CN104700184A - Plan management method of commanding and training drill system - Google Patents

Plan management method of commanding and training drill system Download PDF

Info

Publication number
CN104700184A
CN104700184A CN201310666226.0A CN201310666226A CN104700184A CN 104700184 A CN104700184 A CN 104700184A CN 201310666226 A CN201310666226 A CN 201310666226A CN 104700184 A CN104700184 A CN 104700184A
Authority
CN
China
Prior art keywords
prediction scheme
management
scheme
plan
examined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310666226.0A
Other languages
Chinese (zh)
Inventor
陈维一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN LINGDONG TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
DALIAN LINGDONG TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN LINGDONG TECHNOLOGY DEVELOPMENT Co Ltd filed Critical DALIAN LINGDONG TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201310666226.0A priority Critical patent/CN104700184A/en
Publication of CN104700184A publication Critical patent/CN104700184A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a plan management method of a commanding and training drill system. The plan management method includes the steps of recording and registering of functions of a government side, to-be-examined-and-approved plan processing, examined-and-approved plan processing and plan drilling, and digital planing, the functions mainly include to-be-examined-and-approved plan management, examined-and-approved plan management and recording statistics, the system is supportive of examination and approval, recording and look-up statistics, to-be-examined-and-approved plan processing refers to management of plans which are not examined and approved, and the system is supportive of looking up plan information, examined and approved plans and returned plans; for plans which are not examined and approved successfully, fail-to-pass reports are generated intelligently and fed back to enterprises, the fail-to-pass reports specifically include information about fail-to-pass reasons, content needing improvement and time limitation for resubmitting for examination and approval, the system is supportive of summarizing statistics and management of drilling plans reported by the enterprises or other institutions and can check, output and print emergency drilling guidebooks, and the system supports the enterprises to newly create and edit structured plans through a structured plan module.

Description

The predetermined plan management method of commander and training exercise system
Technical field
The present invention relates to the predetermined plan management method of a kind of commander and training exercise system.
Background technology
Commander and training exercise system synthesis use the technology such as two-dimension GIS, three-dimensional live, virtual reality, aid decision making, support base emergency resources, the management of powerful emergency traffic and intelligent decision ability of meeting an urgent need are provided, meet the daily contingency management in base, training and drill, the demand of accident emergency management and rescue and commander.System for supporting with emergency traffic, emergency resources, with GIS, three-dimensional artificial scene for exhibition platform, realizes graphical based on GIS platform, visual, intelligentized emergency management and rescue and commander, trains and drill.The predetermined plan management method of training exercise system is even more important.
Summary of the invention
The present invention is directed to the proposition of above problem, and develop the predetermined plan management method of a kind of commander and training exercise system.The technical solution used in the present invention is as follows:
Government's end function filing and registration, system support to the examination & verification of enterprise's prediction scheme, put on record, consult statistics; Mainly comprise pending program management, audit program management, statistics of putting on record; Pending process, manages the prediction scheme of not auditing, and system support is checked prediction scheme information, audits by prediction scheme, return prediction scheme; For the prediction scheme not by auditing, Intelligent generation does not feed back to enterprise by audit report, specifically comprises not by the reason of auditing, the timing information needing perfect content, again submit examination & verification to; Audit process, safeguarding auditing the program management passed through, comprising query statistic, prediction scheme is browsed, export printing; Put on record statistics, a point rank, classifying type statistics are carried out in system support to putting on record; Prediction scheme imports, and system support has reported the automatic and manual operation of prediction scheme to import to enterprise or relevant unit; According to unified template, the independent importing or the batch that realize company information import, and for the papery version emergency preplan submitted to, scanned copy can be imported in prediction scheme storehouse, in order to consulting; Program management, system is supported the query statistic of prediction scheme, is formulated and safeguard and stage management; Mainly comprise that prediction scheme is browsed, prediction scheme editor, the establishment stage, prediction scheme template, prediction scheme sort module; Prediction scheme is browsed, and system support is browsed text prediction scheme and checking of digitizing prediction scheme; Prediction scheme editor, system support increases text prediction scheme, deletion; Digital emergency planning increases, deletion, and version is newly-built, old version is checked; In the establishment stage, system support, to the management stage by stage of prediction scheme, comprises first trial, review, consults on, is expounded through peer review, leader examines, word is audited, finalized a text several stage, the procedure documents in stored record each stage; Prediction scheme template, system provides prediction scheme template management function, supports the bibliographic structure of comprehensive, the special prediction scheme of configuration and site disposal scheme, realizes interpolation, editor, deletes prediction scheme tree node; Prediction scheme is classified, the interpolation of system support emergency preplan classification, deletion, amendment; Prediction scheme responds, and system support is informed of a case to the event in auto-associating emergency management and rescue command dispatching system, realizes the inquiry to event, increase, deletion, amendment; System is supported, for the relevant prediction scheme of reported event association, to generate emergency disposal scheme; Support the editor to emergent disposal method, check, delete, export printing; Prediction scheme is drilled, and system support carries out tabulate statistics, management to the drill plan that enterprise or other unit report, and can check, export printing emergency drilling guide; Digitizing prediction scheme, system supports that enterprise carries out newly-built and edit structure prediction scheme by structuring prediction scheme module.
Owing to have employed technique scheme, method provided by the invention has: easy to use, processing speed, technology realize the features such as easy.In addition, the method is based on the realization of computer system, and only the method need be compiled into the upgrading that corresponding program can realize active computer, therefore its cost is very cheap is suitable for extensive popularization.
Accompanying drawing explanation
Fig. 1 is the flowage structure figure of the method for the invention.
Embodiment
The predetermined plan management method of commander as shown in Figure 1 and training exercise system, government's end function filing and registration, system support to the examination & verification of enterprise's prediction scheme, put on record, consult statistics.Mainly comprise pending program management, audit program management, statistics of putting on record.Pending process, manages the prediction scheme of not auditing, and system support is checked prediction scheme information, audits by prediction scheme, return prediction scheme.For not by the prediction scheme of examination & verification, Intelligent generation does not feed back to enterprise by audit report, specifically comprises not by the reason of examination & verification, needs perfect content, again submits the information such as the time limit of examination & verification to.Audit process, safeguarding auditing the program management passed through, comprising query statistic, prediction scheme is browsed, export printing etc.Put on record statistics, a point rank, classifying type statistics are carried out in system support to putting on record.Prediction scheme imports, and system support has reported the automatic and manual operation of prediction scheme to import to enterprise or relevant unit.According to unified template, the independent importing or the batch that realize company information import, and for the papery version emergency preplan submitted to, scanned copy can be imported in prediction scheme storehouse, in order to consulting.Program management, system is supported the query statistic of prediction scheme, is formulated and safeguard and stage management.Mainly comprise the functional modules such as prediction scheme is browsed, prediction scheme editor, establishment stage, prediction scheme template, prediction scheme classification.Prediction scheme is browsed, and system support is browsed text prediction scheme and checking of digitizing prediction scheme.Prediction scheme editor, system support increases text prediction scheme, deletion; Digital emergency planning increases, deletion, and version is newly-built, old version is checked.In the establishment stage, system support, to the management stage by stage of prediction scheme, comprises first trial, review, consults on, is expounded through peer review, leader examines, word is audited, finalized a text several stage, the procedure documents in stored record each stage.Prediction scheme template, system provides prediction scheme template management function, supports the bibliographic structure of comprehensive, the special prediction scheme of configuration and site disposal scheme, realizes interpolation, editor, deletes prediction scheme tree node.Prediction scheme is classified, the interpolation of system support emergency preplan classification, deletion, amendment.Prediction scheme responds, and system support is informed of a case to the event in auto-associating emergency management and rescue command dispatching system, realizes the inquiry to event, increase, deletion, amendment etc.System is supported, for the relevant prediction scheme of reported event association, to generate emergency disposal scheme.Support the editor to emergent disposal method, check, delete, export printing etc.Prediction scheme is drilled, and system support carries out tabulate statistics, management to the drill plan that enterprise or other unit report, and can check, export printing emergency drilling guide.Digitizing prediction scheme, system supports that enterprise carries out newly-built and edit structure prediction scheme by structuring prediction scheme module.
General character factor analysis, system support is by analyzing existing comprehensive emergency preplan, special emergency preplan and site disposal scheme, in conjunction with the demand of base emergency management and rescue dispatch control, its common element of summary and induction, realizes decomposing the structuring of text prediction scheme, organize and storing.The comprehensive emergency preplan of structured stencil management system support, special emergency preplan and site disposal scenario-frame element template configure, increase, delete, revise.System provides quantification and the non-quantized typing masterplate of prediction scheme structuring key element, to quick-searching and identifications such as prediction scheme keyword, numerical informations, can provide basis for intelligent emergency disposal method generates.Structuring key element at least comprises: fundamental information prediction scheme title, prediction scheme classification, prediction scheme rank, prediction scheme response rank, accident pattern, affiliated area, version number, suitable application area (relevant industries), establishment department, issue code, date issued, Date of Revision, prediction scheme numbering, the term of validity of putting on record, prediction scheme state, signed by, prediction scheme summary etc.Detailed elements information object, work rule, basis of compilation, the scope of application, coordination organizational structure and responsibility, relevant department's responsibility, emergency command portion and responsibility, information monitoring and report, early warning prevention action, rank, measure, response at different level, entry condition, responder, information processing, commander and coordination, on-the-spot emergency action, Information issued, emergently to terminate, command, control, communications, and information guarantee, emergently to support and guarantee, technical support and guarantee, publicity, training and manoeuvre etc.The support of " event-prediction scheme " chain generation system is served as theme with initial with event chain, generates the report of " event-prediction scheme " relation.System support has access to the prediction scheme of event correlation automatically according to event evolves, and each event starts various level prediction scheme respectively according to development trend, forms prediction scheme chain relationship; The existing different event of response level complicated variant carries out the emergency response of appropriate level; For the prediction schemes at different levels that event chain drives, form a prediction scheme chain corresponding with event chain, the report of " event-prediction scheme " link analysis is filed.Corresponding " event--prediction scheme " chain relation figure is as shown below.Event correlation system can provide the configuration feature of the correlation rule between accident and prediction scheme, according to event argument information (as event class, event property etc.), the relevant prediction scheme element information of system Auto-matching association, automatically main duty prediction scheme and relevant emergency preplan is recalled, for emergency management and rescue dispatch control schemes generation provides support.Mainly comprise event-prediction scheme content association (as following table): organizational structure, directorate, expert, response task, emergency guarantee task dispatching element information in the digital emergency planning in comprehensive emergency preplan, special prediction scheme and site disposal scheme extract by auxiliary emergency plan generation system automatically, quick formation solution framework, emergency disposal scheme is formed fast, for decision references in conjunction with prediction and warning, comprehensive analysis, Map Services etc.A lot of dissimilar accident is disposed in the support of multistage prediction scheme start up system simultaneously, or the secondary derived events that main event causes.When starting multiple prediction scheme, identical element in multiple prediction scheme, as task, responsibility etc., is carried out many prediction schemes content mergence respectively according to unit simultaneously, generates that corresponding work report issues, following feedback and file.The support of prediction scheme statistics output system carries out keyword, classification and self-defined query composition by prediction scheme classification, title, organization unit, prediction scheme type etc. to prediction scheme, prediction scheme can be carried out browse, support Query Result to print with formatted outputs such as word, html, excel, pdf, support Print Preview, setting.System supports full view editor, the printing of printer page.Enterprises end function reporting system of putting on record supports text prediction scheme and putting on record of digital emergency planning to report.System supports that prediction scheme and GIS, three-dimensional artificial scene link, and report prediction scheme simultaneously to the information relevant to GIS all kinds of in prediction scheme content, system provides manually marks and draws function.In emergency management and rescue process, while initiate emergency plan, prediction scheme content can be shown in GIS, three-dimensional artificial scene.Prediction scheme put on record report mainly comprise do not audit program management, prediction scheme is return, audit the functions such as program management.Do not audit the support of prediction scheme system to not added by the prediction scheme that higher level's department for review passes through, delete, edit, check, add up.System supports that automatic reception government holds the emergency preplan fed back not by audit report, comprises the contents such as unsanctioned reason, the content of needs amendment and the time limit of filing and registration again, and points out in modes such as note, system alert and voice.Return the support of prediction scheme system to edit the prediction scheme of returning, check, delete, add up.Audit the support of prediction scheme system to check and browse, add up the prediction scheme of having audited.Program management system supports the comprehensive inquiry of prediction scheme, statistics, formulation maintenance and stage management.Mainly comprise that prediction scheme is browsed, worked out editor, establishment stage, prediction scheme template, prediction scheme recycle bin, prediction scheme are submitted to a higher level for approval or revision and put on record and the functional module such as to report.Prediction scheme browing system supports that text prediction scheme and checking of digitizing prediction scheme are browsed.Prediction scheme editing system is supported that text prediction scheme increases, deletes, is inquired about output etc.; System provides the emergency preplan editor based on digitizing prediction scheme template.Enterprise prediction scheme editorial staff carries out newly-built and edit structure prediction scheme by structuring prediction scheme masterplate.System supports increase, the deletion of digital emergency planning, and version is newly-built, old version is checked.The support of establishment stage system, to the management stage by stage of prediction scheme, comprises first trial, review, consults on, is expounded through peer review, leader examines, word is audited, finalized a text several stage, the procedure documents in stored record each stage.Prediction scheme template system provides prediction scheme template management function, supports the bibliographic structure of configuration emergency preplan, realizes interpolation, editor, deletes prediction scheme tree node.The support of prediction scheme recycle bin system is inquired about the prediction scheme abolished in forecasting edited management, check, is reduced and permanent deletion action.Prediction scheme exercise management system support rehearsal guide is checked, drill plan is formulated and drill plan management etc.The support of prediction scheme statistics output system carries out keyword, classification and self-defined query composition by prediction scheme classification, title, organization unit, prediction scheme type etc. to prediction scheme, prediction scheme can be carried out browse, support Query Result to print with formatted outputs such as word, html, excel, pdf, support Print Preview, setting.System supports full view editor, the printing of printer page.
The above; be only the present invention's preferably embodiment; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (1)

1. commander and the predetermined plan management method of training exercise system, is characterized in that comprising: government's end function filing and registration, system support to the examination & verification of enterprise's prediction scheme, put on record, consult statistics; Mainly comprise pending program management, audit program management, statistics of putting on record; Pending process, manages the prediction scheme of not auditing, and system support is checked prediction scheme information, audits by prediction scheme, return prediction scheme; For the prediction scheme not by auditing, Intelligent generation does not feed back to enterprise by audit report, specifically comprises not by the reason of auditing, the timing information needing perfect content, again submit examination & verification to; Audit process, safeguarding auditing the program management passed through, comprising query statistic, prediction scheme is browsed, export printing; Put on record statistics, a point rank, classifying type statistics are carried out in system support to putting on record; Prediction scheme imports, and system support has reported the automatic and manual operation of prediction scheme to import to enterprise or relevant unit; According to unified template, the independent importing or the batch that realize company information import, and for the papery version emergency preplan submitted to, scanned copy can be imported in prediction scheme storehouse, in order to consulting; Program management, system is supported the query statistic of prediction scheme, is formulated and safeguard and stage management; Mainly comprise that prediction scheme is browsed, prediction scheme editor, the establishment stage, prediction scheme template, prediction scheme sort module; Prediction scheme is browsed, and system support is browsed text prediction scheme and checking of digitizing prediction scheme; Prediction scheme editor, system support increases text prediction scheme, deletion; Digital emergency planning increases, deletion, and version is newly-built, old version is checked; In the establishment stage, system support, to the management stage by stage of prediction scheme, comprises first trial, review, consults on, is expounded through peer review, leader examines, word is audited, finalized a text several stage, the procedure documents in stored record each stage; Prediction scheme template, system provides prediction scheme template management function, supports the bibliographic structure of comprehensive, the special prediction scheme of configuration and site disposal scheme, realizes interpolation, editor, deletes prediction scheme tree node; Prediction scheme is classified, the interpolation of system support emergency preplan classification, deletion, amendment; Prediction scheme responds, and system support is informed of a case to the event in auto-associating emergency management and rescue command dispatching system, realizes the inquiry to event, increase, deletion, amendment; System is supported, for the relevant prediction scheme of reported event association, to generate emergency disposal scheme; Support the editor to emergent disposal method, check, delete, export printing; Prediction scheme is drilled, and system support carries out tabulate statistics, management to the drill plan that enterprise or other unit report, and can check, export printing emergency drilling guide; Digitizing prediction scheme, system supports that enterprise carries out newly-built and edit structure prediction scheme by structuring prediction scheme module.
CN201310666226.0A 2013-12-06 2013-12-06 Plan management method of commanding and training drill system Pending CN104700184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310666226.0A CN104700184A (en) 2013-12-06 2013-12-06 Plan management method of commanding and training drill system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310666226.0A CN104700184A (en) 2013-12-06 2013-12-06 Plan management method of commanding and training drill system

Publications (1)

Publication Number Publication Date
CN104700184A true CN104700184A (en) 2015-06-10

Family

ID=53347280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310666226.0A Pending CN104700184A (en) 2013-12-06 2013-12-06 Plan management method of commanding and training drill system

Country Status (1)

Country Link
CN (1) CN104700184A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651071A (en) * 2015-10-29 2017-05-10 国网智能电网研究院 Emergency processing method used for electric power emergency
CN108009701A (en) * 2017-10-26 2018-05-08 苏州汇视信息技术有限公司 A kind of intelligent emergency program management system
CN111652495A (en) * 2020-05-28 2020-09-11 北京瑞华赢科技发展有限公司 Operation command system based on cloud server
CN111815281A (en) * 2020-07-09 2020-10-23 北京中百信信息技术股份有限公司 Information system project supervision project bid management system
CN113822546A (en) * 2021-09-01 2021-12-21 上海智眭科技有限公司 Automatic plan management system and management method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651071A (en) * 2015-10-29 2017-05-10 国网智能电网研究院 Emergency processing method used for electric power emergency
CN106651071B (en) * 2015-10-29 2022-03-18 国网智能电网研究院 Emergency processing method for power emergency
CN108009701A (en) * 2017-10-26 2018-05-08 苏州汇视信息技术有限公司 A kind of intelligent emergency program management system
CN111652495A (en) * 2020-05-28 2020-09-11 北京瑞华赢科技发展有限公司 Operation command system based on cloud server
CN111815281A (en) * 2020-07-09 2020-10-23 北京中百信信息技术股份有限公司 Information system project supervision project bid management system
CN113822546A (en) * 2021-09-01 2021-12-21 上海智眭科技有限公司 Automatic plan management system and management method thereof

Similar Documents

Publication Publication Date Title
Clack et al. Smart contract templates: essential requirements and design options
CN104700184A (en) Plan management method of commanding and training drill system
CN107145480B (en) Method for compiling XBRL report based on Word
CN103605705A (en) SCD (substation configuration description) file management system
CN109816328A (en) Power engineering Project Technical economic information system
CN101169804A (en) Electronic drawing data recording method and system
US20060149770A1 (en) Integrated authoring system for electronic technical manual and paper technical manual using logistics support analysis data and authoring method therefor
CN101763343A (en) Document editor principle supporting format comparison and plagiarism check and method
CN107526804B (en) Railway investment project data statistics system and method
CN105046604A (en) Patent information management system
CN101221564A (en) Universal independent data acquisition method
CN110543303A (en) Visual business platform
CN110990620A (en) Intelligent transformer substation drawing and document data management method based on intelligent technology application
CN111709702A (en) Product full life cycle management system
CN104008107A (en) Implement method of knowledge base on operation and maintenance management
CN104700185A (en) Major hazard source management method of commanding and training drill system
CN114372118A (en) Audit knowledge recommendation system and method based on recursive algorithm
CN104573053B (en) A kind of configuration item template dynamic customization method based on XML
CN105225176B (en) Warrant basic information system
CN111291197B (en) Knowledge base construction system based on new word discovery algorithm
CN108492089A (en) Investment in fixed assets Evaluation on Energy Saving reports digitized information system
CN113538626A (en) Workflow generation method and device
CN108510184A (en) Energy conservation object examines digitized information system
CN114911773B (en) Universal meta-model design method
CN108416532A (en) Energy auditing digitized information system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150610