CN105894742A - Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall - Google Patents

Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall Download PDF

Info

Publication number
CN105894742A
CN105894742A CN201610404721.8A CN201610404721A CN105894742A CN 105894742 A CN105894742 A CN 105894742A CN 201610404721 A CN201610404721 A CN 201610404721A CN 105894742 A CN105894742 A CN 105894742A
Authority
CN
China
Prior art keywords
warning
monitoring
rainfall
disaster
condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610404721.8A
Other languages
Chinese (zh)
Inventor
魏世玉
杨建国
江君
赵火焱
陈柏林
叶兆荣
陈立川
吴孟
李逾睿
王玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING HUADI ENGINEERING SURVEY AND DESIGN INSTITUTE
Chongqing Institute of Geology and Mineral Resources
Original Assignee
CHONGQING HUADI ENGINEERING SURVEY AND DESIGN INSTITUTE
Chongqing Institute of Geology and Mineral Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING HUADI ENGINEERING SURVEY AND DESIGN INSTITUTE, Chongqing Institute of Geology and Mineral Resources filed Critical CHONGQING HUADI ENGINEERING SURVEY AND DESIGN INSTITUTE
Priority to CN201610404721.8A priority Critical patent/CN105894742A/en
Publication of CN105894742A publication Critical patent/CN105894742A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B31/00Predictive alarm systems characterised by extrapolation or other computation using updated historic data

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Engineering & Computer Science (AREA)
  • Computing Systems (AREA)
  • Alarm Systems (AREA)

Abstract

The invention provides a monitoring and early warning method for a geological disaster warning and prevention area based on real-time rainfall monitoring, which comprises the following steps: surveying the precaution area, and dividing the precaution area into warning precaution blocks with different warning degrees according to disaster conditions; installing rainfall observation equipment at a preset point of each warning and precaution block to measure rainfall parameters in the current warning and precaution block; when the rainfall parameter exceeds an early warning threshold value, sending alarm information to the outside; and establishing a remote monitoring platform to monitor the state and the measurement data of the rainfall observation equipment in each warning and precaution block and manage the evacuation of the resident in the precaution area. The monitoring and early warning method of the invention has wider geological disaster monitoring coverage and stronger early warning real-time performance, and the geological disaster warning and prevention information management system improves the geological disaster monitoring informatization degree, realizes the effective management of the warning and prevention area and solves the problem of 'the last kilometer' of the geological disaster monitoring and early warning information release.

Description

The monitoring and pre-alarming method in district is taken precautions against based on the observation geological disaster warning of real-time rainfall
Technical field
The present invention relates to a kind of Geological Hazards Monitoring early warning technology, be specifically related to one and see based on real-time rainfall Survey geological disaster warning and take precautions against the monitoring and pre-alarming method in district.
Background technology
In recent years, the extreme weather conditions that particularly reservoir area of Three Gorges, Chongqing City dramatically increases is taken precautions against natural calamities to geological disaster Mitigation work brings challenge greatly.This area recurs repeatedly geological disaster, cause personal casualty loss and Economic loss, the geological disaster quantity wherein caused because of rainfall accounts for the overwhelming majority.And rainfall usually causes Multiple disaster consequence, such as mountain torrents, long-pending flood, road damage, house collapse, induction avalanche, landslide, mudstone Stream etc., therefore by the rainfall in monitoring area, can prevent most geological disaster.
Additionally, current calamity forecast aspect there is also a lot of problem:
1. as there is no, for research of abrupt geological hazard, effect of effectively taking precautions against natural calamities;
2. professional monitoring real-time is not enough, and monitoring information process of feedback is longer;
3. professional monitoring is generally basede on discrete single-point Monitoring Data to analyze geological hazard body monolithic stability sexual state, Easily omit;
4. mass presdiction and disaster prevention monitoring means falls behind and the most single, more focuses on the monitoring of macroscopic deformation situation.
Summary of the invention
The invention aims to provide a kind of monitor based on real-time rainfall broad covered area, early warning real-time By force, the geological disaster warning prevention method that the level of informatization is high, environmental suitability is strong.
Especially, the present invention provides the monitoring and warning taking precautions against district based on the monitoring geological disaster warning of real-time rainfall Method, it is characterised in that comprise the steps:
Step 100, investigates taking precautions against district, and is divided into difference to warn strick precaution zoning according to the condition of causing disaster Block is taken precautions against in the warning of degree;
Step 200, takes precautions against in each warning and installs rainfall scope at the predetermined point of block, current to measure The precipitation parameter in block is taken precautions against in warning;
Step 300, outwardly sends warning message when described precipitation parameter exceedes threshold value of warning;
Step 400, sets up remote monitoring platform, takes precautions against rainfall scope in block monitoring each warning State and measurement data, be managed the evacuation of inhabitation personnel in strick precaution district simultaneously.
Further, the condition of causing disaster in described step 100 include landform slope angle, catchment area/gross area, Surface water Escape condition, Slop type, leading edge river wash away situation, Human dried bloodstains, trailing edge depression feelings Condition, stratum, leading edge face sky abrupt slope height, ramp height, groundwater condition and Development of Geological Hazards surface density The present situation.
Further, described warning take precautions against block divide time, condition is close, occur geology hazardous condition similar The region suitable with the distribution situation of geologic body of causing disaster divides a warning into and takes precautions against block.
Further, determine cause disaster condition time, in addition it is also necessary to the pregnant calamity sufficient condition of each influence factor and Its weighted value, judges that the sufficient condition that causes disaster in block is taken precautions against in warning.
Further, in described step 200, it is spacious, smooth that described rainfall monitoring device is arranged on surrounding And the position that windage is little, the distance of surrounding barrier and rainfall monitoring device is risen not less than barrier With the rainfall monitoring instrument discrepancy in elevation 2 times.
Further, the region that the set-point of described rainfall monitoring device remotely calamity body deformability is active.
Further, in described step 300, the sending object of warning message includes broadcasting prior-warning device, sound The warning lamp that light is reported to the police, communication networking, and specify mass presdiction and disaster prevention person, the person of managing, garrison geological personnel and master Pipe department.
Further, described broadcast prior-warning device is wireless by be arranged on that warning takes precautions against in block in loudspeaker Control device, control loudspeaker and directly carry out the condition of a disaster audio frequency broadcasting.
Further, described rainfall scope includes the column providing installation foundation, and is arranged on column Top with analyze rain condition measuring instrument, receive described gage data the middle control module decision making, with And outwardly send the alarm device of the condition of a disaster.
Further, described rainfall scope also includes solar powered module and the electric power storage providing electric power Pond, described alarm device includes the warning lamp of local warning, and pre-to the broadcast of scheduled circuit transmission alarm signal Alarm device.
The monitoring and pre-alarming method of the present invention makes Geological Hazards Monitoring coverage rate wider, and early warning real-time is higher, ground The warning of matter disaster is taken precautions against information management system and is improve the Geological Hazards Monitoring level of informatization, it is achieved that to warning Take precautions against effective management in district, solve " last one kilometer " problem that Geological Hazards Monitoring early warning information is issued.
The present invention is directed to extreme rainfall and become the region of the principal element luring calamity, carry out rainfall lure calamity threshold value research, Rainfall observation and on-the-spot acousto-optic early warning work, can be that the research of abrupt geological hazard under extreme condition of raining is prevented Calamity work provides new means, expands area of taking precautions against natural calamities, preferably ensures the people's livelihood.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the monitoring and pre-alarming method of one embodiment of the invention;
Fig. 2 is the structural representation of the rainfall scope of one embodiment of the invention.
Detailed description of the invention
As it is shown in figure 1, warning based on the monitoring geological disaster of real-time rainfall of one embodiment of the invention is taken precautions against The monitoring and pre-alarming method in district comprises the steps: in general manner
Step 100, investigates taking precautions against district, and is divided into difference to warn strick precaution zoning according to the condition of causing disaster Block is taken precautions against in the warning of degree;
District of taking precautions against in this step is the region that typical case's Yi Fasheng rainfall induces geological disaster, utilizes 1:10000 The geologic survey basis of scale accuracy, according to 12 influence factors, analysis of stabilities of geological conditions Analysis and evaluation, be divided into several conditions warnings of causing disaster to take precautions against block by strick precaution zoning.
12 influence factors include landform slope angle, catchment area/gross area, surface water Escape condition, slope Type, leading edge river wash away situation, Human dried bloodstains, trailing edge depression situation, stratum, leading edge are faced empty steep Slope height, ramp height, groundwater condition, Development of Geological Hazards surface density etc..Drawing at limit of consideration block Timesharing, condition is close, occur similar and geologic body of causing disaster the distribution situation of geology hazardous condition suitable Region divide into one warning take precautions against block.
Stability analysis and evaluation includes: according to pregnant calamity sufficient condition and the weighted value thereof of each influence factor, The sufficient condition that causes disaster in cellular zone is judged.Cellular zone cause disaster condition analysis use fuzzy synthesis comment Sentence method, be calculated as follows:
B=K*R (1)
In formula, B is the fuzzy synthetic evaluation value of sufficient condition of causing disaster, and K is weighted value, and R is pregnant calamity bar Part adequacy.
Step 200, takes precautions against in each warning and installs rainfall scope at the predetermined point of block, current to measure The precipitation parameter in block is taken precautions against in warning;
In this step, need to consider following factors during installation rainfall scope:
1. rainfall scope should be laid in and belong to the warning causing disaster serious and take precautions against in block, layout density according to Geomorphologic conditions, resident live in concentrated communities the propagation radius of situation and early warning audio frequency and consider;
2. rainfall monitoring point is preferably laid in the position that surrounding is spacious, smooth and windage is little.Ordinary circumstance Under, the distance of surrounding barrier and instrument cannot be less than barrier and rises and 2 times of the instrument mouth discrepancy in elevation;
3., time for finding out that geological disaster hidden danger point periphery has more than " 3 family 10 people " gathering, rain should be disposed Amount monitoring station, simultaneously for ensureing the permanently effective work of precipitation station, precipitation station should not be deployed in ground calamity body deformability and live Jump region.
Step 300, outwardly sends warning message when described precipitation parameter exceedes threshold value of warning;
Rainfall scope in this step uses real-time rainfall monitoring mode, when rainfall value reaches to set Threshold value of warning time, by broadcast alarm mode and warning lamp type of alarm externally send alarm signal, to carry Wake up nearby residents and pedestrian's hedging or withdraw.By communication networking technology, and " taking over for use " monitors in ground calamity Existing loudspeaker (such as the loudspeaker of villagers' committee) near on-the-spot, installs control device of wireless additional, it is achieved The loudspeaker simultaneously driving " being taken over for use " during the broadcast audio work of monitoring station carry out isochronous audio broadcasting, by early warning Information feeds back to mass presdiction and disaster prevention person, the person of managing in time, garrisons geological personnel and authorities, and according to reality Threshold value of warning just definite value is modified by border ruuning situation.
Step 400, sets up remote monitoring platform, takes precautions against rainfall scope in block monitoring each warning State and measurement data, be managed the evacuation of inhabitation personnel in strick precaution district simultaneously.
Utilized by remote monitoring platform and control software accordingly, it is possible to achieve Life cycle high-efficiency management with And engineering construction is information-based and Standardization Construction, and it is dynamic, simultaneously to grasp rainfall in district is taken precautions against in warning in time Field apparatus is remotely managed.
This control software at least can realize following purpose:
1. the project implementation;
1. field investigation: field investigation information can be shown by remote monitoring platform.
2. installation and deployment: installation and deployment show that function is divided into geographical position to show and surrounding enviroment are shown, wherein Geographical position is shown by coordinate, and surrounding enviroment are shown by photo.
3. data are observed: system receives the real-time observed data of rainfall scope and is analyzed, on time Generate form to send to regulatory authorities.
(2) forewarning management
1. threshold management: threshold value of warning is suitably adjusted according to practical operation situation.
2. acousto-optic early warning record: system background real time record scene acousto-optic early warning situation.
3. short message alarm: real-time early warning information is informed in time villager, the small towns person of managing, district ground ring station with And ground, city ring station.
4. early warning information remotely updates: can remotely update on-the-spot early warning audio frequency.
The present embodiment geological disaster based on large scale precision probe, divides warning and takes precautions against block, determine Rainfall threshold value in district, by technology such as rainfall real-time monitored, sound and light alarm, Internet of Things communications, it is achieved Geological disaster Monitoring and forecasting system in real-time and preventing function.The present embodiment so that Geological Hazards Monitoring coverage rate more Extensively, early warning real-time is higher;Geological disaster warning is taken precautions against information management system and is improve Geological Hazards Monitoring letter Breathization degree, it is achieved that warning is taken precautions against effective management of district's Prevention And Treatment of Geological Hazards.
Illustrate that the dividing mode of block is taken precautions against in warning with the example of a concrete division.
Warning is taken precautions against block and is divided: condition of causing disaster divides above rank all to put warning strick precaution block A (bag under in charge less Include the sufficient condition region A1 that causes disaster, condition of causing disaster more abundant region A2, condition of causing disaster charge less subregion A3), The insufficient district of condition of causing disaster, divides non-warning into and takes precautions against block B.If tiltedly there is geological disaster hidden danger point in (limit) slope Or having there is geological disaster, this sloped region should divide warning into and take precautions against block A1 district.
Following table is taken precautions against block for warning and is caused disaster sufficient condition sex index table.
Determine rainfall threshold value: take precautions against the sufficient condition that causes disaster in block according to warning, in conjunction with local meteorological money Material, it is determined that rainfall threshold value, proposes warning and takes precautions against the treatment advice of block and be early warning or hedging withdraws (traffic pipe System).Taking precautions against block geological conditions in view of warning fragile, geological conditions is complicated, easily send out multiple Matter disaster, and resident lives in concentrated communities in region, physical features gentle slope, initial operating stage chooses the lower limit conduct of rainfall threshold value Warning take precautions against block rainfall threshold value, after progressively refine according to actual motion feedback.
Following table takes precautions against block rainfall threshold value for warning.
Rainfall scope type selecting: rainfall scope is the nucleus module that geological disaster warning is taken precautions against, Take precautions against the geological disaster warning preventing function of block for realizing selected warning, the parameter of rainfall scope needs Following table to be met.
As in figure 2 it is shown, one embodiment of the present of invention provides a kind of rainfall scope 100, including making For the column 20 of main body, column 20 utilizes concrete 30 to be fixed on the ground of point of observation, at column 20 On the termination erected, the measuring instrument 10 measuring rain condition is installed, for the broadcast to networking broadcast transmission the condition of a disaster Prior-warning device 11, the warning lamp 12 reported to the police by shadow, and absorb the solar powered module 13 of solar energy. In shaft or the bottom of column 20, power distribution cabinet 14 is installed, each equipment of control is installed in power distribution cabinet 14 The middle control module 15 run and accumulator 16.Middle control module 15 includes for networking wireless, wired Modules, and analyze and process the processor of rain condition parameter, memorizer.For preventing at column 20 Top hydrops, can arrange the drain pipe 17 connecting column top to ground together along column 20 shaft. Fix intensity for improving column 20, built-in fitting 21, the bottom of column 20 can be set in concrete 30 It is connected with built-in fitting 21 by flange 22.
So far, although those skilled in the art will appreciate that and the most detailed illustrate and describing the present invention's Multiple exemplary embodiments, but, without departing from the spirit and scope of the present invention, still can be according to this Disclosure of invention directly determines or derives other variations or modifications of many meeting the principle of the invention.Cause This, the scope of the present invention is it is understood that and regard as covering other variations or modifications all these.

Claims (10)

1. the monitoring and pre-alarming method in district is taken precautions against based on the monitoring geological disaster warning of real-time rainfall, it is characterised in that Comprise the steps:
Step 100, investigates taking precautions against district, and is divided into difference to warn strick precaution zoning according to the condition of causing disaster Block is taken precautions against in the warning of degree;
Step 200, takes precautions against in each warning and installs rainfall scope at the predetermined point of block, current to measure The precipitation parameter in block is taken precautions against in warning;
Step 300, outwardly sends warning message when described precipitation parameter exceedes threshold value of warning;
Step 400, sets up remote monitoring platform, takes precautions against rainfall scope in block monitoring each warning State and measurement data, be managed the evacuation of inhabitation personnel in strick precaution district simultaneously.
Monitoring and pre-alarming method the most according to claim 1, it is characterised in that
The condition of causing disaster in described step 100 includes that landform slope angle, catchment area/gross area, surface water are drained Condition, Slop type, leading edge river wash away situation, Human dried bloodstains, trailing edge depression situation, stratum, Leading edge faces sky abrupt slope height, ramp height, groundwater condition and the present situation of Development of Geological Hazards surface density.
Monitoring and pre-alarming method the most according to claim 2, it is characterised in that
Described warning takes precautions against block when dividing, condition is close, occur that geology hazardous condition is similar and geology of causing disaster The region that the distribution situation of body is suitable divides a warning strick precaution block into.
Monitoring and pre-alarming method the most according to claim 3, it is characterised in that
Determine cause disaster condition time, in addition it is also necessary to pregnant calamity sufficient condition and the weighted value thereof to each influence factor, Judge that the sufficient condition that causes disaster in block is taken precautions against in warning.
Monitoring and pre-alarming method the most according to claim 1, it is characterised in that
In described step 200, described rainfall monitoring device is arranged on that surrounding is spacious, smooth and windage The distance of little position, surrounding barrier and rainfall monitoring device is risen not less than barrier and rainfall is supervised Survey the instrument discrepancy in elevation 2 times.
Monitoring and pre-alarming method the most according to claim 5, it is characterised in that
The region that the set-point of described rainfall monitoring device remotely calamity body deformability is active.
Monitoring and pre-alarming method the most according to claim 1, it is characterised in that
In described step 300, the sending object of warning message includes broadcasting prior-warning device, the police of sound and light alarm Lamp, communication networking, and specify mass presdiction and disaster prevention person, the person of managing, garrison geological personnel and authorities.
Monitoring and pre-alarming method the most according to claim 7, it is characterised in that
Described broadcast prior-warning device by being arranged on the control device of wireless that warning is taken precautions against in block in loudspeaker, Control loudspeaker and directly carry out the condition of a disaster audio frequency broadcasting.
Monitoring and pre-alarming method the most according to claim 1, it is characterised in that
Described rainfall scope includes the column providing installation foundation, and is arranged on the top of column to divide The measuring instrument of analysis rain condition, receives described gage data the middle control module decision making, and outwardly sends out Send the alarm device of the condition of a disaster.
Monitoring and pre-alarming method the most according to claim 9, it is characterised in that
Described rainfall scope also includes solar powered module and accumulator, the described report providing electric power Alarm device includes the warning lamp of local warning, and sends the broadcast prior-warning device of alarm signal to scheduled circuit.
CN201610404721.8A 2016-06-08 2016-06-08 Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall Pending CN105894742A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610404721.8A CN105894742A (en) 2016-06-08 2016-06-08 Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610404721.8A CN105894742A (en) 2016-06-08 2016-06-08 Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall

Publications (1)

Publication Number Publication Date
CN105894742A true CN105894742A (en) 2016-08-24

Family

ID=56729003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610404721.8A Pending CN105894742A (en) 2016-06-08 2016-06-08 Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall

Country Status (1)

Country Link
CN (1) CN105894742A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651165A (en) * 2016-12-15 2017-05-10 中国电力科学研究院 Rainfall capacity risk ranking method and apparatus used for geological disaster region assessment pre-warning
CN107255829A (en) * 2017-06-09 2017-10-17 成都亿动视通科技有限公司 Radiation environment monitoring method for emergency and system
CN109035709A (en) * 2018-09-13 2018-12-18 中国科学院、水利部成都山地灾害与环境研究所 A kind of method for early warning, the apparatus and system of mountain torrents mud-rock flow
CN110849415A (en) * 2019-11-07 2020-02-28 中交天航港湾建设工程有限公司 Rainfall point location arrangement and monitoring system and method
CN112465356A (en) * 2020-11-30 2021-03-09 国网四川省电力公司电力科学研究院 Improved quantitative evaluation method and system for material vulnerability of landslide geological disaster
CN113380005A (en) * 2021-08-16 2021-09-10 中铁水利水电规划设计集团有限公司 Flood prevention consultation monitoring device and method based on Internet of things
CN114093138A (en) * 2022-01-11 2022-02-25 国能大渡河流域水电开发有限公司 Embedded rainfall monitoring terminal and monitoring method for landslide monitoring and early warning
CN114333245A (en) * 2022-01-05 2022-04-12 中国地质科学院探矿工艺研究所 Multi-parameter model dynamic early warning method based on landslide three-dimensional monitoring
CN115424426A (en) * 2022-08-15 2022-12-02 中国地质环境监测院(自然资源部地质灾害技术指导中心) Method for improving accuracy of regional geological disaster early warning and forecasting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477207A (en) * 2009-01-20 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 Intelligent geological calamity synthetic monitoring system and multi-stage prediction analysis method
CN102103787A (en) * 2011-02-27 2011-06-22 中国科学院水利部成都山地灾害与环境研究所 Debris flow early warning method
CN202275482U (en) * 2011-09-06 2012-06-13 北京中民防险科技发展有限公司 Debris flow disaster prevention and alarm system
CN202929821U (en) * 2012-08-09 2013-05-08 梁睿 3G (the 3rd generation telecommunication) wireless hydraulic video and data monitor system
CN104952213A (en) * 2015-05-20 2015-09-30 中国电力科学研究院 Rainfall type landslide disaster early warning system and method for power transmission line
CN105608840A (en) * 2016-03-09 2016-05-25 长江水利委员会水文局 Mountain torrents early warning platform based on fused quantitative rainfall forecast algorithm, and early warning method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477207A (en) * 2009-01-20 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 Intelligent geological calamity synthetic monitoring system and multi-stage prediction analysis method
CN102103787A (en) * 2011-02-27 2011-06-22 中国科学院水利部成都山地灾害与环境研究所 Debris flow early warning method
CN202275482U (en) * 2011-09-06 2012-06-13 北京中民防险科技发展有限公司 Debris flow disaster prevention and alarm system
CN202929821U (en) * 2012-08-09 2013-05-08 梁睿 3G (the 3rd generation telecommunication) wireless hydraulic video and data monitor system
CN104952213A (en) * 2015-05-20 2015-09-30 中国电力科学研究院 Rainfall type landslide disaster early warning system and method for power transmission line
CN105608840A (en) * 2016-03-09 2016-05-25 长江水利委员会水文局 Mountain torrents early warning platform based on fused quantitative rainfall forecast algorithm, and early warning method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651165A (en) * 2016-12-15 2017-05-10 中国电力科学研究院 Rainfall capacity risk ranking method and apparatus used for geological disaster region assessment pre-warning
CN106651165B (en) * 2016-12-15 2022-01-11 中国电力科学研究院 Rainfall risk grading method and device for geological disaster area assessment and early warning
CN107255829A (en) * 2017-06-09 2017-10-17 成都亿动视通科技有限公司 Radiation environment monitoring method for emergency and system
CN109035709A (en) * 2018-09-13 2018-12-18 中国科学院、水利部成都山地灾害与环境研究所 A kind of method for early warning, the apparatus and system of mountain torrents mud-rock flow
CN110849415A (en) * 2019-11-07 2020-02-28 中交天航港湾建设工程有限公司 Rainfall point location arrangement and monitoring system and method
CN112465356A (en) * 2020-11-30 2021-03-09 国网四川省电力公司电力科学研究院 Improved quantitative evaluation method and system for material vulnerability of landslide geological disaster
CN112465356B (en) * 2020-11-30 2023-05-23 国网四川省电力公司电力科学研究院 Improved quantitative evaluation method and system for vulnerability of collapse geological disaster substance
CN113380005A (en) * 2021-08-16 2021-09-10 中铁水利水电规划设计集团有限公司 Flood prevention consultation monitoring device and method based on Internet of things
CN114333245A (en) * 2022-01-05 2022-04-12 中国地质科学院探矿工艺研究所 Multi-parameter model dynamic early warning method based on landslide three-dimensional monitoring
CN114093138A (en) * 2022-01-11 2022-02-25 国能大渡河流域水电开发有限公司 Embedded rainfall monitoring terminal and monitoring method for landslide monitoring and early warning
CN115424426A (en) * 2022-08-15 2022-12-02 中国地质环境监测院(自然资源部地质灾害技术指导中心) Method for improving accuracy of regional geological disaster early warning and forecasting

Similar Documents

Publication Publication Date Title
CN105894742A (en) Monitoring and early warning method for observing geological disaster warning and prevention area based on real-time rainfall
CN111882830B (en) Urban waterlogging monitoring, forecasting and early warning method, device and system and storage medium
CN106128035B (en) The geological disaster forecasting method merged based on neural network and multi-parameter information
KR102124546B1 (en) Management and warning system of falling rock and soil and stone measure facilities to be communicated with the slope warning device
CN111275937B (en) Intelligent waterlogging early warning method and device
CN106023530A (en) Heavy rain type diluted debris flow monitoring, forecast and early warning device and method
CN105678966A (en) Integrated monitoring and early warning system for geological mountain torrent disaster and realization method thereof
KR101092093B1 (en) Apparatus for sensing inundation and street lamp therewith
CN105844859B (en) A kind of highway crag wireless monitor early warning system
CN203720380U (en) Mobile hydrology meteorology monitoring and compass positioning communication and alarm device
KR101103697B1 (en) Landslide warning system using rainfall and soil moisture content
JP2002269656A (en) River information provision system
CN102353400A (en) Method and system for monitoring icing condition of overhead power transmission line
CN103090825A (en) Compatible railroad bridge condition monitoring system based on Beidou satellite
CN107525558A (en) Ponding on-line monitoring system and its monitoring method under a kind of bridge based on cloud platform
Khedo Real-time flood monitoring using wireless sensor networks
CN114235093A (en) Automatic early warning system and early warning method for water levels of subway tunnel and pipe gallery
CN103512621A (en) Environment monitoring method and system
CN111780829B (en) Blockage detection system and method for drainage well lid
CN101477206A (en) Geological calamity emergency monitoring, predicting and analyzing method
Ancona et al. An “Internet of Things” vision of the flood monitoring problem
CN109307545A (en) A kind of waterlogging monitoring device
CN202120410U (en) Multichannel broken-line monitoring early warning device for debris flow
KR101278300B1 (en) System for Integrated Information Guide using Wireless Communication
CN202956865U (en) Urban waterlogging alarm device base on GPRS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160824