CN105184675B - Optical cable method of adjustment in intelligent substation based on infologic - Google Patents

Optical cable method of adjustment in intelligent substation based on infologic Download PDF

Info

Publication number
CN105184675B
CN105184675B CN201510566415.XA CN201510566415A CN105184675B CN 105184675 B CN105184675 B CN 105184675B CN 201510566415 A CN201510566415 A CN 201510566415A CN 105184675 B CN105184675 B CN 105184675B
Authority
CN
China
Prior art keywords
infologic
fibre core
optical cable
record
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510566415.XA
Other languages
Chinese (zh)
Other versions
CN105184675A (en
Inventor
石慧
姬慧
王晓坤
刘凯
曹卫国
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Bolisi Information Technology Co Ltd
NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Nanjing Bolisi Information Technology Co Ltd
NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Bolisi Information Technology Co Ltd, NANJING WUCAIZHIDIAN ELECTRIC POWER TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Yangzhou Power Supply Co of Jiangsu Electric Power Co filed Critical Nanjing Bolisi Information Technology Co Ltd
Priority to CN201510566415.XA priority Critical patent/CN105184675B/en
Publication of CN105184675A publication Critical patent/CN105184675A/en
Application granted granted Critical
Publication of CN105184675B publication Critical patent/CN105184675B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Optical Communication System (AREA)

Abstract

The invention discloses the optical cable methods of adjustment in a kind of intelligent substation based on infologic, it is the method that one kind directly configures infologic between secondary device, it is automatically performed optical cable connection map generalization and adjustment work after configuration is complete, both design efficiency is improved, it also ensures in optical cable adjustment, the connection of original optical cable is continued to use as far as possible, while having evaded infologic and optical cable contacts both figures and draws the contradictory risk of appearance respectively.

Description

Optical cable method of adjustment in intelligent substation based on infologic
Technical field
The present invention relates to intelligent substation technical field more particularly to a kind of optical cable methods of adjustment based on infologic.
Background technique
It is largely attached with optical cable in the connection of transformer station process layer secondary circuit, needs in the design process It wants the optical cable between detailed design secondary device to connect, generallys use manual assignment optical cable fibre core connectivity port, hand drawn optical cable The method for contacting figure.The port of device, interchanger, fibre distribution frame is attached first, later in statistics screen cabinet, between screen cabinet Connection quantity, finally by count connection quantitative design optical cable specification, generate optical cable connection figure.Become when there is optical cable to connect When dynamic, need to increase manually, delete, adjusts each connection, then regenerate optical cable connection figure.This manual operation fully relies on No matter the experience of designer is directed to the design of optical cable starting point, terminal and intermediate path, workload when generating or adjusting It is larger, also it is easy to produce mistake.
And mostly use networking diagram in first configuration station, optical cable connection figure complete in existing secondary system of intelligent substation design Process is designed at physical loop, then the mode for interior virtual terminator loop diagram design of completing to stand, for generalling use in terms of infologic Virtual terminator loop diagram and optical cable connection figure in conjunction with mode express or one information logic graph of hand drawn.This side Design cycle is unintelligible under formula, and information logic graph is the core in secondary system of intelligent substation circuit, and optical cable connection is for complete It is loop-coupled at these infologics, there is close incidence relation between the two, optical cable connection had both been needed to configure under existing way It is that figure is also required to draw information logic graph, inefficiency, and does not embody incidence relation between the two clearly, when either one appearance It will cause contradiction occur between two kinds of drawings when mistake.
" a kind of secondary system of intelligent substation process layer optical cable distributes the patent of Publication No. CN 103955870A automatically Method " includes the following steps: to define equipment physical location and electrical secondary system equipment void circuit;According to electrical secondary system equipment room Empty circuit definition, identifies relevant equipment, whether belongs to same screen cabinet according to equipment, whether belongs to same field, select Select fiber cable type;For same optical cable connection type, the quantity that equipment connecting relation middle port uses is counted, calculates optical fiber company Number is connect, the optical-fiber connection in same connection direction is added to the calculating for completing Cable Core Number, determines optical cable model.Use the party Method, can guarantee not easy to make mistakes when optical cable connects, and each optical cable fibre core has explicitly using approach, and can select automatically Fiber cable type is selected, design efficiency is improved.But the invention only focuses on the distribution method of optical cable, does not also disclose when optical cable changes When method of adjustment.
Summary of the invention
Technical problem to be solved by the present invention lies in, provide it is a kind of can optical cable adjustment in substation based on infologic Method can carry out optical cable adjustment automatically.
In order to solve the above-mentioned technical problems, the present invention provides the optical cable tune in a kind of intelligent substation based on infologic Adjusting method, comprising:
Creation secondary loop information logic is simultaneously stored in database profession;
Fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, is stored To in the database;
When the infologic of secondary circuit generates variation, generated according to the infologic changed in the database new Fibre core linkage record;
To have in the new fibre core linkage record and the database in fibre core linkage record two sides screen cabinet information and Identical record of affiliated set sequence information compares;
If the infologic number in the existing fibre core linkage record being compared includes in the new fibre core linkage record The infologic number of current new fibre core linkage record is then copied to the existing fibre core linkage record being compared by infologic number In infologic number in, and delete current new fibre core linkage record;
If the infologic number in the existing fibre core linkage record being compared does not include in the new fibre core linkage record Infologic number, then the existing optical cable not all being compared all fibre core linkage records deletes, and will be in remaining existing optical cable All fibre core linkage records not being compared are designated as spare fibre core record;
If the existing fibre core linkage record being compared with there are connection path information phases in the new fibre core linkage record Infologic number in current new fibre core linkage record is then copied to the existing fibre core linkage record being compared by same record In infologic number in, and delete current new fibre core linkage record;Otherwise by not deleted new fibre core linkage record Generate new optical cable;
The adjustment of all optical cables and the record again of optical cable fibre core link information are completed, is stored to the database.
Further, it the creation secondary loop information logic and is stored in database profession, specifically includes:
Selection has the starting point and end-point arrangement of information exchange in secondary circuit, defines the type of secondary loop information logic It is GOOSE, SV or mixed information;
The content of specify information logic is GOOSE tripping, GOOSE signal, GOOSE locking or SV sampling;
The interchanger routing connected needed for being added between beginning and end device;
The port for specifying connection used in starting point device, end-point arrangement, interchanger routing, completes the wound of infologic It builds;
In the database by the storage of all infologics, record infologic starting point device, starting point device port, institute are through handing over Change planes, institute is through switch port, end-point arrangement, end-point arrangement port, infologic type and infologic content, and to be each Infologic number, i.e. infologic number, while screen cabinet belonging to all devices and interchanger is stored in the database, and Shield the fibre distribution frame information in cabinet.
Further, the infologic according in the database generates fibre core linkage record, and calculates required Optical cable specification is stored into the database, is specifically included:
According to infologic all in the database, judge infologic institute through port and corresponding device or exchange Machine, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, and distribution dress automatically The fibre distribution frame port information that port is connected is set, fibre core linkage record is generated, the fibre core linkage record includes record two The light that side screen cabinet information, two sides screen cabinet the connect infologic number included with frame end mouth and each connection;
According to the set sequence information of device, all fibre core connection point set sequences are calculated into practical connection quantity;
According to predefined percentage reserve, practical connection quantity is calculated into the company containing minimum spare core number multiplied by percentage reserve Connect quantity;
According to the optical cable fibre core specification selected in engineering, optical cable fibre core specification is selected to be greater than the connection containing minimum spare core number Quantity and immediate optical cable, as required optical cable between screen cabinet;
The fibre core of the practical connection quantity of distribution first in optical cable, record two sides screen cabinet information, connection port and its wrapped The infologic number contained;Remaining fibre core all as spare core, only records the port of two sides screen cabinet information and connection;
The calculating of all optical cable specifications and the record of optical cable fibre core link information are completed, database is stored in.
Further, described that new fibre core linkage record, tool are generated according to the infologic changed in the database Body includes:
According to all infologics changed in the database, judge infologic institute through port and corresponding device or Interchanger, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, generate new Fibre core linkage record, including the included infologic number of record two sides screen cabinet information and each connection;
According to the set sequence information of device, all new fibre core connection point set sequences are calculated into practical connection quantity.
The invention has the following beneficial effects: the optical cable tune in intelligent substation of the invention based on infologic Adjusting method is the method for infologic between one kind directly configuration secondary device, is automatically performed optical cable connection figure after configuration is complete It generates and adjusts work, both improve design efficiency, also ensure in optical cable adjustment, continue to use original optical cable connection as far as possible System, while having evaded infologic and optical cable contacts both figures and draws the contradictory risk of appearance respectively.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow diagram of step 1 and step 2 in the embodiment of the present invention;
Fig. 2 is the flow diagram of step 3 in the embodiment of the present invention, step 4, step 5, step 6, step 7, step 8.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention provides the optical cable methods of adjustment in a kind of intelligent substation based on infologic, including step It is rapid:
1, it creates secondary loop information logic and is stored in database profession.
Specifically, step 1 specifically includes with reference to Fig. 1:
Selection has the starting point and end-point arrangement of information exchange in secondary circuit, defines the type of secondary loop information logic It is GOOSE, SV or mixed information;
The content of specify information logic is GOOSE tripping, GOOSE signal, GOOSE locking or SV sampling;
The interchanger routing connected needed for being added between beginning and end device;
The port for specifying connection used in starting point device, end-point arrangement, interchanger routing, completes the wound of infologic It builds;
In the database by the storage of all infologics, record infologic starting point device, starting point device port, institute are through handing over Change planes, institute is through switch port, end-point arrangement, end-point arrangement port, infologic type and infologic content, and to be each Infologic number, i.e. infologic number, while screen cabinet belonging to all devices and interchanger is stored in the database, and Shield the fibre distribution frame information in cabinet.
2, fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, deposited Storage is into the database.
Specifically, with reference to Fig. 2 step 2 comprising steps of
According to infologic all in the database, judge infologic institute through port and corresponding device or exchange Machine, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, and distribution dress automatically The fibre distribution frame port information that port is connected is set, fibre core linkage record is generated, the fibre core linkage record includes record two The light that side screen cabinet information, two sides screen cabinet the connect infologic number included with frame end mouth and each connection;
According to the set sequence information of device, all fibre core connection point set sequences are calculated into practical connection quantity;
According to predefined percentage reserve, practical connection quantity is calculated into the company containing minimum spare core number multiplied by percentage reserve Connect quantity;
According to the optical cable fibre core specification selected in engineering, optical cable fibre core specification is selected to be greater than the connection containing minimum spare core number Quantity and immediate optical cable, as required optical cable between screen cabinet;
The fibre core of the practical connection quantity of distribution first in optical cable, record two sides screen cabinet information, connection port and its wrapped The infologic number contained;Remaining fibre core all as spare core, only records the port of two sides screen cabinet information and connection;
The calculating of all optical cable specifications and the record of optical cable fibre core link information are completed, database is stored in.
3, it when the infologic of secondary circuit generates variation, is generated according to the infologic changed in the database New fibre core linkage record.
Wherein, step: generating new fibre core linkage record according to the infologic changed in the database, specific to wrap It includes:
According to all infologics changed in the database, judge infologic institute through port and corresponding device or Interchanger, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, generate new Fibre core linkage record, including the included infologic number of record two sides screen cabinet information and each connection;According to the set of device All new fibre core connection point set sequences are calculated practical connection quantity by sequence information.
Specifically, step 3, step 4, step 5, step 6, step 7, step 8 please Fig. 2 for reference.
4, will have two sides screen cabinet information in fibre core linkage record in the new fibre core linkage record and the database And affiliated identical record of set sequence information compares.
If the infologic number in the existing fibre core linkage record 5, being compared includes in the new fibre core linkage record Infologic number, then the infologic number of current new fibre core linkage record is copied to the existing fibre core connection note being compared In infologic number in record, and delete current new fibre core linkage record.
If the infologic number in the existing fibre core linkage record 6, being compared does not include the new fibre core linkage record In infologic number, then the existing optical cable not all being compared all fibre core linkage records deletes, and by the existing optical cable of residue In all fibre core linkage records not being compared be designated as spare fibre core record.
If in the existing fibre core linkage record 7, being compared and the new fibre core linkage record, there are connection path informations Infologic number in current new fibre core linkage record is then copied to the existing fibre core connection note being compared by identical record In infologic number in record, and delete current new fibre core linkage record;Otherwise not deleted new fibre core is connected into note Record generates new optical cable.
8, the adjustment of all optical cables and the record again of optical cable fibre core link information are completed, is stored to the database.
The invention has the following beneficial effects: the optical cable tune in intelligent substation of the invention based on infologic Adjusting method is the method for infologic between one kind directly configuration secondary device, is automatically performed optical cable connection figure after configuration is complete It generates and adjusts work, both improve design efficiency, also ensure in optical cable adjustment, continue to use original optical cable connection as far as possible System, while having evaded infologic and optical cable contacts both figures and draws the contradictory risk of appearance respectively.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (4)

1. the optical cable method of adjustment in a kind of intelligent substation based on infologic characterized by comprising
Creation secondary loop information logic is simultaneously stored in database profession;
Fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, is stored to institute It states in database;
According to infologic all in the database, judge infologic institute through port and corresponding device or interchanger, root According to the screen cabinet belonging to it, the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, and automatic allocation device port are calculated The fibre distribution frame port information connected, generates fibre core linkage record, and the fibre core linkage record includes record two sides screen cabinet The light that information, two sides screen cabinet the connect infologic number included with frame end mouth and each connection;
When the infologic of secondary circuit generates variation, new fibre is generated according to the infologic changed in the database Core linkage record;
By the new fibre core linkage record with have two sides screen cabinet information and affiliated in fibre core linkage record in the database The identical record of set sequence information compares;
If the infologic number in the existing fibre core linkage record being compared includes the information in the new fibre core linkage record Logic number then copies to the infologic number of current new fibre core linkage record in the existing fibre core linkage record being compared In infologic number, and delete current new fibre core linkage record;
If the infologic number in the existing fibre core linkage record being compared does not include the letter in the new fibre core linkage record Logic number is ceased, then the existing optical cable not all being compared all fibre core linkage records is deleted, and will be owned in the existing optical cable of residue The fibre core linkage record not being compared is designated as spare fibre core record;
If the existing fibre core linkage record being compared is identical with there are connection path informations in the new fibre core linkage record Record then copies to the infologic number in current new fibre core linkage record in the existing fibre core linkage record being compared In infologic number, and delete current new fibre core linkage record;Otherwise not deleted new fibre core linkage record is generated New optical cable;
The adjustment of all optical cables and the record again of optical cable fibre core link information are completed, is stored to the database.
2. the optical cable method of adjustment in intelligent substation as described in claim 1 based on infologic, which is characterized in that described Creation secondary loop information logic is simultaneously stored in database profession, and is specifically included:
Selection has the starting point and end-point arrangement of information exchange in secondary circuit, and the type for defining secondary loop information logic is GOOSE, SV or mixed information;
The content of specify information logic is GOOSE tripping, GOOSE signal, GOOSE locking or SV sampling;
The interchanger routing connected needed for being added between beginning and end device;
The port for specifying connection used in starting point device, end-point arrangement, interchanger routing, completes the creation of infologic;
In the database by the storage of all infologics, record infologic starting point device, starting point device port, institute are through exchanging Machine, institute are each through switch port, end-point arrangement, end-point arrangement port, infologic type and infologic content Infologic number, i.e. infologic number, while screen cabinet belonging to all devices and interchanger, Yi Jiping are stored in the database Fibre distribution frame information in cabinet.
3. the optical cable method of adjustment in intelligent substation as claimed in claim 2 based on infologic, which is characterized in that described Fibre core linkage record is generated according to the infologic in the database, and calculates required optical cable specification, is stored to the number According in library, specifically include:
According to the set sequence information of device, all fibre core connection point set sequences are calculated into practical connection quantity;
According to predefined percentage reserve, practical connection quantity is calculated into the connection number containing minimum spare core number multiplied by percentage reserve Amount;
According to the optical cable fibre core specification selected in engineering, optical cable fibre core specification is selected to be greater than the connection quantity containing minimum spare core number And immediate optical cable, as required optical cable between screen cabinet;
The fibre core of the practical connection quantity of distribution first in optical cable, record two sides screen cabinet information, connection port and its included Infologic number;Remaining fibre core all as spare core, only records the port of two sides screen cabinet information and connection;
The calculating of all optical cable specifications and the record of optical cable fibre core link information are completed, database is stored in.
4. the optical cable method of adjustment in intelligent substation as described in claim 1 based on infologic, which is characterized in that described New fibre core linkage record is generated according to the infologic changed in the database, is specifically included:
According to all infologics changed in the database, judge infologic institute through port and corresponding device or exchange Machine, the screen cabinet according to belonging to it calculate the connection quantity between the screen cabinet information for having connection relationship, and screen cabinet, generate new fibre core Linkage record, including the included infologic number of record two sides screen cabinet information and each connection;
According to the set sequence information of device, all new fibre core connection point set sequences are calculated into practical connection quantity.
CN201510566415.XA 2015-09-08 2015-09-08 Optical cable method of adjustment in intelligent substation based on infologic Active CN105184675B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510566415.XA CN105184675B (en) 2015-09-08 2015-09-08 Optical cable method of adjustment in intelligent substation based on infologic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510566415.XA CN105184675B (en) 2015-09-08 2015-09-08 Optical cable method of adjustment in intelligent substation based on infologic

Publications (2)

Publication Number Publication Date
CN105184675A CN105184675A (en) 2015-12-23
CN105184675B true CN105184675B (en) 2019-01-08

Family

ID=54906731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510566415.XA Active CN105184675B (en) 2015-09-08 2015-09-08 Optical cable method of adjustment in intelligent substation based on infologic

Country Status (1)

Country Link
CN (1) CN105184675B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111783267A (en) * 2020-07-10 2020-10-16 广东电网有限责任公司电力调度控制中心 Communication network visualization method and device and computer readable storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1956592A (en) * 2006-09-08 2007-05-02 华为技术有限公司 Method and system for acquiring topological information of radio network
CN102622463A (en) * 2012-01-05 2012-08-01 山东电力工程咨询院有限公司 Drawing-model uniformity based method for automatic check of design drawings
CN102879662A (en) * 2011-09-15 2013-01-16 湖北省电力公司电力科学研究院 Device and method for detecting secondary virtual loop of intelligent transformer substation
US8479139B1 (en) * 2004-06-01 2013-07-02 Pulsic Limited Automatic routing system with variable width interconnect
US20130311961A1 (en) * 2002-07-08 2013-11-21 Raminda Madurawe Timing exact design conversions from fpga to asic
CN103955870A (en) * 2014-04-30 2014-07-30 国家电网公司 Automatic distribution method for optical cables of process layer of intelligent substation secondary system
CN104539473A (en) * 2014-12-03 2015-04-22 广东电网有限责任公司茂名供电局 Whole-group verification method and system for network virtual secondary loop of intelligent substation
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
CN104767280A (en) * 2014-12-30 2015-07-08 国家电网公司 Method for realizing the visualization of secondary virtual circuit in intelligent substation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130311961A1 (en) * 2002-07-08 2013-11-21 Raminda Madurawe Timing exact design conversions from fpga to asic
US8479139B1 (en) * 2004-06-01 2013-07-02 Pulsic Limited Automatic routing system with variable width interconnect
CN1956592A (en) * 2006-09-08 2007-05-02 华为技术有限公司 Method and system for acquiring topological information of radio network
CN102879662A (en) * 2011-09-15 2013-01-16 湖北省电力公司电力科学研究院 Device and method for detecting secondary virtual loop of intelligent transformer substation
CN102622463A (en) * 2012-01-05 2012-08-01 山东电力工程咨询院有限公司 Drawing-model uniformity based method for automatic check of design drawings
CN103955870A (en) * 2014-04-30 2014-07-30 国家电网公司 Automatic distribution method for optical cables of process layer of intelligent substation secondary system
CN104539473A (en) * 2014-12-03 2015-04-22 广东电网有限责任公司茂名供电局 Whole-group verification method and system for network virtual secondary loop of intelligent substation
CN104767280A (en) * 2014-12-30 2015-07-08 国家电网公司 Method for realizing the visualization of secondary virtual circuit in intelligent substation
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《变电站继电保护二次回路的分析与研究》;孔海波;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20131115(第11期);全文
《电力系统光纤二次回路设计与研究》;卞振杨;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20130715(第7期);全文

Also Published As

Publication number Publication date
CN105184675A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN104699801B (en) A kind of method and device of secondary device associated configuration
CN103400007B (en) Based on the automatic generation method of the secondary electrical schematic diagram of Auto CAD
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN109639388B (en) End-to-end service management method based on OTN/SDH fusion equipment
CN104318006B (en) A kind of optimization method of virtual terminals of intelligent substation design
CN104361190B (en) The method and device of empty terminal automation connection in electrical secondary system
CN103605814B (en) Information processing method and information processing system in substation transformation process
CN103853859B (en) Mapping method and mapping system for drawing nuclear power plant terminating map
CN109066660A (en) A kind of power distribution network congestion management and decreasing loss method and apparatus based on optimal reconfiguration
CN105184675B (en) Optical cable method of adjustment in intelligent substation based on infologic
CN108259224A (en) The method and device of homogeneity configuration under SDN and traditional network coexistance model
CN103187801B (en) Method of optical fiber distribution frame port configuration method in intelligent transformer substation secondary system
CN108596741A (en) Network sale product management method, device, terminal device and storage medium
CN103955870A (en) Automatic distribution method for optical cables of process layer of intelligent substation secondary system
CN102185381B (en) Method for processing SCD (substation configuration description) iteration of SCD model during automatic switching
CN110932273B (en) Modeling method for signal loop of secondary system of transformer substation
CN107958345A (en) A kind of SCD file collocation method and device based on database and file fragment
CN102055242B (en) Power grid model based communication link tracking method
CN107169175A (en) One kind verification rational method and system of overhead transmission line topology design
CN108881374A (en) The design method that a kind of cloud computing resources framework front end is shown
CN109960705A (en) The access of Automation System of Power Network multi-source data and methods of exhibiting
CN109492297A (en) A kind of cable work amount statistical method of electric system, apparatus and system
CN104750927B (en) A kind of patterned optic fiber distribution relation methods of exhibiting
CN101431439A (en) Resource data acquisition and leading-out system and method for network management system
CN105208466B (en) Cabinet-type multiport EPON system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant