highway basic capacity and the construction section traffic capacity, specifically include:
Highway basic capacity is obtained from speed-basic capacity table;
According to formula C=Cb×fw×fHV×fp× n calculates the construction section traffic capacity;Wherein, C represents that construction section leads to Row ability, unit is pcu/h;CbHighway basic capacity is represented, unit is pcu/h;fwRepresent lane width and lateral Headroom correction factor;fHVRepresent traffic composition correction factor;fpRepresent driver to environment familiarity correction factor;N is represented Runway number, takes positive integer;
Optionally, it is described that highway construction is calculated according to highway basic capacity and the construction section traffic capacity Environmental correction coefficient, specifically includes:
According to formulaCalculate highway construction environmental correction coefficient;Wherein C represents the construction section traffic capacity, Unit is pcu/h;CbHighway basic capacity is represented, unit is pcu/h.
Optionally, it is described that section is determined using Field Using Fuzzy Comprehensive Assessment according to the highway construction environmental correction coefficient Degree of danger, specifically includes:
Determine dangerous matter sources index, the dangerous matter sources index include condition of road surface, condition of construction, affiliated facility, weather conditions, Vehicle and flow indicator;
Determine opinion rating set, by the assignment from high to low of each grade in the opinion rating set, build and evaluate etc. Level matrix;
Each evaluation of each dangerous matter sources index etc. is determined according to the dangerous matter sources index and the opinion rating set The degree of membership of level, builds the fuzzy matrix of the degree of membership;
The fuzzy matrix is multiplied with weight vectors, fuzzy evaluation vector is obtained;
The opinion rating matrix according to the fuzzy evaluation vector sum, determines the comprehensive evaluation of section degree of danger;
Comprehensive evaluation and the highway construction environmental correction coefficient according to the section degree of danger, determine road Section degree of danger.
Optionally, it is described to set up resource distribution model using the section degree of danger and resource distribution influence factor, have Body method includes:
Resource distribution influence factor is obtained, the resource distribution influence factor includes total resources, rescue station quantity, rescue Time, the emergent point minimum resource requirements in section;
Determine object function, the object function represent resource quantity it is certain in the case of rescue efficiency highest, the mesh Scalar functions are
According to the resource distribution influence factor, the object function and the section degree of danger, resource distribution is determined Model, the constraints of the resource distribution model includes:
Represent that the resource quantity sum that each rescue station sends different rescue points to is m;
Represent that each rescue station configures the quantity energy independent process of minimum kth kind resource slight thing together Therefore;
Time restriction is represented, rescue time is more than maximum rescue time, and it is 0 that rescue resource is sent, Otherwise then it is more than 0;
xij≥0;xij∈ Z, the number of resources of expression rescue station to section dangerous spot is nonnegative integer;
Wherein, λjRepresent section degree of danger;tijRepresent emergency management and rescue station i to the time of rescue point j;rkIt is each rescue Stand treatment minor accident when kth kind resource demand;xijRepresent the resource quantity that emergency management and rescue station i is sent to rescue point j; M represents this kind of total amount of emergency resources;TmaxIt is rescue time most long.
Optionally, the use population optimizing algorithm solves the resource distribution model, specifically includes:
The setup parameter of particle cluster algorithm is obtained, the setup parameter includes learning rate factor c1、c2, maximum evolution generation Number max gen, population scale sizepop, particle maximal rate vmax, particle minimum speed vmin, particle maximum xmax, particle Minimum value xmin
Position and the speed of population particle are initialized, the position popx and speed v of initial population particle is generated;
Judge whether the particle meets the constraints of the resource distribution model, if so, then calculating the adaptation of particle Degree;If it is not, then reinitializing;
Judge current particle fitnessThe individual optimal value of the particle before whether being better thanIf so, then will The position of current particleIt is set to the optimum position p of the particlez;Global optimum is found from individual optimal value again, and Record the particle sequence number and position p of the optimal valueg
The iteration optimizing under the limitation of constraints by the speed of particle and position, if the particle rapidity during iteration VariableThen set it toIfThen set it toOutput changes every time For the local optimum and global optimum of the particle after optimizing;
The global optimum that the global optimum of the particle that current iteration optimizing is obtained is obtained with previous iteration optimizing adapts to Degree is compared, if the global optimum of particle that current iteration optimizing is obtained is less than the global optimum that previous iteration optimizing is obtained Fitness, then global fitness value be updated to the global optimum of the particle that this current iteration optimizing is obtained, otherwise then not more Newly;The local optimum fitness that the local optimum of the particle that current iteration optimizing is obtained is obtained with previous iteration optimizing is carried out Compare, if the local optimum of particle that current iteration optimizing is obtained is adapted to less than the local optimum that previous iteration optimizing is obtained Degree, then local adaptation's angle value is updated to the local optimum of the particle that current iteration optimizing is obtained, otherwise does not update then;
Judge whether the number of times of iteration is equal to maximum iteration max gen, if so, then stop iteration, output particle Local optimum and the corresponding best resource allocation plan of global optimum.
Optionally, the element in the opinion rating set include it is excellent, good, in, it is secondary, weak, very weak, weak, medium, strong, very strong.
Optionally, the condition of road surface includes pavement of road, road alignment;The affiliated facility includes monitor and control facility, shines Bright facility, safety protection facility, traffic control device, service facility;The weather conditions include rain, snow, mist, haze, wind, thunder, High temperature, sand and dust;The vehicle includes car, lorry;The flow indicator includes link length, track quantity, bridge tunnel.
According to the specific embodiment that the present invention is provided, the invention discloses following technique effect:The construction that the present invention is provided Highway emergency vehicles resource allocation method under environment, due to the particular surroundings of construction area, the resource distribution under conventional sense Model is simply not proposed to the resource distribution under construction environment, and the present invention is endangered by setting up the section based on construction section capacity Dangerous Degree Model, and then determine freeway degree of danger under construction environment, being then based on section degree of danger is carried out The distribution of emergency vehicles resource, the resource allocation method be emergency vehicles configuration provides under construction environment it is sufficient it is theoretical according to According to, filled up in the past for emergency vehicles resource distribution under construction environment research blank, the road based on construction section capacity Section degree of danger modeling advantageously accounts for the irrational phenomenon of emergency vehicles resource allocation under construction environment.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing for needing to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the invention Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these accompanying drawings Obtain other accompanying drawings.
The flow chart of highway emergency vehicles resource allocation method under the construction environment that Fig. 1 is provided for the present invention;
Fig. 2 is to be determined using Field Using Fuzzy Comprehensive Assessment according to highway construction environmental correction coefficient in step 103 in Fig. 1 The flow chart of section degree of danger;
Fig. 3 is the flow chart in step 105 in Fig. 1 using population optimizing algorithm solution resource distribution model;
Fig. 4 be in embodiments of the invention Jinan Chinese scholartree shade Pivot Interchange to Tang Yu grade separations section map.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
It is an object of the invention to provide highway emergency vehicles resource allocation method under a kind of construction environment, with to construction Highway emergency vehicles resource under environment is configured, it is ensured that rescue resource science configuration, Improving Expressway should Effect is helped in first aid
It is below in conjunction with the accompanying drawings and specific real to enable the above objects, features and advantages of the present invention more obvious understandable The present invention is further detailed explanation to apply mode.
As shown in figure 1, highway emergency vehicles resource allocation method under the construction environment of present invention offer, including:
Step 101:Obtain highway basic capacity and the construction section traffic capacity;
Step 102:Highway construction ring is calculated according to highway basic capacity and the construction section traffic capacity Border correction factor;
Step 103:Highway is segmented, is commented using fuzzy synthesis according to highway construction environmental correction coefficient Valency method determines section degree of danger;
Step 104:Resource distribution model is set up using section degree of danger and resource distribution influence factor;
Step 105:Resource distribution model is solved using population optimizing algorithm, best resource allocation plan is obtained.
In above-mentioned steps 101, the mode for obtaining highway basic capacity and the construction section traffic capacity is specifically wrapped Include:
Highway basic capacity is obtained from speed-basic capacity table (table 1);
According to formula C=Cb×fw×fHV×fp× n calculates the construction section traffic capacity;Wherein, C represents that construction section leads to Row ability, unit is pcu/h;CbHighway basic capacity is represented, unit is pcu/h;fwRepresent lane width and lateral Headroom correction factor;fHVRepresent traffic composition correction factor;fpRepresent driver to environment familiarity correction factor;N is represented Runway number, takes positive integer;
Table 1
In above-mentioned steps 102, highway is calculated according to highway basic capacity and the construction section traffic capacity Construction environment correction factor, can be specifically:
According to formulaCalculate highway construction environmental correction coefficient;Wherein C represents the construction section traffic capacity, Unit is pcu/h;CbHighway basic capacity is represented, unit is pcu/h.
In above-mentioned steps 103, highway is segmented, can be specifically:
Multiple rescue stations are set up along highway, the section of different rescue station coverings is different, what rescue station was covered How section divides directly influence on rescue scope and resource distribution effect.In order to calculate the dangerous journey of different sections of highway Degree, it is necessary first to be segmented to highway, the division principle to section is as follows:
A. section is divided on the basis of L=10 kilometers, since highway starting point pile No., sequentially divides and number and be then every 10 kilometers is one section.
B. tunnel is middle not to be segmented from into one section on highway.
C. the section less than 10 kilometers, round off principle, are one section more than or equal to 5 kilometers, less than 5 kilometers of merging To the preceding paragraph.
D. under construction environment highway emergency resources configuration, therefore in pavement section, by construction area from into one Section, centre is not segmented.
In step 103, as shown in Fig. 2 true using Field Using Fuzzy Comprehensive Assessment according to highway construction environmental correction coefficient The method for determining section degree of danger, can specifically include:
Step 201:Determine dangerous matter sources index, dangerous matter sources index includes condition of road surface, condition of construction, affiliated facility, weather Situation, vehicle and flow indicator;
Step 202:Determine opinion rating set, by the assignment from high to low of each grade in opinion rating set, structure is commented Valency ranking matrix;Opinion rating matrix T=[t1,t2,...,tn] ', wherein, t1,t2,...,tnRepresent opinion rating.
Specifically, the present embodiment is condition of road surface in expressway traffic accident dangerous matter sources, condition of construction, attached sets Apply, the influence of weather conditions, vehicle and flow indicator to road hazard degree, respectively customize Pyatyi opinion rating set, respectively Stated with different language.Wherein, condition of road surface includes pavement of road, road alignment;Affiliated facility includes that monitor and control facility, illumination set Apply, safety protection facility, traffic control device, service facility;Weather conditions include rain, snow, mist, haze, wind, thunder, high temperature, sand Dirt;Vehicle includes car, lorry;Flow indicator includes link length, track quantity, bridge tunnel.In the opinion rating set Element for it is excellent, good, in, it is secondary, weak;Or the element in the opinion rating set is very weak, weak, medium, strong, very strong.
Foundation is combined into dangerous matter sources index and opinion rating collection, metrics evaluation application form is specified, such as table 2 below and the institute of table 3 Show.Influence degree of these dangerous matter sources indexs to section safety is evaluated in table 2, dangerous matter sources index is better in certain section, then this The degree of danger in individual section is smaller, and dangerous matter sources index is poorer in certain section, then the degree of danger in this section is bigger.In table 3 Influence degree of these dangerous matter sources indexs to section safety is evaluated, if dangerous matter sources index influences weaker to certain section, then this Individual section degree of danger is smaller, if dangerous matter sources index influences stronger to certain section, then the degree of danger in this section is bigger.
Table 2
Table 3
According to the characteristic of evaluation object (i.e. dangerous matter sources index), selection traffic engineering is constituted with the judge expert of security fields Judge group, the quantity for judging expert is advisable with 10 people or so.Expert is given by metrics evaluation application form, expert is only needed to right The position answered and hook is made below corresponding grade, represent that expert agrees to the corresponding metrics evaluation grade of the questionnaire, so that it is determined that often Each opinion rating of one dangerous matter sources index.
Step 203:Each evaluation of each dangerous matter sources index etc. is determined according to dangerous matter sources index and opinion rating set The degree of membership of level, builds the fuzzy matrix of degree of membership;
Specifically, the present embodiment is the situation that the expert evaluated in application form according to These parameters makes hook, statistics.It is right The degree of membership of each opinion rating of each the dangerous matter sources index answered makes hook according to expert in metrics evaluation application form Quantity determines with the ratio of expert's quantity of totality.rijRepresent that i-th index belongs to j-th degree of opinion rating, that is, be subordinate to Category degree.
Fuzzy matrix is constructed according to degree of membership, the degree of membership square being made up of n index, m evaluation approach is combined into Battle array, fuzzy matrix is
Step 204:Fuzzy matrix R is multiplied with weight vectors W, fuzzy evaluation vector S, i.e. S=RW=[s is obtained1 s2 ... sn];
Step 205:According to fuzzy evaluation vector sum opinion rating matrix, the comprehensive evaluation of section degree of danger is determined; The computing formula of the comprehensive evaluation Q of section degree of danger is as follows:
The size of Q values indicates the comprehensive evaluation of the section danger level, reflects the degree of danger in the section.
Step 206:Comprehensive evaluation and highway construction environmental correction coefficient according to section degree of danger, determine road Section degree of danger.
Specifically, in the present embodiment, due to road conditions, the traffic environment etc. of each section of construction area be it is different, Therefore, for the different sections of highway of different construction areas, its influence factor is different.Therefore the height in construction area section is combined Fast construction of the highway environmental correction coefficient a.Particularly, the section highway construction environmental correction coefficient a=1 without construction area, Thus, the computing formula of section degree of danger is as follows:
λ=aQ
Section degree of danger λ is a numerical value, and λ is bigger, shows that the section is more dangerous.
In above-mentioned steps 104, the side of resource distribution model is set up using section degree of danger and resource distribution influence factor Method specific method includes:
Resource distribution influence factor is obtained, when the resource distribution influence factor includes total resources, rescue station quantity, rescue Between, the emergent point minimum resource requirements in section;
Determine object function, the object function represent resource quantity it is certain in the case of rescue efficiency highest, the mesh Scalar functions are
According to the resource distribution influence factor, the object function and the section degree of danger, resource distribution is determined Model, the constraints of the resource distribution model includes:
Represent that the resource quantity sum that each rescue station sends different rescue points to is m;
Represent that each rescue station configures the quantity energy independent process of minimum kth kind resource slight thing together Therefore;
Time restriction is represented, rescue time is more than maximum rescue time, and rescue resource sends quantity It is 0, otherwise is then more than 0;
xij≥0;xij∈ Z, the number of resources of expression rescue station to section dangerous spot is nonnegative integer;
Wherein, λjRepresent section degree of danger;tijRepresent emergency management and rescue station i to the time of rescue point j;rkIt is each rescue Stand treatment minor accident when kth kind resource demand;xijRepresent the resource quantity that emergency management and rescue station i is sent to rescue point j; M represents this kind of total amount of emergency resources;TmaxIt is rescue time most long.
In above-mentioned steps 105, as shown in figure 3, the method that resource distribution model is solved using population optimizing algorithm, specifically Including:
Step 301:The setup parameter of particle cluster algorithm is obtained, setup parameter includes learning rate factor c1、c2, maximum enters Change algebraically max gen, population scale sizepop, particle maximal rate vmax, particle minimum speed vmin, particle maximum xmax, Particle minimum value xmin
Step 302:Position and the speed of population particle are initialized, the position popx and speed v of initial population particle is generated;
Step 303:Judge whether particle meets the constraints of resource distribution model, if so, then calculating the adaptation of particle Degree;If it is not, then reinitializing;
Step 304:Judge current particle fitnessThe individual optimal value of the particle before whether being better than If so, then by the position of current particleIt is set to the optimum position p of the particlez;Again the overall situation is found from individual optimal value Optimal value, and record the particle sequence number and position p of the optimal valueg
Step 305:The iteration optimizing under the limitation of constraints by the speed of particle and position, if during iteration Particle rapidity variableThen set it toIfThen set it toIt is defeated The local optimum and global optimum of the particle gone out after each iteration optimizing;
Step 306:The overall situation that the global optimum of the particle that current iteration optimizing is obtained is obtained with previous iteration optimizing Adaptive optimal control degree is compared, if what the global optimum of particle that current iteration optimizing is obtained was obtained less than previous iteration optimizing Global optimum's fitness, then global fitness value be updated to the global optimum of the particle that this current iteration optimizing is obtained, instead Do not update then;The local optimum that the local optimum of the particle that current iteration optimizing is obtained is obtained with previous iteration optimizing is fitted Response is compared, if the local optimum of particle that obtains of current iteration optimizing less than previous iteration optimizing obtain it is local most Excellent fitness, then local adaptation's angle value is updated to the local optimum of the particle that current iteration optimizing is obtained, otherwise does not update then;
Step 307:Judge whether the number of times of iteration is equal to maximum iteration max gen, if so, then stop iteration, it is defeated Go out the corresponding best resource allocation plan of local optimum and global optimum of particle.
Collocation method of the invention is discussed in detail with reference to a specific example.
By taking the high speed of Jinan-Qingdao as an example, Jinan Chinese scholartree shade Pivot Interchange to Tang Yu grade separations section is chosen.As shown in figure 4, wherein A, B, C are Resource distribution point at three, is 1,2,3,4 four sections by pavement section.
1. allocation models parameter setting
According to roadway segment principle, four sections are classified as, the central point for setting each section is point of meeting an urgent need, and has cruiser 11, obstacles removing car 6, sweeper 3, medical vehicle 2, fire fighting truck 5.
Calculated firstly the need of to the parameter in allocation models, section degree of danger is entered using fuzzy comprehensive evaluation method Row is calculated, as a result such as table 4 below.
Table 4
Four section central points as the emergent point in respective section are set, then three rescue stations arrive the emergent time put just respectively It is the ratio between distance and rescue speed, if breakdown lorry speed is 60km/h, then rescue station goes out to rescue time such as following table to emergent point 5。
Table 5 goes out the time of rescuing (min)
Arrival time Emergent point 1 Emergent point 2 Emergent point 3 Emergent point 4 Average time
Rescue station A 6.4 16.9 25.4 33.3 20.5
Rescue station B 6.9 4.9 14.9 24.2 12.725
Rescue station C 26.2 16 5.2 3.9 12.825
2. the resource distribution based on particle cluster algorithm is solved
Solved using the resource distribution model solution algorithm based on population herein.By the target letter in allocation models Several opposite numbers is set to the fitness in particle cluster algorithm, solves the particle of highest fitness, and as resource distribution is optimal Solution.
Population scale as 20 is set, particle length is the product of rescue station and emergent point, particle length is 12 in this example, is learned Practise the factor and be set to c1=c2=2, inertia weight is decremented to 0.4 from 0.9, and the formula that successively decreases isIt is maximum Iterations is set to 100.
Particle cluster algorithm and resource distribution model are programmed using Matlab softwares, section degree of danger are input into, are answered The initial parameters such as anxious rescue time, operation program is as shown in table 6 below by being calculated emergency resources configuring condition.
Table 6
From upper table 6, the emergency resources that rescue station is configured perform rescue task and ensure nearest rescue point first, with Reach rescue efficiency highest.Rescue station B to average out the time of rescuing most short, preferably, and nearby dangerous degree is higher for rescue position Construction section, therefore rescue station B rescue tasks are heavier, and the emergency vehicles of configuration are more, and this also fully demonstrates this paper models The demand of time efficiency and rescue task can be met.Due to the scarcity of medical resource, each medical vehicle is mainly responsible for nearby The rescue task demand in section.No matter from rescue efficiency, the side such as rescue time, section degree of danger or rescue station importance Face, Resource-Allocation Result can be applicable actual conditions, and configuration result has scientific meaning and intension, reach constraint and target It is required that, these results show the applicability of resource distribution model, scientific and validity.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.For system disclosed in embodiment For, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is said referring to method part It is bright.
Specific case used herein is set forth to principle of the invention and implementation method, and above example is said It is bright to be only intended to help and understand the method for the present invention and its core concept;Simultaneously for those of ordinary skill in the art, foundation Thought of the invention, will change in specific embodiments and applications.In sum, this specification content is not It is interpreted as limitation of the present invention.

Claims (7)

1. highway emergency vehicles resource allocation method under a kind of construction environment, it is characterised in that including:
Obtain highway basic capacity and the construction section traffic capacity;
Highway construction environmental correction coefficient is calculated according to highway basic capacity and the construction section traffic capacity;
Highway is segmented, is determined using Field Using Fuzzy Comprehensive Assessment according to the highway construction environmental correction coefficient Section degree of danger;
Resource distribution model is set up using the section degree of danger and resource distribution influence factor;
The resource distribution model is solved using population optimizing algorithm, best resource allocation plan is obtained.
2. highway emergency vehicles resource allocation method under construction environment according to claim 1, it is characterised in that institute Acquisition highway basic capacity and the construction section traffic capacity are stated, is specifically included:
Highway basic capacity is obtained from speed-basic capacity table;
According to formula C=Cb×fw×fHV×fp× n calculates the construction section traffic capacity;Wherein, C represents that construction section passes through energy Power, unit is pcu/h;CbHighway basic capacity is represented, unit is pcu/h;fwRepresent lane width and lateral clearance Correction factor;fHVRepresent traffic composition correction factor;fpRepresent driver to environment familiarity correction factor;N represents driving Road number, takes positive integer.
3. highway emergency vehicles resource allocation method under construction environment according to claim 2, it is characterised in that institute State and highway construction environmental correction coefficient is calculated according to highway basic capacity and the construction section traffic capacity, specifically Including:
According to formulaCalculate highway construction environmental correction coefficient;Wherein C represents the construction section traffic capacity, unit It is pcu/h;CbHighway basic capacity is represented, unit is pcu/h.
4. highway emergency vehicles resource allocation method under construction environment according to claim 1, it is characterised in that institute State and section degree of danger is determined using Field Using Fuzzy Comprehensive Assessment according to the highway construction environmental correction coefficient, specific bag Include:
Determine dangerous matter sources index, the dangerous matter sources index includes condition of road surface, condition of construction, affiliated facility, weather conditions, vehicle And flow indicator;
Determine opinion rating set, by the assignment from high to low of each grade in the opinion rating set, build opinion rating square Battle array;
Each opinion rating of each dangerous matter sources index is determined according to the dangerous matter sources index and the opinion rating set Degree of membership, builds the fuzzy matrix of the degree of membership;
The fuzzy matrix is multiplied with weight vectors, fuzzy evaluation vector is obtained;
The opinion rating matrix according to the fuzzy evaluation vector sum, determines the comprehensive evaluation of section degree of danger;
Comprehensive evaluation and the highway construction environmental correction coefficient according to the section degree of danger, determine that section is endangered Dangerous degree.
5. highway emergency vehicles resource allocation method under construction environment according to claim 1, it is characterised in that institute State and set up resource distribution model using the section degree of danger and resource distribution influence factor, specific method includes:
Resource distribution influence factor is obtained, when the resource distribution influence factor includes total resources, rescue station quantity, rescue Between, the emergent point minimum resource requirements in section;
Determine object function, the object function represent resource quantity it is certain in the case of rescue efficiency highest, the target letter Number is
According to the resource distribution influence factor, the object function and the section degree of danger, resource distribution model is determined, The constraints of the resource distribution model includes:
Represent that the resource quantity sum that each rescue station sends different rescue points to is m;
Represent that each rescue station configures the quantity energy independent process of minimum kth kind resource
Minor accident together;
Time restriction is represented, rescue time is more than maximum rescue time, rescue money
It is 0 that source is sent, otherwise is then more than 0;
xij≥0;xij∈ Z, the number of resources of expression rescue station to section dangerous spot is nonnegative integer;
Wherein, λjRepresent section degree of danger;tijRepresent emergency management and rescue station i to the time of rescue point j;
rkThe demand of kth kind resource when being each rescue station treatment minor accident;xijRepresent emergency management and rescue station i to rescue point j The resource quantity sent;M represents this kind of total amount of emergency resources;TmaxIt is rescue time most long.
6. highway emergency vehicles resource allocation method under construction environment according to claim 4, it is characterised in that institute State and the resource distribution model is solved using population optimizing algorithm, specifically include:
The setup parameter of particle cluster algorithm is obtained, the setup parameter includes learning rate factor c1、c2, maximum evolutionary generation max Gen, population scale sizepop, particle maximal rate vmax, particle minimum speed vmin, particle maximum xmax, particle minimum value xmin
Position and the speed of population particle are initialized, the position popx and speed v of initial population particle is generated;
Judge whether the particle meets the constraints of the resource distribution model, if so, then calculating the fitness of particle;If It is no, then reinitialize;
Judge current particle fitnessThe individual optimal value of the particle before whether being better thanIf so, then will be current The position of particleIt is set to the optimum position p of the particlez;Global optimum is found from individual optimal value again, and is recorded The particle sequence number and position p of the optimal valueg
The iteration optimizing under the limitation of constraints by the speed of particle and position, if the particle rapidity variable during iterationThen set it toIfThen set it toEach iteration is exported to seek The local optimum and global optimum of the particle after excellent;
Global optimum's fitness that the global optimum of the particle that current iteration optimizing is obtained is obtained with previous iteration optimizing enters Row compares, if the global optimum of particle that current iteration optimizing is obtained is adapted to less than the global optimum that previous iteration optimizing is obtained Degree, then global fitness value is updated to the global optimum of the particle that this current iteration optimizing is obtained, otherwise does not update then;Will The local optimum fitness that the local optimum of the particle that current iteration optimizing is obtained is obtained with previous iteration optimizing is compared, If the local optimum of the particle that current iteration optimizing is obtained is less than the local optimum fitness that previous iteration optimizing is obtained, office Portion's fitness value is updated to the local optimum of the particle that current iteration optimizing is obtained, otherwise does not update then;
Judge whether the number of times of iteration is equal to maximum iteration max gen, if so, then stopping iteration, export the part of particle Optimal value and the corresponding best resource allocation plan of global optimum.
7. highway emergency vehicles resource allocation method under construction environment according to claim 4, it is characterised in that institute Stating condition of road surface includes pavement of road, road alignment;The affiliated facility includes that monitor and control facility, lighting installation, security protection set Apply, traffic control device, service facility;The weather conditions include rain, snow, mist, haze, wind, thunder, high temperature, sand and dust;The vehicle Including car, lorry;The flow indicator includes link length, track quantity, bridge tunnel.
CN201710099979.6A 2017-02-23 2017-02-23 Highway emergency vehicles resource allocation method under a kind of construction environment Pending CN106781446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710099979.6A CN106781446A (en) 2017-02-23 2017-02-23 Highway emergency vehicles resource allocation method under a kind of construction environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710099979.6A CN106781446A (en) 2017-02-23 2017-02-23 Highway emergency vehicles resource allocation method under a kind of construction environment

Publications (1)

Publication Number Publication Date
CN106781446A true CN106781446A (en) 2017-05-31

Family

ID=58960100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710099979.6A Pending CN106781446A (en) 2017-02-23 2017-02-23 Highway emergency vehicles resource allocation method under a kind of construction environment

Country Status (1)

Country Link
CN (1) CN106781446A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110120150A (en) * 2019-04-16 2019-08-13 东南大学 A kind of freeway net is removed obstacles mechanical equipment configuration method
CN110428608A (en) * 2019-06-18 2019-11-08 上海电科智能系统股份有限公司 A kind of road passage capability extracting method based on traffic big data
CN111553509A (en) * 2020-04-01 2020-08-18 中山大学 Rail transit route selection evaluation and cost optimization method aiming at geological environment risks
CN112447046A (en) * 2019-10-16 2021-03-05 徐涛 Highway rescue station selection method based on big data
CN113299061A (en) * 2021-04-30 2021-08-24 东南大学 Intelligent networking environment double-lane expressway lane resource allocation method
CN114627667A (en) * 2022-05-12 2022-06-14 浙江高信技术股份有限公司 Early warning vehicle control method, server and system for expressway
US11399270B2 (en) 2020-03-25 2022-07-26 Toyota Motor Engineering & Manufacturing North America Inc. Emergency identification based on communications and reliability weightings associated with mobility-as-a-service devices and internet-of-things devices
CN117711185A (en) * 2024-02-05 2024-03-15 中国水利水电第九工程局有限公司 Multi-source data-based early warning and monitoring system and method for highway construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799911A (en) * 2010-03-31 2010-08-11 公安部交通管理科学研究所 Traffic organization aid decision-making system for expressway network in emergency
CN102129771A (en) * 2011-01-19 2011-07-20 东南大学 System for automatically distributing emergency resources of expressway network
CN102169558A (en) * 2011-03-16 2011-08-31 东南大学 Automatic generation method of emergency resource scheduling schemes in expressway network
JP2012164228A (en) * 2011-02-08 2012-08-30 Fujitsu Ltd Vehicle recognizing device, vehicle recognizing method and vehicle recognizing program
CN104657815A (en) * 2014-12-23 2015-05-27 南京道润交通科技有限公司 Expressway integrated incident processing and emergency scheduling system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799911A (en) * 2010-03-31 2010-08-11 公安部交通管理科学研究所 Traffic organization aid decision-making system for expressway network in emergency
CN102129771A (en) * 2011-01-19 2011-07-20 东南大学 System for automatically distributing emergency resources of expressway network
JP2012164228A (en) * 2011-02-08 2012-08-30 Fujitsu Ltd Vehicle recognizing device, vehicle recognizing method and vehicle recognizing program
CN102169558A (en) * 2011-03-16 2011-08-31 东南大学 Automatic generation method of emergency resource scheduling schemes in expressway network
CN104657815A (en) * 2014-12-23 2015-05-27 南京道润交通科技有限公司 Expressway integrated incident processing and emergency scheduling system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
胡空: "高速公路改扩建设计阶段交通组织方案评价研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
陈旭哲: "高速公路应急车辆资源需求预测与配置", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110120150B (en) * 2019-04-16 2021-05-11 东南大学 Configuration method of obstacle removing mechanical equipment of expressway network
CN110120150A (en) * 2019-04-16 2019-08-13 东南大学 A kind of freeway net is removed obstacles mechanical equipment configuration method
CN110428608A (en) * 2019-06-18 2019-11-08 上海电科智能系统股份有限公司 A kind of road passage capability extracting method based on traffic big data
CN110428608B (en) * 2019-06-18 2022-03-04 上海电科智能系统股份有限公司 Road traffic capacity extraction method based on traffic big data
CN112447046A (en) * 2019-10-16 2021-03-05 徐涛 Highway rescue station selection method based on big data
US11399270B2 (en) 2020-03-25 2022-07-26 Toyota Motor Engineering & Manufacturing North America Inc. Emergency identification based on communications and reliability weightings associated with mobility-as-a-service devices and internet-of-things devices
CN111553509A (en) * 2020-04-01 2020-08-18 中山大学 Rail transit route selection evaluation and cost optimization method aiming at geological environment risks
CN111553509B (en) * 2020-04-01 2023-05-09 中山大学 Rail transit route selection evaluation and cost optimization method aiming at geological environment risk
CN113299061A (en) * 2021-04-30 2021-08-24 东南大学 Intelligent networking environment double-lane expressway lane resource allocation method
CN113299061B (en) * 2021-04-30 2022-05-03 东南大学 Intelligent networking environment double-lane expressway lane resource allocation method
CN114627667A (en) * 2022-05-12 2022-06-14 浙江高信技术股份有限公司 Early warning vehicle control method, server and system for expressway
CN114627667B (en) * 2022-05-12 2022-07-29 浙江高信技术股份有限公司 Early warning vehicle control method, server and system for expressway
CN117711185A (en) * 2024-02-05 2024-03-15 中国水利水电第九工程局有限公司 Multi-source data-based early warning and monitoring system and method for highway construction
CN117711185B (en) * 2024-02-05 2024-04-09 中国水利水电第九工程局有限公司 Multi-source data-based early warning and monitoring system and method for highway construction

Similar Documents

Publication Publication Date Title
CN106781446A (en) Highway emergency vehicles resource allocation method under a kind of construction environment
Yang et al. Eco-driving system for connected automated vehicles: Multi-objective trajectory optimization
CN105740556B (en) The automatic preparation method of route map of train based on passenger flow demand
US20170091350A1 (en) Near real-time modeling of pollution dispersion
CN108256714A (en) A kind of wheelpath real-time risk assessment model based on car networking big data
CN104575050B (en) A kind of fast road ramp intellectual inducing method and device based on Floating Car
CN107490384B (en) Optimal static path selection method based on urban road network
CN106910018A (en) One kind rescue resource regulating method and system
CN105946860B (en) A kind of bend speed prediction method for considering driving style
CN102289928A (en) Integrated traffic hub operation situation evaluation method based on FAHP (fuzzy analytic hierarchy process)
CN111583693A (en) Intelligent traffic cooperative operation system for urban road and intelligent vehicle control method
CN106875075A (en) A kind of electric automobile charging station points distributing method based on travel behaviour
Zhong et al. Impact of the built environment on the vehicle emission effects of road pricing policies: A simulation case study
CN106710216A (en) Expressway real-time traffic jam road condition detection method and system
CN110544010A (en) Identification method of key elements influencing global efficiency emergence of rail transit system
CN105678034A (en) Pedestrian crossing time model and signalized intersection pedestrian crosswalk width optimizing method
CN107527137A (en) Urban mass transit network maturity determines method
CN102201021A (en) Expressway aided design system
CN109455178A (en) A kind of road vehicles traveling active control system and method based on binocular vision
CN105719510A (en) Efficiency evaluation method of road traffic accident chain blocking system under IOV (Internet of Vehicles) environment
CN109765801A (en) The implementation method of car networking desin speed adjustment based on VISSIM emulation
CN104778832A (en) Multimode city road cross section resource coordinated configuration method
Zhu et al. Quantifying the mobility and energy benefits of automated mobility districts using microscopic traffic simulation
CN108985616A (en) A kind of public transportation lane evaluation of layout method
CN104331746B (en) A kind of dynamic path optimization system and method for separate type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication