CN104299307B - Lock cluster management system - Google Patents
Lock cluster management system Download PDFInfo
- Publication number
- CN104299307B CN104299307B CN201410632364.1A CN201410632364A CN104299307B CN 104299307 B CN104299307 B CN 104299307B CN 201410632364 A CN201410632364 A CN 201410632364A CN 104299307 B CN104299307 B CN 104299307B
- Authority
- CN
- China
- Prior art keywords
- main frame
- lockset
- unblanking
- substation
- control center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004891 communication Methods 0.000 claims abstract description 3
- 238000013475 authorization Methods 0.000 claims description 18
- 230000000875 corresponding effect Effects 0.000 claims 3
- 230000002596 correlated effect Effects 0.000 claims 1
- 239000013307 optical fiber Substances 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Abstract
The invention discloses a kind of lock cluster management system, including: main frame, program key, key data transporter and lockset, key data transporter for sending program key to and charging to program key by the sequence of unblanking that main frame generates, program key is for opening lockset based on sequence of unblanking, it is characterized in that, management system layer is configured to have centralized control center, multiple distributed control centers that centralized control center divides into and multiple substations that each distributed control center is divided into respectively, each substation is provided with multiple lockset, and multiple locksets of each substation can be by corresponding single the most key operated program.The present invention, by top-down layering serial Communication, enhances the safety of electric power machine room lock group's management.
Description
Technical field
The present invention relates to a kind of lock group's management domain, a kind of lock group for electric power machine room
Microcomputer management system.
Background technology
Owing to the various locksets in electric power machine room and key are various, it is difficult to management, therefore to electric power
The research of lock group's Managed Solution of machine room is increasingly becoming a more popular topic, and if creating
The dry lock cluster management system being applied to electric power machine room.
But, for electric power machine room lock cluster management system generally just within single machine room
Lockset and key are managed, it is impossible to the management being well matched with electric power machine room has hierarchy management
The characteristic of (such as, according to administrative division or membership).Such as, for according to administrative area
Multiple electric power machine rooms that territory is arranged for " township ", power department at county level cannot be to these electric power machines
Lock group's service condition in room carries out unified management and monitoring.
Summary of the invention
For above-mentioned technical problem present in prior art, the invention provides a kind of lock group's pipe
Reason system, it carries out locking group's management for the hierarchy management characteristic of electric power machine room in real world applications.
To achieve these goals, the present invention provides a kind of lock cluster management system, including: main frame,
Program key, key data transporter and lockset, described key data transporter is used for
The sequence of unblanking generated by described main frame sends described program key to and to described program key
Charging, described program key is used for opening described lockset based on described sequence of unblanking, its feature
It is,
Described management system layer is configured to have centralized control center, centralized control center divides into multiple points
Multiple substations that control center and each distributed control center are divided into respectively, are provided with many in each substation
Individual lockset, and multiple locksets of each substation can be by corresponding single key operated program, wherein
The plurality of lockset includes that five anti-class locksets and non-five anti-class locksets, described non-five anti-class locksets are
The logical lockset of spoon, described list is provided with the anti-class lockset with the five of corresponding substation program key and matches
Contact electrode and the spoon of this corresponding substation can be opened lead to the unlocking head of the mechanical lock in lockset;
Described centralized control center includes the first main frame and described key data transporter, and is configured to
Manage the lockset of all substations;
Described distributed control center includes the second main frame and described key data transporter, and is configured to
Manage the lockset of its multiple substations divided into;
Described substation includes the 3rd main frame and described key data transporter, and is configured to management
The lockset of our station;
Described first, second and the 3rd communicates to connect between main frame.
Preferably, described first main frame concrete configuration be storage have all substations lockset information and
Unlocking staff's information based on to the demand of unblanking of any one lockset in all substations and relevant
Unlocking staff's information generates sequence of unblanking;Described second main frame concrete configuration is that storage has belonging to it
The lockset information of multiple substations divided into of distributed control center and unlocking staff's information, and based on to it
The demand of unblanking of any one lockset in multiple substations that affiliated distributed control center is divided into is with relevant
Unlocking staff's information generates sequence of unblanking;Described 3rd main frame is configured to store its affiliated son
The lockset information stood and unlocking staff's information and based on lockset in this substation is unblanked demand and
Relevant unlocking staff's information generates sequence of unblanking.
Preferably, described second main frame is configured to obtain described first main frame to this second main frame
Authorization message, and based on this authorization message, multiple substations that the distributed control center that it is affiliated is divided into
In the demand of unblanking of any one lockset and relevant unlocking staff's information generate sequence of unblanking;Described
3rd main frame is further configured to the mandate obtaining the most described second main frame to the 3rd main frame
Information, and based on the demand of unblanking of lockset in this authorization message, the substation affiliated to it and relevant
Unlocking staff's information generates sequence of unblanking.
Preferably, described first main frame can be further configured to generate the lockset being based on
Unblank sequence and relevant unlocking staff's information send to the substation belonging to this lockset the 3rd main
Machine and the second main frame of the distributed control center belonging to this substation;And described second main frame and the 3rd master
Machine is further configured to receive and store the sequence of unblanking from described first main frame and opens with relevant
Lock personal information.
Preferably, described second main frame is further configured to the lockset that is based on and opening of generating
Lock sequence and relevant unlocking staff's information send the 3rd main frame to the substation belonging to this lockset;The
Three main frames are further configured to receive and store unblank sequence and phase from described second main frame
Close unlocking staff's information.
Preferably, described management system is specifically according to the layer that electric power machine room is residing in power system
Level carrys out layered configuration for having described centralized control center, described distributed control center and described substation.
Preferably, described program key be configured to described first, second and the 3rd main frame without
Line communicates.
The lock cluster management system provided by the present invention, centralized control center can manage all substations
Lockset, distributed control center can only manage the lockset of administrative substation, and each substation can only manage the lock of our station
Tool, it is achieved that top-down layering serial Communication, significantly enhances electric power machine room lock group's pipe
The safety and reliability of reason.
Accompanying drawing explanation
Fig. 1 is the structural representation of the lock cluster management system of the embodiment of the present invention.
Detailed description of the invention
For making those skilled in the art be more fully understood that the present invention, with reference to the accompanying drawings to the present invention
Embodiment be described in detail.
Fig. 1 is the structural representation of the lock cluster management system of the embodiment of the present invention.This lock group manages
System includes: main frame, program key, key data transporter and lockset, key data
Transporter for sending program key to and to program key by the sequence of unblanking that main frame generates
Charging, program key is for opening lockset based on sequence of unblanking.
As it can be seen, system has in multiple sub-controls that centralized control center, a centralized control center divide into
Multiple substations that the heart, each distributed control center are divided into respectively, are provided with multiple lockset in each substation,
And multiple locksets of each substation can be by corresponding single the most key operated program, plurality of lockset
Including five anti-class locksets and non-five anti-class locksets, non-five anti-class locksets are that spoon leads to lockset, single journey
What sequence key was provided with that class lockset anti-with the five of corresponding substation match contacts electrode and can open
The spoon opening this corresponding substation leads to the unlocking head of the mechanical lock in lockset;
Centralized control center includes centralized control center's main frame (the first main frame) and key data transporter,
And it is configured to manage the lockset of all substations;
Distributed control center includes distributed control center main frame (the second main frame) and key data transporter,
And it is configured to manage the lockset of its multiple substations divided into;
Substation includes substation main frame (the 3rd main frame) and key data transporter, and is configured to
The lockset of management our station;
Connected by optical fiber between centralized control center's main frame, distributed control center main frame and substation main frame or
Wireless connections communicate.
For the hierarchy management characteristic of electric power machine room in real world applications, by this top-down
Multi-zone supervision, it is achieved that multiple machine rooms are carried out unified systematized management and monitoring, greatly
Enhance the safety and reliability of electric power machine room lock group's management.Additionally, the program key of each substation
What spoon was provided with that class lockset anti-with the five of corresponding substation match contacts electrode and can open this
The spoon of corresponding substation leads to the unlocking head of the mechanical lock in lockset, and multiple locksets of the most each substation are only
Need list program key by opening, simplify the program of unblanking of substation.
Specifically, centralized control center's main frame is configured to store the lockset information of all substations and open
Lock personal information based on to the demand of unblanking of any one lockset in all substations with relevant open
Lock personal information generates sequence of unblanking;Thus centralized control center can manage the lockset of all substations.
Distributed control center main frame is configured to store multiple substations that its affiliated distributed control center is divided into
Lockset information and unlocking staff's information, and multiple based on what the distributed control center that it is affiliated was divided into
The demand of unblanking of any one lockset in substation and relevant unlocking staff's information generate sequence of unblanking;
Thus distributed control center can manage the lockset of the multiple substations divided into.
Substation main frame is that storage has the lockset information of its affiliated substation and unlocking staff's information also
Based on unblanking lockset in this substation, demand and relevant unlocking staff's information generate sequence of unblanking;
Thus each substation can manage the lockset of our station.
In another embodiment, centralized control center can be by the lockset that is based on and unblanking of generating
Sequence and relevant unlocking staff's information send the distributed control center main frame to the substation belonging to this lockset
With substation main frame;Subsequently, distributed control center main frame and substation main frame receive and store in collection control
Unblank sequence and relevant unlocking staff's information of heart main frame.Substation main frame may utilize opening of receiving
Lock sequence and relevant unlocking staff's information realization lockset order are opened.In this control mode,
Achieve centralized control center and directly its lower all substations administered are carried out lockset management.
Additionally, in a variant embodiment, the corresponding son that centralized control center can only be generated
Unblank sequence and the relevant unlocking staff's information stood send to the distributed control center corresponding to this substation
Main frame, is forwarded to corresponding substation main frame by distributed control center main frame.
Furthermore it is also possible to realize distributed control center directly substation is carried out lockset management.In this situation
Under, unblank sequence and the relevant unlocking staff that the lockset being based on is generated by distributed control center main frame
Information sends the substation main frame to the substation belonging to this lockset;Substation main frame receive and store from
Unblank sequence and relevant unlocking staff's information of the second main frame.
In a preferred embodiment, distributed control center main frame is configured to obtain centralized control center's main frame pair
The authorization message of this distributed control center main frame, and based on authorization message, the distributed control center affiliated to it
The demand of unblanking of any one lockset in the multiple substations divided into and relevant unlocking staff's information are raw
Become sequence of unblanking;And substation main frame is configured to obtain corresponding distributed control center main frame to this substation master
The authorization message of machine, and based on this authorization message, demand that lockset in our station is unblanked and relevant
Unlocking staff's information generates sequence of unblanking.
It is to say, distributed control center needs what the mandate of centralized control center could realize to divide into each substation
It is managed;Substation is also required to the mandate of distributed control center could realize locking our station the pipe of group
Reason.Thus, enhance the dynamics of centralized-control type management, further increase the safety of lock group's management
Property and standardization.Additionally, what deserves to be explained is, in the present embodiment, there is no collection control
On the premise of central authority, distributed control center main frame does not the most have substation each to subordinate main frame to be carried out
The authority authorized.
Owing to being connected by optical fiber between centralized control center's main frame, distributed control center main frame and substation main frame
Connect or wireless connections communicate.Therefore, it can the management software by installing on each main frame real
Now authorize.Utilize traditional user name, the mode of password, or utilize rivest, shamir, adelman
Authorization function can be realized.Such as, centralized control center's main frame has data base, data base deposits
Information and its down tubes such as the user name (host id) and the password that contain each distributed control center main frame
The information of all substations of reason.Distributed control center main frame is by the optical fiber between itself and centralized control center even
Connect or wireless connections send authorization requests to centralized control center, this authorization requests comprises host id,
Password, additionally can comprise host MAC address, this distributed control center divides into substation alternatively
Relevant information etc., the information comprised in authorization requests is verified by centralized control center, and checking is logical
Later, send authorization code, after distributed control center main frame receives authorization code, authorization code is input to
The corresponding function module i.e. opened by management software.Authorization code can be disposably, can also be
There is ageing (such as, only effective within one month).
The level that present invention is particularly suitable for utilizing electric power machine room residing in power system sets
Determine centralized control center, distributed control center and substation.
Additionally, although the present invention provides the management system of three-layer type, but people in the art
Member is on the basis of without departing substantially from spirit and substance of the present invention, it is contemplated that go out such as two-layer pipe
Reason system (i.e. only centralized control center and each substation of subordinate), it is also possible to envision more than three layers
Multiple field lock cluster management system.
The present invention is not limited to above-mentioned specific embodiment, without departing substantially from present invention spirit and essence thereof
In the case of, those of ordinary skill in the art can make various corresponding change and change according to the present invention
Shape, but these change accordingly and deform the protection domain that all should belong to claims of the present invention
Within.
Claims (6)
1. a lock cluster management system, including: main frame, program key, key data transporter and
Lockset, described key data transporter sends described journey to for the sequence of unblanking generated by described main frame
Sequence key also charges to described program key, and described program key is for opening based on described sequence of unblanking
Described lockset, it is characterised in that
Multiple distributed control centers that described management system layer is configured to have centralized control center, centralized control center divides into
And multiple substations that each distributed control center is divided into respectively, each substation is provided with multiple lockset, and respectively
Multiple locksets of substation can be by corresponding single key operated program, and wherein said multiple locksets include five
Anti-class lockset and non-five anti-class locksets, described non-five anti-class locksets are that spoon leads to lockset, and described list is program key
What spoon was provided with that class lockset anti-with the five of corresponding substation match contacts electrode and can open this corresponding substation
Spoon lead to the unlocking head of the mechanical lock in lockset;
Described centralized control center includes the first main frame and described key data transporter, and is configured to manage institute
There is the lockset of substation;
Described distributed control center includes the second main frame and described key data transporter, and is configured to manage it
The lockset of the multiple substations divided into;
Described substation includes the 3rd main frame and described key data transporter, and is configured to manage our station
Lockset;
Described first, second and the 3rd communicates to connect between main frame;
Described first main frame concrete configuration is that storage has the lockset information of all substations and unlocking staff's information also
Sequence of unblanking is generated based on to the demand of unblanking of any one lockset in all substations and relevant unlocking staff's information
Row;
Described second main frame concrete configuration is the lock of multiple substations that storage has its affiliated distributed control center to divide into
Tool information and unlocking staff's information, and based on appointing in multiple substations that the distributed control center that it is affiliated is divided into
The demand of unblanking of one lockset and relevant unlocking staff's information generate sequence of unblanking;
Described 3rd main frame is configured to store the lockset information of its affiliated substation and unlocking staff's information also
Based on unblanking lockset in this substation, demand and relevant unlocking staff's information generate sequence of unblanking.
Lock cluster management system the most as claimed in claim 1, it is characterised in that
Described second main frame is configured to the authorization message obtaining described first main frame to this second main frame, and base
Unblanking of any one lockset in multiple substations that this authorization message, the distributed control center affiliated to it are divided into
Demand and relevant unlocking staff's information generate sequence of unblanking;
Described 3rd main frame is further configured to the mandate obtaining the most described second main frame to the 3rd main frame
Information, and based on the demand of unblanking of lockset in this authorization message, the substation affiliated to it and relevant unlocking person
Member's information generates sequence of unblanking.
Lock cluster management system the most as claimed in claim 1, it is characterised in that
The sequence of unblanking that described first main frame is further configured to generate the lockset being based on is opened with relevant
Lock personal information sends the 3rd main frame to the substation belonging to this lockset and the distributed control center belonging to this substation
Second main frame;
Described second main frame and the 3rd main frame are further configured to receive and store from described first main frame
Sequence of unblanking and relevant unlocking staff's information.
Lock cluster management system the most as claimed in claim 1, it is characterised in that
The sequence of unblanking that described second main frame is further configured to generate the lockset being based on is opened with relevant
Lock personal information sends the 3rd main frame to the substation belonging to this lockset;
3rd main frame is further configured to receive and store unblanking sequence and being correlated with from described second main frame
Unlocking staff's information.
5. the lock cluster management system as according to any one of claim 1-4, it is characterised in that
Described management system specifically carrys out layered configuration according to the level that electric power machine room is residing in power system
There is described centralized control center, described distributed control center and described substation.
6. the lock cluster management system as according to any one of claim 1-4, it is characterised in that
Described program key is configured to and described first, second and the 3rd hosi wireless communication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410632364.1A CN104299307B (en) | 2014-11-11 | 2014-11-11 | Lock cluster management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410632364.1A CN104299307B (en) | 2014-11-11 | 2014-11-11 | Lock cluster management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104299307A CN104299307A (en) | 2015-01-21 |
CN104299307B true CN104299307B (en) | 2016-08-31 |
Family
ID=52319026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410632364.1A Active CN104299307B (en) | 2014-11-11 | 2014-11-11 | Lock cluster management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104299307B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000224163A (en) * | 1999-01-28 | 2000-08-11 | Internatl Business Mach Corp <Ibm> | Access control system, keys, locks and information propagating method |
CN101692524A (en) * | 2009-08-31 | 2010-04-07 | 宁波电业局 | Method and device for preventing faulty operation of electric power system based on wireless communication |
CN201947061U (en) * | 2011-03-07 | 2011-08-24 | 安徽省电力公司芜湖供电公司 | Distribution network dispatching intelligent anti-mistake and real-time management system |
WO2012073265A1 (en) * | 2010-12-02 | 2012-06-07 | Cisa S.P.A | Method for the control and management of keys for access to spaces delimited by electronic locks and the like, and device that can be enabled as key according to the method |
CN202677489U (en) * | 2012-04-17 | 2013-01-16 | 珠海华伟电气科技股份有限公司 | Electric power microcomputer error prevention namely intelligent lock group integrated management system |
-
2014
- 2014-11-11 CN CN201410632364.1A patent/CN104299307B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000224163A (en) * | 1999-01-28 | 2000-08-11 | Internatl Business Mach Corp <Ibm> | Access control system, keys, locks and information propagating method |
CN101692524A (en) * | 2009-08-31 | 2010-04-07 | 宁波电业局 | Method and device for preventing faulty operation of electric power system based on wireless communication |
WO2012073265A1 (en) * | 2010-12-02 | 2012-06-07 | Cisa S.P.A | Method for the control and management of keys for access to spaces delimited by electronic locks and the like, and device that can be enabled as key according to the method |
CN201947061U (en) * | 2011-03-07 | 2011-08-24 | 安徽省电力公司芜湖供电公司 | Distribution network dispatching intelligent anti-mistake and real-time management system |
CN202677489U (en) * | 2012-04-17 | 2013-01-16 | 珠海华伟电气科技股份有限公司 | Electric power microcomputer error prevention namely intelligent lock group integrated management system |
Non-Patent Citations (5)
Title |
---|
大集中模式的变电站五防管理系统分析;贺伟等;《内蒙古电力技术》;20090828;第27卷(第4期);正文第53页第1-3段,第54页第2-7段,图1-3 * |
新型电力地区调度远动主站配置方案探讨;汪晓彤;《安徽电气工程职业技术学院学报》;20090915;第14卷(第3期);全文 * |
电力自动化机房防误锁群综合管理系统及其管理方法研究;刘婷婷等;《电子世界》;20140915(第17期);全文 * |
集控站分层分控管理模式研究;缪欣等;《信息技术》;20060925(第9期);正文第106页第2-8段,第107页第1-3段,图1 * |
集控站防误闭锁系统设置方案及应用管理;魏冬晴;《安徽电气工程职业技术学院学报》;20090315;第14卷(第1期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN104299307A (en) | 2015-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102016123713B4 (en) | Subject-specific access authorization information | |
CN103269332B (en) | Safeguard system for power secondary system | |
CN1863195B (en) | Family network system with safety registration function and method thereof | |
CN106789875A (en) | A kind of block chain service unit, block chain service system and its communication means | |
CN106790112A (en) | A kind of method that the node operating system and data of integrated lightweight block chain update | |
US20110113475A1 (en) | Node for a network and method for establishing a distributed security architecture for a network | |
CN107313660A (en) | The method for unlocking of intelligent lock system and smart lock | |
JP2019511763A (en) | Door lock network control method, device, server and PMS | |
CN104217478A (en) | Hotel Bluetooth access control intelligent management method | |
CN108322432A (en) | A kind of mechanism application rights management method and service system based on tree-like tissue model | |
CN104898507B (en) | A kind of blue-tooth intelligence cloud lock system and blue-tooth intelligence lock working method | |
CN103891395A (en) | Multi-device monitoring and control | |
US20150169860A1 (en) | Security key using multi-otp, security service apparatus, security system | |
CN1587616A (en) | Instant clearing electronic lock system after key cipher use and realizing method | |
CN107818623B (en) | Distributed wireless access control system and use method | |
CN104283881B (en) | Method for the Certificate Authority and safe handling of Internet of Things sensing equipment | |
CN104365029A (en) | Dual communication-interface facility monitoring and management system and method | |
CN110392001A (en) | The chassis level network switch | |
CN109785482A (en) | A kind of smart lock based on bluetooth mesh technology | |
DE102014202637A1 (en) | Arrangement for the authorized response of at least one component located in a building | |
CN104462172B (en) | The method executed by the device in distributed system and device in a distributed system | |
CN109035501A (en) | A kind of intelligent door lock and intelligent door lock system | |
CN105208554B (en) | A kind of method, system and equipment realizing zigbee terminal device and networking | |
CN102056163B (en) | Distributed mesh network key management method and wireless access point device | |
CN103401905A (en) | Mobile application platform system for power grid scheduling based on mobile intelligent terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |