CN105184675B - Optical cable method of adjustment in intelligent substation based on infologic - Google Patents
Optical cable method of adjustment in intelligent substation based on infologic Download PDFInfo
- Publication number
- CN105184675B CN105184675B CN201510566415.XA CN201510566415A CN105184675B CN 105184675 B CN105184675 B CN 105184675B CN 201510566415 A CN201510566415 A CN 201510566415A CN 105184675 B CN105184675 B CN 105184675B
- Authority
- CN
- China
- Prior art keywords
- infologic
- fibre core
- optical cable
- record
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003287 optical effect Effects 0.000 title claims abstract description 87
- 238000000034 method Methods 0.000 title claims abstract description 30
- 239000000835 fiber Substances 0.000 claims description 109
- 241000272814 Anser sp. Species 0.000 claims description 12
- 238000005070 sampling Methods 0.000 claims description 3
- 230000008094 contradictory effect Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000012938 design process Methods 0.000 description 2
- 239000013307 optical fiber Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Optical Communication System (AREA)
Abstract
The invention discloses the optical cable methods of adjustment in a kind of intelligent substation based on infologic, it is the method that one kind directly configures infologic between secondary device, it is automatically performed optical cable connection map generalization and adjustment work after configuration is complete, both design efficiency is improved, it also ensures in optical cable adjustment, the connection of original optical cable is continued to use as far as possible, while having evaded infologic and optical cable contacts both figures and draws the contradictory risk of appearance respectively.
Description
Technical field
The present invention relates to intelligent substation technical field more particularly to a kind of optical cable methods of adjustment based on infologic.
Background technique
It is largely attached with optical cable in the connection of transformer station process layer secondary circuit, needs in the design process
It wants the optical cable between detailed design secondary device to connect, generallys use manual assignment optical cable fibre core connectivity port, hand drawn optical cable
The method for contacting figure.The port of device, interchanger, fibre distribution frame is attached first, later in statistics screen cabinet, between screen cabinet
Connection quantity, finally by count connection quantitative design optical cable specification, generate optical cable connection figure.Become when there is optical cable to connect
When dynamic, need to increase manually, delete, adjusts each connection, then regenerate optical cable connection figure.This manual operation fully relies on
No matter the experience of designer is directed to the design of optical cable starting point, terminal and intermediate path, workload when generating or adjusting
It is larger, also it is easy to produce mistake.
And mostly use networking diagram in first configuration station, optical cable connection figure complete in existing secondary system of intelligent substation design
Process is designed at physical loop, then the mode for interior virtual terminator loop diagram design of completing to stand, for generalling use in terms of infologic
Virtual terminator loop diagram and optical cable connection figure in conjunction with mode express or one information logic graph of hand drawn.This side
Design cycle is unintelligible under formula, and information logic graph is the core in secondary system of intelligent substation circuit, and optical cable connection is for complete
It is loop-coupled at these infologics, there is close incidence relation between the two, optical cable connection had both been needed to configure under existing way
It is that figure is also required to draw information logic graph, inefficiency, and does not embody incidence relation between the two clearly, when either one appearance
It will cause contradiction occur between two kinds of drawings when mistake.
" a kind of secondary system of intelligent substation process layer optical cable distributes the patent of Publication No. CN 103955870A automatically
Method " includes the following steps: to define equipment physical location and electrical secondary system equipment void circuit;According to electrical secondary system equipment room
Empty circuit definition, identifies relevant equipment, whether belongs to same screen cabinet according to equipment, whether belongs to same field, select
Select fiber cable type;For same optical cable connection type, the quantity that equipment connecting relation middle port uses is counted, calculates optical fiber company
Number is connect, the optical-fiber connection in same connection direction is added to the calculating for completing Cable Core Number, determines optical cable model.Use the party
Method, can guarantee not easy to make mistakes when optical cable connects, and each optical cable fibre core has explicitly using approach, and can select automatically
Fiber cable type is selected, design efficiency is improved.But the invention only focuses on the distribution method of optical cable, does not also disclose when optical cable changes
When method of adjustment.
Summary of the invention
Technical problem to be solved by the present invention lies in, provide it is a kind of can optical cable adjustment in substation based on infologic
Method can carry out optical cable adjustment automatically.
In order to solve the above-mentioned technical problems, the present invention provides the optical cable tune in a kind of intelligent substation based on infologic
Adjusting method, comprising:
Creation secondary loop information logic is simultaneously stored in database profession;
Fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, is stored
To in the database;
When the infologic of secondary circuit generates variation, generated according to the infologic changed in the database new
Fibre core linkage record;
To have in the new fibre core linkage record and the database in fibre core linkage record two sides screen cabinet information and
Identical record of affiliated set sequence information compares;
If the infologic number in the existing fibre core linkage record being compared includes in the new fibre core linkage record
The infologic number of current new fibre core linkage record is then copied to the existing fibre core linkage record being compared by infologic number
In infologic number in, and delete current new fibre core linkage record;
If the infologic number in the existing fibre core linkage record being compared does not include in the new fibre core linkage record
Infologic number, then the existing optical cable not all being compared all fibre core linkage records deletes, and will be in remaining existing optical cable
All fibre core linkage records not being compared are designated as spare fibre core record;
If the existing fibre core linkage record being compared with there are connection path information phases in the new fibre core linkage record
Infologic number in current new fibre core linkage record is then copied to the existing fibre core linkage record being compared by same record
In infologic number in, and delete current new fibre core linkage record;Otherwise by not deleted new fibre core linkage record
Generate new optical cable;
The adjustment of all optical cables and the record again of optical cable fibre core link information are completed, is stored to the database.
Further, it the creation secondary loop information logic and is stored in database profession, specifically includes:
Selection has the starting point and end-point arrangement of information exchange in secondary circuit, defines the type of secondary loop information logic
It is GOOSE, SV or mixed information;
The content of specify information logic is GOOSE tripping, GOOSE signal, GOOSE locking or SV sampling;
The interchanger routing connected needed for being added between beginning and end device;
The port for specifying connection used in starting point device, end-point arrangement, interchanger routing, completes the wound of infologic
It builds;
In the database by the storage of all infologics, record infologic starting point device, starting point device port, institute are through handing over
Change planes, institute is through switch port, end-point arrangement, end-point arrangement port, infologic type and infologic content, and to be each
Infologic number, i.e. infologic number, while screen cabinet belonging to all devices and interchanger is stored in the database, and
Shield the fibre distribution frame information in cabinet.
Further, the infologic according in the database generates fibre core linkage record, and calculates required
Optical cable specification is stored into the database, is specifically included:
According to infologic all in the database, judge infologic institute through port and corresponding device or exchange
Machine, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, and distribution dress automatically
The fibre distribution frame port information that port is connected is set, fibre core linkage record is generated, the fibre core linkage record includes record two
The light that side screen cabinet information, two sides screen cabinet the connect infologic number included with frame end mouth and each connection;
According to the set sequence information of device, all fibre core connection point set sequences are calculated into practical connection quantity;
According to predefined percentage reserve, practical connection quantity is calculated into the company containing minimum spare core number multiplied by percentage reserve
Connect quantity;
According to the optical cable fibre core specification selected in engineering, optical cable fibre core specification is selected to be greater than the connection containing minimum spare core number
Quantity and immediate optical cable, as required optical cable between screen cabinet;
The fibre core of the practical connection quantity of distribution first in optical cable, record two sides screen cabinet information, connection port and its wrapped
The infologic number contained;Remaining fibre core all as spare core, only records the port of two sides screen cabinet information and connection;
The calculating of all optical cable specifications and the record of optical cable fibre core link information are completed, database is stored in.
Further, described that new fibre core linkage record, tool are generated according to the infologic changed in the database
Body includes:
According to all infologics changed in the database, judge infologic institute through port and corresponding device or
Interchanger, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, generate new
Fibre core linkage record, including the included infologic number of record two sides screen cabinet information and each connection;
According to the set sequence information of device, all new fibre core connection point set sequences are calculated into practical connection quantity.
The invention has the following beneficial effects: the optical cable tune in intelligent substation of the invention based on infologic
Adjusting method is the method for infologic between one kind directly configuration secondary device, is automatically performed optical cable connection figure after configuration is complete
It generates and adjusts work, both improve design efficiency, also ensure in optical cable adjustment, continue to use original optical cable connection as far as possible
System, while having evaded infologic and optical cable contacts both figures and draws the contradictory risk of appearance respectively.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the flow diagram of step 1 and step 2 in the embodiment of the present invention;
Fig. 2 is the flow diagram of step 3 in the embodiment of the present invention, step 4, step 5, step 6, step 7, step 8.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention provides the optical cable methods of adjustment in a kind of intelligent substation based on infologic, including step
It is rapid:
1, it creates secondary loop information logic and is stored in database profession.
Specifically, step 1 specifically includes with reference to Fig. 1:
Selection has the starting point and end-point arrangement of information exchange in secondary circuit, defines the type of secondary loop information logic
It is GOOSE, SV or mixed information;
The content of specify information logic is GOOSE tripping, GOOSE signal, GOOSE locking or SV sampling;
The interchanger routing connected needed for being added between beginning and end device;
The port for specifying connection used in starting point device, end-point arrangement, interchanger routing, completes the wound of infologic
It builds;
In the database by the storage of all infologics, record infologic starting point device, starting point device port, institute are through handing over
Change planes, institute is through switch port, end-point arrangement, end-point arrangement port, infologic type and infologic content, and to be each
Infologic number, i.e. infologic number, while screen cabinet belonging to all devices and interchanger is stored in the database, and
Shield the fibre distribution frame information in cabinet.
2, fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, deposited
Storage is into the database.
Specifically, with reference to Fig. 2 step 2 comprising steps of
According to infologic all in the database, judge infologic institute through port and corresponding device or exchange
Machine, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, and distribution dress automatically
The fibre distribution frame port information that port is connected is set, fibre core linkage record is generated, the fibre core linkage record includes record two
The light that side screen cabinet information, two sides screen cabinet the connect infologic number included with frame end mouth and each connection;
According to the set sequence information of device, all fibre core connection point set sequences are calculated into practical connection quantity;
According to predefined percentage reserve, practical connection quantity is calculated into the company containing minimum spare core number multiplied by percentage reserve
Connect quantity;
According to the optical cable fibre core specification selected in engineering, optical cable fibre core specification is selected to be greater than the connection containing minimum spare core number
Quantity and immediate optical cable, as required optical cable between screen cabinet;
The fibre core of the practical connection quantity of distribution first in optical cable, record two sides screen cabinet information, connection port and its wrapped
The infologic number contained;Remaining fibre core all as spare core, only records the port of two sides screen cabinet information and connection;
The calculating of all optical cable specifications and the record of optical cable fibre core link information are completed, database is stored in.
3, it when the infologic of secondary circuit generates variation, is generated according to the infologic changed in the database
New fibre core linkage record.
Wherein, step: generating new fibre core linkage record according to the infologic changed in the database, specific to wrap
It includes:
According to all infologics changed in the database, judge infologic institute through port and corresponding device or
Interchanger, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, generate new
Fibre core linkage record, including the included infologic number of record two sides screen cabinet information and each connection;According to the set of device
All new fibre core connection point set sequences are calculated practical connection quantity by sequence information.
Specifically, step 3, step 4, step 5, step 6, step 7, step 8 please Fig. 2 for reference.
4, will have two sides screen cabinet information in fibre core linkage record in the new fibre core linkage record and the database
And affiliated identical record of set sequence information compares.
If the infologic number in the existing fibre core linkage record 5, being compared includes in the new fibre core linkage record
Infologic number, then the infologic number of current new fibre core linkage record is copied to the existing fibre core connection note being compared
In infologic number in record, and delete current new fibre core linkage record.
If the infologic number in the existing fibre core linkage record 6, being compared does not include the new fibre core linkage record
In infologic number, then the existing optical cable not all being compared all fibre core linkage records deletes, and by the existing optical cable of residue
In all fibre core linkage records not being compared be designated as spare fibre core record.
If in the existing fibre core linkage record 7, being compared and the new fibre core linkage record, there are connection path informations
Infologic number in current new fibre core linkage record is then copied to the existing fibre core connection note being compared by identical record
In infologic number in record, and delete current new fibre core linkage record;Otherwise not deleted new fibre core is connected into note
Record generates new optical cable.
8, the adjustment of all optical cables and the record again of optical cable fibre core link information are completed, is stored to the database.
The invention has the following beneficial effects: the optical cable tune in intelligent substation of the invention based on infologic
Adjusting method is the method for infologic between one kind directly configuration secondary device, is automatically performed optical cable connection figure after configuration is complete
It generates and adjusts work, both improve design efficiency, also ensure in optical cable adjustment, continue to use original optical cable connection as far as possible
System, while having evaded infologic and optical cable contacts both figures and draws the contradictory risk of appearance respectively.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (4)
1. the optical cable method of adjustment in a kind of intelligent substation based on infologic characterized by comprising
Creation secondary loop information logic is simultaneously stored in database profession;
Fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, is stored to institute
It states in database;
According to infologic all in the database, judge infologic institute through port and corresponding device or interchanger, root
According to the screen cabinet belonging to it, the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, and automatic allocation device port are calculated
The fibre distribution frame port information connected, generates fibre core linkage record, and the fibre core linkage record includes record two sides screen cabinet
The light that information, two sides screen cabinet the connect infologic number included with frame end mouth and each connection;
When the infologic of secondary circuit generates variation, new fibre is generated according to the infologic changed in the database
Core linkage record;
By the new fibre core linkage record with have two sides screen cabinet information and affiliated in fibre core linkage record in the database
The identical record of set sequence information compares;
If the infologic number in the existing fibre core linkage record being compared includes the information in the new fibre core linkage record
Logic number then copies to the infologic number of current new fibre core linkage record in the existing fibre core linkage record being compared
In infologic number, and delete current new fibre core linkage record;
If the infologic number in the existing fibre core linkage record being compared does not include the letter in the new fibre core linkage record
Logic number is ceased, then the existing optical cable not all being compared all fibre core linkage records is deleted, and will be owned in the existing optical cable of residue
The fibre core linkage record not being compared is designated as spare fibre core record;
If the existing fibre core linkage record being compared is identical with there are connection path informations in the new fibre core linkage record
Record then copies to the infologic number in current new fibre core linkage record in the existing fibre core linkage record being compared
In infologic number, and delete current new fibre core linkage record;Otherwise not deleted new fibre core linkage record is generated
New optical cable;
The adjustment of all optical cables and the record again of optical cable fibre core link information are completed, is stored to the database.
2. the optical cable method of adjustment in intelligent substation as described in claim 1 based on infologic, which is characterized in that described
Creation secondary loop information logic is simultaneously stored in database profession, and is specifically included:
Selection has the starting point and end-point arrangement of information exchange in secondary circuit, and the type for defining secondary loop information logic is
GOOSE, SV or mixed information;
The content of specify information logic is GOOSE tripping, GOOSE signal, GOOSE locking or SV sampling;
The interchanger routing connected needed for being added between beginning and end device;
The port for specifying connection used in starting point device, end-point arrangement, interchanger routing, completes the creation of infologic;
In the database by the storage of all infologics, record infologic starting point device, starting point device port, institute are through exchanging
Machine, institute are each through switch port, end-point arrangement, end-point arrangement port, infologic type and infologic content
Infologic number, i.e. infologic number, while screen cabinet belonging to all devices and interchanger, Yi Jiping are stored in the database
Fibre distribution frame information in cabinet.
3. the optical cable method of adjustment in intelligent substation as claimed in claim 2 based on infologic, which is characterized in that described
Fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, is stored to the number
According in library, specifically include:
According to the set sequence information of device, all fibre core connection point set sequences are calculated into practical connection quantity;
According to predefined percentage reserve, practical connection quantity is calculated into the connection number containing minimum spare core number multiplied by percentage reserve
Amount;
According to the optical cable fibre core specification selected in engineering, optical cable fibre core specification is selected to be greater than the connection quantity containing minimum spare core number
And immediate optical cable, as required optical cable between screen cabinet;
The fibre core of the practical connection quantity of distribution first in optical cable, record two sides screen cabinet information, connection port and its included
Infologic number;Remaining fibre core all as spare core, only records the port of two sides screen cabinet information and connection;
The calculating of all optical cable specifications and the record of optical cable fibre core link information are completed, database is stored in.
4. the optical cable method of adjustment in intelligent substation as described in claim 1 based on infologic, which is characterized in that described
New fibre core linkage record is generated according to the infologic changed in the database, is specifically included:
According to all infologics changed in the database, judge infologic institute through port and corresponding device or exchange
Machine, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, generate new fibre core
Linkage record, including the included infologic number of record two sides screen cabinet information and each connection;
According to the set sequence information of device, all new fibre core connection point set sequences are calculated into practical connection quantity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510566415.XA CN105184675B (en) | 2015-09-08 | 2015-09-08 | Optical cable method of adjustment in intelligent substation based on infologic |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510566415.XA CN105184675B (en) | 2015-09-08 | 2015-09-08 | Optical cable method of adjustment in intelligent substation based on infologic |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105184675A CN105184675A (en) | 2015-12-23 |
CN105184675B true CN105184675B (en) | 2019-01-08 |
Family
ID=54906731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510566415.XA Active CN105184675B (en) | 2015-09-08 | 2015-09-08 | Optical cable method of adjustment in intelligent substation based on infologic |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105184675B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111783267A (en) * | 2020-07-10 | 2020-10-16 | 广东电网有限责任公司电力调度控制中心 | Communication network visualization method and device and computer readable storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1956592A (en) * | 2006-09-08 | 2007-05-02 | 华为技术有限公司 | Method and system for acquiring topological information of radio network |
CN102622463A (en) * | 2012-01-05 | 2012-08-01 | 山东电力工程咨询院有限公司 | Drawing-model uniformity based method for automatic check of design drawings |
CN102879662A (en) * | 2011-09-15 | 2013-01-16 | 湖北省电力公司电力科学研究院 | Device and method for detecting secondary virtual loop of intelligent transformer substation |
US8479139B1 (en) * | 2004-06-01 | 2013-07-02 | Pulsic Limited | Automatic routing system with variable width interconnect |
US20130311961A1 (en) * | 2002-07-08 | 2013-11-21 | Raminda Madurawe | Timing exact design conversions from fpga to asic |
CN103955870A (en) * | 2014-04-30 | 2014-07-30 | 国家电网公司 | Automatic distribution method for optical cables of process layer of intelligent substation secondary system |
CN104539473A (en) * | 2014-12-03 | 2015-04-22 | 广东电网有限责任公司茂名供电局 | Whole-group verification method and system for network virtual secondary loop of intelligent substation |
CN104732021A (en) * | 2015-03-17 | 2015-06-24 | 国家电网公司 | Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation |
CN104767280A (en) * | 2014-12-30 | 2015-07-08 | 国家电网公司 | Method for realizing the visualization of secondary virtual circuit in intelligent substation |
-
2015
- 2015-09-08 CN CN201510566415.XA patent/CN105184675B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130311961A1 (en) * | 2002-07-08 | 2013-11-21 | Raminda Madurawe | Timing exact design conversions from fpga to asic |
US8479139B1 (en) * | 2004-06-01 | 2013-07-02 | Pulsic Limited | Automatic routing system with variable width interconnect |
CN1956592A (en) * | 2006-09-08 | 2007-05-02 | 华为技术有限公司 | Method and system for acquiring topological information of radio network |
CN102879662A (en) * | 2011-09-15 | 2013-01-16 | 湖北省电力公司电力科学研究院 | Device and method for detecting secondary virtual loop of intelligent transformer substation |
CN102622463A (en) * | 2012-01-05 | 2012-08-01 | 山东电力工程咨询院有限公司 | Drawing-model uniformity based method for automatic check of design drawings |
CN103955870A (en) * | 2014-04-30 | 2014-07-30 | 国家电网公司 | Automatic distribution method for optical cables of process layer of intelligent substation secondary system |
CN104539473A (en) * | 2014-12-03 | 2015-04-22 | 广东电网有限责任公司茂名供电局 | Whole-group verification method and system for network virtual secondary loop of intelligent substation |
CN104767280A (en) * | 2014-12-30 | 2015-07-08 | 国家电网公司 | Method for realizing the visualization of secondary virtual circuit in intelligent substation |
CN104732021A (en) * | 2015-03-17 | 2015-06-24 | 国家电网公司 | Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation |
Non-Patent Citations (2)
Title |
---|
《变电站继电保护二次回路的分析与研究》;孔海波;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20131115(第11期);全文 |
《电力系统光纤二次回路设计与研究》;卞振杨;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20130715(第7期);全文 |
Also Published As
Publication number | Publication date |
---|---|
CN105184675A (en) | 2015-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104699801B (en) | A kind of method and device of secondary device associated configuration | |
CN103400007B (en) | Based on the automatic generation method of the secondary electrical schematic diagram of Auto CAD | |
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN109639388B (en) | End-to-end service management method based on OTN/SDH fusion equipment | |
CN104318006B (en) | A kind of optimization method of virtual terminals of intelligent substation design | |
CN104361190B (en) | The method and device of empty terminal automation connection in electrical secondary system | |
CN103605814B (en) | Information processing method and information processing system in substation transformation process | |
CN103853859B (en) | Mapping method and mapping system for drawing nuclear power plant terminating map | |
CN109066660A (en) | A kind of power distribution network congestion management and decreasing loss method and apparatus based on optimal reconfiguration | |
CN105184675B (en) | Optical cable method of adjustment in intelligent substation based on infologic | |
CN108259224A (en) | The method and device of homogeneity configuration under SDN and traditional network coexistance model | |
CN103187801B (en) | Method of optical fiber distribution frame port configuration method in intelligent transformer substation secondary system | |
CN108596741A (en) | Network sale product management method, device, terminal device and storage medium | |
CN103955870A (en) | Automatic distribution method for optical cables of process layer of intelligent substation secondary system | |
CN102185381B (en) | Method for processing SCD (substation configuration description) iteration of SCD model during automatic switching | |
CN110932273B (en) | Modeling method for signal loop of secondary system of transformer substation | |
CN107958345A (en) | A kind of SCD file collocation method and device based on database and file fragment | |
CN102055242B (en) | Power grid model based communication link tracking method | |
CN107169175A (en) | One kind verification rational method and system of overhead transmission line topology design | |
CN108881374A (en) | The design method that a kind of cloud computing resources framework front end is shown | |
CN109960705A (en) | The access of Automation System of Power Network multi-source data and methods of exhibiting | |
CN109492297A (en) | A kind of cable work amount statistical method of electric system, apparatus and system | |
CN104750927B (en) | A kind of patterned optic fiber distribution relation methods of exhibiting | |
CN101431439A (en) | Resource data acquisition and leading-out system and method for network management system | |
CN105208466B (en) | Cabinet-type multiport EPON system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||