CN101847227A - Product test management system and method - Google Patents

Product test management system and method Download PDF

Info

Publication number
CN101847227A
CN101847227A CN200910301096A CN200910301096A CN101847227A CN 101847227 A CN101847227 A CN 101847227A CN 200910301096 A CN200910301096 A CN 200910301096A CN 200910301096 A CN200910301096 A CN 200910301096A CN 101847227 A CN101847227 A CN 101847227A
Authority
CN
China
Prior art keywords
test
unit
product
data
tester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910301096A
Other languages
Chinese (zh)
Inventor
蓝元志
陈昕辉
丘德盛
廖文颢
王翔
周武京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CN200910301096A priority Critical patent/CN101847227A/en
Publication of CN101847227A publication Critical patent/CN101847227A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • General Factory Administration (AREA)

Abstract

The invention discloses a product test management system for managing the test on products, comprising a test data module for storing various data needed by a test, a test management module for carrying out test management on the whole test process of an item to be tested according to the data provided by the test data module, and a test statistics module for generating a statistical form for analyzing and controlling the time and the cost of the item according to a test result calculated by the test management module and displaying. The invention also provides a product test management method. By applying the product test management system and method, product test can be effectively and conveniently managed.

Description

Product test management system and test and management method
Technical field
The present invention relates to a kind of management system and method, particularly a kind of test and management system and test and management method at the product test aspect.
Background technology
When research and development department developed new product as the server new architecture, after a plurality of test phases of needs process were verified and passed through usually, new product just can enter the volume production stage.In whole testing authentication process, the tester of checking department such as Test Engineer can come the configuration of maintenance test plan and test environment by Excel form or Word document usually, for example comprise information such as the spare part of relevant test case, test procedure, composition product and correlation technique specification; Responsible official among the tester such as test lead can only check project testing progress, test status and slip-stick artist's Task Distribution situation usually by various formula result of calculations.
Because above-mentioned test basic document is not done unified management control, is easy to produce mistake in the detecting information transmittance process, thereby causes the distortion of test result, can't guarantee the quality of test products.And come the management testing task by Excel form or Word document, operating efficiency is low and make mistakes easily, the statistical summaries of test result is also more loaded down with trivial details, make whole test process progress, situation opaque, can't do cost and temporal management control to whole testing authentication process, to make rapid reaction with market.
Summary of the invention
In view of foregoing, the invention provides a kind of test and management system and the test and management method that can carry out effectively product test, conveniently manage.
A kind of product test management system is used for the test of product is managed, and described product test management system comprises:
One test data module is used to store the required various data of using of test;
One test and management module, it comprises a project team unit, is used for the tester's of setting item team role and tests authority accordingly; One supply equipment unit is used for safeguarding the test spare part of each test item; One project stage unit is used to the tester with corresponding authority that test phase template and establishment disparity items test phase are provided; One stage product specification unit is used to different test phases to provide and safeguards each work-in-process specification; The test environment configuration in each stage of data creation of being provided according to described supply equipment unit and described work-in-process specification unit is provided one test environment dispensing unit; One test plan unit is used to different test phases to set up test plan; The concrete test item of data creation that is provided according to described test plan unit and described test environment dispensing unit is provided one test item production unit; One test assignment allocation units are used for tester's allocation for test task that sacrificial vessel has corresponding authority; And a test result collecting unit, be used for supplying tester input test result and gathering input results; And
One test statistics module is used for generating the statistical report form that PROJECT TIME and cost are analyzed and controlled and showing according to the test result that described test and management module draws.
A kind of product test management method, the input command that has the tester of corresponding authority by reception is realized test and management, described product test management method may further comprise the steps:
Input test data in a test data module;
User profile to the tester that stores in the described test data module is carried out authority setting;
From described test data module, choose required spare part of each test phase and operating system;
Choose the test phase that needs establishment;
From described test data module, choose the detail specifications of product to be measured;
Create the test environment configuration in each stage of test;
Set up test plan for testing each stage;
The test item that foundation need be finished;
Concrete test assignment is distributed to corresponding tester;
The test result of the corresponding task of each tester is gathered; And
Receive the test result data that collects by a test statistics module, and generate the statistical report form and the demonstration of test usefulness according to above-mentioned data.
Compare prior art, described product test management system and method are by the required various data of using of described test data module stores test, by described test and management module test process is managed again, by described test statistics module test result is automatically generated corresponding statistical report form at last and show, made things convenient for the test data management, test plan is made, test assignment is distributed and the test result collection, and provide multiple statistical report form to exercise supervision and make a strategic decision for the test lead, thereby reduced the test duration of product effectively, test error rate and testing cost, improved the quality of product.
Description of drawings
The invention will be further described in conjunction with embodiment with reference to the accompanying drawings.
Fig. 1 is the theory diagram of the better embodiment of product test management system of the present invention.
Fig. 2 is the process flow diagram of the better embodiment of product test management method of the present invention.
Embodiment
Please refer to Fig. 1, the better embodiment of product test management system of the present invention comprises a test data module 10, a test and management module 20 and a test statistics module 30.Between these three modules, described test data module 10 provides test the required various data of using for test and management module 20, described test and management module 20 manages at the whole test process of test request to test item, and the test result that described test statistics module 30 draws according to described test and management module 20 generates the statistical report form that PROJECT TIME and cost are analyzed and controlled and shows.
Described test data module 10 comprises a use-case and use-case template base unit 110, a product specification library unit 120, a supply equipment library unit 130, a test procedure library unit 140 and a user profile library unit 150.Wherein, described use-case and use-case template base unit 110 are used for storing all test cases and the test case template that test is used; Described supply equipment library unit 120 is used for storing the various spare parts and the operating system of the supply equipment that test uses, and described supply equipment can be testing apparatus or watch-dog etc.; Described product specification library unit 130 is used to store the concrete specifications parameter of product to be measured; Described test procedure library unit 140 is used for storing the test procedure that test is used; Described user profile library unit 150 is used for storing testers' such as all Test Engineers of test process and test lead user profile.In other embodiments, also can increase or the minimizing units corresponding,, be not limited to the unit kind that present embodiment is enumerated to adapt to various test environments according to concrete test request.
Described test and management module 20 comprises a project team unit 210, a supply equipment unit 220, a project stage unit 230, a stage product specification unit 240, a test environment dispensing unit 250, a test plan unit 260, a test item production unit 270, test assignment allocation units 280 and a test result collecting unit 290.Wherein, described project team unit 210 is used for the tester's of setting item team role and tests authority accordingly, and tester's role can comprise test lead, Test Engineer etc.; Described supply equipment unit 220 is used for safeguarding the test spare part of each test item, promptly chooses each test phase required test spare part and operating system; Described project stage unit 230 is used to the tester with corresponding authority that the test phase template is provided and creates the disparity items test phase; Described work-in-process specification unit 240 is used for safeguarding each work-in-process specification at different test phases, promptly chooses the detail specifications of product to be measured; The test environment configuration in each stage of data creation of being provided according to described supply equipment unit 220 and described work-in-process specification unit 240 is provided described test environment dispensing unit 250; Described test plan unit 260 is used to different test phases to set up test plan; The data that described test item production unit 270 is used for being provided according to described test plan unit 250 and described test environment dispensing unit 260 are created concrete test item fast; Described test assignment allocation units 280 are used for tester's allocation for test task that sacrificial vessel has corresponding authority; Described test result collecting unit 290 is used for for tester input test result and gathers input results.
Described test statistics module 30 comprises a testing progress table unit 310, a test mode table unit 320, a test specification analytical table unit 330, a test assignment allocation table unit 340, a curve of progress figure unit 350.Wherein, described testing progress table unit 310 be used for to test item in a period of time (as every day) actual test Percent Complete and scenario test Percent Complete calculate and add up; Described test mode table unit 320 is used for adding up according to different used time of test result number, test result and the number percent of finishing; Described test specification analytical table unit 330 is used for statistical test environment configurations data; Described test assignment allocation table unit 340 is used to add up the number percent of the data that test case number, test duration and each Test Engineer that each Test Engineer is assigned to be assigned to; Described curve of progress figure unit 350 is used to generate the correlation curve figure of the current project scheduling and actual progress.
In other embodiments, unit in test data module 10, test and management module 20 and test statistics module 30 is provided with, can correspondingly increase or reduce the unit kind and the function of test usefulness according to concrete test request, to adapt to various test environments and requirement, be not limited to the kind and the function setting of various unit cited in the present embodiment.
Please refer to Fig. 2, the better embodiment of product test management method of the present invention may further comprise the steps:
S11: input test data in described test data module 10, particularly, all test cases and the test case template in described use-case and use-case template base unit 110, used in the input test; The concrete specifications parameter of input product to be measured in described product specification library unit 120; The various spare parts of in described supply equipment library unit 130, using in the input test; The test procedure of in described test procedure library unit 140, using in the input test; And in described user profile library unit 150 all testers' personal user information in the input test process.
S12: receive the input command of the tester with corresponding authority by described project team unit 210, so that testers' such as the Test Engineer of storage in the described user profile library unit 150 and test lead user profile is carried out authority setting.For example, the authority that the Test Engineer only has the test result of filling in is set, the test lead is set to be had and creates test assignment, allocation for test task, checks authority such as test result.
S13: receive the input command of the tester with corresponding authority by described supply equipment unit 220, from described supply equipment library unit 120, to choose required spare part of each test phase and operating system.
S14: receive the input command of the tester with corresponding authority by described project stage unit 230, with the test phase of from described project stage unit 230, choosing the test phase template as required and creating.For example: insert the start time and the Estimated Time Of Completion of test phase, create sub for each test phase, fill in each sub information, a project can comprise a plurality of test phases, can create a plurality of test subs under a test phase again.
S15: receive the input command of the tester with corresponding authority by described work-in-process specification unit 240, from described product specification library unit 130, to choose the detail specifications of product to be measured.
S16: receive the input command of the tester with corresponding authority by described test environment dispensing unit 250, to create the test environment configuration in each stage of test.Wherein, a test phase comprises an environment configurations group, can comprise a plurality of functional configuration groups below the environment configurations group, can comprise a plurality of configuration items again under each functional configuration group.But content is created among the configuration integrating step S13 of this step test environment and the S15.
S17: receive the input command of the tester with corresponding authority by described test plan unit 260, think that each stage of test sets up test plan.Wherein, set up test plan and comprise three kinds of modes: mode one, choose in the test case that from described use-case and use-case template base unit 110, stores; Mode two is chosen in the test case template that stores from described use-case and use-case template base unit 110; Mode three is chosen from other test macro that is connected with this test macro.
S18: receive the input command of the tester with corresponding authority by described test item production unit 270, to set up the test item that to finish.Wherein, the foundation of test item can be made up according to concrete test case that is provided with among step S16 and the S17 and test environment configuration.
S19: receive the input command of the tester with corresponding authority by described test assignment allocation units 280, concrete test assignment is distributed to corresponding tester (for example the test lead has distributed to a plurality of Test Engineers to a plurality of test assignments).Wherein, test assignment can be respectively disposes according to the concrete test case that is provided with among step S16 and the S17 and test environment and distributes.
S20: receive the input command of the tester with corresponding authority by described test result collecting unit 290,, handle in order to subsequent analysis so that the test result of the corresponding task of each tester is gathered.
S21: described test statistics module 30 receives the test result data that described test result collecting unit 290 collects, and generates the various statistical report forms and the demonstration of test usefulness according to above-mentioned data.Particularly, 310 pairs of test item a period of times of described testing progress table unit interior (as every day) actual test Percent Complete and scenario test Percent Complete calculate and show; Described test mode table unit 320 is added up demonstration according to different used time of test result number, test result and the number percent of finishing; Described test specification analytical table unit 330 statistical test environment configurations data; The number percent of the data that described test assignment allocation table unit 340 statistics test case number, test duration and each Test Engineer that each tester was assigned to are assigned to; Described curve of progress figure unit 350 generates the correlation curve figure of the current project scheduling and actual progress.
Using described product test management system and method manages product test, can make things convenient for test data management, test plan making, test assignment to distribute and the test result collection, and provide multiple statistical report form to exercise supervision and make a strategic decision for the test lead, thereby reduced test duration, test error rate and the testing cost of product effectively, improved the quality of product.

Claims (6)

1. a product test management system is used for the test of product is managed, and described product test management system comprises:
One test data module is used to store the required various data of using of test;
One test and management module, it comprises a project team unit, is used for the tester's of setting item team role and tests authority accordingly; One supply equipment unit is used for safeguarding the test spare part of each test item; One project stage unit is used to the tester with corresponding authority that test phase template and establishment disparity items test phase are provided; One stage product specification unit is used to different test phases to provide and safeguards each work-in-process specification; The test environment configuration in each stage of data creation of being provided according to described supply equipment unit and described work-in-process specification unit is provided one test environment dispensing unit; One test plan unit is used to different test phases to set up test plan; The concrete test item of data creation that is provided according to described test plan unit and described test environment dispensing unit is provided one test item production unit; One test assignment allocation units are used for tester's allocation for test task that sacrificial vessel has corresponding authority; And a test result collecting unit, be used for supplying tester input test result and gathering input results; And
One test statistics module is used for generating the statistical report form that PROJECT TIME and cost are analyzed and controlled and showing according to the test result that described test and management module draws.
2. product test management system as claimed in claim 1 is characterized in that: described test data module comprises:
One use-case and use-case template base unit are used for storing all test cases and the test case template that test is used;
One supply equipment library unit is used for storing various spare parts and the operating system that test is used;
One product specification library unit is used to store the concrete specifications parameter of product to be measured;
One test procedure library unit is used for storing the test procedure that test is used; And
One user profile library unit is used for storing all testers' of test process user profile.
3. product test management system as claimed in claim 2 is characterized in that: described test statistics module comprises:
One testing progress table unit, be used for to test item in a period of time actual test Percent Complete and scenario test Percent Complete calculate and add up;
One test mode table unit is used for adding up according to different used time of test result number, test result and the number percent of finishing;
One test specification analytical table unit is used for statistical test environment configurations data;
One test assignment allocation table unit is used to add up the number percent of the data that test case number, test duration and each Test Engineer that each Test Engineer is assigned to be assigned to; And
One curve of progress figure unit is used to generate the correlation curve figure of the current project scheduling and actual progress.
4. product test management method, the input command that has the tester of corresponding authority by reception is realized test and management, described product test management method may further comprise the steps:
Input test data in a test data module;
User profile to the tester that stores in the described test data module is carried out authority setting;
From described test data module, choose required spare part of each test phase and operating system;
Choose the test phase that needs establishment;
From described test data module, choose the detail specifications of product to be measured;
Create the test environment configuration in each stage of test;
Set up test plan for testing each stage;
The test item that foundation need be finished;
Concrete test assignment is distributed to corresponding tester;
The test result of the corresponding task of each tester is gathered; And
Receive the test result data that collects by a test statistics module, and generate the statistical report form and the demonstration of test usefulness according to above-mentioned data.
5. product test management method as claimed in claim 4 is characterized in that: the step of input test data comprises in described test data module:
All test cases and the test case template in a use-case and use-case template base unit, used in the input test;
The concrete specifications parameter of input product to be tested in a product specification library unit;
The various spare parts of in a supply equipment library unit, using in the input test;
The test procedure of in a test procedure library unit, using in the input test; And
All Test Engineers and test lead's personal user information in the input test process in a user profile library unit.
6. product test management method as claimed in claim 5 is characterized in that: the step that described test statistics module generates the statistical report form of test usefulness comprises:
One testing progress table unit to test item in a period of time actual test Percent Complete and scenario test Percent Complete calculate and add up;
One test mode table unit was added up according to different used time of test result number, test result and the number percent of finishing;
One test specification analytical table unit statistical test environment configurations data;
The number percent of the data that test case number, test duration and each Test Engineer that each tester is assigned to be assigned to is added up in one test assignment allocation table unit; And
One curve of progress figure unit generates the correlation curve figure of the current project scheduling and actual progress according to the test duration.
CN200910301096A 2009-03-24 2009-03-24 Product test management system and method Pending CN101847227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910301096A CN101847227A (en) 2009-03-24 2009-03-24 Product test management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910301096A CN101847227A (en) 2009-03-24 2009-03-24 Product test management system and method

Publications (1)

Publication Number Publication Date
CN101847227A true CN101847227A (en) 2010-09-29

Family

ID=42771843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910301096A Pending CN101847227A (en) 2009-03-24 2009-03-24 Product test management system and method

Country Status (1)

Country Link
CN (1) CN101847227A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101980225A (en) * 2010-11-16 2011-02-23 中国人民解放军63908部队 Method for implementing testability analysis and diagnosis decision system for electronic products
CN102521697A (en) * 2011-12-13 2012-06-27 广东电网公司信息中心 Power grid informatization evaluating lab management system
CN102693460A (en) * 2011-03-25 2012-09-26 鸿富锦精密工业(深圳)有限公司 Tester management system and method thereof
CN103338129A (en) * 2012-02-13 2013-10-02 弗兰克公司 Method and apparatus for testing and displaying test results
CN105095165A (en) * 2014-05-08 2015-11-25 北大方正集团有限公司 Test analysis report generation method and test analysis report generation device
CN105426307A (en) * 2015-11-05 2016-03-23 深圳市高斯贝尔家居智能电子有限公司 Local area network product test resource sharing method and system
CN106447157A (en) * 2016-08-26 2017-02-22 隆鑫通用动力股份有限公司 Product testing and supervision method and monitoring system thereof
CN106844196A (en) * 2016-12-22 2017-06-13 福建瑞之付微电子有限公司 A kind of payment terminal embedded software test Workload Account system
CN107329944A (en) * 2017-07-04 2017-11-07 武汉斗鱼网络科技有限公司 Report form generation method, device and electronic equipment
CN107783900A (en) * 2017-09-22 2018-03-09 郑州云海信息技术有限公司 A kind of efficient server system test and management system and method
CN108573365A (en) * 2017-03-07 2018-09-25 北京空间技术研制试验中心 The service-oriented and flow state digitized management method of integration test
CN109086985A (en) * 2018-07-20 2018-12-25 北京卫星环境工程研究所 Professional test information management system towards spacecraft
CN109960654A (en) * 2019-02-22 2019-07-02 德联易控科技(北京)有限公司 Test method, device, equipment and the storage medium of setting loss rule

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101980225A (en) * 2010-11-16 2011-02-23 中国人民解放军63908部队 Method for implementing testability analysis and diagnosis decision system for electronic products
CN102693460A (en) * 2011-03-25 2012-09-26 鸿富锦精密工业(深圳)有限公司 Tester management system and method thereof
CN102521697A (en) * 2011-12-13 2012-06-27 广东电网公司信息中心 Power grid informatization evaluating lab management system
US9847921B2 (en) 2012-02-13 2017-12-19 Fluke Corporation Method and apparatus for testing and displaying test results
CN103338129B (en) * 2012-02-13 2019-06-04 弗兰克公司 Method and apparatus for testing and showing test result
US10355951B2 (en) 2012-02-13 2019-07-16 Fluke Corporation Method and apparatus for testing and displaying test results
CN103338129A (en) * 2012-02-13 2013-10-02 弗兰克公司 Method and apparatus for testing and displaying test results
CN105095165A (en) * 2014-05-08 2015-11-25 北大方正集团有限公司 Test analysis report generation method and test analysis report generation device
CN105426307A (en) * 2015-11-05 2016-03-23 深圳市高斯贝尔家居智能电子有限公司 Local area network product test resource sharing method and system
CN105426307B (en) * 2015-11-05 2018-01-16 深圳市高斯贝尔家居智能电子有限公司 A kind of Local Area Network products' test resource sharing method and system
CN106447157A (en) * 2016-08-26 2017-02-22 隆鑫通用动力股份有限公司 Product testing and supervision method and monitoring system thereof
CN106844196A (en) * 2016-12-22 2017-06-13 福建瑞之付微电子有限公司 A kind of payment terminal embedded software test Workload Account system
CN106844196B (en) * 2016-12-22 2019-12-10 福建瑞之付微电子有限公司 Payment terminal embedded software testing workload statistical system
CN108573365A (en) * 2017-03-07 2018-09-25 北京空间技术研制试验中心 The service-oriented and flow state digitized management method of integration test
CN107329944A (en) * 2017-07-04 2017-11-07 武汉斗鱼网络科技有限公司 Report form generation method, device and electronic equipment
CN107783900A (en) * 2017-09-22 2018-03-09 郑州云海信息技术有限公司 A kind of efficient server system test and management system and method
CN109086985A (en) * 2018-07-20 2018-12-25 北京卫星环境工程研究所 Professional test information management system towards spacecraft
CN109960654A (en) * 2019-02-22 2019-07-02 德联易控科技(北京)有限公司 Test method, device, equipment and the storage medium of setting loss rule

Similar Documents

Publication Publication Date Title
CN101847227A (en) Product test management system and method
CN102880532B (en) Cloud technology-based test system and method
US20140032637A1 (en) Enterprise Test System Platform and Associated Method for Interoperable Test Data Management, Test Development, Test Libraries and Test Workflow Management and Automation
CN110162471A (en) A kind of method for testing pressure and system based on container cloud
CN103345442B (en) Equipment automatization test service integrated system
CN100587651C (en) Method and system for supplying combinations of clock frequency, voltage, and current to processors
CN106339312A (en) API (application programming interface) testing method and system
CN107423181A (en) The automated testing method and device of a kind of uniform storage device
CN103365770A (en) Mobile terminal software testing system and software testing method
CN106325883A (en) Development method and system for industry business area information system
CN105786695B (en) Data test method and system
CN105608254A (en) Automated design method and platform oriented to intelligent hardware system development
CN106405286A (en) Electric energy quality monitoring device automatic test method and system
CN104407576A (en) Realization method for general type production and manufacturing unit and control system thereof
CN108182058A (en) A kind of software development methodology and cloud development platform based on cloud platform
Deif et al. A systematic design approach for reconfigurable manufacturing systems
CN103197640A (en) Intelligent management and control system and method of manufacturing technique
CN106776165A (en) Server performance method of testing and system
CN103823145A (en) Automation test platform for hardware
CN103401727A (en) Method, device and system for testing performance of streaming media server based on virtual DVR (digital video recorder)
CN106646315A (en) Automatic testing system and automatic testing method for digital measuring instruments
CN105718372B (en) A kind of electric-controlled plate Black-box testing Cases generation and automatic test approach
CN108809998A (en) A kind of interface access method and device
Wang et al. PV Hosting Capacity Estimation: Experiences with Scalable Framework
Geddes The Large Hadron Collider and Grid computing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100929