CN105191408A - Method, device and apparatus for controlling base station - Google Patents

Method, device and apparatus for controlling base station Download PDF

Info

Publication number
CN105191408A
CN105191408A CN201480000225.5A CN201480000225A CN105191408A CN 105191408 A CN105191408 A CN 105191408A CN 201480000225 A CN201480000225 A CN 201480000225A CN 105191408 A CN105191408 A CN 105191408A
Authority
CN
China
Prior art keywords
base station
load
default
threshold
transmission power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201480000225.5A
Other languages
Chinese (zh)
Other versions
CN105191408B (en
Inventor
刘玉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN105191408A publication Critical patent/CN105191408A/en
Application granted granted Critical
Publication of CN105191408B publication Critical patent/CN105191408B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/08Reselecting an access point
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/22Performing reselection for specific purposes for handling the traffic
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Disclosed are a method, device and apparatus for controlling a base station. The method comprises: acquiring a load of a first base station and a load of a second base station, wherein a coverage region of the second base station comprises a coverage region of the first base station; if the load of the first base station is less than a preset first load threshold and the load of the second base station is less than a preset second load threshold, switching a UE accessing the first base station to the second base station, and closing the first base station to enable the first base station to enter a dormant energy-saving state; and acquiring the load of the second base station, and if the load of the second base station is greater than or equal to a preset third load threshold, activating the first base station to enable the first base station to enter an operating state. The present invention can avoid the phenomena of delay or even interruption of partial services due to the fact that a second base station cannot bear a suddenly increased service amount, and avoid causing damage to a user.

Description

Method, device and apparatus for controlling base station
A kind of method being controlled to base station, device and equipment technical field
The present invention relates to the communications field, more particularly to a kind of method being controlled to base station, device and equipment.Background technology
With the rapid development of mobile communication technology, people are increasing to the demand of mobile communication business, in order to tackle a large amount of mobile communication businesses, operator deploys substantial amounts of micro-base station and macro base station in a network, but the substantial amounts of base station of operation needs to consume more energy.Therefore, the problem of network power consumption becomes an extensive concern how is reduced.
At present, it can be in micro-base station in the time of low traffic and close micro-base station to reduce the power consumption of network, be specially:If the overlay area of macro base station includes the overlay area of micro-base station, the period of the daily low traffic of statistics micro-base station, daily closing micro-base station when the period starts, making micro-base station be in dormancy power save mode within the period;Micro-base station is opened at the end of the period daily, micro-base station is entered working condition.For example, it is assumed that the statistics micro-base station daily low traffic period is 0:00 to 8:00, daily 0:Micro-base station is closed when 00, makes micro-base station 0:00 to 8:00 is in dormancy power save mode;Daily 8:Micro-base station is opened when 00, micro-base station is entered working condition.
During the present invention is realized, inventor has found that prior art at least has problems with:After micro-base station closing, if the portfolio of macro base station increase suddenly and beyond the bearing capacity of macro base station, now micro-base station is in dormancy power save mode, it is impossible to share macro base station increased portfolio suddenly, traffic delay even service disconnection can be then caused, is caused damage to user.The content of the invention
In order to avoid traffic delay even service disconnection, the invention provides a kind of method being controlled to base station, device and equipment.The technical scheme is as follows:
In a first aspect, a kind of method being controlled to base station, methods described includes:
The load of first base station and the load of the second base station are obtained, the overlay area of second base station includes the overlay area of the first base station;
If the load of the first base station is less than the load of default first load-threshold and second base station Less than default second load-threshold, then UE (the User Equipment, user equipment of the first base station will be accessed)It is switched on second base station, closes the first base station, the first base station is entered dormancy power save mode;
The load of second base station is obtained, if the load of second base station is more than or equal to default 3rd load-threshold, the first base station is activated, the first base station is entered working condition.
With reference in a first aspect, in the first possible implementation of first aspect, the load for obtaining the second base station, including:
Obtain the load of the base station and the base station of overlay area of the overlay area including the first base station;If the base station is a base station, the base station is defined as the second base station and the load of the base station is defined as to the load of second base station;
If the base station is multiple base stations, the minimum base station of selection load, is defined as the second base station by the base station of the selection and the load of the base station of the selection is defined as to the load of second base station from the base station.
It is described that the UE for accessing the first base station is switched to second base station with reference in a first aspect, in second of possible implementation of first aspect, including:
If the frequency that the first base station is supported is different from the frequency that second base station is supported, the UE of the request access first base station is switched on second base station;Or,
If the frequency that the first base station is supported is identical with the frequency that second base station is supported, then gradually reduce the transmission power of the first base station, the UE of the access first base station is set independently to be switched to second base station, untill accessing when the UE of the first base station is switched on second base station entirely.
It is described to close the first base station with reference in a first aspect, in the third possible implementation of first aspect, the first base station is entered dormancy power save mode, including:
Close and CPU (Central Processing Unit, central processing unit are removed in the first base station)Other functional modules beyond mini system and X2 interface, so that the first base station enters dormancy power save mode.
With reference in a first aspect, in the 4th kind of possible implementation of first aspect, the load for obtaining second base station, including:
The load of second base station is obtained by the CPU mini systems and the X2 interface.
With reference in a first aspect, in the 5th kind of possible implementation of first aspect, after the activation first base station, in addition to:
The transmission power of the first base station is recovered to the specified transmission power of the first base station.
It is described by described first with reference in a first aspect, in the 6th kind of possible implementation of first aspect The transmission power of base station is recovered to the specified transmission power of the first base station, including:
The transmission power of the first base station is gradually lifted, untill when the transmission power of the first base station reaches the specified transmission power of the first base station;Or,
The transmission power of the first base station is directly recovered to the specified transmission power of the first base station.A kind of second aspect, device being controlled to base station, methods described includes:
First acquisition module, for obtaining the load of first base station and the load of the second base station, the overlay area of second base station includes the overlay area of the first base station;
Handover module, if the load for the first base station is less than default first load-threshold and the load of second base station is less than default second load-threshold, the UE for accessing the first base station is switched on second base station;
Closedown module, for closing the first base station, makes the first base station enter dormancy power save mode;Second acquisition module, the load for obtaining second base station;
Active module, if the load for second base station is more than or equal to default 3rd load-threshold, activates the first base station, the first base station is entered working condition.
With reference to second aspect, in the first possible implementation of second aspect, first acquisition module includes:
First acquisition unit, the load of base station and the base station for obtaining overlay area of the overlay area including the first base station;
First determining unit, if being a base station for the base station, is defined as the second base station by the base station and the load of the base station is defined as to the load of second base station;
Second determining unit, if being multiple base stations for the base station, the minimum base station of selection load, is defined as the second base station by the base station of the selection and the load of the base station of the selection is defined as to the load of second base station from the base station.
With reference to second aspect, in second of possible implementation of second aspect, the handover module includes:
Request unit, if different from the frequency that second base station is supported for the frequency that the first base station is supported, the UE of the request access first base station is switched on second base station;Or,
Reduce unit, if identical with the frequency that second base station is supported for the frequency that the first base station is supported, then gradually reduce the transmission power of the first base station, the UE of the access first base station is set independently to be switched to second base station, untill accessing when the UE of the first base station is switched on second base station entirely. With reference to second aspect, in the third possible implementation of second aspect, the closedown module is specifically for closing other functional modules in the first base station in addition to CPU mini systems and X2 interface, so that the first base station enters dormancy power save mode.
With reference to second aspect, in the 4th kind of possible implementation of second aspect, second acquisition module is specifically for the load by the CPU mini systems and X2 interface acquisition second base station.
With reference to second aspect, in the 5th kind of possible implementation of second aspect, described device also includes:Recovery module, for the transmission power of the first base station to be recovered to the specified transmission power of the first base station.
With reference to second aspect, in the 6th kind of possible implementation of second aspect, the recovery module includes:
Lift unit, the transmission power for gradually lifting the first base station, untill when the transmission power of the first base station reaches the specified transmission power of the first base station;Or,
Recovery unit, for directly recovering the transmission power of the first base station to the specified transmission power of the first base station.
A kind of third aspect, equipment, the equipment includes:
Memory and processor, for performing a kind of method being controlled to base station.
In embodiments of the present invention, if the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station, closing first base station makes first base station enter dormancy power save mode, has saved the energy;When first base station is in dormancy power save mode, if the portfolio of the second base station is uprushed and the load of the second base station is more than default 3rd load-threshold, it is then automatic to activate first base station, first base station is entered working condition and first base station is shared the portfolio that the second base station is uprushed, avoid causes partial service delay or even the phenomenon interrupted because the second base station can not carry the portfolio uprushed, and avoids causing damage to user.Brief description of the drawings
Fig. 1 is a kind of apparatus structure schematic diagram being controlled to base station that the embodiment of the present invention 1 is provided;Fig. 2 is a kind of method flow diagram being controlled to base station that the embodiment of the present invention 2 is provided;Fig. 3 is a kind of method flow diagram being controlled to base station that the embodiment of the present invention 3 is provided;Fig. 4 is a kind of device structure schematic diagram being controlled to base station that the embodiment of the present invention 4 is provided.Embodiment To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing, embodiment of the present invention is described further in detail.Embodiment 1
Referring to Fig. 1, the embodiments of the invention provide a kind of device being controlled to base station, including:First acquisition module 101, for obtaining the load of first base station and the load of the second base station, the overlay area of the second base station includes the overlay area of first base station;
Handover module 102, if the load for first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station;Closedown module 103, for closing first base station, makes first base station enter dormancy power save mode;Second acquisition module 104, the load for obtaining the second base station;
Active module 105, if the load for the second base station is more than or equal to default 3rd load-threshold, activates first base station, first base station is entered working condition.
Preferably, the first acquisition module 101 includes:
First acquisition unit, the load of base station and the base station for obtaining overlay area of the overlay area including first base station;
First determining unit, if being a base station for the base station, is defined as the second base station by the base station and the load of the base station is defined as to the load of the second base station;
Second determining unit, if being multiple base stations for the base station, the minimum base station of selection load, is defined as the second base station by the base station of selection and the load of the base station of selection is defined as to the load of the second base station from the base station.
Wherein, when the daily low traffic period starts, first acquisition unit obtains the load of first base station, and the load of the base station and the base station of overlay area of the overlay area including first base station is obtained, the low traffic period is that the load of first base station in one day is less than the period for presetting the 4th load-threshold;If the base station is a base station, the base station is defined as the second base station and the load of the base station is defined as to the load of the second base station by the first determining unit;If the base station is multiple base stations, the second determining unit is selected to load minimum base station from the base station, and the base station of selection is defined as into the second base station and the load of the base station of selection is defined as to the load of the second base station.
Preferably, first acquisition unit obtains the load of the base station of overlay area of the overlay area including first base station, including:
First acquisition unit sends the first request message by the X2 interface of first base station to be included to overlay area The base station of the overlay area of first base station;The base station receives the first request message by the X2 interface of itself, obtains the load of itself, generates the first response message, and the first response message carries the load of the base station, and the base station sends the first response message to first acquisition unit by the X2 interface of itself;First acquisition unit receives the first response message by the X2 interface of first base station, and the load of the base station is extracted from the first response message.
Wherein, the load of first base station includes PRB (the Physical Radio Block, radio physical resource block of first base station)The UE of utilization rate, the cpu busy percentage of first base station and access first base station number;The load of second base station includes the PRB utilization rates of the second base station, the UE of the second base station of the cpu busy percentage of the second base station and access number.The load of technical staff counted first base station in one day in advance each period, finds out load less than the default 4th load-threshold corresponding period, using the period as first base station the low traffic period.
Default 4th load-threshold includes the wealthy value of default 4th PRB utilization rates, the wealthy value of default 4th cpu busy percentage and default 4th number.
If the PRB utilization rates of first base station are less than the default 4th wealthy value of PRB utilization rates preset the 4th load-threshold and included, the cpu busy percentage of first base station includes less than default 4th load-threshold the default 4th wealthy value of cpu busy percentage and the UE of access first base station number, which are less than, presets default 4th number that the 4th load-threshold includes, it is determined that the load of first base station, which is less than, presets the 4th load-threshold;Otherwise, it determines the load of first base station is more than or equal to default 4th load-threshold.
For example, it is assumed that the low traffic period of first base station is daily 0:00 to 8:00, daily 0:When 00, the load of first base station and the load of the second base station are obtained.
Assuming that it is 9% and the UE of access first base station number is 3 that the PRB utilization rates that include of load for the first base station that first acquisition unit is obtained, which are 10%, CPU utilization rates,;The PRB utilization rates that the load of second base station includes are that 12%, cpu busy percentage is 6% and the UE of the second base station of access number is 5.
Preferably, if the load that handover module 102 is used for first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station;
Specifically, handover module 102 judges whether the load of first base station is less than default first load-threshold, and judges whether the load of the second base station is less than default second load-threshold;
Wherein, presetting the first load-threshold includes the wealthy value of default first PRB utilization rates, the wealthy value of default first CPU utilization rates and default first number;Default second load-threshold includes the wealthy value of default 2nd PRB utilization rates, the wealthy value of default second cpu busy percentage and default second number.
If the PRB utilization rates of first base station are less than default first PRB that default first load-threshold includes The number preset the wealthy value of the first cpu busy percentage and access the UE of first base station that the wealthy value of utilization rate, the cpu busy percentage of first base station are less than default first load-threshold and included is less than default first number that default first load-threshold includes, then determine that the load of first base station is less than default first load-threshold, otherwise, it determines the load of first base station is more than or equal to default second load-threshold.
If the PRB utilization rates of the second base station are less than the default 2nd wealthy value of PRB utilization rates preset the second load-threshold and included, the cpu busy percentage of the second base station includes less than default second load-threshold the default wealthy value of second cpu busy percentage and the UE of the second base station of access number, which are less than, presets default second number that the second load-threshold includes, then determine that the load of the second base station is less than default second load-threshold, otherwise, it determines the load of the second base station is more than or equal to default second load-threshold.
For example, it is assumed that the first wealthy value of PRB utilization rates of presetting that default first load-threshold includes is that 20%, the default wealthy value of first cpu busy percentage is 15% and default first number is 20;The default 2nd wealthy value of PRB utilization rates that default second load-threshold includes is that 20%, the default wealthy value of second cpu busy percentage is 20% and default second number is 25;
It can draw, the PRB utilization rates 10% that the load of first base station includes are less than the wealthy value 20% of default first PRB utilization rates that default first load-threshold includes, the cpu busy percentage 9% that the load of first base station includes is less than the wealthy value 15% of default first cpu busy percentage that default first load-threshold includes, the UE for the access first base station that the load of first base station includes number 3 is less than default first number 20 that default first load-threshold includes, thus may determine that the load of first base station is less than default first load-threshold;
The PRB utilization rates 12% that the load of second base station includes are less than the wealthy value 20% of default 2nd PRB utilization rates that default second load-threshold includes, the cpu busy percentage 6% that the load of second base station includes is less than the wealthy value 20% of default second cpu busy percentage that default second load-threshold includes, the UE for the base station of access second that the load of second base station includes number 5 is less than default second number 25 that default second load-threshold includes, thus may determine that the load of the second base station is less than default second load-threshold.
If the load of first base station is less than default first load-threshold, and the load of the second base station is less than default second load-threshold, then the frequency that the frequency and the second base station that the acquisition of handover module 102 first base station is supported are supported;
Specifically, handover module 102 obtains the frequency that first base station is supported, and sends the second request message to the second base station by the X2 interfaces of first base station;Second base station receives the second request message by the X2 interface of itself, obtain the frequency itself supported, the second response message is generated, the second response message carries the frequency that the second base station is supported, the second base station sends the second response message to handover module 102 by the X2 interface of itself;Handover module 102 receives the second response message by the X2 interface of first base station, disappears from the second response The frequency of the second base station support is extracted in breath.
Handover module 102 includes request unit and reduction unit.
Request unit, if different from the frequency that the second base station is supported for the frequency that first base station is supported, the UE of request access first base station is switched on the second base station;Or,
Specifically, request unit sends handover request message to the second base station, and the handover request message carries the UE of access first base station mark;The switch acknowledgment message of the second base station transmission is received again;And send RRC (Radio Resource Control, radio resource control)UE of the reconfiguration message to access first base station is connected, the RRC connections reconfiguration message carries the mark of the second base station;UE receives the RRC connection reconfiguration messages, the mark of the second base station is extracted from the RRC connections reconfiguration message, disconnect the connection between first base station, and according to the mark of the second base station, the UE for accessing first base station, is switched on the second base station by the connection set up between the second base station with realizing.
Reduce unit, if identical with the frequency that the second base station is supported for the frequency that first base station is supported, the transmission power of first base station is then gradually reduced, the UE of access first base station is independently switched to the second base station, untill accessing when the UE of first base station is switched on the second base station entirely.
Wherein, gradually reduced with the transmission power of first base station, the coverage of its signal is also gradually decreased, access the signal of UE periodically each base stations of its present position of monitoring covering of first base station, UE can access the best base station of signal.When the signal of the UE for the accessing first base station first base stations detected is less than the signal of the second base station, the connection that the UE is actively set up between the second base station, and the connection between first base station is disconnected, it is switched to the second base station to realize from first base station.
Preferably, closedown module 103 is specifically for closing other functional modules in first base station in addition to CPU mini systems and X2 interface, so that first base station enters dormancy power save mode.
Specifically, closedown module closes other functional modules in addition to CPU ' J, system and X2 interface in first base station, so that first base station enters dormancy power save mode, other functional modules in first base station in addition to CPU mini systems and X2 interface include power amplifier, D/A converter, A/D converter, DSP (Digital Signal Processor, digital signal processor) and FPGA (Field Programmable Gate
Array, field programmable gate array)Deng.
First base station enters after dormancy power save mode, only CPU mini systems and X2 interface work, and other functional modules in addition to CPU mini systems and X2 interface do not work, have saved electric energy.
After first base station enters dormancy power save mode, the portfolio of the second base station is possible to increase suddenly and beyond the bearing capacity of the second base station, now needs activation first base station to share the portfolio that the second base station is uprushed. Preferably, the second acquisition module 104 is specifically for the load by the second base station of CPU mini systems and X2 interface acquisition.
Wherein, when first base station enters dormancy power save mode, the second acquisition module sends the 3rd request message to the second base station by the X2 interface of first base station;Second base station receives the 3rd request message by the X2 interface of itself, obtain the load of itself, the 3rd response message is generated, the 3rd response message carries the load of the second base station, and the second base station sends the 3rd response message to the second acquisition module by the X2 interface of itself;Second acquisition module receives the 3rd response message by the X2 interface of first base station again, and the load of the second base station is extracted from the 3rd response message.
If the load of the second base station is more than default 3rd load-threshold, the activation first base station of active module 105 makes first base station enter working condition.
Wherein, presetting the 3rd load-threshold includes the wealthy value of default 3rd PRB utilization rates, the wealthy value of default 3rd CPU utilization rates and default 3rd number.
If the number that the PRB utilization rates of the second base station are more than or equal to the UE that the default 3rd wealthy value of PRB utilization rates preset the 3rd load-threshold and included, the cpu busy percentage of the second base station are more than or equal to the second base station of the default 3rd wealthy value of cpu busy percentage or access that default 3rd load-threshold includes is more than or equal to default 3rd number that default 3rd load-threshold includes, then determine that the load of the second base station is more than or equal to default 3rd load-threshold, the functional module being turned off in first base station is opened, first base station is entered working condition.
When first base station is in dormancy power save mode, only CPU mini systems and X2 interface normal work in first base station, other functional modules in addition to CPU mini systems and X2 interface are all closed, therefore other functional modules in first base station in addition to CPU mini systems and X2 interface are opened, first base station is entered working condition.
Wherein, if the PRB utilization rates of the second base station are less than the default 3rd wealthy value of PRB utilization rates that default 3rd load-threshold includes, the cpu busy percentage of second base station is less than the number d for presetting the 3rd wealthy value of cpu busy percentage and accessing the UE of the second base station that default 3rd load-threshold includes, default 3rd number included in default 3rd load-threshold, then determine that the load of the second base station is less than default 3rd load-threshold, wait the load for obtaining the second base station after preset duration again, the preset duration can be 5 minutes, 10 minutes or 20 minutes etc., the present invention is not limited to this.
For example, it is assumed that it is 27% and the UE numbers of the second base station of access are 27 that the PRB utilization rates that include of load of the second base station obtained, which are 26%, cpu busy percentage,;The default 3rd wealthy value of PRB utilization rates that default 3rd load-threshold includes is that 25%, the default 3rd wealthy value of cpu busy percentage is 25% and default 3rd number is 25;
It can draw, the PRB utilization rates 26% that the load of the second base station includes are more than default 3rd load door Limit the wealthy value 25% of default 3rd PRB utilization rates included, the cpu busy percentage 27% that the load of second base station includes is more than the wealthy value 25% of default 3rd cpu busy percentage that default 3rd load-threshold includes, the UE for the base station of access second that the load of second base station includes number 27 is more than default 3rd number 25 that default 3rd load-threshold includes, thus may determine that the load of the second base station is more than default 3rd load-threshold, first base station is then activated, first base station is entered working condition.
Further, the device also includes:
Recovery module, for the transmission power of first base station to be recovered to the specified transmission power of first base station.Preferably, recovery module includes:
Lift unit, the transmission power for gradually lifting first base station, untill when the transmission power of first base station reaches the specified transmission power of first base station;Or,
Recovery unit, for directly recovering the transmission power of first base station to the specified transmission power of first base station.
Wherein, if also un-activation first base station before at the end of the low traffic period of first base station, active module activates first base station at the end of the low traffic period of first base station.
Wherein, in embodiments of the present invention, can be in the daily low traffic period, first acquisition module 101 obtains the load of first base station, if the load of first base station is less than default first load-threshold, then obtains the load of the second base station, if the load of the second base station is again smaller than default second load-threshold, then the UE for accessing first base station is switched on the second base station by handover module 102, and closedown module 103 closes first base station, first base station is entered dormancy power save mode;If the load of first base station is more than or equal to default first load-threshold, the first acquisition module 101 does not obtain the load of the second base station, reduces the occupancy to Internet resources.
In embodiments of the present invention, if the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station, closing first base station makes first base station enter dormancy power save mode, has saved the energy;When first base station is in dormancy power save mode, if the portfolio of the second base station is uprushed and the load of the second base station is more than default 3rd load-threshold, it is then automatic to activate first base station, first base station is entered working condition and first base station is shared the portfolio that the second base station is uprushed, avoid causes partial service delay or even the phenomenon interrupted because the second base station can not carry the portfolio uprushed, and avoids causing damage to user.Embodiment 2
Referring to Fig. 2, the embodiments of the invention provide a kind of method being controlled to base station, including:Step 201:Obtain the load of first base station and the load of the second base station, the overlay area of the second base station Overlay area including first base station;
Step 202:If the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station, first base station is closed, first base station is entered dormancy power save mode;
Step 203:The load of the second base station is obtained, if the load of the second base station is more than or equal to default 3rd load-threshold, first base station is activated, first base station is entered working condition.
In embodiments of the present invention, if the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station, closing first base station makes first base station enter dormancy power save mode, has saved the energy;When first base station is in dormancy power save mode, if the portfolio of the second base station is uprushed and the load of the second base station is more than default 3rd load-threshold, it is then automatic to activate first base station, first base station is entered working condition and first base station is shared the portfolio that the second base station is uprushed, avoid causes partial service delay or even the phenomenon interrupted because the second base station can not carry the portfolio uprushed, and avoids causing damage to user.Embodiment 3
The embodiments of the invention provide a kind of method being controlled to base station, when the load of first base station and the relatively low load of the second base station, the UE for accessing first base station is switched to the second base station, the overlay area of second base station includes the overlay area of first base station, first base station is closed when the handover is complete, first base station is entered dormancy power save mode, when the portfolio of the second base station is uprushed, automatic activation first base station, to share the business that the second base station is uprushed;Wherein, first base station can be micro-base station, and the second base station can be macro base station.
Referring to Fig. 3, this method flow includes:
Step 301:The load of first base station and the load of the second base station are obtained, the overlay area of the second base station includes the overlay area of first base station;
Specifically, when the daily low traffic period starts, first base station obtains the load of itself, and the load of the base station and the base station of overlay area of the overlay area including first base station is obtained, the low traffic period is that the load of first base station in one day is less than the period for presetting the 4th load-threshold;If the base station is a base station, the base station is defined as the second base station and the load of the base station is defined as to the load of the second base station;If the base station is multiple base stations, the minimum base station of selection load, is defined as the second base station by the base station of selection and the load of the base station of selection is defined as to the load of the second base station from the base station.
Preferably, the load of the base station of overlay area of the overlay area including first base station is obtained, including:First base station includes first base station by X2 interface the first request message of transmission of itself to overlay area Overlay area base station;The base station receives the first request message by the X2 interface of itself, obtains the load of itself, generates the first response message, and the first response message carries the load of the base station, and the first response message is sent to first base station by the X2 interface of itself;First base station receives the first response message by the X2 interface of itself, and the load of the base station is extracted from the first response message.
Wherein, the load of first base station includes the UE of PRB utilization rates, the cpu busy percentage of first base station and the access first base station of first base station number;The load of second base station includes the PRB utilization rates of the second base station, the UE of the second base station of the cpu busy percentage of the second base station and access number.The load of technical staff counted first base station in one day in advance each period, finds out load less than the default 4th load-threshold corresponding period, using the period as first base station the low traffic period.
Default 4th load-threshold includes the wealthy value of default 4th PRB utilization rates, the wealthy value of default 4th cpu busy percentage and default 4th number.
If the PRB utilization rates of first base station are less than the default 4th wealthy value of PRB utilization rates preset the 4th load-threshold and included, the cpu busy percentage of first base station includes less than default 4th load-threshold the default 4th wealthy value of cpu busy percentage and the UE of access first base station number, which are less than, presets default 4th number that the 4th load-threshold includes, it is determined that the load of first base station, which is less than, presets the 4th load-threshold;Otherwise, it determines the load of first base station is more than or equal to default 4th load-threshold.
For example, it is assumed that the low traffic period of first base station is daily 0:00 to 8:00, daily 0:When 00, the load of first base station and the load of the second base station are obtained.
Assuming that it is 9% and the UE of access first base station number is 3 that the PRB utilization rates that include of load of the first base station obtained, which are 10%, cpu busy percentage,;The PRB utilization rates that the load of second base station includes are that 12%, cpu busy percentage is 6% and the UE of the second base station of access number is 5.
Step 302:If the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station;
Specifically, this step can be realized by following 3021 to 3025 flow, including:
3021 :Judge whether the load of first base station is less than default first load-threshold, and judge whether the load of the second base station is less than default second load-threshold;
Wherein, presetting the first load-threshold includes the wealthy value of default first PRB utilization rates, the wealthy value of default first CPU utilization rates and default first number;Default second load-threshold includes the wealthy value of default 2nd PRB utilization rates, the wealthy value of default second cpu busy percentage and default second number.
If the PRB utilization rates of first base station are less than the default first wealthy value of PRB utilization rates preset the first load-threshold and included, the cpu busy percentage of first base station and are less than default first load-threshold includes default first The UE of the wealthy value of cpu busy percentage and access first base station number is less than default first number that default first load-threshold includes, then determine that the load of first base station is less than default first load-threshold, otherwise, it determines the load of first base station is more than or equal to default second load-threshold.
If the PRB utilization rates of the second base station are less than the default 2nd wealthy value of PRB utilization rates preset the second load-threshold and included, the cpu busy percentage of the second base station includes less than default second load-threshold the default wealthy value of second cpu busy percentage and the UE of the second base station of access number, which are less than, presets default second number that the second load-threshold includes, then determine that the load of the second base station is less than default second load-threshold, otherwise, it determines the load of the second base station is more than or equal to default second load-threshold.
For example, it is assumed that the first wealthy value of PRB utilization rates of presetting that default first load-threshold includes is that 20%, the default wealthy value of first cpu busy percentage is 15% and default first number is 20;The default 2nd wealthy value of PRB utilization rates that default second load-threshold includes is that 20%, the default wealthy value of second cpu busy percentage is 20% and default second number is 25;
It can draw, the PRB utilization rates 10% that the load of first base station includes are less than the wealthy value 20% of default first PRB utilization rates that default first load-threshold includes, the cpu busy percentage 9% that the load of first base station includes is less than the wealthy value 15% of default first cpu busy percentage that default first load-threshold includes, the UE for the access first base station that the load of first base station includes number 3 is less than default first number 20 that default first load-threshold includes, thus may determine that the load of first base station is less than default first load-threshold;
The PRB utilization rates 12% that the load of second base station includes are less than the wealthy value 20% of default 2nd PRB utilization rates that default second load-threshold includes, the cpu busy percentage 6% that the load of second base station includes is less than the wealthy value 20% of default second cpu busy percentage that default second load-threshold includes, the UE for the base station of access second that the load of second base station includes number 5 is less than default second number 25 that default second load-threshold includes, thus may determine that the load of the second base station is less than default second load-threshold.
3022:If the load of first base station is less than default first load-threshold, and the load of the second base station is less than default second load-threshold, then the frequency that the frequency and the second base station that acquisition first base station is supported are supported;Specifically, first base station obtains the frequency of itself support, and sends the second request message to the second base station by the X2 interface of itself;Second base station receives the second request message by the X2 interface of itself, obtains the frequency of itself support, generates the second response message, and the second response message carries the frequency that the second base station is supported, the second response message is sent to first base station by the X2 interface of itself;First base station extracts the frequency of the second base station support by the response message of X2 interfaces second of itself from the second response message.
3023:Judge whether the frequency supported the second base station is identical with the frequency that first base station is supported, if identical, performs step 3024;If it is different, performing step 3025; 3024:The transmission power of first base station is gradually reduced, the UE of access first base station is independently switched to the second base station, untill accessing when the UE of first base station is all switched on the second base station;
Wherein, gradually reduced with the transmission power of first base station, the coverage of its signal is also gradually decreased, access the signal of UE periodically each base stations of its present position of monitoring covering of first base station, UE can access the best base station of signal.When the signal of the UE for the accessing first base station first base stations monitored is less than the signal of the second base station, the connection that the UE is actively set up between the second base station, and the connection between first base station is disconnected, it is switched to the second base station to realize from first base station.
3025:The UE of request access first base station is switched on the second base station.
Specifically, first base station sends handover request message to the second base station, and the handover request message carries the UE of access first base station mark;Receive the switch acknowledgment message of the second base station transmission;UE of the RRC connection reconfiguration messages to access first base station is sent, the RRC connections reconfiguration message carries the mark of the second base station;UE receives the RRC connection reconfiguration messages, the mark of the second base station is extracted from the RRC connections reconfiguration message, disconnect the connection between first base station, and according to the mark of the second base station, the UE for accessing first base station, is switched on the second base station by the connection set up between the second base station with realizing.
Wherein, if the load of first base station is more than or equal to default first load-threshold or the load of the second base station is more than or equal to default second load-threshold, then wait after preset duration and being performed again since step 301, the preset duration can be 5 minutes, 10 minutes or 20 minutes etc., and the present invention is not limited to this.
Step 303:First base station is closed, so that first base station enters dormancy power save mode;
Specifically, first base station closes other functional modules in addition to CPU mini systems and X2 interface in first base station, so that other functional modules that first base station enters in dormancy power save mode, first base station in addition to CPU mini systems and X2 interface include power amplifier, D/A converter, A/D converter, DSP and FPGA etc..
First base station enters after dormancy power save mode, only CPU mini systems and X2 interface work, and other functional modules in addition to CPU mini systems and X2 interface do not work, have saved electric energy.
After first base station enters dormancy power save mode, the portfolio of second base station is possible to increase suddenly and beyond the bearing capacity of the second base station, now need activation first base station to share the portfolio that the second base station is uprushed, can specifically be realized with as follows 304 to 306 flow.
Step 304:Obtain the load of the second base station;
Specifically, first base station obtains the load of the second base station by the CPU mini systems and X2 interface of itself.When first base station enters dormancy power save mode, the CPU mini systems of first base station send the 3rd request message to the second base station by the X2 interface of first base station;Second base station is received by the X2 interface of itself 3rd request message, obtains the load of itself, generates the 3rd response message, and the 3rd response message carries the load of the second base station, and the 3rd response message is sent to first base station by the X2 interface of itself;The CPU mini systems of first base station receive the 3rd response message by the X2 interface of first base station again, and the load of the second base station is extracted from the 3rd response message.
Step 305:If the load of the second base station is more than default 3rd load-threshold, first base station is activated, first base station is entered working condition;
Specifically, the CPU mini systems of first base station judge whether the load of the second base station is more than default 3rd load-threshold, if it is, activation first base station.
Wherein, presetting the 3rd load-threshold includes the wealthy value of default 3rd PRB utilization rates, the wealthy value of default 3rd CPU utilization rates and default 3rd number.
If the number that the PRB utilization rates of the second base station are more than or equal to the UE that the default 3rd wealthy value of PRB utilization rates preset the 3rd load-threshold and included, the cpu busy percentage of the second base station are more than or equal to the second base station of the default 3rd wealthy value of cpu busy percentage or access that default 3rd load-threshold includes is more than or equal to default 3rd number that default 3rd load-threshold includes, then determine that the load of the second base station is more than or equal to default 3rd load-threshold, the functional module being turned off in first base station is opened, first base station is entered working condition.
When first base station is in dormancy power save mode, only CPU mini systems and X2 interface normal work in first base station, other functional modules in addition to CPU mini systems and X2 interface are all closed, therefore other functional modules in first base station in addition to CPU mini systems and X2 interface are opened, first base station is entered working condition.
Wherein, if the PRB utilization rates of the second base station are less than the default 3rd wealthy value of PRB utilization rates that default 3rd load-threshold includes, the cpu busy percentage of second base station is less than the number d for presetting the 3rd wealthy value of cpu busy percentage and accessing the UE of the second base station that default 3rd load-threshold includes, default 3rd number included in default 3rd load-threshold, then determine that the load of the second base station is less than default 3rd load-threshold, wait and being performed again since step 304 after preset duration, the preset duration can be 5 minutes, 10 minutes or 20 minutes etc., the present invention is not limited to this.
For example, it is assumed that it is 27% and the UE numbers of the second base station of access are 27 that the PRB utilization rates that include of load of the second base station obtained, which are 26%, cpu busy percentage,;The default 3rd wealthy value of PRB utilization rates that default 3rd load-threshold includes is that 25%, the default 3rd wealthy value of cpu busy percentage is 25% and default 3rd number is 25;
It can draw, the PRB utilization rates 26% that the load of second base station includes are more than the wealthy value 25% of default 3rd PRB utilization rates that default 3rd load-threshold includes, the cpu busy percentage 27% that the load of second base station includes is more than the wealthy value 25% of default 3rd cpu busy percentage that default 3rd load-threshold includes, the second base station The UE of the base station of access second number 27 that includes of load be more than default 3rd number 25 that default 3rd load-threshold includes, thus may determine that the load of the second base station is more than default 3rd load-threshold, first base station is then activated, first base station is entered working condition.
Step 306:The transmission power of first base station is recovered to the specified transmission power of first base station.
Specifically, it can be realized by the following first or second two ways, including:
Firstth, the transmission power of first base station is gradually lifted, untill when the transmission power of first base station reaches the specified transmission power of first base station;Or,
Secondth, the transmission power of first base station is directly recovered to the specified transmission power of first base station.
Wherein, if also un-activation first base station before at the end of the low traffic period of first base station, first base station is activated at the end of the low traffic period of first base station.
Wherein, in embodiments of the present invention, can be in the daily low traffic period, the load of first base station is first obtained, if the load of first base station is less than default first load-threshold, then the load of the second base station is obtained, if the load of the second base station is again smaller than default second load-threshold, then the UE for accessing first base station is switched on the second base station, and closes first base station, first base station is entered dormancy power save mode;If the load of first base station is more than or equal to default first load-threshold, the load of the second base station is not obtained, the occupancy to Internet resources is reduced.
In embodiments of the present invention, if the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station, closing first base station makes first base station enter dormancy power save mode, has saved the energy;Enter in first base station in dormancy power save mode, the load of the second base station is periodically obtained by CPU mini systems and X2 interface, if the portfolio of the second base station is uprushed and the load of the second base station is more than default 3rd load-threshold, it is then automatic to activate first base station, recover the transmission power of first base station to the specified transmission power of first base station, first base station is entered working condition and first base station is shared the portfolio that the second base station is uprushed, avoid causes partial service delay or even the phenomenon interrupted because the second base station can not carry the portfolio uprushed, and avoid causing damage to user.Embodiment 4
Referring to Fig. 4, the embodiments of the invention provide a kind of equipment, the equipment includes memory 401 and processor 402, for performing a kind of following method being controlled to base station:
The load of first base station and the load of the second base station are obtained, the overlay area of second base station includes the overlay area of the first base station; If the load of the first base station is less than default first load-threshold and the load of second base station is less than default second load-threshold, then the UE for accessing the first base station is switched on second base station, the first base station is closed, the first base station is entered dormancy power save mode;
The load of second base station is obtained, if the load of second base station is more than or equal to default 3rd load-threshold, the first base station is activated, the first base station is entered working condition.
Preferably, the load of the second base station is obtained, including:
Obtain the load of the base station and the base station of overlay area of the overlay area including the first base station;If the base station is a base station, the base station is defined as the second base station and the load of the base station is defined as to the load of second base station;
If the base station is multiple base stations, the minimum base station of selection load, is defined as the second base station by the base station of the selection and the load of the base station of the selection is defined as to the load of second base station from the base station.
Preferably, it is described that the UE for accessing the first base station is switched to second base station, including:If the frequency that the first base station is supported is different from the frequency that second base station is supported, the UE of the request access first base station is switched on second base station;Or,
If the frequency that the first base station is supported is identical with the frequency that second base station is supported, then gradually reduce the transmission power of the first base station, the UE of the access first base station is set independently to be switched to second base station, untill accessing when the UE of the first base station is switched on second base station entirely.
Preferably, it is described to close the first base station, the first base station is entered dormancy power save mode, including:
Other functional modules in addition to CPU mini systems and X2 interface in the first base station are closed, so that the first base station enters dormancy power save mode.
Preferably, the load for obtaining second base station, including:
The load of second base station is obtained by the CPU mini systems and the X2 interface.
Further, after the activation first base station, in addition to:
The transmission power of the first base station is recovered to the specified transmission power of the first base station.
Preferably, the transmission power by the first base station is recovered to the specified transmission power of the first base station, including:
The transmission power of the first base station is gradually lifted, untill when the transmission power of the first base station reaches the specified transmission power of the first base station;Or,
The transmission power of the first base station is directly recovered to the specified transmission power of the first base station. In embodiments of the present invention, if the load of first base station is less than default first load-threshold and the load of the second base station is less than default second load-threshold, the UE for accessing first base station is switched on the second base station, closing first base station makes first base station enter dormancy power save mode, has saved the energy;When first base station is in dormancy power save mode, if the portfolio of the second base station is uprushed and the load of the second base station is more than default 3rd load-threshold, it is then automatic to activate first base station, first base station is entered working condition and first base station is shared the portfolio that the second base station is uprushed, avoid causes partial service delay or even the phenomenon interrupted because the second base station can not carry the portfolio uprushed, and avoids causing damage to user.One of ordinary skill in the art will appreciate that realizing all or part of step of above-described embodiment can be completed by hardware, the hardware of correlation can also be instructed to complete by program, described program can be stored in a kind of computer-readable recording medium, storage medium mentioned above can be read-only storage, disk or CD etc..Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (14)

  1. Claims
    1st, a kind of device being controlled to base station, it is characterised in that methods described includes:
    First acquisition module, for obtaining the load of first base station and the load of the second base station, the overlay area of second base station includes the overlay area of the first base station;
    Handover module, if the load for the first base station is less than default first load-threshold and the load of second base station is less than default second load-threshold, the user equipment (UE) for accessing the first base station is switched on second base station;
    Closedown module, for closing the first base station, makes the first base station enter dormancy power save mode;Second acquisition module, the load for obtaining second base station;
    Active module, if the load for second base station is more than or equal to default 3rd load-threshold, activates the first base station, the first base station is entered working condition.
    2nd, device as claimed in claim 1, it is characterised in that first acquisition module includes:First acquisition unit, the load of base station and the base station for obtaining overlay area of the overlay area including the first base station;
    First determining unit, if being a base station for the base station, is defined as the second base station by the base station and the load of the base station is defined as to the load of second base station;
    Second determining unit, if being multiple base stations for the base station, the minimum base station of selection load, is defined as the second base station by the base station of the selection and the load of the base station of the selection is defined as to the load of second base station from the base station.
    3rd, device as claimed in claim 1, it is characterised in that the handover module includes:Request unit, if different from the frequency that second base station is supported for the frequency that the first base station is supported, the UE of the request access first base station is switched on second base station;Or,
    Reduce unit, if identical with the frequency that second base station is supported for the frequency that the first base station is supported, then gradually reduce the transmission power of the first base station, the UE of the access first base station is set independently to be switched to second base station, untill accessing when the UE of the first base station is switched on second base station entirely.
    4th, device as claimed in claim 1, it is characterised in that The closedown module is specifically for closing other functional modules in the first base station in addition to central processor CPU mini system and X2 interface, so that the first base station enters dormancy power save mode.
    5th, device as claimed in claim 4, it is characterised in that
    Second acquisition module is specifically for the load by the CPU mini systems and X2 interface acquisition second base station.
    6th, device as claimed in claim 1, it is characterised in that described device also includes:
    Recovery module, for the transmission power of the first base station to be recovered to the specified transmission power of the first base station.
    7th, device as claimed in claim 6, it is characterised in that the recovery module includes:Lift unit, the transmission power for gradually lifting the first base station, untill when the transmission power of the first base station reaches the specified transmission power of the first base station;Or,
    Recovery unit, for directly recovering the transmission power of the first base station to the specified transmission power of the first base station.
    8th, a kind of method being controlled to base station, it is characterised in that methods described includes:
    The load of first base station and the load of the second base station are obtained, the overlay area of second base station includes the overlay area of the first base station;
    If the load of the first base station is less than default first load-threshold and the load of second base station is less than default second load-threshold, then the user equipment (UE) for accessing the first base station is switched on second base station, the first base station is closed, the first base station is entered dormancy power save mode;
    The load of second base station is obtained, if the load of second base station is more than or equal to default 3rd load-threshold, the first base station is activated, the first base station is entered working condition.
    9th, method as claimed in claim 8, it is characterised in that the load of the base station of acquisition second, including:
    Obtain the load of the base station and the base station of overlay area of the overlay area including the first base station;If the base station is a base station, the base station is defined as the second base station and the load of the base station is defined as to the load of second base station; If the base station is multiple base stations, the minimum base station of selection load, is defined as the second base station by the base station of the selection and the load of the base station of the selection is defined as to the load of second base station from the base station.
    10th, the method as described in claim 8, it is characterised in that described that the user equipment (UE) for accessing the first base station is switched on second base station, including:
    If the frequency that the first base station is supported is different from the frequency that second base station is supported, the UE of the request access first base station is switched on second base station;Or,
    If the frequency that the first base station is supported is identical with the frequency that second base station is supported, then gradually reduce the transmission power of the first base station, the UE of the access first base station is set independently to be switched to second base station, untill accessing when the UE of the first base station is switched on second base station entirely.
    11st, the method as described in claim 8, it is characterised in that the closing first base station, makes the first base station enter dormancy power save mode, including:
    Other functional modules in addition to central processor CPU mini system and X2 interface in the first base station are closed, so that the first base station enters dormancy power save mode.
    12nd, method as claimed in claim 11, it is characterised in that the load of acquisition second base station, including:
    The load of second base station is obtained by the CPU mini systems and the X2 interface.
    13rd, method as claimed in claim 8, it is characterised in that after the activation first base station, in addition to:
    The transmission power of the first base station is recovered to the specified transmission power of the first base station.
    14th, method as claimed in claim 13, it is characterised in that the transmission power by the first base station is recovered to the specified transmission power of the first base station, including:
    The transmission power of the first base station is gradually lifted, untill when the transmission power of the first base station reaches the specified transmission power of the first base station;Or,
    The transmission power of the first base station is directly recovered to the specified transmission power of the first base station. 15th, a kind of equipment, it is characterised in that the equipment includes memory and processor, for performing a kind of method being controlled to base station as described in any one of claim 8 to 14 claim.
CN201480000225.5A 2014-03-26 2014-03-26 The method, device and equipment that a kind of pair of base station is controlled Active CN105191408B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/074106 WO2015143636A1 (en) 2014-03-26 2014-03-26 Method, device and apparatus for controlling base station

Publications (2)

Publication Number Publication Date
CN105191408A true CN105191408A (en) 2015-12-23
CN105191408B CN105191408B (en) 2019-06-21

Family

ID=54193879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480000225.5A Active CN105191408B (en) 2014-03-26 2014-03-26 The method, device and equipment that a kind of pair of base station is controlled

Country Status (2)

Country Link
CN (1) CN105191408B (en)
WO (1) WO2015143636A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110012485A (en) * 2019-04-10 2019-07-12 惠州Tcl移动通信有限公司 A kind of base station classification control method, system, storage medium and mobile terminal
CN110099400A (en) * 2019-06-05 2019-08-06 中国联合网络通信集团有限公司 Power-economizing method, equipment and the computer readable storage medium of communication base station
CN110492954A (en) * 2019-07-01 2019-11-22 中国联合网络通信集团有限公司 A kind of base station control method, first base station and the second base station
CN113873557A (en) * 2021-11-09 2021-12-31 中国电信股份有限公司 Method and device for calculating overlapping coverage rate of base station, storage medium and electronic equipment
WO2023010305A1 (en) * 2021-08-04 2023-02-09 Huawei Technologies Co.,Ltd. Carrier shutdown for nodes in a telecommunications network

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114077213B (en) * 2020-08-21 2023-11-03 大唐移动通信设备有限公司 Energy-saving control method and device
CN114173400B (en) * 2020-09-11 2023-05-16 中国联合网络通信集团有限公司 Energy saving method, device and equipment of network equipment
CN114302485B (en) * 2021-12-29 2024-03-29 深圳市佳贤通信科技股份有限公司 Method for intelligently managing cell dormancy of indoor time division system
CN114666877B (en) * 2022-02-14 2024-04-16 南京邮电大学 Dynamic dormancy energy-saving method for mobile edge computing auxiliary base station based on service type
CN115052328B (en) * 2022-05-18 2024-05-14 中国联合网络通信集团有限公司 Shared base station energy saving method, equipment and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101175332A (en) * 2007-11-14 2008-05-07 中兴通讯股份有限公司 Generation method for mobile station access switch-over
WO2010002991A1 (en) * 2008-07-02 2010-01-07 Qualcomm Incorporated Low power modes for femto cells
CN101841859A (en) * 2009-03-20 2010-09-22 中兴通讯股份有限公司 Base station state control method and base station energy-saving control system
CN102111816A (en) * 2011-03-22 2011-06-29 北京邮电大学 Energy-saving femto-network system and energy-saving method
CN102340825A (en) * 2011-08-12 2012-02-01 中国科学技术大学 Load-transfer-based energy-saving control method and system for mobile communication system
CN102413554A (en) * 2011-12-23 2012-04-11 浙江大学 Energy saving method based on heterogeneous honeycomb wireless network and implementation structure thereof
CN103313357A (en) * 2012-03-12 2013-09-18 华为技术有限公司 Method, system and apparatus for saving energy for base station

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103391604B (en) * 2013-07-17 2016-02-24 浙江大学 The control method of little base station dormancy

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101175332A (en) * 2007-11-14 2008-05-07 中兴通讯股份有限公司 Generation method for mobile station access switch-over
WO2010002991A1 (en) * 2008-07-02 2010-01-07 Qualcomm Incorporated Low power modes for femto cells
CN101841859A (en) * 2009-03-20 2010-09-22 中兴通讯股份有限公司 Base station state control method and base station energy-saving control system
CN102111816A (en) * 2011-03-22 2011-06-29 北京邮电大学 Energy-saving femto-network system and energy-saving method
CN102340825A (en) * 2011-08-12 2012-02-01 中国科学技术大学 Load-transfer-based energy-saving control method and system for mobile communication system
CN102413554A (en) * 2011-12-23 2012-04-11 浙江大学 Energy saving method based on heterogeneous honeycomb wireless network and implementation structure thereof
CN103313357A (en) * 2012-03-12 2013-09-18 华为技术有限公司 Method, system and apparatus for saving energy for base station

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110012485A (en) * 2019-04-10 2019-07-12 惠州Tcl移动通信有限公司 A kind of base station classification control method, system, storage medium and mobile terminal
CN110099400A (en) * 2019-06-05 2019-08-06 中国联合网络通信集团有限公司 Power-economizing method, equipment and the computer readable storage medium of communication base station
CN110492954A (en) * 2019-07-01 2019-11-22 中国联合网络通信集团有限公司 A kind of base station control method, first base station and the second base station
CN110492954B (en) * 2019-07-01 2021-07-27 中国联合网络通信集团有限公司 Base station control method, first base station and second base station
WO2023010305A1 (en) * 2021-08-04 2023-02-09 Huawei Technologies Co.,Ltd. Carrier shutdown for nodes in a telecommunications network
CN113873557A (en) * 2021-11-09 2021-12-31 中国电信股份有限公司 Method and device for calculating overlapping coverage rate of base station, storage medium and electronic equipment

Also Published As

Publication number Publication date
WO2015143636A1 (en) 2015-10-01
CN105191408B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN105191408A (en) Method, device and apparatus for controlling base station
US10736173B2 (en) Method and apparatus for setting up/releasing radio resource control connection between evolved node B and user equipment in communication system
CN105898895B (en) Mobile communication device and method for releasing connection or resource
US8977325B2 (en) Method and system for processing cell sleeping
CN103338473B (en) The treatment facility of cell outage
KR101978404B1 (en) Terminal-initiated power mode switching
EP2355594B1 (en) Controlling small cell base stations
CN105814950B (en) Heterogeneous network energy saving method and device
US10057937B2 (en) Communications via multiple access points
JP5053409B2 (en) Mobile communication system, control device, and control method
WO2015103772A1 (en) Energy-saving system, device and method of distributed base station
CN101754296A (en) Method, system and network equipment for realizing the management of wireless access network information
EP2453706B1 (en) A small cell base station for wireless telecommuncations, and a method of switching between states
CN105830525A (en) Devices and methods for protocol mode switching
EP2381723B1 (en) Method and system for realizing energy saving control of bs
US9144021B2 (en) Mobile communication system, controller and method
CN107925934A (en) Processing unit, method and the communication system of network instruction
CN103581954A (en) Method for network service process optimization and intelligent terminal
US20110105125A1 (en) Method for clearing invalid user equipment information in home node b-gateway
WO2015109669A1 (en) Method and apparatus for terminal to optimize network resource, and storage medium
EP2544484B1 (en) State handover method and network equipment
KR20130118961A (en) Sleeping core network nodes for energy saving in 3g networks
CN104202764A (en) Switching method from opening to closing of small cell
WO2015154792A1 (en) Control of energy consumption in a wireless backhaul link
WO2017000412A1 (en) Cell handover method, device and system of lc-mtc system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant