CN104141480B - A kind of pressure break slug adds sand process - Google Patents

A kind of pressure break slug adds sand process Download PDF

Info

Publication number
CN104141480B
CN104141480B CN201310523172.2A CN201310523172A CN104141480B CN 104141480 B CN104141480 B CN 104141480B CN 201310523172 A CN201310523172 A CN 201310523172A CN 104141480 B CN104141480 B CN 104141480B
Authority
CN
China
Prior art keywords
sand
period
slug
ratio
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310523172.2A
Other languages
Chinese (zh)
Other versions
CN104141480A (en
Inventor
银本才
杨保军
赵正龙
万龙
孙宝才
刘信党
唐世东
庞清鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Down-Hole Job That Requires Special Skills Co Of Central Plains Petroleum Works Co Ltd Of China Petrochemical Industry
China Petrochemical Corp
Original Assignee
Down-Hole Job That Requires Special Skills Co Of Central Plains Petroleum Works Co Ltd Of China Petrochemical Industry
China Petrochemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Down-Hole Job That Requires Special Skills Co Of Central Plains Petroleum Works Co Ltd Of China Petrochemical Industry, China Petrochemical Corp filed Critical Down-Hole Job That Requires Special Skills Co Of Central Plains Petroleum Works Co Ltd Of China Petrochemical Industry
Priority to CN201310523172.2A priority Critical patent/CN104141480B/en
Publication of CN104141480A publication Critical patent/CN104141480A/en
Application granted granted Critical
Publication of CN104141480B publication Critical patent/CN104141480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a kind of pressure break slugs to add sand process, belongs to petroleum exploration and development fracturing engineering technical field.The present invention each slug of shale gas pressing crack construction add the sand period plus the later stage in sand stage increase sand proportion, form a high sand ratio stage, this stage sand is than the sand with next plus sand period than identical.Enter pressure change behind stratum than section by observing this high-stage sand, instruct subsequent construction, complete pressing crack construction task.

Description

A kind of pressure break slug adds sand process
Technical field:
The present invention relates to a kind of pressure break slugs to add sand process, belongs to petroleum exploration and development fracturing engineering technical field.
Background technology:
In the construction of petroleum exploration and development shale gas fracturing sand feeding, sand technique is usually added using slug formula, i.e. pumping is certain After prepad fluid, add the sand period for a slug by one plus sand stage and an insulating liquid stage closely followed, multicycle alternating is extremely It constructs the later stage, starts continuously plus sand to construction terminates.Each period sand is than keeping a fixed value, and the latter period is compared with the last week Phase sand than high, this sand injection manner because latter period sand than suddenly improve, be easy to cause the period sand enter stratum after draw The abnormal raising of construction pump pressure is played, causes plus sand stops or causes construction sand plug that construction is caused to fail in advance.
Invention content:
Present invention aim to address pressure anomalies during shale gas slug sand fracturing to increase, and causes plus sand construction carries The defects of preceding termination or failure, provides a kind of pressure break for slowing down Fracturing Pressure and rising extremely, improving fracturing sand feeding coincidence rate Slug adds sand process.
The technical solution of this process is as follows:
The present invention includes the following steps:
1st, it is pumped into prepad fluid according to design;
2nd, it is pumped into first slug and adds the sand period.Start to add sand according to design sand ratio, sand stage liquid is added within this period The preceding 80-90% of amount, sand when adding sand liquid measure later stage 10-20%, carry high sand ratio, the sand ratio after raising than keeping a definite value Value is identical with the sand ratio in the second slug period of design, after being pumped into the period 1 and adding sand liquid measure, stops sand, and the is pumped by design One slug adds the isolation liquid measure in the sand period, completes the first slug and the sand period is added to construct.
3rd, it is pumped into second slug and adds the sand period.Start to add sand according to design sand ratio, sand stage liquid is added within this period The preceding 80-90% of amount, sand when the sand liquid measure later stage is added to remain 20-10%, carry high sand ratio, the sand after raising than keeping a definite value The sand ratio in third slug period of the ratio with designing is identical, after being pumped into second round and adding sand liquid measure, stops sand, is pumped by design Second slug adds the isolation liquid measure in the sand period, completes the second slug and the sand period is added to construct.
4th, above-mentioned 2,3 are repeated and is pumped into program, be sequentially completed the follow-up each section of slug of this well and add the sand period.
5th, it completes to be pumped into after each slug adds the sand period, according to design requirement, completes continuously plus sand pump enters program, and replaced Into entire pressing crack construction task.
The present invention adds the sand stage in each slug of shale gas pressing crack construction adds the sand period, and the sand later stage is being added to increase Sand ratio, forms a high sand ratio stage, this stage sand than the sand with next plus sand period than identical, by observing this high sand ratio Stage enters pressure changing behind stratum, if pressure, without apparent fluctuation, pressing crack construction can be normally carried out;On if pressure is apparent Rise fluctuation, it can be determined that current formation is unfavorable for follow-up high sand ratio and sand is added to construct, there are sand plug risk, but because of this increased height Sand is fewer than stage liquid measure, the time is short, and when causing pressure oscillation, insulating liquid has been basically completed replacement in pit shaft, will not cause to add Sand construction, which terminates or constructs in advance, to fail.
Specific embodiment:
The present invention is further described in detail with reference to embodiment.
Certain a bite shale gas well fracturing sand feeding program is as follows:
In above-mentioned plus sand program, each slug adds the sand period to add the sand stage last 10-20% of liquid measure, increases a height Sand than the stage, this stage sand than the sand with next plus sand period than identical, after entering stratum by observing this high sand ratio stage Pressure changing, if pressure, without apparent fluctuation, pressing crack construction can be normally carried out;If pressure significantly rises fluctuation, can sentence Disconnected current formation is unfavorable for follow-up high sand ratio and sand is added to construct, and there are sand plug risks, can reduce the sand ratio in follow-up each period, continue Into construction.

Claims (1)

1. a kind of pressure break slug adds sand process, which is characterized in that adds the later stage in sand period in each slug, increases a height Sand is than the stage, this stage sand with next slug than adding the sand in sand period to include the following steps than identical:
(1)Prepad fluid is pumped into according to design;
(2)It is pumped into first slug and adds the sand period;Start to add sand according to the first design sand ratio, sand stage liquid is added within this period The preceding 80-90% of amount, sand is than keeping a definite value, i.e., the first design sand ratio;When the sand liquid measure later stage is added to remain 20-10%, sand is improved Than the sand ratio after raising adds the sand ratio in sand period identical with the second slug designed, and the second slug adds the sand ratio in sand period Value i.e. the second design sand ratio, after being pumped into the period 1 and adding sand liquid measure, stops sand, being pumped into the first slug by design added in the sand period Liquid measure is isolated, completes the first slug and the sand period is added to construct;
(3)It is pumped into second slug and adds the sand period;Start to add sand according to the second design sand ratio, sand stage liquid is added within this period The preceding 80-90% of amount, sand is than keeping a definite value, i.e., the second design sand ratio;When the sand liquid measure later stage is added to remain 20-10%, sand is improved Than the sand ratio after raising adds the sand ratio in sand period identical with the third slug designed, and third slug adds the sand ratio in sand period Value is third design sand ratio, after being pumped into second round and adding sand liquid measure, stops sand, and being pumped into the second slug by design added in the sand period Liquid measure is isolated, completes the second slug and the sand period is added to construct;
(4)According to above-mentioned(2)、(3)It is pumped into program successively backward to analogize, adds sand period and subsequent each slug in third slug The sand period is added to add the sand stage last 10-20% of liquid measure, increases the high sand ratio stage described in one, the sand in the high sand ratio stage Than adding the design sand in sand period with next slug, than identical, being sequentially completed this well, subsequently each section of slug adds the sand period;
(5)Completion is pumped into after each slug adds the sand period, according to design requirement, completes continuously plus sand pump enters program, and replace completion Entire pressing crack construction task.
CN201310523172.2A 2013-10-29 2013-10-29 A kind of pressure break slug adds sand process Active CN104141480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310523172.2A CN104141480B (en) 2013-10-29 2013-10-29 A kind of pressure break slug adds sand process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310523172.2A CN104141480B (en) 2013-10-29 2013-10-29 A kind of pressure break slug adds sand process

Publications (2)

Publication Number Publication Date
CN104141480A CN104141480A (en) 2014-11-12
CN104141480B true CN104141480B (en) 2018-07-06

Family

ID=51850792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310523172.2A Active CN104141480B (en) 2013-10-29 2013-10-29 A kind of pressure break slug adds sand process

Country Status (1)

Country Link
CN (1) CN104141480B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761644A (en) * 2016-12-27 2017-05-31 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 The processing method that control pressure rises extremely in a kind of shale fracturing process
CN106593394B (en) * 2017-01-23 2019-03-05 重庆矿产资源开发有限公司 A kind of shale gas pressure break ladder sand adding method
CN107023285A (en) * 2017-05-16 2017-08-08 华美孚泰油气增产技术服务有限责任公司 A kind of shale gas reservoir hydraulic fracturing adds sand technique
CN108222910A (en) * 2018-01-22 2018-06-29 成都西油联合石油天然气工程技术有限公司 A kind of fixed displacement slug formula fracturing technology
CN112240191B (en) * 2019-07-19 2022-11-29 中国石油化工股份有限公司 Shale gas fracturing sand adding method
CN111335862A (en) * 2020-04-26 2020-06-26 中国石油天然气集团有限公司 Variable viscosity sand fracturing method
CN114592842A (en) * 2020-12-04 2022-06-07 中国石油天然气股份有限公司 Continental facies shale oil reservoir fracturing sand adding method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6863128B2 (en) * 2001-10-24 2005-03-08 Schlumberger Technology Corporation Method of predicting friction pressure drop of proppant-laden slurries using surface pressure data
CN102562022A (en) * 2012-03-02 2012-07-11 陕西延长石油(集团)有限责任公司研究院 Process technology suitable for deep coal bed gas fracturing
CN103244094A (en) * 2013-05-16 2013-08-14 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Carbonate rock multi-slug injection type fracturing method
CN103306661A (en) * 2012-11-29 2013-09-18 中国石油化工股份有限公司 Method for controlling fracturing of multiple fractures of oil and gas field with natural micro-fracture-developed reservoir stratum

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2652489C (en) * 2008-02-04 2014-06-03 Sanjel Corporation Low residue fluid fracturing system and method of use

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6863128B2 (en) * 2001-10-24 2005-03-08 Schlumberger Technology Corporation Method of predicting friction pressure drop of proppant-laden slurries using surface pressure data
CN102562022A (en) * 2012-03-02 2012-07-11 陕西延长石油(集团)有限责任公司研究院 Process technology suitable for deep coal bed gas fracturing
CN103306661A (en) * 2012-11-29 2013-09-18 中国石油化工股份有限公司 Method for controlling fracturing of multiple fractures of oil and gas field with natural micro-fracture-developed reservoir stratum
CN103244094A (en) * 2013-05-16 2013-08-14 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Carbonate rock multi-slug injection type fracturing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《页岩油气水平井压裂裂缝复杂性指数研究及应用展望》;蒋廷学;《石油钻探技术》;20130331;第41卷(第2期);第11页图4 *

Also Published As

Publication number Publication date
CN104141480A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN104141480B (en) A kind of pressure break slug adds sand process
CN103527163B (en) A kind of compact reservoir horizontal well volume fracturing technique
CN107989592B (en) Staged fracturing method for horizontal well
CN106593394B (en) A kind of shale gas pressure break ladder sand adding method
MX2016015616A (en) Applications of ultra-low viscosity fluids to stimulate ultra-tight hydrocarbon-bearing formations.
CN110984943B (en) Limit clustering perforation fracturing method for long horizontal well of compact reservoir
MX365203B (en) A method of increasing efficiency in a hydraulic fracturing operation.
CN204140045U (en) Deep layer super heavy oil recovery-mixing light oil and wellbore electric heating compound viscosity reduction lifting device
CN103244094A (en) Carbonate rock multi-slug injection type fracturing method
CN109209332B (en) Acid slickwater composite fracturing method for shale gas horizontal well
CN110792421B (en) Fracturing process for development and application of low-permeability heterogeneous sandstone oil-gas layer
MX2016016569A (en) Method for planning production and injection wells.
WO2012119076A3 (en) In situ combustion following sagd
GB2538685A (en) Wellbore fluid discrimination using impedance spectra characteristics
MX2017015101A (en) Fracturing utilizing an air/fuel mixture.
CN103787801B (en) For the priming explosive of reservoir aerodynamic force volume increase
CN109267988A (en) A kind of shale gas pressure break middle section plug sand adding method
CN104564007A (en) Process for fracturing non-fractured compact sand shale rock reservoirs to obtain fracture networks of vertical wells
CN104389566A (en) Method for judging gas fleeing time
MX2012004023A (en) Method for tertiary oil production using surfactant mixtures.
CN105756649A (en) Yield increase method for low-permeability wax-bearing oil well
CN103912255A (en) Hydraulic oscillation fracturing technology for oil and gas wells
CN105715240B (en) It is spaced water injection oil extraction method between multistage fracturing horizontal well seam
CN104632173A (en) Fracture-network fracturing layer selection method for non-natural fracture tight reservoir
RU2637539C1 (en) Method for formation of cracks or fractures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant