CN106657302A - Communication system for charging pile, and charging pile - Google Patents

Communication system for charging pile, and charging pile Download PDF

Info

Publication number
CN106657302A
CN106657302A CN201611132771.1A CN201611132771A CN106657302A CN 106657302 A CN106657302 A CN 106657302A CN 201611132771 A CN201611132771 A CN 201611132771A CN 106657302 A CN106657302 A CN 106657302A
Authority
CN
China
Prior art keywords
charging pile
concentrator
resource
charging
processor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611132771.1A
Other languages
Chinese (zh)
Inventor
潘鸣宇
孙舟
王伟贤
田贺平
李香龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611132771.1A priority Critical patent/CN106657302A/en
Publication of CN106657302A publication Critical patent/CN106657302A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/38Transceivers, i.e. devices in which transmitter and receiver form a structural unit and in which at least one part is used for functions of transmitting and receiving
    • H04B1/3827Portable transceivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a communication system for a charging pile, and the charging pile, wherein the system comprises a wireless communication device and a concentrator; the wireless communication device is arranged in each charging pile, and used for transmitting data by a processor and the concentrator of the charging pile, wherein the processor is used for performing resource processing according to a pre-set time division table sent by the concentrator; and the concentrator is used for sending a pre-set resource processing model to the processor, wherein the pre-set resource processing model is used for performing resource processing by the processor according to the charging time and consumed electricity of the charging pile. By means of the communication system for the charging pile, and the charging pile disclosed by the invention, the technical problem that the consumed electricity of the charging pile is singly used as the basis when resources of the charging pile are processed in the prior art can be solved.

Description

The communication system and charging pile of charging pile
Technical field
The present invention relates to field of power communication, in particular to the communication system and charging pile of a kind of charging pile.
Background technology
What State Council printed and distributed《Energy-conservation and new-energy automobile industrial development planning (2012-the year two thousand twenty)》Middle proposition 2012- The groundwork of the year two thousand twenty new-energy automobile development includes accelerating popularization and application and pilot demonstration, actively pushes forward electrically-charging equipment and builds If wanting planning of science activities, strengthen technological development, explore effective commercial operation pattern, actively push forward electrically-charging equipment construction, adapt to new The needs of energy automobile industrialized development.Accelerate to formulate electrically-charging equipment design, construction, operational management specification and correlation technique mark Standard, research and development electrically-charging equipment connects net, monitoring, metering, counting equipment and technology, carries out car net integration technology research and application, Explore new-energy automobile and realize the interactive mechanism of energy and information bidirectional as Mobile energy storage unit and electrical network.Explore business to transport Battalion's pattern, actively attracts social funds to participate in, and according to local supply of electric power and land resource situation, suits measures to local conditions to build and fills at a slow speed The facilities such as electric stake, public quick charging and conversion electric.But it is related to charging pile body, collection in current electric automobile operation management platform It is that foundation collects the charging electricity charge to user that device, user's charging system all adopt the single electric energy used with charging, so as to Cause charge inaccurate.
The single electric energy with charging pile consumption is as foundation during for processing the resource of charging pile in prior art Problem, effective solution is not yet proposed at present.
The content of the invention
The communication system and charging pile of a kind of charging pile are embodiments provided, it is right in prior art at least to solve The single technical problem with the electric energy of charging pile consumption as foundation when the resource of charging pile is processed.
A kind of one side according to embodiments of the present invention, there is provided communication system for charging pile, including:Channel radio T unit, is arranged in each charging pile, the processor and concentrator transmission data for charging pile, wherein, processor is used for Resource process is carried out according to the default moment division table that concentrator is issued;Concentrator, for issuing default money to processor Source processes model, wherein, time and the electricity of consumption that default resource process model charges for processor according to charging pile Amount carries out resource process.
Further, default resource processes model includes dividing the moment different in timetable, and timetable with money The corresponding relation in source.
Further, concentrator is additionally operable to the charging pile resource result of readback processor return.
Further, concentrator be additionally operable to record charging pile in the corresponding multigroup energy data of multiple different periods.
Further, concentrator is additionally operable to reserved multiple resources and processes model, wherein, multiple resources process model include as Descend any one or more:Carry out resource process according to charging times, resource process carried out according to charge volume ratio, according to default Resource carries out resource process and carries out resource process according to the charging interval.
Further, concentrator is additionally operable to record the clock information of charging pile communicated with concentrator, and by clock information Main station system is uploaded to, wherein, main station system is used for clock information and actual clock in any one concentrator or charging pile The clock information of concentrator or charging pile is calibrated when the error of information exceedes preset range.
Further, concentrator is additionally operable to arrange identification information for charging pile, or reads configured identification information excessively The identification information of charging pile.
Further, concentrator is additionally operable to perform the instruction charged without card of charging pile.
Further, concentrator is additionally operable to the inquiry of resource result, reports and the status data of charging pile calls survey together, Wherein, the status data of charging pile includes:Real-time status data, record of charging data, charge operation data, status data are reported Cycle and the stake multiplying power of charging pile.
Another aspect according to embodiments of the present invention, additionally provides a kind of charging pile, including it is above-mentioned any one be used to fill The communication system of electric stake.
In the embodiment of the present invention by being arranged at the processor and collection of the radio communication device in charging pile of each charging pile Transmission data between middle device, issues default resource and processes model by concentrator to processor.Electric load is anaplasia at any time Change, electrical network can be formed when electric load increases meets peak, meeting for electrical network can be formed when electric load reduces low Paddy, can be that the capacity of generation and supply electric equipment can not make full use of when meeting that gap is excessive between the peak value on curve and valley, For example, in the peak time power cuts to limit consumption of electrical network, electrical network low ebb period produce waste etc., such scheme by concentrator to The processor of charging pile issues the resource for carrying out resource process and processes model, and the electric energy consumed to charging pile is in difference Carry out different resources at quarter to process, so as to the only single situation with electricity as foundation of the process for avoiding resource process, solve Single technical problem with the electric energy of charging pile consumption as foundation when processing the resource of charging pile in prior art.
Description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of the communication system for charging pile according to embodiments of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than the embodiment of whole.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that description and claims of this specification and the term " first " in above-mentioned accompanying drawing, " Two " it is etc. the object for distinguishing similar, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating here or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, and for example, process, method, system, product or the equipment for containing series of steps or unit is not necessarily limited to Those steps clearly listed or unit, but may include clearly not list or for these processes, method, product Or intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of the communication system for charging pile, it should be noted that Can perform in the such as computer system of one group of computer executable instructions the step of the flow process of accompanying drawing is illustrated, and And, although logical order is shown in flow charts, but in some cases, institute can be performed with the order being different from herein The step of illustrating or describe.
Fig. 1 is the schematic diagram of the communication system for charging pile according to embodiments of the present invention, as shown in figure 1, the system Including:
Radio communication device 10, is arranged in each charging pile, the processor and concentrator transmission for the charging pile Data, wherein, the default moment division table that the processor is used to be issued according to the concentrator carries out resource process.
Specifically, above-mentioned processor is the processor of each charging pile, and the processor of charging pile can be used for charging pile Resource process is carried out, concentrator can enter row information as the point of multiple charging piles to the charging pile in a region Collect and be managed collectively.
Concentrator 20, for issuing default resource to processor model is processed, wherein, the default resource processes mould The time and the electricity of consumption that type charges for the processor according to the charging pile carries out resource process.
Specifically, above-mentioned default resource process model include dividing the moment different in timetable, and timetable with The corresponding relation of resource.Default moment division table will can constantly be divided into total, sharp, peak, flat, five periods of paddy so that every The processor of individual charging pile can respectively record the power consumption of each period according to the different periods.
From the foregoing, it will be observed that the above embodiments of the present application are by being arranged at the radio communication device of each charging pile in charging pile Transmission data between processor and concentrator, issues default resource and processes model by concentrator to processor.Electric load It is time dependent, electrical network can be formed when electric load increases meets peak, electricity can be formed when electric load reduces Net meets low ebb, when meeting that gap is excessive between the peak value on curve and valley, can be that the capacity of generation and supply electric equipment can not Make full use of, for example, in the peak time power cuts to limit consumption of electrical network, in the low ebb period of electrical network waste etc. is produced, such scheme leads to Cross concentrator and process model to the resource that the processor of charging pile is issued for carrying out resource process, the electricity that charging pile is consumed Can process different resources are not carried out in the same time, so as to avoid the process of resource process it is only single with electricity as foundation Situation, solves the electric energy with charging pile consumption single when processing the resource of charging pile in prior art as foundation Technical problem.
Optionally, according to the above embodiments of the present application, concentrator is additionally operable to the charging pile Energy Resources Service of readback processor return Reason result.
Optionally, according to the above embodiments of the present application, concentrator be additionally operable to record charging pile in multiple different periods pair The multigroup energy data answered.
Specifically, above-mentioned multiple different periods can be total, point determined by division timetable that Energy Resources Service is managed in model, Peak, flat, five periods of paddy, concentrator can respectively record the electric energy of this five periods.
Optionally, according to the above embodiments of the present application, concentrator is additionally operable to reserved multiple resources and processes model, wherein, it is many Kind of resource process model include it is following any one or more:Carry out resource process according to charging times, according to charge volume ratio Resource process is carried out, resource process is carried out according to default resource and carries out resource process according to the charging interval.
In a kind of optional embodiment, so that resource is processed as charging pile charge as an example, according to charging times resource is carried out Process can calculate toll amount according to the relation of default charging times and rate;Resource process is carried out according to Charge Proportional Can be that toll amount is calculated according to the relation of Charge Proportional and rate;According to default resource carry out resource process can be according to The default amount of money is charged, and the amount of money collected is the default amount of money;Carry out resource processing according to the charging interval can be root According to the time for dividing charging in moment table record different time sections, and according to the time and each time period of each time period charging Correspondence rate calculates toll amount.
Optionally, according to the above embodiments of the present application, concentrator be additionally operable to record communicate with concentrator charging pile when Clock information, and clock information is uploaded into main station system, wherein, main station system is used in any one concentrator or charging pile The clock information of concentrator or charging pile is calibrated when clock information exceedes preset range with the error of actual clock information.
In a kind of optional embodiment, concentrator can communicate with concentrator in daily scheduled event record each The clock of charging pile, and together report and submit main website with the clock of synchronization itself.In main station system, set up each concentrator and The clocking error monitoring module of each charging pile, when relatively large deviation or mistake occurs in the clock of any concentrator or any charging pile When, first according to main station system clock concentrator is carried out compared with when, compared with when successful concentrator charging pile is carried out again compared with when, for Compared with when unsuccessful, and alarm, to find and excluding related errors in time.
Optionally, according to the above embodiments of the present application, concentrator is additionally operable to arrange identification information for charging pile, or reads The identification information of the configured charging pile for crossing identification information.
In a kind of optional embodiment, in charging pile first Application, in order to manage concentratedly, concentrator can be to charging pile An identification information is issued, when concentrator is obtained to the charging pile with identification information and issues or read back data, is needed Accept obtain charging pile identification information, with determine issue or data of reading back object.
Optionally, according to the above embodiments of the present application, concentrator is additionally operable to perform the instruction charged without card of charging pile.
Optionally, according to the above embodiments of the present application, concentrator is additionally operable to the inquiry of resource result, reports and fill The status data of electric stake calls survey together, wherein, the status data of charging pile includes:Real-time status data, record of charging data, charging fortune The stake multiplying power of row data, status data report cycle and charging pile.
Embodiment 2
According to embodiments of the present invention, there is provided one kind is used to charge for any one in charging pile, including embodiment 1 The communication system of stake.
Charging pile communication system included by charging pile in the above embodiments of the present application is by being arranged at each charging pile Radio communication device between the processor and concentrator of charging pile transmission data, issued to processor by concentrator default Resource process model.Electric load is time dependent, and electrical network can be formed when electric load increases meets peak, when What electric load can form electrical network when reducing meets low ebb, when meeting that gap is excessive between the peak value on curve and valley, meeting It is that the capacity of generation and supply electric equipment can not make full use of, for example, in the peak time power cuts to limit consumption of electrical network, in the low ebb of electrical network Phase produces waste etc., and such scheme is processed by concentrator to the resource that the processor of charging pile is issued for carrying out resource process Model, not carry out different resources process in the same time to the electric energy of charging pile consumption, so as to avoid the mistake of resource process The only single situation with electricity as foundation of journey, solve when processing the resource of charging pile in prior art it is single with The electric energy of charging pile consumption is the technical problem of foundation.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can pass through other Mode is realized.Wherein, device embodiment described above is only schematic, such as the division of described unit, Ke Yiwei A kind of division of logic function, can there is an other dividing mode when actually realizing, such as multiple units or component can with reference to or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module Connect, can be electrical or other forms.
The unit as separating component explanation can be or may not be it is physically separate, it is aobvious as unit The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can according to the actual needs be selected to realize the purpose of this embodiment scheme.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list Unit both can be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized using in the form of SFU software functional unit and as independent production marketing or used When, during a computer read/write memory medium can be stored in.Based on such understanding, technical scheme is substantially The part for contributing to prior art in other words or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or network equipment etc.) perform the whole of each embodiment methods described of the invention or Part steps.And aforesaid storage medium includes:USB flash disk, read-only storage (ROM, Read-OnlyMemory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), portable hard drive, magnetic disc or CD etc. are various can be with store program codes Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of communication system for charging pile, it is characterised in that include:
Radio communication device, is arranged in each charging pile, the processor and concentrator transmission data for the charging pile, its In, the default moment division table that the processor is used to be issued according to the concentrator carries out resource process;
The concentrator, for issuing default resource to the processor model is processed, wherein, the default resource is processed The time and the electricity of consumption that model charges for the processor according to the charging pile carries out resource process.
2. system according to claim 1, it is characterised in that the default resource processes model to be included dividing the moment The corresponding relation of different moment and resource in table, and timetable.
3. system according to claim 2, it is characterised in that the concentrator is additionally operable to what processor described in retaking of a year or grade was returned The charging pile resource result.
4. system according to claim 3, it is characterised in that the concentrator is additionally operable to record the charging pile multiple The corresponding multigroup energy data of different periods.
5. system according to claim 4, it is characterised in that the concentrator is additionally operable to reserved multiple resources and processes mould Type, wherein, the multiple resources process model include it is following any one or more:According to charging times carry out resource process, Resource process is carried out according to charge volume ratio, resource process is carried out according to default resource and carries out Energy Resources Service according to the charging interval Reason.
6. system according to claim 5, it is characterised in that the concentrator is additionally operable to record and communicates with the concentrator Charging pile clock information, and the clock information is uploaded into main station system, wherein, the main station system is used for any The clock information of one concentrator or charging pile and the error of actual clock information more than during preset range to concentrator or charging The clock information of stake is calibrated.
7. system according to claim 6, it is characterised in that the concentrator is additionally operable to be arranged for the charging pile and identifies Information, or read the identification information of the configured charging pile for crossing identification information.
8. system according to claim 7, it is characterised in that the concentrator be additionally operable to perform the charging pile without card The instruction of charging.
9. system according to claim 8, it is characterised in that the concentrator be additionally operable to resource result inquiry, Report and the status data of charging pile calls survey together, wherein, the status data of the charging pile includes:Real-time status data, charging The stake multiplying power of record data, charge operation data, status data report cycle and the charging pile.
10. a kind of charging pile, it is characterised in that including the communication for charging pile described in any one in claim 1 to 9 System.
CN201611132771.1A 2016-12-09 2016-12-09 Communication system for charging pile, and charging pile Pending CN106657302A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611132771.1A CN106657302A (en) 2016-12-09 2016-12-09 Communication system for charging pile, and charging pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611132771.1A CN106657302A (en) 2016-12-09 2016-12-09 Communication system for charging pile, and charging pile

Publications (1)

Publication Number Publication Date
CN106657302A true CN106657302A (en) 2017-05-10

Family

ID=58824381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611132771.1A Pending CN106657302A (en) 2016-12-09 2016-12-09 Communication system for charging pile, and charging pile

Country Status (1)

Country Link
CN (1) CN106657302A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107394295A (en) * 2017-07-26 2017-11-24 万帮充电设备有限公司 Charge the method and system prejudged
CN112470013A (en) * 2019-05-24 2021-03-09 维尔塔有限公司 Electric vehicle charging monitoring device and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102742113A (en) * 2009-12-17 2012-10-17 库仑科技公司 Electric vehicle charging and accounting
CN202712974U (en) * 2012-06-12 2013-01-30 上海市电力公司 Power utilization information acquisition system
CN103259844A (en) * 2013-04-02 2013-08-21 国家电网公司 Electric automobile charging service system and method
CN103559782A (en) * 2013-10-28 2014-02-05 国家电网公司 Public community charging pile data concentrator with dual-network complementary function and application method of data concentrator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102742113A (en) * 2009-12-17 2012-10-17 库仑科技公司 Electric vehicle charging and accounting
CN202712974U (en) * 2012-06-12 2013-01-30 上海市电力公司 Power utilization information acquisition system
CN103259844A (en) * 2013-04-02 2013-08-21 国家电网公司 Electric automobile charging service system and method
CN103559782A (en) * 2013-10-28 2014-02-05 国家电网公司 Public community charging pile data concentrator with dual-network complementary function and application method of data concentrator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107394295A (en) * 2017-07-26 2017-11-24 万帮充电设备有限公司 Charge the method and system prejudged
CN107394295B (en) * 2017-07-26 2020-01-21 万帮充电设备有限公司 Charging pre-judging method and system
CN112470013A (en) * 2019-05-24 2021-03-09 维尔塔有限公司 Electric vehicle charging monitoring device and method
US11932131B2 (en) 2019-05-24 2024-03-19 Liikennevirta Oy / Virta Ltd Electric vehicle charging monitoring device and method

Similar Documents

Publication Publication Date Title
Unsihuay-Vila et al. Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model
CN102496213B (en) Battery charging and replacing flow control system for new energy automobiles
CN108491266A (en) Data processing method, device based on block chain and electronic equipment
US20150277410A1 (en) Power delivery system management
Cheng et al. Electric bus fast charging station resource planning considering load aggregation and renewable integration
CN108054773A (en) A kind of V2G intelligent scheduling method of servicing for peak load
CN103793794B (en) The automatic demand response of dsm evaluates system and method
Dukpa et al. Fuzzy stochastic programming method: Capacitor planning in distribution systems with wind generators
CN109523368A (en) A kind of electricity transaction system based on charging pile
CN107153924A (en) A kind of Research on Intelligent Scheduling of Public Traffic Vehicles generation method
CN108428114A (en) Information processing method and device, storage medium, the electronic device of project
CN110110895A (en) The method and terminal device of electric car Optimized Operation
CN104820939A (en) Analysis method and device based on charging transaction data
CN103996078A (en) Charging and discharging optimization control method for electric vehicle cluster
CN106657302A (en) Communication system for charging pile, and charging pile
CN113469585A (en) Carbon management data adjusting method, carbon management platform, system and storage medium
CN103854373A (en) Method and device for charging for electricity consumed by electric vehicle based on package settlement mode
CN106696732A (en) Monitoring system and method of electromobile charging station
CN106873552B (en) The electric car charging monitoring system and method for group's intarconnected cotrol
CN106390451A (en) Method and device for testing capacity of game server
CN111833205A (en) Mobile charging pile group intelligent scheduling method in big data scene
CN103065517A (en) System and method of popularization of science
CN110516849A (en) A kind of load classification evaluation of result method based on typical day load curve
CN108830515A (en) A kind of photovoltaic plant capital construction information management system
CN108764737A (en) The assessment of economic benefit method and device of industrial park user side battery energy storage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510

RJ01 Rejection of invention patent application after publication