CN104989345A - Auxiliary extraction method for single horizontal well solvent - Google Patents

Auxiliary extraction method for single horizontal well solvent Download PDF

Info

Publication number
CN104989345A
CN104989345A CN201510324029.XA CN201510324029A CN104989345A CN 104989345 A CN104989345 A CN 104989345A CN 201510324029 A CN201510324029 A CN 201510324029A CN 104989345 A CN104989345 A CN 104989345A
Authority
CN
China
Prior art keywords
solvent
horizontal well
oil
pressure
composite gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510324029.XA
Other languages
Chinese (zh)
Other versions
CN104989345B (en
Inventor
张胜飞
李秀峦
王红庄
周游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201510324029.XA priority Critical patent/CN104989345B/en
Publication of CN104989345A publication Critical patent/CN104989345A/en
Application granted granted Critical
Publication of CN104989345B publication Critical patent/CN104989345B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides an auxiliary extraction method for a single horizontal well solvent. The method comprises the following steps that: 1, a single horizontal well pattern is deployed, and the distance from a horizontal section of a horizontal well to the bottom of an oil reservoir is less than 1m; 2, a composite gas solvent formed by C1-C4 organic compounds and CO2 is injected through a long pipe at the pressure being greater than the dew point pressure of the composite gas solvent; 3, the well is closed for 1 to 2 days, the horizontal section of the horizontal well is heated, and the heating is stopped when the horizontal section is heated to 50 to 70 DEG C; 4, extraction is performed in a mode of using the long pipe to inject thin oil and using a short pipe to extract oil, the extraction process lasts for 2 days, the composite gas solvent is injected through the long pipe when the underground pressure is lower than 1MPa, the operations in the third step are repeated, and the injection quantity of the composite gas solvent is 1 to 3 times of the volume of a solvent cavity; 5, the operations in the second step to the fourth step are repeated, and the extraction is completed when the extraction degree reaches more than 50 percent and the extraction efficiency is lower than an economic limit. The extraction method has the advantages that the single-well cost is low; the technical requirement on drilling is low; the process is a waterless process; and the energy consumption is low.

Description

The exploitation method that a kind of single horizontal well solvent is auxiliary
Technical field
The present invention relates to a kind of oil reservoir exploitation method, the exploitation method that single horizontal well solvent of the thin heavy oil that particularly a kind of thermal recovery is less economical is auxiliary, belong to technical field of petroleum extraction.
Background technology
The development technique of the main flow of current oil reservoir uses the exploitation via steam injection technology such as steam soak, steam flooding, SAGD to exploit.
Wherein, SAGD develops viscous crude and achieves successfully in Canada, obtains business application.Domestic also beginning is attempted, but some application is limited by the restriction of factors, and the thickness as oil reservoir is thin, it is dark to bury, containing edge-bottom water, causes that heat waste is large, development rate is slow, oil-gas ratio is low, business efficiency is poor.
And dual horizontal well requires very high to wellbore trace, parallelism is poor, and the fluctuation of well spacing is large, has a strong impact on development effectiveness.In addition, SAGD startup stage, between 5 meters of traditional wells, oil reservoir thermal communication and fluid communication need to consume a large amount of water and heat, and effect is not also fine.
The thickness of oil reservoir is thin, and development rate is slow, and the oil reservoir development that oil-gas ratio is low, business efficiency is poor becomes the difficult problem generally run in oil reservoir development process.
Therefore, solve that thin heavy oil thermal recovery heat waste is large, a difficult problem high to well-drilling borehole track requirements is this area technical problem urgently to be resolved hurrily.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides the exploitation method that a kind of single horizontal well solvent is auxiliary, this exploitation gives full play to the advantage of horizontal well gravity drainage, the mode of organic solvent huff and puff oil recovery is utilized effectively to employ viscous crude, there is individual well cost low, low, anhydrous process is required to drilling technology and the low advantage of energy consumption.
In order to achieve the above object, the invention provides the exploitation method that a kind of single horizontal well solvent is auxiliary, this exploitation method comprises the following steps:
Step one: dispose single horizontal well patterns, the distance < 1m bottom the horizontal segment of horizontal well and oil reservoir;
Step 2: under the pressure being greater than dew-point pressure, inject C by long tube 1-C 4organic compound and CO 2composite gas solvent, described dew-point pressure is the dew-point pressure of composite gas solvent;
Step 3: closing well 1-2 days, heats the horizontal segment of horizontal well, when being heated to 50-70 DEG C, stops heating;
Step 4: adopt long tube companion note thin oil, the mode that short tube recovers the oil is exploited, extraction process lasts two days, when the pressure of down-hole is lower than 1MPa, injects described composite gas solvent by long tube, and repeat the step of step 3, wherein, the injection rate of composite gas solvent is 1-3 times of solvent cavity volume;
Step 5: repeat the step of step 2 to step 4, when recovery percent of reserves reaches more than 50%, when production efficiency is lower than economic limit, terminates exploitation, completes the exploitation that described single horizontal well solvent is auxiliary.
In above-mentioned exploitation method provided by the invention, in step, distance bottom the horizontal segment of horizontal well and oil reservoir is more little more economical, if but fixed too low of index, part of horizontal well well section can be caused to be in substrate rock stratum, to production, not there is any effect, have very high risk, general setting is less than 1 meter, and concrete numerical value those skilled in the art can select suitable distance according to real needs.
In above-mentioned exploitation method provided by the invention, solvent chamber in step 4 refers to the injection along with solvent, part viscous crude above Injection Well is plucked out of, and this part space is occupied by the solvent of follow-up injection, and we claim this part space to be the solvent chamber that oil reservoir inside is formed.Solvent chamber constantly expands along with the carrying out of development process.
In above-mentioned exploitation method provided by the invention, in step 5, when output crude value by the estimation of current oil price of the summation > of the solvent cost injected, equipment and manipulation expense then production efficiency lower than economic limit, with an operation cycle for assessing basis.
In above-mentioned exploitation method of the present invention, preferably, in step 2, described C 1-C 4organic compound comprises the combination of one or more in methane, ethane, propane and butane.
In above-mentioned exploitation method of the present invention, preferably, in step 2, CO in composite gas solvent 2volume content be 20%-80%.
In above-mentioned exploitation method of the present invention, in composite gas solvent, the content of carbon dioxide can be selected according to reservoir characteristic.Select according to being: the dew-point pressure Proximity operation pressure of composite gas solvent but more lower slightly than operating pressure.The fluid of such injection oil reservoir can enter in two-phase section (as shown in Figure 1), can ensure that again the overwhelming majority is injected solvent and is in gas phase, make the consumption of composite gas solvent few (density of gas phase is low), but pressure is enough high again, is beneficial to and improves the solubility of composite gas solvent in viscous crude.
In above-mentioned exploitation method of the present invention, preferably, heater is provided with in the horizontal segment of horizontal well.Wherein, this heater can be electric heater unit.
In above-mentioned exploitation method of the present invention, preferably, in the horizontal segment of described horizontal well, be provided with temperature measuring equipment and pressure tester, to implement the temperature and pressure in monitor well.
In above-mentioned exploitation method provided by the invention, in described step 2, dew-point pressure refers to the maximum pressure keeping single gas phase in gas phase hydrocarbon pressurization, and the composition with reservoir temperature and composite gas solvent changes.As, at 20 DEG C, the dew-point pressure of composite gas solvent is 1.5-6MPa.Dew-point pressure is generally high than strata pressure, to ensure that composite gas solvent can inject, but also can not be high especially, otherwise uneconomical, those skilled in the art can judge according to actual conditions.
In above-mentioned exploitation method of the present invention, the long tube of employing is used for gas injection, and gas injection speed does not require high, and the diameter of long tube does not specially require, and the general oil pipe using common model, is generally the oil pipe of 2 (7/8) in models.Short tube is used for adopting liquid, and Produced Liquid is the mixture of viscous crude, solvent, thin oil, and extraction process is that pump is taken out, and uses the oil pipe of common model, is generally the oil pipe of 2 (7/8) in models.
According to the specific embodiment of the present invention, in step 4, after long tube companion note thin oil mainly prevents output crude oil deaeration, viscosity significantly gos up, and causes extraction pipeline to be blocked.The thin oil adopted can be the self-produced low glutinous crude oil of dehydration of other block of oil field, also can be viscous crude thinner, specifically to fall glutinous and cost control for selection gist.
In above-mentioned exploitation method of the present invention, extraction process is the process that step-down is produced.
According to the specific embodiment of the present invention, when recovery percent of reserves reaches more than 50%, solvent naphtha rises than significantly, and output oil mass declines fast, and when causing production efficiency lower than economic limit, completed product run.
Above-mentioned exploitation method provided by the invention, mainly comprises and disposes well pattern, solvent injection, immersion and extraction four-stage;
Dispose single horizontal well patterns, as flooding pattern, wherein, ensure the distance <1 rice bottom the horizontal segment of horizontal well and oil reservoir, the built-in heater of horizontal well, for homogeneous heating, under enter point for measuring temperature and pressure tap for monitoring the temperature and pressure of recovery process; And in pit shaft under the screen casing that enters, enter multitube post (temperature tube, heating tubing string, long tube, short tube etc.) under in screen casing, solvent injects stage long tube note double solvents, extraction stage long tube companion note thin oil, and short tube recovers the oil;
In the injection stage, according to factors such as reservoir buried depth, pore pressure, formation temperatures, select suitable composite gas solvent, the duration in injection stage is short, start inject short period in most solvent enter smoothly, after this flow diminishes, and receives solvent power weak; Composite gas solvent injects more than dew-point pressure, and ensure that solvent enters Gas-liquid phase region, now the consumption of solvent is little, and pressure is enough high simultaneously, and the solubility in crude oil is large, and high pressure injects solvent, reaches the object of supplementary stratum energy;
Closing well a period of time after injection double solvents, enter impregnation stage, soak time slightly long (average 1-2 days depends on Crude viscosity and produce oil speed), be mainly high pressure solvent dissolving and fall glutinous, formation foam oil when step-down is produced.Three characteristic areas are formed, as shown in Figure 2 in fill out sand tube;
The extraction stage is pressure reduction, foam oil is (gravity effect is relatively very weak) output under the effect of solvent gas drive, with pressure drop, Crude viscosity rises, this process passes through step-down, the mixture of crude oil and double solvents will form foam oily, under the effect of dissolved gas drive, crude oil (foam oily) in solvent chamber is pushed to shaft bottom fast, after the crude oil deaeration of shaft bottom, viscosity gos up, now by injecting thin oil and shaft bottom heating, reduce its viscosity, crude oil is given rise to ground by the mode then adopting pump to take out.
Above-mentioned exploitation method provided by the invention, the composite gas solvent of use can carry out being separated and reclaiming, and pressurization Posterior circle uses.
Exploitation method of the present invention falls the process such as glutinous, dissolved gas drive, gravity drainage, molecular heat diffusion by solvent, with the extraction of the form of handling up strengthening viscous crude.Wherein, the solvent of injection is gas phase, is easy to separation and recovery, recycles; Wherein, the injection state of composite gas solvent is positioned at two-phase section, near dew point line, to improve the solubility of composite gas solvent in viscous crude as much as possible, reduces its consumption simultaneously;
In impregnation stage, solvent molecule enters in oil phase under the effect of thermal diffusion, and general diffusion depth is 2cm/d, slowly.Under gravity, the viscous crude fallen after sticking slowly departs from oil phase, promotes solvent-oil contact leading edge reach, compensate for and dissolve the low deficiency of diffusion velocity;
The extraction stage is that step-down is produced, and in pressure reduction, operative liquid solvent gasifies, and supplements driving force.In addition, the solvent be dissolved in viscous crude can form foam oil in step-down is produced, and produces the stronger driving force to pit shaft.Very large extraction driving force is formed under two kinds of mechanism.
Above-mentioned exploitation method provided by the invention is applicable to the less economical thin layer super-heavy oil deposit of thermal recovery, and the energy consumption of this exploitation method is low, and discharge is few, and the rigors of unparalleled horizontal well drilling, is easy to drilling completion;
The solvent of above-mentioned exploitation method provided by the invention can recycle, and solvent consumption is few, and agalasisa water chemical treatment problem, and to big hole barefoot completion, well pattern tubing string has no special requirements;
Sand producing well in above-mentioned exploitation method provided by the invention significantly improves oil production rate and UNICOM's speed, and is expected to the interlayer destroying horizontal distribution, when process conditions allow, takes sand and recovers the oil and greatly can accelerate oil production rate.
Accompanying drawing explanation
Fig. 1 is composite gas solvent phasor of the present invention;
Fig. 2 is that solvent of the present invention is handled up the comparison diagram of different phase.
Detailed description of the invention
In order to there be understanding clearly to technical characteristic of the present invention, object and beneficial effect, existing following detailed description is carried out to technical scheme of the present invention, but can not be interpreted as to of the present invention can the restriction of practical range.
Embodiment 1
Present embodiments provide the exploitation method that a kind of single horizontal well solvent is auxiliary, this exploitation method specifically comprises the following steps:
Oil reservoir and working condition:
The oil reservoir degree of depth 250 meters, effective oil reservoir height 10 meters, reservoir porosity is 30%, and permeability is 5 darcies, and 50 DEG C of degassed crude viscositys are 50000mPaS, formation temperature 22 DEG C.Horizontal well is positioned at above 1 meter of bottom oil reservoir.Horizontal section length is 400 meters, and well spacing is 70 meters, and borehole diameter is 8.5in.7in cutting seam sieve tube completion, prevents horizontal well sand producing well.Enter long and short oil pipe under in screen casing, tubing diameter is 27/8in.Wherein, short tube end connects sucker rod pump, long tube end is dried up horizontal well tiptoe 5-10 rice.In addition, under in screen casing, enter coiled tubing thermometric, arrange electric heater unit along horizontal segment.
First operating pressure scope is selected to be 3-4MPa according to oil reservoir pore pressure, fracture pressure.According to indoor viscous crude solvent optimization screening experiment, obtain the phasor of solvent, and adopt the mixed solvent of 25% propane+75% carbon dioxide as composite gas solvent, at confirming 22 DEG C, mixed solvent is positioned at two-phase section, and dew-point pressure is 3.2MPa, design injection pressure is 3.5MPa.
The good composite gas solvent of on-the-spot mixed preparing, adds back pressure to 8.5MPa, guarantees all solvent liquefaction, then open long tube valve and slowly inject stratum, and the concentration that can ensure to inject solvent like this forms composite design and constant.Observation well head pressure is reacted, and when stopping note after pressure Proximity operation pressure, and supplements a certain amount of solvent of injection in immersion a few hours backsight pressure drop situation.The injection rate of solvent increases along with the continuous extraction of crude oil, the continuous expansion in solvent chamber.Suppose that solvent chamber develops into equilateral triangle and is highly the solvent chamber of 5 meters, its volume is 5773.3m 3, inject solvent and be estimated as 14433.3m 3(under normal temperature, an atmospheric mark state).
Closing well soaks 1 day, and the viscous crude fallen after sticking leaks in pit shaft under gravity.Open down-hole heater (working to add heat drop to stick and supplementary pressure), heating and temperature control is at 50-70 DEG C, and the change of monitor well downforce, be advisable lower than bubble point pressure higher than dew-point pressure with pressure.
In long tube, slowly injecting the dehydration thin oil of other block output of oil field, (injection rate will depending on thinning effect, mix thin oil 5-10wt% and can reach good thinning effect), and from short tube pump extraction oil, because pressure reduction is along with the process that balances each other slowly, this process generally will continue about 2 days.Planned well downforce fall off rate is 1.25MPa/d accordingly, and relative set working conditions of oil extractor (stroke and frequency).
To extraction fluid step-down gas-liquid separation, reclaim vapor phase solvent.Store for subsequent use after the solvent of collection is delivered to water booster system pressure-raising in high pressure piston container.Repeat above step.
Through this well of above-mentioned exploitation method after 120 cycles of experience note solvent operation in totally 360 days, recovery percent of reserves 37%, common property goes out crude oil 18648 tons, is equivalent to day produce oil 51.8 tons.Solvent recovering rate reaches 75%, and peak value monocycle mixed solvent injection rate is 833.3m 3, thin oil consumption is 1865 tons.

Claims (5)

1. the exploitation method that single horizontal well solvent is auxiliary, this exploitation method comprises the following steps:
Step one: dispose single horizontal well patterns, the distance < 1m bottom the horizontal segment of horizontal well and oil reservoir;
Step 2: under the pressure being greater than dew-point pressure, inject C by long tube 1-C 4organic compound and CO 2composite gas solvent, described dew-point pressure is the dew-point pressure of composite gas solvent;
Step 3: closing well 1-2 days, heats the horizontal segment of horizontal well, when being heated to 50-70 DEG C, stops heating;
Step 4: adopt long tube companion note thin oil, the mode that short tube recovers the oil is exploited, extraction process lasts two days, when the pressure of down-hole is lower than 1MPa, inject described composite gas solvent by long tube, repeat the step of step 3, wherein, the injection rate of composite gas solvent is 1-3 times of solvent cavity volume;
Step 5: repeat the step of step 2 to step 4, when recovery percent of reserves reaches more than 50%, when production efficiency is lower than economic limit, terminates exploitation, completes the exploitation that described single horizontal well solvent is auxiliary.
2. exploitation method according to claim 1, wherein, in step 2, described C 1-C 4organic compound comprises the combination of one or more in methane, ethane, propane and butane.
3. exploitation method according to claim 1, wherein, in step 2, CO in composite gas solvent 2volume content be 20%-80%.
4. exploitation method according to claim 1, wherein, is provided with heater in the horizontal segment of described horizontal well.
5. exploitation method according to claim 1, wherein, is provided with temperature measuring equipment and pressure tester in the horizontal segment of described horizontal well.
CN201510324029.XA 2015-06-12 2015-06-12 A kind of recovery method of single horizontal well solvent auxiliary Active CN104989345B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510324029.XA CN104989345B (en) 2015-06-12 2015-06-12 A kind of recovery method of single horizontal well solvent auxiliary

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510324029.XA CN104989345B (en) 2015-06-12 2015-06-12 A kind of recovery method of single horizontal well solvent auxiliary

Publications (2)

Publication Number Publication Date
CN104989345A true CN104989345A (en) 2015-10-21
CN104989345B CN104989345B (en) 2017-09-15

Family

ID=54301214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510324029.XA Active CN104989345B (en) 2015-06-12 2015-06-12 A kind of recovery method of single horizontal well solvent auxiliary

Country Status (1)

Country Link
CN (1) CN104989345B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520118A (en) * 2020-06-12 2020-08-11 西南石油大学 Recyclable heavy oil recovery method and system for heating injected solvent underground

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4560003A (en) * 1982-09-20 1985-12-24 Mobil Oil Corporation Solvent stimulation in heavy oil wells producing a large fraction of water
US20080017372A1 (en) * 2006-07-21 2008-01-24 Paramount Resources Ltd. In situ process to recover heavy oil and bitumen
CA2584712A1 (en) * 2007-04-13 2008-10-13 Nexen Inc. Methods of improving heavy oil production
CN102628350A (en) * 2012-04-20 2012-08-08 中国石油天然气股份有限公司 Propane-injecting shallow heavy oil reservoir exploitation method
CN103244086A (en) * 2013-04-12 2013-08-14 中国石油天然气股份有限公司 Deep heavy oil reservoir in-situ regeneration foam oil exploiting method
CN104314539A (en) * 2014-10-20 2015-01-28 中国石油天然气股份有限公司 Artificial foaming-oil huff and puff oil production method for heavy oil reservoir
CN104405348A (en) * 2014-10-27 2015-03-11 中国石油天然气股份有限公司 Solvent reinforcement method for communicating between horizontal wells

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4560003A (en) * 1982-09-20 1985-12-24 Mobil Oil Corporation Solvent stimulation in heavy oil wells producing a large fraction of water
US20080017372A1 (en) * 2006-07-21 2008-01-24 Paramount Resources Ltd. In situ process to recover heavy oil and bitumen
CA2584712A1 (en) * 2007-04-13 2008-10-13 Nexen Inc. Methods of improving heavy oil production
CN102628350A (en) * 2012-04-20 2012-08-08 中国石油天然气股份有限公司 Propane-injecting shallow heavy oil reservoir exploitation method
CN103244086A (en) * 2013-04-12 2013-08-14 中国石油天然气股份有限公司 Deep heavy oil reservoir in-situ regeneration foam oil exploiting method
CN104314539A (en) * 2014-10-20 2015-01-28 中国石油天然气股份有限公司 Artificial foaming-oil huff and puff oil production method for heavy oil reservoir
CN104405348A (en) * 2014-10-27 2015-03-11 中国石油天然气股份有限公司 Solvent reinforcement method for communicating between horizontal wells

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李雁鸿等: "溶剂蒸汽萃取脱沥青的影响因素实验", 《石油学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520118A (en) * 2020-06-12 2020-08-11 西南石油大学 Recyclable heavy oil recovery method and system for heating injected solvent underground

Also Published As

Publication number Publication date
CN104989345B (en) 2017-09-15

Similar Documents

Publication Publication Date Title
US20210277757A1 (en) Pressure assisted oil recovery
CN102628350B (en) Propane-injecting shallow heavy oil reservoir exploitation method
CA2729430C (en) Recovery of hydrocarbons using artificial topseals
RU2334095C1 (en) Method of high-viscosity oil pool development
US20080017372A1 (en) In situ process to recover heavy oil and bitumen
CN104405348B (en) Solvent reinforcement method for communicating between horizontal wells
US20160069170A1 (en) Method and process for extracting shale oil and gas by fracturing and chemical retorting in oil shale in-situ vertical well
US20070175638A1 (en) Petroleum Extraction from Hydrocarbon Formations
US20160076350A1 (en) Method and process for extracting shale oil and gas by fracturing and chemical retorting in oil shale in-situ horizontal well
CA2837475C (en) Improving recovery from a hydrocarbon reservoir
RU2539048C2 (en) In-situ combustion method (versions)
US8770289B2 (en) Method and system for lifting fluids from a reservoir
US20150204171A1 (en) Carbon dioxide energy storage and enhanced oil recovery
CN105201468A (en) Method for assisting in communication of horizontal wells
CN109538177A (en) A kind of supercritical CO2The new process of pressure break
US20120241150A1 (en) Methods for producing oil and/or gas
CN104265254A (en) Oil production technological method for multi-stage plug injection of oil-soluble viscosity reducer and liquid CO2 in deep super-heavy oil
CA2553297C (en) In situ process to recover heavy oil and bitumen
CN104453816A (en) Method for solvent assisting SAGD heavy oil reservoir exploiting
CN105178931A (en) Method for increasing initial production speed of SAGD (Steam Assisted Gravity Drainage)
Nie A comprehensive model for simulating supercritical water flow in a vertical heavy oil well with parallel double tubes
CN104989345B (en) A kind of recovery method of single horizontal well solvent auxiliary
Smirnov et al. Innovative methods of enhanced oil recovery
Zhang Cyclic hot solvent injection method to enhance heavy oil recovery based on experimental study
Hou The Feasibility Study of High Pressure Steam Flooding after Water Flooding for Common Heavy Oil Reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant