CN102761939A - Home eNB access control method, device and system - Google Patents

Home eNB access control method, device and system Download PDF

Info

Publication number
CN102761939A
CN102761939A CN2011101341457A CN201110134145A CN102761939A CN 102761939 A CN102761939 A CN 102761939A CN 2011101341457 A CN2011101341457 A CN 2011101341457A CN 201110134145 A CN201110134145 A CN 201110134145A CN 102761939 A CN102761939 A CN 102761939A
Authority
CN
China
Prior art keywords
home enodeb
subscriber equipment
access control
access
rrc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101341457A
Other languages
Chinese (zh)
Inventor
刘磊
奚进
吴蕴璐
翟恒星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2011101341457A priority Critical patent/CN102761939A/en
Priority to PCT/CN2012/071337 priority patent/WO2012146074A1/en
Publication of CN102761939A publication Critical patent/CN102761939A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/16Discovering, processing access restriction or access information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W74/00Wireless channel access
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W84/00Network topologies
    • H04W84/02Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
    • H04W84/04Large scale networks; Deep hierarchical networks
    • H04W84/042Public Land Mobile systems, e.g. cellular systems
    • H04W84/045Public Land Mobile systems, e.g. cellular systems using private Base Stations, e.g. femto Base Stations, home Node B

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a home eNB access control method, device and system. The method is as follows: obtaining user equipment access control information by the home eNB through an RRC (Radio Resource Control) process; and carrying out access control for the user equipment by the home eNB according to the access control information. Due to the adoption of the technical scheme, the problem that the home eNB can not carry out access control of the user equipment during X2 switching process is solved, so that the home eNB can obtain the access control information of the user equipment, and finally complete the access control of the user equipment in the X2 switching process.

Description

Home eNodeB connection control method, Apparatus and system
Technical field
The present invention relates to the communications field, in particular to a kind of Home eNodeB connection control method, Apparatus and system.
Background technology
Home eNodeB is a kind of small-sized, lower powered base station, is deployed in indoor places such as family and office.The main effect of Home eNodeB is in order higher service rate to be provided to the user and to reduce the needed expense of high rate services of using, simultaneously, remedying the deficiency that existing distributed cellular radio communication system covers.The advantage of Home eNodeB is economical, convenient, low-power output, plug and play etc.
As shown in Figure 1; In Long Term Evolution (Long-Term Evolution abbreviates LTE as) system, the terminal is through Home eNodeB Access Network (Home eNodeB Access Network; Abbreviate HeNB AN as) be connected to the core net network; Wherein HeNBAN is by Home eNodeB (Home eNodeB abbreviates HeNB as) and the common composition of femto gateway (Home eNodeB Gateway abbreviates HeNB GW as).The function that HeNB GW mainly carries out is: handle the registration and the access control of Home eNodeB, Home eNodeB is verified, be responsible for the data of exchcange core net and Home eNodeB.In addition, Home eNodeB management system (HomeeNodeB Manage System abbreviates HeMS as); Can carry out operation maintenance management to Home eNodeB; According to Carrier Requirements configuration and control Home eNodeB, be mainly HeNB and realize configuration management function, carry out parameter configuration comprising the examining of positional information, for HeNB; Be mainly concerned with mobile management entity (Mobility Management Entity; Abbreviate MME as) level other parameter configuration, the parameter configuration of wireless access network (Radio Access Network abbreviates RAN as) side and the parameter configuration of radio frequency (Radio Frequency abbreviates RF as).HeNB system under the LTE system, HeNB can directly not be connected with MME through HeNB GW.
Along with the development of technology, Home eNodeB has been introduced the notion of closed signed user group (Close Subscriber Group abbreviates CSG as); The closed signed user group refers to a group contracted user; Wherein each user allows to insert one or more specific cells, and there are three kinds of access modules in HeNB: sealing access module (if the CSG ID of user's CSG ID and HeNB self is identical, then allowing to insert); Open access module (Any user all allows to insert); Mix (Hybrid) access module (no matter whether the user is the contracted user of this CSG, all allows to insert, and the contracted user of this CSG preferentially inserts).Simultaneously; Also introduced the notion of active user CSG information in user's the mobile management; User CSG information (User CSG Information) comprises the CSG ID of user's present access subzone; The access module of user's present access subzone (access mode), and the user is at the CSG of present access subzone identify label (CSG membership indication).Adhere to the user; Tracing section updating (Tracking Area Update abbreviates TAU as) and when switching the flow process of (Handover), core net is through home subscriber server (Home Subscriber Server; Abbreviate HSS as) obtain the CSG information that the user contracts; Normally a user allows the CSG that inserts to tabulate (Allowed CSG List abbreviates ACL as), obtains the CSG information of the sub-district of the current access of user through the user with the access side.
Under the LTE system, the switching at terminal is had two kinds, promptly S1 switches the switching with X2.S1 switches as shown in Figure 2; Mainly comprise: switch requirement (Handover Required); Handoff request (Handover Request), Handover Request Acknowledge (Handover Request Acknowledge), switching command (Handover Command) and user side data transmission etc.; It is general changing method that S1 switches, and can be used for various handoff scenario, and MME participates in switching flow, and the access control in the handoff procedure is accomplished by MME.In the X2 switching flow, switching flow is accomplished in the Access Network side, and MME does not participate in switching flow; Need carry out access control to the terminal during X2 switches, and the ACL that does the needed terminal of access control is not present in the Home eNodeB access net system, therefore, X2 switches and needs ACL that a kind of method obtains the terminal to accomplish the access control to the terminal.
Summary of the invention
Main purpose of the present invention is to provide a kind of Home eNodeB connection control method, Apparatus and system, to address the above problem.
According to an aspect of the present invention, a kind of Home eNodeB connection control method is provided, has comprised: Home eNodeB obtains the access control information of subscriber equipment through Radio Resource control (Radio Resource Control abbreviates RRC as) flow process; Home eNodeB carries out access control according to above-mentioned access control information to subscriber equipment.
According to a further aspect in the invention, a kind of subscriber equipment is provided, has comprised: information notification module is used for the flow process through RRC, the access control information of this subscriber equipment of notice Home eNodeB.
According to another aspect of the invention, a kind of Home eNodeB is provided, has comprised: the information acquisition module, be used for flow process through RRC, obtain the access control information of subscriber equipment; The access control module is used for according to above-mentioned access control information subscriber equipment being carried out access control.
In accordance with a further aspect of the present invention, a kind of Home eNodeB access control system is provided, has comprised: above-mentioned subscriber equipment and above-mentioned Home eNodeB.
Through the present invention; Employing is passed through the RRC flow process by Home eNodeB; Obtain the access control information of subscriber equipment and the scheme of further this subscriber equipment being carried out access control; Solved Home eNodeB can't carry out access control to subscriber equipment in the X2 switching flow problem, made the Home eNodeB access net system can in the X2 switching flow, accomplish access control the terminal.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is the structured flowchart according to the HeNB network of prior art;
Fig. 2 is the schematic flow sheet that switches according to S1 in the HeNB network of prior art;
Fig. 3 is the flow chart according to the Home eNodeB connection control method of the embodiment of the invention;
Fig. 4 is the flow chart of Home eNodeB connection control method according to the preferred embodiment of the invention;
Fig. 5 is that the HeNB of the instance according to the present invention sets up the schematic flow sheet that process is obtained terminal access control information through the RRC connection;
Fig. 6 is the HeNB of the instance according to the present invention obtains terminal access control information through RRC connection reconstruction process a schematic flow sheet;
Fig. 7 is that the HeNB of the instance according to the present invention connects the schematic flow sheet that reconfiguration course obtains terminal access control information through RRC;
Fig. 8 is the HeNB of the instance according to the present invention accomplishes access control through the terminal access control information that gets access to a schematic flow sheet;
Fig. 9 is the structured flowchart according to the subscriber equipment of the embodiment of the invention;
Figure 10 is the structured flowchart according to the Home eNodeB of the embodiment of the invention;
Figure 11 is the structured flowchart of Home eNodeB according to the preferred embodiment of the invention.
Embodiment
Hereinafter will and combine embodiment to specify the present invention with reference to accompanying drawing.Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the application can make up each other.
Fig. 3 is the flow chart according to the Home eNodeB connection control method of the embodiment of the invention.As shown in Figure 3, comprise according to the Home eNodeB connection control method of the embodiment of the invention:
Step S302, Home eNodeB obtain the access control information of subscriber equipment through the RRC flow process;
Step S304, Home eNodeB carries out access control according to above-mentioned access control information to subscriber equipment.
In existing X2 switching flow, because switching flow is to accomplish in the Access Network side, MME does not participate in switching flow, so HeNB can't be known the ACL of subscriber equipment, therefore is difficult to accomplish the access control to subscriber equipment.But; Because the ACL information of subscriber equipment is actually and is kept in the subscriber equipment; Therefore just its ACL is sent to HeNB in the time of can letting subscriber equipment at the beginning of connecting with HeNB; Make HeNB know this information, thereby solve the problems of the technologies described above at one stroke, for follow-up access control is provided convenience.In the said method, utilized the RCC flow process, made HeNB connect the access control information of knowing subscriber equipment, for follow-up access control provides foundation through set up RCC in subscriber equipment.
Preferably, step S304 can further include following processing:
When Home eNodeB is in the CSG ID that has this Home eNodeB in the access control information of sealing access module and subscriber equipment, this subscriber equipment is inserted;
When Home eNodeB is in open access module, subscriber equipment is inserted;
When Home eNodeB is in the mixing access module, subscriber equipment is inserted, when Home eNodeB is in the CSG ID that has this Home eNodeB in the access control information of mixing access module and subscriber equipment, this subscriber equipment is preferentially inserted.
The concrete operations of the above-mentioned processing access control that to be HeNB carry out the user according to ACL, whether HeNB can be according to ACL inserts the user to and judges, when judged result just can insert subscriber equipment when being passable, thereby has realized access control.
Preferably; As shown in Figure 4; After Home eNodeB inserts subscriber equipment,, can also comprise according to the Home eNodeB connection control method of the preferred embodiment of the present invention (wherein step S402, step S404 identical) with the operation of above-mentioned steps S302, step S304 execution:
Step S406, Home eNodeB sends to MME with its CSG configuration, confirms whether subscriber equipment is normal access.
From the consideration of fail safe and reliability, after inserting completion, Home eNodeB preferably sends to MME with its CSG configuration to be confirmed, confirms with final whether this subscriber equipment is normal access.
Preferably, above-mentioned CSG configuration comprise following one of at least: whether the access module of target BS, CSG ID, subscriber equipment insert with member's identity.
The CSG configuration of target BS is that MME confirms whether this subscriber equipment is the normal foundation that inserts, and includes but not limited to above-mentioned three configuration informations, can expand according to actual conditions.
Preferably, above-mentioned access control information can comprise one of following: a closed signed user Groups List ACL that allows to insert or the part of this ACL.
The access control information spinner will be meant the ACL of subscriber equipment among the present invention, but also can expand according to concrete needs.Need to prove that in the practical implementation process, can a part with ACL send to HeNB, the information that promptly only whether specific cell is allowed to insert sends to HeNB, places just choosing of specific cell to have selected as the case may be.
Preferably, above-mentioned RRC flow process can comprise one of following: RRC connection building process, RRC connection reconstruction flow process, RRC connect and reshuffle flow process.
What subscriber equipment and HeNB set up that RRC is connected can have multiple flow process, can be by subscriber equipment initiation request initiatively, and also can be by HeNB initiation request initiatively.These different flow processs can be used for making HeNB to know the access control information of subscriber equipment, the instance that specifically can vide infra.
Below in conjunction with instance and Fig. 5 to Fig. 8 above-mentioned preferred embodiment is elaborated, the said terminal in the instance is a kind of of subscriber equipment.
Instance 1:
This case description in the process that the terminal is initially inserted, is initiated the RRC flow process to HeNB under the LTE system, HeNB sets up through RRC and accomplishes message, obtains the ACL information at terminal.In the present embodiment, HeNB can directly connect MME, also can be connected to MME through HeNB GW.As shown in Figure 5, may further comprise the steps:
Step S502: starting up of terminal, initiate initial access process to HeNB, request is set up RRC and is connected, and this RRC connection request message is with existing RRC connection request message (RRC Connection request);
Step S504:HeNB receives the RRC connection request message at terminal, initiates the RRC connection message to the terminal, and this message is with existing RRC connection message (RRC Connection);
Step S506: the RRC connection message of HeNB is received at the terminal; Reply RRC to HeNB and connect completion message; This message connects to accomplish at existing RRC adds a cell in the message (RRC Connection Complete); The content of this cell is the ACL at this terminal, or whether specific cell is allowed to insert;
Step S508: initial access process is proceeded in the terminal after accomplishing the RRC establishment of connection, this process is identical with existing process.
Embodiment 2:
This case description is under the LTE system, and the terminal gets into the RRC_CONNECTED attitude from the RRC_IDLE attitude, initiates RRC connection reconstruction flow process to network side, and HeNB rebuilds through RRC and accomplishes message, obtains the ACL information at terminal.In the present embodiment, HeNB can directly connect MME, also can be connected to MME through HeNB GW.As shown in Figure 6, may further comprise the steps:
Step S602: the terminal has not got into the RRC_IDLE attitude owing to carrying out business for a long time after the access network side;
Step S604: a certain moment of terminal need be carried out business, initiates RRC connection reconstruction request message to network side, and this message is with existing RRC connection reconstruction request message (RRC Connection Reestablishment Request);
Step S606:HeNB receives the RRC connection reconstruction request at terminal, initiates RRC connection reconstruction message to the terminal, and this message is with existing RRC connection reconstruction message (RRC Connection Reestablishment);
Step S608: the RRC connection reconstruction message of HeNB is received at the terminal; Reply the RRC connection reconstruction to HeNB and accomplish message; This message is accomplished in existing RRC connection reconstruction and is added a cell in the message (RRC Connection Reestablishment Complete); The content of this cell is the ACL at this terminal, or whether specific cell is allowed to insert;
Step S610: the mutual of completion and network side continued in the terminal after accomplishing the RRC connection reconstruction, and initiates professional to network side.
Instance 3:
This case description is under the LTE system, and the terminal gets into the RRC_CONNECTED attitude from the RRC_IDLE attitude, and network side is initiated the RRC connection to the terminal and reshuffled flow process, and HeNB reshuffles completion message through RRC, obtains the ACL information at terminal.In the present embodiment, HeNB can directly connect MME, also can be connected to MME through HeNB GW.As shown in Figure 7, may further comprise the steps:
Step S702: the terminal has not got into the RRC_IDLE attitude owing to carrying out business for a long time after the access network side;
Step S704: network side at a time needs and terminal carrying out service, and HeNB sends RRC to the terminal and connects reconfiguration message, and this message connects reconfiguration message (RRC Connection Reconfiguration) with existing RRC;
Step S706: the terminal receives that the RRC of HeNB connects reconfiguration message; Reply the RRC connection to HeNB and reshuffle completion message; This message connects to reshuffle to accomplish at existing RRC adds a cell in the message (RRC Connection Reconfiguration Complete); The content of this cell is the ACL at this terminal, or whether specific cell is allowed to insert;
Step S708: network side continues to carry out alternately with the terminal, and initiates business to end side after completion RRC connection is reshuffled.
Instance 4:
This case description is under the LTE system, and in the flow process of the terminal being carried out the X2 switching, source HeNB (source HeNB) carries out access control through the ACL that gets access to the terminal.In the present embodiment, source HeNB can directly be connected MME with target HeNB (target HeNB), also can be connected to MME through HeNB GW.As shown in Figure 8, may further comprise the steps:
Step S802: business is carried out with network side in the terminal;
Step S804:source HeNB switches to target HeNB through the measurement report decision of terminal to report with the terminal;
The ACL that the embodiment of step S806:source HeNB through the front obtains carries out access control to the terminal.If the access module of target HeNB is close, and CSG ID is in ACL, and perhaps the access module of target HeNB is hybrid or open, and then target HeNB can be inserted in the terminal;
Step S808:source HeNB sends handoff request message (Handover Request) through X2 interface to target HeNB; Target HeNB sends switching request acknowledgement message (Handover Request Acknowledge) to source HeNB, and these two message are with existing message;
Step S810:source HeNB sends to the terminal and inserts reconfiguration message, and the terminal is sent to insert to target HeNB and reshuffled completion message, and these two message are the same with existing message;
Step S812:target HeNB sends Path Switch Request message to MME or through HeNB GW to MME; This message is added the CSG configuration in existing Path Switch Request; Such as the access module of target HeNB, whether CSG ID and terminal are inserted with member's identity;
Step S814:MME receives Path Switch Request message; The access information at the terminal that target HeNB is provided is confirmed; If the terminal is normal access; Send Path Switch Request Acknowledge message,, send Path Switch Request failure message if the terminal is improper access.
Fig. 9 is the structured flowchart according to the subscriber equipment of the embodiment of the invention.As shown in Figure 9, comprise according to the subscriber equipment of the embodiment of the invention:
Information notification module 92 is used for the flow process through RRC, the access control information of this subscriber equipment of notice Home eNodeB.
Above-mentioned subscriber equipment is when connecting with HeNB, and the ACL that can utilize the RRC flow process will be kept in the subscriber equipment sends to HeNB.Thereby make HeNB know this access control message, for follow-up access control is provided convenience.
Preferably, above-mentioned access control information can comprise one of following: a closed signed user Groups List ACL that allows to insert or the part of this ACL; It is one of following that above-mentioned RRC flow process can comprise: RRC connection building process, RRC connection reconstruction flow process, RRC connect and reshuffle flow process.
The access control information spinner will be meant the ACL of subscriber equipment among the present invention, but also can expand according to concrete needs.Need to prove that in the practical implementation process, can a part with ACL send to HeNB, the information that promptly only whether specific cell is allowed to insert sends to HeNB, places just choosing of specific cell to have selected as the case may be.
What subscriber equipment and HeNB set up that RRC is connected can have multiple flow process, can be by subscriber equipment initiation request initiatively, and also can be by HeNB initiation request initiatively.These different flow processs can be used for making HeNB to know the access control information of subscriber equipment.
Figure 10 is the structured flowchart according to the Home eNodeB of the embodiment of the invention.Shown in figure 10, comprise according to the Home eNodeB of the embodiment of the invention:
Information acquisition module 102 is used for the flow process through RRC, obtains the access control information of subscriber equipment;
Access control module 104 is connected to information acquisition module 102, is used for according to above-mentioned access control information subscriber equipment being carried out access control.
Above-mentioned HeNB can utilize the RRC flow process to obtain the access control information of subscriber equipment, thereby provide convenience for follow-up access control when connecting with subscriber equipment.
Preferably, access control module 104 may further include:
Sealing access unit 1042 is connected to information acquisition module 102, is used for when Home eNodeB is in the CSG ID of this Home eNodeB of access control information existence that seals access module and subscriber equipment, this subscriber equipment being inserted;
Open access unit 1044 is connected to information acquisition module 102, is used for when Home eNodeB is in open access module, and subscriber equipment is inserted;
Mix access unit 1046; Be connected to information acquisition module 102; Be used for when Home eNodeB is in the mixing access module; Subscriber equipment is inserted, when Home eNodeB is in the CSG ID that has this Home eNodeB in the access control information of mixing access module and subscriber equipment, this subscriber equipment is preferentially inserted.
Use said units can make HeNB accomplish the access control that the user is carried out, make HeNB can be according to ACL the user be inserted and judge, when judged result just can insert subscriber equipment when being passable whether according to ACL.
Preferably, shown in figure 11, Home eNodeB can further include according to the preferred embodiment of the invention:
Admission confirm module 106 is connected to access control module 104, is used for after Home eNodeB inserts subscriber equipment, and the CSG configuration of standing family is basic sends to MME, confirms whether this subscriber equipment is normal access.
From the consideration of fail safe and reliability, after inserting completion, Home eNodeB preferably sends to MME with its CSG configuration to be confirmed, confirms with final whether this subscriber equipment is normal access.
Preferably, above-mentioned CSG configuration comprise following one of at least: whether the access module of target BS, CSG ID, subscriber equipment insert with member's identity.
The CSG configuration of target BS is that MME confirms whether this subscriber equipment is the normal foundation that inserts, and includes but not limited to above-mentioned three configuration informations, can expand according to actual conditions.
Preferably, preferably, it is one of following that above-mentioned access control information can comprise: a closed signed user Groups List ACL that allows to insert or the part of this ACL; It is one of following that above-mentioned RRC flow process can comprise: RRC connection building process, RRC connection reconstruction flow process, RRC connect and reshuffle flow process.
The access control information spinner will be meant the ACL of subscriber equipment among the present invention, but also can expand according to concrete needs.Need to prove that in the practical implementation process, can a part with ACL send to HeNB, the information that promptly only whether specific cell is allowed to insert sends to HeNB, places just choosing of specific cell to have selected as the case may be.
What subscriber equipment and HeNB set up that RRC is connected can have multiple flow process, can be by subscriber equipment initiation request initiatively, and also can be by HeNB initiation request initiatively.These different flow processs can be used for making HeNB to know the access control information of subscriber equipment.
The present invention also provides a kind of Home eNodeB access control system, comprises according to the subscriber equipment of the foregoing description or preferred embodiment and according to the Home eNodeB of the foregoing description or preferred embodiment.As the Home eNodeB access control system, can comprise one or more above-mentioned subscriber equipmenies and Home eNodeB, these equipment combine can realize above-mentioned Home eNodeB connection control method.
From above description, can find out that through technical scheme of the present invention, Home eNodeB can get access to and carry out the needed terminal of access control ACL information in the X2 switching flow, thereby accomplish access control the terminal.
Obviously, it is apparent to those skilled in the art that above-mentioned each module of the present invention or each step can realize with the general calculation device; They can concentrate on the single calculation element; Perhaps be distributed on the network that a plurality of calculation element forms, alternatively, they can be realized with the executable program code of calculation element; Thereby; Can they be stored in the storage device and carry out, and in some cases, can carry out step shown or that describe with the order that is different from here by calculation element; Perhaps they are made into each integrated circuit modules respectively, perhaps a plurality of modules in them or step are made into the single integrated circuit module and realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is merely the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (14)

1. a Home eNodeB connection control method is characterized in that, comprising:
Said Home eNodeB obtains the access control information of subscriber equipment through the radio resource control RRC flow process;
Said Home eNodeB carries out access control according to said access control information to said subscriber equipment.
2. method according to claim 1 is characterized in that, said Home eNodeB carries out access control according to said access control information to said subscriber equipment and comprises:
Be in when having the closed signed user group id CSG ID of said Home eNodeB in sealing access module and the said access control information at said Home eNodeB, said subscriber equipment is inserted;
When said Home eNodeB is in open access module, said subscriber equipment is inserted;
Be in when mixing access module at said Home eNodeB, said subscriber equipment is inserted, be at said Home eNodeB and mix when having the CSG ID of said Home eNodeB in access module and the said access control information, said subscriber equipment is preferentially inserted.
3. method according to claim 2 is characterized in that, after said Home eNodeB inserts said subscriber equipment, also comprises:
Said Home eNodeB sends to mobile management entity MME with its closed signed user group CSG configuration, confirms whether said subscriber equipment is normal access.
4. method according to claim 3 is characterized in that, said CSG configuration comprise following one of at least: whether the CSG ID of the access module of said Home eNodeB, said Home eNodeB, said subscriber equipment insert with member's identity.
5. according to each described method of claim 1 to 4, it is characterized in that it is one of following that said access control information comprises: a closed signed user Groups List ACL that allows to insert or the part of this ACL.
6. according to each described method of claim 1 to 4, it is characterized in that it is one of following that said RRC flow process comprises: RRC connection building process, RRC connection reconstruction flow process, RRC connect and reshuffle flow process.
7. a subscriber equipment is characterized in that, comprising:
Information notification module is used for through the radio resource control RRC flow process, the access control information of the said subscriber equipment of notice Home eNodeB.
8. subscriber equipment according to claim 7 is characterized in that,
It is one of following that said access control information comprises: a closed signed user Groups List ACL that allows to insert or the part of this ACL or whether specific cell is allowed access information.
It is one of following that said RRC flow process comprises: RRC connection building process, RRC connection reconstruction flow process, RRC connect and reshuffle flow process.
9. a Home eNodeB is characterized in that, comprising:
The information acquisition module is used for through the radio resource control RRC flow process, obtains the access control information of subscriber equipment;
The access control module is used for according to said access control information said subscriber equipment being carried out access control.
10. Home eNodeB according to claim 9 is characterized in that, said access control module comprises:
The sealing access unit is used for when said Home eNodeB is in sealing access module and said access control information and has the closed signed user group id CSG ID of said Home eNodeB, said subscriber equipment being inserted;
Open access unit is used for when said Home eNodeB is in open access module, and said subscriber equipment is inserted;
Mix access unit; Be used for when said Home eNodeB is in the mixing access module; Said subscriber equipment is inserted, be at said Home eNodeB and mix when having the CSG ID of said Home eNodeB in access module and the said access control information, said subscriber equipment is preferentially inserted.
11. Home eNodeB according to claim 10 is characterized in that, also comprises:
The admission confirm module is used for after said Home eNodeB inserts said subscriber equipment, and the closed signed user group CSG configuration of standing said family is basic sends to mobile management entity MME, confirms whether said subscriber equipment is normal access.
12. Home eNodeB according to claim 11 is characterized in that, said CSG configuration comprise following one of at least: whether the CSG ID of the access module of said Home eNodeB, said Home eNodeB, said subscriber equipment insert with member's identity.
13. according to each described Home eNodeB of claim 9 to 12, it is characterized in that,
It is one of following that said access control information comprises: a closed signed user Groups List ACL that allows to insert or the part of this ACL or whether specific cell is allowed access information;
It is one of following that said RRC flow process comprises: RRC connection building process, RRC connection reconstruction flow process, RRC connect and reshuffle flow process.
14. a Home eNodeB access control system is characterized in that, comprising: claim 7 or 8 described subscriber equipmenies and each described Home eNodeB of claim 9 to 13.
CN2011101341457A 2011-04-29 2011-04-29 Home eNB access control method, device and system Pending CN102761939A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2011101341457A CN102761939A (en) 2011-04-29 2011-04-29 Home eNB access control method, device and system
PCT/CN2012/071337 WO2012146074A1 (en) 2011-04-29 2012-02-20 Access control method of home enodeb, apparatus and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101341457A CN102761939A (en) 2011-04-29 2011-04-29 Home eNB access control method, device and system

Publications (1)

Publication Number Publication Date
CN102761939A true CN102761939A (en) 2012-10-31

Family

ID=47056227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101341457A Pending CN102761939A (en) 2011-04-29 2011-04-29 Home eNB access control method, device and system

Country Status (2)

Country Link
CN (1) CN102761939A (en)
WO (1) WO2012146074A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103347295A (en) * 2013-07-31 2013-10-09 重庆邮电大学 Energy-saving control method for family base station networks

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101388811A (en) * 2007-09-10 2009-03-18 中兴通讯股份有限公司 Access control method based on radio access network
CN101651974A (en) * 2009-09-10 2010-02-17 中兴通讯股份有限公司 Registration method and system of user equipment of closed user group in home node base system
US20100279687A1 (en) * 2009-05-04 2010-11-04 Qualcomm Incorporated Access mode-based access control
CN101938733A (en) * 2009-06-30 2011-01-05 大唐移动通信设备有限公司 Acquiring method and equipment of ACL (Allowable Closed Subscriber Group List)
CN101990273A (en) * 2009-08-04 2011-03-23 中兴通讯股份有限公司 Method and system for home base station in hybrid access mode to acquire access mode of user equipment (UE)

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101388811A (en) * 2007-09-10 2009-03-18 中兴通讯股份有限公司 Access control method based on radio access network
US20100279687A1 (en) * 2009-05-04 2010-11-04 Qualcomm Incorporated Access mode-based access control
CN101938733A (en) * 2009-06-30 2011-01-05 大唐移动通信设备有限公司 Acquiring method and equipment of ACL (Allowable Closed Subscriber Group List)
CN101990273A (en) * 2009-08-04 2011-03-23 中兴通讯股份有限公司 Method and system for home base station in hybrid access mode to acquire access mode of user equipment (UE)
CN101651974A (en) * 2009-09-10 2010-02-17 中兴通讯股份有限公司 Registration method and system of user equipment of closed user group in home node base system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103347295A (en) * 2013-07-31 2013-10-09 重庆邮电大学 Energy-saving control method for family base station networks
CN103347295B (en) * 2013-07-31 2016-01-20 重庆邮电大学 A kind of energy-saving control method of home base station network

Also Published As

Publication number Publication date
WO2012146074A1 (en) 2012-11-01

Similar Documents

Publication Publication Date Title
JP7152109B2 (en) Communication terminal and communication method
EP2525602B2 (en) Processing methods and device for handing over to closed subscriber group cell
CN102378288B (en) The method and system of cell update, base station from home
CN106162777B (en) Relay node switching method and system
CN102256233B (en) Closed subscriber group (CSG) cell handover method, equipment and system
CN111225427B (en) Method for establishing X2 through gateway
US10264468B1 (en) Method and apparatus of supporting wireless femtocell clusters
CN111601315B (en) Method for supporting verification of home base station
US11265956B2 (en) Radio communication system and user device
WO2011040601A1 (en) Mobile communication method, mobile station and radio base station
RU2547816C2 (en) Base station devices, mobility management entity, system, method and computer programme product for informing core network of subscriber access group of target cell during x2 handover procedure
CN103220815A (en) Establishing method and device of interface connection between base stations
US20120003980A1 (en) Method and apparatus for supporting local breakout in wireless communication network including femtocells
EP3251417B1 (en) Mobility signalling for user equipment using dual connectivity
CN101998542A (en) Method and system for handling failure of closed user group cell switching
MX2012015140A (en) Switch method, communications device and communications system.
EP2254378A1 (en) A method of paging a user terminal in idle mode, and a femtocell-controlling gateway
CN102378313A (en) Mobility management entity selecting method and relay node
CN110012500B (en) Method and device for reporting measurement report
CN106304060B (en) Switching method and system in dual-connection system supporting closed member group
CN102170670A (en) Method, system and device for cell switch and close subscriber group information sending
CN102917434A (en) Access control method and system under scene that home base station supports a plurality of cells
CN102958094A (en) System and method for implementation of femtocell wireless access network sharing
CN106559847B (en) Main base station and method for switching to CSG cell
CN102761939A (en) Home eNB access control method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121031