CN106685091B - Backstage distributing monitoring system based on Google Earth - Google Patents

Backstage distributing monitoring system based on Google Earth Download PDF

Info

Publication number
CN106685091B
CN106685091B CN201710136447.5A CN201710136447A CN106685091B CN 106685091 B CN106685091 B CN 106685091B CN 201710136447 A CN201710136447 A CN 201710136447A CN 106685091 B CN106685091 B CN 106685091B
Authority
CN
China
Prior art keywords
layer
pel
base map
access
backstage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710136447.5A
Other languages
Chinese (zh)
Other versions
CN106685091A (en
Inventor
刘刚
邱冬
张越
蒋家清
金富义
戴成弟
张福甲
张亦大
徐静
陈昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suqian Power Supply Co Of State Grid Jiangsu Electric Power Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Suqian Power Supply Co Of State Grid Jiangsu Electric Power Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Power Supply Co Of State Grid Jiangsu Electric Power Co, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical Suqian Power Supply Co Of State Grid Jiangsu Electric Power Co
Priority to CN201710136447.5A priority Critical patent/CN106685091B/en
Publication of CN106685091A publication Critical patent/CN106685091A/en
Application granted granted Critical
Publication of CN106685091B publication Critical patent/CN106685091B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is based on the backstage distributing monitoring systems of Google Earth to be related to backstage distributing monitoring system, especially a kind of monitoring system suitable for power generation, power transformation or power distribution station.Including preposition service layer, access layer, managed application data-layer, accumulation layer and the interface layer being successively connected;Operation of the desktop client end to core business database data information, addition, modification and deletion including data information, including pel mark 1) is carried out on base map, image name is carried out according to geographical form;2) base map layer is subjected to type mark, while saves corresponding longitude and latitude numerical value;3) Image editors are opened, corresponding base map layer is explained in further detail;4) different type route is marked, draws pel, finally saves;5) it to pel progress parameter setting has been drawn, saves;6) failure or defect record are carried out to the pel in step 5), uploads failure or defect photo, saved.

Description

Backstage distributing monitoring system based on Google Earth
Technical field
The present invention is based on the backstage distributing monitoring systems of Google Earth to be related to backstage distributing monitoring system, especially one Kind it is suitable for generating electricity, the monitoring system of power transformation or power distribution station.
Background technique
Currently, most domestic designing institute uses traditional transmission line of electricity route selection means, that is, depend on design institute 1:5000 the or 1:10000 papery topographic map or CAD diagram of purchase.This map is often excessively old, cannot accurately show geography State is had the limitation of regulation map sheet, and is presented using 2D mode, the limitation with vision, is unfavorable for designer rapidly, accurately Ground carries out route selection on figure.
With the development of science and technology, some designing institutees, which will use satellite map, carries out auxiliary route selection, and utilize Google Earth progress secondary development, the technical solution as disclosed in Patent publication No CN103996991A, on the basis of Google Maps, The mobile terminal that advanced satellite map system contains GPS function is combined, is achieved and is built a station, founds tower, line, survey Away from, share etc. Computer Aided Designs function, this mode convenient for designer in route selection using mobile terminal to route scene progress Route selection on the spot reduces costs;But this method can not achieve backstage manager and clearly check abort situation, it cannot be for event Barrier position photo exports accurate location in time, can not accomplish system overall monitor.
Summary of the invention
The purpose of the present invention is provide a kind of backstage distribution monitor based on Google Earth in view of the above shortcomings System makes to carry out transmission line of electricity wire selection system realization backstage manager's progress overall monitor based on Google Earth.
The present invention adopts the following technical solutions to achieve:
Backstage distributing monitoring system based on Google Earth, including be successively connected preposition service layer, access layer, answer With management level, accumulation layer and interface layer;
Preposition service layer includes desktop client end and intelligent sliding moved end, and intelligent sliding moved end includes handheld terminal and smart phone Client;
Access layer includes HTTP service, TCP service (multiple client-ends access mode), SMS service (short message service), Web Services service (mobile device access service) and access-in management agreement;
Managed application data-layer includes operation system and safety and two parts of control system, and wherein operation system is by enterprise's electric power Monitor supervision platform or monitoring mobile phone and control centre's composition, safety and control system are examined by access control, security control and database Index holds up composition;
Accumulation layer includes core business database;
Interface layer includes mobile phone access interface and/or other systems interface.
The HTTP service uses web page access server.
Preposition service layer initiates operational motion to managed application data-layer by access layer, and managed application data-layer passes through user right control After system and safety certification, the data that preposition service layer is sent are stored into core business database, and to core business data Content is added, modifies, deletes and inquires in library.
The monitoring process of backstage distributing monitoring system based on Google Earth, including desktop client end is to core business The operation of database data information, inquiry of the intelligent sliding moved end to core business database data information, smart machine is to failure The upload and modification of information.
Operation of the desktop client end to core business database data information, addition including data information are modified and are deleted It removes, specifically comprises the following steps:
1) position with corresponding clarity for being described Google Earth by desktop client end, carries out on base map Pel mark carries out image name according to geographical form;
2) base map layer, the latitude and longitude coordinates of real-time display base map layer, by base map layer are directed toward by cursor at desktop client end Type mark is carried out, while saving corresponding longitude and latitude numerical value;
3) Image editors are opened, corresponding base map layer is explained in further detail;
4) pel tools menu is opened, selects pel on Google Earth, by different type route using different Color is labeled, and is drawn pel, is finally saved;
5) it to pel progress parameter setting has been drawn, saves;
6) failure or defect record are carried out to the pel in step 5), uploads failure or defect photo, saved.
Base map described in step 1) includes base map layer and pel editing layer, and base map layer is Baidu map, and user can be in Baidu The geographical locations such as editor's mark street river on map;Can draw in pel editing layer needs pel route and editing console to be added Account.
Base map can be able to use the mode and the operating software page of left mouse button long-pressing by mouse roller zoom The transverse and longitudinal axis of rolling check different location.
The pel that user adds up can simultaneously amplify diminution with base map.
The parameter of the pel is the attribute of represented equipment or article, including title, date of putting into operation, main transformer capacity, shape State etc..
Inquiry of the intelligent sliding moved end to core business database data information, includes the following steps:
1) intelligent sliding moved end is serviced by Web Services and issues inquiry request to managed application data-layer;
2) managed application data-layer examines the search access right of intelligent sliding moved end, if any search access right, then by core business database In corresponding inquiry content be sent to intelligent sliding moved end, checked for user;Such as without search access right, then do not send.
Upload and modification of the smart machine to fault message, include the following steps:
1) smart machine is serviced by Web Services or TCP service issues managed application data-layer to upload or modify and ask It asks;
2) managed application data-layer examines the upload or modification authority of smart machine, if any uploading or modification authority, then allows pair Corresponding content in core business database is uploaded or is modified;Such as without upload or modification authority, then do not allow to access core Service database.
The invention has the advantages that
1, system uses tri-level logic Automated generalization, between each layer access relation, pass through Interface Controller.Realize perfect use The control of family permission, perfect security authentication mechanism;Access layer provides current mainstream service interface;In the premise for guaranteeing system safety Under, increase the availability of system, so as to the expansion of later system.
Desktop client end is stored data into the core business database of accumulation layer by database manipulation interface, and to core Content is made an amendment, is deleted in heart service database;Intelligent sliding moved end by interface layer to the core business database of accumulation layer into Row access, such as realize that immediate operand is not according to library by web services interface;Web Services interface provides Inquiry, deletes function at modification, ensure that stabilization, reliable, consistency that data are transmitted between the layers.And the number of smart machine According to being to be directly entered core database by managed application data-layer.
2, following platform access mode is provided:
1) end PC accesses;
2) iPhone end accesses;
3) Android mobile phone end accesses;
4) wechat access (needing to provide wechat public platform)
By terminal access facility abundant, it can easily and efficiently realize that any time, any place, anyone is to being The operation of system.
3, by this system, it is able to achieve the route to institute restriction, realizes complete management.It is simple and clear in system When and where upper mark route can clearly see line condition, the event of compass of competency in mobile phone, computer, wechat Hinder situation.
4, by this system, workflow examination & approval are able to achieve.Cumbersome papery signature approval process is avoided, work effect is improved Rate.For example emergency case is encountered, when employee initiates breakdown maintenance request, supervisor can directly be examined by intelligent terminal.
5, smart machine inspection is available arrives photo site, and the information such as longitude and latitude are accomplished evidence-based;It is available to apply Work photo site.
6, can make intelligent early warning and control, this system there are sufficient interfaces can be to monitoring point reality in conjunction with hardware Existing temperature, humidity, electric current, voltage real time monitoring.It was found that being more than threshold value, alarmed in time by wechat.Meanwhile it is flat by means of cloud Platform can remotely realize the intelligent switch to equipment.
Detailed description of the invention
A specific embodiment of the invention is further described with reference to the accompanying drawing:
Fig. 1 is that present system network opens up complement;
Fig. 2 is present system frame construction drawing.
Specific embodiment
The present invention is based on the backstage distributing monitoring systems of Google Earth, several big in conjunction with hardware, software, mobile terminal etc. Platform operates with, and grid opens up complement with reference to attached drawing 1;
Backstage distributing monitoring system based on Google Earth, including be successively connected preposition service layer, access layer, answer With management level, accumulation layer and interface layer;
Preposition service layer includes desktop client end and intelligent sliding moved end, and intelligent sliding moved end includes handheld terminal and smart phone Client;
Access layer includes HTTP service, TCP service (multiple client-ends access mode), SMS service (short message service), Web Services service (mobile device access service) and access-in management agreement;
Managed application data-layer includes operation system and safety and two parts of control system, and wherein operation system is by enterprise's electric power Monitor supervision platform or monitoring mobile phone and control centre's composition, safety and control system are examined by access control, security control and database Index holds up composition;
Accumulation layer includes core business database;
Interface layer includes mobile phone access interface and/or other systems interface.
The HTTP service uses web page access server.
Operation of the desktop client end to core business database data information, addition including data information are modified and are deleted It removes, specific steps are illustrated by following example:
1) position with corresponding clarity for being described Google Earth by desktop client end, carries out on base map Pel mark carries out image name according to geographical form;For example, selecting marking types to be labeled for river in river, name For river A;
Base map can be amplified and be reduced by mouse roller, be rolled by the transverse and longitudinal of long-pressing left mouse button or the operating software page Moving axis can check the different location on base map layer;The pel that user adds up can simultaneously amplify diminution with base map;
2) it finds fault point, cursor can be directed toward base map layer, the latitude and longitude coordinates of system real-time display base map layer, the bottom of by Figure layer carries out type mark, while saving longitude and latitude numerical value;Such as, the longitude to certain street river and latitude count respectively Value record;
3) it opens pel tools menu and pel is selected on Google Earth by the positioning of longitude and latitude, while with not Different type route is labeled with color, mouse is clicked and draws pel, finally save;The route of selection is used respectively red green Dichromatism is labeled, as substation F, aerial condutor solid line etc. are arranged among route;
4) it to pel progress parameter setting has been drawn, saves;
5) failure or defect record are carried out to the pel in step 5, uploads failure or defect photo, saved.
Using present system be not only convenient for designer in route selection using mobile terminal to route scene progress on the spot Route selection reduces costs;And be able to achieve backstage manager and clearly check abort situation, it is defeated in time for abort situation photo Accurate location out accomplishes system overall monitor.
Above embodiments are only exemplary embodiment of the present invention, are not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalents meeting, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (6)

1. a kind of backstage distributing monitoring system based on Google Earth, it is characterised in that: including the preposition clothes being successively connected Business layer, access layer, managed application data-layer, accumulation layer and interface layer;
Preposition service layer includes desktop client end and intelligent sliding moved end, and intelligent sliding moved end includes handheld terminal and smart phone client End;
Access layer includes HTTP service, TCP service, SMS service, Web Services service and access-in management agreement;
Managed application data-layer includes operation system and safety and two parts of control system, and wherein operation system is by enterprise's power monitoring Platform or monitoring mobile phone and control centre's composition, safety and control system are drawn by access control, security control and database retrieval Hold up composition;
Accumulation layer includes core business database;
Interface layer includes mobile phone access interface and/or other systems interface;
Preposition service layer by access layer to managed application data-layer initiate operational motion, managed application data-layer by user right control and After safety certification, the data that preposition service layer is sent are stored into core business database, and in core business database Content is added, modifies, deletes and inquires;
The HTTP service uses web page access server;
Operation including desktop client end to core business database data information, intelligent sliding moved end is to core business database number It is believed that the inquiry of breath, upload and modification of the smart machine to fault message;
Operation of the desktop client end to core business database data information, addition, modification and deletion including data information, tool Body includes the following steps:
1) position with corresponding clarity for being described Google Earth by desktop client end, carries out pel on base map Mark carries out image name according to geographical form;
2) base map layer is directed toward by cursor at desktop client end, the latitude and longitude coordinates of real-time display base map layer carry out base map layer Type mark, while saving corresponding longitude and latitude numerical value;
3) Image editors are opened, corresponding base map layer is explained in further detail;
4) pel tools menu is opened, selects pel on Google Earth, different type route is used into different colors It is labeled, draws pel, finally save;
5) it to pel progress parameter setting has been drawn, saves;
6) failure or defect record are carried out to the pel in step 5), uploads failure or defect photo, saved.
2. the monitoring process of the backstage distributing monitoring system according to claim 1 based on Google Earth, feature It is, base map described in step 1) includes base map layer and pel editing layer, and base map layer is Baidu map, and user can be in Baidu map Upper editor marks street river geographical location;Can draw in pel editing layer needs pel route to be added and editor's account.
3. the monitoring process of the backstage distributing monitoring system according to claim 1 based on Google Earth, feature It is, the base map in step 1) can be able to use the mode and operation of left mouse button long-pressing by mouse roller zoom The transverse and longitudinal axis of rolling of the software page checks different location;The pel that user adds up can simultaneously amplify diminution with base map.
4. the monitoring process of the backstage distributing monitoring system according to claim 1 based on Google Earth, feature It is, the parameter of the pel is the attribute of represented equipment or article, including title, date of putting into operation, main transformer capacity and state.
5. the monitoring process of the backstage distributing monitoring system according to claim 1 based on Google Earth, feature It is, inquiry of the intelligent sliding moved end to core business database data information includes the following steps:
1) intelligent sliding moved end is serviced by Web Services and issues inquiry request to managed application data-layer;
2) managed application data-layer examines the search access right of intelligent sliding moved end then will be in core business database if any search access right Corresponding inquiry content is sent to intelligent sliding moved end, checks for user;Such as without search access right, then do not send.
6. the monitoring process of the backstage distributing monitoring system according to claim 1 based on Google Earth, feature It is, upload and modification of the smart machine to fault message include the following steps:
1) smart machine is serviced by Web Services or TCP service issues managed application data-layer to upload or modify and request;
2) managed application data-layer examines the upload or modification authority of smart machine, if any upload or modification authority, then allows to core Corresponding content in service database is uploaded or is modified;Such as without upload or modification authority, then do not allow to access core business Database.
CN201710136447.5A 2017-03-08 2017-03-08 Backstage distributing monitoring system based on Google Earth Active CN106685091B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710136447.5A CN106685091B (en) 2017-03-08 2017-03-08 Backstage distributing monitoring system based on Google Earth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710136447.5A CN106685091B (en) 2017-03-08 2017-03-08 Backstage distributing monitoring system based on Google Earth

Publications (2)

Publication Number Publication Date
CN106685091A CN106685091A (en) 2017-05-17
CN106685091B true CN106685091B (en) 2019-11-05

Family

ID=58826012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710136447.5A Active CN106685091B (en) 2017-03-08 2017-03-08 Backstage distributing monitoring system based on Google Earth

Country Status (1)

Country Link
CN (1) CN106685091B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111223386A (en) * 2020-01-16 2020-06-02 深圳市中科智联科技有限公司 Electronic map lamp marking method, terminal and storage medium
CN111858521A (en) * 2020-07-27 2020-10-30 保定华电电力设计研究院有限公司 Distribution network engineering design data sharing cloud platform and application method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102088491A (en) * 2011-02-01 2011-06-08 西安建筑科技大学 Distributed storage oriented cloud storage security architecture and data access method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102088491A (en) * 2011-02-01 2011-06-08 西安建筑科技大学 Distributed storage oriented cloud storage security architecture and data access method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
结合小波变换与GIS地图的电力通信光缆故障定位及管理系统;李伟;《中国优秀硕士学位论文全文数据库 信息科技辑》;20160615;第23-49页 *

Also Published As

Publication number Publication date
CN106685091A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN104850596B (en) A kind of distribution data processing method based on mobile GIS and RTK positioning
CN103837796B (en) The transmission line malfunction visualization report method of a kind of sing on web and GIS and system
CN102938899B (en) Optimization system for wifi communication at rail transit stations
CN107292989A (en) High voltage power transmission cruising inspection system based on 3DGIS technologies
CN102760255B (en) Underground electric network data management and Electric Power Network Planning system and management method
CN103426061B (en) A kind of emergency maintenance based on target following and renewal integral system and method
CN106056349A (en) Province-city-county three-level power grid programming GIS drawing system and method
CN106408453A (en) GIS-based power transmission line intelligent inspection system
US20210294826A1 (en) Modeling Analysis Method for Equipment Management Network and Electronic Equipment
CN108010154A (en) Method and system for routing inspection of urban suburban pipe network
CN111428629B (en) Substation operation monitoring method, state determining method and unmanned aerial vehicle inspection system
CN111027834A (en) Power cable informatization management system and method based on three-dimensional detection technology
CN104506566A (en) IPad mobile online/offline site selection system based on cloud GIS (Geographic Information System) platform for wind power plant
CN112035983A (en) Urban medium-voltage power grid planning and designing platform based on three-dimensional real scene
CN105809575A (en) Mobile operation system and method for water and electricity production management
CN105447923A (en) Electric power circuit routing inspection system
CN108304983A (en) Management platform is repaiied in a kind of oil and gas pipeline inspection acquired based on unmanned plane and network communication technology data
CN108491649A (en) A kind of design method and processing equipment of wind power plant digital Platform
KR20140032205A (en) System and method for disaster damage investigation based on mobile
CN108764711A (en) Land patrol manages system
CN112287050A (en) Territorial monitoring service system based on high-resolution remote sensing
CN106685091B (en) Backstage distributing monitoring system based on Google Earth
CN107734458A (en) A kind of residential property personnel management methods and system
CN103698659A (en) Simulation early warning platform and monitoring system for dark spots on electric transmission line
CN102819788A (en) Whole journey live-action information management method and whole journey live-action information management system for movable type oil pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant