CN103605814B - Information processing method and information processing system in substation transformation process - Google Patents
Information processing method and information processing system in substation transformation process Download PDFInfo
- Publication number
- CN103605814B CN103605814B CN201310670691.1A CN201310670691A CN103605814B CN 103605814 B CN103605814 B CN 103605814B CN 201310670691 A CN201310670691 A CN 201310670691A CN 103605814 B CN103605814 B CN 103605814B
- Authority
- CN
- China
- Prior art keywords
- file
- icd
- former
- information
- amended
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 230000010365 information processing Effects 0.000 title claims abstract description 19
- 238000003672 processing method Methods 0.000 title claims abstract description 17
- 230000009466 transformation Effects 0.000 title abstract description 10
- 230000008569 process Effects 0.000 title abstract description 9
- 238000012986 modification Methods 0.000 claims abstract description 82
- 230000004048 modification Effects 0.000 claims abstract description 82
- 230000008676 import Effects 0.000 claims description 32
- 238000004891 communication Methods 0.000 claims description 9
- 230000008859 change Effects 0.000 claims description 6
- 241000272814 Anser sp. Species 0.000 claims 2
- 230000005611 electricity Effects 0.000 claims 1
- 238000012546 transfer Methods 0.000 description 16
- 230000006870 function Effects 0.000 description 4
- 230000003247 decreasing effect Effects 0.000 description 3
- 238000012217 deletion Methods 0.000 description 3
- 230000037430 deletion Effects 0.000 description 3
- 230000001419 dependent effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/16—File or folder operations, e.g. details of user interfaces specifically adapted to file systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Public Health (AREA)
- Human Computer Interaction (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an information processing method and an information processing system in a substation transformation process. The information processing method comprises the following steps that after the original ICD (IED Capability Description) document of target power equipment is modified, the obtained original ICD document of the target power equipment is compared with the modified ICD, first modified information which is modified previously in the modified ICD is confirmed, and then, the modification part in the modified ICD is directly imported into the corresponding part of an original SCD (Substation Configuration Description) document without importing the non-modified part, so that the problems of the increase of difficulty and workload of the field adjustment work, the reduction of efficiency of the field adjustment work and influence on the working efficiency of the substation transformation works as in the substation transformation process, when the original ICD document of the target power equipment needs to be modified a plurality of times, the corresponding part of the original SCD document is replaced with the modified ICD document a plurality of times and the original configuration of the target power equipment is correspondingly adjusted according to the ICD document modified each time in the prior art can be solved.
Description
Technical field
The present invention relates to Transfomer Substation Reconstruction technical field, the letter during more particularly to a kind of Transfomer Substation Reconstruction
Breath processing method and system.
Background technology
With the fast development of electrical network, intelligent grid has become the Developing mainstream of power system, in order to adapt to intelligent grid
Development, old-fashioned Transfomer Substation Reconstruction need to be become intelligent substation.It will usually need to intelligent power equipment during changing
ICD(IED Capability Description, intelligent power equipment ability description)File is modified, due to becoming to whole
The description of the configuration of all devices in power station is all in SCD(Substation Configuration Description, transformer station
Configuration description)In file, so, once the former ICD file modification of certain power equipment, whole transformer station will necessarily be affected
SCD file, now the appropriate section in the SCD file of this transformer station be necessary for modifying.For this reason, in prior art, generally
Be all that the appropriate section in SCD file is deleted, more again import amended ICD file, so again to related subnet and
GOOSE(Generic Object Oriented Substation Event, general towards transformer station's object time)Empty terminal
Reconfigure and debug, to meet real work demand.
However, in actual transformation process, generally all the former ICD file of power equipment repeatedly can be changed, now, existing
There is technology to be accomplished by repeatedly making amended ICD file replace SCD file appropriate section, and replacement is required for debugging this every time
Power equipment configured after subnet and/or GOOSE void terminal arrangement(I.e. communication configuration and/or GOOSE configuration), increase
Add difficulty and the workload of field adjustable work, reduce the efficiency of field adjustable work, especially in the transformation of transformer station
Later stage needs ICD file is modified, and through so repeatedly working, leverages the work efficiency of Transfomer Substation Reconstruction engineering.
Content of the invention
In view of this, the invention provides the information processing method during a kind of Transfomer Substation Reconstruction and system, solve
Correspondence after the ICD file modification of target power equipment it is necessary in the former SCD file of deletion transformer station in prior art
Partial information, imports amended ICD file again, and also will again debug the amended with this of this target power equipment
The related original configuration of ICD file, considerably increases difficulty and the workload of field adjustable work, reduces field adjustable work
Efficiency, have impact on the technical problem of the efficiency of Transfomer Substation Reconstruction engineering.
For achieving the above object, the present invention provides following technical scheme:
A kind of information processing method during Transfomer Substation Reconstruction, methods described includes:
Obtain target power equipment former ICD file and amended ICD file;
Described former ICD file and described amended ICD file are compared, determine described amended ICD file
In the first modification information;
Will be new with described first modification information corresponding part, generation in the described first modification information former SCD file of importing
SCD file.
Preferably, after described acquisition target power equipment former ICD file and amended ICD file, and to institute
State former ICD file and described amended ICD file is compared, determine the first modification in described amended ICD file
Before information, methods described also includes:
According to preset requirement, judge whether to retain original configuration of described target power equipment;
If it is not, then described amended ICD file is introduced directly into civilian with described amended ICD in former SCD file
The corresponding part of part;
According to the described amended ICD file importing in described former SCD file, to mesh described in described former SCD file
Original configuration of mark power equipment is modified and is debugged, and generates new SCD file;
If it is, being directly entered described described former ICD file and described amended ICD file being compared, really
The first modification information step in fixed described amended ICD file continues executing with.
Preferably, original configuration of described target power equipment includes communication configuration and/or GOOSE configuration.
Preferably, after generating new SCD file, methods described also includes:
Described new SCD file is compared with described former SCD file, determines second in described new SCD file
Modification information;
Described second modification information is imported part corresponding with described second modification information in background data base.
Preferably, after generating new SCD file, methods described also includes:
Described new SCD file is compared with described former SCD file, determines the 3rd in described new SCD file
Modification information;
By described 3rd modification information import background data base, and replace in described background data base with described 3rd modification
The corresponding configuration information of information.
A kind of information processing system during Transfomer Substation Reconstruction, described system includes:
Acquiring unit:For obtaining target power equipment former ICD file and amended ICD file;
Relatively determining unit:Enter for the described former ICD file obtaining and amended ICD file to described acquiring unit
Row compares, and determines the first modification information in described amended ICD file;
First information import unit:For described the first modification information comparing determining unit determination is imported former SCD literary composition
Part corresponding with described first modification information in part, generates new SCD file.
Preferably, described system also includes:
First judging unit:For according to preset requirement, judging whether to retain original configuration of described target power equipment;
Second information modification unit:For when the judged result of described judging unit is no, by described amended ICD
File is introduced directly into part corresponding with described amended ICD file in former SCD file;
Configuration information changes unit:For according to the described amended ICD file importing in described former SCD file, right
Described in described former SCD file, the configuration information of original configuration of target electronic device is modified, and generates new SCD file.
Preferably, original configuration of described target power equipment includes:Communication configuration and/or GOOSE configuration.
Preferably, described system also includes:
Second judging unit:For being compared with described former SCD file to described new SCD file, determine described new
SCD file in the second modification information;
Second information import unit:The second modification information for determining described second judging unit imports back-end data
Part corresponding with described second modification information in storehouse.
Preferably, described system also includes:
3rd judging unit:For being compared with described former SCD file to described new SCD file, determine described new
SCD file in the 3rd modification information;
3rd information import unit:The 3rd modification information for determining the 3rd judging unit imports background data base,
And replace configuration information corresponding with described 3rd modification information in described background data base.
Understand via above-mentioned technical scheme, compared with prior art, the present disclosure provides a kind of Transfomer Substation Reconstruction
During information processing method and system, after former ICD file modification to target power equipment, by this target obtaining
Power equipment former ICD file and amended ICD file are compared, and determine in this amended ICD file and do change
First modification information, afterwards, the transfer portion in amended ICD file is that the first modification information is introduced directly into former SCD literary composition
The corresponding part of part, non-transfer portion need not import, thus solving during Transfomer Substation Reconstruction, target power is set
When standby former ICD file is repeatedly changed, former SCD file need to repeatedly be replaced by this amended ICD file by prior art
Corresponding part, and original configuration of this target power equipment is correspondingly debugged according to the ICD file of each modification, and increased existing
The difficulty of field debugging efforts and workload, reducing the efficiency of field adjustable work, that is, avoiding the duplication of labour, improve
The work efficiency of Transfomer Substation Reconstruction engineering.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only this
Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
The accompanying drawing providing obtains other accompanying drawings.
Fig. 1 is the flow chart of the embodiment 1 of information processing method during a kind of Transfomer Substation Reconstruction of the present invention;
Fig. 2 is the flow chart of the embodiment 2 of information processing method during a kind of Transfomer Substation Reconstruction of the present invention;
Fig. 3 is the structural representation of the embodiment 1 of information processing system during a kind of Transfomer Substation Reconstruction of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation description is it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of not making creative work
Embodiment, broadly falls into the scope of protection of the invention.
The embodiment of the invention discloses information processing method and system during a kind of Transfomer Substation Reconstruction, when to target power
The former ICD of equipment(IED Capability Description, intelligent power equipment ability description)After file modification, by right
This target power equipment former ICD file obtaining and amended ICD file are compared, and determine this amended ICD file
In did change the first modification information, afterwards, the transfer portion in amended ICD file is that the first modification information is direct
Import former SCD(Substation Configuration Description, substation configuration description)The corresponding part of file
, non-transfer portion need not import, thus solving the former ICD literary composition during Transfomer Substation Reconstruction, to target power equipment
When part is repeatedly changed, the corresponding part of former SCD file need to repeatedly be replaced by this amended ICD file by prior art, and
Correspondingly debug original configuration of this target power equipment according to the ICD file of each modification, and increased field adjustable work
Difficulty and workload, reduce field adjustable work efficiency, that is, avoiding the duplication of labour, improve Transfomer Substation Reconstruction
The work efficiency of engineering.
As shown in figure 1, the flow process for the embodiment 1 of information processing method during a kind of Transfomer Substation Reconstruction of the present invention
Figure, the method can include:
Step S11:Obtain target power equipment former ICD file and amended ICD file.
Step S12:Former ICD file and amended ICD file are compared, determine in this amended ICD file
The first modification information.
Step S13:This first modification information is imported corresponding part in former SCD file, generates new SCD literary composition
Part.
The ICD literary composition of certain power equipment during old-fashioned Transfomer Substation Reconstruction is intelligent substation, often occurs
Part needs situation about changing, and because transformer station is all generally using SCL language(Substation Configuration
Description Language, substation configuration description language)To the IED in this transformer station(Intelligent
Electronic Devices, intelligent power equipment)Configuration information be described, formed describe this IED function information ICD
File, then by these ICD file generateds one be SCD file to whole transformer station configuration describing document, so, once target is electric
The ICD file of power equipment changes, and the SCD file of its place transformer station is necessary for changing.In this regard, at the information of prior art
Reason method is all to import amended ICD file every time in SCD file, substitutes civilian with this amended ICD in this SCD file
The corresponding part of part, and again debug all and device-dependent configuration of this target power, such as communication configuration and/or GOOSE
(Generic Object Oriented Substation Event, general towards transformer station's object time)Configuration, to meet
The work requirements of intelligent grid.
However, in actual applications, it is not that entire contents are modified generally to the modification of former ICD file, because
And, the original information of modification information and non-transfer portion that amended ICD file can include transfer portion is former ICD file pair
Answer the information of part, then, prior art will be deleted with entirely amended ICD file corresponding part in SCD file, is substituted for
In the mode of amended ICD file, necessarily having partial content in amended SCD file is and the phase in former SCD file
Answer the content identical of part, thus, for this part identical content, above-mentioned replacement operation is actually insignificant,
Belong to idle work operation.So, after the ICD file to this target power equipment is repeatedly changed, the operation of this idle work will
Repeatedly the work efficiency of Transfomer Substation Reconstruction can be leveraged;And, every time amended ICD file is imported SCD literary composition
It is necessary to the configuration related to this amended ICD file in tested target power equipment will be re-started after part
Debugging, considerably increases difficulty and the workload of field adjustable work, reduces the efficiency of field adjustable work, thus further
Have impact on the work efficiency of Transfomer Substation Reconstruction.
For this reason, the embodiment of the present invention is by comparing to the former ICD file of target power equipment and amended ICD file
Relatively, so that it is determined that the content going out transfer portion in amended ICD file is the first modification information, and only by this first modification letter
Breath imports the corresponding part in former SCD file, need not non-transfer portion content in amended ICD file, without deletion
Corresponding part in former SCD file, it is to avoid the generation of idle work operation, improves the work efficiency of Transfomer Substation Reconstruction;And,
Due to not deleting information in former SCD file, thus, it remains the device-dependent configuration of this target power, and it need not be carried out
Repeating to debug, decrease field adjustable workload, improve the efficiency of field adjustable work, thus further increasing power transformation
Stand transformation work efficiency.
As shown in Fig. 2 the flow process for the embodiment 2 of information processing method during a kind of Transfomer Substation Reconstruction of the present invention
Figure, the method can include:
Step S21:Obtain target power equipment former ICD file and amended ICD file.
Step S22:According to preset requirement, judge whether to retain original configuration of this target power equipment, if it is, holding
Row step S25, if it is not, then be directly entered step S23.
Wherein, this preset requirement can be to be actually needed to determine during Transfomer Substation Reconstruction, target power equipment
Original configuration can include communication configuration and/or GOOSE configuration.
Step S23:Amended ICD file is introduced directly into corresponding part in former SCD file.
Step S24:According to the amended ICD file importing in former SCD file, to target power in this former SCD file
Original configuration of equipment is modified and is debugged, and generates new SCD file.
In actual applications, due to not retaining original configuration of target power equipment, so, when entirely amended
It is necessary to according to amended ICD file, to target power equipment, original configuration is repaiied after ICD file all imports SCD file
Change and debug.During this of the embodiment of the present invention, when importing amended ICD file every time, former SCD file need not be deleted
In appropriate section, as long as being introduced directly into this amended ICD file, decreasing the operating procedure of Transfomer Substation Reconstruction, carrying
High work efficiency.
Step S25:Former ICD file and amended ICD file are compared, determine in this amended ICD file
The first modification information.
Step S26:This first modification information is imported corresponding part in former SCD file, generates new SCD literary composition
Part.
In embodiments of the present invention, the processing method relatively with above-mentioned steps S23~S24, step S25~step S26 institute
The change content of the processing method providing is fewer, needs the configuration again debugged also relatively less, more improves transformer station
The work efficiency of transformation, in actual applications, according to the practical situation of Transfomer Substation Reconstruction, and can select suitable processing method.
Wherein, in actual applications, obtain the new SCD file of transformer station by said method after, system configuration utility
The instantiation configuration file of IED would generally be generated according to this SCD file(Configured IED Description file, letter
Claim CID file), to control IED normal work.
Step S27:New SCD file is compared with former SCD file, determines that second in this new SCD file is repaiied
Convert to breath.
Step S28:This second modification information is imported corresponding part in background data base.
In the practical application of transformer station, its SCD file generally will store in background data base, to become from now on
Information needed is called from this background data base, thus ensureing the safe and reliable operation of this transformer station in the running in power station.
In embodiments of the present invention, equally in order to reduce idle work operation, improve work efficiency, it only will be amended
In SCD file with respect to the transfer portion of former SCD file be second modification information import background data base, need not entirely be changed
Rear SCD file imports corresponding prime information in background data base, and background data base without deletion, thus decreasing work
Measure, improve the work efficiency of Transfomer Substation Reconstruction.
As another embodiment of the present invention, according to actual needs, being compared with former SCD file to new SCD file,
Determine the 3rd modification information in this new SCD file(I.e. the second modification information)Afterwards, the 3rd modification information can also be led
Enter background data base, and replace corresponding configuration information in this background data base.Its step S27 with the embodiment of the present invention
~step S28 belongs to the scope of the present invention, and the mode that the present invention does not import background data base to the second modification information is entered
Row limits.
In the embodiment of the present invention, after the ICD file to target power equipment is modified, and this target power is being set
When the SCD file of standby place transformer station is modified, by judging whether the original configuration needing to retain target power equipment, when
When judged result is to be, then directly by the transfer portion of amended ICD file(I.e. the first modification information)Import SCD file,
The non-transfer portion in amended ICD file need not be imported, and letter corresponding with this transfer portion in SCD file need not be deleted
Breath, thus remaining original configuration of target power equipment, greatly reducing field adjustable workload and difficulty, improve scene
The work efficiency of debugging, thus improve the work efficiency of Transfomer Substation Reconstruction;And when judged result for no when, then will entirely change
ICD file afterwards is introduced directly into SCD file, without deleting appropriate section in this SCD file, corresponding prior art, also carries
The high work efficiency of Transfomer Substation Reconstruction.In addition, after the completion of to SCD file modification, the method that the present invention is imported by increment, only
The transfer portion of this SCD file is imported background data base, thus further increasing the work efficiency of Transfomer Substation Reconstruction.
As shown in figure 3, the structural representation of the information processing system during being a kind of Transfomer Substation Reconstruction of the present invention, this is
System can include:
Acquiring unit S31:For obtaining target power equipment former ICD file and amended ICD file.
In actual applications, as another embodiment of the present invention, this system can also include:
First judging unit:For according to preset requirement, judging whether to retain original configuration of target power equipment.
Wherein, as further embodiment of this invention, this system can execute corresponding operating, tool by a system configuration utility
Body, in the transformation process to transformer station, can be by a kind of function of " updating IED " of this system configuration utility design, at it
The target power equipment needing to update is provided on the function interface providing, obtains corresponding amended ICD file, at this moment this is joined
Instrument of putting generally ejects a reservation selection of configuration being provided with " retaining communication configuration " and " retaining GOOSE configuration " two options
Window, now, staff can therefrom select, according to preset requirement, the original configuration needing to retain.
Second information modification unit:For judging unit judged result be no when, will be direct for amended ICD file
Import corresponding part in former SCD file.
Configuration information changes unit:For according to the amended ICD file importing in former SCD file, to former SCD file
Original configuration of middle target electronic device is modified and is debugged, and generates new SCD file.
Relatively determining unit S32:Carry out for the former ICD file obtaining and amended ICD file to acquiring unit S31
Relatively, determine the first modification information in amended ICD file.
Still with above-mentioned another embodiment, when the judged result of the first judging unit is to be, that is, retain target power equipment
Communication configuration and GOOSE configuration, just can trigger this and compare determining unit S32.
First information import unit S33:For the first modification information comparing the determination of determining unit S32 is imported former SCD
Part corresponding with the first modification information in file, generates new SCD file.
After completing the modification to the SCD file of transformer station, also need to be conducted into background data base, for this reason, this system
Can also include:
Second judging unit:For being compared with former SCD file to the new SCD file generating, determine this new SCD
The second modification information in file.
Wherein, this second modification information is the transfer portion in the new SCD file generating.
Second information import unit:The second modification information for determining the second judging unit imports in background data base
Corresponding part.
Or, this system can also include:
3rd judging unit:For being compared with former SCD file to the new SCD file generating, determine this new SCD
The 3rd modification information in file.
Wherein, the 3rd modification information is identical with the second modification information.
3rd information import unit:The 3rd modification information for determining the 3rd judging unit imports background data base,
And replace corresponding configuration information in background data base.
In the embodiment of the present invention, when acquiring unit obtain target power equipment former ICD file and amended ICD file it
Afterwards, by comparing determining unit, the former ICD file of target power equipment and amended ICD file are compared, determine
In amended ICD file, the content of transfer portion is the first modification information, and by first information import unit only by this first
Modification information imports the corresponding part in former SCD file, need not non-transfer portion content in amended ICD file, also no
The corresponding part in former SCD file need to be deleted, it is to avoid the generation of idle work operation, improve the work effect of Transfomer Substation Reconstruction
Rate;It is additionally, since and do not delete information in former SCD file, thus, it remains the device-dependent configuration of this target power, need not
It is carried out repeat to debug, decreasing field adjustable workload, improve the efficiency of field adjustable work, thus further carrying
The high work efficiency of Transfomer Substation Reconstruction.
It should be noted that further for words such as " first ", " second ", " the 3rd " occurring in the above embodiment of the present invention
Language, it is not offered as orbution, and it is only to play difference effect.And the above embodiment of the present invention is a kind of exemplary
Example, should not be taken as limiting, given particular content should in no way limit the purpose of the application.For example, described unit draw
Point, only a kind of division of logic function, actual can have other dividing mode when realizing, and for example multiple units combine one
Rise;In addition, multiple units can or assembly can in conjunction with or be desirably integrated into another system, or some features can be neglected
Slightly, or do not execute.And, herein, term " inclusion ", "comprising" or its any other variant are intended to nonexcludability
Comprise so that including a series of process of key elements, method, article or equipment not only include those key elements, but also
Including other key elements being not expressly set out, or also include for this process, method, article or intrinsic the wanting of equipment
Element, here will no longer repeat one by one, and those skilled in the art are creative making great efforts determination so long as not paying, and belong to the present invention
Protection domain.
In this specification, each embodiment is described by the way of going forward one by one, and what each embodiment stressed is and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.For system disclosed in embodiment
For, because it corresponds to the method disclosed in Example, so description is fairly simple, say referring to method part in place of correlation
Bright.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the present invention.
Multiple modifications to these embodiments will be apparent from for those skilled in the art, as defined herein
General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention
It is not intended to be limited to the embodiments shown herein, and be to fit to and principles disclosed herein and features of novelty phase one
The scope the widest causing.
Claims (8)
1. the information processing method during a kind of Transfomer Substation Reconstruction is it is characterised in that methods described includes:
Obtain target power equipment former ICD file and amended ICD file;
According to preset requirement, judge whether to retain original configuration of described target power equipment;
If it is not, then by described amended ICD file be introduced directly in former SCD file with described amended ICD file pair
The part answered;
According to the described amended ICD file importing in described former SCD file, to the electricity of target described in described former SCD file
Original configuration of power equipment is modified and is debugged, and generates new SCD file;
If it is, being compared to described former ICD file and described amended ICD file, determine described amended ICD literary composition
The first modification information in part;
Will be civilian with described first modification information corresponding part, the new SCD of generation in the described first modification information former SCD file of importing
Part.
2. method according to claim 1 is it is characterised in that original configuration of described target power equipment includes communication and joins
Put and/or GOOSE configuration.
3. method according to claim 1 and 2 is it is characterised in that after generating new SCD file, methods described is also
Including:
Described new SCD file is compared with described former SCD file, determines the second modification in described new SCD file
Information;
Described second modification information is imported part corresponding with described second modification information in background data base.
4. method according to claim 1 and 2 is it is characterised in that after generating new SCD file, methods described is also
Including:
Described new SCD file is compared with described former SCD file, determines the 3rd modification in described new SCD file
Information;
By described 3rd modification information import background data base, and replace in described background data base with described 3rd modification information
Corresponding configuration information.
5. the information processing system during a kind of Transfomer Substation Reconstruction is it is characterised in that described system includes:
Acquiring unit:For obtaining target power equipment former ICD file and amended ICD file;
Relatively determining unit:Compare for the described former ICD file obtaining and amended ICD file to described acquiring unit
Relatively, determine the first modification information in described amended ICD file;
First information import unit:For described the first modification information comparing determining unit determination is imported in former SCD file
Part corresponding with described first modification information, generates new SCD file;
Described system also includes:
First judging unit:For according to preset requirement, judging whether to retain original configuration of described target power equipment;
Second information modification unit:For when the judged result of described judging unit is no, by described amended ICD file
It is introduced directly into part corresponding with described amended ICD file in former SCD file;
Configuration information changes unit:For according to the described amended ICD file importing in described former SCD file, to described
The configuration information of original configuration of target power equipment described in former SCD file is modified, and generates new SCD file.
6. system according to claim 5 is it is characterised in that original configuration of described target power equipment includes:Communication
Configuration and/or GOOSE configuration.
7. the system according to claim 5 or 6 is it is characterised in that described system also includes:
Second judging unit:For being compared with described former SCD file to described new SCD file, determine described new SCD
The second modification information in file;
Second information import unit:The second modification information for determining described second judging unit imports in background data base
Part corresponding with described second modification information.
8. the system according to claim 5 or 6 is it is characterised in that described system also includes:
3rd judging unit:For being compared with described former SCD file to described new SCD file, determine described new SCD
The 3rd modification information in file;
3rd information import unit:The 3rd modification information for determining the 3rd judging unit imports background data base, and replaces
Change configuration information corresponding with described 3rd modification information in described background data base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310670691.1A CN103605814B (en) | 2013-12-10 | 2013-12-10 | Information processing method and information processing system in substation transformation process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310670691.1A CN103605814B (en) | 2013-12-10 | 2013-12-10 | Information processing method and information processing system in substation transformation process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103605814A CN103605814A (en) | 2014-02-26 |
CN103605814B true CN103605814B (en) | 2017-02-15 |
Family
ID=50124036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310670691.1A Active CN103605814B (en) | 2013-12-10 | 2013-12-10 | Information processing method and information processing system in substation transformation process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103605814B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104065163B (en) * | 2014-06-19 | 2016-08-17 | 国家电网公司 | Delivery method on a kind of intelligent substation warning information |
CN104657176A (en) * | 2015-02-09 | 2015-05-27 | 南京南瑞继保电气有限公司 | File updating method and electronic equipment |
CN106294750B (en) * | 2016-08-10 | 2019-08-06 | 国家电网公司 | ICD model file familial defect upgrade-system and method |
CN106888113B (en) * | 2017-01-21 | 2019-10-29 | 国网浙江省电力公司绍兴供电公司 | A kind of method and device for intelligent substation business configuration |
CN110896363B (en) * | 2019-11-25 | 2022-07-29 | 东方电子股份有限公司 | Plug-and-play access configuration method for IEC61850 intelligent device |
CN115499520B (en) * | 2022-11-21 | 2023-03-10 | 北京蓝天航空科技股份有限公司 | Interface control file updating method and device, electronic equipment and storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102867274A (en) * | 2012-07-27 | 2013-01-09 | 江苏省电力公司电力科学研究院 | Management and graphical display system for intelligent substation SCL (substation configuration description language) configuration files |
CN103399888A (en) * | 2013-07-19 | 2013-11-20 | 广东电网公司电力科学研究院 | Differential synchronization method and system for power grid model data |
-
2013
- 2013-12-10 CN CN201310670691.1A patent/CN103605814B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102867274A (en) * | 2012-07-27 | 2013-01-09 | 江苏省电力公司电力科学研究院 | Management and graphical display system for intelligent substation SCL (substation configuration description language) configuration files |
CN103399888A (en) * | 2013-07-19 | 2013-11-20 | 广东电网公司电力科学研究院 | Differential synchronization method and system for power grid model data |
Also Published As
Publication number | Publication date |
---|---|
CN103605814A (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103605814B (en) | Information processing method and information processing system in substation transformation process | |
CN105335584B (en) | Distribution network systems line chart generates optimization device and method | |
CN105576660B (en) | Local distribution network in-circuit emulation analytical equipment and system | |
CN106451556A (en) | Method and apparatus for determining capability of receiving distributed power supply by distributed network feeder line | |
US20150294037A1 (en) | System and method for automated substation design and configuration | |
CN102930111B (en) | The generation method of transformer station's SCD model file and device | |
CN103217649A (en) | Method and device for displaying electric quantity, and mobile device | |
CN104267365A (en) | Portable small current earth-fault line selection closed loop performance tester | |
CN108388688A (en) | A kind of active distribution network reliability estimation method | |
CN103746421A (en) | Intelligent recognition system for optimal charging current and method thereof | |
CN105355021A (en) | ZigBee-based remote wireless meter reading system and performance detection method thereof | |
CN104392307B (en) | A kind of reliability estimation method based on distribution network automated engineering | |
CN104715144A (en) | Power distribution network closed loop power flow simulation algorithm based on real-time running data | |
CN104504524A (en) | Reliability assessment method and load curtailing method applied to active distribution network | |
CN108427821B (en) | Digital-analog hybrid simulation method and system for operation characteristics of alternating-current/direct-current hybrid power grid | |
CN110048884A (en) | Resist the intelligent distribution network communication network planing method of random attack and premeditated network attack | |
CN103036228A (en) | Method for determining location of transformer substation and length of power supply circuit in power system planning process | |
CN103560497B (en) | A kind of short circuit current method for limiting based on power network topology adjustment | |
CN109116139A (en) | A kind of PoE interchanger band of low cost carries the ageing testing method of PD | |
CN102509168A (en) | Improved integer programming method-based optimum PMU (Power Management Unit) placement method | |
CN105990878A (en) | Charging method based on step current automatic adjustment, system and mobile terminal | |
CN109657332B (en) | Method and system for decoupling electromagnetic transient automatic modeling of large-scale power grid | |
CN104218546B (en) | A kind of self-healing recovery control method of intelligent distribution network | |
CN103778055B (en) | A kind of key-press test method and device | |
CN106855592B (en) | Dynamic simulation test wave recording message playback method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |